1 Hawarden Airport Proposal to Establish a Radio Mandatory Zone in the Vicinity of Hawarden Airport Sponsor Consultation ISSUE 2.0 Date 20 th February 2015 Serco UK & Europe Enterprise House 11 Bartley Wood Business Park Bartley Way, Hook Hampshire RG27 9XB United Kingdom Document Copyright 2015 Serco Group This document is the property of Airbus Operations Ltd ACP Sponsor Consultation 1 of 52 Issue 2

2 2 Consultation Document DOCUMENT APPROVAL This document has been prepared, authorised and approved by the individuals listed in the following table: Authority Name and Signature Responsibility Date Manager Air Traffic Services Head of Aviation Safety & Compliance Senior Air Traffic Control Officer Mark Downes M Wilshaw-Rhead Matt Wilshaw-Rhead S E Underhill Simon Underhill Author 20 th February 2015 Reviewer 20 h February 2015 Authorisation 20 th February 2015 ACP Sponsor Consultation 2 of 52 Issue 2

3 3 Consultation Document DOCUMENT STATUS ISSUE RECORD Issue Date Comments Initial Issue Revised consultation dates AMENDMENT RECORD Page Number Change Number Issue Number Description of Change Date ACP Sponsor Consultation 3 of 52 Issue 2

4 4 Consultation Document DISTRIBUTION LIST Copy No Recipient / Location 01 Hawarden Airport Air Traffic Services Unit 02 CAA SARG Kingsway Electronic versions As per list at Appendix B ACP Sponsor Consultation 4 of 52 Issue 2

5 5 Process Overview Consultation Document Hawarden Airport is operated as a licensed aerodrome by Airbus Operations Ltd. Airbus Operations Ltd contracts the provision of Air Traffic Services (ATS) to Serco, who are an Air Navigation Service Provider (ANSP) approved under Article 7 of the European Commission Regulation 550/2004. In its capacity as an ANSP, Serco must satisfy the UK Civil Aviation Authority (CAA) as to their competence to provide safe and effective Air Navigation Services. The Air Traffic Services Unit (ATSU) at Hawarden Airport currently provides services to aircraft in controlled airspace but predominantly in uncontrolled airspace. ATS are provided to all aircraft, both those operating at Hawarden Airport and those transiting the area, in accordance with UK FIS. The diversity and nature of aircraft operations in uncontrolled airspace has led to conflicts between aircraft, which is likely to become more frequent with known and forecast traffic increases at Hawarden Airport. In particular, it is a concern that the see & avoid principle often applied to operations in uncontrolled airspace is unrealistic given the diverse speeds and size of aircraft utilising Hawarden Airport and the surrounding airspace. Resolution of these conflicts increases the workload of Air Traffic Control (ATC) and regularly results in the extended routing of flights, at the expense of efficient and effective use of airspace. In order to comply with its responsibilities for safety management of the ATS and ensure flight safety in the airspace in the vicinity of Hawarden Airport, Serco (on behalf of Airbus Operations Ltd) propose to submit a case to the CAA to establish a Radio Mandatory Zone in the vicinity of Hawarden Airport. CAA Civil Aviation Publication (CAP) 725 sets out the processes that are to be followed in applying for making a change to any airspace. This Airspace Change Proposal (ACP) is being developed in accordance with the requirements specified in CAP 725. CAP 725 requires the sponsor (Serco) of the ACP to carry out a consultation with the airspace users who may be directly or indirectly affected by the change and with organisations representing those who may be affected on the ground by the environmental impact of the change. As the change proposed has been identified only to have an impact on aviation stakeholders the public is not being canvassed as part of this process, however they are free to participate in this process if they so desire. This document is the Sponsor Consultation Document developed in accordance with the provisions of CAP 725. Background Information of this document explains the process of the consultation. It also provides some basic background information about the Airport, the current airspace arrangements and an outline of the current Air Traffic Management (ATM) procedures. The ACP section of this document describes in detail the various elements of the proposed airspace change, including the options that have been considered for each element. Through a process of option consideration and development, and taking into account external influences on the airspace configuration, Hawarden Airport has reached a balanced judgement on the changes presented in this consultation. A number of Appendices provide amplifying detail where necessary, including a comprehensive Glossary of the aviation terminology used. Additionally, as the required changes are affected by requirements arising from a number of UK, European and International Policies and Strategies, a list of source documents is included for reference by consultees. This consultation runs from Monday 23 rd February 2015 to Monday 18 th May ACP Sponsor Consultation 5 of 52 Issue 2

6 6 Table of Contents Consultation Document List of Abbreviations About this consultation What is this consultation about? Why is this consultation being undertaken? Who is being consulted? Conduct of the consultation Consultation period and response method Results of the consultation What this consultation is not about Sponsor representative for the consultation CAA oversight Confidentiality Hawarden Airport History Future Statistics Introduction Overview Airspace design parameters Airspace design objectives Existing Operational Constraints and Concerns/Considerations Unknown traffic Holding of IFR traffic Arrival routing Standard outbound clearances Military low level transit routes Future Operational Considerations Northern Terminal Control Area re-design Beluga XL Airspace Development Process Initial airspace development Operational requirements to be met Early stakeholder engagement Focus groups Post-focus group airspace reviews Design Proposal for Hawarden Radio Mandatory Zone ACP Sponsor Consultation 6 of 52 Issue 2

7 7 Consultation Document 8.1 Overview Airspace classification Radio Mandatory Zone (RMZ) Alternative means of compliance Operation of the Proposed RMZ Introduction Overview Integration of VFR and other airspace activity Impact on Airspace Users A Super Transporter operations Airline operators Other Hawarden Airport operators Gresford Flash Strip & Poulton Disused Airfield North Wales Hang Gliding etc (NWHPA) sites Gliders Miscellaneous airspace activity Visual Reference Points (VRPs) Choke points Environmental Considerations Introduction In the vicinity of Hawarden Airport Further away from Hawarden Airport Arriving traffic Distribution of GA activity Climate change Visual impact and tranquility Air quality Summary Next Steps Appendix A Reference Documents Appendix B List of Consultees B.1. Development of the consultee list B.2 Airport user consultees B.3 Off-airport aerodrome and airspace user consultees B.4 NATMAC Consultees B.5 NATMAC military consultees Appendix C Airspace Development Options Considered ACP Sponsor Consultation 7 of 52 Issue 2

8 8 Consultation Document C.1 Introduction C.2 Do nothing C.3 Controlled airspace (CTR) C.4 Transponder Mandatory Zone (TMZ) C.5 Radio Mandatory Zone (RMZ) ACP Sponsor Consultation 8 of 52 Issue 2

9 9 List of Abbreviations Consultation Document aal above aerodrome level ACP Airspace Change Proposal ADI Aerodrome Control Service (Instrument) Agl above ground level ALT Altitude amsl above mean sea level ANO Air Navigation Order (2008) ANSP Air Navigation Service Provider APS Approach Control Service (Surveillance) ARP Aerodrome Reference Point ATC Air Traffic Control ATCO Air Traffic Control Officer ATM Air Traffic Management ATS Air Traffic Service ATZ Aerodrome Traffic Zone CAA Civil Aviation Authority CAP Civil Aviation Publication CCP Continuous Climb Profile CDA Continuous Descent Approach CTA Control Area CTR Control Zone DME Distance Measuring Equipment FUA Flexible Use of Airspace GA General Aviation GNSS Global Navigation Satellite System IAP Instrument Approach Procedure ICAO International Civil Aviation Organisation IFR Instrument Flight Rules ILS Instrument Landing System LJAO London Joint Airspace Organisation NATMAC National Air Traffic Management Advisory Committee NATS National Air Traffic Services NDB Non-Directional Beacon NDB (L) Non-Directional Beacon (Locator) nm Nautical Mile PANS-OPS Procedures for Air Navigation - Operations PSR Primary Surveillance Radar RNAV Area Navigation RotAR Rules of the Air Regulations (2007) RTF Radio Telephony SARG Safety and Airspace Regulation Group SID Standard Instrument Departure SOC Standard Outbound Clearance SSR Secondary Surveillance Radar STAR Standard Arrival Route TMA Terminal Control Area UK AIP United Kingdom Aeronautical Information Publication VFR Visual Flight Rules VRP Visual Reference Point ACP Sponsor Consultation 9 of 52 Issue 2

