Two townships received

Size: px
Start display at page:

Download "Two townships received"

Transcription

1 34 TH ANNUAL ROAD AND BRIDGE SAFETY IMPROVEMENT AWARDS Townships Are Recognized for Projects That Make Roads and Bridges Safer Six townships were recognized during PSATS 94 th Annual Educational Conference for transportation projects that improved safety in their communities. Two of the municipalities received top honors, and the others achieved runner-up or honorable mention status in the 34 th Annual Road and Bridge Safety Improvement Contest. RECIPIENTS Roadway Category Winner: Cranberry Township, Butler County Runner-up: West Brunswick Township, Schuylkill County Honorable mention: Upper Fairfield Township, Lycoming County Bridge Category Winner: South Park Township, Allegheny County Co-runner-up: North Hopewell Township, York County Co-runner-up: Sullivan Township, Tioga County BY BRENDA WILT / ASSISTANT EDITOR Two townships received top honors in the 34 th Annual Road and Bridge Safety Improvement presented during PSATS 94 th Annual Educational Conference in Hershey. Road and bridge projects were recognized in separate categories, and the winning activities included bridge replacements, intersection improvements, and road reconstruction. The Pennsylvania Highway Information Association (PHIA) and the state Department of Transportation (PennDOT) partner with PSATS each year to present the awards. Professional engineers and safety consultants from PennDOT, highway construction and design representatives, and PHIA staff judge the entries according to four criteria: safety, resource innovation, benefits to the community, and cooperation. This year, we had a tremendous number of entries, PHIA Managing Director Jason Wagner told township officials during the award presentation. We sincerely appreciate the work that you do to help your communities when it comes to enhancing the safety of your infrastructure. PennDOT Deputy Secretary for 64 PA TownshipNews JUNE 2016

2 Planning James Ritzman also applauded the large number of entries and what they represent. The good thing about having many entries means there is a lot of good activity going on, so hopefully we ll see some huge improvements in our communities because of your good work. We needed to find the right fit Cranberry Township undertook its winning road reconstruction project to address a dangerous intersection that a 2013 study had identified as a critical safety concern. Sixteen reportable crashes had occurred at the site from 2008 to 2012, mostly from drivers going too fast in wet conditions and colliding with fixed objects or opposing traffic. We were seeing a high accident rate on the road, Cranberry Township Director of Engineering Jason Kratsas says. Drivers built up speed coming down a hill and then entered a curve that had a sharp kink in it. Their speed made it hard to stay in their lane or even on the roadway. Short-term solutions, such as additional signage, delineators on the guide rail, and reflective tape on utility poles, failed to help. In fact, another 16 crashes occurred in 2014 alone. The township contracted with Herbert, Rowland and Grubic, Inc. to design a solution that would improve safety and address a drainage problem on the road. We worked pretty long with HRG to find the right design, Kratsas says. We needed to find the right fit that could be done quickly and efficiently to solve the problem. The resulting project involved realigning the curve and reconstructing the intersection, storm sewer connections, and sidewalk connections. The township public works crew widened about 750 linear feet of the road and installed new catch basins and an underdrain to manage stormwater. The entire project area also received a pavement overlay, and upgraded pavement markings were installed at the intersection. Kratsas points to the cooperation with a nearby homeowners association as one of the most positive aspects of the project. The HOA acted as a partner throughout the project, he says, and Roadway Winner: Cranberry Township, Butler County PennDOT Deputy Secretary for Planning James Ritzman, third from right, presents the 34 th Annual Road and Bridge Safety Improvement Award to Kelly Maurer, project engineer for Cranberry Township, Butler County. The township received top honors in the roadway category for a road reconstruction project (below). Participating in the presentation are, from left, PSATS First Vice President Shirl Barnhart, PHIA Managing Director Jason Wagner, Cranberry Township chairman Dick Hadley, Maurer, project designer Jeff Mikesic of Herbert, Rowland & Grubic, Inc., Springfield Manor Homeowners Association president Steve Nalepa, and Cranberry Township manager of streets and properties Bob Howland. is thrilled with the result because safety has increased tenfold. Receiving the statewide Road and Bridge Safety Improvement Award means a lot to the township, Kratsas says, especially since this project involved a lot of cooperation. There were many different parties that came together to make it happen, he says. We are pretty proud of the award. The visibility was absolutely terrible West Brunswick Township undertook its runner-up project to address a sight distance problem at a busy intersection, which had been a safety issue for years. The visibility was absolutely terrible, township secretary Peggy Pritchard says. Many people avoided the area, and the township received many complaints about the intersection. Compounding the issue was the fact that two schools are located within a half mile of the intersection, which generated more traffic. Township supervisor and roadmaster Todd Shappell knew something needed to be done. With years of experience running heavy equipment under his belt, Shappell was confident that the road crew could tackle the problem. JUNE 2016 PA TownshipNews 65

