1 SRI LANKA Road Network Assessment 20 February 2005 Page 1 of 10

2 By: Road Network Assessment East Coast South Coast North Coast Date Surveyed: Weather conditions during survey: Dry and sunny The survey covers the tsunami affected districts predominantly situated on the south and east coast of the island. These include: Galle District, Matara District, Hambantota District, Ampara District, Batticaloa District, Trincomalee District, Mullaitivu District, and Jaffna District. The road network including bridges along the tsunami affected coastline was assessed under a number of criteria. The network was examined from an operational perspective to establish repair priorities that would best benefit humanitarian operations. The assessment included identifying major obstacles and bottlenecks for road transportation. Cost estimates for road and bridge emergency rehabilitation have been provided but it must be stressed that these improvements will only provide short term benefits. Time pressures have not allowed any detailed strategic analysis of the network. Trincomalee/Batticoloa/Pottuvil East Coast According to the UNHCR and WFP Offices in Trincomalee the MSR (main supply route) from Trincomalee to Batticoloa is as follows: Trinco-Kantale-Somapura-Sunkankuli-Kathiravelli-Vakarai-Panichchankeni-Kakkaville- Vaiaichchenai-Chenkaladi-Batticoloa-Pottuvil The length of the road from the A6/A15/A4 Junction at Trincomalee to Pottuvil is approx. 200km. This was the route for freight and large vehicles prior to the tsunami on the 26 th Dec 04 because of the poor condition of the A15 between Trincomalee and Sunkankuli. The situation on the A15/A4 was exacerbated by the tsunami and has increased the importance of this MSR. The road from Trincomalee involved crossing the Pawara Ar river by ferry at Verugal which was also the situation prior to the tsunami. The A15 was not passable at Panichchankeni because of the damage to the bridge. In order to get to the southern side of the bridge we had to travel back to Kantale, Habarana, Polonnaruwa which involved a journey of approx 240km that took 5hrs. Relief agencies were loading goods on boats from trucks at Panichchankeni in an effort to get them to the other side. The erection of a temporary Bailey Bridge at Panichchankeni is the most important infrastructural item required at present along the A15/A4. Page 2 of 10

3 Panichchankeni Bridge The road from the southern side of Panichchankeni to Pottuvil was passable because of the erection of several temporary bridges and the repair of damaged causeways and roads. There are a number of weight restrictions on the bridges and the roadway is only wide enough for single vehicles in many areas. The repairs were ongoing at the time of the assessment. Page 3 of 10

4 South Coast Kalutara-Galle-Matara-Hambantota-Debarawewa-Kirinda-Palatupana The MSR(main supply route)a2 from Colombo to Palatupana is as follows: Colombo-Kalutara-Galle-Matara-Hambantota-Debarawewa-Kirinda-Palatupana. The length of the road from Kalutara to Palatupana is approx. 250km. This is a two lane carriageway (one lane in each direction) with a bitumen macadam surface. The road follows the coast to Tangalle, moves inland and then touches the coast at Hambantota before going inland again to Debarawewa and then follows the coast from Kirinda to Palatupana. The railway runs parallel to the A2 as far as Matara. The road from Colombo to Galle is in reasonably good condition with two temporary bridges. These Bailey bridges are capable of taking 30 ton and they are not restricting traffic in either direction. The road from Galle to Matara is in good condition. A temporary SS Bailey bridge was erected on the eastern direction of the carriageway as a result of the collapse of one section of a bridge. The temporary bridge is capable of carrying 30 ton but there are no signs in-situ. SS Bailey Bridge Ahangama The road from Matara to Hambantota had suffered some damage but there was evidence of repair work being undertaken. A contractor was laying 2km of wearing course east of Matara and three (3) no. crews of approx fifty (50) personnel were working on the drains and ditches at the side of the road. Pothole filling and surface dressing was also taking Page 4 of 10

5 place at regular intervals. All of the above work was being supervised and coordinated by the RDA. There was no evidence of any significant damage occurring to the bridges. The road from Hambantota to Kirinda was inland and was not affected by the tsunami. There were two locations were traffic was restricted. The first a culvert that was under repair although there was no activity on that day and the second a bridge that could only accommodate traffic in one direction at a time. Culvert at Welligatta A contract for 10km of new road between Wirawila and Debarawewa had recently been completed and the standard of construction was excellent. The road included hard shoulders, drains, road markings, road signs, etc. New Road Wirawila-Debarawewa The road from Kirinda to Palatupana follows the coast and is in poor condition. The carriageway width is less than 4.0m in many areas which does not permit vehicles to pass. Page 5 of 10

