NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

Size: px
Start display at page:

Download "NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY"

Transcription

1 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY MAY 2011 SW1132SWD

2 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY TABLE OF CONTENTS 1.0 INTRODUCTION CURRENT TRAVEL PATTERNS AND DEFICIENCIES FUTURE CONDITIONS EFFECTS OF SOUTH FRASER PERIMETER ROAD PROPOSED IMPROVEMENTS & ANTICIPATED BENEFITS SW1132SWD May 2011 i

3 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY 1.0 INTRODUCTION The North Fraser Perimeter Road (NFPR) corridor is a critical element in the Greater Vancouver transportation network because it links key routes, communities and commercial/industrial activity centres across the core of the region. Recognized in the Transport 2021 and Livable Region Strategic Plans, it is a strategic regional link serving inter-municipal traffic, particularly for goods movement and in short sections it provides access to local roads and private businesses. The North Fraser Perimeter Road exists today as a collection of municipal road segments, however, the discontinuities between adjacent segments and cross-section inconsistencies create capacity and safety issues that undermine the overall corridor performance. The current configuration and associated traffic operations do not provide reliable trip making and therefore do not reflect the economic importance of this facility. Travel demand patterns along the North Fraser Perimeter Road reflect regional land use patterns, the geographical constraints imposed by the river and the local topography. Over time, the corridor has become increasingly important in serving a growing regional population with numerous new business and residential developments. In 2008, TransLink in consultation with the City of New Westminster and the City of Coquitlam studied the North Fraser Perimeter Road West section between the Queensborough Bridge and United Boulevard in order to better understand the existing conditions in the corridor and to identify future improvements needed. This document provides a summary of the rationale behind the recommended improvements to the New Westminster segment of the North Fraser Perimeter Road and, in particular, the United Boulevard Extension. SW1132SWD May

4 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY 2.0 CURRENT TRAVEL PATTERNS AND DEFICIENCIES North Fraser Perimeter Road is an established corridor serving key travel demand patterns, including dominant traffic flows oriented to and from the Pattullo Bridge, and the Queensborough Bridge/Stewardson Avenue corridors. TRAVEL PATTERNS AND DESIRE LINES Modelled travel demand patterns for traffic using the NFPR corridor are illustrated in Exhibit 1 through Exhibit 4 with additional exhibits illustrating only truck traffic provided in Appendix A. The information provided in Exhibits 1 to 4 identifies the predominant municipal origins and destinations of base year traffic on East Columbia Street south of in the AM and PM peak hours. This location provides perspective on the broad range of travel demand using the corridor, as it captures traffic that enters the corridor from multiple origins and destinations to the north and south. For the 2011 time frame, the analysis of the travel patterns was based on the existing road network and did not include the proposed United Boulevard Extension. Furthermore, improvements to the Highway 1 corridor, construction of the South Fraser Perimeter Road facility, and the Evergreen Light Rail Transit Line were also omitted from the analysis. The following key observations can be made from these exhibits: Southbound Travel Patterns: The is the predominant origin of southbound NFPR peak period travel demand, generating approximately 85% and 60% of the traffic (at the location) in the AM and PM peak hours, respectively, with or without the United Boulevard Extension. and New Westminster are the predominant destinations of southbound NFPR peak period travel demand, respectively attracting approximately 40% and 35% of traffic in the AM peak hour, and approximately 30% and 60% of traffic in the PM peak hour, again with or without the United Boulevard Extension. 1 The Gateway GSAM5 EMME model was adapted for analysis of the NFPR in SW1132SWD May

5 North Shore / Vancouver New Westminster 10 Avenue Pitt Meadows / Maple Ridge South Surrey / Langleys Braid Street 100% 90% 80% 70% 60% South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore Highway 1 Lougheed Highway United Boulevard 50% 40% 8 Avenue Street 30% 20% 10% 0% Existing No UBE New Westminster Origins for South of (Southbound) Destinations for South of (Southbound) 100% 90% 80% 70% 60% South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore 50% 40% 30% 20% 10% 0% Existing No UBE New Westminster Existing AM Southbound Travel Patterns Without UBE (All Vehicles) Exhibit 1

6 North Shore / Vancouver New Westminster 10 Avenue Pitt Meadows / Maple Ridge South Surrey / Langleys Braid Street 100% 90% 80% 70% 60% South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore Highway 1 Lougheed Highway United Boulevard 50% 40% 8 Avenue Street 30% 20% 10% 0% Existing No UBE New Westminster Destinations for South of (Southbound) Origins for South of (Southbound) 100% 90% 80% 70% 60% South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore 50% 40% 30% 20% 10% 0% Existing No UBE New Westminster Existing AM Northbound Travel Patterns Without UBE (All Vehicles) Exhibit 2

7 North Shore / Vancouver New Westminster 10 Avenue Pitt Meadows / Maple Ridge South Surrey / Langleys Braid Street 100% 90% 80% 70% 60% South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore Highway 1 Lougheed Highway United Boulevard 50% 40% 8 Avenue Street 30% 20% 10% 0% Existing No UBE New Westminster Origins for South of (Southbound) Destinations for South of (Southbound) 100% 90% 80% 70% 60% South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore 50% 40% 30% 20% 10% 0% Existing No UBE New Westminster Existing PM Southbound Travel Patterns Without UBE (All Vehicles) Exhibit 3

8 North Shore / Vancouver New Westminster 10 Avenue Pitt Meadows / Maple Ridge South Surrey / Langleys Braid Street 100% 90% 80% 70% 60% South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore Highway 1 Lougheed Highway United Boulevard 50% 40% 8 Avenue Street 30% 20% 10% 0% Existing No UBE New Westminster Destinations for South of (Southbound) Origins for South of (Southbound) 100% 90% 80% 70% 60% South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore 50% 40% 30% 20% 10% 0% Existing No UBE New Westminster Existing PM Northbound Travel Patterns Without UBE (All Vehicles) Exhibit 4

