1 1 Context This public exhibition is being held to present NEW proposals for the development of the Brassington Ave site in Sutton Coldfield town centre. NEW Come and see proposals for We would very much welcome your feedback on proposals please feel free to speak to the team present or fill in (or take away) a questionnaire Who owns the site? The site is owned by City Lofts (Brassington) Ltd, care of Allsop as fixed charge receivers. What about the previous residential-led scheme? Due to the current economic climate, the previous scheme planned for the site is now not viable. Other potential new uses have been explored, eg. where there is demand in the town, what is physically possible due to the site s constraints and what is now deliverable. What is now proposed? A medium sized supermarket with a café, street level car park and other local improvements. PARK ROAD GERRARD GARDENS GERRARD GARDENS The exhibition is part of a wider public consultation to inform the development of an OUTLINE planning application for the site to be submitted in early spring. Please note that these proposals are only in outline; further design detail will need to be submitted for planning to Birmingham City Council at a later date before full planning permission to build is granted. (See Board 9). FAWDRY CLOSE Why a supermarket? Studies show that Sutton Coldfield residents predominantly do their main food shopping at distant superstores; this proposal would not only enhance the town centre s retail offer for residents but also bring back local spending to the town centre. THE MALL BRASSINGTON AVENUE Details of PUBLIC EXHIBITION overleaf > Consultation promotional flyer Who owns the site? The site is owned by City Lofts (Brassington) Ltd, care of Allsop as fixed charge receivers. Why is the site being developed? The site is part of Sutton Coldfield town centre and is allocated by Birmingham City Council for development. As it is a designated commercial site, it is felt to be a valuable asset to the town centre and therefore leaving the site undeveloped is not an option. What is on the site now? The site is currently a vacant development site with hoarding around the perimeter which has lain dormant for over ten years or more. park road gerrard gardens the mall brassington avenue What happened to the previous plans proposed? The previous residential-led scheme FAWDRY CLOSE City Lofts, the previous owner, went into receivership in Their proposal was for the creation of a mixed-use development comprising 295 apartments, a restaurant, 3 retail shops, 2 bars/ cafes/restaurants, health and fitness club and associated multideck parking (405 spaces). There was also a bridge link into The Mall originally proposed but this was removed in the final design as it was not viable. gerrard gardens The previous scheme gained consent but was unpopular due to its height, density and traffic impact. Due to the current economic climate, the previous scheme is not viable at the current time but the planning permission remains live. The development site within the red boundary

2 2 Site options When a team was appointed to develop proposals for the site, it first considered: 1 Whether the scheme with planning consent was still possible NOT NOW VIABLE. What are the constraints of the site? 2 What the physical constraints of the site would allow ie. its location and character. 3 What the town centre is missing and what it needs to add to its offer. 4 What market demand there is for different uses. 1 WESTERN SUN 5 What uses were considered for the site? Leisure A cinema and/or restaurants would not create value on the site and there is already one provided at the top of town. 4 2 culvert sewers 5 4 EASTERN SUN Residential Discussions with housebuilders demonstrated that demand in the area is now for traditional housing stock. Offices Little demand was evident, supported by a number of unlet premises across the town. Birmingham Road cinema Hotel use this would create too much development on the site and conflict with other uses that would need to be provided for viability reasons. Non-food this is a struggling sector evident in the number of companies falling into receivership; the only buoyant subsector is discount sector (ie. pound shops) which is unviable on new schemes. 1. Network Rail: NR owns the land on the western boundary which means that they need to approve all design for the site for the planning submission 2. Underground river (culvert): this runs across the site at a depth of only m and its redirection would be prohibitively expensive this means significant excavation (eg. the sinking of Brassington Ave) is not possible 3. Two main sewers: these run west to east and are buried at a depth of only 1-1.5m and are 1m in diameter; like the river, these cannot be moved cost effectively 4. Three main roads: the site is bounded by three roads which means a real challenge for linkages 5. Difference in land levels: across the site the land levels vary by 5m which means earth removal and levelling is a considerable cost and vehicular access from Manor Road is not viable 6. Long and thin site: affects design in terms of access routes and layout of buildings and car parking

