WAIKARAKA CYCLEWAY: LESSONS LEARNT. Daniel Newcombe & Ina Stenzel Auckland City Council
|
|
- Esther Morton
- 5 years ago
- Views:
Transcription
1 WAIKARAKA CYCLEWAY: LESSONS LEARNT Daniel Newcombe & Ina Stenzel Auckland City Council
2 Introduction Waikaraka cycleway is key link in Auckland regional cycle network Lessons learnt from two sections: Pikes Point section Mt Roskill cone section Ina Stenzel project managed these 2
3 Waikaraka Cycleway Auckland City One Tree Hill Mt Roskill Onehunga SH1 Onehunga Pikes Pt Manukau Harbour Manukau City Manukau City 3
4 Pikes Point section 4km long Off-road facility built along existing path Construction began June 2006 Originally due by Dec 2006 Opened in September 2007 Issues with construction method & asset performance Cost increased from $1.45m to $2.26m 4
5 Pikes Point section 5
6 Original condition 6
7 Issues - Surface construction Original design widened existing path Existing path had variable quality & thickness, minimal basecourse Concern about design tolerances & long-term asset performance Preferred solution replacement of existing path over entire length Higher quality asset with much improved aesthetics 7
8 Existing condition Original design 8
9 Eventual design solution 9
10 Issues Contaminated site Cycleway along old landfill site for 700m Foundations required additional work Initial tests failed to identify scale of problem Landfill section also covered in dense vegetation & with large gas pipeline Original construction method not appropriate Needed to avoid disturbing existing ground while installing quality basecourse 10
11 Issues - Cycleway fence Design consultant underestimated need for & length of fencing required through contaminated area Oversight corrected at late stage Contract variation needed to cover full cost of fencing 11
12 12
13 Issues - Landfill Previously unknown landfill discovered during drilling works for new boardwalk Risk of asbestos contamination New resource consent & an Asbestos Management Plan needed Delayed construction by 3 months 13
14 14
15 Learnings Issues could be prevented if identified early (e.g. more extensive survey of landfills, depth of basecourse) Emphasis on high quality asset rather than scaling down project quality or quantity to fit budget Political approval assisted by showing importance of route for regional cycle network & council s cycle strategy 15
16 16
17 17
18 18
19 19
20 20
21 Mt Roskill cone section (Winstone Park) Cycleway along Transit NZ s SH20 Mt Roskill extension SH20 involves excavation of edge of Mt Roskill volcanic cone Major complications due to cultural & heritage significance of cone 21
22 Mt Roskill cone section Mt Roskill 22
23 23
24 24
25 Issue Cone excavations Opposed by Akl Volcanic Cone Society, Ngati Whatua, DoC, Akl Regional Council, etc 1915 Cones Act used to prevent further work New design shifted SH20 away from cone & avoided major excavation for cycleway Still opposition to visual & physical impacts on cone Designs changes to use existing path but still no stakeholder agreement 25
26 Issues cont d Council commissioned an opponent (landscape architect) to prepare design & landscape plan Opponent used his professional skills to negotiate with other opponents & develop the plan 26
27 Issues cont d New plan reduced overall project footprint Reduced physical & visual impact on cone Landscaping acknowledges significance of cone to iwi Landscape plan incorporates a new stonewalls & planting Narrower path width than preferred (2.1m or 2.4m, with 1.5m over middle section) 27
28 Original design 28
29 Alternative suggestion 29
30 Final design 30
31 Plan of final design 31
32 Issues cont d Stakeholders agreed to revised plan Lodging consents in Nov with Auckland City & NZ Historic Places Trust Construction depends on consent progress but aiming for late 2008 Cost approx $1.3m 32
33 Learnings Major delays but overall aim will be achieved Satisfies stakeholders who initially opposed the project Engagement of opponent utilised his skills to develop possible solutions Difficult negotiation task was taken on by this stakeholder Regional cycle network meant project not seen in isolation 33
34 Conclusions These projects gave valuable learnings Significant budget increases don t rule out high quality outcomes Use opponent s skills to develop solutions which achieve Council s goals & meet stakeholder concerns Hope that lessons learned assist other councils in their cycling projects 34