3 Roadway Runner-up: West Brunswick Township, Schuylkill County Taking advantage of an intermunicipal agreement that the township has with neighboring South Manheim and Wayne townships, Shappell assembled a crew of eight men and the necessary equipment to cut back the sight-obscuring bank at the intersection. The crew completed the project over four days. An agreement with the homeowners at the site allowed the removed dirt to be piled on their properties for their use, saving the township the cost of hauling it away. As a result of the project, drivers at this intersection can now see about 300 feet in each direction, rather than the previous 50 feet before the improvement. Residents and merchants near the intersection are very pleased with the safer conditions, Pritchard says. I have to give credit to the roadmaster, she says. His experience enabled him to pull everything together to get the job done. Pritchard also praises the intermunicipal agreement that the township has with its neighbors and the great working relationship the township s road crew has with those of the other municipalities. With three townships working together, it s fantastic what we can get done, she says. We are very proud of what we accomplished with this project and are honored to be given this statewide award. A good, solid job Upper Fairfield Township tackled its honorable mention project to address an undersized culvert and unstable embankment that was causing severe streambank erosion, localized flooding, and water overtopping the road above. The collapsing bank was causing the road surface to crack and slump toward the creek, risking a total collapse of the roadway. PHIA Managing Director Jason Wagner, second from left, presents the roadway runner-up award in the 34 th Annual Road and Bridge Safety Improvement Contest to West Brunswick Township, Schuylkill County. The township received recognition for an intersection sight distance improvement project (below). Participating in the presentation are, from left, PSATS First Vice President Shirl Barnhart, Wagner, West Brunswick Township supervisor and roadmaster Todd Shappell and road crew member Ned Noecker, and PennDOT Deputy Secretary for Planning James Ritzman. The creek had been eating away at the culvert for a long time, township supervisor Luther Lunt says. The banks were sliding down toward the water. The affected route is one of the main roads in the township and is the primary route for the local fire service. Truck traffic from a nearby natural gas well pad also uses the road. The township knew the situation needed to be corrected quickly so it bundled the road and culvert work into one project and used Act 13 natural gas impact fee funds to finance the work by Bassett Engineering. The project involved the replacement of the existing pipe arch culvert with a larger aluminum box culvert and precast concrete wing walls and stabilizing the embankment with stone. The road was reconstructed with a deep subbase and pavement, and a new cross pipe was installed to redirect runoff. New guide rail was also installed to protect traffic from the steep streambanks and bridge ends. It s a good, solid job, Lunt says. The new road and culvert should hold up well for a long time. Government at its best South Park Township s winning project focused on replacing a crumbling bridge. Annual inspections of the 46-year-old, two-lane structure revealed that it had been deteriorating for about 15 years. PennDOT kept reducing the allowable weight and eventually limited the bridge to one lane, township manager 66 PA TownshipNews JUNE 2016

4 Roadway Honorable Mention: Upper Fairfield Township, Lycoming County PHIA Managing Director Jason Wagner, second from left, presents the roadway honorable mention award in the 34 th Annual Road and Bridge Safety Improvement Contest to Upper Fairfield Township in Lycoming County. The township received the honor for replacing a failing culvert (below). Participating in the presentation are, from left, PSATS First Vice President Shirl Barnhart, Wagner, Britt Bassett and Bill Scott from Bassett Engineering, who accepted the award on the township s behalf, and PennDOT Deputy Secretary for Planning James Ritzman. Karen Fosbaugh says. At the time that we replaced it, it had a three-ton weight limit and was facing possible closure within a year. The road containing the bridge not only connects South Park Township with adjacent Jefferson Hills Borough but also serves as an access route for more than 1,000 employees of a federal research facility in the township. Due to the bridge s posted weight limit, fire and emergency vehicles and even township snow plows could not use it, making it difficult for them to provide essential services to township residents. Because the bridge is shared equally by the township and adjacent Jefferson Hills Borough, the township supervisors approached borough officials in 2013 about a joint project to replace the bridge. They approved a memorandum of understanding to pool their resources to fund the project the following year. Construction began in September 2014 and was completed in May The new bridge consists of four composite, prestressed spread box beams and a concrete deck. The structure was widened slightly to accommodate trucks. The project also involved reconstructing the cheek walls, installing new guide rail, repaving the approaches, realigning a drainage ditch, and installing new signage. We are quite pleased with the result, Fosbaugh says. The residents are happy, and the fire and ambulance companies are very pleased that they don t have to take longer routes to respond to emergencies. JUNE 2016 PA TownshipNews 67