3 3 Why a supermarket? Does Sutton Coldfield need a supermarket? As part of the review of potential new uses for the site, the idea of a supermarket was also considered because a Birmingham Retail Needs Assessment * found that There is only small-scale top up convenience shopping in the town centre (eg. Waitrose, M&S and Aldi) There are no medium sized supermarkets in the town centre where people can do their main shop Sutton Coldfield residents do their main food shop at distant superstores and recommended that: Spend should be local rather than in competing centres across Birmingham and the West Midlands Shops in the town should enhance Sutton Coldfield town centre s retail offer to encourage local spend Sutton Coldfield should be a priority for additional food store provision *The study was carried out by Roger Tym & Partners (in Oct 2009) on commission by Birmingham City Council to help them to plan future retail development in the town centre. Whilst the study was undertaken in 2009, the town centre still has no medium supermarket offer so spend continues elsewhere. Will it be a big building? A medium sized supermarket was also chosen for the site as it would allow low density, low scale, development on the site (see board 5) as opposed to the previously high, dense scheme which was unpopular locally. Concerns about the previous scheme related to an imposing wall of development creating an uninviting canyon affect along Brassington Ave. The new scheme would also provide (compared to the previous scheme) a lower impact in terms of traffic movements on local roads. (See boards 6 & 7). WALSALL Aldridge New Oscott Mere Green SUTTON COLDFIELD Brassington Avenue Site MANOR ROAD PARK ROAD BRASSINGTON AVENUE QUEEN ST How will the proposed development bring business into the town centre or into The Mall? The town s existing food provision is predominantly servicing the lower end (Aldi) and upper end (M&S and Waitrose). Due to the lack of middle market food store provision in the town centre as a whole, the site will act as a draw to shoppers to encourage them to visit Sutton Coldfield town centre by enhancing the existing retail offer. A supermarket would also bring approximately 100 new jobs to the town centre. SUTTON COLDFIELD VICTORIA ROAD Is there a supermarket operator signed already? Waitrose, Aldi and M&S in Sutton Coldfield centre are small, convenience top-up shopping stores. The proposed new supermarket would be around double the size of the town s Aldi store. Sutton Coldfield residents travel to do their main food shop outside of the town Castle Vale Minworth Not at present although the majority of food retailers have expressed interest in principle. A planning approval will enhance market interest so we expect to be in a position to negotiate with multiple operators at that time.

4 4 Proposals: Uses and Layout Dotted line denotes staff facilities on mezzanine level 31,000ft² (2900m²) food store including cafe, back of house and staff facilities Existing trees WESTERN SUN Car park providing 169 no. spaces in total Manor Road Glazed Cafe frontage helps to break down massing of food store Pedestrian stairs and ramp Cycle Parking Park Road Existing pedestrian crossing Service yard with full 26m turning circle EASTERN SUN Soft landscaping around edges of car park New pedestrian crossing to improve safety and link to The Mall and Lower Parade The supermarket is located to the south with a street level car park running north over the remainder of the site with a café located adjacent Brassington Ave. This layout allows for the best access to the Manor Road roundabout, creates more life, activity and interest along Brassington Ave and is the most efficient use of the site given its challenging linear shape. This layout is also the most suitable to ensure an appropriate size of servicing yard can be provided ie. to ensure all turning can be undertaken on site instead of onto Brassington Ave. The store will target the sustainable measure for BREEAM * of very good which is above Birmingham City Council s current requirements. *Building Research Establishment Environmental Assessment Method A new glazed café is proposed looking out onto Brassington Ave

5 5 Proposals: Views and Landscaping Proposed new planting of trees and bushes How high will the building be? The planning application is in OUTLINE only and will propose a building height of between 9 to 13m. As there is no operator yet signed for the scheme, this will provide greater flexibility as the major food retailers have differing height requirements on this footprint of building. Will the building impact visually on residents? With its town centre location, the site has very little overlooking by residential property: To the North - railway station land To the East - The Mall Building line along Manor Road with maximum height stepped back Park Road view with proposed new landscaping Brassington Ave view To the West - the railway line, landscaping and differing land levels provide a visual buffer to residential properties Building line along Manor Road with lower height Roundabout view To the South - the development site is much lower than Manor Road and is also significantly lower than the few residential blocks at the end of Caversham Place which look down onto Manor Road. However, the proposals provide for the building to be stepped back from Manor Road if the maximum height (13m) is required by the operator (see image above). How will the Brassington Ave experience be improved? Brassington Ave, bordered on one side by this derelict site and on the other by the back of The Mall, is currently a bleak and uninviting environment. Proposals for this development look to make this area more pleasant by: Planting over 20 trees on the site s edge to soften the harsh urban feel Opening up attractive views of the railway embankment Landscaping proposed Providing further quality green landscaping adjacent to the building and car park Providing a glazed café overlooking Brassington Ave to create more life, activity and interest along the road and better safety through overlooking Creating a safe new pedestrian crossing where people most want to cross to access The Mall Proposing a much lower scale, much less dense development than was previously given planning consent on this site.

