1 Monaghan County Council N2 Monaghan Town to Emyvale Road Improvements Part 8 Application Description of Proposed Development Appendix C Stage 1 Road Safety Audit Draft 1 11 April 2013 \\DUBNTS03\DUBLIN_JOBS\218000\ \4. INTERNAL PROJECT DATA\4-04 REPORTS\ INFRASTRUCTURE\PART 8\CORRACRIN PART 8 REPORT.DOCX Page B2
2 Corracrin Village Improvement Works N2 Road Realignment Stage 1 Road Safety Audit RSA1 Draft 1 17 April 2013 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number Ove Arup & Partners Ireland Arup 50 Ringsend Road Dublin 4 Ireland
3
4 Corracrin Village Improvement Works N2 Road Realignment Stage 1 Road Safety Audit Contents 1 Introduction 1 2 Items raised within this Stage 1 Road Safety Audit 3 Page 2.1 Problem: Right Turning Facility length Problem: Right Turn Facility at Church Entrance Problem: Property Entrances Problem: Cyclist Facilities Problem: Pedestrian Facilities Problem: Pedestrian and Cyclist crossing facilities Comment: Adjacent Schemes 4 3 Audit Team Statement 5 RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\ \4. INTERNAL PROJECT DATA\4-04 REPORTS\ INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\ RSA1 - D1.DOCX Page 1
5 Monaghan County Council Corracrin Village Improvement Works Stage 2 Road Safety Audit 1 Introduction Monaghan County Council are proposing to realign and widen the N2 in Corracrin and Arup has been requested to carry out a Stage 1 Road Safety Audit on this proposed scheme. A plan showing the location of the scheme in the context of the surrounding local road network is presented in Figure 1. The audit was carried out on the 15 th April 2013 both on site and in the Arup Dublin office. The audit team members were as follows: Shane FitzGerald BA BAI, MIEI (Team Leader) Arup Dublin Kieran Malone BA BA1, CEng MIEI - (Team Member) Arup Dublin The audit comprised an examination of the drawings relating to the scheme and site visits on Monday 15th April 2013 between the hours of 10:00 and 13:00. On the day of the site visit the weather was dry, and the road surface was wet. No previous Stage 1 or 2 Road Safety Audit has been undertaken on these schemes. Information provided to assist the Auditors comprised of the drawings which are referenced in Appendix A. The Audit has been carried out in accordance with the relevant sections of HD 19/12, Road Safety Audits. The team has examined only those issues within the design relating to road safety implications of the scheme, and has therefore not examined or verified the compliance of the design to any other criteria. The audit team were not made aware of any relaxations or departures from standards. No drawings relating to Drainage, Public Lighting or Signing & Lining were provided to the Auditors and these aspects of the scheme have therefore not been examined. The designers response to the audit issues is included in Appendix B. An Audit Team Statement and feedback is included at the end of the Report. RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\ \4. INTERNAL PROJECT DATA\4-04 REPORTS\ INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\ RSA1 - D1.DOCX Page 1
6 Monaghan County Council Corracrin Village Improvement Works Stage 2 Road Safety Audit Figure 1 - Location of site in local road network RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\ \4. INTERNAL PROJECT DATA\4-04 REPORTS\ INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\ RSA1 - D1.DOCX Page 2
7 Monaghan County Council Corracrin Village Improvement Works Stage 2 Road Safety Audit 2 Items raised within this Stage 1 Road Safety Audit 2.1 Problem: Right Turning Facility length Location: Ch On the mainline, at the junction. Issue: The right turning pocket appears to be quite short and the Auditors are concerned that there will be insufficient length available for agricultural vehicles with trailers or for queuing vehicles, thereby creating the potential for queuing vehicles to block the main road and increasing the risk of rear end shunt type collisions. Recommendation: The designers should ensure that sufficient space for agricultural vehicles with trailers and queuing vehicles, as indicated by anticipated traffic volumes, is provided. 2.2 Problem: Right Turn Facility at Church Entrance Location: Ch On the mainline, at the entrance to the church car-park. Issue: On the drawings there is an angled line within the median on approach to the church and the auditors are not clear as to whether a right turning facility for the church is proposed. Recommendation: A right turning facility should be provided for the church. 2.3 Problem: Property Entrances Location: Throughout the scheme. Issue: There are a number of entrances along the main road where dropped kerbs for entrances are not shown. Recommendation: Dropped kerbs should be provided at each entrance. 2.4 Problem: Cyclist Facilities Location: Throughout the scheme. Issue: The drawings provide no indication as to the directionality of the cycle tracks. In addition, the cycle only area between Ch and CH discourages pedestrians from egressing and returning from/to the residential property on the western side of the road. Recommendation: Permitted cycle movements should be outlined on the drawings and consideration should be given to re-allocating this cycle only area for shared use. RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\ \4. INTERNAL PROJECT DATA\4-04 REPORTS\ INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\ RSA1 - D1.DOCX Page 3