35 Questions or comments? Or contact the authors later Daniel Newcombe (09) Ina Stenzel (09)
waterview connection Completing the Western Ring Route the Waterview Connection
waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting
More informationAUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION
AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationCumberland Conservation Corridor
Cumberland Conservation Corridor A concept for protecting and managing the remnant Ecological Communities of the Cumberland Plain. A call for the NSW Government to commit funding and resources towards
More informationNOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT
1 July 2016 Planning Manager Westland District Council 36 Weld Street HOKITIKA Attn Alex Dunn Dear Alex NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT On 15 June 2016 you issued
More informationTHE NORTHERN CORRIDOR IMPROVEMENTS PROJECT
THE NORTHERN CORRIDOR IMPROVEMENTS PROJECT The Northern Corridor Improvements Project is the last link in the Western Ring Route, connecting the north with the west long SH1 and SH18. Major benefits of
More informationCAS Case Study: Mullion Harbour, adapting to a stormier future
t The National Trust Coastal Adaptation Strategy Case Study: Mullion Harbour Authors: Ed Bartlett, Alastair Cameron, Phil Dyke & Adrian Woodhall June 2010 CAS Case Study: Mullion Harbour, adapting to a
More informationULDA Update Yarrabilba Project The Developers Perspective Tanya Martin Project Planner Communities Lend Lease June 2011
ULDA Update Yarrabilba Project The Developers Perspective Tanya Martin Project Planner Communities Lend Lease June 2011 Development Context & Approvals Background The Region Strategic Location Single Ownership
More informationSouth Fremantle Solar Farm Agenda 1 March 2018
South Fremantle Solar Farm Agenda 1 March 2018 INTRODUCTION (CoF) Format of session Project background and process Community concerns Environmental requirements THE PROJECT (Epuron) Epuron credentials
More informationUniversity of Connecticut Division of Student Affairs Unit Review. What is Unit Review? Purpose. Guiding Principles of Unit Review
University of Connecticut Division of Student Affairs Unit Review What is Unit Review? Unit review is a collaborative process designed to provide an in-depth, comprehensive study of a unit/department.
More information5 MAP SPECIFICATION FOR SKI-ORIENTEERING
5 MAP SPECIFICATION FOR SKI-ORIENTEERING 5.1 General Maps for ski orienteering are based on the specifications for foot-orienteering maps. However in order to meet the specific requirements put on the
More informationHawke s Bay Regional Parks Network. Pekapeka Regional Park Individual Park Plan
Hawke s Bay Regional Parks Network Pekapeka Regional Park Individual Park Plan 2015-2024 Hawke s Bay Regional Council 159 Dalton Street Private Bag 6006 Napier 4110 Hawke s Bay New Zealand Telephone: 0800
More informationAirways New Zealand Queenstown lights proposal Public submissions document
Airways New Zealand Queenstown lights proposal 2014 Public submissions document Version 1.0 12 December, 2014 Contents 1 Introduction... 3 2 Purpose... 3 3 Air New Zealand Limited... 4 3.1 Proposed changes
More informationGISBORNE DISTRICT COUNCIL BUSINESS CASE PROPOSAL. Eastland Port Access. Pedestrian Safety Rakaiatane Rd. Page 1 of 4
GISBORNE DISTRICT COUNCIL BUSINESS CASE PROPOSAL Eastland Port Access Pedestrian Safety Rakaiatane Rd Page 1 of 4 Introduction This proposal has been developed by Gisborne District Council (GDC) to provide
More informationFirst proposed route Purangi Estuary to Hot Water Beach. Stella Evered Reserve. Purangi Estuary
Great Walks Project First proposed route Purangi Estuary to Hot Water Beach PACIFIC OCEAN Cathedral Cove Hahei Hereheretaura Ngati Hei Pa site Stella Evered Reserve Proposed Carpark Lees Rd Blow Hole site
More informationTerms of Reference: Introduction
Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS
More informationPort Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT
Port Macquarie-Hastings Pedestrian Access and Mobility Plan Working Paper COMMUNITY ENGAGEMENT December 2014 Table of Contents Table of Contents... 2 1 Introduction... 3 2 Submissions... 3 2.1 Stakeholder
More informationEnergex Loganlea to Jimboomba Network Upgrade Response to Supplementary IAR. Closes 8 April Submission by
