Size: px
Start display at page:

Download "Capital Budget - Requested Action"

Transcription

1 Don Hoch Director STATE OF WASHINGTON WASHINGTON STATE PARKS AND RECREATION COMMISSION 1111 Israel Road S.W. P.O. Box Olympia, WA (360) TDD Telecommunications Device for the Deaf: July 12, 2018 Item E-8: Capital Budget - Requested Action EECUTIVE SUMMARY: This item asks the Washington State Parks and Recreation Commission to approve a capital budget request level, proposed project list, resolution on an Anderson Lake State Park multi-use trail, and authorization for the Director to submit a biennium capital budget proposal to the Office of Financial Management substantially consistent with those approvals. This item advances the Commission s strategic goal: Develop amenities and acquire lands that advance transformation. SIGNIFICANT BACKGROUND INFORMATION: Previous Commission Involvement At its November 2017 regular meeting, the Commission approved a set of principles to guide development of the Ten-Year Capital Plan and biennial budget request (Appendix 1). Key among the principles was a determination to move the system s facility condition to an overall grade of B (80% Facility Condition Index) within ten years. The B grade goal was an acceleration from last biennium s goal to achieve that grade in 15 to 20 years. These principles, along with the Commission s other adopted strategic guidance (e.g., Acquisition and Development Strategy and 2016 update to the Strategic Plan), form the basis for development of the Capital Budget request. The Director further refined staff s direction to include the following capital budget targets that came out of the Commission s action: Aim for an 80% preservation and 20% programmatic mix of projects funded in the capital construction account (057 Account) Set a capital construction account request level at about $110 million and aim for $10 million in grants. At its May 2018 regular meeting, the Commission heard a progress report on candidate project lists and priorities. Staff provided the Commission with criteria for project ranking, as well as the following four pre-ranked criteria under which projects were automatically included in the biennial capital request: Projects needing re-appropriation (projects that have already been funded and started but not completed) Projects that follow-up phases of previously approved projects (construction phase of a previously designed and permitted project) 1

2 Projects that are critical (projects that are required to keep a park or portion of a park open due to risk of facility failure) Statewide projects (projects the Commission has already committed to and take place in multiple parks). A Distinctive Year of Challenges The legislature s unprecedented failure to pass a capital budget until nine months after the scheduled end to its 2017 Regular Session, resulted in a unique set of challenges for the capital program. The program was required to first lay off staff and then try to rehire those staff still available and interested in working for the agency. The task of fully hiring staff to meet this biennium s existing needs is still underway. Combined with the nearly $500 million maintenance backlog, an expanded emphasis on multi-biennial phased projects, and the Commission-established principles identified above, it quickly became clear that the list of preranked projects (See Table 1) would exceed the agency s average historical capital budget, which has generally been funded in the $50 to 70 million range. Table 1: Proposed Pre-Ranked Categories and Budget Amounts in Staff- Recommended Capital Budget Pre-Ranked Category Proposed Budget Re-Appropriations $19,817,000 Projects with Previous Phases $28,640,000 Critical Projects $11,550,000 Statewide Priority Projects $15,388,000 Total Pre-Ranked $75,395,000 $36,505,000 in other projects = Total Capital budget of $111,900,000 Given about $110 million ceiling in requests, that left about $31million worth of additional projects to be prioritized. Project Ranking Criteria Nevertheless, regional parks staff developed and prioritized capital projects under the following criteria: 1. Acquisition and Development Strategy goals 2. Guiding Principles for All Projects 3. Recreation Experience 4. Visitation 5. Fiscal Impact 6. Urgency of Project 7. Facility Condition 8. Natural Resources Condition 9. Historic Property Condition 10. Interpretation/Educational Opportunities 2

3 11. Environmental Regulatory Viability and Ease of Regulatory Compliance 12. Cultural Resource Condition 13. Partnerships and Community Support After the initial regional prioritization effort, headquarters and region staff went through several iterations of analysis and project definition to get to the list that it is recommending to the Commission. See Appendix 2 for the Staff Recommended Capital Budget Request. Appendix 3 contains a more complete list of capital projects, including those that did not make the cutline. These out year projects form the basis for the agency s Ten-Year Capital Plan along with additional concept-only projects that are bundled under the category 2029 to 39. Both these documents together provide a picture of the relationship between the upcoming biennial budget request and the Commission s longer-term capital strategy. Anderson Lake State Park Multi-Use Trail When reviewing hundreds of candidate projects, priorities emerge, in part, based on timeliness for execution. The Peninsula Trails Coalition (PTC) has proposed that State Parks construct a leg of a long-distance multi-use non-motorized trail that would pass through Anderson Lake State Park and link up with the Olympic Discovery Trail and the Pacific Northwest National Scenic Trail. This project is consistent with previous Commission actions. Yet, the PTC has not yet secured the necessary rights-of-way to assure that a State Parks investment would be able to tie in to other portions of the trail. Staff is thus recommending a special Commission resolution (Appendix 4) be passed that gives encouragement for PTC efforts to secure the rights-of-way and assurance of a Commission funding request once those rights are secured. Expenditures and Anticipated Outcomes Appendices 5, 6, and 7 provide further context to the budget recommendations for the biennium. Appendix 5 breaks down projected ten-year capital expenditures by a set of investment criteria established by the Director. Appendix 6 contains a list of potential grant projects over the next ten years. Appendix 7 displays a quantitative listing of ten-year outcomes down to the facility level. Finally, as context for biennial capital investment, staff has compiled a list of anticipated outcomes for the ten-year list of prioritized capital projects tied to the 2016 Commission-adopted Acquisition and Development Strategy. The Strategy established five fundamental goals the Commission wished to advance through acquiring land and developing park facilities. In addition to dramatically improving the condition of facilities, staff anticipates that full support and funding of the proposed Ten-Year Capital Plan will yield key outcomes in each of the Commission s five adopted goals, which are highlighted below: Places to be: Connecting people with Washington s iconic landscapes Constructs two new state parks on major existing land holdings Constructs initial public access to four previously acquired properties Stories to know: Engaging people in authentic Washington stories Constructs a new interpretive center at Sun Lakes-Dry Falls State Park to tell the story of the ice age floods, a new interpretive center at Fort Casey to tell the story of the coastal 3

4 defense system, and fully renovates interpretive centers at Ginkgo-Wanapum, Spokane House, Fort Columbia, Federation Forest, and Bowman Bay at Deception Pass, all of which had not been renovated for a quarter century or more. Preserves 25 percent (190 of 754) of the higher priority historic structures in the state park system Provides relevant contemporary interpretation at all 16 State Park Heritage Sites Provides a destination interpretive feature in every park area Constructs utility infrastructure to support cultural events and festivals in suitable parks Things to do: Providing Washington s recreational mainstays Constructs 1 new campground with about 100 campsites Renovates 15 existing campgrounds with about 1400 refurbished campsites Constructs 50 cabins, yurts, platform tents, and other roofed accommodations with state capital funds and more than 100 through private/partner investment. Ways to grow: Inviting novices to experience Washington s outdoors Redevelops day-use areas in 35 parks Provides improved universal access for people with disabilities to the principal feature and suitable support facilities in 45 parks Improves 50 miles of long-distance trails Something for everyone: Improving the quality of life for all Washingtonians Corrects all significant barriers to fish passage on agency-owned lands Treats 2000 acres of forest lands to reduce risk of fire and pest infestation Generates an estimated about $110 million of increased annual statewide economic activity from a base of over $800 million per year. Operating impacts Operating impact analysis from the proposed capital project list is ongoing. Upon adoption of the list by the Commission, operating impacts will be incorporated into the Operating Budget request. STAFF RECOMMENDATION: Staff recommends about $110 million capital budget request for the biennium. Together with the agency s operating budget, this request will continue to move the state park system toward a healthy and sustainable condition. Staff recommends that the Commission approve the proposed capital project priorities as described in Appendix 2, allowing the Director to make minor modifications due to refined project scoping and cost estimates. These are projects that staff believe can be realistically completed with the resources the agency can align to the task. Given the agency s capital appropriation history, the current economic climate, and legislative trends, it is expected to be a great challenge to secure gubernatorial and legislative support for a package of this size. 4