5 This is an example of government at its best, working together for the good of the people. Fosbaugh is quick to emphasize that the township could not have done this project alone. The agreement with Jefferson Hills Borough enabled both municipalities to get a new bridge without busting either one s budget. A $100,000 grant from the Allegheny County Community Infrastructure and Tourism Fund was split equally to help offset each community s share of the costs. We worked as a team to bring this project to fruition, Fosbaugh says. This is an example of government at its best, working together for the good of the people. Cut expense but not quality North Hopewell Township decided to replace a single-lane bridge after it was severely damaged during a storm in June The county bridge engineer determined that the structure was compromised to the point of failure, and township engineer Jason Snyder closed that bridge and two others that had also been damaged. The bridge closure limited access to the county s Spring Valley Park and also affected the local fire company s ability to provide emergency services to the park and nearby residents. While the township pursued grants, the structure suffered further damage. One of the wing walls collapsed completely and tree roots protruded through the resulting void, the western abutment was cracked horizontally above the water line, and the stream was flowing on both sides of the abutment. The township focused its attention on the critical bridge and with the guidance of township engineer Jason Snyder, decided to use the alternative bridge construction technique known as the geosynthetic reinforced soilintegrative bridge system, or GRS-IBS. This method uses alternating layers of compacted granular fill and sheets of geotextile fabric to provide support for the bridge, rather than poured concrete foundations. It can be done faster with municipal equipment and manpower and for a fraction of the cost of a conventional bridge. Bridge Winner: South Park Township, Allegheny County PennDOT Deputy Secretary for Planning James Ritzman, second from left, presents the first place bridge award in the 34th Annual Road and Bridge Safety Improvement to South Park Township, Allegheny County chairman Dave Buchewicz. The township received the honor for a bridge replacement project. Also participating in the presentation are, from left, PHIA Managing Director Jason Wagner, far left, and PSATS First Vice President Shirl Barnhart, far right. 68 PA TownshipNews JUNE 2016

6 JUNE 2016 PA TownshipNews 69

7 We try to use the limited resources we have the best way we can. We liked the lower cost factor and being able to use our own manpower and equipment, North Hopewell Township chairman Dusty Grove says. The township had already installed a GRS bridge on another road. Once you learn the tricks of how to do it, it goes pretty fast. The shorter construction period was especially welcome to township residents, he says. Although the road is not a high-traffic route, a lot of people use it as a shortcut to get to Interstate 83. The township officials and road crew like the GRS-IBS technique so much that they plan to use it to replace two more bridges if and when the township can secure grants to help offset the costs. Our goal is to cut expense but not quality, Grove says. We try to use the limited resources we have the best way we can. A bad, bad bridge Sullivan Township replaced a onelane, 1930s-era concrete bridge because it was failing due to repeated flooding. The inadequate clearance under the bridge led to debris getting caught and the creek backing up, undermining the concrete. Shell Appalachia had upgraded parts of the road in 2014 to accommodate its trucks used for Marcellus Shale natural gas development. The bridge was a concern for the heavy trucks, and an inspection revealed severe damage to the underside. In addition to the unstable structure, Shell s engineer also cited concerns about the narrow width of the bridge and the lack of guide rail on the approaches. It was just a bad, bad bridge, Sullivan Township chairman Bernie Cole says. The waterway was always backing up, and the concrete was cracking. Shell offered $125,000 to replace the bridge and provided a highway consultant, Jason Snyder of North Hopewell Township, York County, who proposed using the GRS-IBS method. Over the course of a few weeks, Snyder guided four Sullivan Township public works employees, two North Hopewell employees, and two civil engineering interns from Lafayette College in completing the structure. 70 PA TownshipNews JUNE 2016

8 Bridge Co-runner-up: North Hopewell Township, York County PHIA Managing Director Jason Wagner, second from left, presents a bridge runner-up award in the 34 th Annual Road and Bridge Safety Improvement Contest to North Hopewell Township, York County, chairman Dusty Grove, center. The township received the honor for replacing a deteriorating bridge using the geosynthetic reinforced soil-integrated bridge system, or GRS-IBS, construction method (right). Participating in the presentation are, from left, PSATS First Vice President Shirl Barnhart, Wagner, Grove, North Hopewell Township engineer Jason Snyder, and PennDOT Deputy Secretary for Planning James Ritzman. Bridge Co-runner-up: Sullivan Township, Tioga County Sullivan Township, Tioga County, representatives accept a bridge runner-up award in the 34 th Annual Road and Bridge Safety Improvement Contest from PHIA Managing Director Jason Wagner, second from left. The township was honored for replacing an old bridge with a GRS-IBS structure( right). Also present are, from left, PSATS First Vice President Shirl Barnhart, Wagner, Shane Winner of Shell Appalachia, Sullivan Township secretary Nancy Smith and supervisor Tom Robbins, project engineer Jason Snyder, Luke Snyder of Shell Appalachia, and PennDOT Deputy Secretary for Planning James Ritzman. JUNE 2016 PA TownshipNews 71

9 The new bridge is a two-lane, 80-ton-capacity structure that will easily accommodate Shell s drilling traffic, Cole says. It s a very nice bridge, and it works beautifully, he says. I spent so much time working on it, I feel like I could build one myself. Cole says that receiving this award shows that the township is taking care of its roads and its residents. The new bridge is an asset to the people of Sullivan Township, he says. I have heard nothing but compliments on it. People are thrilled that it is no longer a one-lane turkey path. I think we did a great job on it. F Think about entering your projects in this year s contest As your township undertakes road and bridge projects this summer and fall, consider entering them in the 35 th Annual Road and Bridge Safety Improvement Contest. Document your work and take before and after photos. Brochures for the 2016 contest will be mailed to member townships and members of the Township Engineers Association in December or January. The deadline is typically in early March. For more information, contact Brenda Wilt at PSATS at (717) , ext. 123, or bwilt@psats.org. Townships may also go to select the Programs and Services tab, and choose PSATS Award Programs. 72 PA TownshipNews JUNE 2016