Energex Loganlea to Jimboomba Network Upgrade Response to Supplementary IAR Closes 8 April 2010 Submission by Logan and Albert Conservation Association Prepared by Anne Page (BA Hons Dip Ed M Env Mgt)
More informationMaryland Transit Administration. Master Plan Alignment Trail
Maryland Transit Administration Master Plan Alignment Trail Master Plan Alignment Byrne Kelly Concept Trail Analysis - North vs. South Trail Access & Crossings Aesthetics Master Plan Alignment Description
More informationAppendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited
Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information
More informationTrail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding
I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes
More informationSubmission to NSW Koala Strategy Consultation Process. March 2017
Submission to NSW Koala Strategy Consultation Process March 2017 Table of contents Opening 3 Response 3 Whole-of-government NSW koala strategy 3 State Environment Planning Policy (SEPP) 44 3 The draft
More informationThe original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:
5. REDCLIFFS/SUMNER COMMUNITY CRÈCHE RELOCATION Officer responsible Author Property Manager Kevin Mara, DDI 941 6401 The purpose of this report is to update the Council on the status of this project, in
More informationAbbey Chesterton bridge Questions & Answers
Abbey Chesterton bridge Questions & Answers Please click on links below to go to individual subjects: Bridge location and access routes Timescales Bridge details and accessibility Construction compound
More informationThe Great New Zealand River Ride
The Great New Zealand Overview River Ride The concept of the national cycleway was proposed at the Employment Summit in February 2009 by the newly elected National government. Objectives for the Cycleway
More informationARRIVALS REVIEW GATWICK
ARRIVALS REVIEW GATWICK BO REDEBORN GRAHAM LAKE bo@redeborn.com gc_lake@yahoo.co.uk 16-12-2015 2 THE TASK Has everything been done that is reasonably possible to alleviate the noise problems from arriving
More informationMANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY
MANAGING COASTAL HAZARDS THROUGH BENEFICIAL REUSE OF DREDGED SAND AND AN ADAPTIVE WORKS STRATEGY Isabelle Ghetti 1, B.Morgan 2, R.Massie 1, Gary Blumberg 2 1 Shoalhaven City Council, Nowra, NSW 2 Royal
More informationIsland Eastern Corridor Boardwalk-Cycleway Feasibility Study
For discussion on 12 January 2012 Island Eastern Corridor Boardwalk-Cycleway Feasibility Study PURPOSE The purpose of this paper is to understand and promote the feasibility of incorporating the Harbourfront
More informationMERIDIAN DELTA LTD BRIEFING DOCUMENT
MERIDIAN DELTA LTD BRIEFING DOCUMENT 1. Meridian Delta Ltd A joint-venture between Quintain Estates and Development Plc and Lend Lease Europe Ltd, a wholly-owned subsidiary of Lend Lease Corporation. MDL
More informationMEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING
MEETING CONCLUSIONS Andean South America Regional Meeting Lima, Peru 5-7 March 2002 1.0 ECOTOURISM PLANNING 1.1 Protected Areas Ecotourism in Protected Areas is part of an integrated vision of tourism
More informationHamilton City Council Transport Strategy
Hamilton City Council Transport Strategy Where Does Access Hamilton Fit? Strategic Vision Deliver an affordable, integrated, safe, responsive and sustainable transport system. Support economic, social,
More informationWINTER SHELTER IN EAST KING COUNTY
WINTER SHELTER IN EAST KING COUNTY Vision Statement Every person in East King County has the opportunity to live in a safe, affordable, healthy home. Value Statement Homelessness is an experience that
More informationPuketapapa Local Board
ATTACHMENT A July September 2017 Puketapapa Local Board This report provides a picture of Auckland Transport activities over the July September 2017 Quarter. The report is in two sections: (a) Information
More informationCreating a High Quality Business District
Date Month Date Month Friday 7 November 2014 Nine Elms on the South Bank A Bilfinger Real Estate company Creating a High Quality Business District New London Architecture Introduction Nine Elms Vauxhall
More informationBD- Legacy Steering Group Agenda
BD- Legacy Steering Group Agenda 1. Apologies and Substitutions 2. Minutes from Previous Meeting 3. Matters Arising 4. Project Update 5. AOCB - Landscaping Mitigation - Other Mitigation Works BEAULY to
More informationSubmission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02.
