1 Edisto Beach Renourishment and Groin Lengthening Project Tim Kana Coastal Science & Engineering
2 Hurricane Matthew 8 Oct 2016 Cat 1 Edisto Beach Worst Surge Event Since DAVID in 1979 Tides ~ 5 ft above normal
3 Hurricane Matthew 8 Oct October 2017 Steven Traynum
4 Hurricane Matthew 9 October 2017 Steven Traynum
5 Hurricane Matthew Groin 16 Nancy St 9 October 2017 Steven Traynum
6 Groins Point St Hurricane Matthew 9 October 2017 Steven Traynum
7 Hurricane Matthew Standing Flood Waters at The Point 9 October 2017 Steven Traynum
8 Hurricane Matthew 9 October 2017 Steven Traynum
9 Hurricane Matthew 9 October 2017 Steven Traynum
10 Hurricane Matthew 9 October 2017 Steven Traynum
11 Hurricane Matthew 9 October 2017 Steven Traynum
12 Baynard St Fairfield Cabana Hurricane Matthew 9 October 2017 Steven Traynum Jenkins St
13 Hurricane Matthew 9 October 2017 Steven Traynum
14 Hurricane Matthew 11 October 2017 Luke Fleniken
15 Hurricane Matthew Thank you National Guard! 11 October 2017 Luke Fleniken
16 CSE founded in 1984 CSE Most SC nourishment and groin experience of any private group Completed over 40 nourishment projects since the 1980s. Major projects at Myrtle Beach, Seabrook, Hunting, Edisto, Kiawah, Folly, Bogue Banks (NC), Nags Head (NC).
17 The Setting Edisto Beach Setting Edingsville-Botany Bay
18 September 2012 Condition Why is Edisto Beach so shelly?
19 Edisto Beach 5.8 miles from Jeremy Inlet to Big Bay Creek First Development - ~1920 ~3.4 miles of upland along the Atlantic ~190 oceanfront homes in project area ~2,180 residential units Beach Nourishments: 1954, 1995, 2006 Groins 34 groins built between 1948 and 1975 Groins rehabilitated in 1995 Federal Study Initiated 2003 Ongoing CSE Studies 2012 Built on USACE
20 1954 Edisto Beach Nourishments 1995 First SC Nourishment Project! Adjusted Cost: $15,500,000 ~$15.50 per foot of shoreline per year (Kana 2012) 2006
21 Beach Volume Changes Since 2006 Project Areas Lost ~450,000 cy (~51% of Fill) Between 2006 & 2015
22 Volume Changes Since 2006
23 2015 Condition Exposed Seawall Cell 1 Cell 3 Cell 2 Cell 11
24 Groin These Building Setbacks Became the Target Minimum Condition for CSE s 2017 Plan
25 2012 Groin Extension Study
26 2012 Groin Extension Study
27 2012 Groin Extension Study Compared groin lengths relative to houses Extensions based on condition of groin 16 Extensions would protect stable dunes in chronically eroded areas
28 2017 Project Larger than USACE initial nourishment plan Expanded by State & FEMA funds Sought most beneficial combination of nourishment/groin lengthening Timely Implementation possible after Hurricane Matthew Included lengthening for 26 groins The Town was able to accomplish full plan Nourishment volume greatly exceeds trapping capacity of the groins
29 Project Funding Town of Edisto Beach State of SC (Nourishment Fund) SCPRT (Park pro rata share) Colleton County Sales Tax Fund FEMA (post-joaquin Grant) FEMA (post-matthew Grant) 3,000,000 6,800,000 3,270,000 4,000,000 1,100,000 1,400,000 Total 19,570,000 Covers construction, engineering, permitting, sand fencing, environmental protection & contingency
30 Borrow Area 2006 Area Borrow Area was evaluated as part of the USACE planning Additional borings were obtained to determine changes since 2008 Most of the 2006 borrow area filled in with sandy material
31 2017 Beach Nourishment Project Dredge Savannah Marinex Construction Inc
32 Project Limits Design - 1,006,000 Cubic Yards Contractor: Marinex Construction Inc. Charleston SC
33 2017 Construction First Day of Pumping 25 January Groin Extensions 25 January 2017 Tim Kana 26 January 2017 Haiqing Kaczkowski
34 2017 Construction Finn s Restaurant after Matthew Cleanup Before Nourishment 6 February 6 Feb January 2017 Steven Traynum
35 2017 Construction Included Storm Berm 6 February 2017 Steven Traynum
36 2017 Construction Groin 28 Extension Placing Grout 27 February 2017 Steven Traynum
37 2017 Construction Groin 8 Extension Driving Sheetpiles 27 February 2017 Steven Traynum
38 2017 Construction Groin 8 Extension Placing Mattresses To Stabilize the Armorstone 27 February 2017 Steven Traynum
39 2017 Construction Groin 8 Extension Placing Armorstone for Scour Portection 3 March 2017 Andy Hammill
40 2017 Construction Groin 8 Extension Preparing Cap 15 March 2017 Steven Traynum
