1 Arctic Canada 1
2 Public Works and Government Services Canada (PWGSC) Real Property Institute of Canada: Marine Infrastructure National Workshop January 28, 2014 Jerome MacGillivray, P. Eng John Davidson, P. Eng. (ret d) A&E Resources, Project Management, Atlantic Region Western Region
3 PWGSC Western & Atlantic Regions And DFO-SCH Central & Arctic Region Pangnirtung Harbour Development
4 Background Nunavut was formed as Canada s 3 rd Territory on April 1, 1999; Nunavut has an Ocean Coastline of 104,000 km (approx 43% of Canada s Coastline) encompasses 1/5 th of Canada s Geography (or 1.9 million km 2 ); Nunavut has a populanon of approximately 30,000 (85% are Inuit); The Government of Nunavut (GNU) funcnons within a framework of a Land Claim Agreement and operates under a Consensus system, there are no polincal parnes; The GNU derives approx 91% of its budget from Federal 4 Transfers and could not fund these harbour
5 . PMO announced December 12, 2007, seven harbours to be developed as part of sovereignty; Viewed as an opportunity to encourage development of the commercial fishery in the Davis Strait; Pangnirtung was chosen as the first of the seven to be built. 5
6 6
7 Challenges with Construction in Northern Canada Remoteness Climate Resources 7
8 Remoteness 2400 km - Montreal to Pangnirtung, Nunavut via sealift. 8
9 Climate 9
10 Climate: summer enroute to Pangnirtung. 10
11 Pre-development: harbour at low tide. 11
12 Pre-development: harbour at low tide. 12
13 Pre-development: harbour at high tide of approximately +7.4 m. 13
14 Design Vessel: Pang Fisheries Co-Op Vessel. 14
15 Ice movement within the harbour. 15
16
17 Project Specific Challenges +7.4 meter Ndal range; Limited exisnng site informanon (i.e. geotechnical, hydrographic, topographic, etc.); Limited ArcNc Marine experience in the industry; and Short Nme frame to invesngate exisnng condinons, design, tender and construct, all within the Federal Governments 2 year, Accelerated Infrastructure Program, Nme constraint. 17
18 2 Phase Delivery Method for the Pangnirtung Harbour DFO SCH undertook Phase 1; west breakwater construcnon, supply and installanon of floanng docks and inner basin dredging (- 1.5 m), dredge materials from inner basin used to fill the seali` marshalling area. PWGSC undertook Phase 2; new channel dredging (- 2.4m), outer basin dredging (- 4.4m) and fixed wharf construcnon. 18
19 Preliminary Work : Environmental AMEC Disposal at Sea Permit applicanon to Environment Canada: Requirements included stakeholder consultanon, water and sediment sampling as well as benthic habitat survey; The Nunavut Impact Review Board (NIRB) provided environmental oversight and project approval in the NU Territory: Requirements included an Environmental Management Plan; Navigable Waters ProtecNon Act (NWPA) AuthorizaNon applicanon to Transport Canada; and Fisheries Act AuthorizaNon applicanon for the Harmful AlteraNon, DisrupNon or DestrucNon (HADD) of fish habitat to Fisheries and Oceans Habitat Management Division. 19
20 Preliminary Work: Design Determina8on Drilling Undertook geotechnical invesnganon in order to characterize site for detailed design. 20
21 Implementa8on Phase 1 Tower Arc8c and Community of Pangnirtung Inner basin dredging; Seali` marshalling area construcnon; West breakwater construcnon; and InstallaNon of the floanng docks for the small vessels. 21
22 Implementa8on Phase 2 McNally Almiq Joint Venture (MAJV) Outer basin and channel dredging as well as fixed wharf construcnon; Contract for a Design Build approach to reduce the contractor risk as much as possible given the lack of experience and informanon available with regards to marine construcnon in the ArcNc environment; Worley Parsons as a sub- consultant provided the design; McNally ConstrucNon Ltd provided the 6.5 cu yd clam bucket and dredge, 2x300 yd 3 dump scows, 2x500 hp tugs to perform dredging. Required a 10 day tow from Pt Tupper to Pang; Almiq ConstrucNon installed and operated a 30 man construcnon camp. They were responsible for the civil works for the fixed wharf and the provision of electrical shore power. 22
23 Quality Assurance SHM Canada Consul8ng Responsible for resident supervision of the steel sheet piling (SSP) fixed wharf and seali` marshalling area construcnon as well as inner basin dredging. Shepherd and Stevens Responsible for interim and as- built survey informanon including the Disposal at Sea jord site. 23
24 Phase 1: Inner Basin Dredging 24
25 Phase 1: West Breakwater Construction 25
26 Phase 1: Inner Basin Dredging Low Tide 26
27 27 Phase 2: Channel Dredging- material transported 1.5 km to centre of fjord and disposed in approximately 120 meters of water.