Hutt Valley Tramping Club PO Box 30 883 LOWER HUTT 5045 Tukituki Catchment Proposal Environmental Protection Agency Private Bag 63 002 WELLINGTON 6140 29 July 2013 Submission on the Tukituki Catchment
More informationChristchurch City Council. Major Cycleways. Activity Management Plan. Long Term Plan
Major Cycleways Activity Management Plan Long Term Plan 2015 2025 3 December 2014 Quality Assurance Statement Christchurch City Council Civic Offices 53 Hereford Street PO Box 73015 Christchurch 8154 Tel:
More informationQueenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes
Queenstown aerodrome price proposal for night operations and building upgrade. For aircraft over five tonnes 29 October 2014 1 Purpose This document outlines Airways proposed price increase for new lights
More informationSCAF Workshop Integrated Cost and Schedule Risk Analysis. Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol
The following presentation was given at: SCAF Workshop Integrated Cost and Schedule Risk Analysis Tuesday 15th November 2016 The BAWA Centre, Filton, Bristol Released for distribution by the Author www.scaf.org.uk/library
More informationThe Cobham Room, Novotel Hamilton Tainui, 7 Alma Street, Hamilton
Board Meeting Minutes Date & time Location Board Membership Apologies NZTA staff in attendance 12 August 2016, 8.00am 12.30pm Board Strategy Session 1.00pm 2.30pm The Cobham Room, Novotel Hamilton Tainui,
More informationRegional summary - Wellington
Regional summary Wellington Regional summary - Wellington This is a summary of data relevant to transportation in this region, viewed from a Land Transport NZ perspective. It s purpose is to inform the
More informationConstruction Staging Adelaide Street West
REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationWater Industry Commission for Scotland Integrating customer perspectives in a regulatory setting
Water Industry Commission for Scotland Integrating customer perspectives in a regulatory setting National Water Forum Adelaide A presentation by Alan D A Sutherland Chief Executive Officer 11 November
More informationEDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN
1 INTRODUCTION New Zealand was awarded the Rugby World Cup 2011 hosting rights in November 2005. A condition of the winning bid was the provision of a 60,000 seat stadium for the finals. New Zealand s
More informationAppendix 6 Fulbourn Greenway Review
Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationSubmission to. Southland District Council on. Draft Stewart Island/Rakiura Visitor Levy Policy and Bylaw
Submission to Southland District Council on Draft Stewart Island/Rakiura Visitor Levy Policy and Bylaw Date: 9 November 2018 Tourism Industry Aotearoa (TIA) welcomes the opportunity to comment on Southland
More informationPERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy
PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report
More informationMTB Trails Trust Submission to Council s Long Term Plan
MTB Trails Trust Registration Number CC50635 P.O. Box 78 Brightwater 7051 MTB Trails Trust Submission to Council s Long Term Plan 2015-2025 Introduction This submission is from the Mountainbike Trails
More informationAuckland Transport - Transport Indicators Report June 2013
Thousands Auckland Transport Transport Indicators Report June 213 Economic Indicators 5 4 3 2 1 % 1 2 3 4 9 8 3 2 1 Auckland Economic Activity Composite index of Economic Activity Auckland Source : ANZ
More informationAttending UPR Pre-Session on New Zealand (24th-28th Nov) and 2nd Session on Business and Human Rights Forum(1-3 Dec)
Name of organisation: Human Rights Commission David Rutherford Disclosure period: 01/07/2013 to 31/12/2013 International and domestic travel expenses International Travel Credit Card expenses Date Amount
More information1. Good Practice Example: Sustainable Urban Development (Northern Budapest, Hungary)