8 Monaghan County Council Corracrin Village Improvement Works Stage 2 Road Safety Audit 2.5 Problem: Pedestrian Facilities Location: Ch On the mainline, at the junction. Issue: There are footpaths alongside the road approaching the junction on the mainline from the north; however, no crossing point has been shown on the drawings and no footpath is indicated on the south side of the junction. Recommendation: Adequate pedestrian crossing facilities should be provided across all entrances, facilitating pedestrian desirelines where possible and to include dropped kerbs with tactile paving. 2.6 Problem: Pedestrian and Cyclist crossing facilities Location: Ch & On the mainline. Issue: The drawings indicate that one pedestrian crossing point and one cyclist crossing point are to be provided, with the cyclist crossing outside the school. In particular the cyclist crossing should also accommodate pedestrians due to its close proximity to the school. No dropped kerbs or tactile paving is indicated on the drawings. Recommendation: These crossing points should both be dual-purpose, i.e. the provision of shared crossings, facilitating both pedestrians and cyclists, should be considered. Additionally, tactile paving should be provided at these crossing points. 2.7 Comment: Adjacent Schemes Location: Scheme Extents Issue: There are other schemes proposed to connect with the subject scheme, and the Auditors have not been given details with respect to these schemes. The Auditors feel that once all schemes have been constructed an overall audit should be undertaken to ensure that there is consistency across the schemes. RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\ \4. INTERNAL PROJECT DATA\4-04 REPORTS\ INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\ RSA1 - D1.DOCX Page 4
9
10
11 Appendix A Information provided and referenced within this Stage 1 Road Safety Audit
12 A1 List of Drawings provided and referenced within this Stage 1 Road Safety Audit N2-P N2-P N2-P N2-P N2-P Scheme Layout Proposed Site Layout Plan Proposed Site Boundary Proposed Plan Layout & Vertical Alignment Proposed Cross Sections Mainline
13 Appendix B Designer's Response
14
15 Corracrin Village Improvement Works N2 Road Realignment Stage 1 Road Safety Audit RSA1 Draft 1 17 April 2013 Arup \\DUBNTS03\DUBLIN_JOBS\218000\ \4. INTERNAL PROJECT DATA\4-04 REPORTS\ INFRASTRUCTURE\RSA\CORRACRIN VILLAGE\ RSA1 - D1.DOCX
Queen s Circus Roundabout
Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member
More informationACORNS PROJECTS LIMITED
ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project
More informationLLANBEDR ACCESS IMPROVEMENTS
LLANBEDR ACCESS IMPROVEMENTS NON-MOTORISED USER SUPPLEMENTARY REPORT CPF: 5111 Client: Gwynedd Council Document Control Sheet Document Title: Document Author: Project Manager: Project Title: A496 Llanbedr
More informationFinchley and Golders Green Area Committee 27 April 2017
Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Junction of Regents Park Road / Tillingbourne Gardens, N3 Commissioning
More informationSky Temporary Car Park Transport Statement
001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility
More informationBUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway
BUSINESS ZONE - OPTION 400 (Western footpath) Have your say Love the Bay Delivering on the Cycleway Consultation open from 31 July to 13 August 2017 1 Introduction After the Love the Bay community-based
More informationProposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:
Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of
More informationMovement Strategy. November On behalf of Barton Oxford LLP
Movement Strategy November 2014 On behalf of Barton Oxford LLP BARTON PARK, OXFORD. Movement Strategy 17/11/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date
More informationProject No Brent Cross, Cricklewood London, UK Phase 1A North RMA
Project No. 431679 Brent Cross, Cricklewood London, UK Phase 1A North RMA River Overshadowing Impact Study For Waterman Energy, Environment & Design 18 th November 2014 431679 Report 2 Rel.3 1 of 23 431679rep2v3.docx
More informationPART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT
PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support
More informationCommissioning Director - Environment
Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationCAPITA SYMONDS PHASE 2 KESWICK TOWN CENTRE ENVIRONMENTAL IMPROVEMENTS STAGE 3 ROAD SAFETY AUDIT. Work Order: 31986
0 KESWICK TOWN CENTRE ENVIRONMENTAL IMPROVEMENTS PHASE 2 STAGE 3 ROAD SAFETY AUDIT Work Order: 31986 Project Client: Cumbria County Council COUNTY COUNCIL Ju/y2004 IQUALlTY SYSTEM MANUAL I REPORT COVER
More informationThe Point Roundabout Improvement Scheme
The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the
More informationCommissioning Director - Environment. Officer Contact Details Jane Shipman;