9 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY Northbound Travel Patterns: is the major origins of northbound NFPR AM peak period travel demand, generating approximately 40% of the northbound traffic (at the East Columbia Street location) in the AM peak hour, with or without the United Boulevard Extension. The remaining northbound AM peak hour travel demand originates in New Westminster, and, generating approximately 22%, 20% and 16% of traffic (at the location), respectively. In reverse of the AM peak trend, the is again the predominant destination of northbound NFPR PM peak period travel demand, attracting just under 90% of northbound traffic (at the location) in the PM peak hour, again with or without the United Boulevard Extension. Summarizing the previous exhibits based on the predominant origins and destinations, two key desire lines emerge as shown in Figure 1 below. The primary desire line passes through New Westminster and matches travel along the north side of the Fraser River between the Northeast Sector and. The other desire line passes through New Westminster accommodating travel between and the Northeast Sector via the Pattullo Bridge. Figure 1: NFPR Corridor - Primary and Secondary Desire Lines SW1132SWD May

10 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY These desire lines are primarily based on historical land use or existing development patterns found in the areas of the region identified above. As there are many origins and destinations at each end of the desire lines, the actual width of the desire line can be significant, however, critical links in the road network tend to narrow the desire lines, in most cases to just a single corridor typically consisting of one or more parallel facilities / routes. Given their basis on current development patterns, desire lines cannot be easily altered through simple changes in roadway operations as traffic will tend to follow routes which closely match the most direct path between the dominant origins and destinations. CORRIDOR TRAFFIC FLOWS While the above analysis identifies the key desire lines based on the predominant municipal origins and destinations of traffic at a representative point in the NFPR corridor, it does not identify which corridors traffic uses to access/egress the NFPR. The latter traffic flow patterns contributing to all traffic on south of are depicted in Exhibit 5 and Exhibit 6. These patterns were derived from the travel demand model, and illustrate conditions without the United Boulevard Extension in place. Key observations are noted as follows: Southbound Traffic Flows: (Exhibit 5) In the AM peak hour, the major contributor to southbound traffic is Brunette Avenue (54%), followed by / North Road (20%), Highway 1 (19%) and United Boulevard (7%). In the PM peak hour, the major contributor to southbound traffic is /North Road (36%), followed by (29%); In the AM peak hour, the majority of traffic from the selected link is destined to Stewardson Way (58%), followed by New Westminster (31%) and Pattullo Bridge (11%); In the PM peak hour, the majority of traffic from the selected link is destined to New Westminster (51%) followed by Stewardson Way (47%). Due to the closure of the loop ramp from Columbia Street to the Pattullo Bridge southbound during the PM peak period, traffic destined to the bridge does not use the selected link portion of the NFPR as evidenced by the low contribution at 2%. SW1132SWD May

11

12

13 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY Northbound Traffic Flows: (Exhibit 6) In the AM peak hour, the major contributor to northbound traffic is the Pattullo Bridge (52%) followed by Stewardson Way (29%) and New Westminster (19%). In the PM peak hour, the major contributor to northbound traffic is Stewardson Way (44%), followed by New Westminster (32%) and the Pattullo Bridge (24%). In the AM peak hour, the majority of traffic from the selected link is destined to Highway 1 (33%) followed by (27%), and United Boulevard (20%); In the PM peak hour, the majority of traffic from the selected link is destined to (45%) followed by Highway 1 (35%). These observations emphasize the significance of the NFPR corridor for traffic travelling between the and and. Furthermore, the analysis highlights the importance of key road segments such as Stewardson Way and the Queensborough Bridge, the Pattullo Bridge, and as the key entry / exit points for traffic using the NFPR corridor. LOCATIONS WITH OPERATING DEFICIENCIES In addition to the modelled travel pattern and corridor traffic flow analyses documented above, operational analysis of existing signalized traffic operations along the corridor has been conducted, on the basis of the most recent available 2 traffic data for the study area. Capacity analyses of a total of thirteen intersections along the established NFPR corridor were conducted, incorporating traffic data from 2007 through A summary of intersection locations identified with existing peak hour operating deficiencies in provided in Table 1 overleaf. 2 At time of analysis for the North Fraser Perimeter Road West Corridor Definition Study (Delcan, Oct. 2009) SW1132SWD May

14 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY Table 1 Traffic Operations Deficiencies Intersection Location Deficient 3 Movement(s) Stewardson Way / Columbia Street & Royal Avenue EB through movement (PM peak hour) Columbia Street East / Front Street NB through movement (PM peak hour) WB right turn movement (PM peak hour) Columbia Street East / NB right turn movement (AM & PM peak hours) WB left turn movement (AM peak hour) / Braid Street WB left turn movement (AM & PM peak hours) WB through movement (AM & PM peak hours) NB through movement (AM & PM peak hours) SB left turn movement (AM & PM peak hours) EB left turn movement (PM peak hour) It should be noted that while the identified movements are operationally deficient, the overall intersection performance at these locations does not exceed critical thresholds in the time periods analyzed, with the exception of the / Braid Street intersection in the PM peak hour. Noting the magnitude of traffic using the segment of the NFPR and the deficient operational issues associated with the / Braid Street intersection, the proposed United Boulevard Extension element will provide improved continuity along the established corridor to serve that demand and reduce the congestion at the / Braid Street intersection as well as at the Brunette Interchange. TRUCK TRAFFIC As previously noted, the North Fraser Perimeter Road corridor is a key regional corridor for goods movement traffic. The corridor provides access to major goods movement activity centres located throughout the region, including commercial and industrial parks in, the Big Bend area of, Annacis Island, the South Coquitlam / Pacific Reach areas of Coquitlam, and along the Mary Hill Bypass. In addition, the NFPR corridor serves container terminals, transload facilities, and intermodal yards, such as Coast 2000 in, the Transpacific Container Terminal in Port Coquitlam, and the CP Intermodal facility in Pitt Meadows. Historic industrial developments along the riverfront and railway corridors, such as those in Brunette Creek and along Stewardson Way, are also served by the NFPR. 3 A deficient movement has been defined as having either a Volume/Capacity ratio > 0.85 or a Level of Service of D or worse. SW1132SWD May