28 Phase 1: Floating Dock Installation 28
29 Phase 2:Fixed SSP Wharf Construction 29
30 Phase 2:Fixed SSP Wharf 30
31 31
32 32
33 Conclusion Public Works and Government Services Western & Atlantic Regions DFO Small Craft Harbours Central and Arctic Region 33
34 Questions?
Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010
Port of Durban Entrance Channel Widening & Deepening Project Completion Function 31 March 2010 Presented by: Theunis Steenkamp Project Director Natcor 1 The saying goes.. THE JOB IS NOT OVER UNTILL THE
More informationMaximising Beneficial Reuse through the use of a Novel Dredging Contract
Maximising Beneficial Reuse through the use of a Novel Dredging Contract Nicola Clay & Katherine Harris Port of London Authority Nick Bray Dredging Research Paul Hesk Van Oord UK CEDA Dredging Days 2007
More informationNEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May
Organization Of American States Second Hemispheric Conference On Inland Ports, Waterways & Dredging NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA Christopher Hamilton May 18 2017 2.83
More informationChair and Members of Harbour East - Marine Drive Community Council. Brad Anguish, Director, Parks and Recreation
P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 15.1.1 Harbour East-Marine Drive Community Council December 3, 2015 TO: SUBMITTED BY: Chair and Members of Harbour East - Marine Drive Community
More informationNEW ZEALAND TEMPORARY AND PRELIMINARY NOTICES IN FORCE (NZ NTM Edition No. 1 dated 11 January 2019)
NEW ZEALAND TEMPORARY AND PRELIMINARY NOTICES IN FORCE (NZ NTM Edition No. 1 dated 11 January 2019) NZ Notice T/P Charts Affected Locality and Subject 93/17 T NZ 82 (T 82), NZ 827 (T 827), NZ 8275 (T 8275),
More informationU.S. Army Corps of Engineers Wilmington District
U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers Wilmington District Ongoing Contracts Project Quantity
More informationAPPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY
APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY Effects of Lyttelton Port Recovery Plan on Navigational Safety November 2014 INTRODUCTION Lyttelton Port of Christchurch (LPC) utilises an integrated health
More informationPorts. Water and Environment Solutions
Ports Water and Environment Solutions BMT WBM in Ports The Company BMT WBM and Ports BMT WBM Pty Ltd is a leading edge water and environmental consultancy with more than 40 years national and international
More informationCOMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project
COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT AUGUST 2009 OVERALL VIEW OF NASSAU HARBOUR AERIAL VIEW OF NASSAU HARBOUR PROJECT HISTORY 1960 s
More informationAnnacis Island Wastewater Treatment Plant OUTFALL PROJECT
Annacis Island Wastewater Treatment Plant OUTFALL PROJECT PORT COMMUNITY LIAISON COMMITTEE - DELTA John Newby SENIOR VICE PRESIDENT CDM SMITH Delta, Tuesday, March 7, 2017 Andrea Winkler PROGRAM MANAGER
More informationPresentation to MASS17 OCTOBER 2017
Presentation to MASS17 OCTOBER 2017 Since 1967, the Woodward Group of Companies has been involved in the fuels and shipping business throughout eastern and northern Canada Average annual CPP throughput
More informationBackground of the project
D runway of Tokyo International Airport DESIGN-BUILD PROCUREMENT SCHEME FOR THE EXPANSION OF THE TOKYO INTERNATIONAL AIRPORT Mitsuhiko OKADA The Overseas Coastal Area Development Institute of Japan (OCDI)
More informationCanadian Coast Guard Programs Update. Shipping Federation of Canada Meeting
Canadian Coast Guard Programs Update Shipping Federation of Canada Meeting November 2018 1 Purpose and Table of Contents Provide updates on Central and Arctic Region program activities. Aids to navigation
More informationOhio Freight Conference Great Lakes Commercial Navigation
Ohio Freight Conference Great Lakes Commercial Navigation Roger E. Haberly Regional Economist Buffalo New York 13 September 2013 US Army Corps of Engineers Presentation Overview 1. GL Physical System Description
More informationMESO-AMERICAN AND CARIBBEAN HYDROGRAPHIC COMMISSION. National Report (October 2006) - Jamaica