5 Staff recommends the Commission authorize the Director to submit the proposed Capital Budget Request per the Office of Financial Management s Capital Budget Instructions. In addition, staff recommends that a document be prepared that describes the proposed capital projects and suitably conveys the need and rationale for the Commission s capital budget request. LEGAL AUTHORITY: RCW 79A Powers and Duties - Mandatory SUPPORTING INFORMATION: Appendix 1: Ten-Year Capital Plan Guiding Principles and Goals Appendix 2: Staff Recommended Capital Project List Appendix 3: Plus Out Years Capital Project List Appendix 4: Anderson Lake State Park Multi-Use Trail Resolution Appendix 5: Capital Plan Projected Expenditures Appendix 6: Candidate Grant Projects (Not Prioritized) Appendix 7: Capital Plan Outcomes (All Facilities in Average B Condition) REQUESTED ACTION OF COMMISSION: That the Washington State Parks and Recreation Commission: 1. Approve proposed capital projects priority order, and funding level as described in Appendix Approve the resolution regarding Anderson Lake State Park Multi-Use Trail as shown in Appendix Authorize the Director to submit a capital budget proposal to the Office of Financial Management per the Capital Budget instructions generally consistent with Appendix 2; allowing the Director to make minor modifications due to refined project scoping and cost estimates. 5

6 Author(s)/Contact: Peter Herzog, Assistant Director, Parks Development (360) Daniel Farber, Capital Program Consultant (360) Reviewer(s): Jessica Logan, SEPA Review: Following review, staff has determined that the action proposed for the Commission by staff is exempt from the State Environmental Policy Act (SEPA) pursuant to WAC (19)(a). Dennis Tate, Fiscal Impact: The capital fiscal impacts to the agency will be known when there is a final project list with estimated costs. Identified operating impacts will be incorporated into the agency s biennium and future operating budget requests. Michael Young, Assistant Attorney General: June 18, 2018 Approved for Transmittal to Commission Don Hoch, Director 6

7 APPENDI 1 TEN-YEAR CAPITAL PLAN GUIDING PRINCIPLES AND GOALS November 2017 Commission Action Guiding Principles for All Projects Improve statewide facilities condition index Increase operational efficiency Advance universal access Minimize development impact and apply sustainable design strategies Respond proactively to the effects of climate change Protect natural features and systems Value historical properties and cultural sites and treat according to adopted guidelines View capital improvements from a park, area, and state perspective Consider lifecycle costs and maximize value of constructed assets. Provide recreational experiences and amenities equitably to all state residents 1 Preserve and provide access to key park aesthetics Maximize recreational and cultural benefits. Ten-Year Capital Plan Assumptions and Goals: The Washington State Parks Strategic Plan identifies the key goal of moving toward a healthy and sustainable parks system. The TYCP s role is to move the system s facilities toward a healthy and sustainable condition. Below are specific assumptions the Parks and Recreation Commission makes and goals it sets to achieve that objective by TYCP Assumptions and Goals That Do Not Have Specific Financial Measures Overall 2 Facility Condition Index (FCI) Goal: Improve the overall FCI of parks facilities from a Grade D to a Grade B in 10 years. 3 Recreation Niche: Assume no substantial change from State Parks Recreation Mainstays in the state capital budget. However, consider visitor-driven demographic and technological changes and remain open to more entrepreneurial innovation in Recreational Concession Areas (RCAs). 1 Considerations include population size, age distribution, regional variation, ethnicity, socio-economic status, etc. Special attention should be paid to efforts at inclusivity. This means the deliberate effort in park design to ease access and promote use for a full spectrum of the state s residents. This may include, for example, providing public transit access facilities in parks, providing facilities for varied recreation pursuits popular in different ethnic groups, and locating parks and facilities near urban population centers. 2 Overall FCI All facilities are included in this calculation, including buildings, roads, utilities, parking, marine facilities, etc. While the condition of some of these facilities may end up above or below the B level, the aim is for an overall average. 3 In the Capital Budget Agency Request, see the description of the strategic approach to facility condition backlog reduction. 7

8 Recognize State Population Changes: The State s population will increase and diversify dramatically over the coming 10 years and there will be other significant changes in the state s demographics to consider in park capital decisions. Level of Operating Budget: Assume that the Legislature provides adequate funds for planned and preventive maintenance of facilities in both the State Operating and Transportation budgets. Day Use Facilities Emphasis: Capital facility design should consider the importance of meeting day use visitation demand. Campground Design and Amenities: Capital facility design should reflect changes in consumer preferences with special emphasis directed toward improving off-peak occupancy rates of standard sites. High Risk of Facility Failure: As facility conditions warrant, invest where and when there is a risk of facility failure within 10 years. Natural Resources: Integrate efforts to improve the condition and resiliency of natural resources whenever feasible in conjunction with and as part of capital facility investments. Natural Disasters: Assume that any significant impacts from natural disasters are above and beyond the budgets identified in the TYCP. Assume the Federal Emergency Management Agency (FEMA) will reimburse State Parks for most if not all of those costs. 8