15 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY The heavy utilization of the corridor by goods movement vehicles is demonstrated by the vehicle classification data collected along with the traffic count surveys 4 (also referenced previously) and summarized in Table 2, below. Table 2 Vehicle Classification Data % Trucks in Traffic Stream NFPR Corridor Location AM Peak Hour South North bound bound PM Peak Hour South North bound bound Stewardson Way (west of Royal Avenue) 12.4% 28.8% 9.3% 6.9% Front Street (East of Columbia Street) 46.0% 56.2% 41.5% 19.8% Columbia Street East (South of ) 14.5% 17.7% 5.4% 6.4% (west of Braid Street) 10.5% 15.0% 4.7% 6.2% It should be noted that the differences in truck proportions throughout the corridor reflects variations in auto volumes as well as truck volumes, however it is clear that the NFPR is an integral part of the regional goods movement network. In fact, region wide vehicle classification data provided in the 2008 Dangerous Goods and Truck Classification Survey 5 indicate that heavy vehicle movements along the NFPR corridor are among the highest in the Lower Mainland. In a 2008 survey conducted over a 10.5 hour period from 7:00 am to 5:30 pm on a typical weekday, south of Highway 1 was ranked as eighth among the top 20 locations for heavy vehicle volumes in Metro Vancouver, and second only to the Knight Street Bridge amongst the non-highway locations surveyed. 4 At time of analysis for the North Fraser Perimeter Road West Corridor Definition Study (Delcan, Oct. 2009) Dangerous Goods and Truck Classification Survey, BC MoT, TransLink, and Transport Canada SW1132SWD May

16 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY The analysis above clearly indicates that there currently exist strong desire lines passing through New Westminster associated with travel demand between the Northeast Sector and and. Furthermore, the existing collection of road segments forming the North Fraser Perimeter Road represent the most appropriate corridor to accommodate the traffic flows associated with these desire lines. However, intersection operation deficiencies and the lack of consistency between these existing municipal road segments strongly suggest that some improvements to the corridor are required to manage travel demand within the corridor. These improvements to the NFPR corridor are of significance economic importance, as well as in consideration of safety issues related to high volumes of goods movement vehicles. SW1132SWD May

17 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY 3.0 FUTURE CONDITIONS In order to assess the need for North Fraser Perimeter Road improvements in the context of other background network improvements, travel demand forecasts were developed for the horizon year. Selected to reflect the opening day conditions for the proposed United Boulevard Extension, the 2015 horizon year incorporates the Gateway Program improvements currently underway through the Highway 1 corridor, the Evergreen Light Rail Transit Line, the South Fraser Perimeter Road, and other committed projects throughout the region. Travel demand patterns and traffic flows for 2015 have been derived from the model, consistent with the base year (2011) analyses methodology. As part of this travel demand forecasting exercise, scenarios with and without the proposed United Boulevard Extension were tested to show the potential effects associated with this critical element of the North Fraser Perimeter Road corridor. The United Boulevard Extension was modelled as a four lane connection between and United Boulevard and with all movements permitted between the two facilities. To isolate the effects pertaining directly to the United Boulevard Extension, no improvements to the Pattullo Bridge or other elements of the NFPR were included in this set of analysis. The traffic pattern results of the 2015 analysis, with and without the United Boulevard Extension, are illustrated in Exhibits 7 to 10 where as the associated traffic flow diagrams are depicted in Exhibits 11 to 14. Key observations from these exhibits and those related to the existing conditions previously described in Section 2 are noted as follows: Traffic Patterns (Exhibits 7 to 10) The forecast origin destination patterns in the AM peak period without the United Boulevard Extension in place are very similar to existing conditions, with slightly less interaction with and slightly more interaction with New Westminster. When comparing future 2015 conditions with and without the United Boulevard Extension, no significant change in traffic patterns is noted with the exception of a very slight change in destinations in the Northeast Sector and North Fraser Valley (Pitt Meadows and Maple Ridge) in the AM peak period. (See Exhibits 7 and 8) 6 A blended version of the 2011 and 2021 horizon years, adapted from the Gateway GSAM5 model. SW1132SWD May

18 North Shore / Vancouver New Westminster 10 Avenue Pitt Meadows / Maple Ridge South Surrey / Langleys Braid Street 100% 90% 80% 70% 60% 50% Highway 1 Lougheed Highway South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore United Boulevard 40% 8 Avenue Street 30% 20% 10% 0% Existing 2015 Existing 2015 No United Boulevard Extension With United Boulevard Extension New Westminster Origins for South of (Southbound) 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Destinations for South of (Southbound) Existing 2015 Existing 2015 No United Boulevard Extension With United Boulevard Extension South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore New Westminster Existing and 2015 AM Southbound Travel Patterns With and Without UBE (All Vehicles) Exhibit 7

