1 THE WILDWOODS TRANSPORTATION IMPROVEMENT STUDY EISTING CONDITIONS REPORT DRAFT January 26, 2012 Prepared for: City of North Wildwood, City of Wildwood and orough of Wildwood Crest Prepared by: Michael aker Jr., Inc. Clarke Caton Hintz With Funding Support from: New Jersey Department of Transportation

2 TALE OF CONTENTS Introduction...1 The Wildwoods... 1 Vehicular...2 Traffic Volumes... 2 Level of Service... 5 Crashes... 9 Signage Parking Transit Tram Car Great American Trolley NJ Transit Charter uses icycle and Pedestrian icycle Compatibility ike Parking Pedestrian Activity icycle and Pedestrian Crashes Public Involvement Public Survey Stakeholder Issues Urban Design Conditions... 37

3 Introduction The Wildwoods in Cape May County (comprising the City of Wildwood, City of North Wildwood, and the orough of Wildwood Crest) have requested assistance from NJDOT, Local Transportation Planning Assistance (NJDOT LTPA) Unit, in developing a comprehensive transportation improvement study. Representatives of the Wildwoods indicated that the study should function as the Transportation Element of the Vision 2015 Plan and consider vehicular, transit, pedestrian and bicycle modes of transportation. Goals for the study include: Propose improvements to traffic system to better serve the proposed Destination Station multimodal transportation center and alleviate congestion Provide recommendations to better accommodate pedestrian and bicycle modes Provide way finding plan for all modes Provide recommendations on routing for the oardwalk Tram and the 5 Mile Trolley Evaluate and recommend parking modifications to complement strategies Develop concepts to enhance visual connections between Destination Station and the oardwalk, and between the oardwalk and Downtown NJDOT LTPA has contracted with Michael aker Jr., Inc. (aker), to provide assistance to the Wildwoods in preparing the study. The firms Clarke Caton Hintz and TechniQuest Corporation are providing support as sub consultants to aker on the study. This document is an Existing Conditions memorandum that summarizes the existing state of the transportation system for the following modes: vehicular, transit, pedestrian and bicycle. A summary is also provided of existing conditions for urban design features such as street lighting and entrances to the oardwalk. A future memorandum as part of this study will propose transportation improvements to address identified issues. The Wildwoods The Wildwoods together comprise one of the most popular resort areas in New Jersey, and the economy is heavily dependent upon tourism. According to the 2010 Census, the year round population in the City of Wildwood was 5,325; North Wildwood was 4,041; and Wildwood Crest was 3,270. Estimates of summer population for the three communities vary, but Wildwood by itself is believed to have a summer population of about 250,000. The Wildwoods are recognized for the quality of their beaches. In the 2008 Top 10 eaches Contest sponsored by the NJ Marine Sciences Consortium, Wildwood finished first, Wildwood Crest second, and North Wildwood fourth. The Wildwood oardwalk. 1

4 Wildwood experienced economic decline during the late 1980 s and early 1990 s, leading in turn to sustained economic development efforts. The Wildwood Vision 2015 Plan was agreed to by the municipalities and the major tourism and business development agencies in an effort to continue redevelopment efforts. Vehicular Traffic Volumes Intersections requiring detailed traffic analysis were selected following coordination with the study Steering Committee. Turning movement traffic counts were conducted at these locations on a summer Saturday, 11:00 AM to 12:30 PM, and 5:00 PM to 8:30 PM. Most were counted on July 30 th and August 13 th, 2011, (during the peak summer beach season) although the intersections of Park Avenue and 26 th Street and New Jersey Avenue and 26 th Street were counted on Saturday, September 3 rd, Traffic volumes for the intersections of Rio Grande Avenue and Pacific Avenue, Rio Grande and Atlantic Avenue, and Rio Grande and Ocean Avenue were provided by counts conducted by Stantec on Saturday, July 15 th, Minor modifications to volumes were performed in several locations to balance the volumes departing an intersection and entering the adjacent intersection. The peak traffic hour of the roadway network was determined to be from 5:45 PM to 6:45 PM. Although traffic volumes are higher in the eastbound direction on Rio Grande earlier on Saturday, this is more than offset by the higher total network volumes in the hour of 5:45 to 6:45 PM. Figure 1 indicates the volumes for individual turning movements at study area intersections during this hour. Saturday traffic volumes on Rio Grande Avenue. 2

5 HUDSON AVE TH AVE OAK AVE DELAWARE AVE NEW YORK AVE CR 621 NEW JERSEY AVE CR 621 NEW JERSEY AVE TH AVE SCHELLENGER AVE JUNIPER AVE POPLAR AVE PARK LVD LINCOLN AVE PACIFIC C AVE ATLAN NTIC AVE AVE OCEAN ANDREW AVE TAYLOR AVE 38 SUSQUEHANN NA AVE HUDSON AVE PARK LV VD ARCTIC AV VE NJ RIO GRANDE AVE CR 621 NEW JERSEY AVE PACIFIC AVE AVE ATLANTIC OCEAN AV VE Private 0 HAND AVE Driveway The Figure 1: Peak Hour Traffic Volumes Summer 2011 Saturday 5:45pm 6:45pm October 2011

6 Figure 2 indicates the total intersection volumes for the seven highest volume intersections in the study area. As seen, the top six intersections are all along the Rio Grande Avenue corridor, with volumes typically falling from west to east. The intersection of Atlantic and Schellenger Avenues is the only intersection not on Rio Grande Avenue, with a total volume of 1,573. Figure 2: Peak Hour Volumes at Intersections Peak Hour Volume Peak Hour Volumes at Intersections Intersections Expressed in terms of ADT (Average Daily Traffic volume), the highest ADT on any roadway in the study area is found on Rio Grande Avenue at the entrance to Wildwood, at 33,100. The volume on Rio Grande Avenue drops to 22,900 ADT east of Park oulevard, and further falls to 15,725 ADT east of New Jersey Avenue, and 6,900 ADT by Ocean Avenue. On cross streets, Park oulevard has the highest volume at 14,525, followed by New Jersey Avenue at 13,575; Atlantic Avenue at 10,675; and Ocean Avenue at 10,475. Volumes on Atlantic Avenue increase closer to Schellenger Avenue, with 12,200 ADT at that intersection. At Schellenger Avenue, volumes on Ocean Avenue are only 4,500 ADT. Other than Rio Grande Avenue, volumes on east-west roadways are relatively modest. Hand Avenue between Susquehanna Avenue and Park oulevard has volumes of 6,400 ADT; Schellenger Avenue has volumes of 5,700 ADT; and 26 th Street has volumes of 5,900 ADT. The study team also conducted a preliminary evaluation of traffic conditions in the hour of 11:30 AM to 12:30 PM (the mid-day peak, when inbound volumes are highest) to determine if different traffic volume patterns at that time would make a significant difference in the operations of key intersections. At 11:30 AM to 12:30 PM, there are 1,823 vehicles heading inbound on Rio Grande Avenue at Susquehanna, 317 4

7 more than the inbound volume from 5:45 to 6:45 PM. However, the outbound volume on Rio Grande Avenue west of Susquehanna during this mid-day peak is 1,750, 588 less than the outbound volume of 2,338 during the evening peak. Further, inbound traffic on Rio Grande Avenue follows different travel patterns in the mid-day peak than it does in the evening. Of the traffic entering Wildwood on Rio Grande Avenue in the mid-day peak, 46% splits off to the south by turning right at Susquehanna Avenue. In the evening, just 40% of inbound traffic on Rio Grande Avenue turns right at Susquehanna Avenue. The difference in split may reflect, in part, a greater attraction earlier in the day by inbound traffic towards the hotels and second homes in Wildwood Crest. The effect of this split in the mid-day is that a smaller percentage of traffic inbound on Rio Grande Avenue remains on this roadway through Ocean Avenue. Due in part to the heavier volumes from 5:45 to 6:45 PM, and in part to the greater tendency of motorists to stay on Rio Grande Avenue at this hour, the evening peak hour sees higher delays than the hour from 11:30 AM to 12:30 PM at every intersection along Rio Grande Avenue, with the one exception being the intersection of Rio Grande Avenue and Park oulevard. Level of Service The Level of Service (LOS) is used by transportation professionals to grade intersections by traffic delay, expressed in terms of average stopped delay per vehicle. At signalized intersections, levels of service range from Level of Service A (indicating average delays of 10 seconds or less) to Level of Service F (indicating average delays of greater than 80 seconds). Level of Service D is generally considered as the desirable upper limit of delay for most drivers (55 seconds), while Levels of Service E and F are considered undesirable. It should be noted, however, that longer traffic delays are generally considered more acceptable in traditional downtown business areas. Levels of service classifications are defined in Table 1. Table 1: Levels of Service Classifications Level of Service Signalized Intersection Average Delay per Vehicle (seconds) Unsignalized Intersection Average Delay per Vehicle (seconds) A 0 to 10 0 to to to 15 C 20.1 to to 25 D 35.1 to to 35 E 55.1 to to 50 F Over 80 Over 50 Levels of service for study area intersections are presented in Figure 3. Roadway capacity is sufficient to accommodate traffic volumes on all of the roadways evaluated, with a few exceptions. The Levels of Service for existing conditions were determined for intersections counted in the summer peak period. Three intersections operate at Level of Service F : Rio Grande Avenue and Susquehanna Avenue; Rio Grande Avenue and Park oulevard; and Atlantic Avenue and Schellenger Avenue. The intersection of Rio Grande Avenue and Hudson Avenue operates at Level of Service D. The other 13 intersections operate at 5