1. Good Practice Example: Sustainable Urban Development (Northern Budapest, Hungary) List of relevant key words Brownfield Rehabilitation, Sustainable Urban Development, Green Space Development, Functional
More informationHIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 6pm on 19 JANUARY 2016
HIGHWAYS PANEL held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 6pm on 19 JANUARY 2016 Present: Councillor S Walsh (Chairman Essex County Council) Councillors R Gooding and J Lodge (Essex County Council)
More informationChina Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017
China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;
More informationFrequently Asked Questions South Head Paper Roads By the South Head Action Group
Frequently Asked Questions South Head Paper Roads By the South Head Action Group May 2010 What is the issue about? The Rodney District Council is planning to close a safe public vehicle accessway to the
More informationOctober 7, Mr. Geoffrey Wilson Chief Executive Officer PortsToronto 60 Harbour Street Toronto, Ontario M5J 1B7. Dear Geoff,
October 7, 2016 Mr. Geoffrey Wilson Chief Executive Officer PortsToronto 60 Harbour Street Toronto, Ontario M5J 1B7 Dear Geoff, On behalf of Nieuport Aviation Infrastructure Partners, the owner and operator
More informationAppendix D Media. Document No. NCI-1PRM-4COM-RPT-0103 Project No
Appendix D Media Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 This page has been intentionally left blank. Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 Auckland s Northern Motorway
More informationEAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC
More informationDesigning & Building for People on Bikes within evolving constraints Auckland Central City
Designing & Building for People on Bikes within evolving constraints Auckland Central City Asia Pacific Cycle Congress 19 October 2017 Graeme Bean MEngSc (Transport), BE (Civil), PGDipBus (Mktg), MEngNZ,
More informationImplementation Strategy for the Lethbridge Destination Management Organization (LDMO)
Implementation Strategy for the Lethbridge Destination Management Organization (LDMO) IMPLEMENTATION AND TRANSITION STRATEGY LDMO MANDATE: To establish a destination management organization that provides
More informationMeeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012
Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns
More informationRevalidation: initial consultation
Revalidation: initial consultation During 2009, we will be formulating our proposals for revalidation. Please help us to shape our policy by offering your views. Page 2 GOC revalidation: initial consultation
More informationUpdate on the Thameslink programme
A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts
More informationCAA stakeholder engagement Draft airspace modernisation strategy
CAA stakeholder engagement Draft airspace modernisation strategy 19 July to 10 September 2018 Civil Aviation Authority airspace.policy@caa.co.uk CAP 1690 1 1 We are asking for responses to this stakeholder
More informationAuckland Transport Quarterly Indicators Report 2018/19
Attachment 1 Auckland Transport ly Indicators Report 218/19 September 218 Table of Contents Page 2. 1. Executive summary 2. External indicators 3. Performance by Key Priority 3.1 Deliver an efficient and
More informationSTRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003
STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION
More informationHave your say... on the Ian McKinnon Drive Cycleway Project
Have your say... on the Ian McKinnon Drive Cycleway Project The missing cycleway link connecting the Northwestern Cycleway and Dominion Road cycle lanes to the Grafton Gully Cycleway, Te Ara I Whiti Lightpath
More informationtransformational an overview PoPulation Growth auckland s PoPulation will increase by up to million PeoPle over the next 30 years.