19 North Shore / Vancouver New Westminster 10 Avenue Pitt Meadows / Maple Ridge South Surrey / Langleys Braid Street 100% 90% 80% 70% 60% 50% Highway 1 Lougheed Highway South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore United Boulevard 40% 8 Avenue Street 30% 20% 10% 0% Existing 2015 Existing 2015 No United Boulevard Extension With United Boulevard Extension New Westminster Destinations for South of (Northbound) 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Origins for South of (Northbound) Existing 2015 Existing 2015 No United Boulevard Extension With United Boulevard Extension South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore New Westminster Existing and 2015 AM Northbound Travel Patterns With and Without UBE (All Vehicles) Exhibit 8

20 North Shore / Vancouver New Westminster 10 Avenue Pitt Meadows / Maple Ridge South Surrey / Langleys Braid Street 100% 90% 80% 70% 60% 50% Highway 1 Lougheed Highway South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore United Boulevard 40% 8 Avenue Street 30% 20% 10% 0% Existing 2015 Existing 2015 No United Boulevard Extension With United Boulevard Extension New Westminster Origins for South of (Southbound) 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Destinations for South of (Southbound) Existing 2015 Existing 2015 No United Boulevard Extension With United Boulevard Extension South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore New Westminster Existing and 2015 PM Southbound Travel Patterns With and Without UBE (All Vehicles) Exhibit 9

21 North Shore / Vancouver New Westminster 10 Avenue Pitt Meadows / Maple Ridge South Surrey / Langleys Braid Street 100% 90% 80% 70% 60% 50% Highway 1 Lougheed Highway South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore United Boulevard 40% 8 Avenue Street 30% 20% 10% 0% Existing 2015 Existing 2015 No United Boulevard Extension With United Boulevard Extension New Westminster Destinations for South of (Northbound) 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Origins for South of (Northbound) Existing 2015 Existing 2015 No United Boulevard Extension With United Boulevard Extension South Surrey / Langleys Pitt Meadows / Maple Ridge Vancouver / North Shore New Westminster Existing and 2015 PM Northbound Travel Patterns With and Without UBE (All Vehicles) Exhibit 10

22

23

24

25

26 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY In the PM peak period, the forecast origin destination patterns are also very similar to the existing conditions with slightly less interaction with and slightly more interaction with New Westminster and. A comparison of the 2015 conditions with and without the United Boulevard Extension indicates that again the origin destination patterns remain constant to the existing patterns with possibly a very slight increase in traffic destined to New Westminster in the southbound direction and an equally slight decrease in traffic destined to. (see Exhibits 9 and 10) Traffic Flow Diagrams - Southbound Traffic Flows Without the United Boulevard Extension in place, traffic flow destinations remain very consistent with those of 2011 during the AM peak period, with marginally higher flows to Stewardson Way and New Westminster, and marginally lower flows across the Pattullo Bridge. In the PM peak period, slightly higher traffic flows to New Westminster are noted with a similar decrease in traffic destined to Stewardson Way. (Exhibit 5 vs Exhibit 11). Traffic origins in the AM peak period shift slightly with the Highway 1 contribution increasing from 19% to 21% while the contribution decreases from 54% to 50%, and the United Boulevard contribution decreases marginally from 7% to 6%. In the PM peak period, a similar shift in traffic origins occurs between Highway 1 and, but to a lesser extent, and the United Boulevard contribution increases marginally from 8% to 11%. (Exhibit 5 vs Exhibit 11) When including the United Boulevard Extension, the contribution of traffic originating from United Boulevard during the AM peak period is forecast to increase from 6% to 18% as compared to the situation without the United Boulevard Extension. A slight decrease in the contributions from Highway 1 and are also noted. In the PM peak period, the contribution of traffic from United Boulevard is forecast to increase from 11% to 16% with a slight decrease in the contribution from. (Exhibit 11 vs Exhibit 12) Traffic flow destinations during the AM peak period also remain very consistent between the with and without scenarios with the United Boulevard Extension causing only a marginal increase in traffic to New Westminster offset by a similar decrease in traffic to Stewardson Way. In the PM peak period, the inclusion of the United Boulevard Extension results in a slight increase in traffic destined to the Pattullo Bridge with this increase offset by a similar decrease destined to Stewardson Way. (Exhibit 11 vs Exhibit 12) SW1132SWD May

27 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY Traffic Flow Diagrams Northbound Traffic Flows Without the United Boulevard Extension, the 2015 AM peak period forecasts indicate an increase in the contribution of traffic from New Westminster and Stewardson Way as compared to the traffic flow patterns in The contribution from the Pattullo Bridge decreases from 52% to 42% during this same period. In the PM peak period, the contribution of traffic from the Pattullo Bridge decreases from 24% to 20% with slight increases in the contribution from New Westminster and Stewardson Way. (Exhibit 6 vs Exhibit 13) The destinations of traffic during the AM peak period also change with Highway 1 showing an increase from 33% to 39% while minor decreases are anticipated for traffic destined to, United Boulevard, and North Road. In the PM peak period, traffic destined to Highway 1 is forecast to increase from 35% to 38% with a no change in the traffic destined to United Boulevard. Marginal decreases in the proportion of traffic destined to and North Road are forecast. (Exhibit 6 vs Exhibit 13) When the United Boulevard Extension is included, the contribution of traffic from New Westminster, Stewardson Way, and the Pattullo Bridge remains relatively constant with the both the AM and PM traffic flow patterns associated with the condition that does not include the United Boulevard Extension. (Exhibit 13 vs Exhibit 14) In terms of destinations, including the United Boulevard Extension results in an increase in the traffic flow to United Boulevard from 18% to 36% in the AM peak period as compared to the scenario without the United Boulevard Extension. During this same period, traffic destined to Highway 1 is forecast to decrease from 39% to 31% and a similar decrease in forecast for traffic destined to. In the PM peak period, the inclusion of the United Boulevard Extension results in an increase in the proportion of traffic destined to United Boulevard from 9% to 26%.. The proportion of traffic destined to Highway 1 is forecast to decrease by 8% and the proportion of traffic destined to is forecast to increase by 1% as a result of including the United Boulevard Extension. (Exhibit 13 vs Exhibit 14) Thus, despite the large transportation projects such as the Port Mann / Highway 1 improvements, the South Fraser Perimeter Road, and the Evergreen Line coming on stream, it can be seen that the NFPR (with and without the United Boulevard Extension) will remain a key corridor serving high levels of travel demand associated with the previously identified desire lines. SW1132SWD May