MESO-AMERICAN AND CARIBBEAN HYDROGRAPHIC COMMISSION National Report (October 2006) - Jamaica 1. HYDROGRAPHIC OFFICE: Reorganization Jamaica is a member State of the IHO and the Meso-America and Caribbean
More informationNew Orleans Municipal Yacht Harbor
New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &
More informationMarch 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018
OFFICE OF THE CITY MANAGER (757) 385-4242 (757) 427-5626 FAX MUNICIPAL CENTER BUILDING 1, ROOM 234 2401 COURTHOUSE DRIVE VIRGINIA BEACH, VA 23456-9001 March 2, 2018 The Honorable Mayor Williams D. Sessoms,
More informationEco-Certification of Fisheries in Canada
Eco-Certification of Fisheries in Canada Presentation by Nadia Bouffard, Director General, Fisheries Renewal, DFO Gulf Snow Crab Workshop, Moncton, NB January 15-16, 2008 What is Eco-Certification? A third
More informationThaidene Nëné Proposed National Park Reserve. Public Consultation in Yellowknife, NWT June 2016 Protected Areas Establishment Branch Parks Canada 1
Thaidene Nëné Proposed National Park Reserve Public Consultation in Yellowknife, NWT June 2016 Protected Areas Establishment Branch Parks Canada 1 Consultations for Thaidene Nëné Purpose Parks Canada is
More informationAlexandria Port, Egypt
Alexandria Port, Egypt Source: This information has been extracted from the WFP Logistics Capacity Assessment for Egypt. This LCA is a work in progress and not all sections are complete. This material
More informationCORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015
CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS
More informationProposed National Marine Conservation Area Reserve Southern Strait of Georgia PROJECT UPDATE Spring 2012
Proposed National Marine Conservation Area Reserve Southern Strait of Georgia PROJECT UPDATE Spring 2012 National marine conservation areas (NMCAs) are established to protect, conserve and present examples
More informationARCTIC/ICE OPERATIONS SESSION. DYPIC A Multinational R&D Project of DP Technology in Ice
Return to Session Menu DYNAMIC POSITIONING CONFERENCE October 9-10, 2012 ARCTIC/ICE OPERATIONS SESSION DYPIC A Multinational R&D Project of DP Technology in Ice Peter Jochmann DYPIC Coordinator Hamburg
More informationPRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT
PRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT CAIRNS A STRATEGIC PORT NORTH EAST NAVY BASE MAIN MARITIME ACTIVITY AND EMPLOYMENT : NORTHERN AUSTRALIA CARGO SHIPPING SERVICING LARGEST POPULATION :
More informationWaterways Management Program
Waterways Management Program 2017-2021 Table of Contents GCWA WATERWAYS MANAGEMENT PROGRAM 2017-2021 3 Gold Coast Waterways Management Strategy 2014-2023 3 Waterways Authority Funding & Investment 4 Table
More informationClam Harbour Provincial Park
Clam Harbour Provincial Park Public Engagement Session Thursday, September 14 th, 2017 5:30pm 7:30pm Webbers Store 11470 Nova Scotia Trunk 7 Lake Charlotte, NS Agenda Overview of the Provincial Parks System
More informationAppendix B. Cultural Heritage Properties
Appendix B Cultural Heritage Properties Existing Conditions Report Page 1 1. CHL Industrial Port Lands Industrial District. Bounded by Lake Shore Boulevard on the north, Leslie Street on the east, Inner
More informationProject Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN
Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN 1. Basic information 1.1 Title: Master plan 1.2 Location: Sava River Basin which covers Bosnia and Herzegovina,
More informationPRESIDENT S MESSAGE - CHANGES AT THE HELM Hello Harbour Authority Association of British Columbia Members,
HARBOUR AUTHORITY ASSOCIATION OF BRITISH COLUMBIA PRESIDENT S MESSAGE - CHANGES AT THE HELM Hello Harbour Authority Association of British Columbia Members, I am Robert Clarke, your new president of the
More informationAPPLICANT NAME PROJECT DESCRIPTION AWARD
Scotland - Round 1 Awards APPLICANT NAME PROJECT DESCRIPTION AWARD Highlands & Islands Bute Forest Ltd The project will launch a community timber products business, attract tourists to the Island and create
More informationThe Nunavik Inuit Land Claims Agreement Impact Assessment Process. Presented at the Kuujjuaq Mining Forum, April 2017.