10 1. About this consultation 1.1 What is this consultation about? Consultation Document Background Information This consultation is about a proposal to establish a Radio Mandatory Zone (RMZ) in the vicinity of Hawarden Airport Traffic levels for Hawarden Airport are forecast to increase significantly over the coming years, particular the A Super Transporters supporting increased Airbus aircraft production. Hawarden Airport believes that the provision of a RMZ is necessary to enhance the safe operating environment for these increasing aircraft movement levels, in the critical stages of flight immediately after departure and prior to landing. This is explained in detail, together with the options that have been considered, in the body of this Consultation Document. 1.2 Why is this consultation being undertaken? We are required to consult any organisation and users who may be affected directly or indirectly, by the changes to airspace we are proposing. This obligation is placed on us by the CAA, who regulate the airport and the ANSP and will oversee the process we follow The purpose of the consultation is to advise all parties who may be affected by the proposed change of the scope and nature of the change. It is also important to establish any impact on those affected and for the sponsor to work with those affected to minimise this impact as far as is reasonably practical. This may be by means of altering the dimensions, procedures or conditions of the proposed airspace change in order to reasonably accommodate the impact on those affected. This will allow us to confirm views and opinions of the proposed change in advance of the formal submission of a proposal to the CAA The CAA regulates all UK airspace. Any proposed changes must be submitted by the change sponsor to the CAA for approval. The CAA will consider the proposed change in line with legislation, standards and Government guidance The primary responsibility of the CAA is to ensure that ANSPs exercise their responsibilities to maintain a high standard of safety in the provision of ATS. This duty, which is imposed on the CAA by the Transport Act 2000, takes priority over all of the CAA s other duties The consultation and subsequent formal ACP will follow the guidance of CAP 725 CAA Guidance on the Application of the Airspace Change Process The formal ACP will capture and outline the responses from this consultation process, together with the technical and procedural changes proposed. The CAA will decide if the ACP Sponsor Consultation 10 of 55 Issue 1

11 proposed Airspace change should be approved based on the relative merits of the proposal presented. 1.3 Who is being consulted? Those assessed for consultation are divided into two groups, Aviation consultees and nonaviation consultees. However, as the proposal has been established as only having an impact on aviation stakeholders, non-aviation stakeholders are not being consulted as part of this process Aviation consultees include: Current Hawarden Airport operators Adjacent ATSUs Local airspace users Although this consultation is entirely aviation related, the views of members of the public are valued and they are permitted to contribute to the consultation process if they choose to do so. The preferred manner for this is directly via A full list of consultees is given at Appendix B and has been developed in discussion with the CAA As part of the development process, specific aviation related aviation stakeholders have been involved in Focus Groups as recommended in CAP 725. This is further detailed in Airspace Change Proposal of this document It is crucial that consultees have a voice in respect of this proposed change, as such full and timely engagement is encouraged. 1.4 Conduct of the consultation This consultation is being conducted in accordance with the Cabinet Office Code of Practice on Consultation as required by the CAA Serco, as the ANSP, are acting on behalf of Airbus Operations Ltd (the Airport Operator) as the sponsor for this change This document encompasses both the aviation and environmental aspects of the proposed airspace change. As far as possible, this document has been structured to provide a clear explanation of the proposed change in plain language. Non-aviation consultees may be unfamiliar with the aeronautical terminology used, so these aspects are explained in detail where necessary and a full glossary of terms also provided. ACP Sponsor Consultation 11 of 52 Issue 2

12 1.4.4 If any consultee requires clarification of any aspect of this document they should make contact with the Sponsor Representative via This document will be made available on the Hawarden RMZ website Paper copies can be made available by contacting the Project Representative as detailed in Consultation period and response method The consultation begins on 23rd February 2015 and will be open for a period of 12 weeks (in line with the Cabinet Office Code of Practice on Consultation). The consultation will close on 18th May During this period we ask all consultees to consider the proposal detailed in this document and submit a response to us We welcome all comments, both positive and negative. If you have no comment to make we would appreciate a response to that effect Responses should be made by or in writing to the contact details at Results of the consultation All responses will be reviewed upon receipt Should we require any clarification regarding your response we will contact you Should any points or issues you raise require further development of our proposal, you may be invited to take part in a focus group. This may be in the form of a meeting or by other suitable means All responses will be acknowledged At the end of the consultation, Hawarden Airport will prepare a formal ACP together with a Consultation Analysis Feedback Report and submit this to the CAA The CAA will follow its regulatory process and consider the proposed airspace change. If they are content with the proposal, the airspace change will be implemented in accordance with international requirements for the promulgation of aeronautical information. 1.7 What this consultation is not about This consultation is not about any proposed future development of Hawarden Airport or any aspect of Government Policy This consultation is not about any proposed future development of a passenger terminal at Hawarden Airport This consultation is not about any Noise Abatement Procedures for departing aircraft or Noise Preferential Routes. The proposed airspace changes are compatible with the existing procedures. ACP Sponsor Consultation 12 of 52 Issue 2

13 1.7.4 This consultation is not about changes to any inbound or outbound aircraft routings. The proposed airspace change is compatible with the existing procedures This consultation is not a pre-cursor to the establishment of controlled airspace This consultation is not about changes to the Northern Terminal Control Area. 1.8 Sponsor representative for the consultation The Sponsor Representative for the consultation is: Miss Lindsay Smith, Air Traffic Services Unit, Airbus Operations Ltd, Chester Road, Broughton, CH4 0DR 1.9 CAA oversight Safety and Airspace Regulation Group of the CAA is responsible for oversight of the conduct of this consultation, ensuring that Hawarden Airport adheres to the processes detailed in CAP 725. Should you have any complaints or concerns about the manner in which the consultation is being run, you should contact: Airspace Regulator (Consultation) Safety and Airspace Regulation Group CAA House Kingsway London WC2B 6TE airspace.policy@caa.co.uk Please be aware that the CAA will not comment on the content of the proposal itself Confidentiality The CAA requires that all consultation material relating to the ACP, including copies of responses from consultees and others, is included in any formal submission to the CAA Hawarden Airport undertakes that, apart from the necessary submission of material to the CAA and essential use for analysis purposes, Hawarden Airport undertakes not to disclose any personal details or content of responses or submissions to any third parties. ACP Sponsor Consultation 13 of 52 Issue 2

14 2. Hawarden Airport 2.1 History Hawarden Airport was first opened on 4 th September 1939 by Vickers Armstrong, for the production of Wellington Bombers and subsequently Avro Lancasters. Operating as RAF Hawarden, the Airfield was also home to No 48 Maintenance Unit, No 3 Ferry Flight Pool of the Air Transport Auxiliary and No 56 Operational Training Unit (responsible for operational training of Spitfire Pilots) From 1948 the factory was taken over by the de Havilland Company and was used for the development and production of numerous iconic aircraft including Mosquito, Hornet, Venom, Vampire, Comet and many more In the 1960s the factory was taken over by Hawker Siddeley Aviation and production of the HS 125 series of aircraft continued for almost 40 years. The airfield was utilized for testing of completed and developmental aircraft, for company communications and for supporting maintenance of in service aircraft British Aerospace took over the operation of the airfield and factory and in the 1970s began an association with Airbus, who eventually took over operation of the factory and airfield The site has been the centre of wing production for all Airbus aircraft since With the exception of A380, all aircraft wings are dispatched from Hawarden Airport by Beluga A Super Transporter aircraft. Additional factory staff flights to Bristol and Toulouse are currently provided under contract by BMI In addition to the production activity the airport also supports numerous other aviation activities, these include: Aircraft maintenance and overhaul by Marshall Aviation Services. Aircraft maintenance and overhaul by Raytheon Systems Limited. General aviation from based operators. Fixed based corporate jet and turbo-prop aircraft. Aerial survey work by APEM Ltd. Police Air Support. Flying training by Flintshire Flying School & JD Aviation. Corporate aircraft handling by Chester Handling Services. Flying training for RAF Shawbury, RAF Valley and other RAF Units. Executive Aircraft Charter by Williams Aviation In the past, scheduled services have operated to Liverpool, Heathrow and The Isle of Man, although no schedules are currently operated. ACP Sponsor Consultation 14 of 52 Issue 2

15 2.2 Future Airbus has a full aircraft order book for the foreseeable future. These orders will require a higher rate of wing production and consequently increased delivery flights by the fleet of 5 Beluga aircraft. This will increase to a rate of 10,000 flying hours of the fleet per year, equating to approximately 1200 Beluga movements per year at Hawarden Airport There are no plans for scheduled services from Hawarden Airport; however national forecasts and economic trends indicate an increase in non-airbus flights in the order of 50%. 2.3 Statistics Diagrams are reproduced below to show both historic and forecast movement figures for Hawarden Airport. Diagram Total movements Total movements ACP Sponsor Consultation 15 of 52 Issue 2