28 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY 4.0 EFFECTS OF SOUTH FRASER PERIMETER ROAD Although the South Fraser Perimeter Road was included in the analysis conducted in the previous section, concerns have been raised that the North Fraser Perimeter Road is redundant in the context of South Fraser Perimeter Road. These concerns relate primarily to the indirect connectivity between the Port Mann Bridge river crossing and the SFPR and that if improved, traffic would be diverted from the NFPR and the Pattullo Bridge. The closest connection between the SFPR and the Port Mann Bridge river crossing is currently planned at Highway 15 (176 Street). An improved connection would likely involve a direct route from the SFPR to the Port Mann Bridge river crossing immediately west of the 152 Street interchange along Highway 1. This direct route, as modelled, would involve a facility with long steep gradients to overcome the significant elevation difference between the SFPR and the Port Mann Bridge. In addition, extensive property impacts would likely occur in the adjacent neighbourhoods in order to provide this additional connection to Highway 1. By providing a direct connection between the SFPR and the Port Mann Bridge river crossing, it is envisioned that the key desire lines identified in the previous sections would be deflected into north Surrey as shown in Figure 2, with actual traffic flows being accommodated along the new SFPR. Figure 2: Proposed Deflection of NFPR Corridor Desire Lines SW1132SWD May

29 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY In order to address these concerns, a diversion analysis of travel demand in the NFPR corridor has been completed to clarify whether the SFPR corridor can in fact serve the same travel demand patterns / desire lines as the NFPR. This analysis was conducted with the Gateway GSAM model noting that a six lane Pattullo Bridge (with tolls and direct connections to the SFPR) was included. The United Boulevard Extension project with four lanes and full movements was also included in this analysis. The forecast diversion on Columbia Street south of and on the Pattullo Bridge with a direct connection between the South Fraser Perimeter Road and Highway 1 at the Port Mann Bridge river crossing is summarized in Table 3, below. Table 3 Diversion Analysis (all vehicles) Link Direction 2031AM Diversion (%) 2031PM Pattullo Bridge East Columba Street South of Eastbound -3.4% -1.1% Westbound -1.7% -4.7% Northbound -0.1% -0.5% Southbound -2.4% -1.0% It can be seen from the table that a direct connection between SFPR and the Port Mann Bridge has little impact on traffic volumes on either the NFPR corridor south of or the Pattullo Bridge. The circuitous routing required for the current major NFPR traffic flows to use the Port Mann Bridge is clearly a major deterrent to diversion away from the NFPR corridor. This model analysis indicates that the NFPR remains more attractive to traffic with specific destinations on the north side of the Fraser River even with an improved connection between the SFPR and Highway 1 (at the Port Mann Bridge) and demonstrates that traffic patterns on the NFPR West Corridor are independent of the traffic patterns associated with the planned improvements on the south side of the Fraser River. SW1132SWD May

30 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY 5.0 PROPOSED IMPROVEMENTS & ANTICIPATED BENEFITS Proposed improvements to the North Fraser Perimeter Road have been identified in the NFPR Corridor West Definition Report (Delcan Draft Oct. 2009). The proposed improvements have been developed to reflect the role and function definition for the corridor, and to respond to the inconsistencies between the existing road segments as well as the specific deficiencies noted in Table 1. Multiple improvement options were considered for the segment of the corridor containing the proposed United Boulevard Extension and for the Front Street segment of the corridor. For these two segments, the recommended improvements have been selected on the basis of a Multiple Accounts Evaluation. The recommended improvements for the New Westminster segment of the NFPR corridor are summarized below and graphically depicted in Exhibit 15: Route Improvements United Boulevard Extension Front Street improvements (Downtown New Westminster) Front Street widening to four lanes along Pattullo Bridge / Rail Bridge area Intersection Improvements Upgraded intersection at Royal Avenue / Stewardson Way Upgraded intersection at Front Street / Columbia Street (West) Upgraded intersection at Front Street / Columbia Street East Upgraded intersection at Columbia Street / Intersection Upgraded intersection at Spruce Street / Intersection Other Improvements Access management along the corridor Road / rail grade separation on NFPR / Front Street New 6 th Street Overpass to the waterfront new accessible Hyack Square pedestrian overpass SW1132SWD May

31 Ongoing study of Proposed United Boulevard Extension Highway 1 Lougheed Highway / E Columbia Street Intersection Improvement Connections to Pattullo Bridge to be determined McBride Boulevard East Columbia Street / Spruce Street Intersection Improvement Front Street / Columbia Street Intersection Improvement (Assuming Replacement of Pattullo Bridge) Widening of Front Street to 4-Lanes (Assuming Replacement of Pattullo Bridge) Queensborough Bridge Widening of Front Street to 4-Lanes (Assuming Replacement of Pattullo Bridge) Stewardson Way Access Management Royal Avenue Columbia Street Front Street Pattullo Bridge New 6th Street Overpass New Hyack Square Pedestrian Overpass Front Street / Columbia Street Intersection Improvement Stewardson Way / Royal Avenue Intersection Improvement North Fraser Perimeter Road West Corridor - Proposed Improvements Exhibit 15