8 LOS C or above; of these, only one is at LOS C (Rio Grande and New Jersey Avenue), with the rest operating at LOS A or. Figure 4 presents the LOS per turning movement. At Rio Grande and Susquehanna Avenue, the westbound approach operates at LOS F, as well as the northbound approach on Susquehanna Avenue. Traffic waiting at the northbound approach regularly backs up around the corner of Hand Avenue, as many motorists leaving Wildwood Crest access Rio Grande Avenue at this intersection to avoid sitting in traffic farther to the east. At the intersection of Rio Grande Avenue and Park oulevard, the eastbound left turn operates at LOS F, as well as the westbound approach. The eastbound left at 221 vehicles per hour has the heaviest left turn volume along this corridor. At Atlantic Avenue and Schellenger Avenue, the eastbound approach operates at LOS F, despite the fact that the volumes here are not particularly heavy. In general, the results depict a transportation system with available capacity, with the exception of the major intersections on Rio Grande Avenue to the west of New Jersey Avenue. 6

9 25TH AVE OAK AVE CR 621 NEW JERSEY AVE ATLANTIC AVE AVE 4.1 A 26TH AVE SCHELLENGER AVE PACIFIC C AVE HUDSON AVE DELAWARE AVE NEW YORK AVE CR 621 NEW JERSEY AVE JUNIPER AVE POPLAR AVE LINCOLN AVE ANDREWS AVE TAYLOR AVE F 9.2 A SUSQUEHANNA AVE HUDSON AVE PARK LVD ARCTIC AVE PACIFIC AVE PARK LVD AVE OCEAN 14.4 NJ 47 RIO GRANDE AVE CR 621 NEW JERSEY AVE ATLANTIC 151 F 35.1 D 128 F 22.8 C 18.4 Private 19.4 HAND AVE 7.2 Driveway A The Figure 3: Intersection Levels of Sevice Summer 2011 Saturday 5:45pm 6:45pm 16.5 LOS A C LOS D E LOS F Key 18.3 Delay (sec) LOS October 2011

10 HUDSON AVE 25TH AVE DELAWARE AVE NEW YORK AVE CR 621 NEWJERSEY AVE A A 35.2 D 28.6 C 32.9 C 15.4 C 26TH AVE SCHELLENGER AVE 33.5 C 20.4 C 24.4 C F JUNIPER AVE POPLAR AVE PARK LVD 8.5 A 10.0 CR 621 NEW JERSEY AVE OAK AVE A A LINCOLN AVE 7.8 A PACIFIC AVE A A C 7.0 A ATLANTIC AVE 5.8 A 8.2 A A C 8.0 A 8.2 A 9.9 A Overall Intersection Delay/LOS Intersection Intersection Delay LOS Stop/Signal New Jersey Ave & 26th Ave 16.3 Signal New Jersey Ave & Taylor Ave 14.4 Signal 26th Ave & Delaware Ave/Park lvd 15.4 Signal Atlantic Ave & Oak Ave 11.8 Signal Atlantic Ave & Schellenger Ave 25.5 F Signal Hand Ave & Park lvd 19.4 Signal Hand Ave & Susquehanna Ave* 7.2 A Stop Ocean Ave & Schellenger Ave 9.2 A Stop Pacific Ave & Oak Ave 4.1 A Stop Pacific Ave & Schellenger Ave 14.3 Stop Rio Grande Ave & Susquehanna Ave 151 F Signal Rio Grande Ave & Hudson Avenue 35.1 D Signal Rio Grande Ave & Park lvd 128 F Signal Rio Grande Ave & New Jersey Ave 22.8 C Signal Rio Grande Ave & Pacific Ave 18.4 Signal Rio Grande Ave & Atlantic Ave 16.5 Signal Rio Grande Ave & Ocean Ave 18.3 Signal *The intersection of Hand Ave and Susquehanna Ave is a 3 way stop. However, the intersection was modeled as a 2 way stop due to software limitations. ANDREW AVE 12.5 TAYLOR AVE C 12.3 SUSQUEHANNA A AVE 20.2 C HUDSON AV VE 12.8 PARK LVD E ARCTIC AVE One Way 621 RSEY AVE CR NEW JER E PACIFIC AVE 11.6 ATLANTIC AV VE 10.9 E NJ F 41.3 D 278 F A RIO GRANDE AVE 127 F E 21.3 C A A F D C D C C C 8.3 A 19.5 Private Driveway 41.3 E 8.3 A 16.6 C HAND AVE A 24.6 C One Way Key Signalized Intersection Stop Controlled The Figure 4: Turning Movement Level of Service Summer 2011 Saturday 5:45pm 6:45pm October 2011

11 Crashes Vehicular crash reports were provided for key roadways for the period January 1, 2008 through December 31, 2010 by police departments for the three municipalities. Table 2 indicates intersections that had at least eight crashes in this period. Crash locations are illustrated in Figure 5. Table 2: Crash History Intersection Municipality Number of Predominant Crash Types Crashes Rio Grande Avenue and Park oulevard Wildwood rear end (7 W); 12 angle; 7 left turn (4 W) Rio Grande Avenue and New Jersey Avenue Wildwood 29 6 rear end; 4 left turn; 3 bicycle; 3 pedestrian New Jersey Avenue and 26 th Avenue Wildwood and North Wildwood 17 6 on-street parking (5 at Groom s Liquor store) Rio Grande Avenue and Hudson Avenue New Jersey Avenue and Taylor Avenue Rio Grande Avenue and Pacific Avenue Pacific Avenue and Wildwood Avenue Rio Grande Avenue and Atlantic Avenue New Jersey Avenue and 3 rd Avenue Atlantic Avenue and Wildwood Avenue Pacific Avenue and Cresse Avenue Park Avenue and Hand Avenue Pacific Avenue and ennett Avenue Atlantic Avenue and Schellenger Avenue New Jersey Avenue and 10 th Avenue Hudson Avenue and Hand Avenue Wildwood 16 7 angle (5 related to vehicles exiting driveway to east of Hudson); 4 rear end Wildwood 16 8 angle (6 N and W vehicles; in four of these, N motorist drove through red signal); 5 on-street parking Wildwood 16 6 bicycle Wildwood 11 8 angle (3 S and W) Wildwood 10 No predominant type North Wildwood 10 3 rear end Wildwood 10 No predominant type Wildwood and 10 9 angle (5 S and W) Wildwood Crest Wildwood 9 3 bicycle Wildwood 9 7 on-street parking Wildwood 8 No predominant type North Wildwood 8 3 rear end Wildwood 8 4 angle 9

12 Given the high traffic volumes on Rio Grande Avenue, it was anticipated that intersections along Rio Grande Avenue would also have the highest number of crashes, and they appear in five of the top eight crash sites. The intersection of Rio Grande Avenue and Park oulevard has the highest number, with 46 in the three-year period. However, the numbers of crashes, and the distribution among the various categories, are not unusual for an intersection with these volumes. Crash patterns are relatively diffuse for most of the intersections, although the crash incidence at several intersections points to the need for addressing problems with adjacent parking and driveway activity; this is the case at Pacific Avenue and ennett Avenue. The intersections of Rio Grande Avenue and Pacific Avenue, and Park Avenue and Hand Avenue, were unusual in that bicycle and pedestrian crashes were the predominant crash types. 10

13 ALLEN DR OAK AVE ANGLESEA DRIVE UV 147 PINE AVE Middle Township West Wildwood orough LAKE AVE HUDSON AVE 26TH AVE TH AVE 7TH AVE North Wildwood City 12TH AVE 15TH AVE 16TH AVE 18TH AVE 19TH AVE 20TH AVE 21ST AVE 22ND AVE 24TH AVE MARYLAND AVE JUNIPER AVE POPLAR AVE MAGNOLIA AVE GLENWOOD AVE 17 DELAWARE AVE NEW JERSEY AVE 8 1ST AVE SPRUCE AVE WALNUT AVE NEW YORK AVE 10 8TH AVE 10TH AVE 11TH AVE SURF AVE PINE AVE 13TH AVE CENTRAL AVE ATLANTIC AVE 2ND AVE 3RD AVE 4TH AVE JOHN F. KENNEDY EACH DR NJSH RT 47 DELSEA DR Lower Township I « II ROSEMARY RD URK AVE ANDREWS AVE TAYLOR AVE RIO GRANDE AVE LAKE RD MONTGOMERY AVE CRESSE AVE SWEET RIAR RD WISTARIA RD NEW JERSEY AVE Wildwood City ROERTS AVE AKER AVE ENNETT AVE DOCK ST TACONY RD PACIFIC AVE HAND AVE ARCTIC AVE HILDRETH AVE UTTERCUP RD LAVENDER RD CARDINAL RD 10 CROCUS RD PARK LVD 16 LEAMING AVE EACH AVE WILDWOOD AVE SCHELLENGER AVE GARFIELD AVE SPENCER AVE DAVIS AVE 10 ATLANTIC AVE SPICER AVE YOUNGS AVE 11 PACIFIC AVE OAK AVE 8 LINCOLN AVE MAPLE AVE PINE AVE FORGET ME NOT RD PRIMROSE RD LOTUS RD SEAVIEW AVE Wildwood Crest orough STOCKTON RD ORCHID RD FARRAGUT RD NASHVILLE AVE AYVIEW DR MIAMI AVE ST PAUL AVE DENVER AVE TRENTON AVE JEFFERSON AVE CHARLESTON AVE LOUIS AVE HOLLYWOOD AVE LEGEND!# Number of Crashes OCEAN DR JEFFERSON AVE Mile The Figure 5: High Crash Loactions Year State Roadway County Roadway Local Roadway Waterways Municipal oundary October, 2011