16 Diagram Beluga movements Beluga movements ACP Sponsor Consultation 16 of 52 Issue 2

17 Air Traffic Management at Hawarden Airport 3 Overview Hawarden Airport is situated in uncontrolled airspace, although it is in close proximity to controlled Airspace An Aerodrome Traffic Zone (ATZ) is established around the airport, radius 2.5 nautical miles (nm) from the Aerodrome Reference Point (ARP) from the surface to 2000ft above the aerodrome level (aal). Within the ATZ aircraft must be in communication with Hawarden ATC and comply with ATC instructions. Outside the ATZ aircraft are not required to be in communication with Hawarden ATC nor comply with ATC instructions. Aircraft operating at the airport will be in communication with Hawarden ATC and some aircraft operating in this airspace may elect to do so, but there is no dedicated go to frequency for aircraft operations in this airspace. As such, the uncontrolled airspace presents an environment that has a variety of known and unknown aircraft which may conflict with aircraft landing at or taking off from Hawarden Airport The Liverpool Control Zone (CTR) is located to the North of Hawarden Airport from surface level to 2500ft amsl, where it joins the Manchester CTA. Aircraft operating within the CTR fall under the control of Liverpool ATC. The exception to this is traffic which is controlled by Hawarden ATC, coordinated with Liverpool ATC, operating in accordance with procedures detailed in a Letter of Agreement Above Hawarden Airport is a complex network of airways, predominantly from 3000ft amsl upwards, however the levels vary and are depicted below: Hawarden Chart reproduced with the permission of NATS (Services) Limited. Ordnance Survey Crown Copyright, All rights reserved Licence number ACP Sponsor Consultation 17 of 52 Issue 2

18 3.1.5 There are several minor aerodromes and airstrips in the vicinity of Hawarden Airport. The interaction of these is detailed at Although RAF Shawbury is located 25nm to the Southwest of Hawarden Airport, intense helicopter training takes place in areas as close to 10nm from Hawarden Airport. Hawarden ATC routinely coordinate aircraft operations with Shawbury ATC. Should the RMZ be approved, this arrangement will be supplemented by a Letter of Agreement. 3.2 Hawarden ATC Serco (as the ANSP) provides Air Traffic Control Services at Hawarden Airport. Aerodrome Control (ADI) is provided to aircraft and vehicles on the ground and to aircraft in the immediate vicinity of the airport. Approach Radar Control (APS) is provided to aircraft operating up to 40nm from the airport Operational hours of the airport are detailed in the United Kingdom Aeronautical Information Publication (UKAIP). At present the weekday operational hours are 0630 to 2100 local time with the option for additional Beluga operations until midnight. At weekends and public holidays the operational hours are predominantly 0830 to 1600 local time 1. It is likely that the weekend published hours will increase to 1900 local time in 2015, dependent upon operational requirements As Hawarden Airport lies outside controlled airspace there are no Standard Instrument Departures (SIDs) published. Instead, Standard Outbound Clearances 2 (SOCs) are utilised and published in the UKAIP to effect a safe and efficient entry into the airways structure. However, due to our location in uncontrolled airspace the SOCs cannot be de-conflicted from the myriad of non-communicating flights permitted to operate in uncontrolled airspace. In order to maintain safety of all aircraft, Hawarden ATC will avoid conflictions to planned Hawarden departures by delaying an aircraft take off until unknown traffic is no longer an operational issue. This can result in several minutes holding on the runway with its engine(s) running Control of inbound airways traffic to Hawarden Airport is transferred to Hawarden ATC within the protection of controlled airspace. However, all of the runway 04 final approach path and several critical areas of the runway 22 final approach are located in uncontrolled airspace, where Hawarden traffic may come into conflict with unknown, non-communicating aircraft. In cases of such conflict, Hawarden ATC will provide an extended routing to their traffic, which results in an increased fuel burn. 1 Airbus operations may take place between 0630 and 2100 local times and other operators may operate up to 1700 (local time) with prior approval from ATC. 2 Standard Outbound Clearances are equivalent to Planned Departure Routes. ACP Sponsor Consultation 18 of 52 Issue 2

19 3.3 Navigation infrastructure As well as the radar capability, Hawarden Airport currently provides the following navigation and instrument approach facilities: A Medium Frequency (MF) Non-Directional Locator Beacon (NDB); Category 1 Instrument Landing System (ILS) to runways 22 and 04; Distance Measuring Equipment (DME) frequency paired to the ILS and zero ranged to respective thresholds; Surveillance Radar Approach (SRA) The NDB/ILS/DME facilities support both ILS/DME and Localiser LLZ/DME Instrument Approach Procedures (IAPs) to the final approach track on each runway There are plans to introduce Area Navigation (RNAV), Global Navigation Satellite System (GNSS) IAPs in the near future. 3.4 Airspace activity in the vicinity of Hawarden Airport As stated previously, pilots are not required to communicate with, or make their presence known to any ATC unit, when operating in uncontrolled airspace. Providing the pilot operates the flight in accordance with the Rules of the Air as laid down in the Air Navigation Order, the aircraft may be manoeuvred at will. Aircraft operating in this manner avoid collisions via the principle of see and avoid UK Flight Information Services are available, on request, from Hawarden ATC to all aircraft operating in the vicinity of Hawarden Airport, whether using the airport or not. The level of services provided in accordance with UK FIS varies from basic safety information to full navigational and traffic avoidance by means of positive air traffic control instructions Whilst some aircraft will elect to ask for a radar service when operating in the vicinity of Hawarden Airport in uncontrolled airspace, not all will elect to do so. This results in a block of airspace within which the responsible ATSU is not fully aware of the intentions, or in some cases presence of all the aircraft within it. This is manifested as follows: Some aircraft will be communicating with Hawarden ATC and receiving a Flight Information Service from the unit; Some aircraft may be receiving a Flight Information Service, from another ATSU; Some aircraft may be showing on the Hawarden Airport Radar display but not in two-way communication; Some aircraft (such as microlights, or gliders) may not be showing on the radar display, whether or not they are in two-way communication. ACP Sponsor Consultation 19 of 52 Issue 2

20 3.4.4 All inbound/outbound Airways traffic operate under the Instrument Flight Rules (IFR) and rely on instrument navigation, as opposed to external visual cues, to determine their route and avoidance of other aircraft. General Aviation (GA) flights in uncontrolled airspace may operate under the Visual Flight Rules (VFR) or IFR whether or not in communication with any ATSU In accordance with CAP 493 Manual of Air Traffic Services Part 1, aircraft in receipt of a Deconfliction Service (the majority of airways and flight test aircraft, including the Beluga), a minimum separation of 5nm laterally or 3000ft vertically must be applied against any unknown traffic. If the other aircraft is in communication with Hawarden ATC and the intentions known, separation may be reduced to 3nm laterally and 1000ft vertically (when approved by the CAA) There are a variety of minor airfields, airstrips, launch and landing sites within the vicinity of Hawarden Airport, which utilise the associated uncontrolled airspace. Notable sites include Poulton, Gresford Flash Strip, Clotton Strip, Bryngwyn Bach, Rheddyn Coch, Llantisilio, Llandegla, Dale Barracks, Chester Racecourse, Arclid, Lleweni Parc, Gypsy Lane, Nantclwyd, Chirk, Welshpool and Sleap Due to the prevalence of controlled Airspace in the area, a significant number of GA and military flights transit through the area in which Hawarden Airport operations take place. The funnelling effect of the controlled Airspace is exacerbated further by the terrain, which focuses transit aircraft across the runway 04 approach and runway 22 climb-out These factors culminate in Hawarden IFR traffic operating in an area of relatively high air traffic density, a substantial proportion of which is not known to Hawarden ATC Hawarden ATC has attempted several publicity campaigns in order to encourage aircraft operating in the vicinity of Hawarden Airport to communicate with the unit, however, this has had very limited success. 3.5 Airspace Safety Hawarden ATC has identified several safety concerns associated with the current status quo that could be improved by the adoption of a known traffic environment. High velocity aircraft operate at Hawarden Airport which is incompatible with the principle of see and avoid. Heavy aircraft operate at Hawarden Airport which generate wake turbulence 3 that are incompatible with the principle of see and avoid. The see and avoid principle can be enhanced when all aircraft are operating on a single frequency. This enhances pilots situational awareness. The complex arrangement of controlled airspace in the vicinity of Hawarden Airport can result in GA pilots inadvertently entering controlled airspace. These incidents can lead to a reduction in safety levels, both for the GA aircraft and IFR aircraft inside controlled airspace. The lack of a single ATC unit being responsible for provision of UK FIS in this 3 Significant turbulence is generated by aircraft over a weight of 17,000kg, in the form of strong vortices. These can exist for up to 8 miles following the heavier types of aircraft. The vortices can cause handling difficulties or even damage to aircraft and are not visible to the naked eye. ACP Sponsor Consultation 20 of 52 Issue 2