32 NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY A fundamental aspect of the proposed improvements to the North Fraser Perimeter Road corridor is that no additional lanes are being added to the corridor. It is important to note that while the recommended improvements include widening the Front Street segment of the corridor to accommodate a four lane cross section, these additional lanes replace the lanes previously removed from Columbia Street. Anticipated Benefits from proposed NFPR Improvements The combination of route improvements, intersection reconfigurations and upgrades will improve trip reliability and safety as well as reduce congestion levels and related vehicle emissions (eg. GHGs). Cross section consistency in combination with reconfigured intersections to permit the continuity of the through movements along the NFPR corridor is anticipated to improve the operational efficiency and safety of the existing facility. The improvements to the various intersections will assist in distributing traffic more evenly along the corridor as opposed to the existing situation with extensive queuing at poorly performing intersections. Traffic flow in the corridor will be moderated by these existing signalized intersections, thus minimizing the effects of increased traffic flow in any one segment of the corridor. The United Boulevard Extension will further improve the goods movement connection between the and. The United Boulevard Extension will ease the congestion at the Braid Street / intersection, and allow for more efficient traffic flow for travel across Highway 1 at the Interchange and King Edward Street overpass. In summary, the NFPR is an established and regionally significant component in the Metro Vancouver road network, serving a high volume of goods movement traffic. Improvements to this corridor are critical for economic reasons and will enhance safety for all users. SW1132SWD May

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015

MEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015 MEMORANDUM To: VDOT Northern Virginia District From: I-66 Project Team Date: November 5, 2015 Subject: Open Section Background The purpose of this technical memorandum is to provide narrative and technical

More information

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905) !" # $ !" # $ Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) 882-4100 Fax: (905) 882-1557 www.itransconsulting.com November 2009 %&'('$&$ 1. West Brampton Road Network...

More information

South of Fraser Transportation Priorities March 2017 Engagement

South of Fraser Transportation Priorities March 2017 Engagement March 20 Engagement Welcome to the South of Fraser Transportation Priorities Engagement A robust and reliable highway network is needed to serve the needs of a growing population and diverse economy. The

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project SEPTEMBER 2013 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new three-berth container terminal in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot equivalent

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project JULY 2018 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority Need

More information

Roberts Bank Terminal 2 Project

Roberts Bank Terminal 2 Project OCTOBER 2012 Roberts Bank Terminal 2 Project The Roberts Bank Terminal 2 Project is a proposed new multi-berth container terminal at Roberts Bank in Delta, B.C. that would provide 2.4 million TEUs (twenty-foot

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report II. EXISTING CONDITIONS A. INTRODUCTION The Route 107 study area extends from the south at Chestnut Street in Lynn approximately 3.7 miles to the north to Boston Street in Salem. The study area has three

More information

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007 June 15, 2007 Mr. Gary Stobb, P.E. Director of Planning/Operations Harris County Toll Road Authority 330 Meadowfern, Suite 200 Houston, TX 77067 Re: Westpark Tollway Value Pricing Analysis Dear Mr. Stobb:

More information

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii

More information

Pattullo Bridge Replacement Project

Pattullo Bridge Replacement Project FEBRUARY 2019 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

KING STREET TRANSIT PILOT

KING STREET TRANSIT PILOT KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS TRANSIT RIDERSHIP TRANSIT CAPACITY To respond to this growth in ridership, the TTC has increased the capacity of

More information

FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC BUILDING 9 THE BREWERY DISTRICT JOIN :

FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC BUILDING 9 THE BREWERY DISTRICT JOIN : East Columbia Street (13,451 VPD) JOIN : FOR LEASE 773 SF TO 2,500 SF UNITS AVAILABLE AT THE BREWERY DISTRICT NEW WESTMINSTER, BC Northgate Village Lougheed Mall BUILDING 9 Austin Avenue Lougheed Highway

More information

Watts St westbound thru

Watts St westbound thru Executive Summary At the request of the Hudson Square Business Improvement District, Sam Schwartz Engineering, DPC (Sam Schwartz) has completed a technical analysis of various congestion pricing and/or

More information

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY Final Report Research Project Agreement No. T1803, Task 4 HOV Monitoring V HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY by Jennifer Nee TRAC Research Engineer John Ishimaru TRAC Senior

More information

Assessment of Travel Trends

Assessment of Travel Trends I - 2 0 E A S T T R A N S I T I N I T I A T I V E Assessment of Travel Trends Prepared for: Metropolitan Atlanta Rapid Transit Authority Prepared by: AECOM/JJG Joint Venture Atlanta, GA October 2011 General

More information

FINAL TERMINAL TRAFFIC MONITORING STUDY

FINAL TERMINAL TRAFFIC MONITORING STUDY FINAL TERMINAL 91 216 TRAFFIC MONITORING STUDY Prepared for: Port of Seattle February 15, 217 Prepared by: 12131 113 th Avenue NE, Suite 23 Kirkland, WA 9834-712 Phone: 425-821-3665 www.transpogroup.com

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and

More information

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation

More information

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Mercer SCOOT Adaptive Signal Control Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017 Our mission, vision, and core values Mission: deliver a high-quality transportation system for Seattle Vision: connected

More information

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2 Job No. 15-019 Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION... 4 2.0 EXISTING CONDITIONS... 5 3.0 TRAFFIC GENERATION... 7 4.0 TRIP DISTRIBUTION... 8 5.0 FUTURE CONDITIONS... 8 6.0 SITE ACCESS...13 7.0 CONCLUSION...13

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP).