14 Signage Two signage issues were apparent on field views: General lack of way-finding signage throughout the Wildwoods. Although an extensive block-byblock survey of way-finding signage was not conducted as part of this study, the study team noted way-finding signs where present along major roadways in Wildwood. Few signs are visible, and the photos below depict two such signs. The sign on the left faces westbound Montgomery Avenue traffic at Park oulevard, and directs motorists to Rio Grande Avenue. As seen, the sign is small and relatively inconspicuous. The Wildwood Crest sign on the right is on Hand Avenue, facing eastbound traffic at New Jersey Avenue. Signage on Pacific Avenue. The street signs along Pacific Avenue in Wildwood are designed to look like a palm tree. The street names are harder to read than names on conventional signs. The difficulty in reading the signs has been significantly increased by the physical deterioration over the years, as many of the palms have been bent out of position. It is very difficult to read the name of the side street on a number of these signs when traveling along Pacific Avenue. Palm tree street sign on Pacific Avenue. 12

15 Parking Vehicular parking is an important issue in the Wildwoods. To determine the parking occupancy of on-street parking and major lots in the heart of the study area, a parking count was conducted on Saturday, July 16, 2011, during the mid-day peak at 2 PM, and the evening peak of 8 PM. These two peak periods correspond to the traffic volume peaks of 11:30 AM to 12:30 PM, and 5:45 to 6:45 PM discussed above. The 2 PM peak indicate conditions after visitors heading to the beach for a daytime visit have settled in for the afternoon, and the 8 PM peak indicates conditions after visitors have settled in for an evening visit to the oardwalk and the restaurants and other attractions. The parking count area was bounded by Morning Glory Road in Wildwood Crest; New Jersey Avenue; 14 th Avenue in North Wildwood; and the beach. The parking counts were conducted through the use of aerial flights. The parking count focused on paid parking lots, as opposed to lots ancillary to hotels and motels. A parking lot was only counted if it encompassed 30 or more spaces. The existing parking conditions are summarized in Figures 6A through 7. There are over 6,950 parking spaces in the area counted, divided into 4,348 on-street spaces, and 2,614 spaces in off-street lots. Parking occupancy was found to be highest at the 2 PM peak, with 87% of spaces occupied, slightly higher than the system peak of 84% at 8 PM. Off-street lots had an occupancy rate of 90%, versus 86% for on-street parking. The parking occupancy levels are categorized by three levels: 90% to 100%, 80% to 89%, and less than 80%. On-street parking in the study area is divided into zones, of a block in width. Off-street parking lots are depicted by dashed lines. Each zone indicates the total number of spaces available, and the number of spaces occupied. As shown in the figures, at 2 PM, parking is in high demand along the beach, with many lots running at close to 100% occupancy. Demand falls off between Atlantic Avenue and Pacific Avenue in Wildwood, corresponding to lower levels of activity at the Pacific Avenue business district. The lower demand on some blocks also reflects the presence of parking associated with rented or owned housing, as the residents of these units may be gone elsewhere for the afternoon. At 8 PM, parking demand diminishes adjacent to the beach, although it is still high in many places from visitors congregating on the boardwalk. Conversely, parking demand increases in the zones farthest from the beach, as people visit the restaurants along Pacific Avenue, or residents in rental units return home for the evening. In summary, the parking count indicates very high demand for parking proximate to the major attractions in this area. Even for those lots or blocks not 100% occupied, a very high occupancy can be a problem for people searching for parking, as the few empty spaces may not be readily apparent, or people may end up circling the block in an effort to find an open space. It should further be noted that, according to local stakeholders, parking occupancy is even higher on weekends later in the summer. In addition, parking operations were viewed at the Convention Center parking lots on a Saturday morning. It was noted that parking operations were not coordinated, in that motorists were permitted to enter the lot north of Rio Grande Avenue that had just filled, at which point the motorists were asked to leave. Simultaneously, the Convention Center parking lot to the south of Rio Grande Avenue had an ample number of parking spaces available. 13

16 Mariner s Landing The daytime parking count revealed high demand in the lots next to Mariner s Landing. 14

17 WILDWOOD AVE OAK AVE CEDAR AVE LINCOLN AVE SCHELLENGER AVE 49/120 41% 150/ % 64/70 91% MARINER'S LANDING LINCOLN AVE GARFIELD AVE 196/200 98% 56/60 93% SPICER AVE 118/195 60% 42/45 93% SPENCER AVE Wildwood City YOUNGS AVE 83/120 69% ADVENTURE PIER DOCK ST PARK LVD DAVIS AVE ARCTIC AVE AKER AVE WASHINGTON AVE URK AVE ROERTS AVE 375/444 84% MONTGOMERY AVE PACIFIC AVE 266/471 56% ATLANTIC AVE 256/287 89% 53/55 96% 80/82 98% 76/80 95% CONVENTION CENTER ANDREWS AVE TAYLOR AVE 350/372 94% RIO GRANDE AVE HAND AVE 184/203 91% LEAMING AVE NEW JERSEY AVE 202/220 92% ENNETT AVE 222/226 98% 119/125 95% 122/124 98% HILDRETH AVE CRESSE RD LAVENDER RD MORNING GLORY RD HEATHER RD PACIFIC AVE SEAVIEW AVE UTTERCUP RD The Figure 6A: Parking Occupancy Summer 2011 Saturday, 2 PM EACH AVE LEGEND Mile Municipal oundary Occupancy On Street Parking 90%-100% 80%-89% <80% # / # Vehicles/Spaces # Pecentage Occupied Occupancy Parking Lot 90%-100% 80%-89% <80% November, 2011

18 KIRY AVE NEW YORK AVE DELAWARE AVE NEW JERSEY AVE SURF AVE 12TH AVE 13TH AVE 14TH AVE 15TH AVE 16TH AVE North Wildwood City 17TH AVE 18TH AVE 19TH AVE 394/450 88% 20TH AVE 286/301 95% 420/431 97% 452/476 95% 21ST AVE CENTRAL AVE 22ND AVE RD AVE 24TH AVE 25TH AVE 164/175 94% SURFSIDE PIER 26TH AVE JUNIPER AVE 169/170 99% POPLAR AVE 70/70 100% Wildwood City MAGNOLIA AVE 80/80 100% GLENWOOD AVE MAPLE AVE ATLANTIC AVE 88/88 100% 156/234 67% 269/342 79% 307/341 90% PINE AVE WILDWOOD AVE OAK AVE PACIFIC AVE 63/65 97% Mile 83/90 92% LEGEND Municipal oundary CEDAR AVE Occupancy On Street Parking 90%-100% Occupancy Parking Lot 90%-100% The Figure 6: Parking Occupancy 49/12041% Summer /150100% 64/7091% Saturday, 2 PM LINCOLN AVE 80%-89% <80% # / # Vehicles/Spaces # Pecentage Occupied 80%-89% <80% November, 2011

19 WILDWOOD AVE OAK AVE CEDAR AVE SCHELLENGER AVE MARINER'S LANDING LINCOLN AVE 66/120 55% 130/150 87% 55/70 79% LINCOLN AVE GARFIELD AVE 173/200 87% 60/60 100% SPICER AVE 117/195 60% 43/45 96% SPENCER AVE DOCK ST PARK LVD DAVIS AVE ARCTIC AVE Wildwood City AKER AVE WASHINGTON AVE YOUNGS AVE 399/444 90% MONTGOMERY AVE URK AVE PACIFIC AVE ROERTS AVE 369/471 78% ATLANTIC AVE 254/287 89% 75/120 63% 52/55 95% 75/82 91% 80/80 100% ADVENTURE PIER CONVENTION CENTER NEW JERSEY AVE ANDREWS AVE TAYLOR AVE 339/372 91% RIO GRANDE AVE HAND AVE 161/203 79% LEAMING AVE 205/220 93% ENNETT AVE 208/226 92% 125/103 82% 124/ % HILDRETH AVE CRESSE RD LAVENDER RD MORNING GLORY RD HEATHER RD PACIFIC AVE SEAVIEW AVE UTTERCUP RD The Figure 7A: Parking Occupancy Summer 2011 Saturday, 8 PM EACH AVE LEGEND Mile Municipal oundary Occupancy On Street Parking 90%-100% 80%-89% <80% # / # Vehicles/Spaces # Pecentage Occupied Occupancy Parking Lot 90%-100% 80%-89% <80% November, 2011