21 area, leads to a dilution of local knowledge and, radar monitoring, by the more distant units providing these services In addition to the direct safety concerns, the issue of aircraft having to extend their routing therefore resulting in increased fuel burn should not be overlooked. The avoidance of unknown aircraft can lead to an increased routing in the order of 20nm. Similarly, a ground based delay due to unknown conflicting traffic can be in the order of 10 minutes The immediate reaction of a pilot to urgent radar vectoring instructions can detract from the otherwise optimal operation of the aircraft. Routine checklists and procedures can be interrupted and items missed, resulting in a reduction to safety margins. 3.6 Summary The increase in Beluga flights, both experienced and planned, has and will lead to a greater need to integrate their entry to and exit from controlled airspace, with other flights operating in this airspace Whilst the existing airspace arrangements may have been appropriate for the type and level of operations taking place at Hawarden Airport, historically, the nature and level have changed to such a point that the status quo must be reviewed Hawarden Airport has no desire to preclude or unnecessarily restrict other airspace users from operating in the vicinity of Hawarden Airport. The impact to airspace users needs to be balanced on both sides, however unless a known traffic environment is adopted in the vicinity of Hawarden Airport, IFR traffic operating at Hawarden Airport will be disproportionately disadvantaged by non-communicating traffic. In the worst possible scenario, there is an element of risk of collision between Hawarden traffic and noncommunicating small aircraft (i.e. not observed on radar). Whilst this risk is currently acceptably low, the likelihood will necessarily increase as Hawarden Airport movements increase, year on year. This risk cannot be ignored With these factors in mind, Hawarden Airport is proposing to submit a case for the adoption of a Radio Mandatory Zone in the vicinity of Hawarden Airport. Full information regarding this proposal is detailed in this document. ACP Sponsor Consultation 21 of 52 Issue 2

22 Airspace Change Proposal 4. Introduction 4.1 Overview This section details the airspace change proposed by Hawarden Airport. It covers: The overarching principles and other factors which affect the design of the airspace; The configuration of the proposed Radio Mandatory Zone; The ATS and flight procedures that are to be utilised within the airspace; The options that have been considered in reaching the proposed airspace configuration; The impact of the proposal on other airspace users and the means of mitigating any adverse impact; The environmental impact of the proposed changes The design of the RMZ aims to balance the diverse needs of the airspace users, the operational requirements of ATS providers and the environmental impact of aircraft operations. Notwithstanding this, flight safety shall take priority at all times. 4.2 Airspace design parameters Whilst there are no established design criteria for Radio Mandatory Zones, we have followed relevant guidelines for ACPs: The volume of the RMZ shall be the minimum necessary for the effective generation of a known traffic environment in the vicinity of Hawarden Airport and its current typical arrival and departure routes: The design should be as simple as possible to aid navigation; The classification of the Airspace shall be selected to permit safe access to as many airspace users as possible; There shall be effective integration of departure and arrival routes associated with the airspace structure and linking to designated runways and published IAPs; Sufficient Visual Reference Points (VRPs) should be established to facilitate the effective integration of VFR flights with other flights; The Flexible Use of Airspace (FUA) concept should be considered at every opportunity to allow maximum integrated usage of airspace by all airspace users. ACP Sponsor Consultation 22 of 52 Issue 2

23 4.2.3 The CAA specifies requirements in respect of controlled airspace, which, whilst not specifically relevant, can be used as guidance: The ATM system must be adequate to ensure that prescribed separation can be maintained between aircraft within the airspace structure and safe management of interfaces with other airspace structures; If the new airspace structure lies close to another airspace structure or overlaps an associated airspace structure, the need for operating agreements shall be considered; Should there be any other aviation activity in the vicinity of the new airspace structure and no suitable operating agreements or ATC procedures can be devised, the Change Sponsor shall act to resolve any conflicting interests Additionally, environmental considerations must be taken into account if and where they are identified. 4.3 Airspace design objectives The Radio Mandatory Zone is designed to meet, as far as is reasonably practical, the following design objectives: CAP 725 requirements should be followed and complied with; A known traffic environment should be generated within the airspace; ATC procedures and facilities must be designed and provided with regard to ATC capacity and workload; The airspace should not unduly restrict the operation or routing of current airspace users within the airspace or its vicinity; The airspace should not require any change to existing flight procedures or traffic routings The ANSP maintains an excellent relationship with GA and other airspace users and aims to maintain and build on this relationship. ACP Sponsor Consultation 23 of 52 Issue 2

24 5. Existing Operational Constraints and Concerns/Considerations 5.1 Unknown traffic Unknown traffic is defined as traffic of which the flight details and intentions are unknown to the ATCO Sections 3.4 & 3.5 of this document describe the airspace activities which may take place in uncontrolled airspace in the vicinity of Hawarden Airport, together with some of the hazards generated by the operation of unknown aircraft in this airspace The suite of radar services provided by Hawarden ATC to aircraft operating outside controlled airspace is detailed in CAP 774 UK FIS. The ATSU at Hawarden Airport provides all services (Basic Service, Traffic Service and Deconfliction Service) to aircraft operating to and from Hawarden Airport and to any other aircraft using the airspace, when requested The provision of Basic Service to aircraft is not affected by unknown traffic as the pilot of the aircraft is responsible for the navigation of his aircraft, terrain avoidance and separation from all other aircraft. However, when an ATCO becomes aware of an aircraft, in receipt of a Basic Service, which appears to be in immediate conflict with another aircraft, the ATCO must pass a warning. This generates a light increase in workload to the ATSU The provision of Traffic Service to aircraft is affected by unknown traffic as, although the pilot remains ultimately responsible for the navigation of his aircraft, terrain avoidance and separation of all other aircraft, the ATCO must advise any aircraft receiving a Traffic Service of the relative position of any potentially conflicting known and unknown traffic. Due to the unpredictable movements of unknown traffic, this generates a moderate increase in workload to the ATSU The provision of Deconfliction Service to aircraft is affected by unknown traffic as, although the pilot remains ultimately responsible for the navigation of his aircraft, terrain avoidance and separation of all other aircraft, the ATCO must aim to provide defined separation from known and unknown traffic. This separation is provided by issuing the aircraft under the Deconfliction Service with heading and levels to fly. This is normally provided in conjunction with navigational guidance from ATC for approach to Hawarden Airport or on departure from it. In the case of known traffic the separation minima is 1000ft vertically or 3NM laterally. For unknown traffic, this safety margin is increased to 3000ft vertically or 5NM laterally. Due to the unpredictable movements of unknown traffic, this generates a significant increase in workload to the ATSU The provision of Traffic Information provided as part of the Traffic Service and separation requirements provided as part of the Deconfliction Service is aimed to avoid collisions and ensure aircraft safety. However, this relies upon all aircraft painting on the radar screen. Due to the small size, low speed and construction materials of some aircraft this is not always the case. As such a risk of collision exists between known aircraft and unknown aircraft not being displayed In order to ensure aircraft safety the ATCO will endeavour to provide at least the minimum separation from unknown traffic. When the movement of the unknown traffic is erratic or unpredictable this minima may be increased as dictated by the circumstances. This often results in known traffic being given an extended routing which is not efficient. ACP Sponsor Consultation 24 of 52 Issue 2