6 The road network from Colombo to Palatupana along the coast has largely been unaffected by the tsunami. However the road has limited potential for further development and is presently carrying more vehicles than the design capacity. Page 6 of 10

7 North Coast Trincomalee-Kumpurupiddi-Pulmoddai-Eramadu The road from Trincomalee to Eramadu is approximately 80km long and on the route there are three major bridges(>40m), two minor bridges, two causeways and two ferry crossings. The road follows the coast from Trincomalee to Mullaittivu but because of the security regime access north of Pulmoddai and south of Mullaittivu is restricted. As a result the assessment of the coast road terminated at Pulmoddai and continued inland to Eramadu. The assessment started at the A6/A15 Junction which was the same starting point for the Eastern road assessment completed on 29 th Jan 05. The road from A6/A15 Jn to Kumpurupiddi is in reasonably good condition with a bitumen macadam surface. The average road width is 4.0m. The road from Kumpurupiddi to Eramadu has no surface finish and consists only of a sub-grade. The average road width is 3.5m. The three major bridges and one minor bridge are capable of taking 20ton vehicles. However one of the minor bridges, the causeways and the ferry crossings are only capable of taking passenger vehicles Page 7 of 10

8 Mullaittivu-Puthukkudiyiruppu-Velikkandal-Paranthan A35 The road from Mullaittivu to Paranthan is approximately 54km long and on the route there are thirteen bridges and two causeways. Access south of Mullaittivu was not granted due to the security regime in place. The assessment started at the A35/A34 Junction. The Ministry of Relief, Rehabilitation and Reconstruction has a programme for bridge replacement in the North East. Five bridges along the Mullaittivu-Paranthan route are to be replaced, four of which are completed and the other one is well advanced. The remaining eight bridges are in good condition although they do not have the same load capacity as the new structures. One of the causeways has collapsed and while it is not a hindrance to traffic at the moment it will cause problems when the weather deteriorates. This causeway should be replaced with a similar bridge to the others. The road is in good condition with a bitumen macadam surface. The average width of the road is 6.0m. Page 8 of 10

9 North Coast:Jaffna-Kilinochchi A9 The road from Kilinochchi to Jaffna was not assessed in any detail apart from the bridges. The Ministry of Relief, Rehabilitation and Reconstruction has a programme for four bridges to be replaced along the route. Three bridges are completed and the groundworks are well advanced on the remaining one. The condition of the road is good with a finished surface of bitumen macadam. The A9 at Navatkuli is closed due to the bridge under construction on the route to Jaffna. As a result of the road closure a detour of approx 12km via Kopai into Jaffna will be in place for the next 16 weeks. The average road width of the A9 is approx 6.5m, but the average road width on the detour route is approx 5.0m. Page 9 of 10

10 Damaged Bridges on A Class Roads Ref Location District Length Comments BS8 NW of Kahawa Galle 37.0m Temporary two lane structure supported on original abutments BS7 Galle Galle 37.0m Temporary two lane structure supported on original abutments BS6/6a Ahangama Galle 15.4m Temporary single lane structure supported on original abutments. Eastern side of original bridge used for the other lane. BS5 N of Dondra Matara 19.2m Spalling of concrete on the underside of deck and cracking to bottom of supporting beam. B8 Komari Ampara 35.0m Temporary single lane structure and backfilled causeway C7 Tampaddai Ampara 220.0m Damaged bridge deck and backfilled causeway C5 N of Kallar Batticaloa 200.0m Temporary backfilled causeway B6 N of Kallar Batticaloa 30.45m Temporary two structure supported on backfilled causeway B3 Mankeni Batticaloa 46.5m Temporary single lane structure on poor supports. B2 Panichchankeni Batticaloa 220.0m Temporary single lane structure awaiting erection B1 Mahaweli Trincomalee 30.48m Temporary single lane structure supported on backfilled causeway. BN1 Uppaweli Trincomalee 42.7m Existing single lane damaged concrete bridge deck BN2 S of Kumpurupiddi Trincomalee 231.8m Existing single lane damaged concrete bridge deck BN3 S of Kuchchaveli Trincomalee 66.4m Existing concrete bridge with abutments and piers undermined by action of the sea. BN6 Mullaittivu Mullaitivu 20.1m Existing two lane damaged concrete bridge deck BN19 W of Kaitadi Jaffna 83m New bridge under construction but major diversion of traffic As of 20 Feb 05 all of the above bridges are passable with the exception of B2 and BN19. Page 10 of 10