20 KIRY AVE NEW YORK AVE DELAWARE AVE NEW JERSEY AVE SURF AVE 12TH AVE 13TH AVE 14TH AVE 15TH AVE 16TH AVE North Wildwood City 17TH AVE 18TH AVE 19TH AVE 382/476 80% 433/450 96% 20TH AVE 277/301 92% 341/431 79% 21ST AVE 22ND AVE RD AVE 24TH AVE 25TH AVE 90/175 51% SURFSIDE PIER 26TH AVE JUNIPER AVE 129/170 76% POPLAR AVE 48/70 69% MAGNOLIA AVE Wildwood City MAPLE AVE GLENWOOD AVE 65/80 81% 182/234 78% 299/342 87% ATLANTIC AVE 309/341 91% PINE AVE 64/88 73% WILDWOOD AVE OAK AVE PACIFIC AVE 52/65 80% Mile 87/90 97% LEGEND Municipal oundary CEDAR AVE Occupancy On Street Parking 90%-100% Occupancy Parking Lot 90%-100% The Figure 7: Parking Occupancy Summer 66/12055% /15087% 55/7079% Saturday, 8 PM LINCOLN AVE 80%-89% <80% # / # Vehicles/Spaces # Pecentage Occupied 80%-89% <80% November, 2011

21 Transit Service Visitors and residents to the Wildwoods are served by a variety of transit options, as summarized in Table 3, and illustrated in Figure 8. Tram Car The Sightseer Tram Car that runs along the oardwalk is a very visible symbol of the Wildwoods, and has easily the highest ridership among the local transit services, carrying about 600,000 passengers per year. The Tram Car runs on a 2-mile route on the oardwalk. Tram car along the oardwalk on a weekday afternoon. Great American Trolley The Great American Trolley Company operates three local transit routes, as described below: The North Wildwood Rio Grande Trolley is the only one of the three services that runs yearround. The primary ridership is evenly split between senior citizens, and residents traveling to school or work. It does not run on weekends, since the demand by these groups is less at that time. This service averages about 200 to 250 people per day. The oardwalk Trolley has varied its schedule over the years. It used to run from Memorial Day to Labor Day, but was curtailed due to lower ridership in early June. This year, the Trolley ran the last two weeks in June, although this extra service was not publicized. Although the Trolley runs at 20- minute headways, the schedule is not publicized, to avoid customer complaints when the trolley is delayed due to congestion. Dolly the Trolley conducts a loop around the Wildwood downtown every 20 minutes, although this schedule is unpublicized. This service averages about 200 to 250 people per day. Along with these regular services, Great American Trolley runs a bar bus on the weekends to the North Wildwood entertainment district, from 9:00 PM to 3:30 AM on Fridays and Saturdays, for a one-way fare of $5.00. As indicated in the summary, transit services are somewhat disjointed, with slightly different times of operation for the oardwalk Trolley and Dolly the Trolley, and different days of service, although both services focus on the weekends. As noted above, the North Wildwood trolley does not run on weekends. 19

22 Signs for the trolley services are lacking along much of the routes, although signs have been installed along the oardwalk trolley route in segments of Wildwood Crest. NJ Transit According to local stakeholders, NJ Transit routes are used primarily by residents and workers. According to NJ Transit, use of the transit services is heaviest on weekday mornings, as residents leave via transit to jobs in the region. Three of the transit routes are long-distance. Routes 313 and 315 travel between Cape May and Philadelphia, and Route 319 travels between Cape May and New York City. Route 552 is the most heavily used local line, as it stops at Wildwood between Atlantic City and Cape May, and has a more frequent headway than the other NJ Transit services listed. On Route 552, trips are typically 50 minutes to Cape May, and 80 minutes to Atlantic City. Charter uses Charter buses are an important aspect of the transit mix in the Wildwoods. During the summer, it is not unusual to see two to three charter buses, along with school buses, along Schellenger Avenue at Atlantic Avenue. ased on several interviews with bus drivers, charter buses typically do not dwell on Schellenger Avenue the entire day. After dropping off passengers, drivers often retreat to Wildwood Crest by several hotels, or to a vacant lot at the intersection of Park oulevard and Spencer Avenue in Wildwood. There is no designated place for buses to lay over. Charter buses along Schellenger Avenue. 20

23 Table 3: Transit Services Provider Route Termini Main Routes Schedule Trips Per Day Wildwood usiness Improvement District Great American Trolley Tram Car North Wildwood Trolley 16 th Street to Cresse Avenue North Wildwood Rio Grande& Grande Center Along the boardwalk New Jersey Avenue, Rio Grande Avenue, Peak Headway Fares Seasonal 11:00 AM until amusement piers close Unlisted N/A $2.25 Year-Round 7 1hr 10min $1.25 to $2.50 Great American Trolley Great American Trolley oardwalk Trolley Dolly the Trolley Wildwood Wildwood Crest 26 th Avenue to Cresse Avenue NJ Transit 313 Daily Philadelphia Cape May Transportation Center NJ Transit 315 Daily Philadelphia Cape May Transportation Center NJ Transit 319 Daily New York City Cape May Welcome Center NJ Transit 552 Daily Cape May Welcome Center Atlantic City Atlantic Avenue, Ocean Avenue, Atlantic Avenue and Pacific Avenue, New Jersey Avenue, Rio Grande Avenue, New Jersey Avenue, Rio Grande Avenue, Memorial Day weekend; July 2 to September 4; Every day, 4:00 PM - midnight All summer Thursday to Sunday, 5:00-11:00 PM Unlisted Unlisted 20 minutes (unpublicized) 20 minutes (unpublicized) $2.50 Free Year-Round 3-4 3hrs 10min Varies based on zone Year-Round 2-3 4hrs 30min 8hrs Varies based on zone New Jersey Avenue, Year-Round 2 4hrs Varies based on zone New Jersey Avenue, Rio Grande Avenue, Year-Round min 1hr Varies based on zone 21

24 ACCESS RD ALLEN DR OAK AVE ANGLESEA DRIVE UV 147 PINE AVE Middle Township 1ST AVE 6TH AVE 7TH AVE SPRUCE AVE WALNUT AVE NEW YORK AVE CENTRAL AVE North Wildwood City PINE AVE ATLANTIC AVE 4TH AVE 2ND AVE 3RD AVE POPLAR AVE West Wildwood orough AVENUE P MAPLE AVE LAKE AVE 26TH AVE 22ND AVE 24TH AVE MARYLAND AVE DELAWARE AVE TH AVE 15TH AVE 16TH AVE 18TH AVE 19TH AVE 20TH AVE 21ST AVE NEW JERSEY AVE 8TH AVE 10TH AVE 11TH AVE SURF AVE 13TH AVE JOHN F. KENNEDY EACH DR NJSH RT 47 DELSEA DR MONTGOMERY AVE Wildwood City ROERTS AVE AKER AVE PINE AVE PINE AVE YOUNGS AVE PARK LVD HUDSON AVE WILDWOOD AVE SCHELLENGER AVE MAGNOLIA AVE GLENWOOD AVE MAPLE AVE PACIFIC AVE JUNIPER AVE I «47 URK AVE SPENCER AVE GARFIELD AVE SPICER AVE OAK AVE II ANDREWS AVE TAYLOR AVE HAND AVE ARCTIC AVE Lower Township LAKE RD LEAMING AVE ENNETT AVE CRESSE RD SWEET RIAR RD WISTARIA RD RIO GRANDE AVE DAVIS AVE POPLAR AVE TACONY RD LINCOLN AVE DOCK ST ROSEMARY RD NEW JERSEY AVE UTTERCUP RD LAVENDER RD CROCUS RD PACIFIC AVE CARDINAL RD EACH AVE ATLANTIC AVE PRIMROSE RD SEAVIEW AVE Wildwood Crest orough LOTUS RD STOCKTON RD ORCHID RD FARRAGUT RD NASHVILLE AVE AYVIEW DR MIAMI AVE ST PAUL AVE DENVER AVE JEFFERSON AVE OCEAN DR CHARLESTON AVE LOUIS AVE TRENTON AVE HOLLYWOOD AVE Mile The Figure 8: Transit Facilities LEGEND NJ Transit Lines Line 319 Lines 313, 315 and 552 Wildwood Trolley Lines oardwalk Trolley Downtown Trolley North Wildwood Trolley Tram Car Waterways Municipal oundary October, 2011

25 icycle and Pedestrian icycle Compatibility State, county and key local roadways in the Wildwoods were evaluated for compatibility with bicycle travel, using NJDOT icycle Compatible Roadways and ikeways guidelines (April 1996). icycle compatible refers to roadway conditions that, taken together, are considered suitable for a fairly wide range of bicyclists. Criteria used to determine bicycle compatibility are: lane width, shoulder width, traffic volume, speed limit, character of the area (urban or rural), presence or absence of on-street parking, and truck volumes. Traffic volumes and speed are important factors; generally, as either increase on a roadway, it is recommended that a travel lane shared by motorists and bicyclists increase in width, or that shoulders or bike lanes be available for use by bicyclists. icycle compatible roadway pavement widths are indicated in Table 4. Table 4: icycle Compatible Pavement Widths Condition I: AADT 1,200 2,000 Urban w/ Parking Urban w/o Parking Rural <30 mph SL 12 ft SL 11 ft SL 10 ft mph SL 14 ft SL 14 ft SL 12 ft mph SL 15 ft SL 15 ft SH 3 ft 50 mph NA SH 4 ft SH 4 ft Condition II: AADT 2,000 10,000 Urban w/ Parking Urban w/o Parking Rural <30 mph SL 14 ft SL 12 ft SL 12 ft mph SL 14 ft SL 14 ft SH 3 ft mph SL 15 ft SL 15 ft SH 4 ft 50 mph NA SH 6 ft SH 6 ft Condition III: AADT Over 10,000 or Trucks Over 5% Urban w/ Parking Urban w/o Parking Rural <30 mph SL 14 ft SL 14 ft SL 14 ft mph SL 14 ft SH 4 ft SH 4 ft mph SL 15 ft SH 6 ft SH 6 ft 50 mph NA SH 6 ft SH 6 ft Source: NJDOT icycle Compatible Roadways and ikeways: Planning and Design Guideline, April 1996 SH = shoulder SL = shared lane Roadways that are identified as bicycle compatible are often attractive candidates for incorporating into a planned bicycle network. However, it should be emphasized that roadways are open to bicyclists whether or not the roadway meets compatibility criteria, nor is the compatibility evaluation intended to assess safety. The results of the bicycle compatibility analysis are depicted in Figure 9. As illustrated, there are several major north-south roadways in North Wildwood and Wildwood Crest that are bicycle compatible. In North Wildwood, Central Avenue is compatible due to wide travel lanes, while Surf Avenue has bike lanes. In Wildwood Crest, Seaview Avenue west of Rambler Road has bike lanes, and Atlantic Avenue is compatible due to wide travel lanes. In Wildwood, none of the north-south roadways evaluated are 23