The Nunavik Inuit Land Claims Agreement Impact Assessment Process Presented at the Kuujjuaq Mining Forum, April 2017. The Nunavik Inuit Land Claims Agreement The Nunavik Inuit Land Claims Agreement (NILCA)
More informationINTSOK 12 th Annual Russian-Norwegian Oil & Gas Conference
INTSOK 12 th Annual Russian-Norwegian Oil & Gas Conference Kvaerner Concrete Solutions for Arctic Exploration Drilling, LNG and Oil & Gas Production Platforms By Erik Gulbrandsen Vice President Business
More informationTerms, conditions and prices
Terms, conditions and prices 2017 PORT OF ALTA valid from January 1th - Expires Des 31th 2017 page 1 CRUISE QUAYS IN ALTA QUAY LENGTH DRAFT BEAM HEIGHT Terminalquay 169 m 8,4 m Unlimited Marinequay 63
More informationNew Oil & Gas Awards in Myanmar Possible Timeline
New Oil & Gas Awards in Myanmar Possible Timeline - PSC Contract Signing may be end of this year, 2014. - Then, EIA and SIA, etc. - Exploration is expected to be after the 2015 Monsoon, i.e., after Oct
More informationFramework Agreement on the Sava River Basin and its implementation
Framework Agreement on the Sava River Basin and its implementation Dejan Komatina, Ph.D. Civ. Eng., Secretary, ISRBC Samo Grošelj, Deputy Secretary Overview Introduction on the Sava river basin Establishment
More informationCHAPTER 14. MARINE TRANSPORTATION
CHAPTER 14. MARINE TRANSPORTATION 14.1 AFFECTED ENVIRONMENT 14.1.1 Definition of Resource Marine transportation refers to marine vessels and facilities used to support commercial, military, and recreational
More informationThe Company Major Projects Somru BioScience Inc. Souris Harbour Authority Inc. Confederation Centre of the Arts, PWGSC Tethy s Aquaculture Canada,
The Company James C. Johnson Associates Inc. (JCJ), a professional Project and Construction Management consulting firm, was incorporated in 1982 by James C. Johnson, P.Eng. Since that time more than $550
More information7. Services Navigation and Operation
7. Services Navigation and Operation 7.1. Regional Harbour Master Role at Port of Gladstone Shipping legislation in Queensland is controlled by the State Government agency, Maritime Safety Queensland (MSQ).