41 2017 Construction Groin 8 Pouring Cap 15 March 2017 Steven Traynum
42 2017 Construction Second Landing Zone Cell 19 near Fairfield Cabana 9 March 2017 Steven Traynum
43 2017 Construction 20 April 2017 Nourishment Complete
44 2017 Construction Groin 1 State Park 20 April 2017 Steven Traynum
45 20 April April Construction
46 20 April Construction
47 20 April 20 April Construction
48 20 April April Construction
49 2017 Construction 20 April April 2017
50 20 April 20 April Construction
51 20 April 20 April Construction
52 20 April April Construction
53 Post Construction - Expectations 2006 Project
54 Post Construction - Expectations The Point
55 Expected Outcome 17 Feb 2007 ~8 months after nourishment Photo by Tim Kana Project Director
56 Edisto Beach Project Town of Edisto Beach Acknowledgements Jane Darby, Mayor Susan Hornsby, Councilwoman Jerome Kizer, Councilman Crawford Moore, Councilman Patti Smyer, Councilman Iris Hill, Town Manager Thank you! Photo by Steven B. Traynum Project Manager
2011 Nags Head Beach Nourishment Project Update. Tim Kana & Haiqing Kaczkowski
2011 Nags Head Beach Nourishment Project Update Tim Kana & Haiqing Kaczkowski NCBIWA Conference 3 April 2017 Outline of the Presentation 1 Review 2011 Nourishment Project Post-project monitoring efforts
More informationA Brief History of the Town of Palm Beach Coastal Protection Program. Beach nourishment occurred in Palm Beach as far back as the 1940s.
A Brief History of the Town of Palm Beach Coastal Protection Program Beach nourishment occurred in Palm Beach as far back as the 1940s. The Lake Worth Inlet Sand Transfer Plant was built in the late 1950s.
More informationCoastal Management: Treasure Island - Long Key Nourishment
Coastal Management: Treasure Island - Long Key Nourishment Project Completed - October 20, 2010 The nourishment of Treasure Island and Long Key (TI/LK) beaches began in late July of 2010. The previous
More informationDAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC
OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC June 07, 2017 PREPARED FOR: GEORGETOWN COUNTY DEPARTMENT OF PUBLIC SERVICES PREPARED BY: The EARTHWORKS Group 11655
More informationThe Galveston Seawall
Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada. March, 2013 The Galveston Seawall Mark Harvey
More informationNorfolk District North Atlantic Division
Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 26, 2016 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers Norfolk District FY-17 Dredging Program
More informationU.S. Army Corps of Engineers Wilmington District
U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers Wilmington District Ongoing Contracts Project Quantity
More informationGreat Lakes Navigation System Buffalo District
Great Lakes Navigation System Buffalo District Josh Feldmann U.S. Army Corps of Engineers Chief, Operations Branch 9 FEB 2016 US Army Corps of Engineers BUILDING STRONG Key FY16/17 Buffalo District O&M
More informationHurricane Irma: Palm Beach County Coastal Storm Damage Assessment
Project Area: Coral Cove Park Location: R1 to R7.5 Project Length: 5,170 ft Estimated Volumetric Loss: 38,296 cy Pre-Storm Assessment Date: August 22, 2017 General observations: 30 ft loss of dry beach
More informationEconomic Impacts of Beach Nourishment in Texas
Galveston Island South Padre Island April 25, 2017 Economic Impacts of Beach Nourishment in Texas Michael Walther Coastal Tech G.E.C., Inc. Reuben Trevino - Galveston Island Park Board of Trustees Special
More informationPORT EVERGLADES SAND BYPASS PROJECT
28 th Annual National Conference on Beach Preservation Technology February 4, 2015 Clearwater Beach, FL PORT EVERGLADES SAND BYPASS PROJECT AN IMPORTANT FUTURE SAND SOURCE FOR SOUTHEAST FLORIDA BEACHES
More informationOctober 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles
October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles Hammock Dunes Suffers Penetration of the Ocean into the Community; has a 15-30 ft. Wide Triangular Section of the
More informationNC Dredge Studies NCBIWA Spring Conference April 23, 2018
NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference
More information7/21/2014. New Jersey Waterway Debris Removal from Superstorm Sandy: Unprecedented! Superstorm Sandy. Superstorm Sandy.