26 bicycle compatible, although several east-west roadways are, particularly those that are one-way. The lack of bicycle compatibility presents issues, given the high bicycle volumes in Wildwood. The oardwalk is a very popular place to bicycle; bicycling is permitted until 11 AM. It becomes increasingly difficult to bicycle later in the day, as pedestrian activity increases. Some bicyclists on New Jersey Avenue prefer to ride on the sidewalk, left. The bike lanes on Surf Avenue provide a desirable environment for bicyclists, right. ike Parking One of the most visible aspects of transportation in the Wildwoods is the significant mismatch between the high volume of bicyclists and the lack of bicycle parking. The lack of bike parking is especially noticeable along the oardwalk, as many bikes are chained to the signposts and the handrail along the oardwalk ramps. ikes can also be found parked or chained to signposts and other objects in front of popular destinations throughout the Wildwoods. Ramp to oardwalk, left; in front of Uncle ill s Pancake House, right. 24

27 ALLEN DR OAK AVE ANGLESEA DRIVE UV 147 SPRUCE AVE Middle Township NEW YORK AVE CENTRAL AVE West Wildwood orough 20TH AVE NEW JERSEY AVE 6TH AVE 7TH AVE WALNUT AVE 1ST AVE PINE AVE MARYLAND AVE 22ND AVE DELAWARE AVE 15TH AVE 12TH AVE 18TH AVE North Wildwood City 13TH AVE 16TH AVE 9TH AVE 10TH AVE 11TH AVE SURF AVE ATLANTIC AVE 2ND AVE 3RD AVE 4TH AVE JOHN F. KENNEDY EACH DR HUDSON AVE 26TH AVE POPLAR AVE CENTRAL AVE NJSH RT I «47 AKER AVE Wildwood City PARK LVD GLENWOOD AVE 24TH AVE DELSEA DR TACONY RD WILDWOOD AVE SCHELLENGER AVE SPENCER AVE SPICER AVE LINCOLN AVE PACIFIC AVE OAK AVE JUNIPER AVE MAPLE AVE PINE AVE II ANDREWS AVE RIO GRANDE AVE ARCTIC AVE MONTGOMERY AVE YOUNGS AVE Lower Township LAKE RD COLUMINE RD CRESSE AVE SWEET RIAR RD ENNETT AVE NEW JERSEY AVE PACIFIC AVE HAND AVE UTTERCUP RD CROCUS RD HILDRETH AVE LEAMING AVE EACH AVE ATLANTIC AVE FORGET ME NOT RD RAMLER RD LOTUS RD SEAVIEW AVE Wildwood Crest orough ORCHID RD STOCKTON RD FARRAGUT RD NASHVILLE AVE AYVIEW DR MIAMI AVE ST PAUL AVE DENVER AVE TRENTON AVE CHARLESTON AVE JEFFERSON AVE HOLLYWOOD AVE SEAVIEW AVE Mile The Figure 9: icycle Compatibility LEGEND icycle Compatible Roadway icycle Non-Compatible Roadway State Roadway County Roadway Local Roadway Waterways Municipal oundary October 2011

28 Pedestrian Activity Pedestrian volumes are high throughout the Wildwoods. A comprehensive pedestrian count program was not undertaken as part of this study, but some limited field views corroborated the high levels of activity. Figure 10 below indicates the result of a count conducted on Wednesday, August 17, from 11:00 to 11:30 AM at six points along Ocean Avenue. Not surprisingly, volumes were heavier at Spencer and Youngs Avenue, adjacent to Adventure Pier, than further to the south, at aker and Montgomery Avenues. The numbers of mid-block crossings were low. The short block structure in the Wildwoods funnels pedestrians to crossing roadways at intersections, rather than mid-block locations. Figure 10: Pedestrian Volumes on Ocean Avenue icycle and Pedestrian Crashes A categorization of bicycle and pedestrian crashes with vehicles for the period of January 1, 2008 through December 31, 2010 is provided in Tables 5 and 6. As shown in Table 5, there were 85 bicycle crashes in the Wildwoods for this time period. Motorist drive-out crashes occur when a motorist drives through a stop sign or red light at an intersection; there were 16 of these crashes. There were 19 crashes when bicyclists rode through red lights or stop signs. There were 20 crashes involving motorists turning right into bicyclists; 13 of these involved bicyclists riding against traffic (i.e., on the wrong side of the road). Motorists do not anticipate bicyclists riding in this direction, heightening the danger. In total, 26 crashes involved bicyclists riding in the wrong direction. This behavior contributes to the risk of a crash. 26

29 Table 5: icycle Crashes icycle Crash Type Number Percentage Motorist Drive Out - icyclist With Traffic 11 13% Motorist Drive Out - icyclist Against Traffic 5 6% Motorist Drive Out - Driveway 5 6% icyclist Ride Out - icyclist With Traffic 15 18% icyclist Ride Out - icyclist Against Traffic 4 5% Motorist Right Turn - icyclist With Traffic 7 8% Motorist Right Turn - icyclist Against Traffic 13 15% Motorist Left Turn - icyclist With Traffic 7 8% Motorist Left Turn - icyclist Against Traffic 3 4% icyclist Right Turn - icyclist Against Traffic 1 1% icyclist Left Turn - icyclist With Traffic 2 2% Other 12 14% Total % As shown in Table 6, there were 43 pedestrian crashes, or half the number of bicycle crashes. This number indicates the popularity of bicycling in the Wildwoods, since in many urban communities in New Jersey, pedestrian crashes are most common. The highest number of crashes came in the left turn parallel path category, with 10. Crashes resulting from left turns routinely outnumber crashes from right turns, which may be due to the more complex maneuvers involved. Table 6: Pedestrian Crashes Pedestrian Crash Type Number Percentage Dash or Dart - Out 5 12% Motorist Exiting Driveway or Alley 2 5% Motorist Failed to Yield 3 7% Motorist Left Turn - Parallel Paths 10 23% Motorist Right Turn - Parallel Paths 2 5% Motorist Right Turn - Perpendicular Paths 1 2% Pedestrian Failed to Yield 2 5% Trapped 2 5% Walking Along Roadway with Traffic - From ehind 2 5% Other 14 33% Total % Figure 11 depicts pedestrian and bicycle crash locations. Wildwood accounts for the majority of crashes. Within Wildwood, the roadways with the highest number of crashes are New Jersey Avenue, with 28, and Rio Grande Avenue, with 20. The pattern of crashes on the north-south roads within Wildwood is particularly interesting; there are four north-south roads from Ocean Avenue to New Jersey Avenue, and 27

30 the number of crashes increases with greater distance from the ocean. Along with the 28 crashes on New Jersey Avenue, there were 17 on Pacific Avenue, 15 on Atlantic Avenue, and 7 on Ocean Avenue. The largest crash clusters are at the intersections of Rio Grande Avenue and Pacific Avenue, and Rio Grande Avenue and New Jersey Avenue, with six each. The high number of crashes on these streets indicates regular bicycling activity away from the oardwalk. 28