More informationIntroduction and Company Overview
Introduction and Company Overview Multi-discipline consulting firm Founded in 1950 - HQ in Laurel, Maryland Local WPB Office Survey, Utility Coordination, Roadway Design, Environmental and CEI Past Port
More informationPort of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management
Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes
More informationDOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. The single biggest investment ever undertaken in Dover
DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER The single biggest investment ever undertaken in Dover Spring 2017 WELCOME The Port handles 12 million passengers, 2.6 million freight vehicles, 2.3m tourist
More informationVERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE
DRAMMENREGIONENS VIRKESTERMINALER DEVELOPMENT OF NEW TIMBER TERMINAL NAVIGATION AND BERTH LOCATION STUDY ADDRESS COWI A/S Parallelvej 2 2800 Kongens Lyngby Denmark TEL +45 56 40 00 00 FAX +45 56 40 99
More informationMarine Façade. ade ST. PETERSBURG RUSSIA
Marine Façade ade ST. PETERSBURG RUSSIA 1. Land reclamation - 476 ha, at the Western edge of Vasilievsky Island, St. Petersburg, Russia Marine Façade ade 2. The only Marine Passenger Port in the Russian
More informationCat Island Chain Background & Access Guide
Cat Chain Background & Access Guide Brown County Port & Resource Recovery Department 2561 S. Broadway, Green Bay, WI 54304 (920) 492-4950 www.portofgreenbay.com January 2018 1 Restoration of the Cat Chain
More informationInternational Sava River Basin Commission - An example of EU/non EU country cooperation in water management
International Sava River Basin Commission - An example of EU/non EU country cooperation in water management Improvement and co-operation possibilities in the water sector with non-eu countries Ulm, 29
More informationMr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012
Management of Dredged Materials: Challenges and Opportunities Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012 1 Craney Island Eastward Expansion and Marine Terminal NNMT Hampton
More informationHARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA
HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA Harbor Location: Erie Harbor is located on the southern shore of Lake Erie in the City of Erie, PA about 98 Miles southwest of Buffalo. Authority: River
More informationBARBADOS NATIONAL REPORT
BARBADOS NATIONAL REPORT TO THE 10 TH MEETING OF THE MESO-AMERICA AND CARIBBEAN HYDROGRAPHIC COMMISSION BRIDGETOWN, BARBADOS 3 RD 6 TH NOVEMBER 2009 HYDROGRAPHIC OFFICE: Establishment Barbados is an associate
More informationCentral and local government's efforts in Russian Federation
Maritime State University Central and local government's efforts in Russian Federation Presented by Ml FP of Russia SERGEY MONINETS 19-20 September 2017, Toyama, Japan 1 ML Sources # Sea-based ML Source
More informationAppendix C. Cultural Heritage Properties
Appendix C Cultural Heritage Properties Existing Conditions Report Page 1 Don River Mouth Naturalization and Port Lands Flood Protection Project Appendix C: Inventory of Cultural Heritage Properties in
More informationBonne Shipyard (Belgium) Pictures showing the application of Zinga by roller to the blasted hull of a typical fishing vessel.
Bangor Pier (Ireland) Pictures of the application of Zinga on immersed piles at Bangor harbour. The piles were first UHP water-blasted and then grit-blasted to give the correct surface profile. Then 200
More informationTNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August
TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects 13 August 2014 1 THE TNPA WORLD OF PORT INFRASTRUCTURE Complete Pixman Images 2010 Dredging International - Pallieter Overview of Presentation
More informationNational Report of Finland
National Report of 1. Finnish Hydrographic Office The Finnish Hydrographic Office (FHO) is responsible for nautical charting over the Finnish sea area and the most important inland water bodies. This covers
More informationACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN
Doc. 1S-26-O-11-5/1-2 ACTION PLAN FOR THE PERIOD 2011-2015 concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN April 2011 Table of Contents INTRODUCTION... 5 1.
More informationRehabilitation and development of navigation on the Sava river
Rehabilitation and development of navigation on the Sava river 3rd Joint Statement Implementation Meeting, Vienna, April 5-6, 2011 Background of the project Recognized as a priority project in the framework
More informationThe official closing date for the Sault Ste. Marie Locks (U.S.A.) is 2400 hours January 15, 2015.
SEAWAY NOTICE NO. 11-2014 Closing of the 2014 Navigation Season Mariners are reminded that there is always a possibility that severe climatic conditions may occur during the closing period. Should this
More informationTHAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.