auckland s PoPulation will increase by up to million PeoPle over the next 30 years. an overview Auckland s time has come. We now have a shared vision to be the world s most liveable city and, for the first
More informationCycling as part of the NZ transport system
Cycling as part of the NZ transport system New Zealand s journey so far and where we re headed next Asia Pacific Cycle Congress, 19 October 2017, Christchurch Claire Pascoe, Lead Advisor Multi-modal, NZ
More information1 INFORMATION REQUIREMENTS
1 INFORMATION REQUIREMENTS 1.1 BACKGROUND 2 1.2 WHAT IS THE DISTRICT PLAN 3 1.3 DISTRICT PLAN STRUCTURE 4 1.4 HOW TO USE THE DISTRICT PLAN 5 1.5 STRATEGIC FRAMEWORK 6 Whanganui District Plan (15 January
More informationDEVELOPMENT MANAGEMENT COMMITTEE. 23 August 2011
DEVELOPMENT MANAGEMENT COMMITTEE Agenda item 15 23 August 2011 APPLICATION NUMBER : CA//11/00883/VAR PROPOSAL : Variation of conditions 02 (drawings numbers); alterations in respect of internal layout
More informationSouthwest Scotland Transport Mitigation Forum. 5 May 2015 Dumfries Arms Hotel, Cumnock
Southwest Scotland Transport Mitigation Forum 5 May 2015 Dumfries Arms Hotel, Cumnock In attendance David Elliot (Cumnock Community Council) Beth Griffin (Ochiltree Community Council) Alex Baird (Ochiltree
More informationLLI. Mighty River Domain & Karapiro Reserves Committee Agenda. Waipa. 4.00pm
LLI Reserves Committee Agenda Time: 4.00pm Date: Monday 17 June 2013 Venue: Karapiro Room, Don Rowlands Centre, Mighty River Domain, 601 Maungatautari Road, Cambridge INDEX PAGE NO. Agenda -17 June 2013
More informationSR 934 Project Development And Environment (PD&E) Study
SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW
More information9/8/2016. Transition Planning. One Agency s Ongoing Experience
Transition Planning One Agency s Ongoing Experience 1 Background per the Fairfax County Park Authority The Fairfax County Park Authority owns approximately 23,000 acres and maintains 425 park facilities
More informationSmart Safety Tidal Flow Barrier
ITS New Zealand Summit 2012 Auckland Harbour Bridge Martin Leak Managing Director, Resolve Group Ltd Auckland, N.Z. Auckland Harbour Bridge - demand for service: Opened in May 1959 with 4 lanes and an
More informationAirlines costs management
Airlines costs management May 2016 Phil Seymour - CEO Paul Lyons - Strategy Director Housekeeping Your Participation Open and close your control panel Join audio: Choose Mic & Speakers to use VoIP Choose
More informationMINUTES SPECIAL MEETING OF COUNCIL. Tuesday, 1 September 2015
MINUTES SPECIAL MEETING OF COUNCIL Tuesday, 1 September 2015 Held at the Council Conference and Reception Centre City Hall, Little Malop Street, Geelong commencing at 7.20p.m. COUNCIL: Cr. D. Lyons Mayor
More informationGLEN INNES TO TAMAKI DRIVE SHARED PATH PROJECT
GLEN INNES TO TAMAKI DRIVE SHARED PATH PROJECT Summary of the process to assess the route options for Section 4 to establish a short list for investigation May 217 This document is subject to review as
More informationTAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy
TAG Guidance Notes on responding to the Civil Aviation Authority s consultation on its Five Year Strategy 1. Introduction (Deadline for consultation responses is 19 February 2016) The CAA is currently
More informationDECEMBER 2017 QUARTERLY ACTIVITIES REPORT
DECEMBER 2017 QUARTERLY ACTIVITIES REPORT Completion of 1.3Moz WA gold merger and $5.33m capital raising allows Spitfire to hit the ground running in 2018 Scheme of arrangement between Aphrodite Gold and
More informationAppendix 7 Local Green Spaces - Detailed Evidence
Appendix 7 Local Green Spaces - Detailed Evidence Neigh Bridge Country Park, Somerford Keynes General information Neigh Bridge Country Park is situated at the southern entrance to Somerford Keynes village.