11 Page 11 of 10

TOURIST ACCOMMODATION

TOURIST ACCOMMODATION 1 TOURIST ACCOMMODATION Number of SLTDA Registered Accommodation Establishments as at end June 2018 Categorization Number of Establishments Number of Rooms Classified Tourist Hotels 136 12,822 Five Star

More information

TOURIST ACCOMMODATION

TOURIST ACCOMMODATION TOURIST ACCOMMODATION Number of SLTDA Registered Accommodation Establishments as at end March 2018 Categorization Establishments Rooms Classified Tourist Hotels 141 12,828 Five stars 20 4,217 Four Star

More information

Pre and Post Tsunami Coastal Planning and Land Use Policies and Issues in Sri Lanka. Sri Lanka. Maritime Zones of Sri Lanka

Pre and Post Tsunami Coastal Planning and Land Use Policies and Issues in Sri Lanka. Sri Lanka. Maritime Zones of Sri Lanka Pre and Post Tsunami Coastal Planning and Land Use Policies and Issues in Sri Lanka Maritime Zones of Sri Lanka By Dr. R.A.D.B. SAMARANAYAKE IMPORTANCE OF COASTAL ZONE The Coast line is 1620 km in length

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

Major Attacks Launched by LTTE on Sri Lankan Navy

Major Attacks Launched by LTTE on Sri Lankan Navy Major Attacks Launched by LTTE on Sri Lankan Navy 03/3/1996 P 110- Nainathivu Pier Destroyed due to explosion of LTTE sea mine. 07/10/1990 SLNS Edithara - Surveillance Off Valvettithurai sustained minor

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

Intervention of a task force composed of professional water technicians in Sri Lanka, after the dec.2004 tsunami

Intervention of a task force composed of professional water technicians in Sri Lanka, after the dec.2004 tsunami Intervention of a task force composed of professional water technicians in Sri Lanka, after the dec.2004 tsunami Presented by François GUERQUIN, Director for International Affairs Société des Eaux de Marseille

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

INVESTMENT PROMOTION DEPARTMENT. DIlip Samarasinghe - Director (Media & Publicity) Board of Investment of Sri Lanka

INVESTMENT PROMOTION DEPARTMENT. DIlip Samarasinghe - Director (Media & Publicity) Board of Investment of Sri Lanka INVESTMENT PROMOTION DEPARTMENT DIlip Samarasinghe - Director (Media & Publicity) Board of Investment of Sri Lanka Country Profile Island Nation of 65000 Sq. Kilometers Population of 20 Million Strategically

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

The astounding victory of the Maithripala Sirisena has not only stunned Rajapaksa, but

The astounding victory of the Maithripala Sirisena has not only stunned Rajapaksa, but SRI LANKA PRESIDENTIAL ELECTIONS 2015: AN OVERVIEW Kriti Singh, Associate Fellow, CAPS The astounding victory of the Maithripala Sirisena has not only stunned Rajapaksa, but also the international community.

More information

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018 BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO

More information

REPUBLIC OF INDONESIA THE URGENT REHABILITATION AND RECONSTRUCTION SUPPORT PROGRAM FOR ACEH PROVINCE AND AFFECTED AREAS IN NORTH SUMATRA

REPUBLIC OF INDONESIA THE URGENT REHABILITATION AND RECONSTRUCTION SUPPORT PROGRAM FOR ACEH PROVINCE AND AFFECTED AREAS IN NORTH SUMATRA No. REPUBLIC OF INDONESIA THE URGENT REHABILITATION AND RECONSTRUCTION SUPPORT PROGRAM FOR ACEH PROVINCE AND AFFECTED AREAS IN NORTH SUMATRA ( REHABILITATION AND RECONSTRUCTION OF WEST COAST ROAD IN NORTH

More information

Road Rehabilitation Project

Road Rehabilitation Project Indonesia Road Rehabilitation Project Report Date: March 2001 Field Survey: September 2000 1. Project Profile and Japan s ODA Loan Location Map of Project Area Improved Road Section in Lampung Province,

More information

The Government of the Democratic Socialist Republic of Sri Lanka.