New Jersey Waterway Debris Removal from Superstorm Sandy: Unprecedented! Superstorm Sandy Image courtesy of Remik Ziemlinski, Climate Central (www.climatecentral.org) 2 New Jersey Waterway Debris Removal
More informationSt. Augustine Port, Waterway & Beach District. St. Augustine Inlet 2013 draft Inlet Management Plan. March 19, 2013
Division of Water Resource Management St. Augustine Port, Waterway & Beach District St. Augustine Inlet 2013 draft Inlet Management Plan March 19, 2013 Discussion Outline Florida Statutes Florida Inlets
More informationNC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018
NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis Sterling Baker, P.E. NCDOT James
More informationRiverine Sand Mining/Scofield Island Restoration (BA-40)
Riverine Sand Mining/Scofield Island Restoration (BA-40) Conference on Ecological and Ecosystem Restoration Kenneth Bahlinger, CPRA Project Manager July 31, 2014 committed to our coast committed to our
More informationDOES BEACH NOURISHMENT PROTECT PROPERTY VALUES FROM HURRICANES? THE CASE OF THE 2004 AND 2005 HURRICANES
DOES BEACH NOURISHMENT PROTECT PROPERTY VALUES FROM HURRICANES? THE CASE OF THE 2004 AND 2005 HURRICANES James Murley, Director, Center for Urban and Environmental Solutions (CUES), FAU Dr. Lenore Alpert,
More informationBuffalo District Navigation Program Overview
Buffalo District Navigation Program Overview 16 FEB 2011 US Army Corps of Engineers Buffalo District Area of Operations Our Facilities District Headquarters 2 Area Offices 3 Regulatory Field Offices Lake
More informationImpact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas
Google Earth 29 Aug 2017 Impact of Offshore Directed Forcing on Sediment Transport and Structural Integrity at Packery Channel, Corpus Christi Texas Deidre D. Williams Coastal Research Scientist Conrad
More informationCity of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance
City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale
More informationCORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015
CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS
More informationStakeholder Meeting #1. An Introduction to the Blind Pass Inlet Management Study
Stakeholder Meeting #1 An Introduction to the Blind Pass Inlet Management Study April 21, 2016 5:30 PM, The Sanctuary, Sanibel Island A World of Solutions 0 Agenda Introductions Study Overview Study Status
More informationMANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY
MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY Isabelle Ghetti 1, B.Morgan 2, R.Massie 1, Gary Blumberg 2 1 Shoalhaven City Council, Nowra, NSW 2 Royal
More information80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS
11 3 1 6 9 4 5 4 8 7 7 9 ' MUDLINE ELEVATION 8 1 6 11 6 1 7 8 5 7 7 12 11 5 12 7 8 9 5 11 8 REVISED FEDERAL LIMIT FOR DREDGING FEDERAL LIMIT FOR DREDGING 12 1 11 7 1 4 8 5 8 5 14 4 14 3 9 3 8 5 1 5 11
More informationOngoing Projects 3/16/2017 2
Ongoing Projects 26 th to 34 th Street, West Avenue to Bay Avenue ($6.5 million contract awarded) 46 th Street (complete) 29 th Street Firehouse South Jersey Gas improvements 34 th Street playground repairs
More informationOWN A PIECE OF PARADISE. SEABROOK ISLAND.