6 6 Transport challenges and solutions New Brassington Ave Pelican crossing proposed When considering solutions for transport and access to the site and beyond plus local traffic management, the following was taken into consideration: How traffic uses the slip road down from The Mall car park Traffic using Manor Road roundabout and Park Road/Clifton Road roundabout Capacity of 5 local junctions Approved entrance and exit routes for the previous scheme which BCC approved Existing pedestrian crossings and links into The Mall and the town centre (see board 8) The scope of research undertaken was agreed with the Highway Authority and a full Transport Assessment will be provided with the planning application. Studies included: traffic/queue surveys; personal-injury accident review; and junction analysis. How will entrance and access be managed? Currently two options are being considered for entrance and access management for this site (based on consideration of the above 5 points): Clifton Road roundabout one of the junctions considered re impact Option 1 PRIORITY JUNCTION AS EXISTING Key differing features of this approach are: Road lanes laid out as they are now ie. cars directed into the middle lane to provide an inside lane slip road for cars exiting The Mall car park onto Brassington Ave Cars turning into the supermarket site would need to slow down in the inside lane of Brassington Ave to turn left into the site Cars turning out from the supermarket onto Brassington Ave would need to wait for a gap in the traffic and join the inside lane traffic - but then be re-directed into the middle lane. The Mall car park slip road onto Brassington Ave Exiting zebra crossing across Brassington Ave BRASSINGTON AVE Common features across both options are: New Brassington Ave pelican crossing from Park Road to link into The Mall s entrance ramp at the side of United Reformed Church and café: - With a widened island, dropped kerbs and tactile paving for the visually impaired - To respond to the natural desire line of pedestrians ie. provide a safe crossing where people naturally want to cross a road To promote sustainable modes of transport, provision of a 3m wide shared foot and cycleway: - Connecting into Birmingham North cycle route running from Manor Road and the existing crossing, north to the site s access and along Brassington Ave and beyond - Linking up with cycle parking at the front of the supermarket. NB The council will also be upgrading the Manor Road crossing into a Toucan to allow cyclists to ride across

7 7 Transport challenges and solutions Option 2 NEW SLIP ROAD FOR SUPERMARKET SITE Key differing features of this approach are: Servicing management The service yard is big enough that delivery vehicles will not have to wait on Brassington Ave and turning can occur within the site. It is likely that servicing times will be part of the planning permission which will likely demand for off peak deliveries to ensure traffic flow along Brassington Ave is not disturbed. Dedicated supermarket entry and exit lane with new signing and road lining to maintain flow of traffic along Brassington Ave From the Manor Road roundabout, cars would be directed into the middle lane if NOT turning into the supermarket site allowing cars turning left into the site to slow down in their own slip lane Cars leaving the supermarket site would have a dedicated slip road for exiting and would merge in to flowing traffic on Brassington Ave The Mall car park exit slip lane would still be in operation and would link in well with the supermarket slip road However, this requires the removal of 14 out of 22 disabled parking bays behind The Mall on Brassington Ave. NB A usage count would be undertaken to determine utilisation of the parking bays. The above would require a Traffic Regulation Order if this were not approved/supported by Councillors, Option 1 would be pursued. Impact on local roads The previous residential-led scheme would have meant most traffic movements would occur at peak times however this scheme was approved at planning. With a supermarket proposal, traffic would be staggered throughout the day. The traffic impact from the supermarket scheme would be less than the City Lofts residential-led scheme which already has planning consent; assessment work is still on-going to determine this and this will be detailed in a supporting Transport Assessment. Car and cycle parking 169 car parking spaces are proposed which responds both to both levels required by Birmingham City Council s planning policy and also demands from supermarket operators. Approximately 20 (TBC) cycle parking spaces are provided which are located at the front of the store to link into the Birmingham North cycle route. Until an operator is signed for the supermarket, it is unknown how the car park will be managed but it is likely that there will be a time limit on free parking after which charges will be applied.

8 8 Linking into the town centre The Mall turns its back onto Brassington Ave but as the site is within the town centre, it needs to contribute to the overall shopping offer of Sutton Coldfield and link into the town centre. The development has been considered in light of links into The Mall but also links across to the southern part of the town centre along Birmingham Road and east to the retail park. Diversion of Brassington Ave to be parallel to the railway track considered by the Council but dismissed due to engineering costs and disruption to The Mall car park with the relocation of the slip road Sinking/lowering of Brassington Ave not possible due to the underground river and 1m wide sewers (see board 2) Proposed link to the town centre A number of options have been considered for Brassington Ave to help improve pedestrian links: Bridge over Brassington Ave see below left Ramped access through The Mall see below Bridge over Brassington Ave Ramped access through The Mall Travel distance over 400m (1300ft) to town central point (outside Aldi) Pedestrian route through The Mall s car park Bridge 6.5m (20ft) above ground level 100 steps Road closures to Brassington Ave during construction On-going maintenance and security Additional payment to The Mall not quantified This option could cost in excess of 1m not viable Distance over 300m (980ft) to town central point (outside Aldi) 50m (170ft) long ramp required to connect varying levels Disruption to flow of traffic with increase from 2 crossing s to 4 in a very short distance Security risk to The Mall Loss of retail unit at The Mall Additional payment to The Mall and quantified On-going maintenance required additional costs This option could cost up to 1m not viable To improve pedestrian links, a new crossing is being proposed at Park Road which is where many people currently try to cross Brassington Ave to access The Mall up the existing pedestrian ramp. By providing a new crossing here, we are working with the natural pedestrian desire line to create a safer and more pleasant access route with dropped kerbs for wheel chair users. Pedestrian routes from the supermarket car park along Brassington Ave either north or south will also be more pleasant with tree planting and overlooking from the glazed café area. Key features of this proposed approach to links: Shorter travel distance than the bridge link Key linkage to important point in Town from the proposed car park: - Distance to Bus Stop 320m (1000ft) - Distance to town central point (outside Aldi) 230m (750ft) - Distance to M&S 290m (950ft) - Distance to House of Fraser 350m (1150ft).