9 APPENDI STAFF RECOMMENDED CAPITAL PROJECT LIST Park Projected Reappropriation Amount Budget Budget Running Total 1 Statewide $100,000 $100,000 Marine Facilities Project Name Project Scope This phased project assesses, designs, permits, and constructs numerous floats and pilings at various parks. Some of these structures are coated with creosote, so the project will both increase visitor safety and improve the environment. The first biennium designs and permits improvements, with construction occurring in and out years. and out year projects are park specific from assessment, and include Blake Island, Jarrell Cove, Joemma Beach, Illahee, Fort Flagler, Sequim Bay, Lake Chelan, D-Pass (Bowman Bay pier and dock, & East Cranberry Swim dock), and Twanoh. See Projects CBS # , CBS # , and CBS # and park specific projects. Related to Puget Sound Action Agenda Implementation 2 Statewide $1,000,000 $1,100,000 Comfort Station Pilot Project (Firelight) 3 4 Illahee $200,000 $1,300,000 Replace Failing Drainfield (Minor Works - Facilities & Infrastructure) Penrose Point $100,000 $1,400,000 Sewer Improvements 5 Schafer $200,000 $1,600,000 Renovate Historic Structures (Minor Works- Facilities & Infrastructure) This phased project implements a budget proviso that states The appropriation is provided solely for a pilot program for new Firelight toilets. The commission may sole source for the equipment. The commission must operate and maintain the equipment for a minimum of two years and report annually to legislative fiscal committees on: (1) the ease of use by park patrons and (2) the cost and time to maintain the equipment. This project relocates the drainfield that is hydraulically compromised to an area with suitable disposal soils. This project replaces sewer lines on the main campus which have surpassed their expected lifespan. This project will reduce park maintenance costs. This project provides new shake roofs, log repairs, and other improvements for the historic CCC structures that are a critical asset of Schafer State Park. Replacing the roofs and those logs that have deteriorated will keep the CCC buildings in service now and preserve them for future generations. 6 7 Fort Casey $300,000 $1,900,000 ADA Improvements Battery Worth ( Minor Works) Lake Chelan $292,000 $2,192,000 Moorage Dock Pile Replacements 8 Moran $850,000 $3,042,000 Summit Learning Center - Interp. Facility 9 Lake Sammamish $2,500,000 $5,542,000 Sunset Beach Picnic Area 10 Dash Point $550,000 $6,092,000 Replace Pedestrian Bridge 11 Cape Disappointment $200,000 $6,292,000 North Head Buildings and Grounds Repairs and Improvements This project provides barrier free routes of travel between the parking areas and select areas of the park to increase accessibility and safe routes of pedestrian travel. This project replaces failing dock pilings on five docks to ensure safety of state park visitors. It has been designed and permitted in biennium. This project, in collaboration with the park s friends group, designs, permits, and constructs an interpretive facility that replaces the communications building. It makes improvements to the site on top of Mount Constitution to accommodate its use more efficiently as a learning and interpretive center. This project provides a grant match to redevelop the picnic area at Sunset Beach in Lake Sammamish State Park. The project includes one large and two smaller picnic shelters, a new lawn and trees, and a portion of a wide, paved esplanade that will eventually connect Sunset Beach to Tibbets Beach. This project is a key part of an overall redevelopment of Sunset Beach, through six phases of work which have been completed or are currently underway. This project replaces a pedestrian bridge that has been condemned due to structural failure. Replacement of the bridge will reopen a large portion of the park's trail system. This project also includes trail improvements. Designing and permitting started during the biennium. This project carries out preservation and restoration work on North Head area buildings and grounds. It is a third phase, reappropriation only project. 9

10 Park Projected Reappropriation Amount Budget Budget Running Total Project Name Cape Disappointment $2,400,000 $8,692,000 North Head Lighthouse Area Buildings and Grounds Fort Flagler $1,500,000 $3,823,000 $14,015,000 WW1 Historic Facilities Preservation Fort Worden $500,000 $5,000,000 $14,515,000 Pier and Marine Learning Center Improve or Replace Project Scope This final phase of the project preserves the historic keepers trail between the lighthouse and keepers houses, railing repairs, replacing chain link fencing with period sensitive fencing, preserving/stabilizing/rehabilitating the carriage house, garages, chicken coop, residences, south stairway to the trail, area sidewalks and the water tower, cultural landscape restoration/tree removal as well as installing a flush toilet facility at the single garage. The project also includes replacing failing secondary power from the transformers to residences and replacing failing water supply lines. Project also provides repairs to the two oil house roof structures, repairs the masonry structures, replaces stone parapet copings, and provides new doors to both buildings. It also replicates the original fence around the lighthouse. Finally, the project includes paving from the parking lot turn-around up to the garages, between the garages, and around the carriage house. This provides an ADA-accessible route to the buildings. This project preserves 22 World War I Era buildings. It is phase two of two construction phases. Fort Flagler has many intact and coherent historic military buildings. All are in advanced deterioration. It is important to stabilize and restore the structures and exterior skin including roof/gutters, siding, windows/doors, and masonry. Designs for preservation of all systems are completed with bid packages currently available. This project is a partnership with the Fort Worden Public Development Authority. Based on the outcome of the structural engineering study occurring during the biennium, the current phase designs and permits repair or replacement of the pier. If repair is not economically justified, then the pier and learning center will be replaced to enable continued use as a component of the Marine Science Center programs. Future phases include construction, including partnership participation by the PDA and MSC. 15 Fort Worden $1,500,000 $16,015,000 Replace Failing Sewer Lines 16 Willapa Hills Trail $100,000 $3,817,000 $19,932,000 Develop Safe Multi-Use Trail Crossing at SR 6 17 Kopachuck $3,500,000 $1,400,000 $1,400,000 $24,832,000 Day Use Development 18 Fort Worden $150,000 $1,500,000 $1,500,000 $26,482,000 Replace Failing Waterlines This project replaces sewer lines to maintain sewer service at the park. The sewage collection system for the main campus of Fort Worden State Park is failing and has exceeded is useful life. The first phase of this project designed and permitted a pedestrian overpass within the Willapa Hills State Park Trail right-of-way at the intersection of State Route 6 to provide a safe crossing for pedestrians, cyclists, and equestrians. The current location of the atgrade crossing is dangerous because of limited sight-distance on a curved segment of the highway. This not only poses a serious threat to park visitors, but also highway motorists. This phase constructs the overpass and associated paving to merge with existing trail standards. This project contains a major renovation of the upland day use area, as a reappropriation. The new project carries out improvements accessing the beach area. New beach facilities include a cascading boardwalk system that provides ADA access and scenic viewpoints. A new pocket beach provides safe water access for park visitors of the shoreline. Other improvements include paving the access road, a new ADA-accessible beach area restroom with outdoor shower, parking for people with disabilities and for people dropping off and picking up handheld boats, and an emergency vehicle turnaround. The project also includes relocating the popular Cascadia Marine Trail campsite. This phased project replaces the failing water system at Fort Worden State Park. The existing water system is plagued by failures and has passed its useful life-span. A new system will meet current Department of Health standards and health codes, and the practical demands of water pressure for visitors and park staff. The first biennium designs and permits the improvements, with the following biennium completing construction. 10