31 ALLEN DR OAK AVE ANGLESEA DRIVE UV 147 PINE AVE NJSH RT 47 DELSEA DR Lower Township I « II ROSEMARY RD Middle Township West Wildwood orough URK AVE ANDREWS AVE TAYLOR AVE RIO GRANDE AVE LAKE RD HAND AVE CRESSE AVE SWEET RIAR RD WISTARIA RD MONTGOMERY AVE NEW JERSEY AVE # # Wildwood City ROERTS AVE AKER AVE ENNETT AVE DOCK ST TACONY RD PACIFIC AVE # # # HILDRETH AVE UTTERCUP RD LAVENDER RD CARDINAL RD CROCUS RD ARCTIC AVE PARK LVD LEAMING AVE EACH AVE # HUDSON AVE ATLANTIC AVE 26TH AVE # 22ND AVE 24TH AVE JUNIPER AVE POPLAR AVE MAGNOLIA AVE GLENWOOD AVE MAPLE AVE PINE AVE WILDWOOD AVE OAK AVE SCHELLENGER AVE GARFIELD AVE SPENCER AVE DAVIS AVE LAKE AVE SPICER AVE YOUNGS AVE LINCOLN AVE MARYLAND AVE # # PACIFIC AVE DELAWARE AVE North Wildwood City 15TH AVE 12TH AVE 18TH AVE 19TH AVE 20TH AVE 21ST AVE NEW JERSEY AVE 6TH AVE 7TH AVE 16TH AVE 1ST AVE SPRUCE AVE WALNUT AVE NEW YORK AVE # 10TH AVE 11TH AVE SURF AVE PINE AVE 8TH AVE 13TH AVE CENTRAL AVE ATLANTIC AVE 4TH AVE 2ND AVE 3RD AVE JOHN F. KENNEDY EACH DR FORGET ME NOT RD PRIMROSE RD SEAVIEW AVE LOTUS RD Wildwood Crest orough STOCKTON RD ORCHID RD FARRAGUT RD AYVIEW DR MIAMI AVE ST PAUL AVE DENVER AVE NASHVILLE AVE TRENTON AVE JEFFERSON AVE OCEAN DR CHARLESTON AVE LOUIS AVE JEFFERSON AVE HOLLYWOOD AVE Mile The Figure 11: icycle and Pedestrian Crashe Locations Year LEGEND icycle Crash Pedestrian Crash State Roadway County Roadway Local Roadway Waterways Municipal oundary September, 2011

32 Public Involvement Public Survey Although a formal survey was not included in the study scope of work, an unscientific survey was conducted by the study team to better understand transportation issues in the area. Toward this end, a questionnaire survey was distributed in Wildwood hotels in late summer, and was also made available online from August 17, 2011 through October 19, During that time 68 responses were received. Of these, 67 respondents reported visiting the Wildwoods at least once, and 62 respondents reported going to the Wildwoods for more than five years. Visits to the Wildwoods The survey showed that Saturday is the most common day for arriving in the Wildwoods, accounting for 34% of respondents, while 24% arrived on a Friday. The mid-day period is the most common time, accounting for 39% of the respondents, while 26% arrived in the afternoon (2pm to 6pm). Figures 12 and 13 illustrate the results. Figure 12: Arrival Day in the Wildwood What day of the week did you arrive in the Wildwoods? 16% Sunday 34% 7% 0% 2% Monday Tuesday Wednesday Thursday Friday 17% Saturday 24% 30

33 Figure 13: Arrival Time in the Wildwoods What time of the day did you arrive in the Wildwoods? 0% 4% 12% 19% 26% 39% Morning (6am-10am) Mid-Day (10am-2pm) Afternoon (2pm-6pm) Evening (6pm-10pm) Late Evening (10pm-2am) Early Morning (2am-6am) The large majority of respondents (67%) indicated that they would stay between three and seven nights, with 18% indicating that they would stay more than seven nights. Leaving the Wildwoods Sunday is the most common day for leaving the Wildwoods, accounting for 32% of the respondents, while 23% planned to leave on Saturday. Regarding the time of departure, 33% said that they left during the morning (6am to 10pm), and 33% left during the mid-day (10am to 2pm). Figures 14 and 15 illustrate the results. 31

34 Figure 14: Day of Departure from the Wildwoods What day of the week did you leave the Wildwoods? 23% 32% Sunday Monday Tuesday Wednesday 13% 7% 3% 10% 12% Thursday Friday Saturday Figure 15: Time of Departure from the Wildwoods What time of the day did you leave the Wildwoods? 2% 0% 19% Morning (6am-10am) 33% Mid-Day (10am-2pm) Afternoon (2pm-6pm) 13% Evening (6pm-10pm) Late Evening (10pm-2am) Early Morning (2am-6am) 33% 32

35 Traffic Participants were asked if they experienced any traffic delays entering the Wildwoods on their visits and to specify the locations. Half of the respondents said that they have experienced traffic delays, while 47% said that they had not experienced delays. Some of the respondents indicated locations of delays, shown in Table 7. Table 7: Locations of Traffic Delays Outside the Wildwoods Route Route Garden Atlantic City State Expressway ridge Parkway Inside the Wildwoods Rio New Jersey Grande Avenue Avenue Number Fifty-five percent of respondents enter the Wildwoods from Rio Grande Avenue (southern exit 4 off the Parkway) and 37% enter via New Jersey Avenue (northern exit 6 off the Parkway). Signing When asked if signing should be improved to help reach various destinations in the Wildwoods, 45% of respondents said Yes and 55% said No. When asked to provide examples, respondents suggested the signing improvements listed in Table 8. Table 8: Requested Signing Improvements etter Signs Signing on the Signing to Key Other Parkway Destinations Number With reference to key destinations, respondents suggested that signing be provided for Morey s Pier, the oardwalk and beach, the restaurant district along Pacific Avenue, and North Wildwood and Wildwood Crest. Two of these respondents said that the signs should be installed along the northsouth avenues. Fifty-two percent of respondents found parking to be a problem when moving around the Wildwoods each day or evening, and specified the locations identified in Table 9. Table 9: Locations of Parking Issues each oardwalk On Restaurants/ Motel Everywhere None Other Streets Night Clubs Number

36 Transportation Modes Participants were asked to indicate the different modes of transportation used by them in the Wildwoods aside from driving as indicated in Figure 16. As shown, two-thirds of visitors ride on the Tram Car, while 56% bicycle. Another 21% ride on the Trolley. Figure 16: Transportation Modes 100% 90% esides driving, what other modes of transportation do you use in the Wildwoods? 90% 80% 70% 60% 50% 40% 67% 56% 30% 20% 10% 0% 21% 11% 5% 2% Trolley Tram Car ike Taxi us Walk Other Visitors were asked if they would visit more areas in the Wildwoods or participate in more resort activities if there were changes in transportation and parking. Of the respondents, 68% said Yes and 23% said No. Respondents also provided some examples as to what type of improvements they would like to see, as indicated in Table 10. The greatest amount of interest was shown in improving bus and trolley services in the Wildwoods. It should be noted that these were not multiple choice questions, and the respondents needed to draw directly upon their experience in identifying these needs. Table 10: Types of Improvements ike Improve us/trolley Service Routes Improve Roadway General More Times More Places Parking Number Finally, participants had the opportunity to add any other suggestions on improving transportation within the Wildwoods or approaching/departing the area. Table 11 summarizes the comments. Tram Car 34

37 Table 11: Other Requested Improvements Parking Tram Information Roads Trolley Other General Streets oardwalk Car Number Stakeholder Issues Interviews were conducted with local stakeholders to discuss various topics of interest to this study. These stakeholders included: Will Morey, Morey s Piers Jack Morey, Morey s Piers Clark Doran, Morey s Piers Tracey DuFault, Greater Wildwood Chamber of Commerce Mark D Amico, City of Wildwood Public Works Department Dan MacElrevey, Wildwoods Hotel & Motel Association Dick Adelizzi, Great American Trolley Company Patrick Rosenello, Wildwood usiness Improvement District and oardwalk Special Improvement District Captain Matthew Gallagher, North Wildwood Police Department Tom radley, radley ike Rental Jessica Inaya, Wildwood School oard Administrative Office Steve Long, Wildwood Police Department John Siciliano, Wildwoods Convention Center The following lists a summary of the comments that were received: Vehicular 1. Address congestion on: Rio Grande Avenue Ocean Avenue 2. Address conflicts at busy driveways along Rio Grande Avenue, including the Wawa driveway 3. Make greater use of Park oulevard for traffic 4. Signalize : urk Avenue and Atlantic Avenue, to help people leave after special events New Jersey Avenue and Maple Avenue Pacific Avenue and Schellenger Avenue Pacific Avenue and Wildwood Avenue 5. Direct incoming motorists to Hand Avenue, and exiting to Taylor Avenue 6. Install No Turn signage at Rio Grande Avenue and Hudson Avenue 7. Consider making Arctic and Hudson Avenues one-way away from Rio Grande 35

38 Parking 1. Provide more parking: y oardwalk Pacific Avenue 2. uild parking garage 3. Reduce parking costs Public Transportation 1. Provide more information on Trolley services stops and schedule 2. Expand Dolly the Trolley hours 3. Provide better trolley service to North Wildwood entertainment district 4. Run tram on street from future parking garage to Fox Park 5. Provide more inter-city bus service 6. Provide dedicated charter bus loading/unloading area icycle and Pedestrian 1. Provide beachside bikeway 2. Provide more bicycling options in Wildwood 3. Provide more bike parking 36

39 Urban Design Conditions Clarke Caton Hintz conducted several field surveys of the Wildwoods to evaluate pedestrian and bicycle facilities from an urban design perspective. In Wildwood there are minimal pedestrian crosswalks from the residential areas to the oardwalk. Passageways from the street network underneath the oardwalk to the beach are typically missing signage. Further, these passageways are relatively Example of missing pedestrian crosswalks. oardwalk to beach underpass. unappealing, dark even in the daytime or with minimal headroom. In some cases, delivery trucks regularly impede access to the beach. There are no clear connections between the business district and the boardwalk. Dark and uninviting oardwalk to beach underpass. oardwalk and beach access with delivery trucks. 37