Two townships received top

Two townships received top Awards 35 TH ANNUAL ROAD AND BRIDGE SAFETY IMPROVEMENT AWARDS Townships Are Recognized for Projects That Increase Safety on Roads and Bridges Two townships were recognized during PSATS 95 th Annual Educational

More information

Most people notice when ODOT builds something

Most people notice when ODOT builds something ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

Tallahassee-St. Marks Historic Railroad Trail

Tallahassee-St. Marks Historic Railroad Trail Revitalizing a Historic Trail Designated as a National Recreation Trail, the 16-mile Tallahassee-St. Marks Historic Railroad Trail has been enjoyed by countless bicyclists, runners, and outdoor enthusiasts

More information

American Conservation Experience

American Conservation Experience ACE Project Report For Tonto National Forest, Arizona Trail Association and Arizona State Parks Title of Project: 4 Peaks Trail Maintenance Award Contract Number: ASP NM11021 Project Partner: Paul Burghard

More information

Most of rural Clarion

Most of rural Clarion county associations AN ONLINE PRESENCE Websites Help County Associations Update Members Quickly and Easily The few county associations of township officials that have websites say they re a great way to

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

Traffic Safety Commission Meeting Minutes-Approved December 7, :00 am

Traffic Safety Commission Meeting Minutes-Approved December 7, :00 am Traffic Safety Commission Meeting Minutes-Approved December 7, 201110:00 am Call to order: Meeting was called to order at 10:00 am by Highway Safety Coordinator Sheriff Nancy Hove Members present: Sheriff

More information

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X

DD FORM 3009, FEB 2016 REPLACES DA FORM 1247, WHICH IS OBSOLETE. Page 1 of 6 Pages Adobe Professional X ROUTE CLASSIFICATION For use of this form, see ATP 3-34.81/MCWP 3-17.4; the proponent agency is TRADOC. SECTION I 1. SERIAL NUMBER 2. TO 3. FOR INFORMATION 4. DATE/TIME GROUP 5. NUMBER OF SHEETS OR ENCLOSURES

More information

TOWPLOW TIME-SAVING, SAFE ADDITION TO CONVENTIONAL SNOW PLOWING TRUCKS. Clearing The Way To Keep America Moving

TOWPLOW TIME-SAVING, SAFE ADDITION TO CONVENTIONAL SNOW PLOWING TRUCKS. Clearing The Way To Keep America Moving TOWPLOW TIME-SAVING, SAFE ADDITION TO CONVENTIONAL SNOW PLOWING TRUCKS Clearing The Way To Keep America Moving With just one truck (and operator) able to do the work of more than two conventional snow

More information

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017

United States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017 NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic

More information

Every Deed Tells a Story

Every Deed Tells a Story www.wvalleyhs.org!!! 215-646-6541!!! Vol. 18, Issue 6! info@wvalleyhs.org!!!! Box 96, Ambler, PA 19002!!!!!!!! The Wissahickon Valley Historical Society presents Every Deed Tells a Story Presented by Russ

More information

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview chapter - 2 Hex Highway Touring Route Hamburg to Strausstown Overview The on-road Hex Highway automobile and bicycle touring route begins on State Street in downtown Hamburg. The route continues west on

More information

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin Lake Wissota Access Locations within the LaFayette Township By Chad Martin Anson/ Wissota Access Point # 1 Road: 195 th St. Associated Fire Numbers: 13294 Defining Characteristics: Forested from road

More information

A Message from the Director

A Message from the Director Lee s Summit Public Works Department Director Chuck Owsley Deputy Director & City Engineer Dena Mezger Deputy Director Administration & Operations Bob Hartnett Airport Manager John Ohrazda City Traffic

More information

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 Section 3-04 Cross Sectional Elements TABLE OF CONTENTS INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3 CROSS-SECTIONAL ELEMENTS...3 Traveled Way...3 Shoulder...3 Surfacing Taper...3

More information

VILLAGE OF BREEDSVILLE 82 E Main St. PO Box 152 Breedsville, MI (269)

VILLAGE OF BREEDSVILLE 82 E Main St. PO Box 152 Breedsville, MI (269) Special Meeting Minutes December 14, 2015 7:00 pm These proceeding tonight are being recorded to help prepare the minutes Meeting called to order in village hall by President Cherokee Thompson at 7:00pm.

More information

Non-motorized Trail Plan & Proposal. August 8, 2014

Non-motorized Trail Plan & Proposal. August 8, 2014 Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan

More information

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO

Wyoming Valley Airport Proposed Improvements. Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Wyoming Valley Airport Proposed Improvements Presented June 26, 2012 By The WBW Airport Advisory Board & FBO Contents Purpose of meeting Airport overview Background of proposed improvements SWOT analysis

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

Cummings Township Regular. Monthly Minutes. Nov.13, 2012

Cummings Township Regular. Monthly Minutes. Nov.13, 2012 Cummings Township Regular Monthly Minutes Nov.13, 2012 Chair Walter Braddock called the meeting to order at 7:00P.M. Supervisors Thomas Thompson and John Gasperine were also present at the meeting. Lucy