25 5.1.9 Unknown traffic can generate a high ATCO workload which can lead to a knock-on safety impact as the ATCO can be distracted from routine tasks The mandatory operation of SSR in the vicinity of Hawarden Airport in the form of a Transponder Mandatory Zone (TMZ) was considered as a possible option to addressing some of the safety and efficiency concerns. Whilst the mandatory operation of SSR would provide additional information it does not wholly address these concerns. SSR mode C provides level information but does not specifically convey the intentions of the aircraft. However, this level information must be verified as being accurate by the ATCO before being used, which requires radio communication between the aircraft and the ATCO. Therefore the more onerous separation criteria must be applied against unknown traffic in respect of Deconfliction Service. The carriage of mode C SSR is by no means universal and therefore the establishment of a TMZ would either preclude access to non-equipped aircraft or require substantial investment of non-equipped aircraft owners, to permit entry In the current situation traffic may or may not communicate with Hawarden ATC when operating in the vicinity of Hawarden Airport. In this scenario such aircraft avoid collisions using the see and avoid principle. This concept generates two significant issues for Hawarden ATC: There are a variety of foreseeable scenarios which can arise where Hawarden IFR traffic may end up in close proximity to unknown traffic, due to substantial speed differences or meteorological conditions. The disparity of handling characteristics may make the avoidance of collision (via see and avoid) difficult or even impossible. In the larger aircraft types (particularly the Beluga) the risk exists not only for the aircraft but for the wake vortices generated behind the aircraft for up to 8nm. In normal circumstances, Hawarden ATC would aim to avoid the generation of these situations by extending the routing of the Hawarden IFR traffic, but this relies upon the unknown aircraft being displayed on radar. Whilst GA aircraft operating under the see and avoid principle have no separation requirements to comply with, aircraft operating under a Deconfliction Service have significant separation requirements. As such, whilst a GA aircraft may see & avoid Hawarden Airport traffic by what it considers a reasonable distance; this may not be adequate for the requirements of Deconfliction Service, resulting in the Hawarden Traffic being given an extended routing Two-way radio communication with all aircraft within the vicinity of Hawarden Airport would help to generate a known traffic environment. This would allow Hawarden ATC to be aware of the intentions of all aircraft in the vicinity of Hawarden Airport, optimise the routing of Hawarden traffic in relation to other airspace users and make more efficient use of the airspace. 5.2 Holding of IFR traffic Holding of IFR traffic at the Hawarden Airport holding facility (NDB), predominantly takes place at 2500ft amsl, this is coincident with the altitude that unknown traffic often overflies the airport (operating in-between the ATZ and the base of controlled airspace). Holding at the NDB is normally associated with instrument training in accordance with Hawarden Airport s published instrument approaches and aircraft holding due to emergencies or awaiting weather improvements. ACP Sponsor Consultation 25 of 52 Issue 2

26 5.3 Arrival routing The majority of Hawarden IFR arrivals can be split into either airways arrivals or the Welsh Military Training Area (WMTA) 4 arrivals Airways arrivals nominally follow the Liverpool KEGUN Standard Arrival Route (STAR) before being radar vectored for the desired approach for the runway in use. As the STAR to KEGUN (see diagram 3) and initial portion of the radar vectoring occurs within the protection of controlled airspace, only the proportion of the aircraft manoeuvres taking place in uncontrolled airspace would be affected by any of the change to airspace being proposed. These are: The uncontrolled airspace exposure of an aircraft on final approach to runway 22, between 3.6NM & 2.4NM from touchdown (i.e.; from leaving the Liverpool CTR until entering the Hawarden ATZ. The uncontrolled airspace exposure of an aircraft downwind, base leg and for the entire final approach to runway These areas of exposure are depicted in diagrams 4 & 5. Diagram 3 Chart reproduced with the permission of NATS (Services) Limited. Ordnance Survey Crown Copyright, All rights reserved Licence number The Welsh MTA is a portion of uncontrolled airspace located to the West of Hawarden Airport. ATC Services are available to aircraft from LJAO (Swanwick), subject to prior approval. ACP Sponsor Consultation 26 of 52 Issue 2

27 Diagram 4 ACP Sponsor Consultation 27 of 52 Issue 2

28 Diagram Aircraft arriving from the Welsh MTA, conduct virtually all approach manouevres in uncontrolled airspace. Once within 10nm of Hawarden Airport, they predominantly follow the inbound routings of IFR airways arrivals, hence would be impacted in a similar manner. ACP Sponsor Consultation 28 of 52 Issue 2

29 5.4 Standard outbound clearances IFR departures from Hawarden Airport joining controlled airspace do so predominantly following SOCs. These clearances have been designed to integrate the departing traffic into the complex adjacent controlled airspace structure as quickly as possible. The clearances are integrated with adjacent ATSUs procedures as far as possible. Hawarden SOCs have been designed to incorporate the standard Hawarden Noise abatement procedure. These are detailed within the UKAIP and equally applicable to all Hawarden traffic whether using a SOC or not As stated the SOCs are designed to minimize a departing aircraft exposure within uncontrolled airspace, whilst in the process of entering controlled airspace. The level of exposure varies dependent on aircraft performance, and is depicted in diagram 6 & 7. ACP Sponsor Consultation 29 of 52 Issue 2

30 Diagram 6 ACP Sponsor Consultation 30 of 52 Issue 2

31 Diagram Military low level transit routes Military low level transit routes exist to the south and west of Hawarden Airport. Whilst not depicted on civil aeronautical charts, they are annotated on military charts and used accordingly. A military low level route, does not have defined dimensions but merely identifies flow arrows which if broadly followed will deconflict military traffic using the low level route. ACP Sponsor Consultation 31 of 52 Issue 2

32 5.5.2 The military low level transit routes direct traffic to remain outside the Hawarden ATZ and below the runway 04 approach track and runway 22 climb out. Due to the level of traffic using these routes there is no real risk of collision with Hawarden Traffic on approach or climb out. However, unless the traffic is in communication with Hawarden ATC, the primary or SSR radar returns of these aircraft are considered unknown and therefore the increased Deconfliction Service minima would need to be applied (i.e. 3000ft vertical of 5NM lateral) The majority of traffic using these routes routinely contacts Hawarden ATC and passes pertinent flight details. The issue of possible poor radio coverage in this area has been raised by consultees, but this is not known to be an issue. ACP Sponsor Consultation 32 of 52 Issue 2

33 6. Future Operational Considerations 6.1 Northern Terminal Control Area re-design A working group is currently examining the options for re-designing the airways, Terminal Control Area (TMA) and CTRs around the Liverpool, Manchester and Leeds area. The focus of the working group is aimed at re-organising the existing airspace structure to incorporate RNAV, CDA and continuous climb profiles (CCP). Some re-design of SIDs and STARs is likely to coincide with this in order to reflect the harmonisation of the transition altitude in There are no changes identified within this process which would materially affect the inbound and outbound routes for Hawarden Airport. As such the inbound and outbound routes that are influencing the design of the RMZ will remain unchanged. 6.2 Beluga XL As part of its long term business planning, Airbus is designing the future aircraft component freighter, dubbed Beluga XL. The aircraft is currently being designed and is planned to enter service in Whilst the Beluga XL (based on an A ) will be larger than the current A ST, there are no foreseen specific handling characteristics which would require the Beluga XL to be handled by ATC in any markedly different manner to the current Beluga. As such the design criteria for the current RMZ proposal should not require any adaptation for operation of the Beluga XL It is equally important to note that the need for the RMZ has been identified in respect of both current and future aircraft types operating at Hawarden Airport. This process is not specifically being carried out in order to cater for new aircraft types. ACP Sponsor Consultation 33 of 52 Issue 2

34 7. Airspace Development Process 7.1 Initial airspace development Consultation Document This section outlines the process taken by Hawarden Airport to date, in developing the airspace configuration Prior to developing any airspace configuration, it was established that the current VFR and IFR inbound & outbound typical routings would not be amended. As such any proposed design would be required to provide an appropriate area of known traffic surrounding these routes, particularly the IFR routes In order to assess the impact on airspace operators fully, it was necessary to identify current airspace users, both Hawarden based and non-based. This was achieved by analysing historic ATC data and Aviation charts. This provided a list of common sites and aerodromes from which aircraft operated. A list of aviation operators was also obtained from ATC historical data. The lists were then used to establish operators and aerodromes that should be included in early stakeholder engagement and consultation. 7.2 Operational requirements to be met Hawarden ATC identified several key operational requirements that must be met by the airspace change: Generation of a known traffic environment in the vicinity of Hawarden Airport (pertinent to typical IFR inbound and outbound aircraft tracks and within the vicinity of the aerodrome); ATC procedures and facilities must be designed and provided with regard to ATC capacity and workload; The airspace should not unduly restrict the operation or routing of current airspace users within the airspace or its vicinity; The airspace should not require any change to existing Hawarden flight procedures or traffic routings Using these operational requirements, configurations of airspace design, together with associated procedures could be developed The developed airspace proposal was discussed with the CAA at an ACP framework briefing on 7th January ACP Sponsor Consultation 34 of 52 Issue 2