OWN A PIECE OF PARADISE. SEABROOK ISLAND. Located just 35 minutes from Charleston, SC Named the #1 City in the World by Travel + Leisure 2 Oceanfront Oasis DISCOVERING YOUR Seabrook Island is a private
More informationUSACE GALVESTON DISTRICT PROJECT UPDATE
USACE GALVESTON DISTRICT PROJECT UPDATE 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 DREDGE YOUR DOCKS 2018 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59 112 92 56 62 102
More information- NEUTRAL. Savannah ORGIA PETER SALAMON MASTER OF URBAN DESIGN THESIS SAVANNAH COLLEGE OF ART AND DESIGN MAY 2015
- NEUTRAL + RE δge Savannah ORGIA PETER SALAMON MASTER OF URBAN DESIGN THESIS SAVANNAH COLLEGE OF ART AND DESIGN MAY 2015 PANAMA CANAL EXPANSION THE CATALYST Suez 1869-6,000 km Panama 1914-13,000 km Prior
More informationKINGSTON HARBOUR IN THE YEAR SEMINAR SPONSORED BY NEPA 2003 November 06
KINGSTON HARBOUR IN THE YEAR 2025 SEMINAR SPONSORED BY NEPA 2003 November 06 NORMAN MANLEY INTERNATIONAL AIRPORT (NMIA) RUNWAY EXPANSION URGENTLY REQUIRED AT NMIA NMIA Brief History Previously named Palisadoes
More informationMarch 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018
OFFICE OF THE CITY MANAGER (757) 385-4242 (757) 427-5626 FAX MUNICIPAL CENTER BUILDING 1, ROOM 234 2401 COURTHOUSE DRIVE VIRGINIA BEACH, VA 23456-9001 March 2, 2018 The Honorable Mayor Williams D. Sessoms,
More information30 November Randall G. Hintz Chief, Operations Support Branch Operations Division. US Army Corps of Engineers BUILDING STRONG
30 November 2011 Randall G. Hintz Chief, Operations Support Branch Operations Division US Army Corps of Engineers Overview MAINTENANCE PROJECTS Deep Draft Channels Shallow Draft Channels Coastal Inlets
More informationProposed Cherry Grove Canals Dredging Project
Proposed Cherry Grove Canals Dredging Project 1 Development of Cherry Grove C.D. Nixon inherited 9,940 acres of land 1924 Nixon family began planning subdivision of Cherry Grove 1950 Mr. Nixon closed natural
More informationHolgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018
Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018 The meeting was called to order by Dan Macone at 10.01 a.m. Dan thanked the membership for their support and remarked that
More informationNorfolk District North Atlantic Division
Norfolk District North Atlantic Division Eastern Chapter of WEDA Fall Conference October 9, 2012 Stephen J. Powell, P.E. (757) 201-7788 US Army Corps of Engineers 5-Year Dredging Schedule (By dredge type)
More informationWater Resources Update after NCGA Long Session
Water Resources Update after NCGA Long Session North Carolina Beach Inlet & Waterway Association Annual Conference November 16, 2015 Division of Water Resources Overview New Name / Reorganization Jordan
More informationGuide to Siting of Seawalls January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech
January 13, 2014 by Michael Walther, P.E., D.CE, President - Coastal Tech mwalther@coastaltechcorp.com Prepared for the Sea Turtle Conservancy http://www.conserveturtles.org/ Introduction Overview: This
More informationPort of Kalama, New Approach to Maintenance Dredging
Port of Kalama, New Approach to Maintenance Dredging Vladimir Shepsis, Coast @ Harbor Engineering, Inc. John Dawson, Coast @ Harbor Engineering, Inc. Mark Wilson, Port of Kalama Tabitha Reeder, Port of
More informationSAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012
SAME/A CONFERENCE Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012 U.S. Army Corps of Engineers Galveston District BUILDING STRONG 1 History of the
More informationIntense Hurricane Strike Reconstruction, Vieques, Puerto Rico
Intense Hurricane Strike Reconstruction, Vieques, Puerto Rico beach vegetated barrier Caribbean Sea N Vieques, Puerto Rico 200 m b) a) 67ºW 65ºW 1989 1956 18.5ºN 1928 PRP12 headland La Parguera 17.5ºN