40 Along the some streets parallel to the boardwalk, such as Ocean Avenue, the roads are very wide, and the signalized pedestrian crossings are few. Sidewalks in some areas were in need of repair, and sidewalks in the business district are narrow. Wide street near boardwalk. A sidewalk in need of repair and a narrow street causes bicycle and pedestrian conflicts. Street lighting was also observed. As revealed in the night-time aerial photograph below, lighting is poor in the business district along Pacific Avenue, as well as some of the streets leading to the oardwalk. Night lighting in North Wildwood s entertainment district does not emphasize the distinctness of the area and is generally not attractive. 38

41 Street trees are absent in many areas of the Wildwoods, particularly in the business district of Wildwood and adjacent streets, and in the North Wildwood entertainment district. The North Wildwood entertainment district lacks street trees and vegetation. 39

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys 1 Summary of 2015 BBTCA Traffic and Passenger Surveys Surveys of traffic volumes and pedestrian activity were

More information

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report II. EXISTING CONDITIONS A. INTRODUCTION The Route 107 study area extends from the south at Chestnut Street in Lynn approximately 3.7 miles to the north to Boston Street in Salem. The study area has three

More information

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018 MEMORANDUM TO: Bob Zagozda, Chief Financial Officer Westside Community Schools FROM: Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig DATE: June 11, 218 6-11-18 SUBJECT: Sunset Hills Elementary School

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007 June 15, 2007 Mr. Gary Stobb, P.E. Director of Planning/Operations Harris County Toll Road Authority 330 Meadowfern, Suite 200 Houston, TX 77067 Re: Westpark Tollway Value Pricing Analysis Dear Mr. Stobb:

More information

Traffic Management Plan 2018

Traffic Management Plan 2018 Traffic Management Plan 2018 Jesuit College Preparatory School of Dallas Amendment to Planned Development No. 353 Dallas, Texas June 6, 2018 Prepared for Jesuit College Preparatory School of Dallas Prepared

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT Transportation TRANSPORTATION ELEMENT Data, Inventory, and Analysis Prepared by Contents 1.0 INTRODUCTION... 1 2.0 EXISTING CONDITIONS... 1 2.1 Roadways... 1 2.1.1 Jurisdiction... 1 2.1.2 Functional Classification...

More information

Glasgow Street Traffic Review

Glasgow Street Traffic Review Glasgow Street Traffic Review Recommendation That the Standing Policy Committee on Transportation recommend to City Council: 1. That the Administration proceed with removing the pinch points installed

More information

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW 7272 LOCAL AREA TRANSPORTATION REVIEW AND TRANSPORTATION POLICY AREA REVIEW MONTGOMERY COUNTY, MARYLAND Submitted on behalf of Carr Properties Prepared by: Wells + Associates, Inc. Submission: July 1,

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

FINAL TERMINAL TRAFFIC MONITORING STUDY

FINAL TERMINAL TRAFFIC MONITORING STUDY FINAL TERMINAL 91 216 TRAFFIC MONITORING STUDY Prepared for: Port of Seattle February 15, 217 Prepared by: 12131 113 th Avenue NE, Suite 23 Kirkland, WA 9834-712 Phone: 425-821-3665 www.transpogroup.com

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

YARTS ON-BOARD SURVEY MEMORANDUM

YARTS ON-BOARD SURVEY MEMORANDUM YARTS ON-BOARD SURVEY MEMORANDUM Prepared for the Yosemite Area Regional Transportation System Prepared by LSC Transportation Consultants, Inc. This page left intentionally blank. YARTS On-Board Survey

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118

More information

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS

More information

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) 2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) TABLE OF CONTENTS Introduction 1 Transportation Planning Activities 2 Identification of Problem Areas and Recommended Solutions 7 DeKalb County Projects

More information

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact: The Miles Crossing/ Jeffers Garden transportation plan (underway), will identify needed improvements to the Warrenton Astoria Highway and local street improvements to serve expected growth in the Miles

More information

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2 Job No. 15-019 Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION... 4 2.0 EXISTING CONDITIONS... 5 3.0 TRAFFIC GENERATION... 7 4.0 TRIP DISTRIBUTION... 8 5.0 FUTURE CONDITIONS... 8 6.0 SITE ACCESS...13 7.0 CONCLUSION...13

More information

EAKINS OVAL / 25 TH & PENNSYLVANIA AREA PROJECT SUMMARY 1

EAKINS OVAL / 25 TH & PENNSYLVANIA AREA PROJECT SUMMARY 1 EAKINS OVAL / 25 TH & PENNSYLVANIA AREA PROJECT SUMMARY The Parkway Council Foundation is studying potential road and sidewalk reconfigurations of two areas at the western edge of the Benjamin Franklin

More information

DOGWOOD AT VILLA AVENUE PROJECT

DOGWOOD AT VILLA AVENUE PROJECT TRANSPORTATION IMPACT ANALYSIS DOGWOOD AT VILLA AVENUE PROJECT El Centro, California September 4, 2018 LLG Ref. 3-17-2782 TABLE OF CONTENTS SECTION PAGE Appendices... ii List of Figures... i List of Tables...

More information

IL 390 Station. Wood Dale Open House Summary 5/18/17

IL 390 Station. Wood Dale Open House Summary 5/18/17 Wood Dale Open House Summary 5/18/17 The first public open house for the Wood Dale Comprehensive Plan took place on May 18 th, 2017. The program was conducted as a fun community event and there were 216

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,

More information

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL. Project No. 121-22908 N o v e m b e r 2 0 1 2 Traffic Impact Study Transportation Planning th GENIVAR Inc., 600 Cochrane Drive, 5 Floor, Markham, Ontario L3R 5K3 Telephone: 905.475.7270 Fax: 905.475.5994

More information

Att. A, AI 46, 11/9/17

Att. A, AI 46, 11/9/17 Total s San Diego Metropolitan Transit System POLICY 42 PERFORMANCE MONITORING REPORT Page 1 of 6 Date: 11/8/17 OBJECTIVE Develop a Customer-Focused and Competitive System The following measures of productivity

More information

Chapter 4. Ridecheck and Passenger Survey

Chapter 4. Ridecheck and Passenger Survey Chapter 4. Ridecheck and Passenger Survey YOLOBUS operates a mix of local, intercity, commute and rural routes. Because there are limited roadways that intercity and rural routes can operate on, stop by

More information

SAMTRANS TITLE VI STANDARDS AND POLICIES

SAMTRANS TITLE VI STANDARDS AND POLICIES SAMTRANS TITLE VI STANDARDS AND POLICIES Adopted March 13, 2013 Federal Title VI requirements of the Civil Rights Act of 1964 were recently updated by the Federal Transit Administration (FTA) and now require

More information

SR 934 Project Development And Environment (PD&E) Study

SR 934 Project Development And Environment (PD&E) Study SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer

Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer Strategic Signal Timing Changes = BIG Results Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer Pre Signal Timing Updates Signal Timing Updates Average Retiming Interval Percent

More information

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! Study Overview and Timeline Phase 1: Collect and Analyze Data Project Kickoff, September 2017

More information

rtc transit Before and After Studies for RTC Transit Boulder highway UPWP TASK Before Conditions

rtc transit Before and After Studies for RTC Transit Boulder highway UPWP TASK Before Conditions rtc transit Before and After Studies for RTC Transit UPWP TASK 3403-11-14 Before Conditions Report Boulder highway June 2011 Before and After Studies for RTC Transit BOULDER HIGHWAY BEFORE STUDY UPWP Task

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

Southern Oregon Transportation Engineering, LLC

Southern Oregon Transportation Engineering, LLC Southern Oregon Transportation Engineering, LLC 112 Monterey Drive - Medford, Or. 97504 Office 541.608.9923 Cell 541.941.4148 Email: Kwkp1@Q.com August 12, 2013 Mike Faught, Public Works Department City

More information

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS INTRODUCTION The Municipal docks in both Newboro and Portland were transferred to the Township of Rideau Lakes by Parks Canada in 2002. Little has been done to improve the docks physical condition or role

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW

APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW The following pages are excerpts from a DRAFT-version Fare Analysis report conducted by Nelson\Nygaard

More information

STUDY DESCRIPTION MEMORANDUM. DATE April 20, 2011

STUDY DESCRIPTION MEMORANDUM. DATE April 20, 2011 DATE April 0, 0 TO FROM RE MEMORANDUM Congestion Management Program Files Ariel Godwin, CMP Manager Boston Region MPO Staff Limited-Access Highway Counts and Traffic Volumes, Summer 00 This memorandum

More information

2015 Independence Day Travel Overview U.S. Intercity Bus Industry

2015 Independence Day Travel Overview U.S. Intercity Bus Industry 2015 Independence Day Travel Overview U.S. Intercity Bus Industry Chaddick Institute for Metropolitan Development, DePaul University June 25, 2015 This Intercity Bus Briefing summarizes the Chaddick Institute

More information

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS Draft Environmental Impact Statement/Environment Impact Report Appendix H Milestone 2 Traffic Operations Analysis of the At-Grade Crossings APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

St. Johns River Ferry Patron Survey May 16, 2012

St. Johns River Ferry Patron Survey May 16, 2012 St. Johns River Ferry Patron Survey May 16, 2012 Committee Report Introduction Study Survey Survey Surveyor Summary Table of Contents Executive Summary... ES-1 Section 1 ONE... 1-1 Section 2 TWO Methodology...