Chipping Barnet Area Committee 6 July 2016 Title Report of Wards Status Urgent Key Enclosures The Avenue Zebra crossing and pedestrian improvements Commissioning Director - Environment Chipping Barnet
More informationAll reports. 1. Governance Service receive draft report Name of GSO DPR
DELEGATED POWERS REPORT NO. SUBJECT: Redevelopment at Grahame Park Estate, NW9, Phase 1B Sub-phase 1 Highways Agreement under Sections 38 and 278 of the Highways Act 1980. Control sheet All of the following
More informationan engineering, safety, environmental, traffic and economic assessment of each option to inform a preferred route option choice; 3) Development and as
Page: 42 Infrastructure Services REPORT TO ABERDEENSHIRE COUNCIL COMMITTEE 26 APRIL 2018 A96 ABERDEEN TO INVERNESS DUALLING POSITION STATEMENT 1 Recommendations Aberdeenshire Council is recommended to:
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of
More informationPlanning Committee. Thursday, 26 May 2016
Planning Committee Thursday, 26 May 2016 Attendees: Substitutes: Councillor Lyn Barton (Member), Councillor Helen Chuah (Member), Councillor Theresa Higgins (Chairman), Councillor Brian Jarvis (Member),
More informationTHE WELSH MINISTERS STATEMENT OF REASONS
THE WELSH MINISTERS The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting
More informationProposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne. Statement of Community Involvement
Proposal for gypsy and traveller accommodation on land at Lower Hollow Copse (Pot Common), Copthorne Statement of Community Involvement Prepared by WYG Environment Planning Transport Ltd on behalf of the
More informationSeek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and
3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital
More informationLondon Borough of Barnet Traffic & Development Design Team
London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair
More informationDate: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council
Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering
More informationChapter 2 Route window W25 Maidenhead station. Transport for London
Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,
More informationChapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London
Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin
More information5.7 Local road upgrades
5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and
More information5.5 Material Assets - Transportation
5.5 Material Assets - Transportation 5.5.1 Introduction This Chapter presents the traffic and transportation assessment for the Demolition, Construction and Operational phases of the proposed new City
More informationThe Network Rail (Suffolk Level Crossing Reduction) Order
Aidan Dunn Interim Director of Resource Management Suffolk County Council Endeavour House 8 Russell Road Ipswich IP1 2BX Network Rail James Forbes House 27 Great Suffolk St London SE1 0NS 27 July 2017
More informationI508. Devonport Peninsula Precinct
I508. Devonport Peninsula Precinct I508.1. Precinct description The purpose of the Devonport Peninsula precinct is to provide for the comprehensive residential development of the former Navy housing land
More information7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT
7. CONSULTATION ON THE TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: HEAD OF ECONOMIC PROMOTION AND PLANNING Contact Officer: Nathan Spilsted, Senior Planning Officer Email: nathan.splistead@midsussex.gov.uk
More informationSport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services
Sport Capital Improvement Plan Paul Borci Manager, Campus Planning Property & Campus Services What is SCIP? Property and Campus Services (PCS) in collaboration with Melbourne University Sport (MU Sport)
More informationAir Operator Certification
Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance
More informationMajor Scheme Business Case Summary Report for Programme Entry
Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date
More informationWORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World
WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating
More informationDonegal County Council
Donegal County Council Roads & Transportation Directorate PLANNING AND DEVELOPMENT REGULATIONS 2001 (as amended) Nature and Extent of proposed development in accordance with Part 8 requirements of the
More informationRiverside Heights, Norwich. Travel Plan
RIVERSIDE HEIGHTS, NORWICH Client: Engineer: Taylor Wimpey East Anglia Create Consulting Engineers Limited Hungate House Princes Street Norwich Norfolk NR3 1AZ Tel: 08454507908 Email: enquiries@createconsultingengineers.co.uk
More informationN4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction
Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National
More informationWanaka Community Board 15 April Report for Agenda Item: 4
Wanaka Community Board 15 April 2015 Department: Infrastructure Report for Agenda Item: 4 Mt Burke Station Stopping and Vesting of Road Purpose 1 To obtain the Board s support for a stakeholder agreement
More informationDate 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.
DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process
More informationJohn Betts School Crossing Review
John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the
More informationCAPITA SYMONDS. I March 2005 III _ KESWICK TOWN CENTRE ENVIRONMENTAL IM:PROVEMENTS PHASE 4
CAPTA SYMONDS. _----------------- KESWCK TOWN CENTRE ENVRONMENTAL M:PROVEMENTS Audit Nwnber: 31986/02/05 Project Client CAPTA SYMON DS STAGE 2 ROAD SAFETY AUDT.------- --------------- March 2005? - KESWlCK
More informationIRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City
IRISH PARKING ASSOCIATION The use of Pay and Display in Traffic Management in Kilkenny City Kilkenny City and Environs Draft Mobility Management Plan 2009-2014 2014 Draft Mobility Management Plan Background
More informationREVIEW OF PERTH AIRPORT Noise Abatement Procedures
REVIEW OF PERTH AIRPORT Noise Abatement Procedures Contents SUMMARY... 3 Summary of Review Findings... 3 BACKGROUND... 4 Noise Abatement Procedures... 4 Perth Airport Noise Abatement Procedures... 4 Noise
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Inquiry held on 24 May 2016 by Jonathan Bore MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 27 June 2016 Appeal Ref: APP/Y3940/A/14/2223354
More informationProposed Arthurs Point Special Housing Area. Housing Accords and Special Housing Areas Act Expression of Interest
Proposed Arthurs Point Special Housing Area Housing Accords and Special Housing Areas Act 2013 Expression of Interest 1.0 APPLICANT The applicant for the proposed Arthurs Point Special Housing Area is
More informationNon-technical summary
Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,
More informationAERODROME LICENCE APPLICATION PROCESS
0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,
More information4. The Council s LTCCP decision on 30 June 2009 confirmed the extended tram route and funding.
145 11. TRAM EXTENSION PROJECT PROPOSED PARKING CHANGES AND STREET MODIFICATIONS IN LICHFIELD STREET, MANCHESTER STREET, HIGH STREET, TUAM STREET, ASH STREET, BEDFORD ROW AND OXFORD TERRACE General Manager
More informationSOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director / Senior Planning Policy Officer
SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL REPORT TO: Leader and Cabinet 8 May 2008 AUTHOR/S: Executive Director / Senior Planning Policy Officer SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL S RESPONSE TO UTTLESFORD
More informationOpen Report on behalf of Richard Wills, Executive Director for Environment and Economy
Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1
More informationLYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS
APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District
More informationNovember 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.
November 11, 2009 Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1 BY E-MAIL Attention: Mr. Don Herweyer Dear Mr. Herweyer: Reference: Abbott-Fernbank
More informationEPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE
EPPING FOREST DISTRICT COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 2 nd JULY 2018 REPORT 1 APPROVED SCHEMES UPDATE The following report provides an update on the current position of all of the
More information2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002
2.0 POLICY AND DEVELOPMENT FRAMEWORK Introduction 2.1 This section of the report highlights the key elements of both Transport21, and the Celbridge Development Plan 2002, both of which include a number
More informationPOST CONSTRUCTION ROAD SAFETY AUDIT. Island Bay Cycleway
POST CONSTRUCTION ROAD SAFETY AUDIT Island Bay Cycleway Prepared for Wellington City Council 11 May 2016 This document has been prepared for the benefit of Wellington City Council. No liability is accepted
More informationJOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012
1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley
More informationKilkenny Mobility Management age e Plan The plan sets out a series of mobility management proposals together with an implementation pro
Kilkenny City and Environs Mobility Management Plan 2009 to 2014. Report and Presentation to Kilkenny Borough Council on 21st September, 2009 Kilkenny Mobility Management age e Plan 2009-2014 2014 The
More informationTo: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.