More informationPotential Application of. Shore-Stabilizing Structures along an Open-Coast Shoreline. Christopher G. Creed, P.E. 23 rd Annual National Conference on
23 rd Annual National Conference on Potential Application of Beach Preservation Technology February 3-5, 2010 Indialantic, FL Shore-Stabilizing Structures along an Open-Coast Shoreline Christopher G. Creed,
More informationWaterway Access and the Atlantic Intracoastal Waterway in Florida
Waterway Access and the Atlantic Intracoastal Waterway in Florida Issues: Maintenance - Funding (costs), Infrastructure needs, permitting Management Consideration of the M-95 system, Cooperation among
More informationHARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA
HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA Harbor Location: Erie Harbor is located on the southern shore of Lake Erie in the City of Erie, PA about 98 Miles southwest of Buffalo. Authority: River
More informationwww: vermilionparishpolicejury.com
www: vermilionparishpolicejury.com 1 Coastal Projects in Vermilion Parish Constructed over the last 26 years (CWPPRA, CIAP, State Surplus) PPL Number Project Name Project Types Current Estimate Acres
More informationREVISED DRAFT Integrated Hurricane Sandy General Reevaluation Report and Environmental Impact Statement. Atlantic Coast of New York
REVISED DRAFT Integrated Hurricane Sandy General Reevaluation Report and Environmental Impact Statement Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay Appendix F Public
More informationEFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST
Proceedings of the 7 th International Conference on Asian and Pacific Coasts (APAC 203) Bali, Indonesia, September 2-26, 203 EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE
More informationPUBLIC WORKS DEPARTMENT
PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,
More informationDraft Town Board Meeting Minutes March 12, 2019
Draft Town Board Meeting Minutes March 12, 2019 Chairman Rolly Bogert called the Town Board Meeting to order on Tuesday March 12, 2019 at 6:30 PM at the Town of Onalaska, Town Hall, N5589 Commerce Street.
More informationPUBLIC WORKS DEPARTMENT
PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,
More informationWHY THERE IS NO STORM SURGE PROTECTION FOR THE LAKE PONTCHARTRAIN BASIN
WHY THERE IS NO STORM SURGE PROTECTION FOR THE LAKE PONTCHARTRAIN BASIN A Report Addressing: I. The Reason Why The Corps Of Engineers Abandoned Its Plan To Keep Storm Surge Out Of The Lake Pontchartrain
More information2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:
CENAN-PP-C 10 September 2013 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting 1. The regularly scheduled monthly interagency coordination meeting was held on September 10
More informationMini-budget Workshop Coastal Projects
Mini-budget Workshop Coastal Projects Public Works Department Coastal Division July 16, 2015 Coastal Infrastructure 99 dune walkovers 9 beachfront parks Dispersed over 35 miles of 2 inlet parks coastline.
More informationThe Corps of Engineers Dredges on the West Coast
The Corps of Engineers Dredges on the West Coast Presented To California Marine Affairs and Navigation Conference Sheryl Carrubba Operations Manager, Channels & Harbors Portland District November 8, 2011
More informationBENEFICIAL USE OF DREDGED MATERIAL DISPOSAL HISTORY HOUMA NAVIGATION CANAL, LA
BENEFICIAL USE OF DREDGED MATERIAL DISPOSAL HISTORY HOUMA NAVIGATION CANAL, LA 1991-2012 The Houma Navigation Canal (HNC) provides a navigation channel between Houma, Louisiana, and the Gulf of Mexico
More informationCHAPTER 186. Shore Protection Plan for the Nile Delta Coastline. A.L. Kadib, Member, ASCE^, A.T. Shak, A. Member, ASCE< 2 ), A.A.