11 19 20 Park Projected Reappropriation Amount Budget Budget Running Total Project Name Beacon Rock $100,000 $9,050,000 $26,582,000 Entrance Road Realignment Schafer $300,000 $2,900,000 $29,782,000 Relocate Campground Project Scope This phased project realigns the vehicle entrance to the camping and day use facilities, carries out parking safety improvements in the historic central portions of the park. The current access, built in the 1930 s, has been severely impacted by increased highway traffic, higher vehicle speeds, larger vehicles, and increased park visitation. This project provides a safe entrance to existing park facilities and safer driving conditions for SR14 motorists. The first biennium includes pre-design, the second phase designs and permits the project, and the third phase constructs the improvements. The project includes replacing outdated interpretive panels. This phased project relocates the existing campground due to annual flooding, thus reducing maintenance costs and increasing visitation. The first biennium designs and permits improvements, with construction the following biennium. 21 Sun Lakes - Dry Falls $500,000 $1,350,000 $30,282,000 Sun Lakes Dry Falls Visitor's Center Development This project renovates the existing visitor's center area, including an enhanced potable water system (drill new well and some distribution ($300K)), ADA access to buildings and grounds (visitor center, restroom - $500K), historic preservation (rock wall, visitor center roof and exterior siding work, and other misc. exterior renovations - $600K), and interior and exterior interpretive enhancements ($100K). The center serves to educate visitors regarding the historic massive floods, (Missoula Ice Age Floods) which carved and formed much of Eastern Washington. Design and permit occurs during the biennium along with construction of rock wall. Remainder of construction in biennium. 22 Sun Lakes - Dry Falls $650,000 $30,932,000 Sun Lakes - Dry Falls - Upgrade Failing Water Supply Systems This project designs and constructs separation of potable and irrigation water systems. The project also prepares the documentation required by the Department of Health. The current supply lines for irrigation and potable water at Sun Lakes have evolved over time without any unifying strategy. As a result, a significant amount of irrigation is done using disinfected potable water. The average age of existing irrigation and potable water lines is over 50 years and they are nearing the end of their functional life. The significant use of potable water for irrigation is a violation of Parks domestic water rights obligations and a waste of State resources. 23 Mount Spokane $1,700,000 $32,632,000 Maintenance facility Relocation-const 24 Goldendale $750,000 $33,382,000 Observatory Enhancements Ph4 This project relocates State Park's maintenance facility from its current environmentally sensitive location to meet the Department of Fish and Wildlife requirements. The project has snow removal equipment shop with shop offices and crew area, above ground fuel storage tanks, covered sand and salt storage. New site requires new road access and utilities. This is for the construction phase of a project. This project completes a major renovation of the Observatory. Phases 3 & 4 work include major telescope and observatory improvements, new interpretive exhibition hall, new classroom/presentation spaces, parking upgrades, landscape/site improvements, facility upgrades, main building improvements, expansion of outdoor viewing areas, improved restroom facilities, gallery and administrative spaces. 25 Nisqually $3,000,000 $17,000,000 $36,382,000 New Full-Service Park This project designs, permits and constructs a new full-service park in partnership with the Nisqually Indian Tribe. Tribal financial participation is expected. In a predesign approval from OFM are secured. In, designs and permits are secured for extensions to the existing trail system, construction of a Mashel River viewpoint, first phase development of a campground and appropriate support facilities, trail development to the Nisqually River, along with construction of the trail extensions. In , the first phase campground construction is completed, along with design and permitting for the next phase of construction. In 2023 and onward, design, permitting and construction of the remainder of the park master plan concludes. 11

12 26 Park Projected Reappropriation Amount Budget Budget Running Total Statewide $150,000 $40,000,000 $36,532,000 New Park Project Name 27 Statewide $175,000 $1,200,000 $4,500,000 $37,907,000 Depression Era Structures Restoration 28 Lake Sammamish $4,000,000 $41,907,000 Sunset Beach Parking, Circulation and Esplanade Project Scope This phased project will develop a new park from existing property held by the Washington State Parks and Recreation Commission for new park development. The park to be developed will be determined through a Commission approved statewide acquisition and development strategy. Candidates include Miller Peninsula, Fisk Property, Washougal, Hoko River, Sol Duc, and the Lake Isabella property. The first biennium funding will address the OFM pre-design process. The second biennium funding will address design and permitting. Following bienniums will address construction. Which property or properties to develop will be determined through a business analysis and public process. This project preserves the most important Depression Era heritage structures in the agency. Parks for include, but are not limited to, Deception Pass, Moran, Beacon Rock, and Lewis and Clark. Specific additional parks will be identified for outyear projects. The project includes all phases of the historic preservation process including assessment, design, permitting, and construction. This project renovates the existing Sunset Beach parking area and includes significant storm drainage enhancements. It also completes extension of the esplanade from Sunset Beach to Tibbets Beach. Landscaping, site restoration, and signage are also provided, in a development which completes multiple phases of work in the Sunset Beach upland area. 29 Lake Sammamish $700,000 $42,607,000 Issaquah Creek Bridge and Loop Trail This project constructs a second Issaquah Beach Bridge and completes a riverwalk loop trail. 30 Fort Simcoe $50,000 $900,000 $900,000 $43,557,000 Historic Officers Quarters Renovation 31 Statewide $50,000 $400,000 $44,007,000 Fish Barrier removal (Lawsuit related) 32 Statewide $2,288,000 $7,674,000 $46,295,000 Fish Barriers Phase 2 work completes the renovation of four historic buildings. Prior work included foundation stabilization, structural stabilization and general repairs throughout all four buildings. Extensive restoration work is needed on the buildings wood gutters, windows need to be restored, roofs need replacement or repair and some interior work is needed on the fireplaces and rotten beams. Further delay could result in putting the structural integrity of these historic buildings in jeopardy. Add light filtering UV system. Phase 3 completes other preservation work. This project reviews performance of lawsuit-related fish barrier removals and carries out modifications as needed. Under the injunction, as new barriers are identified that meet lawsuit-standards, barrier removals are designed, permitted and carried out. The first biennium of this phased project constructs six barrier-removals where initial design and permitting have been completed. Additional barrier removals are carried out in subsequent biennia. These are barriers where State Parks is legally responsible for removal even though they are not part of a lawsuit. This is likely an ongoing responsibility Statewide $200,000 $46,495,000 Code/Regulatory Compliance Statewide $1,200,000 $4,800,000 $47,695,000 Code/Regulatory Compliance This project improves infrastructure related to unforeseen code compliance and regulatory requirements. Regulators such as the Department of Ecology, Department of Health and county health departments often issue regulatory changes that require broad upgrades, repairs, or other modifications to our utility systems in order to keep park facilities open. These funds will provide for the quick response expected from the regulators and allow for our park systems to continue necessary operations. This project improves infrastructure related to unforeseen code compliance and regulatory requirements. Regulators such as the Department of Ecology, Department of Health and county health departments often issue regulatory changes that require broad upgrades, repairs, or other modifications to our utility systems in order to keep park facilities open. These funds will provide for the quick response expected from the regulators and allow for our park systems to continue necessary operations. 12