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance City of Fort Lauderdale Frequently Asked Questions Proposed Sea Wall Ordinance The City of Fort Lauderdale is considering amending the Unified Land Development Regulations of the City of Fort Lauderdale

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design RECONSTRUCTION AND WIDENING PROJECT Project Location A44.5 - A57 (Future Project) MP A44.5 Steinsburg Road (Fall 2015 - Fall 2016) John Fries Highway (Fall 2017 - Fall 2019) A42 - A44.5 (Fall 2017 - Fall

More information

Public Service Department MONTHLY REPORT November 2017

Public Service Department MONTHLY REPORT November 2017 - Public Service Department MONTHLY REPORT Professionalism Integrity Be inspired. Reliability Quality Pride Inside This Issue: Department Highlights 2 Project Planning Updates 3 City Construction Projects

More information

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits

90 I-90 Snoqualmie Pass East September Annual Mega-Project Report. Project Benefits 90 I-90 Snoqualmie Pass East September 2015 Annual Mega-Project Report Purpose of this Report The financial and schedule information in this document will assist the Office of Financial Management in meeting

More information

THE BIG PICTURE. Week of March 11, City of Buda Accepting Applications For Boards and Commissions

THE BIG PICTURE. Week of March 11, City of Buda Accepting Applications For Boards and Commissions City of Buda Accepting Applications For Boards and Commissions The deadline is approaching to submit applications for the City of Buda's various boards and commissions. Deadline to submit a completed application

More information

GARFIELD BRIDGE. Building A Bridge to No-Where

GARFIELD BRIDGE. Building A Bridge to No-Where GARFIELD BRIDGE Building A Bridge to No-Where OCEANA COUNTY LOCATION Garfield Road leads to Stony Lake Outlet, a Benona Township park and popular Lake Michigan access GARFIELD BRIDGE OVER STONY CREEK

More information

2017 APC/PennDOT Fall Seminar. Deputy Secretary for Highway Administration George W. McAuley Jr., P.E.

2017 APC/PennDOT Fall Seminar. Deputy Secretary for Highway Administration George W. McAuley Jr., P.E. 2017 APC/PennDOT Fall Seminar Deputy Secretary for Highway Administration George W. McAuley Jr., P.E. Introduction 30 year Career Deputy Secretary Role Goals & Objectives Strengthen Relationships Improve

More information

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018 BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO

More information

Derry Hill and Bingley Road, Menston. Accidents waiting to happen.

Derry Hill and Bingley Road, Menston. Accidents waiting to happen. Derry Hill and Bingley Road, Menston. Accidents waiting to happen. School Bus unable to pass on Hawksworth Drive References: Derry Hill - 10/04551/MAF Bingley Road - 10/06229/MAO Bingley Road - 11/05691/OUT

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Deterioration Factors at Girder Ends

Deterioration Factors at Girder Ends Deterioration Factors at Girder Ends Robert P. Zaffetti, P.E. Connecticut Department of Transportation September 29, 2010 Northeast Bridge Preservation Partnership Meeting Hartford, CT Overview One of

More information

Permeable RECREATIONAL TRAILS

Permeable RECREATIONAL TRAILS SMART EARTH SOLUTIONS Permeable RECREATIONAL TRAILS GEOWEB GEOPAVE GEOTERRA Innovative Solutions for Designing & Building Trails. Trail Surface Stabilization The key to planning and building trails into

More information

Ohio Department of Transportation Construction Update

Ohio Department of Transportation Construction Update Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

Construction Update. PennDOT s Rapid Bridge Replacement Project. Summer 2017

Construction Update. PennDOT s Rapid Bridge Replacement Project. Summer 2017 Construction Update PennDOT s Rapid Bridge Replacement Project Summer 2017 Summer 2017 Construction Update With the summer construction season behind us, crews continue to work at a swift pace on the remaining

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

The Scoop. No Tax Increase for Residents; Rates and Fees to Remain the Same Budget 2019 at a Glance. December 20, 2018

The Scoop. No Tax Increase for Residents; Rates and Fees to Remain the Same Budget 2019 at a Glance. December 20, 2018 The Scoop The Town of Conception Bay South is pleased to present the Scoop, a publication dedicated to providing residents with important information and to highlight significant Town milestones and achievements.

More information

Public Notice July 14, 2017

Public Notice July 14, 2017 Public Notice July 14, 2017 PROPOSED IMPLEMENTATION OF PFC 13 NOTICE TO AIR CARRIERS AND CONSULTATION MEETING Implementation of PFC On June 14, 2017 the Omaha Airport Authority provided written notice

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

MINUTES UNION CITY BOROUGH JUNE 19, 2018

MINUTES UNION CITY BOROUGH JUNE 19, 2018 MINUTES UNION CITY BOROUGH JUNE 19, 2018 VISION STATEMENT: The Union City area is a thriving rural community of families, businesses and organizations dedicated to encouraging growth while maintaining