9 9 Timescales and FAQs Feedback from the public consultation will help to inform the development of an OUTLINE planning application. When the application is submitted, Birmingham City Council (BCC) will carry out its own statutory public consultation. Frequently Asked Questions Further detail will need to be submitted for planning at a later date by a supermarket operator. The anticipated timetable is as follows: Actions How can I provide feedback? You can get involved in the public consultation as follows: Review the proposals and speak to the design team at one of the public events OR call GL Hearn to find out more (for those who can t attend the events) Fill out a questionnaire at one of the public events in February OR take away a questionnaire and send it back to GL Hearn via the FREEPOST address Provide your feedback to GL Hearn by , post or direct on the telephone. Timescales Consultancy team appointed Autumn 2011 Public and stakeholder consultation December - February 2012 OUTLINE planning application submission Early spring 2012 BCC planning decision on outline application Summer 2012 Detailed planning submission and BCC approval Winter 2012/2013 Potential start on site by operator 2013 Contact details For further information please contact: Jo Sistern GL Hearn (public consultation advisors) Jo_sistern@glhearn.com Will the proposed development support business in the Town centre or in The Mall? Yes. The town s existing food provision is predominantly servicing the lower end (Aldi) and upper end (M&S and Waitrose). Due to the lack of middle market food store provision in the town centre as a whole, the site will act as a draw to shoppers to encourage them to visit Sutton Coldfield town centre by enhancing the existing retail offer. What catchment area is the supermarket expected to serve ie. will this development put more cars on local roads that will lead to increased congestion and disruption at junctions? Due to the optimum size proposed, the store will have a dual function of 1) a full food shop offer and 2) a top-up shop, which will divert/ attract traffic that is predominantly en route on the road network. Will the site be served effectively by public transport nearby particularly buses? There are existing bus stops in the vicinity and the majority of bus routes terminate on The Lower Parade which is less than 200m east of the site. Will there be a physical link into The Mall if not, why not? A physical link would only be possible as a connection to The Mall s multi-storey car park (See board 8). Therefore it would be very difficult to deliver this without creating a canyon effect between the car park and a multi-level development on the Brassington Ave site. In addition, any bridge would NOT add a direct access to The Mall retail floor and would be prohibitively expensive to provide. How does the proposed development complement and link into the town centre? There is good linkage to the Manor Road roundabout which is arguably the physical central point of the town centre and there is a pedestrian desire line (ie. the easiest and most direct route that people choose to take) from there on to Park Road to the North of the site. The team is currently discussing with Birmingham City Highways possible contributions to improvements to this desire line route. Will there be any landscape or environmental improvements as a result of the development? The proposal provides for the planting of trees adjacent to Brassington Ave and the opening up of views of the green railway embankment. In addition the store will target the sustainable measure for BREEAM * of very good which is above Birmingham City Council s current requirements. *Building Research Establishment Environmental Assessment Method. When would work start on site and how long would construction take? Depending on the timing of the planning committee s decision, start on site could potentially be The design and construction stage would take around months. When could the new supermarket be open for business? Dependent on when planning approval is secured, the supermarket could be open in 2014.

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

The Point Roundabout Improvement Scheme

The Point Roundabout Improvement Scheme The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the

More information

Welcome WINSTON GROUP. Welcome to our public exhibition on the Winston Group s proposals to redevelop 110 Walm Lane, Willesden Green.