13 Park Projected Reappropriation Amount Budget Budget Running Total Project Name 35 Statewide $500,000 $48,195,000 Provide Event Infrastructure 36 Statewide $250,000 $1,000,000 $48,445,000 Provide Event Infrastructure 37 Statewide $200,000 $48,645,000 Historic Window Rehabilitation 38 Statewide $200,000 $48,845,000 ADA Compliance -Assessment and Construction 39 Statewide $2,000,000 $8,000,000 $50,845,000 ADA Compliance - Design and Construction Statewide $80,000 $50,925,000 Ice Age Floods Interpretive Exhibits Birch Bay $1,100,000 $52,025,000 Replace Failing Bridge Fort Casey $1,500,000 $53,525,000 Lighthouse Historic Preservation 43 Blake Island $700,000 $4,000,000 $54,225,000 Marine Facilities Improvements Project Scope This project provides site hardening, power, and communication infrastructure to accommodate large events and festivals in parks where this type of use is typical. Specific parks and site or sites within the park will be determined through a statewide business analysis. Lake Sammamish, Saltwater, Yakima Sportsman, Sacajawea, Belfair, Riverside, & Battle Ground Lake are some of the candidate parks. This project provides site hardening, power, and communication infrastructure to accommodate large events and festivals in parks where this type of use is typical. Specific parks and site or sites within the park will be determined through a statewide business analysis. Lake Sammamish, Saltwater, Yakima Sportsman, Sacajawea, Belfair, Riverside, & Battle Ground Lake are some of the candidate parks. This project repairs window sashes, jambs, sills and glazing in historically significant buildings throughout the state. Parks included Cape Disappointment, Fort Columbia, Cama Beach, Lime Kiln Point, Fort Worden, and Fort Casey. This project carries out primarily assessment work, resulting in a list of sub-projects to be completed with remaining funding or included in future year funding requests for ADA compliance. This project carries out a list of sub-projects to be completed with remaining funding or included in future year funding requests for ADA compliance. This is an ongoing project throughout the 10-year plan and beyond. This project provides outdoor exhibits in 7 state parks: Cape Disappointment, Sacajawea, Potholes, Wenatchee Confluence, Daroga, Lyons Ferry and Mount Spokane. This project replaces a bridge on the verge of structural failure. The bridge provides vehicular access to a large portion of the park. Design and permit occurs during the biennium with construction the following biennium. This project completes exterior stabilization of the lighthouse and tower, including the masonry chimney and adjacent oil house. Design and permit occurs during the biennium with construction the following biennium. This phased project dredges sand and sediment from the entrance channel and south end of the Blake Island marina. The channel must be dredged to maintain channel depth for boat access to the Blake Island Marina and concession facilities. Project also includes upgrading moorage, gangway, and access routes to comply with ADA, creosote removal at pier and entrance sign, construction of a permanent ramp for State Parks marine crew vessel and replacement of the moorage floats that abut the EPA pier. The first biennium designs and permits improvements and the second biennium carries out dredging and construction. 44 Statewide $200,000 $2,000,000 $54,425,000 Electric Vehicle Charging Stations This project designs, permits, and installs electric vehicle charging systems in several parks. The stations will be in day use areas only. A business analysis will be completed to determine the best locations. 45 Statewide $800,000 $1,600,000 $55,225,000 Statewide Trail Renovations This project renovates or replaces a series of foot bridges and other engineered structures along park trails. Projects are located at various state park facilities throughout the state that are aging or have exceeded their life expectancy. Specific parks will be identified. 46 Statewide $500,000 $55,725,000 Facilities and Infrastructures Backlog Reduction This project carries out a variety of smaller facility improvements throughout the system. State Parks has historically had a backlog of repairs and maintenance needed for facilities and equipment. This backlog can be defined as the upkeep of buildings and infrastructure postponed from an entity s normal budget cycle due to a lack of funds. The agency seeks funding to allow it to continue its progress in reducing the backlog of items needing repairs and maintenance. Comprehensive lists of these improvements are provided. 13

14 47 Park Projected Reappropriation Amount Budget Budget Running Total Project Name Statewide $5,000,000 $10,000,000 $60,725,000 Facilities and Infrastructures Backlog Reduction Project Scope This project carries out a variety of smaller facility improvements throughout the system. State Parks has historically had a backlog of repairs and maintenance needed for facilities and equipment. This backlog can be defined as the upkeep of buildings and infrastructure postponed from an entity s normal budget cycle due to a lack of funds. The agency seeks funding to allow it to continue its progress in reducing the backlog of items needing repairs and maintenance. Comprehensive lists of these improvements are provided. 48 Steptoe Butte $400,000 $3,800,000 $64,925,000 Road Improvements Phase 2 49 Palouse Falls $120,000 $1,500,000 $2,900,000 $66,545,000 Day Use Area Renovation This project rehabilitates the main Steptoe Butte road to the summit. Anticipated improvements include subgrade prep, asphalt surfacing, new guardrail and parking lot improvements including new asphalt, asphalt repair/replacement, asphalt overlay, pavement marking and signage. Construction is in the biennium. This phased project completes construction documents and obtains permits for immediate health and safety improvements in the first biennium. Designs and permits are secured for other park improvements, including additional parking, interpretative, and sanitation facilities. Construction of additional facilities occurs in the following biennium Fort Flagler $2,750,000 $8,000,000 $69,295,000 Parkwide Renovation Moran $200,000 $20,000,000 $69,495,000 Major Park Renovation 1) This phased project completes the interior rehabilitation work of the Hospital. The project also includes ADA parking and access into the building as well as additional parking uphill in vicinity of host campsites and service buildings. Scope also includes interpretive exhibits. The first biennium designs and permits, and the second biennium constructs improvements. 2) The campground road is failing due to hillside instability. The project reconfigures the road away from the top of the bank. This requires the reconfiguration of six campsites. The first biennium designs, permits and constructs improvements. 3) The existing welcome center is part of a small park office building in the historic district of the park. It is a historic structure with steps to enter and does not comply with ADA. Visitors with physical disabilities cannot reach park staff and obtain park information. Its location does not adequately serve all park visitors, only those who visit the historic campus area. This project constructs a new welcome center in an area that can serve visitors to the campground and beach areas. It also constructs an accessible unisex restroom that connects to the existing sewage system. The first biennium designs and permits the project. The third biennium constructs the project. 4) This project constructs a new ADAcompliant restroom in an historic building adjacent to the park office. There is currently no public restroom facility in the historic campus and park visitors must drive to the campground or get permission to use the one non-ada compliant restroom in the park office. The project also creates ADA-compliant office and customer contact space. The first biennium designs and permits and second biennium constructs the improvements. 5) Coast Defense Museum Renovation: This project designs, fabricates, and installs new exhibits housing a significant collection of early 20th century military artifacts conveying the national defense history of Washington. The project also includes historical preservation and related utility upgrades. The first biennium designs and permits and the third biennium constructs improvements. 6) This project replaces the campground and day use restrooms that have surpassed their useful life with ADA-compliant and energy efficient facilities. The first biennium designs and permits and the third biennium constructs improvements. This multi-biennium phased project completes major park renovation. Pre-design is carried out in, designs and permits in , and there are two phases of construction. Site improvements (parking, picnic, interpretation, ADA, etc.) at Cascade Lake/Falls, Mtn. Lake and Mt. Constitution Summit area. Priority historic preservation work for multiple historic structures. Cascade Lake campground redevelopment, Camp Moran dock replacement and restroom replacement. Maintenance compound relocation. ELC Improvements including parking improvements and lodge renovations. In general, a comprehensive response to parking demand is needed. 14