Project: Cambourne to Cambridge Better Bus Journeys To: CCC Subject: Considerations for Corridor Option Plans From: Atkins Date: 1 Sep 2016 cc: 1. Introduction This note summarises considerations undertaken
More informationADDENDUM 2 APPENDIX D STANDARD DRAWINGS
ADDENDUM 2 APPENDIX D STANDARD DRAWINGS Overview This Addendum to Appendix D Standard Drawings replaces Standard Drawing Figures 001 to 020 with new Standard Drawings EDCM 301 to EDCM 704 - as listed below.
More informationNext Generation Cycleway Design. Improving connectivity and cycling behaviours through design
Next Generation Cycleway Design Improving connectivity and cycling behaviours through design Safe segregation between Place Users to offer improved safety and a defined space for each user group Elevated
More informationAPPENDIX A RELEVANT DOCUMENTATION
APPENDIX A RELEVANT DOCUMENTATION A.1 RELEVANT REFERENCE MATERIAL, LEGISLATION AND REGULATIONS All documents in this appendix are subject to amendment being superseded. Any designer installer shall be
More information20mph Speed Limit Zones
Traffic Advisory Leaflet 7/91 May 1991 20mph Speed Limit Zones Summary This leaflet illustrates the main steps in the procedures for the implementation of 20mph zones. It provides brief details on: the
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010
COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)
More informationBorough High Street Low Emission Neighbourhood
Borough High Street Low Emission Neighbourhood Colourful Crossings Design Brief Better Bankside Business Improvement District Brief for Graphic Consultants December 2017 Page 1 of 10 1. Introduction Borough
More informationCuadrilla Elswick Ltd
Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary
More informationScotchbarn Lane, Prescot Accessibility Statement
Scotchbarn Lane, Prescot Accessibility Statement Lancashire Mortgage Corporation Ltd August 2012 Issue R001B 9X0789 All rights reserved. No part of this publication may be reproduced in any form, including
More informationTerms of Reference for rulemaking task RMT Regular update of ATM/ANS rules (IR/AMC/GM)
Terms of Reference for rulemaking task Regular update of ATM/ANS rules (IR/AMC/GM) ISSUE 1 18.8.2017 Issue/rationale Rulemaking task is intended to be used to regularly update the implementing rules (IRs)
More informationWolverhampton City Council
Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION
More informationInvitation to participate in the ATOL Reporting Accountants scheme CAP 1288
Invitation to participate in the ATOL Reporting Accountants scheme CAP 1288 CAP 1288 Invitation to participate in the ATOL Reporting Accountants scheme Invitation to participate in the ATOL Reporting Accountants
More informationA31 Ringwood improvement scheme
A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.
More information(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada
Evaluation of Transport Canada s Program of Payments to Other Government or International Agencies for the Operation and Maintenance of Airports, Air Navigation, and Airways Facilities (Also known as the
More informationEXPLANATORY STATEMENT
THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.