CHAPTER 186 Shore Protection Plan for the Nile Delta Coastline A.L. Kadib, Member, ASCE^, A.T. Shak, A. Member, ASCE< 2 ), A.A. Mazen^3), and M.K. Nadar< 4 ) A Shore Protection Master Plan (SPMP) for the
More informationUAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring
UAS to GIS Utilizing a low-cost Unmanned Aerial System (UAS) for Coastal Erosion Monitoring Agenda Scope of today s presentation Demonstration Objectives Wrightsville Beach Test Area Masonboro Inlet Jetties
More informationSAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM
SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM 1 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 WEDA PACIFIC CHAPTER 2017 ANNUAL MEETING 131 132 122 PORTLAND, OREGON 239 65 53 80
More informationEngineering With Nature Geographic Project Mapping Tool (EWN ProMap)
Engineering With Nature Geographic Project Mapping Tool (EWN ProMap) Cynthia Banks Program Manager Burton Suedel, PhD Research Biologist Michelle Bourne Research Biologist U.S. Army ERDC 23 June 2015 Dredging
More informationBrevard County Utility Services Department
Brevard County Utility Services Department April 3, 2018 Jim Helmer, Department Director Brian Sorensen, W/WW Manager 1 Utility Services Department 9 TREATMENT PLANTS 6 WASTEWATER, 3 WATER 163 EMPLOYEES
More informationResolution NOW THEREF ORE, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONER S OF MANATEE COUNTY, FLORIDA:
Resolution 13-122 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS OF MANATEE COUNTY, FLORIDA, AUTHORIZING THE NATURAL RESOURCES DEPARTMENT TO FILE A LONG-RANGE BEACH EROSION CONTROL BUDGET PLAN WITH
More informationBENEFICIAL USE OF DREDGED MATERIAL PILOT PROGRAM
SECTION 1122 OF WRDA 2016 1 BENEFICIAL USE OF DREDGED MATERIAL PILOT PROGRAM National Dredging Meeting June 13, 2018 The views, opinions and findings contained in this report are those of the authors(s)
More informationEffects of Sea Level Rise and Storm Surge Events On Cape May County s Tourism and Commerce
Megan Hajduk Advanced Environmental Geomatics 5-7-09 Effects of Sea Level Rise and Storm Surge Events On Cape May County s Tourism and Commerce One of New Jersey s most productive resources and vital tourist
More informationFrank A. Rush, Jr., Town Manager
Page #1 Current Projects / Issues 1 Islander Drive Redevelopment Town purchased abandoned go-kart track Town poised to sell 1.8 acre tract for $800,000 and bumper boat facility in June 2017 to clean in
More informationBeach Management Hayling Island. Marc Bryan - Coastal Engineer Havant, Portsmouth and Gosport Coastal Partnership
Beach Management Hayling Island Marc Bryan - Coastal Engineer Havant, Portsmouth and Gosport Coastal Partnership Beach Management Hayling Island The Problem 1985 Beach Nourishment How we Recycle Historic
More informationOverview of Park Board Budgets & Industry Forecasts. Kelly de Schaun, Executive Director
Overview of Park Board Budgets & Industry Forecasts Kelly de Schaun, Executive Director Park Board of Trustee Budget Overview Fiscal Year October 1 to September 30 of each year Composition of Operational
More informationGALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY
GALVESTON DISTRICT O&M NAVIGATION MISSION & RESPONSE TO HURRICANE HARVEY 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 Christopher Frabotta
More informationAnnual Port Review. June 22, 2016
Annual Port Review June 22, 2016 2 Port Everglades by the Numbers (FY2015 unless indicated) #1 Seaport in Florida by Revenue - $153 million #1 Container Port in Florida - (#10 in U.S.) by volume 1,060,507
More informationSeptember 5, 2013 Volume 3, Issue 9
L E W I S R I V E R G A Z E T T E September 5, 2013 Volume 3, Issue 9 Winding down SPECIAL POINTS OF INTEREST: Winding down. What s Happening? Brick Tipi Contact info: Making painting Les & Karen Sundstrom
More informationFirework Fires. Data Dates of Incidents Number of Incidents Percentage of Incidents July 3-6, % All other dates 28 65% Grand Total %
Firework Fires Incident Type Number of Incidents Percentage of Incidents Natural vegetation fire 31 72% Structure Fire 5 12% Special outside fire 3 7% Outside rubbish fire 3 7% Mobile property (vehicle)