15 Park Projected Reappropriation Amount Budget Budget Running Total Project Name 52 Federation Forest $2,500,000 $71,995,000 Remodel Interpretive Center Project Scope This project completes design and construction of exhibit improvements consistent with the established exhibit development plan. ADA improvements include the main interpretive building, the restroom and approaches. Construction and exhibit design will enhance the auxiliary exhibit area, interpretive experience, and administrative area. 53 Spencer Spit $100,000 $72,095,000 Replace Vault Toilet with Composting Toilet This project replaces vault toilets with a composting toilet at beach campsites. 54 Lyons Ferry $3,000,000 $75,095,000 Campground Re-Establishment This project re-establishes an existing campground which has been closed for over 15 years. The budget to design and permit the project was secured through Department of Commerce pass-through funds. This project constructs the improvements. 55 Wallace falls $500,000 $2,500,000 $75,595,000 Parking Area Expansion and Water System Improvement This two-phase project designs, permits and constructs paved parking expansion of up to 100 vehicles in a park which frequently experiences overflow parking outside of park boundaries. It also constructs a new comfort station and also extends the partnership with the neighboring Camp Houston water system and constructs water system improvements. Partnership includes long-term lease of parking area. 56 Millersylvania $300,000 $2,000,000 $75,895,000 Replace original 1940's Water System This project substantially replaces the current water system at the park. The existing water system, developed in the 1930s to 1950s, is nearing the end of its useful life. This new system will meet current health codes and the practical demands of visitors and park staff. 57 Ocean City $250,000 $1,200,000 $76,145,000 Entrance Road Renovation This phased project replaces the failing entrance road into the park with a bridge or box culvert. Currently, the road crosses a wetland on failing substrate. Design and permit occurs during the biennium with construction the following biennium. 58 Manchester $350,000 $1,500,000 $76,495,000 Shoreline Restoration, Road Relocation, & Water Access This project rehabilitates two park roads adjacent to the shoreline that has major failures. It relocates the day use area road that provides access to picnic areas and the park residence, and converts the road to Battery Mitchell to an ADA-accessible trail and administrative access. It develops water access for handheld boats and tide pool access and restores ecological values to the shoreline. It expands and upgrades trails to connect historic features and the shoreline, restores hillside erosion from social trails, and interprets coast defense history. Finally, it constructs Sound friendly and Low Impact Development solutions to stormwater runoff problems along parking lots and roads. It provides matching grant opportunities including WWRP State Parks, Water Access, Riparian and ALEA. 59 Ike Kinswa $500,000 $76,995,000 South Loop and Main Loop Sewage Treatment Systems This project rebuilds septic systems at the South Loop restroom and the Main Loop RV hook up station. The systems are operating under restricted discharge flows. This project expands the North Loop sewage treatment system to accept sewage from the South Loop restroom and Main Loop RV hook ups. The Department of Health is directing that this work be completed. 60 Ginkgo $1,300,000 $78,295,000 Update Exhibits Inside Interpretive Center This project completes much needed updates to the exhibits and circulation system within the Ginkgo Interpretive Center as well as repaves the entrance and access to the interpretive center portion of the park. 61 Lake Chelan $1,100,000 $79,395,000 Replace Comfort Station & Drainfield 62 Sun Lakes - Dry Falls $50,000 $4,000,000 $83,445,000 Sun Lakes-Dry Falls Campground Renovation This project replaces a non-ada-compliant comfort station (#14) that has exceeded its useful life with an ADA-compliant and energy efficient facility. The existing drain field is antiquated and high maintenance. This new comfort station and drain field will reduce the maintenance and utility costs and enhance the experience of park visitors. This project replaces the current 174-unit standard-only site campground with a new campground composed principally of utility sites. It constructs two new comfort stations with other supportive infrastructure. Individual campsites will provide adequate space for RV's, tents, picnic tables, grills and space for boat trailers, bicycles, and other recreational equipment. 15

16 Park Projected Reappropriation Amount Budget Budget Running Total Project Name Project Scope Lewis and Clark Trail $400,000 $83,845,000 Renovate Historic Comfort Station Lake Easton $400,000 $84,245,000 Bridge Renovation Riverside $1,200,000 $85,445,000 Lake Spokane Campground Twanoh $250,000 $10,000,000 $85,695,000 Major Park Renovation 67 Statewide $300,000 $5,000,000 $85,995,000 Recreational Concession Area (RCA) Infrastructure Support 68 Statewide $400,000 $800,000 $86,395,000 Coast Defense Interpretation Statewide $700,000 $3,000,000 $87,095,000 Connectivity in Parks Statewide $500,000 $2,000,000 $87,595,000 Forest Land Management 71 Statewide $400,000 $1,800,000 $87,995,000 Depression-Era Interpretation 72 Pearrygin $100,000 $500,000 $88,095,000 Pearrygin Creek Channel Stabilization This project renovates a comfort station in the day use area to provide ADA-compliant facilities. The existing comfort station is historically significant and will remain but may be need to be supplemented with other facilities. The comfort station currently experiences flooding, and the project will reduces the frequency and damage from those events. This project renovates an historic vehicular bridge, which is currently closed due to a failed structural condition. The project already is 60% designed and this project completes design and construction. This project completes conversion of a DNR-owned primitive campground to a State Parks- quality standard campground with potential for future addition of utility sites. It completes a new campground loop, toilets, trailer parking areas, an interior pathway, and landscaping. Design and permitting is substantially complete and funded by the Avista Corporation as part of its FERC responsibilities. Avista is a financial partner in construction, which will likely include funds for campsite and the camp loop road grading. This project carries out a major park renovation. Along with a specific answer to many choices at Twanoh, it is a pilot of statewide significance for designs that consider historic preservation in the context of projected climate change impacts. The project combines previous historic preservation projects for campground and day use areas, as well as a previous project to provide for an interpretive master plan. This project improves the infrastructure at two parks that have a high likelihood of development and/or partnership with an RCA. Each park is intended to have at least $15 million of private sector investment that is supported by this project's infrastructure investment. This project develops exhibit designs, construction documents, and installs outdoor exhibits at park including, but not limited to, Cape Disappointment, Fort Worden, Fort Flagler, and Fort Ebey state parks. This multi-phase project installs infrastructure to connect individual parks to the agency s computer network to improve business activity efficiency and provide secured computing on the State Government Network for up to 50 parks. This project improves forest health at various parks around the state, reduces risk of wildfires, damage from pests, injuries to park visitors, and improves natural habitat conditions. Parks are selected based on those with the highest need and highest risk. This project tells the story of how the Civilian Conservation Corps and Works Progress Administration contributed to the development of the state parks system. The project is a phased approach to develop interpretation in 23 state parks which follows the strategic approach used for the Ice Age Floods capital program. Renovation of the Bowman Bay CCC Interpretive Center is included. This project stabilizes Pearrygin Creek. In 2015, a major flood event caused major scouring along the creek channel. Without stabilization of a sharp right-hand bend in the creek, the creek is at risk of over topping at this junction, carving a new channel straight downhill and placing all the proposed improvements in jeopardy. 73 Peace Arch $500,000 $88,595,000 Historic Preservation - Coating Replacement 74 Cape Disappointment $2,500,000 $4,500,000 $91,095,000 Welcome Center and Entrance Improvements This project brings coating down to bare concrete, repairs concrete as necessary, and recoats with appropriate material. Project analyzes cause of surface coating problem, designs and carries out repairs at this international symbol. This project constructs in Phase 1 implementation of the previously designed and permitted Isthmus plan. It constructs a new welcome center, removes a comfort station, installs a temporary CT to serve existing cabins, and minimally adjusts roadway alignment and parking. Phase 2, in , completes implementation of the Isthmus plan. 16

Centennial 2013 Plan

Centennial 2013 Plan Centennial 2013 Plan Priority No. 1: Fix what we have. With help from the Governor and Legislature, your State Parks Commission commits to caring for and improving these high-quality state parks and recreation

More information

Statewide Acquisition & Development Strategy

Statewide Acquisition & Development Strategy Washington State Parks & Recreation Commission Adopted July 21, 2016 1 Executive Summary The Washington State Parks and Recreation Commission (State Parks) is developing a strategy to guide its land acquisitions

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY

More information

(509) (360) (360)

(509) (360) (360) WASHINGTON STATE PARKS AND RECREATION COMMISSION Film Permit Application Contact Sheet Last Updated November 2016 Alta Lake Anderson Lake Battle Ground Lake Bay View Beacon Rock Belfair Ben Ure Island

More information

Classification and Management Planning (CAMP)

Classification and Management Planning (CAMP) Classification and Management Planning (CAMP) Classification and Management Planning (CAMP) Washington State Parks Recreation and Conservation Plan 208 State Parks land uses vary from highly developed