More information

FREMONT TOWNSHIOP ROAD DISTRICT MINUTES OF THE NOVEMBER 17, 2015 PUBLIC HEARING

FREMONT TOWNSHIOP ROAD DISTRICT MINUTES OF THE NOVEMBER 17, 2015 PUBLIC HEARING FREMONT TOWNSHIOP ROAD DISTRICT MINUTES OF THE NOVEMBER 17, 2015 PUBLIC HEARING STATE OF ILLINOIS COUNTY OF LAKE TOWN OF FREMONT Road Relocation and Vacation Highland Terrace (Fremont Township) Notice

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

2017 Armstrong County Outreach

2017 Armstrong County Outreach Armstrong County Maintenance Brent Piccola Acting County Maintenance Manager Randy Quinn Acting Assistant County Manager Luke Crawford Assistant County Manager Ernie Cascino Acting Assistant County Manager

More information

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019 BUILD CONSTRUCTION Update FEBRUARY 2019 In this issue: ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEATURED PROJECT: KENT AVENUE * Featured Project KENT AVENUE CP 2-3 CONSTRUCTION UPDATE February 2019 At

More information

Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia

Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia September 18, 2013 Nicholas J. Roper, P.E. District Bridge

More information

Cherrytree Township Board of Supervisors Regular Monthly Meeting March 6, 2017

Cherrytree Township Board of Supervisors Regular Monthly Meeting March 6, 2017 Cherrytree Township Board of Supervisors Regular Monthly Meeting March 6, 2017 A regular monthly meeting of the Cherrytree Township Board of Supervisors was held on Monday, March 6, 2017, at 6:30 p.m.,

More information

PROVIDENCE TOWNSHIP BOARD OF SUPERVISORS Gregory R. Collins, Chairman William H. Schall, Vice Chairman David J. Gerhart

PROVIDENCE TOWNSHIP BOARD OF SUPERVISORS Gregory R. Collins, Chairman William H. Schall, Vice Chairman David J. Gerhart PROVIDENCE TOWNSHIP BOARD OF SUPERVISORS Gregory R. Collins, Chairman William H. Schall, Vice Chairman David J. Gerhart Monday through Thursday, closed Friday Hours: 6:30 a.m. 4:30 p.m. Meeting: First

More information

RamirentClimateSolve TM WE RENT OUT TENTS SO YOU ARE COVERED

RamirentClimateSolve TM WE RENT OUT TENTS SO YOU ARE COVERED ClimateSolve TM WE RENT OUT TENTS SO YOU ARE COVERED Side height Length: Ridge height Width: Measurement in meters: Width: All widths between 10 and 24 m Side height: As desired, in 5 m sections Ridge

More information

Hospital Link Project Project Update September 2015

Hospital Link Project Project Update September 2015 Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service

More information

PORTER COUNTY BOARD OF ZONING APPEALS Regular Meeting Minutes. October 17, 2012

PORTER COUNTY BOARD OF ZONING APPEALS Regular Meeting Minutes. October 17, 2012 PORTER COUNTY BOARD OF ZONING APPEALS Regular Meeting Minutes The regular meeting of the was held at 6:30 p.m. on Wednesday, in the Porter County Administrative Center, 155 Indiana Avenue, Suite 205, Valparaiso,

More information

Project Planning, Compliance, and Funding

Project Planning, Compliance, and Funding Project Planning, Compliance, and Funding The plans above offer high level guidance to ensure that the A.T. is managed effectively as a whole unit in a decentralized management structure. Cooperative management

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

The Covered Bridge of Pepperell

The Covered Bridge of Pepperell The Covered Bridge of Pepperell 1742 - An uncovered wooden bridge historically referred to as the cart bridge at Joseph Blood s Fordway, links Groton West Parish and Groton. Cost Unknown 1753 - As Pepperell

More information

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST

More information

The Holes Creek Bridge Replacement By Bradley McClelland

The Holes Creek Bridge Replacement By Bradley McClelland The Holes Creek Bridge Replacement By Bradley McClelland Each time there is a heavy rainstorm, the folks along Sheffield Road in the Dayton, Ohio suburb of West Carrollton have cause to be concerned. Holes

More information

CHARTIERS TOWNSHIP BOARD OF SUPERVISORS August 2, 2011

CHARTIERS TOWNSHIP BOARD OF SUPERVISORS August 2, 2011 CHARTIERS TOWNSHIP BOARD OF SUPERVISORS August 2, 2011 Chairman Harlan G. Shober, Jr.-Chairman called the regular meeting of the Chartiers Township Board of Supervisors to order at 7:00 p.m. Tuesday August

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

FORKS TOWNSHIP PLANNING COMMISSION

FORKS TOWNSHIP PLANNING COMMISSION FORKS TOWNSHIP PLANNING COMMISSION The Forks Township meeting was held at 7:00 PM at the Forks Township Municipal Building, 1606 Sullivan Trail. Pledge of Allegiance Attendance: Members Present: Vito Tamborrino,

More information

Mason Street Bike/Pedestrian Trail Project

Mason Street Bike/Pedestrian Trail Project Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits

More information

LINWOOD TOWNSHIP ROAD & BRIDGE COMMITTEE January 3, :00 p.m.