More informationORDINANCE NO. C-16- WHEREAS, the proposed minimum seawall elevation exceeds the current maximum by 0.7 feet (8.4 inches); and
ORDINANCE NO. AN ORDINANCE AMENDING THE UNIFIED LAND DEVELOPMENT REGULATIONS OF THE CITY OF FORT LAUDERDALE, FLORIDA, AMENDING SECTION 47-19.3, BOAT SLIPS, DOCKS, BOAT DAVITS, HOISTS AND SIMILAR MOORING
More information1. USACE Response to Sandy Ports 2. NAVFAC Response to Sandy - Base 3. USSOUTHCOM/NAVFAC Response in HaiC Port Au Prince Port
1. USACE Response to Sandy Ports 2. NAVFAC Response to Sandy - Base 3. USSOUTHCOM/NAVFAC Response in HaiC Port Au Prince Port Marcelo Salles, USACE LNO to USSOUTHCOM (With help from USACE NY District,
More informationBeach Monitoring and Hotspots
Beach Monitoring and Hotspots At a February special meeting, Coastal Science and Engineering (CSE) summarized the post-project beach monitoring results to date. The 2008 project was deemed successful,
More informationThe History & Management of the Atlantic Intracoastal Waterway in Florida
The History & Management of the Atlantic Intracoastal Waterway in Florida THE BEGINNING OF THE INTRACOASTAL WATERWAY IN FLORIDA CONSTRUCTED BY A PRIVATE COMPANY, THE FLORIDA EAST COAST CANAL COMPANY BETWEEN
More informationUsing Managed Retreat to Address Coastal Erosion in Brewster
Using Managed Retreat to Address Coastal Erosion in Brewster Chris Miller, Director, Brewster Department of Natural Resources CMiller@brewster-ma.gov Brewster, Massachusetts Almost 1/3 of town preserved
More informationINNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016
INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016 PND Engineers, Inc. Founded in 1979 Headquartered in Anchorage, Alaska with offices in Juneau, Seattle, Houston and Vancouver, B.C. International
More informationCHAPTER 241. SAND BYPASSING TO "PLAYA DE CASTILLA" (HUELVA SPAIN) Jose Fernandez (1) Gregorio Gomez Pina (2) Angel Mufloz (3)
CHAPTER 241 SAND BYPASSING TO "PLAYA DE CASTILLA" (HUELVA SPAIN) Jose Fernandez (1) Gregorio Gomez Pina (2) Angel Mufloz (3) Abstract The "Sand bypassing to Playa de Castilla" project consists of a sand
More informationANNEX F TO HURRICANE PLAN TRAFFIC MANAGEMENT
ANNEX F TO HURRICANE PLAN TRAFFIC MANAGEMENT I. INTRODUCTION A. Evacuation of the population from vulnerable areas is one of the most crucial issues in protecting lives in the face of an approaching hurricane.
More informationANNUAL REPORT AWARDS. PARKS. EVENTS. charlestoncountyparks.com
2016-2017 ANNUAL REPORT AWARDS. PARKS. EVENTS. charlestoncountyparks.com Message from the Executive Director Dear Charleston County Residents: Since 2001, it has been the agency s mission and my personal
More informationThe major parties key coastal policy initiatives
NEWSLETTER July 2016 EDITORIAL: Coastal policies of major parties inadequate By Barry Sammels Chair, Australian Coastal Councils Association and Mayor, City of Rockingham With the result of the 2016 Federal
More informationPresented to: City of Petaluma City Council
Agenda Item #1.A REVISED Presented to: City of Petaluma City Council Presented By: Dan St. John, F.ASCE, Director Jason Beatty, P.E., Senior Engineer James 'Jody' Boyette, USACE Project Manager November
More informationPort MacKenzie Rail Extension
Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough
More informationCofferdam Performance Hurricanes Harvey & Irma
Cofferdam Performance Hurricanes Harvey & Irma - 2017 Greg Hammer Senior Geotechnical Engineer CELRH-DSPC-GS DSMMCX Third Workshop on Case Histories in Dam Safety Risk-Informed Decision Making 2018 USSD
More information# BATHS # BEDROOMS MONTHLY RATE NORTH MYRTLE BEACH WINTER/MONTHLY RENTAL HOMES
WINTER/ RENTAL HOMES Bay Watch III 441 1 1 Oceanfront $850 $28 per day Buena Vista Plaza 506 1 1 Oceanfront $650 $22 per day Buena Vista Plaza 707 1 1 Oceanfront $750 $25 per day Chateau Manor 103 1 1
More informationJason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas
Jason J. Hull, P.E. Director of Engineering Port Freeport 1100 Cherry Street Freeport, Texas 77541 979.233.2667 hull@portfreeport.com Port Freeport s History Feb. 1913 Corps Hopper Dredge Comstock sank
More informationTENTATIVE SCHEDULE