More information

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale

More information

CITY OF BROOKFIELD Capital Improvement Fund Budget

CITY OF BROOKFIELD Capital Improvement Fund Budget CITY OF BROOKFIELD Capital Improvement Fund Budget The City adopts an annual capital improvement budget, based on a five-year capital improvement program (CIP). The annual budget and CIP are prepared by

More information

Dungeness Recreation Area County Park Master Plan

Dungeness Recreation Area County Park Master Plan Dungeness Recreation Area County Park Public Outreach Meeting October 10, 2007 Project Overview USFWS Site Dungeness Recreation Area County Park Meeting Objectives: Re-Introduce project; provide status

More information

482 :fi6 D34 --' v.i9 ~

482 :fi6 D34 --' v.i9 ~ '- SB 482 :fi6 D34 --' v.i9 ~ This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Sibley LUPA. Board Executive Committee Meeting December 7, 2017

Sibley LUPA. Board Executive Committee Meeting December 7, 2017 Sibley LUPA Board Executive Committee Meeting December 7, 2017 Project Location & Project Area 1,318-acre Robert Sibley Volcanic Regional Preserve Project Area Purpose Project Purpose & Goals Append the

More information

Outdoor Developed Areas

Outdoor Developed Areas The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

What s covered. What s not covered. Options for those not covered. ABA Coverage

What s covered. What s not covered. Options for those not covered. ABA Coverage The United States Access Board is an independent federal agency that promotes equality for people with disabilities through leadership in accessible design and the development of accessibility guidelines

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through recreation ecological restoration opportunities Collaboration

More information

RECREATION MANAGEMENT PLAN WELLS HYDROELECTRIC PROJECT FERC NO. 2149

RECREATION MANAGEMENT PLAN WELLS HYDROELECTRIC PROJECT FERC NO. 2149 RECREATION MANAGEMENT PLAN WELLS HYDROELECTRIC PROJECT FERC NO. 2149 May 2010 Prepared by: Public Utility District No. 1 of Douglas County Copyright 2010. Public Utility District No. 1 of Douglas County.

More information

Waterfront Concept Plan: Community Survey Summary

Waterfront Concept Plan: Community Survey Summary Waterfront Concept Plan: Community Survey Summary Published April 20, 2016 #1100085 Introduction The survey was one component of the public consultation process endorsed by Council in October, 2015. This

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

PURPOSE AND NEED. Introduction

PURPOSE AND NEED. Introduction Public Scoping: Allocation of Recreation Capacity for Commercial Outfitter Guide Services on North Kruzof Island Trails (Kruzof Island Outfitter Guide) PURPOSE AND NEED Introduction The U.S. Department

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information

Community Development

Community Development Community Development City & Borough of Juneau Community Development 155 S. Seward Street Juneau, AK 99801 (907) 586 0715 Phone (907) 586 4529 Fax DATE: February 11, 2016 TO: FROM: Planning Commission

More information

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended Est. 1982 Est. 1982 Urban Planning Community Design Landscape Architecture 731 North Weber Street, Suite 10, Colorado Springs, CO 80903, 719 633-9700 http://www.gumanltd.com/ Members American society of

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS

DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS Date: October 19, 2009 DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS Introduction Background Whom Guidelines Apply To How to Submit Comments Contact for Further Information General Issues:

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE

WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE WASHINGTON STATE PARKS AND RECREATION COMMISSION POLICY/PROCEDURE 65-13-1 Use of Other Power-Driven Mobility Devices by Persons with Mobility Disabilities at State Park Facilities See Also: 28 CFR 35 Title

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No. Committee Report Business Item No. 2015-168 Community Development Committee For the Metropolitan Council meeting of August 12, 2015 Subject: Coon Creek Regional Trail Master Plan, Anoka County Proposed

More information

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP)

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Project Title: Glacial Edge Trail and Downtown Pedestrian Bridge Category: G. Land Acquisition for Habitat and Recreation ENRTF

More information

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL COASTAL CONSERVANCY Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL File No. 04-057 Project Manager: Amy Hutzel RECOMMENDED ACTION: Authorization to disburse up to

More information

RIVER ACCESS STRATEGY

RIVER ACCESS STRATEGY RIVER ACCESS STRATEGY The River Access Strategy is a 10-year plan the City of Edmonton is developing to inform future programming, operations and infrastructure improvements that support access to the

More information

MINNESOTA S PARKS & TRAILS LEGACY PROGRAM: ACCOMPLISHMENTS & PROSPECTS

MINNESOTA S PARKS & TRAILS LEGACY PROGRAM: ACCOMPLISHMENTS & PROSPECTS MINNESOTA S PARKS & TRAILS LEGACY PROGRAM: ACCOMPLISHMENTS & PROSPECTS PAU L P U R M A N M I N N E S OTA D E PA R T M E N T O F N AT U R A L R E S O U R C E S, PA R K S & T R A I L S L EG 5/15/2016 1 A

More information

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,

More information

Performance Clackamas Clackamas County Strategic Plan

Performance Clackamas Clackamas County Strategic Plan June 2017 update Performance Clackamas Clackamas County Strategic Plan Strategic Goals and Milestones This is the June 2017 update to Performance Clackamas, the Clackamas County Strategic Plan. The plan

More information

Blue River Trail Master Plan JSA to Town Hall June 2004

Blue River Trail Master Plan JSA to Town Hall June 2004 Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne

More information

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project

Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project R-16-26 Meeting 16-06 March 9, 2016 AGENDA ITEM AGENDA ITEM 6 Final Design Approval of the Weather Shelters and Summit Stair for the Mount Umunhum Summit Project GENERAL MANAGER S RECOMMENDATIONS 1. Direct

More information

National Forests and Grasslands in Texas

National Forests and Grasslands in Texas United States Department of Agriculture Forest Service National Forests and Grasslands in Texas Sam Houston NF 394 FM 1375 West New Waverly, Texas 77358 Phone 936-344-6205 Dear Friends, File Code: 1950

More information

MEDIUM SIZE STADIUM STRATEGY

MEDIUM SIZE STADIUM STRATEGY MEDIUM SIZE STADIUM STRATEGY Approved by City Council on March 12, 2014 This plan is available online at www.edmonton.ca I. Executive Summary... 4 II. Medium Size Stadium Strategy... 5 1. Background...

More information

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 COASTAL CONSERVANCY Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 File No. 11-039-001 Project Manager: Betsy Wilson RECOMMENDED ACTION: Authorization to disburse

More information

Please Tell Us What You Think: Candidate Sites for Recreation Business Activities

Please Tell Us What You Think: Candidate Sites for Recreation Business Activities Please Tell Us What You Think: Candidate Sites for Recreation Business Activities Background In January 2015, the Washington State Parks and Recreation Commission (Commission) approved some forms of privately

More information

b. Minimum Site Area. Recreational vehicle parks shall be located on a parcel of land not less than 3 acres in area.

b. Minimum Site Area. Recreational vehicle parks shall be located on a parcel of land not less than 3 acres in area. 6450 RECREATIONAL VEHICLE PARK REGULATIONS 6450 TITLE AND PURPOSE. The provisions of Section 6450 through 6499, inclusive, shall be known as the Recreational Vehicle Park Regulations. The purpose of these

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

Group similar facilities together separate dissimilar facilities.