Welcome WINSTON GROUP. Welcome to our public exhibition on the Winston Group s proposals to redevelop 110 Walm Lane, Willesden Green. Welcome Our proposed scheme (image for illustrative purposes only) Welcome to our public exhibition on the Winston Group s proposals to redevelop 110 Walm Lane, Willesden Green. The purpose of our exhibition

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Bridge School, Longmoor Campus, Coppice View Road, Sutton Coldfield, Birmingham, B73 6UE

Bridge School, Longmoor Campus, Coppice View Road, Sutton Coldfield, Birmingham, B73 6UE Committee Date: 22/01/2015 Application Number: 2014/05949/PA Accepted: 08/12/2014 Application Type: Full Planning Target Date: 02/02/2015 Ward: Sutton Vesey Bridge School, Longmoor Campus, Coppice View

More information

Riverside Heights, Norwich. Travel Plan

Riverside Heights, Norwich. Travel Plan RIVERSIDE HEIGHTS, NORWICH Client: Engineer: Taylor Wimpey East Anglia Create Consulting Engineers Limited Hungate House Princes Street Norwich Norfolk NR3 1AZ Tel: 08454507908 Email: enquiries@createconsultingengineers.co.uk

More information

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

Roundhouse Way Transport Interchange (Part of NATS City Centre Package) Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal

More information

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT Committee Date: 07/03/2013 Application Number: 2012/07986/PA Accepted: 29/11/2012 Application Type: Variation of Condition Target Date: 24/01/2013 Ward: Handsworth Wood Old Limberlost Sports Club, Butlers

More information

Public Realm & Landscape

Public Realm & Landscape Town Centre Context Public Realm & Landscape 1. Public realm in the Town Centre varies significantly in quality. Areas of particularly good quality public realm are located around the Minster and outside

More information

Abbey Chesterton bridge Questions & Answers

Abbey Chesterton bridge Questions & Answers Abbey Chesterton bridge Questions & Answers Please click on links below to go to individual subjects: Bridge location and access routes Timescales Bridge details and accessibility Construction compound

More information

Proposed Lidl Food store West Hendford, Yeovil

Proposed Lidl Food store West Hendford, Yeovil Proposed Lidl Food store West Hendford, Yeovil Lidl Travel Plan October 2015 CONTENTS Page 1.0 INTRODUCTION 1 1.1 Background 1 1.2 Aim of Travel Plan 1 1.3 Contents 2 2.0 TRANSPORT CONTEXT 3 2.1 Site Location

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Appendix 6 Fulbourn Greenway Review

Appendix 6 Fulbourn Greenway Review Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE

WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE PROJECT EVERGREEN 3 WELCOME TO PROJECT EVERGREEN 3 CHILTERN S PROPOSED NEW OXFORD TO LONDON ROUTE Chiltern Railways is proposing a railway improvement scheme between Oxford and Bicester (the Evergreen

More information

Economic Development Sub- Committee

Economic Development Sub- Committee Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: 24-04-2018 Applicant: Proposal: Site: Mr Mavroudis Clear weather hoardings

More information

Capital & Counties. October 2007

Capital & Counties. October 2007 Capital & Counties October 2007 Contents!" # $ % % $ & ' "&( # Appendix 1 Appendix 2 1 Introduction 1.1.1 Wincheap regeneration scheme proposes a 600 space Park and Ride facility to replace the existing

More information

Bartlett Square Welcome. Investment Framework. London Airport Ltd

Bartlett Square Welcome. Investment Framework. London Airport Ltd 1 Welcome Welcome to Luton s public exhibition on proposals for the (formerly known as Stirling Place) project which will comprise 2.5 acres of commercial development, providing up to 2,000 jobs for local

More information

WELCOME WELCOME TO OUR EXHIBITION ON THE FUTURE OF TOOTING HIGH STREET

WELCOME WELCOME TO OUR EXHIBITION ON THE FUTURE OF TOOTING HIGH STREET WELCOME Aerial view of the site and surrounding area WELCOME TO OUR EXHIBITION ON THE FUTURE OF 111-113 TOOTING HIGH STREET The existing building is underused and does not fulfil the potential of its location.

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY Matter 3C Easton/Costessey Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY SUBMISSION ON BEHALF OF TAYLOR WIMPEY DEVELOPMENTS AND

More information

Wolverhampton City Council

Wolverhampton City Council Agenda Item: 7G Wolverhampton City Council OPEN EXECUTIVE DECISION ITEM Cabinet / Cabinet Team CABINET Date 24 MARCH 2010 Portfolio(s) Originating Service Group(s) COUNCILLOR MRS BRADLEY (REGENERATION

More information

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South.