The Government of the Democratic Socialist Republic of Sri Lanka. The Government of the Democratic Socialist Republic of Sri Lanka. Fourth meeting of the Working Group on the Trans - Asian Railway Network Bangkok 23-24 November 2015 Sri Lanka Railways Wijaya Samarasinghe

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 354 near Dilke ESTIMATED COST: $3.4M START OF THIS YEAR'S CONSTRUCTION: October 1, 2016 DESCRIPTION: About 17 km of surfacing on Highway 354 from the junction with Highway

More information

THREATS OF MANGROVE FLORA AND THE MANAGEMENT ACTIONS; A CASE STUDY IN KALUWANCHIKUDY AREA.

THREATS OF MANGROVE FLORA AND THE MANAGEMENT ACTIONS; A CASE STUDY IN KALUWANCHIKUDY AREA. THREATS OF MANGROVE FLORA AND THE MANAGEMENT ACTIONS; A CASE STUDY IN KALUWANCHIKUDY AREA. Mr. S. Mathanraj and Dr. MIM. Kaleel Department of Geography, South Eastern University of Sri Lanka. smathan02@gmail.com,

More information

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new

More information

SERENJE NAKONDE ROAD PROJECT PROJECT

SERENJE NAKONDE ROAD PROJECT PROJECT SERENJE NAKONDE ROAD PROJECT PROJECT 2 nd German Africa Infrastructure Forum Munich 3 rd -4 th December 2014 Eng. Amos Phiri Contracts Manager (PPIU COMESA-EAC-SADC TRIPARTITE) Serenje Nakonde Road Project

More information

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon

Project Start Date: Project Completion Date: July 1, Contractor: Mattson Construction Contact Information: Nate Lillemon Date: 06-24-16 To: Derek Hackett, Public Information Officer From: Sunil Jeboo, Traffic Engineer Re: Road Closure for the Week of 06-27-16 (3236.1) 6 th Pump Station Western Ave. and 6 th SW Western Ave.

More information

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project CTDOT Project Nos & (Phase 2) Atlantic Street Bridge Project CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro North RR Bridge Replacement Track & Station Infrastructure Improvements City of Stamford

More information

The Covered Bridge of Pepperell

The Covered Bridge of Pepperell The Covered Bridge of Pepperell 1742 - An uncovered wooden bridge historically referred to as the cart bridge at Joseph Blood s Fordway, links Groton West Parish and Groton. Cost Unknown 1753 - As Pepperell

More information

DRAYCOTT IN THE CLAY PARISH COUNCIL

DRAYCOTT IN THE CLAY PARISH COUNCIL Page 1530 DRAYCOTT IN THE CLAY PARISH COUNCIL Minutes of Parish Council Meeting held on 13 July 2017 Apologies: Present: Chairman Cllr Mark Flavell, Vice Chairman Cllr Nigel Powlson and Cllr Barbara Marshall

More information

Sri Lanka Tourism Sector Summary Overview

Sri Lanka Tourism Sector Summary Overview Sri Lanka Tourism Sector Summary Overview - 2011-2020 Concentration of 4-5 star hotels 20/20 Vision: Coming into Focus See important disclaimers on p. 31 August 2011 Contents Page No. I. 2.6m visitors

More information

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

Deterioration Factors at Girder Ends

Deterioration Factors at Girder Ends Deterioration Factors at Girder Ends Robert P. Zaffetti, P.E. Connecticut Department of Transportation September 29, 2010 Northeast Bridge Preservation Partnership Meeting Hartford, CT Overview One of

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by.

ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation. December 28, Prepared by. ATVANS Trail Assessment for Five Bridge Lakes Wilderness Area Report and Recommendation December 28, 2011 Prepared by Peter Bush Background This report documents the results and recommendations of an all-terrain

More information

Hospital Link Project Project Update September 2015

Hospital Link Project Project Update September 2015 Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

History of Vauxhall Bridge

History of Vauxhall Bridge History of Vauxhall Bridge 1832 map 1844. The Norwich to Yarmouth railway opened. The only access from Vauxhall station to the town was via Cory s Suspension Bridge, a toll bridge. The Norfolk Railway

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

APPENDIX F List of Commitments

APPENDIX F List of Commitments APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 1 near Belle Plaine ESTIMATED COST: $5.1

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia

Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia September 18, 2013 Nicholas J. Roper, P.E. District Bridge

More information

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016

BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 BINBIRRI CONTRACTING PTY LTD CAPABILITY STATEMENT 2016 P: 08 91722341 E: binbirricontracting@hotmail.com ABN: 42 151 996 913 PO Box 2233 South Hedland WA 6722 Binbirri Contracting was established in 2010

More information

Weekly construction update

Weekly construction update November 4, 2011 For more information, contact: Kim A. Rudat, Regional Communications Manager Kim.Rudat@dot.wi.gov, (920) 492-5743 For US 41 Expansion Project information, contact: Kris Schuller, US 41

More information

Infrastructure. SRI LANKA News Extract , Sri Lanka to strike oil, gas soon

Infrastructure. SRI LANKA News Extract ,  Sri Lanka to strike oil, gas soon 11-12-09, www.dailynews.lk Sri Lanka to strike oil, gas soon SRI LANKA News Extract Sanjeevi JAYASURIYA Sri Lanka is to strike oil and gas as soon as the report on 3 D seismic studies are completed within

More information

Topic on A Technical and Project Review of the 10 Airport Core Projects and their Influence on Current Developments

Topic on A Technical and Project Review of the 10 Airport Core Projects and their Influence on Current Developments Topic on A Technical and Project Review of the 10 Airport Core Projects and their Influence on Current Developments Presented by Raymond Wong City University of Hong Kong The need of a new Airport The

More information

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits 90 I-90 Snoqualmie Pass East September 2015 Annual Mega-Project Report Purpose of this Report The financial and schedule information in this document will assist the Office of Financial Management in meeting

More information

All reports. 1. Governance Service receive draft report Name of GSO DPR

All reports. 1. Governance Service receive draft report Name of GSO DPR DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following

More information

N25 New Ross Bypass PPP Project

N25 New Ross Bypass PPP Project Presentation to TII National Roads Conference 2017 29 th September 2017 N25 New Ross Bypass PPP Project History & Construction Progress Joe Shinkwin & Pierre O Loughlin Presentation Content 1. Project

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

Economic Sustainability and expected benefits

Economic Sustainability and expected benefits Project Number: T.13.4 Project Title: Dakar-Bamako Rail Revitalisation and Signalling Status: S3/S4 Programme/project structuring and promotion to obtain financing Countries Region Sector Sub-Sector Project

More information

APPENDIX A. Condition Survey of Pavements Concrete Mixture Proportions Used in Pavements Deicer Usage on Pavements Core Locations and Core Catalog

APPENDIX A. Condition Survey of Pavements Concrete Mixture Proportions Used in Pavements Deicer Usage on Pavements Core Locations and Core Catalog APPENDIX A (i) (ii) (iii) (iv) Condition Survey of Pavements Concrete Mixture Proportions Used in Pavements Deicer Usage on Pavements Core Locations and Core Catalog Report IPRF-01-G-002-05-7 Appendix

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018 SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY September 25, 2018 The members of the Woods Hole, Martha s Vineyard and Nantucket Steamship Authority ( SSA

More information

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2)

Atlantic Street Bridge Project Update CTDOT Project Nos & (Phase 2) Atlantic Street Bridge Project Update CTDOT Project Nos. 135-301 & 301-163 (Phase 2) Reconstruction of Atlantic Street & Metro-North RR Bridge Replacement Track & Station Infrastructure Improvements City

More information

Planning & Development Group

Planning & Development Group Planning & Development Group LAX Airside Technical Committee Meeting January 9, 2018 Mark Vicelja, P.E. 1 Airside Element Projects LAX AIRSIDE ELEMENT PROJECTS CONSTRUCTION SCHEDULE (as of January 1, 2018)

More information

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title: BASIC PROJECT DATA Full project title: Short project title: (acronym) Rehabilitation and Development of Transport and Navigation on the Sava River Waterway Project logo: Project website: www.savacommission.org