More informationRoundhouse Way Transport Interchange (Part of NATS City Centre Package)
Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal
More informationCabinet Member Report
Cabinet Member Report Decision Makers: Cllr Davis, MBE, DL, Deputy Leader and Cabinet Member for Business, Culture and Heritage. Date: 30 March 2017. Cllr Chalkley, Cabinet Member for City Highways. Classification:
More informationEnvironment Committee 24 September 2015
Environment Committee 24 September 2015 Title Enforcement of Single Yellow Lines on Bank Holidays Report of Commissioning Director - Environment Wards All Status Public Urgent No Enclosures Key No Appendix
More informationWoodford Community Council
Woodford Community Council MINUTES OF THE ANNUAL GENERAL MEETING HELD ON THURSDAY, 26 NOVEMBER 2015 WCC members present: Paul Rodman Chairman Helen Buszard Secretary David Buszard, Ken Coxey, Bryan Leck,
More informationSUBJECT: Integration of Health & Social Care Update from H&SC North Lanarkshire
Meeting of Lanarkshire NHS Board: 30 th March 2016 Lanarkshire NHS Board Kirklands Fallside Road Bothwell G71 8BB Telephone: 01698 855500 www.nhslanarkshire.org.uk SUBJECT: Integration of Health & Social
More informationAERODROME SAFETY COORDINATION
AERODROME SAFETY COORDINATION Julio Garriga, RO/TA International Civil Aviation Organization North American, Central American and Caribbean Office ICAO NACC Regional Office Page 1 Coordination of the aerodrome
More informationTHE HIGHWAYS ACT and- THE ACQUISITION OF LAND ACT 1981
Rebuttal Volume 1/1 25 th September 2014 THE HIGHWAYS ACT 1980 -and- THE ACQUISITION OF LAND ACT 1981 THE HIGHWAYS (INQUIRIES PROCEDURE) RULES 1994 COMPULSORY PURCHASE (INQUIRIES PROCEDURE) RULES 2007
More informationSUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan
SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING
More informationCOMMISSION IMPLEMENTING REGULATION (EU)
18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services
More informationContext. Site Development. Brassington Avenue
1 Context This public exhibition is being held to present NEW proposals for the development of the Brassington Ave site in Sutton Coldfield town centre. NEW Come and see proposals for We would very much
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationINFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES
Proposed north west runway Stanwell Moor Stanwell All maps contain OS data Crown copyright and database right 2018 INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES JANUARY 2018 Airport Expansion
More informationHEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:
7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk
More informationM621. Junctions 1 to 7 Improvement scheme. Share your views
M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,
More informationPUBLIC CONSULTATION - THE PURPOSE
PUBLIC CONSULTATION - THE PURPOSE ² To review the sites identified for housing development; ² To introduce new sites that have come forward since the last Public Consultation with potential for housing
More informationSunshine Coast Airport Master Plan September 2007
Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT
More informationGold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging
Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationUniclass L534+L212. August home zones. paving PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS.
August 2005 Uniclass L534+L212 paving home zones PRECAST CONCRETE PAVING SOLUTIONS FOR TODAY S RESIDENTIAL STREET ENVIRONMENTS www.paving.org.uk Home Zone Principles Home Zones are residential streets
More informationAppendix 6 Fulbourn Greenway Review
Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationRegulatory Committee
Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director
More informationINFORMATION FOR LONGFORD, HARMONDSWORTH, SIPSON, HARLINGTON AND CRANFORD CROSS COMMUNITIES
Harmondsworth Proposed north west runway Sipson Harlington Cranford Cross Longford All maps contain OS data Crown copyright and database right 2018 INFORMATION FOR LONGFORD, HARMONDSWORTH, SIPSON, HARLINGTON
More informationD L R C C T R A F F I C N E W S
D L R C C T R A F F I C N E W S Saturday, 23 rd September 2017 to Friday, 29 th September 2017 A public service provided by Municipal Services Department of Dún Laoghaire-Rathdown County Council. Listed
More informationAS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard
Australian/New Zealand Standard AS/NZS 1158.4:2015 Lighting for roads and public spaces Part 4: Lighting of pedestrian crossings Superseding AS/NZS 1158.4:2009 AS/NZS 1158.4:2015 AS/NZS 1158.4:2015 This
More informationEmmet Square BIRR PUBLIC REALM
Emmet Square BIRR PUBLIC REALM Emmet Square Enhancement Proposal PUBLIC MEETING 3 RD MARCH 2014 Public Realm Plan for Birr - 2009 Birr visit to Westport in 2011 Tidy Towns winner 2001, 2006, 2008 Westport
More informationPrince Albert Road Towpath Ramp, Camden Feasibility Report
Prince Albert Road Towpath Ramp, Camden Feasibility Report Function Location: RE-004 Date: 25 October 2012 Report No: 5016-UA003174-UT31R-03 Prince Albert Road Towpath Ramp, Camden Feasibility Report
More informationChapter 21 Route window W6 West Ealing station. Transport for London
Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is
More information