TENTATIVE SCHEDULE 20-2015 Facility Dredge Depth (- ft MLLW) 20 Spring Early Summer 20/2012 2012/2013 HWRP/ HWRP/ HWRP/ SFDODS SF- MWP Upland SFDODS SF- MWP upland SFDODS SF- MWP upland SFDODS SF- 2013/2014
More informationKeansburg: Satellite Photo by USGS. Township of Middletown, and the western tip of Keansburg is adjacent to the Borough of
Keansburg 1. Overview of Keansburg and Its Waterfront Keansburg: Satellite Photo by USGS 1.1 Geographical Overview The Borough of Keansburg is one of nine communities that comprise the Bayshore Region
More informationMOBILE DISTRICT 2018 DREDGING PROGRAM
MOBILE DISTRICT 2018 DREDGING PROGRAM SOUTH ATLANTIC DIVISION U.S. ARMY CORPS OF ENGINEERS Trusted Partners Delivering Value Today for a Better Tomorrow US Army Corps of Engineers BUILDING STRONG MOBILE
More informationAlternative Highest & Best Use Analysis Boutique Hotel
Alternative Highest & Best Use Analysis In response to numerous comments received from the public, as well as issues raised by the CCC in the Appeal Staff Report Substantial Issue Determination, the following
More informationCoastal Structures in Kagoshima Coastline, Japan Ejria Binti Saleh Universiti Malaysia Sabah, Sabah, Malaysia
Coastal Structures in Kagoshima Coastline, Japan Ejria Binti Saleh Universiti Malaysia Sabah, Sabah, Malaysia Report for International Training Program to improve the study ability in biodiversity 1 1.0
More informationCity of Fairborn State of the City Address Presented by Mayor Dan Kirkpatrick
ci.fairborn.oh.us City of Fairborn - 2014 State of the City Address Presented by Mayor Dan Kirkpatrick Your Elected Officials: Councilman Paul Keller, Councilwoman Donna Wilson, Councilman Rob Hoffman,
More informationWhat s Next for the Beach?
Volume 40:11 November, 2016 Volume 41:1 January 2017 Presorted Standard U.S. Postage Paid Postal Permit 03 Folly Beach SC Publisher: Folly Beach Civic Club, est. 1938 POSTAL PATRON Editor: Susan Breslin,
More informationCivil Works Program Trends
Civil Works Program Trends Presentation to Army Engineer Association James Dalton, P.E., Director of Civil Works 2 August 2018 US Army Corps of Engineers BUILDING STRONG Navigation Lock & Dam 15 / Mississippi
More informationSouthwind Marina Sinton Drive Pensacola, Florida Unique Opportunity to Acquire a 90 Slip Marina With Excellent Investment Potential
Urban Realty Southeast is pleased to present Southwind Marina 10121 Sinton Drive Pensacola, Florida 32507 Unique Opportunity to Acquire a 90 Slip Marina With Excellent Investment Potential Closest marina
More informationPort MacKenzie Rail Extension
Port MacKenzie Rail Extension Project The Matanuska-Susitna Borough (MSB) and the Alaska Railroad Corporation (ARRC) jointly propose construction and operation of a new rail line to connect the Borough
More informationLOW $86,900 $0 AVERAGE $331,914 $0 ACTIVE CLIENT SEARCH
LISTING COUNT: TOTAL HIGH 138 1036 DAYS ON MARKET: LOW AVG 5 161 MED 96 LIST PRICE: SOLD PRICE: Class=CT AND Features Must=V2 AND Status= HIGH $1,150,000 LOW $86,900 AVERAGE $331,914 MEDIAN $299,250 TOTAL
More informationCapital Planning City of Ocean City 1
City of Ocean City Capital Planning 2015-2019 City of Ocean City 1 Road Improvements Project Completion Date 2012 Fall Road Improvement Spring, 2014 Program - (Paving 7 th Street, 8 th Street, 800 Block
More informationQuarterly Report. 4 December February 2014
Quarterly Report Faculty of FORESTY 4 December 2013 28 February 2014 School of AGRICULTURAL, FOREST, AND ENVIRONMENTAL SCIENCES College of AGRICULTURE, FORESTRY & LIFE SCIENCES Baruch Institute of Coastal
More information2012 DoD MENTOR-PROTÉGÉ CONFERENCE 8 MARCH
2012 DoD MENTOR-PROTÉGÉ CONFERENCE 8 MARCH Jack Beecher Small Business Office Chief Norfolk District, Army Corps of Engineers US Army Corps of Engineers TYPES OF SMALL BUSINESSES Small Business Woman-Owned
More informationEXECUTIVE SUMMARY COMMONWEALTH OF PUERTO RICO FY 2004-FY2009 MAP MODERNIZATION BUSINESS PLAN. Page i
EXECUTIVE SUMMARY I. Introduction The Commonwealth of Puerto Rico will support the Federal Emergency Management Agency s (FEMA s) Multi-Hazard Flood Map Modernization Program (MHFMMP) by contributing to