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury

More information

Community Notices. Upcoming Yongergnow. January 12th 2017 JANUARY

Community Notices. Upcoming Yongergnow. January 12th 2017 JANUARY January 12th 2017 Community Notices Upcoming Events KONGA FITNESS CLASSES Commencing at Ongerup Hall 9am Tuesday 7th February. Contact Kara Mitchell for more information. 0400 233066 @ Yongergnow FRIDAY

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Current Corridor Characteristics

Current Corridor Characteristics Current Corridor Characteristics Corridor Context Highway 2009 AADT: 2,350 21,000 2009 HCADT: 130 970 Key Highway Connections: MN-371, US-10, US-59, US-71 Number of lanes: 2 Public Transit Becker County

More information

UNLOCKING THE BRIGHTON MAINLINE

UNLOCKING THE BRIGHTON MAINLINE UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

Proposal for the Development of Bus Stops

Proposal for the Development of Bus Stops Proposal for the Development of Bus Stops NATIONAL TRANSPORT COMMISSION Sri Lanka 2005 Objective Providing protection for passengers from extreme weather conditions like Sun, rain, wind, splash while waiting

More information

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

The Holes Creek Bridge Replacement By Bradley McClelland

The Holes Creek Bridge Replacement By Bradley McClelland The Holes Creek Bridge Replacement By Bradley McClelland Each time there is a heavy rainstorm, the folks along Sheffield Road in the Dayton, Ohio suburb of West Carrollton have cause to be concerned. Holes

More information

Smart Motorways Programme

Smart Motorways Programme Smart Motorways Programme M27 Junction 4 to 11 Smart Motorway Response to Statutory Instrument Consultation The introduction of variable mandatory speed limits July 2018 Contents Executive Summary 3 1.

More information

The Danube A Stream of Energy

The Danube A Stream of Energy Danube Business Talks 2018 The Danube A Stream of Energy Hans-Peter Hasenbichler, Managing Director, viadonau 10 October 2018, Meliá Vienna viadonau stands for modern waterway management Company owner:

More information

PAVEMENT CONDITION REPORT

PAVEMENT CONDITION REPORT PAVEMENT CONDITION REPORT Department of Facility Maintenance December 2012 TABLE OF CONTENTS Executive Summary...1 Figure 1. Inputs to Pavement Condition Index...1 Figure 2. Summary Oahu Pavement Condition

More information

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION The A19 Trunk Road The A19 tends to live in the shadow of the more well known A1 it runs more or less parallel with. However, it is no less important

More information

For Immediate Release September 3, CONSTRUCTION BEGINS ON NEW CABLE FERRY Special steel cutting ceremony held at shipyard

For Immediate Release September 3, CONSTRUCTION BEGINS ON NEW CABLE FERRY Special steel cutting ceremony held at shipyard For Immediate Release 14-033 September 3, 2014 CONSTRUCTION BEGINS ON NEW CABLE FERRY Special steel cutting ceremony held at shipyard VICTORIA BC Ferries and Seaspan s Vancouver Shipyards announced that

More information

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must: WHITECOURT TRAILBLAZERS Box 607 Whitecourt, AB T7S 1N7 www.whitecourttrailblazers.ca CNT AMENDMENT Restriction Code 710: See Comments Comments All applicants are required to contact: Whitecourt Trailblazers

More information

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012

Report. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012 Report To: From: Mayor and Councillors District Engineer and Roading Manager Date: 11 th April 2012 File reference: Portfolio holder: Document: 873742 Appendix A: 873811 Appendix B: 871432 Councillor Harris

More information

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Roughness Evaluation- Boeing Bump Methodology FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 3-

More information

Improvements to the Railroad Infrastructure Airport Drive/RFD Airport Davis Jct. Flag Center

Improvements to the Railroad Infrastructure Airport Drive/RFD Airport Davis Jct. Flag Center Winnebago County Rail Authority Rail Engineering and Planning Study Improvements to the Railroad Infrastructure Airport Drive/RFD Airport Davis Jct. Flag Center Table of Contents 1.0 Introduction and Study

More information

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S D L R C C T R A F F I C N E W S Saturday, 4 th February 2017 to Friday, 10 th February 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 ROAD INCIDENTS DUE TO FIRES AND FLOODING PLEASE CHECK OUR WEBSITE FOR MORE UP TO DATE CLOSURES AND INFORMATION http://www.mdt.mt.gov/travinfo/scripts/alerts.pl