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South. Welcome Recent aerial view of the site with Griffin Park, the existing stadium, in the background. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium

More information

Swallow House, 10 Swallow Street, Birmingham, B1 1BD

Swallow House, 10 Swallow Street, Birmingham, B1 1BD Committee Date: 20/02/2014 Application Number: 2013/08477/PA Accepted: 29/11/2013 Application Type: Full Planning Target Date: 28/02/2014 Ward: Ladywood Swallow House, 10 Swallow Street, Birmingham, B1

More information

BRENT CROSS THAMESLINK

BRENT CROSS THAMESLINK INTRODUCTION The 4.5 billion Brent Cross Cricklewood development is Barnet Council s most significant growth and regeneration programme. It will create a new sustainable mixed use town centre for Barnet

More information

PCAL Case Study Retail Areas: Rouse Hill Town Centre

PCAL Case Study Retail Areas: Rouse Hill Town Centre PCAL Case Study Retail Areas: Rouse Hill Town Centre Introduction Rouse Hill Town Centre is a new mixed use development on a greenfield site in Sydney s North West. It has been planned to be a major hub

More information

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering

More information

Finchley and Golders Green Area Committee 27 April 2017

Finchley and Golders Green Area Committee 27 April 2017 Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Officer Contact Details Junction of Regents Park Road / Tillingbourne Gardens, N3 Commissioning

More information

WOKING INTEGRATED TRANSPORT PROJECT

WOKING INTEGRATED TRANSPORT PROJECT Civic Offices Gloucester Square Woking Surrey GU21 6YL Telephone (01483) 755855 Facsimile (01483) 768746 DX 2931 WOKING Email wokbc@woking.gov.uk Website www.woking.gov.uk 20 January 2017 Dear Resident/Business

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

Infrastructure for Growth

Infrastructure for Growth A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has

More information

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002

2.0 POLICY AND DEVELOPMENT FRAMEWORK. Introduction. Transport21. Celbridge Development Plan 2002 2.0 POLICY AND DEVELOPMENT FRAMEWORK Introduction 2.1 This section of the report highlights the key elements of both Transport21, and the Celbridge Development Plan 2002, both of which include a number

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT Committee Date: 7/0/013 Application Number: 013/04/PA Accepted: 1/04/013 Application Type: Variation of Condition Target Date: 1/07/013 Ward: Sutton Four Oaks Sainsburys Store, Mere Green Road, Sutton

More information

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options. Welcome Welcome to the Highways England A27 Arundel Bypass public consultation. Thank you for coming. Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear

More information

Felixstowe Branch Line FAQ

Felixstowe Branch Line FAQ Felixstowe Branch Line FAQ How was the location of the track doubling work decided? We undertook a study to identify how to meet the freight demand along the Felixstowe Branch Line by modelling the route.

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director 1. Expanding Heathrow The expansion of Heathrow will be one of the largest infrastructure projects in

More information

M621. Junctions 1 to 7 Improvement scheme. Share your views

M621. Junctions 1 to 7 Improvement scheme. Share your views M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,

More information

Chapter 16 Route Window NE15 Brentwood station. Transport for London

Chapter 16 Route Window NE15 Brentwood station. Transport for London Chapter 16 Route Window NE15 Brentwood station BRENTWOOD STATION 16 Route Window NE15 Brentwood station Introduction 16.1 The construction activities in this route window are associated with minor refurbishment

More information

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems

Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems Traffic Advisory Leaflet 2/09 April 2009 Integration of Pedestrian Traffic Signal Control within SCOOT-UTC Systems Introduction SCOOT 1,2,3 (Split Cycle and Offset Optimisation Technique) is an adaptive

More information

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

Map showing location of public transport projects in vicinity of railway station

Map showing location of public transport projects in vicinity of railway station Map showing location of public transport projects in vicinity of railway station Market Town Transport Strategy 2013 39 ID PT1a Specific Location Approach at Detail of Project Develop Area Master plan

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

A140 study and Major Road Network

A140 study and Major Road Network A140 study and Major Road Network Executive Summary The Government s new Transport Investment Strategy sets out a new long-term approach for government infrastructure spending. Funding will be targeted

More information

To LET/For Sale. 12,389-50,322 sq ft (1,151-4,765 sq m) description location COnnectivity AMENITIES site plan floor plans accommodation contact

To LET/For Sale. 12,389-50,322 sq ft (1,151-4,765 sq m) description location COnnectivity AMENITIES site plan floor plans accommodation contact To LET/For Sale 12,389-50,322 sq ft (1,151-4,765 sq m) Prominent new landmark office building in Bath s Enterprise Zone description Roseberry Place is a major mixed use urban regeneration scheme enjoying

More information

ACORNS PROJECTS LIMITED

ACORNS PROJECTS LIMITED ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project

More information

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1 Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)

More information

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is considering options for improving surface access and connectivity

More information

Chapter 21 Route window W6 West Ealing station. Transport for London

Chapter 21 Route window W6 West Ealing station. Transport for London Chapter 21 Route window W6 West Ealing station WEST EALING STATION 21 Route window W6 West Ealing station Baseline conditions 21.6 West Ealing station is located in the London Borough of Ealing and is

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

GUNGAHLIN TOWN CENTRE

GUNGAHLIN TOWN CENTRE GUNGAHLIN TOWN CENTRE PLANNING REFRESH SNAPSHOT NOVEMBER 2018 CONTENTS INTRODUCTION....1 Australian Capital Territory, Canberra 2018 This work is copyright. Apart from any use as permitted under the Copyright

More information

Sarawia Street Laxon Terrace Rail Level Crossing Removal

Sarawia Street Laxon Terrace Rail Level Crossing Removal Sarawia Street Laxon Terrace Rail Level Crossing Removal Recommendations It is recommended that the Board: Receives the report. Executive summary The removal of the Sarawia Street to Laxon Terrace rail

More information

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT.

WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. WELCOME WELCOME TO OUR PUBLIC EXHIBITION FOR THE BOND STREET PUBLIC REALM PROJECT. Bond Street Development Plan is one of the key initiatives outlined in the West End Partnership s vision. Bond Street

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

Welcome. Great Yarmouth Third River Crossing. Norfolk County Council

Welcome. Great Yarmouth Third River Crossing.  Norfolk County Council Welcome Great Yarmouth Third River Crossing We are proposing to build a new bridge between Harfreys Roundabout and South Denes Road, and we would like your views. This consultation is stage two of a three-stage

More information

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin

More information

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON March 2017 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 THE SUBJECT SITE 4 3.0 STRATEGIC PLANNING CONTEXT 6 4.0 SUMMARY AND CONCLUSIONS

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

Scala House, 36 Holloway Circus, Queensway, Birmingham, B1 1EQ

Scala House, 36 Holloway Circus, Queensway, Birmingham, B1 1EQ Committee Date: 31/10/2013 Application Number: 2013/06196/PA Accepted: 15/08/2013 Application Type: Full Planning Target Date: 14/11/2013 Ward: Nechells Scala House, 36 Holloway Circus, Queensway, Birmingham,

More information

Construction Staging Area Blue Jays Way (357 King Street West)

Construction Staging Area Blue Jays Way (357 King Street West) REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto

More information

Centurion Way Chichester

Centurion Way Chichester Centurion Way Chichester Work book of plans to show details of the Centurion Way, its links, and potential developments and enhancements from linking to the South Downs National Park all the way to the

More information

Arcadis LLP Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth Access Management Strategy. June 2017

Arcadis LLP Proposed Secondary School (Bolder Academy) Macfarlane Lane, Isleworth Access Management Strategy. June 2017 traffic engineering and transport planning Arcadis LLP Proposed Secondary School () June 2017 Armstrong House, The Flemingate Centre, Beverley, HU17 0NW 01482 679 911 info@local-transport-projects.co.uk

More information

M2 Junction 5. improvements scheme. Preferred route announcement

M2 Junction 5. improvements scheme. Preferred route announcement M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these

More information

Tesco Express, Alcester Road South, Kings Heath, Birmingham, B14 6EB

Tesco Express, Alcester Road South, Kings Heath, Birmingham, B14 6EB Committee Date: 27/11/2014 Application Number: 2014/06477/PA Accepted: 09/09/2014 Application Type: Variation of Condition Target Date: 09/12/2014 Ward: Brandwood Tesco Express, 281-289 Alcester Road South,

More information

Ian Saxon Assistant Executive Director, Environmental Services

Ian Saxon Assistant Executive Director, Environmental Services Report To: SPEAKERS PANEL (PLANNING) Date: 14 December 2016 Reporting Officer: Ian Saxon Assistant Executive Director, Environmental Services Subject: OBJECTIONS TO PROPOSED REMOVAL OF LEECH STREET / BACK

More information

Scotchbarn Lane, Prescot Accessibility Statement

Scotchbarn Lane, Prescot Accessibility Statement Scotchbarn Lane, Prescot Accessibility Statement Lancashire Mortgage Corporation Ltd August 2012 Issue R001B 9X0789 All rights reserved. No part of this publication may be reproduced in any form, including

More information

22-24 Station Road, Erdington, Birmingham, B23 6UB

22-24 Station Road, Erdington, Birmingham, B23 6UB Committee Date: 16/10/2014 Application Number: 2014/05377/PA Accepted: 24/07/2014 Application Type: Full Planning Target Date: 18/09/2014 Ward: Erdington 22-24 Station Road, Erdington, Birmingham, B23

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

Movement Strategy. November On behalf of Barton Oxford LLP

Movement Strategy. November On behalf of Barton Oxford LLP Movement Strategy November 2014 On behalf of Barton Oxford LLP BARTON PARK, OXFORD. Movement Strategy 17/11/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date

More information

Land off Stonnal Grove, & Rowden Drive (Phase 1A), Lyndhurst Estate, Sutton Road, Erdington, Birmingham, B23 5US