At the time, the portion of the line through Eagle County remains wholly under the ownership of Union Pacific Railroad (UP). Chapter 5 The Railroad Corridor as a Trail Corridor The intent of this chapter is to identify how the rail corridor, if available for lease or purchase in all or part, could be incorporated into the core

More information

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Project Deliverable 4.1.3d Individual City Report - City of La Verne Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

B. Congestion Trends. Congestion Trends

B. Congestion Trends. Congestion Trends B. Congestion Trends Congestion Trends There are two types of congestion that impact mobility: recurring and non-recurring congestion. Recurring congestion is related to segments of roadway that are over

More information

Public Information Meetings. October 5, 6, 7, and 15, 2015

Public Information Meetings. October 5, 6, 7, and 15, 2015 Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound

More information

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017 Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project Community Engagement November 15, 2016 to January 15, 2017 Engagement Summary Report February 2017 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada

More information

Ministry of Transportation

Ministry of Transportation This report is prepared for the sole use of Ministry of Transportation. No representations of any kind are made by Urban Systems Ltd. or its employees to any party with whom Urban Systems Ltd. does not

More information

UBC RAPID TRANSIT OPINION STUDY RESULTS. January 2019

UBC RAPID TRANSIT OPINION STUDY RESULTS. January 2019 UBC RAPID TRANSIT OPINION STUDY RESULTS January 2019 UBC RAPID TRANSIT OPINION STUDY RESULTS In field November 14 20, 2018 Conducted by Research Co. (Mario Canseco) Online survey of 1,900 adults in Metro

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

Traffic Analysis Final Report

Traffic Analysis Final Report SR-71 Widening Project Project Approval/Environmental Documentation Traffic Analysis Final Report Prepared for Caltrans District 7 August 2012 6 Hutton Centre Drive, Suite 700 Santa Ana, California 92707

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019

ateway NOW UNDER CONSTRUCTION! 1777 Clearbrook Road Abbotsford, BC 65,000 SF in Building 1 Available Q ,229 SF in Building 2 Available Q2 2019 Abbotsford, BC 65,000 SF in Available Q 209 33,229 SF in Available Q2 209 NOW UNDER CONSTRUCTION! CHRIS MORRISON, Executive Vice President 604 66 085 chris.morrison@colliers.com VITO DECICCO, Senior Vice

More information

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS Draft Environmental Impact Statement/Environment Impact Report Appendix H Milestone 2 Traffic Operations Analysis of the At-Grade Crossings APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE

More information

Lansdowne Wetton BRT Public Transport Corridor Trunk Route: Planning Analysis

Lansdowne Wetton BRT Public Transport Corridor Trunk Route: Planning Analysis Lansdowne Wetton BRT Public Transport Corridor Trunk Route: Planning Analysis 1. Introduction The purpose of this report is to detail the planning evaluation for the trunk route alignment alternatives

More information

V. DATA COLLECTION PROGRAM

V. DATA COLLECTION PROGRAM V. DATA COLLECTION PROGRAM As discussed in Section IV, an extensive data assembly and data collection program was undertaken to develop the data necessary to calibrate the existing Portway Extensions model

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW 7272 LOCAL AREA TRANSPORTATION REVIEW AND TRANSPORTATION POLICY AREA REVIEW MONTGOMERY COUNTY, MARYLAND Submitted on behalf of Carr Properties Prepared by: Wells + Associates, Inc. Submission: July 1,

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS

More information

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018 MEMORANDUM TO: Bob Zagozda, Chief Financial Officer Westside Community Schools FROM: Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig DATE: June 11, 218 6-11-18 SUBJECT: Sunset Hills Elementary School

More information

DISTRICT BREWERY 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT. Join: Layla Vera

DISTRICT BREWERY 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT. Join: Layla Vera 1,000 SF - 17,000 SF AVAILABLE FOR LEASE AT Derick Fluker* 604 638 2125 dfluker@form.ca *Personal Real Estate Corporation Jack Allpress* 604 638 1975 jallpress@form.ca Layla Vera 604 398 4352 lvera@form.ca

More information

ROUTE 20 CORRIDOR STUDY ---- Orange County, Virginia

ROUTE 20 CORRIDOR STUDY ---- Orange County, Virginia ROUTE 20 CORRIDOR STUDY ---- Orange County, Virginia Prepared by PARSONS Fairfax, Virginia on behalf of the: Rappahannock-Rapidan Regional Commission in cooperation with Orange County, Virginia Virginia

More information

UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT

UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT UNION STATION ACCESS AND CAPACITY IMPROVEMENT STUDY PROJECT REPORT Washington Metropolitan Area Transit Authority Department of Planning and Joint Development In Association with District of Columbia Department

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Score. Category. Access Aesthetics Community Resources

Score. Category. Access Aesthetics Community Resources NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

8.01 MEMORA DUM. Mayor and Council. Steven Lan, P.Eng., Director of Engineering. March 31, Pattullo Bridge Replacement Update /PBR

8.01 MEMORA DUM. Mayor and Council. Steven Lan, P.Eng., Director of Engineering. March 31, Pattullo Bridge Replacement Update /PBR MEMORA DUM 8.1! I The Corporation of Delta Engineering To: From: Date: Subject: File No.: CC: Mayor and Council Steven Lan, P.Eng., Director of Engineering March 31, 214 Pattullo Bridge Replacement Update

More information

APPENDIX A: SCREENLINE SURVEY STATION DETAILS

APPENDIX A: SCREENLINE SURVEY STATION DETAILS and Count Details APPENDIX A: SCREENLINE SURVEY STATION DETAILS Table 12 expands on the Quick Facts in Table 1 by providing count details for all screenlines as well as individual stations. The following