LINWOOD TOWNSHIP ROAD & BRIDGE COMMITTEE January 3, :00 p.m. LINWOOD TOWNSHIP ROAD & BRIDGE COMMITTEE January 3, 2017 7:00 p.m. Present: Chairman Bob Beckman, Tom Sausen, Craig Bachman, Craig Rylander, Tammie Lukkonen, Ed Kramer Township Supervisor, Bob Millerbernd

More information

Ground Transportation Strategy. Victoria Airport Authority

Ground Transportation Strategy. Victoria Airport Authority Ground Transportation Strategy Victoria Airport Authority VAA Ground Transportation Strategy We live on an Island in the Pacific, but we are not isolated. A 15 minute flight from the Victoria International

More information

County Bridge Data: (Date bridge data last updated: August 2017)

County Bridge Data: (Date bridge data last updated: August 2017) Greene County Bridge Information Office of Buildings, Grounds, Bridges, and Facilities Maintenance Department of Finance and Administration for Greene County Contact Persons: Jeffrey Marshall, Department

More information

State Level Historic Documentation Report. John Blue Bridge Hampshire County

State Level Historic Documentation Report. John Blue Bridge Hampshire County State Level Historic Documentation Report State Project No. S314-28-22.27 Federal Project No. BR-0028(058)D John Blue Bridge Hampshire County Prepared by: Randy Epperly, Historian Department of Transportation

More information

Borough of Carlisle Workshop Meeting Minutes April 4, 2018

Borough of Carlisle Workshop Meeting Minutes April 4, 2018 Borough of Carlisle Workshop Meeting Minutes April 4, 2018 Present at the meeting: Councilors Crampsie, Flower-Webb, Fulham-Winston, Guido, Landis, and Mayor Scott. Also present were: Borough Manager Candland,

More information

EAST PENNSBORO TOWNSHIP BOARD OF COMMISSIONERS REGULAR MEETING, APRIL 3, 2013

EAST PENNSBORO TOWNSHIP BOARD OF COMMISSIONERS REGULAR MEETING, APRIL 3, 2013 EAST PENNSBORO TOWNSHIP BOARD OF COMMISSIONERS REGULAR MEETING, APRIL 3, 2013 Regular Meeting 7:00 p.m. The Regular Meeting of the East Pennsboro Township was held on Wednesday,, at 7:00 p.m. at the Community

More information

Southern Beltway Projects Summary

Southern Beltway Projects Summary Southern Beltway Projects Summary The Pennsylvania Turnpike Commission is proposing the construction of a 30-mile, tolled fourlane limited-access highway, known as the Southern Beltway that will be located

More information

CITY OF OSWEGO, NEW YORK ZONING BOARD OF APPEALS. January 15, 2019

CITY OF OSWEGO, NEW YORK ZONING BOARD OF APPEALS. January 15, 2019 January 15, 2019 Chairperson Sweet made a motion that all actions taken tonight are excluded, exempt or Type II actions for the purpose of the State Environmental Quality Review Law unless otherwise stated.

More information

City Manager s Update March/April, 2019

City Manager s Update March/April, 2019 City Manager s Update March/April, 2019 It is with very mixed emotions and a somewhat heavy heart that I am sharing my final City Manager Update with the citizens of Clearlake. I have accepted a position

More information

Governor Corbett Announces State Investment in 24 Rail Projects

Governor Corbett Announces State Investment in 24 Rail Projects News for Immediate Release Nov. 9, 2012 Governor Corbett Announces State Investment in 24 Rail Projects Harrisburg Twenty-four freight-rail projects across Pennsylvania will improve businesses rail access,

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth) RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information

More information

Crossroads. Boards and Commissions. Inside this issue: Township Tax Contacts/Deadlines. Know what s below. Dial 811 before you dig.

Crossroads. Boards and Commissions. Inside this issue: Township Tax Contacts/Deadlines. Know what s below. Dial 811 before you dig. Crossroads Inside this issue: Page 1 *Boards and Commissions *Township Taxes Page 2 *Spring Brush Collection *Watershed Clean Up Volunteers Needed *Household Hazardous Waste Collection *Spring Bulk Pick

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Springettsbury Township. Road Improvement Projects

Springettsbury Township. Road Improvement Projects Springettsbury Township Road Improvement Projects 2009 2016 2016 Township Road Improvement Projects Springettsbury Township is divided into the following 4 Sectors: Northwest Sector Sherman Street Route

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

Media Release For Immediate Release Tuesday, April 17, 2018

Media Release For Immediate Release Tuesday, April 17, 2018 Media Release For Immediate Release Tuesday, April 17, 2018 2018 Budget focuses on enhancements to roads and infrastructure Investing in roads and infrastructure is a priority for the County s 2018 budget.

More information

"This is the catalyst we've been waiting for," Norristown Planning Director Jayne Musonye said of the project.

This is the catalyst we've been waiting for, Norristown Planning Director Jayne Musonye said of the project. From the Philadelphia Inquirer $60M Montco transportation project gets rolling Jessica Parks, Inquirer Staff Writer POSTED: Wednesday, September 11, 2013, 1:08 AM http://www.philly.com/philly/news/20130911

More information

Mr. Piorkowski stated that we have one set of minutes from the July 9, 2018 meeting.