Land off Stonnal Grove, & Rowden Drive (Phase 1A), Lyndhurst Estate, Sutton Road, Erdington, Birmingham, B23 5US Committee Date: 07/03/2013 Application Number: 2013/00204/PA Accepted: 11/01/2013 Application Type: Reserved Matters Target Date: 12/04/2013 Development Ward: Erdington Land off Stonnal Grove, & Rowden

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

Creating a High Quality Business District

Creating a High Quality Business District Date Month Date Month Friday 7 November 2014 Nine Elms on the South Bank A Bilfinger Real Estate company Creating a High Quality Business District New London Architecture Introduction Nine Elms Vauxhall

More information

Display of 1 no. internally illuminated advertisement hoarding

Display of 1 no. internally illuminated advertisement hoarding Committee Date: 22/08/2013 Application Number: 2013/04695/PA Accepted: 01/07/2013 Application Type: Advertisement Target Date: 26/08/2013 Ward: Ladywood Summer Row, Birmingham, B3 1JU Display of 1 no.

More information

Pre-application submission for Committee: Phase 4 development at West Hendon

Pre-application submission for Committee: Phase 4 development at West Hendon Pre-application submission for Committee: Phase 4 development at West Hendon 1. Development Details Phase 4 of the West Hendon Estate Regeneration. 2. Background The redevelopment of the West Hendon Estate

More information

CITY OF EDINBURGH COUNCIL WRITTEN SUBMISSION

CITY OF EDINBURGH COUNCIL WRITTEN SUBMISSION CITY OF EDINBURGH COUNCIL Summary WRITTEN SUBMISSION Waverley and Haymarket are significant stations for Scotland as well as Edinburgh. The number of passengers using them has grown substantially in recent

More information

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement A303 Sparkford to Ilchester Dualling Scheme Preferred Route Announcement About this booklet This booklet presents the preferred route for the A303 Sparkford to Ilchester dualling scheme and a summary of

More information

Llandudno Junction. Regeneration Proposals for the Future. December 2009

Llandudno Junction. Regeneration Proposals for the Future. December 2009 Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration

More information

Councillor Briefing on Elvetham Chase

Councillor Briefing on Elvetham Chase Councillor Briefing on Elvetham Chase In partnership with the Calthorpe Estate, Wates Developments vision for Elvetham Chase is to provide an outstanding new community for Hart District that will become

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Chapter 25 Route Window SE6 Plumstead portal. Transport for London Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

COLLEGE STREET STUDY Community Consultation Meeting. December 2015 COLLEGE STREET STUDY Community Consultation Meeting December 2015 2 Agenda 6:30 pm Introductions, Agenda Review and Welcome 6:40 pm Presentation Planning Recommendations 7:30 pm Questions and Discussion

More information

Proposed Arthurs Point Special Housing Area. Housing Accords and Special Housing Areas Act Expression of Interest

Proposed Arthurs Point Special Housing Area. Housing Accords and Special Housing Areas Act Expression of Interest Proposed Arthurs Point Special Housing Area Housing Accords and Special Housing Areas Act 2013 Expression of Interest 1.0 APPLICANT The applicant for the proposed Arthurs Point Special Housing Area is

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

"TOUCAN" - An unsegregated crossing for pedestrians and cyclists

TOUCAN - An unsegregated crossing for pedestrians and cyclists Traffic Advisory Leaflet 10/93 August 1993 "TOUCAN" - An unsegregated crossing for pedestrians and cyclists Summary This leaflet gives advice on the design and use of the Toucan signal controlled crossing,

More information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District

More information

Lorg Wind Farm. Addendum To Pre-Application Consultation Report

Lorg Wind Farm. Addendum To Pre-Application Consultation Report Lorg Wind Farm Addendum To Pre-Application Consultation Report November 2015 Lorg Wind Farm Pre-Application Consultation Report Addendum Contents 1. Introduction... 1 Summary of Non-Statutory Consultation...

More information

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN 1 INTRODUCTION New Zealand was awarded the Rugby World Cup 2011 hosting rights in November 2005. A condition of the winning bid was the provision of a 60,000 seat stadium for the finals. New Zealand s

More information

Heathrow Consultation January March 2018

Heathrow Consultation January March 2018 A briefing from HACAN Heathrow Consultation January March 2018 Heathrow launched its biggest ever consultation on 17 th January. It closes on 28 th March. In reality, it is two consultations running in

More information

20mph Speed Limit Zones

20mph Speed Limit Zones Traffic Advisory Leaflet 7/91 May 1991 20mph Speed Limit Zones Summary This leaflet illustrates the main steps in the procedures for the implementation of 20mph zones. It provides brief details on: the

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL Jackie Davies, Senior Technical Officer (UTC), Bristol City Council Traffic Signals Synopsis Bristol City Council has received

More information