More information

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys 1 Summary of 2015 BBTCA Traffic and Passenger Surveys Surveys of traffic volumes and pedestrian activity were

More information

10.0 Recommendations Methodology Assumptions

10.0 Recommendations Methodology Assumptions 10.0 Recommendations To accommodate the projected growth of the I-526 corridor, this report has summarized potential improvement strategies that were separated into four categories, TDM, Modal, Traffic

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS

More information

Appendix B Connecting Track Options Evaluation Criteria

Appendix B Connecting Track Options Evaluation Criteria Appendix B Connecting Track Options Evaluation Criteria 608979-853_ra_July5-0_App Title Pages.Docx TTC ASHBRIDGES BAY MAINTENANCE AND STORAGE FACILITY CONNECTING TRACK ROUTE ALTERNATIVE - EVAULATION MATRIX.0

More information

PUBLIC INFORMATION SESSION #2

PUBLIC INFORMATION SESSION #2 Highway 16, Highway 779 to Kapasiwin Road, Planning Study PUBLIC INFORMATION SESSION #2 Wednesday June 20, 2012 4 to 8 pm HIGHWAY 16 Highway 779 to Kapasiwin Road Functional Planning Study Blueberry Community

More information

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) 2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) TABLE OF CONTENTS Introduction 1 Transportation Planning Activities 2 Identification of Problem Areas and Recommended Solutions 7 DeKalb County Projects

More information

Eleven things you should know about the carpool lanes in Los Angeles County.

Eleven things you should know about the carpool lanes in Los Angeles County. Eleven things you should know about the carpool lanes in Los Angeles County. Los Angeles County Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA 912 COMPANY NAME Street Address City,

More information

CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand

CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE 26 th Australasian Transport Research Forum Wellington New Zealand 1-3 October 2003 By, Manager Strategic Policy, Transit New Zealand Abstract New Zealand

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

rtc transit Before and After Studies for RTC Transit Boulder highway UPWP TASK Before Conditions

rtc transit Before and After Studies for RTC Transit Boulder highway UPWP TASK Before Conditions rtc transit Before and After Studies for RTC Transit UPWP TASK 3403-11-14 Before Conditions Report Boulder highway June 2011 Before and After Studies for RTC Transit BOULDER HIGHWAY BEFORE STUDY UPWP Task

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time. PREFACE The Florida Department of Transportation (FDOT) has embarked upon a statewide evaluation of transit system performance. The outcome of this evaluation is a benchmark of transit performance that

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

This report recommends two new TTC transit services in southwest Toronto.

This report recommends two new TTC transit services in southwest Toronto. Report for Action New TTC Services - Southwest Toronto Date: March 20, 2018 To: TTC Board From: Chief Customer Officer Summary This report recommends two new TTC transit services in southwest Toronto.

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: March 23, 2018 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 4/10/18 Board Meeting: San Francisco Freeway Corridor Management Study Update

More information

Construction Staging Adelaide Street West

Construction Staging Adelaide Street West REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN

Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN by John M. Ishimaru Senior Research Engineer Duane Wright Systems Analyst Programmer Mark E. Hallenbeck Director Jaime Kang Research

More information

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan Welcome The objectives of this open house are to: Share information on the new investments and funding proposed for the Phase Two Plan Gather feedback from people across the region about the Phase Two

More information

PERFORMANCE MEASURE INFORMATION SHEET #16

PERFORMANCE MEASURE INFORMATION SHEET #16 PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days

More information

HOPEWELL DISTRIBUTION CENTRE

HOPEWELL DISTRIBUTION CENTRE HOPEWELL DISTRIBUTION CENTRE PHASE IV - Up to 330,540 Square Feet Available for Lease DARREN CANNON* 604 662 2637 darren.cannon@colliers.com STUART MORRISON* 604 662 2676 stuart.morrison@colliers.com ANDREW

More information

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

TransAction Overview. Introduction. Vision. NVTA Jurisdictions Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments

More information

RAY YENKANA Willowbrook Cr, Dawson Creek BC Canada $2,847,000

RAY YENKANA Willowbrook Cr, Dawson Creek BC Canada $2,847,000 1716 Willowbrook Cr, Dawson Creek BC Canada For SALE $2,847,000 This is a rare find, 32 townhomes in Dawson Creek, BC. Excellent investment in a single title multi family complex. Vendor has upgraded this

More information

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY AAPA Marine Terminal Management Training Program September 18, 2015 Tom Corsie, PPM Vice-President, Real Estate TODAY S AGENDA

More information

Project Deliverable 4.1.3f Individual City Report - City of San Dimas

Project Deliverable 4.1.3f Individual City Report - City of San Dimas Pomona Valley ITS Project Project Deliverable 4.1.3f Individual City Report - City of San Dimas Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY RSAT RUNUP ANALYSIS 1. INTRODUCTION The FAA Runway Safety Action Team (RSAT) is a team of FAA staff that works with airports to address existing and potential runway safety problems and issues. The RSAT

More information

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011.

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011. MEMORANDUM Date: January 12, 2012 To: Congestion Management Process Files From: Seth Asante, Ryan Hicks, and Efi Pagitsas MPO Staff Re: Historical Trends: Travel Times and Vehicle Occupancy Levels for

More information

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

ROUTE 630 DIVERGING DIAMOND INTERCHANGE ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,

More information

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL. Project No. 121-22908 N o v e m b e r 2 0 1 2 Traffic Impact Study Transportation Planning th GENIVAR Inc., 600 Cochrane Drive, 5 Floor, Markham, Ontario L3R 5K3 Telephone: 905.475.7270 Fax: 905.475.5994

More information

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,

More information