More information

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY MAY 2011 SW1132SWD NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 CURRENT TRAVEL PATTERNS

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

Mainline Description

Mainline Description Mainline Description The Mainline component of Florida s Turnpike extends for 320 miles and consists of five distinct sections as shown in the figure above. These sections are the SR 821 (HEFT), Southern

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

I-66 Inside the Beltway Feasibility Study

I-66 Inside the Beltway Feasibility Study I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation

More information

Watts St westbound thru

Watts St westbound thru Executive Summary At the request of the Hudson Square Business Improvement District, Sam Schwartz Engineering, DPC (Sam Schwartz) has completed a technical analysis of various congestion pricing and/or

More information

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,

More information

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN by John M. Ishimaru Senior Research Engineer Duane Wright Systems Analyst Programmer Mark E. Hallenbeck Director Jaime Kang Research

More information

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION

Attachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

V. DATA COLLECTION PROGRAM

V. DATA COLLECTION PROGRAM V. DATA COLLECTION PROGRAM As discussed in Section IV, an extensive data assembly and data collection program was undertaken to develop the data necessary to calibrate the existing Portway Extensions model

More information

Central Coast Origin-Destination Survey

Central Coast Origin-Destination Survey Central Coast Origin-Destination Survey July 2016 Central Coast Origin-Destination Survey Prepared for: Santa Barbara County Association of Governments San Luis Obispo Council of Governments Ventura County

More information

Lansdowne Wetton BRT Public Transport Corridor Trunk Route: Planning Analysis

Lansdowne Wetton BRT Public Transport Corridor Trunk Route: Planning Analysis Lansdowne Wetton BRT Public Transport Corridor Trunk Route: Planning Analysis 1. Introduction The purpose of this report is to detail the planning evaluation for the trunk route alignment alternatives

More information

DEMOGRAPHICS AND EXISTING SERVICE

DEMOGRAPHICS AND EXISTING SERVICE EXECUTIVE SUMMARY The Central Corridor light-rail transit (LRT) project will open in 2014 and operate between downtown Minneapolis and downtown St. Paul, serving the University of Minnesota and University

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

Washington St. & Ash Coulee Dr./43 rd Ave Intersection Study

Washington St. & Ash Coulee Dr./43 rd Ave Intersection Study 430 IACC Building Fargo, ND 58105 Tel 701-231-8058 Fax 701-231-1945 www.ugpti.org www.atacenter.org Washington St. & Ash Coulee Dr./43 rd Ave Intersection Study Final Report April 2007 Prepared for: City

More information

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY Final Report Research Project Agreement No. T1803, Task 4 HOV Monitoring V HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY by Jennifer Nee TRAC Research Engineer John Ishimaru TRAC Senior

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

Word Count: 3,565 Number of Tables: 4 Number of Figures: 6 Number of Photographs: 0. Word Limit: 7,500 Tables/Figures Word Count = 2,250

Word Count: 3,565 Number of Tables: 4 Number of Figures: 6 Number of Photographs: 0. Word Limit: 7,500 Tables/Figures Word Count = 2,250 Katherine F. Turnbull, Ken Buckeye, Nick Thompson 1 Corresponding Author Katherine F. Turnbull Executive Associate Director Texas Transportation Institute Texas A&M University System 3135 TAMU College

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

PLEASE READ Proposal for Sustainable Service

PLEASE READ Proposal for Sustainable Service IMPORTANT PLEASE READ 019 Proposal for Sustainable Service 019 Service Change Proposal IMPLEMENT A SUSTAINABLE NETWORK Everett Transit completed its Long Range Plan in May, and the plan was adopted by

More information

10.0 Recommendations Methodology Assumptions

10.0 Recommendations Methodology Assumptions 10.0 Recommendations To accommodate the projected growth of the I-526 corridor, this report has summarized potential improvement strategies that were separated into four categories, TDM, Modal, Traffic

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council TORONTO STAFF REPORT ACTION REQUIRED Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road Dnte: February 16,2009 To: From: Toronto and East York Community

More information

Alternatives Analysis EXECUTIVE SUMMARY

Alternatives Analysis EXECUTIVE SUMMARY Alternatives Analysis EXECUTIVE SUMMARY Alternative development plans were created as part of the Master Plan for Harrisburg International Airport. The aim is to provide sufficient capacity for projected

More information

Business Growth (as of mid 2002)

Business Growth (as of mid 2002) Page 1 of 6 Planning FHWA > HEP > Planning > Econ Dev < Previous Contents Next > Business Growth (as of mid 2002) Data from two business directories was used to analyze the change in the number of businesses

More information

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and

More information

Trans Canada Highway Corridor Management Plan. Final Draft Report. Drinkwater Road to Cowichan Bay Road. Prepared for:

Trans Canada Highway Corridor Management Plan. Final Draft Report. Drinkwater Road to Cowichan Bay Road. Prepared for: Trans Canada Highway Corridor Management Plan inal Draft Report Prepared for: City of Duncan Cowichan Tribes Council District of North Cowichan Cowichan Valley Regional District South Coast Region of the

More information

Assessment of Travel Trends

Assessment of Travel Trends I - 2 0 E A S T T R A N S I T I N I T I A T I V E Assessment of Travel Trends Prepared for: Metropolitan Atlanta Rapid Transit Authority Prepared by: AECOM/JJG Joint Venture Atlanta, GA October 2011 General

More information

METROPOLITAN EVANSVILLE TRANSIT SYSTEM Part I: Comprehensive Operations Analysis Overview July 9 th, 2015 Public Information Meeting

METROPOLITAN EVANSVILLE TRANSIT SYSTEM Part I: Comprehensive Operations Analysis Overview July 9 th, 2015 Public Information Meeting METROPOLITAN EVANSVILLE TRANSIT SYSTEM Part I: Comprehensive Operations Analysis Overview July 9 th, 2015 Public Information Meeting AGENDA 5:30 5:40 Open House 5:40 6:30 Presentation Comprehensive Operations

More information

Evaluating Lodging Opportunities

Evaluating Lodging Opportunities Evaluating Lodging Opportunities This section explores market opportunities for new lodging accommodations in the downtown area. It will help you understand travel and visitation trends, existing competition,

More information

ALS Express Bike Ride. Saturday, June 15, 2013

ALS Express Bike Ride. Saturday, June 15, 2013 Presented by DIRECTIONS TO 75-MILE START POINT Camden County College Gabriel E Danch CIM Center 200 College Drive Blackwood, NJ **Overnight Parking in LOT 5 of the CIM Center is allowed. HOWEVER, you must

More information

APPENDIX J MODIFICATIONS PERFORMED TO THE TOR

APPENDIX J MODIFICATIONS PERFORMED TO THE TOR APPENDIX J MODIFICATIONS PERFORMED TO THE TOR This appendix summarizes the modifications that were performed in years 2012 and 2017 to rectify calculation errors that were observed in the data presented

More information

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1 ONONDAGA CREEKWALK PHASE II Public Information Meeting Series 1 Andrew Maxwell Director, Syracuse-Onondaga County Planning Agency Owen Kerney Assistant Director for City Planning Russell Houck, PE City

More information

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520

More information

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 Meeting Agenda - Revised Thursday, March 22, 2018 7:00 p.m. Village Hall Council Chambers 6900 N. Lincoln Ave. Lincolnwood,

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

New 55-Dogpatch Outreach Findings & Route Development

New 55-Dogpatch Outreach Findings & Route Development Executive Summary Based on outreach conducted through Spring of 2018, the SFMTA identified a set of three alternative routes and service plans for a new 55-Dogpatch route. These alternatives respond to

More information

Appendix H1 Traffic Study Hill St Obispo Ave Obispo Ave Student Drop-off & Pick-up Area Parking Lot Plaza Level Hill St Fire Lane Access Service Lane Access Redondo Ave Redondo Ave Parking Lot N No

More information

Caliber Charter School VALLEJO, CA

Caliber Charter School VALLEJO, CA Traffic Impact Study Final Report Caliber Charter School VALLEJO, CA 21 June 2016 Prepared for: Prepared by: Traffic Engineering & Transportation Planning This report has been prepared and certified by

More information

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA

BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA December 1, 2008 Public Hearing TOWN CENTER PARKING TIME LIMITS (FIRST READING) Proposed Council Action: Conduct public hearing and first reading

More information

ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia

ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia Developed by Region 2000 Regional Commission In cooperation with Bedford County, Virginia City of Bedford, Virginia Virginia Department

More information

PUBLIC INFORMATION SESSION #2

PUBLIC INFORMATION SESSION #2 Highway 16, Highway 779 to Kapasiwin Road, Planning Study PUBLIC INFORMATION SESSION #2 Wednesday June 20, 2012 4 to 8 pm HIGHWAY 16 Highway 779 to Kapasiwin Road Functional Planning Study Blueberry Community

More information

Yarmouth Road Corridor Study Barnstable

Yarmouth Road Corridor Study Barnstable Yarmouth Road Corridor Study Barnstable December 2012 Table of Contents Introduction... 1 Background Study Objectives... 1 Study Area... 2 Population & Employment... 3 Problem Identification/Public Participation

More information

3. Proposed Midwest Regional Rail System

3. Proposed Midwest Regional Rail System 3. Proposed Midwest Regional Rail System 3.1 Introduction The proposed Midwest Regional Rail System (MWRRS) will operate in nine states, encompass approximately 3,000 route miles and operate on eight corridors.

More information