35 7.3 Early stakeholder engagement As sponsors, Hawarden ATC elected to engage early with aviation stakeholders. This allowed the sponsor to identify issues early in the airspace design process Engagement was threefold; a website was set up with information and a feedback facility. Letters and s were sent to over 75 identified potential stakeholders. Several aviation presentation events were held The early engagement allowed more of a collaborative approach to the airspace design. The early engagement also allowed for two-way discussions to take place, both on-line and face to face (at presentations). This permitted Hawarden ATC to elaborate on the issues and plans and for stakeholders to voice their concerns The presentations and feedback identified key stakeholders that would require further development of the proposal in order to, as far as possible address their concerns. This has led to the creation of focus groups. 7.4 Focus groups Following the early stakeholder engagement, some stakeholders identified issues which required further development of the proposed change. Focus groups have been set up with: North Wales Hang-Gliding and Para-Gliding Association; Cheshire Flyers; North Wales Gliding Club Should further stakeholders identify issues which require further development of the ACP they will be invited to join the current focus groups or additional focus groups will be set up as required. 7.5 Post-focus group airspace reviews The outcome of the focus groups may require design changes to the ACP or the addition of procedures to the airspace. These will be accommodated as far as is reasonably practical without negating the net gain of the adoption of the RMZ As part of the review process, comments from Glider pilots has led to the change of design at the SW edge of the RMZ. Whilst this does remove a level of known traffic environment from that originally proposed, it has been assessed that this can be operationally accommodated to provide a flexible use of airspace. In the absence of unknown traffic Hawarden ATC may elect to vector outside the RMZ at risk but always have the option to vector right hand for runway 04 if there is known or unknown traffic conflicting in the area. 5 A list of the main stakeholders is included at Appendix B. ACP Sponsor Consultation 35 of 52 Issue 2

36 8 Design Proposal for Hawarden Radio Mandatory Zone 8.1 Overview This section details the airspace configuration being proposed Configuration changes to the airspace or procedures proposed as a result of focus group results or stakeholder feedback is detailed A diagram of the configuration of the proposed airspace is shown in diagram 8 below. Diagram 8 Chart reproduced with the permission of NATS (Services) Limited. Ordnance Survey Crown Copyright, All rights reserved Licence number Airspace classification There is no proposed change to the classification of airspace encompassed by the RMZ. The airspace will remain uncontrolled airspace, the requirements and procedures associated with the RMZ will be applied in addition to the regulations regarding uncontrolled airspace In the most basic application of an RMZ, no aircraft is permitted unless it has two-way radio communication with the ATSU responsible for the airspace. At the outset of the development process it was identified that a strict application of this requirement would either preclude use of the airspace by a proportion of current users or require them to ACP Sponsor Consultation 36 of 52 Issue 2

37 procure costly fitting of radio equipment (which is impossible for some airspace users). As such discussions with stakeholders have taken place as to suitable alternative means of compliance that are still commensurate with generating a known traffic environment. These procedures are outlined at Within the RMZ the ATSU will provide the normal suite of UK Flight Information Services in accordance with CAP The RMZ does not require the mandatory carriage of transponders in aircraft. 8.3 Radio Mandatory Zone (RMZ) The proposed Radio Mandatory Zone will be established laterally, within the area bounded by lines between the points: N W N W N W N W N W N W N W The vertical dimensions will be from surface level to the base of N864 airway or the Manchester CTA (whichever is the lowest) such that the upper limit of the RMZ will be contiguous with controlled airspace. The RMZ will be established during the published operational hours of Hawarden Airport, in accordance with the UKAIP This design has been developed in order to provide a known environment within the critical area of the typical inbound and outbound aircraft tracks to/from Hawarden Airport specifically around the published instrument approach procedures The initial design of the RMZ is depicted in diagram 9 below and was distributed via the consultation website. ACP Sponsor Consultation 37 of 52 Issue 2

38 Diagram 9 Chart reproduced with the permission of NATS (Services) Limited. Ordnance Survey Crown Copyright, All rights reserved Licence number Following feedback from stakeholders in respect of: Airstrips affected. VFR traffic entering and departing the Liverpool CTR. The overall Area affected. The dimensions of the RMZ were reduced in order to negate some of these issues. 8.4 Alternative means of compliance Some concerns have been expressed as to the operation of Poulton Disused Airfield and Gresford Flash Airstrip. Whilst it is accepted that low level two-way radio communication between Hawarden ATC and traffic using these sites it not always possible, it is proposed that Letters of Agreement will be developed that would permit operation. ACP Sponsor Consultation 38 of 52 Issue 2

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures What is an Airspace Change Proposal? It is a formal UK Civil Aviation

More information

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ)

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) Directorate of Airspace Policy NATMAC Representatives DAP/STNTMZ 23 July 2009 NATMAC INFORMATIVE Dear Colleagues INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) INTRODUCTION 1.1 NATS issued a

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL Directorate of Airspace Policy NATMAC Representatives 13 July 2012 CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 During late

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE SAFETYSENSE LEAFLET 8e AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE 1 INTRODUCTION 2 NON-RADAR SERVICES 3 RADAR SERVICES 4 HOW TO OBTAIN A SERVICE 5 RADAR SERVICE LIMITATIONS 1 INTRODUCTION a) In this

More information

CAA AIRSPACE CHANGE DECISION

CAA AIRSPACE CHANGE DECISION Safety and Airspace Regulation Group All NATMAC Representatives 14 April 2016 CAA AIRSPACE CHANGE DECISION RECLASSIFICATION OF THE BELFAST TERMINAL CONTROL AREA AIRSPACE Organisation proposing the change:

More information

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope

More information

Contents. Subpart A General 91.1 Purpose... 7

Contents. Subpart A General 91.1 Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91

More information

NOISE ABATEMENT PROCEDURES

NOISE ABATEMENT PROCEDURES 1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group All NATMAC Representatives 18 August 2014 CAA DECISION LETTER 1. INTRODUCTION BRISTOL INTERNATIONAL AIRPORT (BIA) RNAV STARS 1.1 During January 2014, the Civil Aviation

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Figure 1 AIRSPACE CHANGE PROPOSAL STANSTED TMZ. STAKEHOLDER CONSULTATION FEEDBACK Issue 1. EGSS TMZ Stakeholder Consultation Feedback

Figure 1 AIRSPACE CHANGE PROPOSAL STANSTED TMZ. STAKEHOLDER CONSULTATION FEEDBACK Issue 1. EGSS TMZ Stakeholder Consultation Feedback A B C D Figure 1 AIRSPACE CHANGE PROPOSAL STANSTED TMZ STAKEHOLDER CONSULTATION FEEDBACK Issue 1 EGSS TMZ Stakeholder Consultation Feedback Executive Summary This document provides feedback to all stakeholders

More information

AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original

AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-06-0532 V2 15 June 2016 15 June 2016 BRITISH GLIDING ASSOCIATION : COMPETITIONS 2016

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

Date: 29 Apr 2017 Time: 1119Z Position: 5226N 00112W Location: 10nm ENE Coventry

Date: 29 Apr 2017 Time: 1119Z Position: 5226N 00112W Location: 10nm ENE Coventry AIRPROX REPORT No 2017080 Date: 29 Apr 2017 Time: 1119Z Position: 5226N 00112W Location: 10nm ENE Coventry PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft C560 PA28

More information

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

GENERAL AVIATION ALLIANCE Partnership in Aviation

GENERAL AVIATION ALLIANCE Partnership in Aviation President: Air Chief Marshal Sir John Allison KCB, CBE, FRAeS RAF(rtd) Vice President: The Lord Rotherwick Chacksfield House, 31 St Andrew's Road, Leicester, LE2 8RE Email: facilitator@gaalliance.org.uk

More information

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR)

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Version 1.0 Director NSS 14 February 2018 Guidance for Complexity and Density Considerations

More information

NDS Subject to NOTAM: No

NDS Subject to NOTAM: No AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2017-00-0131 1.1 29 November 2016 29 November 2016 RAF VALLEY (MONA) MSSR CALIBRATION NDS

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

Manual of Radiotelephony

Manual of Radiotelephony Doc 9432 AN/925 Manual of Radiotelephony Approved by the Secretary General and published under his authority Fourth Edition - 2007 International Civil Aviation Organization AMENDMENTS The issue of amendments

More information

LETTER OF AGREEMENT. Between. and RELATING TO

LETTER OF AGREEMENT. Between. and RELATING TO LETTER OF AGREEMENT Between NATS (En Route) plc, Scottish Area Control (Prestwick) NATS (Services) Ltd, Edinburgh ATC NATS (Services) Ltd, Glasgow ATC and BRITISH GLIDING ASSOCIATION (BGA) RELATING TO

More information

It is essential that planning take full account of air safety and efficiency of operations.