Date: January 17, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Jericho Marginal Wharf Phase 2 Concept Plan RECOMMENDATION THAT the Board approve the final
More informationCommercial Shipping in the Arctic. Marine Board Workshop Safe Navigation in the Arctic October 15-16, 2012
Commercial Shipping in the Arctic Marine Board Workshop Safe Navigation in the Arctic October 15-16, 2012 Agenda 1. The Shortest Distance Between Two Points 2. Northern Sea Route 3. Commercial Arctic Shipping
More informationGeotechnics. Curriculum Vita MARINE WORK RELATED PROJECTS.
Geotechnics Curriculum Vita MARINE WORK RELATED PROJECTS Who We Are Geotechnics is a group of engineering consultants specialized in combined Geotechnical, Structural and Marine Projects. Mission Our design
More informationFIG Congress 2010 Facing the Challenges Building the Capacity Sydney, Australia, April
The Challenge of Hydrographic Surveying & Charting the Antarctic FIG Congress, Sydney, 11-16 April 2010 The need for accurate surveying & charting Vessel size & traffic; environmental protection; safety
More informationSTATEMENT OF QUALIFICATIONS
STATEMENT OF QUALIFICATIONS East Coast Consulting Memorial University Department of Engineering & Applied Science St. John s, NL A1B 3X5 eastcoastconsulting@gmail.com COMPANY PROFILE East Coast Consulting
More informationPort of Newcastle Schedule of Port Pricing
Port of Newcastle Schedule of Port Pricing Port of Newcastle Operations Pty Ltd (ACN 165 332 990) as Trustee for the Port Of Newcastle Unit Trust (ABN 97 539 122 070) (trading as Port of Newcastle) Effective
More informationCOMMUNICATION THE RT. HON. PERRY G. CHRISTIE PRIME MINISTER AND MEMBER OF PARLIAMENT FOR CENTREVILLE
COMMUNICATION BY THE RT. HON. PERRY G. CHRISTIE PRIME MINISTER AND MEMBER OF PARLIAMENT FOR CENTREVILLE ON THE GRAND BAHAMA (PORT AREA) INVESTMENT INVENTIVES (AMENDMENT) BILL, 2016 MONDAY, 7 TH NOVEMBER
More informationOctober
October 2017 Dave Lovell Programme Manager @networkrailwest Organisational Update Paul Stanford - RDD Simon Roberts - PCM Peter Corneck - PCM Stuart Hitch Head of Engineering Suzanne Renton Head of Prog
More informationAn Inuit Business Perspective Northern Peoples, Driving the Northern Economy Northern Exposure 2015
An Inuit Business Perspective Northern Peoples, Driving the Northern Economy Northern Exposure 2015 James Thorbourne President & CEO The linked image cannot be displayed. The file may have been moved,
More informationApril 17, Ray Greene Marketing Manager Port of Argentia
April 17, 2018 Ray Greene Marketing Manager Port of Argentia What is the Port of Argentia Who came before us Port Features Board & Staff Vision & Recent Achievements Tenants & Port Users Current Priorities
More informationMontreal-Lake Ontario section at 12:00 hours on December 31, 2018.
SEAWAY NOTICE NO. 13-2018 Closing of the 2018 Navigation Season - Revised (Cancelled 2018/12/27) Note: In consideration of anticipated conditions at closing, we have revised the closing notice with respect
More informationBUSINESS AVIATION COMMITMENT ON CLIMATE CHANGE
BUSINESS AVIATION COMMITMENT ON CLIMATE CHANGE 1 The business aviation community has long been committed to reducing the environmental impact of its products and operations. Indeed, we have improved the
More informationTRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND. PNWER November 2018
TRANSPORT CANADA S NATIONAL TRADE CORRIDORS FUND PNWER November 2018 INVESTING IN CANADA PLAN EXISTING FUNDS Of the $180+ billion, 12-year Investing in Canada Plan, $10.1 billion has been dedicated to
More informationINTO THE CANADIAN WILDERNESS NORTH OF 60. Vicki Sahanatien Parks Canada - Nunavut Field Unit Iqaluit, NU Canada
INTO THE CANADIAN WILDERNESS NORTH OF 60 Vicki Sahanatien Parks Canada - Nunavut Field Unit Iqaluit, NU Canada 2 3 4 5 6 7 Challenge 1: Canadian Wilderness? Little public discourse in Canada on wilderness