More informationUnlocking the Recreation and Tourism Potential of the Manukau Harbour. Carolyn Deuchar 30 April 2014
Unlocking the Recreation and Tourism Potential of the Manukau Harbour Carolyn Deuchar 30 April 2014 Manukau Harbour Visitor Survey www.manukauharboursurvey.co.nz ACTIVITIES/ATTRACTIONS VISITORS PARTICIPATED
More informationThe Strategic Commercial and Procurement Manager
Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose
More informationHIGHWAYS PANEL MEETING held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7pm on 8 SEPTEMBER 2014
HIGHWAYS PANEL MEETING held at COUNCIL OFFICES LONDON ROAD SAFFRON WALDEN at 7pm on 8 SEPTEMBER 2014 Present: Councillor A Walters (Chairman) Councillor J Salmon (Uttlesford District Council) Councillors
More informationNLTF 2020/21 ($000) Funding Priority NLTF 2018/19 ($000) NLTF 2019/20 ($000)
Funding Priority Wellington - Carterton District Council - Local road improvements Low cost / low risk improvements 2018-21 Local Roads 2 341 HM 53% 1,050 194 149 214 Approved Street Light LED conversion
More informationMETROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)
DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning
More informationIntroduction. Implementation of the Village of Capac Master Plan
Implementation of the Village of Capac Master Plan Introduction The key to a well-planned community is the actual day-to-day use of planning documents, like this Master Plan. Because this plan is to be
More informationResort Municipality Initiative Annual Report 2015
Resort Municipality Initiative Annual Report 2015 Submitted by: City of Rossland in association with Tourism Rossland Prepared by: Deanne Steven Acknowledgements The City of Rossland would like to thank
More informationMercer Island Town Center Stakeholder Meeting E. June 10, 2015
Mercer Island Town Center Stakeholder Meeting E June 10, 2015 DATE Tue. June 16 (5:30 7:30 pm) Wed. June 24 (5:30-7:00 pm) Council Chambers Tue. June 30 (5:30 8:30 pm) July 11/12 Thur. July 16 (5:30 7:30
More informationRegional Transport Committee OPEN MINUTES
Regional Transport Committee OPEN MINUTES Minutes of a meeting of the Regional Transport Committee held in Council Chambers, Waikato Regional Council, 401 Grey Street, Hamilton East on 11 June 2018 at
More informationWELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION
WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,
More informationThe Proposed Joint Ventures with The Straits Trading Company Limited And Toga Pty Ltd
The Proposed Joint Ventures with The Straits Trading Company Limited And Toga Pty Ltd DISCLAIMER This Presentation should be read in conjunction with the Circular to Shareholders dated 24 June 2013 issued
More informationToronto Pearson February 2019 Briefing. February 19, 2019
Toronto Pearson February 2019 Briefing February 19, 2019 Noise Management Forums UPDATE: The Six Ideas Runway Selection Criteria 2019 Airfield Restoration Program Noise Management Forums Review elements
More informationMinistry for Women Disclosure of chief executive expenditure and gifts For the year ended 30 June 2017
Jo Cribb Chief Executive: 1 July - 23 September 2016 Total International travel expenditure 9 Jun 2016 157.17 Attendance at the HAYS Salary Survey presentation as keynote speaker and attendance at the
More information$745 $10 $41 OVERVIEW
2015 1 National Land Transport Programme Southern SOUTHERN REGIONAL SUMMARY The NZ Transport Agency s Southern region comprises the local government regions of Canterbury, Otago, Southland and the West
More informationOtorohanga Stopbank Pathway - Project Overview
Otorohanga Stopbank Pathway - Project Overview Introduction Otorohanga District Council with the support of the Otorohanga Community Board are constructing a 3.5 km long gravel pathway for shared use on
More informationCOMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)
CITY COUNCIL UNFINISHED BUSINESS AUGUST 21, 2017 SUBJECT: INITIATED BY: SUNSET STRIP ENTERTAINMENT SHUTTLE - PILOT PROGRAM HUMAN SERVICES & RENT STABILIZATION DEPARTMENT (Elizabeth Savage, Director) 'fj1f'..
More informationTransit s forecasts of expenditure in Waikato for the next 10 years are set out in Table WK1.
WAIKATO STATE HIGHWAY PLAN EXECUTIVE SUMMARY Transit s forecasts of expenditure in Waikato for the next 10 years are set out in Table WK1. These forecasts of expenditure are based on a 10-year plan of
More informationHelping Agritourism Visitors Learn During Their Visits 1
AEC645 1 Kathryn Stofer and Joy N. Rumble 2 Agritourism is a growing industry in Florida, combining the state s assets in tourism and agriculture to provide a learning and entertainment opportunity for
More informationPRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction
PRESENTED TO Town of Middlebury, VT PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction Meeting with you today Brian Carpenter, Middlebury Selectboard Chair Jim Gish, Middlebury
More information