More information

D L R C C T R A F F I C N E W S

D L R C C T R A F F I C N E W S D L R C C T R A F F I C N E W S Saturday, 24 th March 2018 to Friday, 30 th March 2018 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed below

More information

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director 2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director 1 Jefferson County, Missouri Road and Bridge Sales Tax: Jefferson County has a one-half cent sales tax that

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Report on the Crafthole Traffic Light Project 3 rd July th September 2017 Report on the Crafthole Traffic Light Project 3 rd July 2017 4 th September 2017 Brief History The village of Crafthole sits on the B3247 road, one of the 2 Gateways to the Rame Peninsula, the other being

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

Ground Handling Social Dialogue Support. The limitation of ramp handling licenses at Rome Fiumicino Airport

Ground Handling Social Dialogue Support. The limitation of ramp handling licenses at Rome Fiumicino Airport Ground Handling Social Dialogue Support The limitation of ramp handling licenses at Rome Fiumicino Airport Final conference Copenhagen 27-2 April 2017 2 A quick look at history at Rome Fiumicino After

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

Level Crossing Risk Assessment Polegate MCB

Level Crossing Risk Assessment Polegate MCB Level Crossing Risk Assessment Polegate MCB Polegate MCB Level Crossing Risk Assessment 1 CONTENTS 1 INTRODUCTION 3 1.1 Background 3 1.2 Reason for the risk assessment 3 2 DESCRIPTION OF THE SITE 4 2.1

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

Inside Government Conference Case Study: Norwich Northern Distributor Road

Inside Government Conference Case Study: Norwich Northern Distributor Road Inside Government Conference Case Study: Norwich Northern Distributor Road 29 March 2017 Martin Wilby Chair of Environment, Development and Transport Committee Norfolk County Council Introduction What

More information

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69 FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, 540-387-5238 SALEM 69 Jen.Ward@vdot.virginia.gov - The following is a list of forecasted highway projects that may impact traffic traveling

More information

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019 BUILD CONSTRUCTION Update FEBRUARY 2019 In this issue: ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEATURED PROJECT: KENT AVENUE * Featured Project KENT AVENUE CP 2-3 CONSTRUCTION UPDATE February 2019 At

More information

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place. EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in

More information

Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan

Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan Milan Trail Huggers ATV Club P.O. Box 42 Milan, NH 03588 Maintaining Trails in Milan, Stark and Dummer Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan

More information

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34

Hancock. Hancock. Hancock County Population 54,558. Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles HCP 1 81 HCP 2 34 Hancock Hancock County Population 54,558 T3 ND Oqiton Twp Land Area (sq mi) 1,587 Bridges 120 Highway Corridor Priority Miles T41 MD 81 HCP 2 34 T39 MD T40 MD 141 HCP 4 62 215 Total -5 533 T32 MD Great

More information

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017 LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20

More information

Appendix B PAVEMENT CONDITION AND HISTORY

Appendix B PAVEMENT CONDITION AND HISTORY Appendix B PAVEMENT CONDITION AND HISTORY The Sunport maintains a pavement management program (PMP) in order monitor the condition of pavements and to plan for repair/replacement in a timely manner. The

More information

WFP Aviation UNHAS : Implementation Strategy

WFP Aviation UNHAS : Implementation Strategy WFP Aviation UNHAS The United Nations Humanitarian Air Services (UNHAS) is a common service managed by WFP to serve and provide the Humanitarian Community with safe and reliable air transport assets during

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth) RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information

More information

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport 1 DUBLIN-LONDON 28.4 No.1 +2,200 MILLION PASSENGERS BUSIEST ROUTE IN EUROPE &No. 2 IN THE WORLD

More information

North Cruise Berth Projects PortMiami

North Cruise Berth Projects PortMiami North Cruise Berth Projects PortMiami AAPA 2017 Facilities Engineering Seminar Oct 24 26, 2017 Carlos J. Arboleda, PE Vice President Project Director Intermodal Ports 1 PortMiami The Cruise Capital of

More information

Neighbourhood Committee NDG - Westmount. September 12, 2016

Neighbourhood Committee NDG - Westmount. September 12, 2016 Neighbourhood Committee NDG - Westmount September 12, 2016 2 Presentation Outline Requests from the committee members Feedback on previous questions Work update and hindrance of the Turcot Project Ministry

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special

More information