More informationOCTOPUS ISLANDS PROVINCIAL PARK
OCTOPUS ISLANDS PROVINCIAL PARK PURPOSE STATEMENT AND ZONING PLAN February 2003 OCTOPUS ISLANDS PROVINCIAL PARK Purpose Statement and Zoning Plan Primary Role The primary role of Octopus Islands Park is
More informationBeyond Gateway Ports Navigating New Destinations
Beyond Gateway Ports Navigating New Destinations Steven Young Director Port Services & Government Affairs Carnival UK Cruise Down Under Conference 4 th 5 th September 2014 The Nautical Challenges for Regional
More informationFURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013
FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013 FURTHER TO: Pages AUTH7. SECTION I - ITEMS FOR AUTHORITY ACTION AUTH7.4 AUTH7.5 AUTH7.6 COATSWORTH CUT PROJECT Contract RSD13-080 - Channel Dredging
More informationQUEENSLAND RECREATIONAL BOATING COUNCIL INC (QRBC) Report of Meeting
QUEENSLAND RECREATIONAL BOATING COUNCIL INC (QRBC) Report of Meeting 19 08 2015 Items of interest from the August 19th 2015 meeting of the Queensland Recreational Boating Council held at the Queensland
More informationAmended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort
Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance
More informationCBJ DOCKS AND HARBORS BOARD REGULAR MEETING AGENDA For Thursday, August 30th, I. Call to Order (7:00 p.m. at the CBJ Assembly Chambers.
CBJ DOCKS AND HARBORS BOARD REGULAR MEETING AGENDA For Thursday, August 30th, 2012 I. Call to Order (7:00 p.m. at the CBJ Assembly Chambers.) II. III. Roll (Greg Busch, John Bush, Tom Donek, Eric Kueffner,
More informationBuffalo District Navigation Program Overview
Buffalo District Navigation Program Overview 16 FEB 2011 US Army Corps of Engineers Buffalo District Area of Operations Our Facilities District Headquarters 2 Area Offices 3 Regulatory Field Offices Lake
More informationINDONESIA TOURISM INVESTMENT INVITATION
INDONESIA TOURISM INVESTMENT INVITATION An Invitation to Invest in Tourism Development at Rupat Island, Bengkalis Regency, Riau Province, Republic of Indonesia Welcome to the Republic of Indonesia The
More informationDepartment of Environment and Natural Resources
Department of Environment and Natural Resources Brad Ives Assistant Secretary for Natural Resources brad.ives@ncdenr.gov 919-707-8620 Mitch Gillespie Assistant Secretary for Environment mitch.gillespie@ncdenr.gov
More informationRiverine Sand Mining/Scofield Island Restoration (BA-40)
Riverine Sand Mining/Scofield Island Restoration (BA-40) Conference on Ecological and Ecosystem Restoration Kenneth Bahlinger, CPRA Project Manager July 31, 2014 committed to our coast committed to our
More informationInnovation based development of Klaipeda Port technologies
Discover a proven way! Innovation based development of Klaipeda Port technologies Mr. Artūras Drungilas Marketing and Corporate Affairs Director Klaipeda State Seaport Authority PortofKlaipeda.lt 1 Management
More informationDevelopment of Sochi transport node envisaged by items of Program of Olympic venues construction and Sochi development as an alpine resort
Development of Sochi transport node envisaged by items 55-60 of Program of Olympic venues construction and Sochi development as an alpine resort approved by the Regulation of the Government 991 of December
More informationWhile respecting Innu rights, territory and culture, IDLP represents the economic interests of Mushuau and Sheshatshiu Innu communities by:
While respecting Innu rights, territory and culture, IDLP represents the economic interests of Mushuau and Sheshatshiu Innu communities by: Creating opportunities for employment and Innu private businesses;
More informationForth Ports Limited. Ruling Depths & Under Keel Clearances
Forth Ports Limited - Forth Vessels are scheduled into / out of ports on the Forth & Tay in accordance with the under keel clearance criteria specified in this section of the Marine Guidelines & Port Information.