Group similar facilities together separate dissimilar facilities. Park design Principle #1 Group similar facilities together separate dissimilar facilities. Why do we do this? Safety Differences in admission fees Differences in seasonal use Reduce user conflicts Principle

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C. Date: January 17, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Jericho Marginal Wharf Phase 2 Concept Plan RECOMMENDATION THAT the Board approve the final

More information

National Recreation Trail Application for Designation

National Recreation Trail Application for Designation National Recreation Trail Application for Designation Introduction Thank you for your interest in the National Recreation Trail (NRT) program. Completed NRT application packages must be submitted by December

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: SUBJECT: Resubmitted December 19, 2012 November 21, 2012 MODERNIZING THE TTC A NEW APPROACH TO COMMUNICATIONS, COMMUNITY

More information

National Park Service Wilderness Action Plan

National Park Service Wilderness Action Plan National Park Service U.S. Department of the Interior National Park Service Wilderness Action Plan National Wilderness Steering Committee National Park Service "The mountains can be reached in all seasons.

More information

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT

TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA ITEM: 11 TRUCKEE TAHOE AIRPORT DISTRICT BOARD OF DIRECTOR STAFF REPORT AGENDA TITLE: MEETING DATE: January 24, 2018 PREPARED BY: NTPUD Agency Partnership Opportunity, Multi-Use Trailhead Access

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2007 Annual Report

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2007 Annual Report Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2007 Annual Report The Nassau County Bridge Authority is a public benefit corporation created by the New York State Legislature in 1945

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017

Aloha Stadium Conceptual Redevelopment Report. April 5, 2017 Aloha Stadium Conceptual Redevelopment Report April 5, 2017 THE HISTORY OF ALOHA STADIUM A Hawaii landmark since 1975 Aloha Stadium has stood for over 40 years and effectively achieved its mission as a

More information

Section XIII. Cost Estimates

Section XIII. Cost Estimates Section XIII Cost Estimates 13-01. INTRODUCTION SECTION XIII COST ESTIMATES a. General. Preliminary cost estimates for development of proposed new and renovation or replacement actions at Lake Shelbyville

More information

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Background As part of Mass Audubon s mission to preserve the nature of Massachusetts for people and

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

Project Planning, Compliance, and Funding

Project Planning, Compliance, and Funding Project Planning, Compliance, and Funding The plans above offer high level guidance to ensure that the A.T. is managed effectively as a whole unit in a decentralized management structure. Cooperative management

More information

PORT GAMBLE HERITAGE PARK

PORT GAMBLE HERITAGE PARK PORT GAMBLE HERITAGE PARK PARTNERS A Kitsap County Project with non-profit partners: Kitsap County Parks Foundation, administered by Kitsap Community Foundation Visit Kitsap Peninsula Evergreen Mountain

More information

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure

More information

MASTER PLAN EXECUTIVE SUMMARY

MASTER PLAN EXECUTIVE SUMMARY Biscuit Run State Park Scottsville Road (State Route 20) Charlottesville, VA 22902 Biscuit Run State Park MASTER PLAN EXECUTIVE SUMMARY Department of Conservation and Recreation Division of Planning and

More information

Badgerland Council Property Review. Planning the Way Forward

Badgerland Council Property Review. Planning the Way Forward Badgerland Council Property Review Planning the Way Forward LONG RANGE PROPERTY PLANNING COMMITTEE Evaluation & Recommendations November 2013 Overview The volunteer-led, Long-Range Property Planning Committee

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Land Management Summary

Land Management Summary photo credit: ANGAIR Anglesea Heath Land Management Summary The Anglesea Heath (6,501 ha) was incorporated into the Great Otway National Park in January 2018. This provides an opportunity to consider the

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands FINAL TESTIMONY 1 STATEMENT OF DALE BOSWORTH CHIEF Of the FOREST SERVICE UNITED STATES DEPARTMENT OF AGRICULTURE Before the SUBCOMMITTEE ON FORESTS AND FOREST HEALTH And the SUBCOMMITTEE ON NATIONAL PARKS,

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

Port Everglades Master/Vision Plan Update

Port Everglades Master/Vision Plan Update Port Everglades Master/Vision Plan Update Environmental Stakeholder Meeting June 15, 2009 Discussion to Focus On: Updating the 2006 Port Everglades Master Plan Issues dealing with the Turning Notch Potential

More information

A BOAT RAMP TO NOWHERE

A BOAT RAMP TO NOWHERE A BOAT RAMP TO NOWHERE A PROPOSAL FOR ACCESS TO HARVIE PASSAGE A Presentation to the City of Calgary December 2017 Presented by: Peter Crowe-Swords Bow River Trout Foundation Background: The Bow River

More information

Waukee Trailhead Public Art and Amenities Project

Waukee Trailhead Public Art and Amenities Project Waukee - Trailhead Public Art and Amenities Project Sponsor Waukee Project Title Waukee Trailhead Public Art and Amenities Project Termini Description ( i.e. Park Avenue to 19th Street) NE Intersection

More information

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board Port of San Francisco Waterfront Design Advisory Committee Agenda Item No. 1 Meeting Date: Staff Report To: From: Waterfront Design Advisory Committee: Laura Crescimano Jeff Joslin Marsha Maytum Kathrin

More information

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2011 Annual Report

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2011 Annual Report Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2011 Annual Report The Nassau County Bridge Authority is a public benefit corporation created by the New York State Legislature in 1945

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What has been decided? What are the details of the plan? What

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

Kelly Motorized Trails Project Proposed Action

Kelly Motorized Trails Project Proposed Action Kelly Motorized Trails Project Proposed Action November 28, 2011 The Flagstaff Ranger District of the Coconino National Forest is seeking public input on the proposed Kelly Motorized Trails Project (formerly

More information

Jefferson County Non-Motorized Transportation and Recreational Trails Plan 2010

Jefferson County Non-Motorized Transportation and Recreational Trails Plan 2010 Chapter 8: Goals and objectives Plan Update: The following update presents general principles, goals, and objectives related to non-motorized transportation facilities as a component of the overall transportation

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation

More information

Part four. In this part you will find: The next steps to deliver the master plan

Part four. In this part you will find: The next steps to deliver the master plan Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master

More information

Wallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall

Wallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall Wallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall Thanks for coming! This document contains State Parks preliminary recommendations

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1 M E M O R A N D U M DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America RE: Accessible Trails Checklist 1 The purpose of the Accessible Trails Checklist (below) is to help the community review

More information

Classifications, Inventory and Level of Service

Classifications, Inventory and Level of Service Classifications, Inventory and Level of Service Section 3 Kenmore Park, Recreation and Open Space Plan 1 P a g e Classifications and Inventory Park Classifications Kenmore classifies its parks based upon

More information

Classification and Management Planning (CAMP) Washington State Parks and Recreation Commission

Classification and Management Planning (CAMP) Washington State Parks and Recreation Commission Classification and Management Planning (CAMP) Tonight s agenda Welcome, sign-in, handouts Staff introductions Planning area and park overview Description of planning process Get your input Next steps Adjourn

More information

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS INTRODUCTION The Municipal docks in both Newboro and Portland were transferred to the Township of Rideau Lakes by Parks Canada in 2002. Little has been done to improve the docks physical condition or role

More information

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651) DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning

More information