It is essential that planning take full account of air safety and efficiency of operations. Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural

More information

Introduction. Appendix D: Airspace Protection

Introduction. Appendix D: Airspace Protection Preliminary PreliminaryDraft DraftMaster MasterPlan Plan Bankstown Airport Introduction : Airspace Protection D Preliminary Master Plan Draft Master Plan Airspace protection D1 OVERVIEW The protection

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

Application for amendment to Tauranga control zone and control areas Consultation

Application for amendment to Tauranga control zone and control areas Consultation Application for amendment to Tauranga control zone and control areas Civil Aviation Authority Table of Contents 1. Introduction... 1 2. Background... 1 3. Proposal... 1 3. Effect on users... 2 a. VFR traffic...

More information

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013 Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013 Civil Aviation Authority Table of Contents Background... 1 Final decision... 1 The introduction

More information

Summary of Public Submissions Received on

Summary of Public Submissions Received on Summary of Public Submissions Received on NPRM 15-01 Omnibus 2014 Prepared by DENISE RATIETA and PAUL ELTON 17 August 2015 Table of Contents General... 1 Summary of Submissions... 1 Definition of controlled

More information

RV6 800ft aal 24:27 24:39 25:03 24:51

RV6 800ft aal 24:27 24:39 25:03 24:51 AIRPROX REPORT No 2013165 Date/Time: 23 Nov 2013 1125Z (Saturday) Position: 5139N 00203W (Kemble - elevation 436ft) Diagram based on radar data Airspace: Kemble ATZ (Class: G) Aircraft 1 Aircraft 2 Type:

More information

AIRPROX REPORT No Date/Time: 27 Aug Z. (5nm NE Coventry Airport) Airspace: London FIR (Class: G)

AIRPROX REPORT No Date/Time: 27 Aug Z. (5nm NE Coventry Airport) Airspace: London FIR (Class: G) AIRPROX REPORT No 2013123 Date/Time: 27 Aug 2013 1452Z Position: 5225N 00122W (5nm NE Coventry Airport) Airspace: London FIR (Class: G) Reporting Ac Type: ATP C172 Reported Ac Operator: CAT Civ Pte Alt/FL:

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Page 1 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Title of Airspace Change Proposal Change Sponsor Isle of Man/Antrim Systemisation (Revised ATS route structure over the

More information

IFR SEPARATION USING RADAR

IFR SEPARATION USING RADAR IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,

More information

CHAPTER 5 SEPARATION METHODS AND MINIMA

CHAPTER 5 SEPARATION METHODS AND MINIMA CHAPTER 5 SEPARATION METHODS AND MINIMA 5.1 Provision for the separation of controlled traffic 5.1.1 Vertical or horizontal separation shall be provided: a) between IFR flights in Class D and E airspaces

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

AERODROME OPERATIONS 1 INTRODUCTION

AERODROME OPERATIONS 1 INTRODUCTION AIP New Zealand AD 1.5-1 AD 1.5 AERODROME OPERATIONS 1 INTRODUCTION 1.1 General 1.1.1 This section details procedures for operations on and in the vicinity of aerodromes. 1.1.2 The layout of the circuit

More information

NATS Swanwick. Interface Agreement. Owners: General Manager LTC Swanwick. General Manager xxxxx Airport

NATS Swanwick. Interface Agreement. Owners: General Manager LTC Swanwick. General Manager xxxxx Airport - 1 - NATS Swanwick Interface Agreement between TERMINAL CONTROL (LTC), SWANWICK And NATS xxxxxx AIRPORT Owners: General Manager LTC Swanwick General Manager xxxxx Airport APPROVED BY Title Name Signature

More information

AIRPROX REPORT No

AIRPROX REPORT No AIRPROX REPORT No 2013022 Date/Time: Position: 25 Apr 2013 1233Z 5156N 00324W (1nm W Liverpool) Airspace: Liverpool CTR (Class: D) Reporting Ac Reported Ac Type: A319 PA38 Operator: CAT Civ Club Alt/FL:

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

SECTION 6 - SEPARATION STANDARDS

SECTION 6 - SEPARATION STANDARDS SECTION 6 - SEPARATION STANDARDS CHAPTER 1 - PROVISION OF STANDARD SEPARATION 1.1 Standard vertical or horizontal separation shall be provided between: a) All flights in Class A airspace. b) IFR flights

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group 24 August 2015 Policy Statement POLICY FOR POINT MERGE AND TROMBONE TRANSITION PROCEDURES 1 Introduction 1.1 The Point Merge transition procedure is an Area Navigation

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL Safety and Airspace Regulation Group All NATMAC Representatives 13 August 2015 CAA DECISION LETTER LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 For over 10 years

More information

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory. AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which

More information

INTERNATIONAL FIRE TRAINING CENTRE

INTERNATIONAL FIRE TRAINING CENTRE INTERNATIONAL FIRE TRAINING CENTRE RFFS SUPERVISOR INITIAL LICENSING OF AERODROMES CHAPTER 8 THE MINIMUM REQUIREMENTS TO BE MET IN THE PROVISION OF RESCUE AND FIRE FIGHTING SERVICES AT UK LICENSED AERODROMES

More information

AERODROME OPERATING MINIMA

AERODROME OPERATING MINIMA Title: Determination of Aerodrome Operating Minima Page 1 of 8 AERODROME OPERATING MINIMA 1. PURPOSE 1.1 The purpose of this Advisory Circular is to provide methods to be adopted by operators in determining

More information

AIRSPACE INFRINGEMENTS BACKGROUND STATISTICS

AIRSPACE INFRINGEMENTS BACKGROUND STATISTICS AIRSPACE INFRINGEMENTS BACKGROUND STATISTICS What is an airspace infringement? A flight into a notified airspace that has not been subject to approval by the designated controlling authority of that airspace

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

AIRPROX REPORT No Date/Time: 7 Dec Z (Saturday)

AIRPROX REPORT No Date/Time: 7 Dec Z (Saturday) AIRPROX REPORT No 2013173 Date/Time: 7 Dec 2013 1104Z (Saturday) Position: 5148N 00053W (5.8nm W Halton) Airspace: Lon FIR (Class: G) Aircraft 1 Aircraft 2 Type: Vigilant PA28 Operator: HQ Air (Trg) Civ

More information

AIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers

AIRSPACE. Aviation Consultancy at its best.  Specialist aviation support to help solve problems for airports and airport developers AIRSPACE Enabling Excellence in Aviation Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers www.cyrrus.co.uk AIRSPACE Airspace is a

More information

Sherburn Aero Club CAP1122 Review CAP 725 Framework Meeting October 26, 2016

Sherburn Aero Club CAP1122 Review CAP 725 Framework Meeting October 26, 2016 Sherburn Aero Club CAP1122 Review CAP 725 Framework Meeting October 26, 2016 The Structure of the Presentation The Draft CAP725 ACP Document The Safety Case Document Discussion Actions The Draft CAP725

More information

Draft airspace design guidance consultation

Draft airspace design guidance consultation Draft airspace design guidance consultation Annex 2: CAP 1522 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority Aviation House Gatwick Airport South West Sussex RH6 0YR You can copy

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1 Chapter 6 6.1 ESSENTIAL LOCAL TRAFFIC 6.1.1 Information on essential local traffic known to the controller shall be transmitted without delay to departing and arriving aircraft concerned. Note 1. Essential

More information

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB AIRPROX REPORT No 2016061 Date: 28 Apr 2016 Time: 1135Z Position: 5047N 00314W Location: Exeter (EX) NDB hold PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft C17

More information

London Oxford Airport Airspace Change Proposal. Consultation Document

London Oxford Airport Airspace Change Proposal. Consultation Document London Oxford Airport Airspace Change Proposal Consultation Document Document Details Reference Document Title Description London Oxford Airport Airspace Change Proposal Consultation Document Document

More information

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office: Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations

More information

Date: 01 Jun 2018 Time: 0959Z Position: 5121N 00048W Location: 6nm N Farnborough

Date: 01 Jun 2018 Time: 0959Z Position: 5121N 00048W Location: 6nm N Farnborough AIRPROX REPORT No 2018103 Date: 01 Jun 2018 Time: 0959Z Position: 5121N 00048W Location: 6nm N Farnborough PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft DA62 BE90

More information

Number April 2016

Number April 2016 Luxembourg Air Safety Bulletin Number 16-001 - April 2016 This Air Safety Bulletin examines a number of hazards related to flying in and out, and in the vicinity of, Luxembourg Airport. As the Direction

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

Chapter 16. Airports Authority of India Manual of Air Traffic Services Part RESPONSIBILITY IN REGARD TO MILITARY TRAFFIC

Chapter 16. Airports Authority of India Manual of Air Traffic Services Part RESPONSIBILITY IN REGARD TO MILITARY TRAFFIC Chapter 16 16.1 RESPONSIBILITY IN REGARD TO MILITARY TRAFFIC 16.1.1 It is recognized that some military aeronautical operations necessitate non-compliance with certain air traffic procedures. In order

More information

Review of brisbane Airport Noise Abatement Procedures

Review of brisbane Airport Noise Abatement Procedures Review of brisbane Airport Noise Abatement Procedures 1. Summary This document presents an overview of the findings of the review of the Noise Abatement Procedures in place for Brisbane Airport. The technical

More information

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace Title: Airway Q41: Reclassify to Class G below Flight level 55 Subject Release of Controlled and Segregated Airspace Version: V3.0 Status: Final Reference FASVIG 20161026 V3.0 Author: Publication Date:

More information

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016) AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan

More information

CLEARANCE INSTRUCTION READ BACK

CLEARANCE INSTRUCTION READ BACK CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely

More information

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Date: 29 Jun 2018 Time: 1502Z Position: 5325N 00312W Location: 5nm NW Liverpool Airport

Date: 29 Jun 2018 Time: 1502Z Position: 5325N 00312W Location: 5nm NW Liverpool Airport AIRPROX REPORT No 2018158 Date: 29 Jun 2018 Time: 1502Z Position: 5325N 00312W Location: 5nm NW Liverpool Airport PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Temporary Radio Mandatory Zone

Temporary Radio Mandatory Zone Introduction This safety notice contains a briefing and information about the establishment of Temporary airspace in the vicinity of Southend Airport in the form of a Radio Mandatory Zone (RMZ). The RMZ

More information

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B ANNEX B TO PART B: Runway 20 Westerly Departure UPTON 2B 2 Contents

More information

Civil Approach Procedural Controller Military Terminal Radar Controller

Civil Approach Procedural Controller Military Terminal Radar Controller AIR TRAFFIC CONTROLLER APPRENTICESHIP STANDARD Air Traffic Controller Civil Area/ Terminal Controller Civil Approach Controller Military Weapons Controller Military Area Radar Controller Civil Approach

More information

CAT E Subject to NOTAM: No

CAT E Subject to NOTAM: No AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2015-09-0091 V1.0 10 June 2016 10 June 2016 TALLA DVOR/DME CALIBRATION CAT E Subject to

More information

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION FIT FOR : A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR INFORMATION I TABLE OF CONTENTS SECTION A: GENERAL MATERIAL 2 SECTION B: PUBLICATION SPECIFIC FIT

More information

Date: 14 Jun 2017 Time: 1600Z Position: 5121N 00102W Location: 7nm NW Blackbushe airport

Date: 14 Jun 2017 Time: 1600Z Position: 5121N 00102W Location: 7nm NW Blackbushe airport AIRPROX REPORT No 2017113 Date: 14 Jun 2017 Time: 1600Z Position: 5121N 00102W Location: 7nm NW Blackbushe airport PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft

More information

UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM GLIDING CLUB

UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM GLIDING CLUB AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-04-0110 V2.0 05 May 2016 22 April 2016 UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM

More information

The Airport Charges Regulations 2011

The Airport Charges Regulations 2011 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 CAP 1210 The Airport Charges Regulations 2011 CAA Annual Report 2013 14 Civil Aviation Authority 2014 All rights reserved. Copies of this

More information

SAFEGUARDING OF AERODROMES. Advice Note 1

SAFEGUARDING OF AERODROMES. Advice Note 1 AIRPORT OPERATORS ASSOCIATION & GENERAL AVIATION AWARENESS COUNCIL supported by CIVIL AVIATION AUTHORITY Working in Co-operation SAFEGUARDING OF AERODROMES Advice Note 1 Safeguarding - An Overview 1. The

More information

AIRSPACE INFRINGEMENTS

AIRSPACE INFRINGEMENTS AIRSPACE INFRINGEMENTS Eurocontrol Airspace Infringements Workshop 24 January 2008 Dave Drake UK CAA Directorate of Airspace Policy The Problem Can lead to disruption to traffic Can lead to adverse economic

More information

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE ADVISORY CIRCULAR CAA-AC-OPS009A July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE This Advisory Circular (AC) specifies the objectives and content of company indoctrination curriculum segments applicable

More information

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

REVIEW OF PERTH AIRPORT Noise Abatement Procedures REVIEW OF PERTH AIRPORT Noise Abatement Procedures Contents SUMMARY... 3 Summary of Review Findings... 3 BACKGROUND... 4 Noise Abatement Procedures... 4 Perth Airport Noise Abatement Procedures... 4 Noise

More information

CLASS D CONTROLLED AIRSPACE GUIDE

CLASS D CONTROLLED AIRSPACE GUIDE CLASS D CONTROLLED AIRSPACE GUIDE Introduction Norwich International Airport is surrounded by Class D Controlled Airspace (CAS). This airspace is made up of a Control Zone (CTR) and a Control Area (CTA).

More information

European Joint Industry CDA Action Plan

European Joint Industry CDA Action Plan Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

THE GLIDER PILOTS: Despite extensive tracing action, none of the glider pilots could be identified.

THE GLIDER PILOTS: Despite extensive tracing action, none of the glider pilots could be identified. AIRPROX REPORT No 2014126 Date/Time: 30 Jul 2014 1418Z Position: 5211N 00030W (3.5nm NW Bedford) Airspace: London FIR (Class: G) Aircraft 1 Aircraft 2 Type: Jetstream 31 Untraced glider Operator: Alt/FL:

More information

GENERAL INFORMATION Aircraft #1 Aircraft #2

GENERAL INFORMATION Aircraft #1 Aircraft #2 GENERAL INFORMATION Identification number: 2007075 Classification: Serious incident Date and time 1 of the 2 August 2007, 10.12 hours occurrence: Location of occurrence: Maastricht control zone Aircraft

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

helicopter? Fixed wing 4p58 HINDSIGHT SITUATIONAL EXAMPLE

helicopter? Fixed wing 4p58 HINDSIGHT SITUATIONAL EXAMPLE HINDSIGHT SITUATIONAL EXAMPLE Fixed wing or helicopter? Editorial note: Situational examples are based on the experience of the authors and do not represent either a particular historical event or a full

More information

CLASS D CONTROLLED AIRSPACE GUIDE

CLASS D CONTROLLED AIRSPACE GUIDE CLASS D CONTROLLED AIRSPACE GUIDE Introduction Norwich International Airport is surrounded by Class D Controlled Airspace (CAS). This airspace is made up of a Control Zone (CTR) and a Control Area (CTA).

More information

Date: 01 Aug 2016 Time: 1344Z Position: 5441N 00241W

Date: 01 Aug 2016 Time: 1344Z Position: 5441N 00241W AIRPROX REPORT No 2016157 Date: 01 Aug 2016 Time: 1344Z Position: 5441N 00241W Location: Langwathby PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft AS365 King Air

More information

Content. Part 91 General Operating and Flight Rules 5

Content. Part 91 General Operating and Flight Rules 5 Content Rule objective... 3 Extent of consultation... 3 New Zealand Transport Strategy... 3 Summary of submissions... 3 Examination of submissions... 3 Insertion of Amendments... 4 Effective date of rule...

More information

St. Paul Downtown Airport (STP)

St. Paul Downtown Airport (STP) Reliever Airports: NOISE ABATEMENT PLAN St. Paul Downtown Airport (STP) 1 INTRODUCTION The noise abatement plan for the St. Paul Downtown Airport (STP) was prepared in recognition of the need to make the

More information

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 KURDISTAN REGIONAL GOVERNMENT SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 SEPARATION STANDARDS & APPLICATIONS International and Local Procedures ( First Edition ) April 2012 Ff Prepared By Fakhir.F.

More information