More information2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD
2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD The Transit Committee recommends the following: 1. Receipt of the presentation by Rick Takagi, Manager, Operations, York Region Transit;
More information10 Acre Oceanfront Hidden Basin - Nelson Island, BC
10 Acre Oceanfront Hidden Basin - Nelson Island, BC Jamie Zroback jamie@landquest.com 1 (604) 483-1605 Jason Zroback jason@landquest.com 1 (604) 414-5577 The Source for Oceanfront, Lakefront, Islands,
More informationEden Marina is a vibrant new project which is at the heart of a multi-faceted tourist complex set for imminent development.
Project Statement May 2016 Overview Eden Marina is a vibrant new project which is at the heart of a multi-faceted tourist complex set for imminent development. Situated on the shores of Twofold Bay at
More informationDraft Marine and Harbour Facilities Strategy
Draft Marine and Harbour Facilities Strategy Vision The Coromandel peninsula is a destination of choice for safe, sustainable and accessible marine and harbour facilities that are fit for purpose to meet
More informationEUROCONTROL / Central Route Charges Office. The significance of Economic Regulation with regard to air navigation services charges
EUROCONTROL / Central Route Charges Office The significance of Economic Regulation with regard to air navigation services charges Joint World Bank ICAO ATAG Workshop Montreal, 6-8 June 2005 Mr E. SÖHNLE,
More informationSUNWAY CONSTRUCTION GROUP BERHAD SEEKS LISTING ON BURSA MALAYSIA. ANALYST PACK 19 September 14
SUNWAY CONSTRUCTION GROUP BERHAD SEEKS LISTING ON BURSA MALAYSIA ANALYST PACK 19 September 14 Sunway Construction Group Berhad ( SCG ) 2013 Revenue: RM 1.8 bil 2013 PATMI: Approx. RM 75 mil (without property
More informationProposed National Marine Conservation Area Reserve Southern Strait of Georgia PROJECT UPDATE Spring 2012
Proposed National Marine Conservation Area Reserve Southern Strait of Georgia PROJECT UPDATE Spring 2012 National marine conservation areas (NMCAs) are established to protect, conserve and present examples
More informationPort Everglades Master Plan Update Tenant Workshop. July 12, Port Everglades Master Plan Update 2006
Tenant Workshop July 12, 2007 1 Original 2026 Year Vision Plan DYNEGY PROPERTY SHARED AIRPORT/SUPPORT FACILITY 12 12 2 Input from Tenants Northport Convention Center carve out Expanded cruise berth at
More informationLennusadam Marina (Seaplane Harbour) Marina Rules
Lennusadam Marina (Seaplane Harbour) Marina Rules Confirmed on 27 November 2014 Marina operator: Estonian Maritime Museum Location of the Harbour: Vesilennuki 6, Tallinn, Estonia Contents 1. General marina
More informationChapleau Mining Readiness and Growth Strategy Addendum Number 1 February 27 th, 2017
kpmg Chapleau Mining Readiness and Growth Strategy Addendum Number 1 February 27 th, 2017 Prepared for: The Chapleau Economic Development Corporation Corporation of the Township of Chapleau 1 Chapleau
More informationBadgery s Creek Airport Presention. Revised from NAN 2015 AGM
Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline
More informationProject Data Sheet BASIC PROJECT DATA. Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River
BASIC PROJECT DATA Full project title: Short project title: (acronym) Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River Project logo: Project website: Project
More informationMain Cooperative Activities in the SOMS by Malacca Strait Council of Japan
CF 10/5/2/3 Main Cooperative Activities in the SOMS by Malacca Strait Council of Japan The 10 th Cooperation Forum 2 nd -3 rd October 2017 Kota Kinabalu, Sabah, Malaysia Mr. Eiichi Kato Executive Director
More informationEastern Snow Conference: 2017 Student Award Recipient
Eastern Snow Conference: 2017 Student Award Recipient Presentation title: Tracking changes in iceberg calving events and characteristics from Trinity and Wykeham Glaciers, SE Ellesmere, Canada Authors:
More informationNC Dredge Studies NCBIWA Spring Conference April 23, 2018
NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference
More informationNC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018
NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis Sterling Baker, P.E. NCDOT James