Mr. Piorkowski stated that we have one set of minutes from the July 9, 2018 meeting. Moore Township Board of Supervisors 2491 Community Drive Bath, Pa. 10814 August 7, 2018 The Monthly Meeting for the Moore Township Board of Supervisors was called to order on Tuesday August 7, 2018 by

More information

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington

More information

Beachwalk Beginnings July 2017

Beachwalk Beginnings July 2017 The Beachwalk Buzzzzz.. Beachwalk Beginnings July 2017 Beachwalk celebrates its 30 th anniversary this year. To honor our birthday, we reached out to a few of our remaining original and long-term owners

More information

Community Development

Community Development Community Development City & Borough of Juneau Community Development 155 S. Seward Street Juneau, AK 99801 (907) 586 0715 Phone (907) 586 4529 Fax DATE: February 11, 2016 TO: FROM: Planning Commission

More information

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes

More information

MINUTES OF MEETING GLOVER SELECT BOARD. Attendance: Select Board Members Bucky Shelton, Chairman, Tara Nelson, Jason Choquette

MINUTES OF MEETING GLOVER SELECT BOARD. Attendance: Select Board Members Bucky Shelton, Chairman, Tara Nelson, Jason Choquette MINUTES OF MEETING GLOVER SELECT BOARD Date: March 28, 2011 Time Convened: 6:30 P.M. Time Adjourned: 9:11 P.M. Attendance: Select Board Members Bucky Shelton, Chairman, Tara Nelson, Jason Choquette Road

More information

MINUTES. for the meeting of the TOWN OF MONO POLICE SERVICES BOARD. In the Board Room of the Mono Municipal Offices

MINUTES. for the meeting of the TOWN OF MONO POLICE SERVICES BOARD. In the Board Room of the Mono Municipal Offices MINUTES for the meeting of the TOWN OF MONO POLICE SERVICES BOARD Held on Wednesday November 15 th, 2017 at 7:00 p.m. In the Board Room of the Mono Municipal Offices 1. Call to Order at 7:00 pm Meeting

More information

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31 THOMAS P. DiNAPOLI STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER March 4, 2008 Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation

More information

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

Resolution Ordinance Motion Discussion Only

Resolution Ordinance Motion Discussion Only ITEM MOT 00-05169 VILLAGE OF DOWNERS GROVE REPORT FOR THE VILLAGE COUNCIL MEETING MARCH 19, 2013 AGENDA SUBJECT: TYPE: SUBMITTED BY: Concord Square Unit 2 Roadway Improvements & Streetlight Replacement

More information

MANHEIM TOWNSHIP PLANNING COMMISSION MINUTES Wednesday September 19, 2007

MANHEIM TOWNSHIP PLANNING COMMISSION MINUTES Wednesday September 19, 2007 MANHEIM TOWNSHIP PLANNING COMMISSION MINUTES Wednesday A meeting of the Manheim Township was held on Wednesday, at 6:30 p.m. The following members were present: Mr. Jeffrey Sturla; Mr. Steven Geisenberger;

More information

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown Launched April 27th, 2010 1 Table of Contents page 3 Long term Goals Project Scope Project History 4 User Groups Defined Trail Representative Committee 5 Trail Users Breakdown 13 Trail Users Desires 16

More information

Meeting opened 7:03PM 9/20/18. Secretary Report: Approve June 2018 Minutes: No quorum to approve

Meeting opened 7:03PM 9/20/18. Secretary Report: Approve June 2018 Minutes: No quorum to approve September 20, 2018 7:00PM Willow Creek of Metamora HOA Minutes P - Steve Landau A - Jim Susin P - Tom Thomas A - Chad Langan A Jon Van Order P Eli Grove P=present A=absent Guests: Steve Johnson, John Nungester,

More information

The success of this club and the events it provides to its members is directly related to the participation by its members

The success of this club and the events it provides to its members is directly related to the participation by its members END OF 2016 nwtra.com North West Trail Riders Association PO Box 571, Pendleton, OR 97801 Email: contact@nwtra.com Club President: Geoff Reiff Vice President: Brandon Robinson Treasurer: Chuck Overstreet

More information

Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan

Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan Milan Trail Huggers ATV Club P.O. Box 42 Milan, NH 03588 Maintaining Trails in Milan, Stark and Dummer Head Pond Connector Trail Final Report Project Area: From Head Pond in Berlin to Rt. 110B in Milan

More information

EAST COCALICO TOWNSHIP BOARD OF SUPERVISORS MEETING AGENDA

EAST COCALICO TOWNSHIP BOARD OF SUPERVISORS MEETING AGENDA EAST COCALICO TOWNSHIP AGENDA HELD AT EAST COCALICO TOWNSHIP, 100 HILL ROAD, DENVER, PA 17517 at 7:30 P.M. MEETING CALLED TO ORDER AT 7:30 P.M. FARMLAND TRUST PROJECT PRESENTATION BY STEPHANIE ARMPRIESTER

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

Clackamas County Development Agency

Clackamas County Development Agency Clackamas County Development Agency Development Services Building, 150 Beavercreek Rd., Oregon City, OR 97045 www.clackamas.us/transportation/renewal 503-742-4323 The Clackamas County Board of Commissioners

More information