Chicago TRACON (C90) Standard Operating Procedures ORDER K CHICAGO TRACON C90 SOP 1/10/2019

Size: px
Start display at page:

Download "Chicago TRACON (C90) Standard Operating Procedures ORDER K CHICAGO TRACON C90 SOP 1/10/2019"

Transcription

1 ORDER K 1 - PURPOSE CHICAGO TRACON C90 SOP 1/10/2019 The purpose of this document is to standardize how ZAU controllers operate the C90 TRACON. All controllers shall operate via the standards outlined in this document DISTRIBUTION This Document shall be distributed to all members of ZAU ARTCC CANCELLATION This document cancels any previous documentation that shared information this document covers. Cancellation of this document will be at the authority of the ZAU ATM, DATM, TA and the VATUSA Northeastern Regional Director. Revisions to this policy can and will be made when appropriate. 1.3 SIGNATURES Signed, Matthew Campbell Jackson Gilliam Chris Hadden Air Traffic Manager Deputy Air Traffic Manager Training Administrator Chicago ARTCC Chicago ARTCC Chicago ARTCC 1

2 REVISION LOG DATE REVISION EDITOR 11/1/18 INITIAL WRITE VINCE ACRES 1/10/18 FINAL EDIT & SUBMISSION CHRIS HADDEN 1/10/18 APPROVAL & RELEASE MATTHEW CAMPBELL JACKSON GILLIAM CHRIS HADDEN 2

3 1.4 Contents 1: General..4 2: O Hare Approach : Departure : North Satellite : South Satellite : Special Procedures.45 7: Position Relief..46 REST OF PAGE INTENTIONALLY LEFT BLANK 3

4 Chapter 1: General 1.1 Airspace a.) The Chicago TRACON (C90) is divided into four areas O Hare approach, Departure, North Satellite and South satellite. O Hare arrivals enter in the four corners and the MDW arrivals enter from the south east and south west corners. C90 covers roughly 40 NM of airspace around O Hare extending over Lake Michigan, Illinois, Northwest Indiana and Southern Wisconsin. 4

5 1.2 Certification Requirements a.) C90 is considered a major TRACON and requires a major endorsement. Controllers must hold a rating of S3 or above. 1.3 Communications The following are the approved C90 TRACON positions. The name of the position, the frequency, the online callsign, and the voice channel are as follows: CallSign Position Name Frequency ARTS ID Voice Channel CHI_Z_APP Central Final Z/Z C90_ CHI_W_APP South Final W/W C90_ CHI_F_APP North Final F/F C90_ CHI_Y_APP FRAMM Feeder Y/Y C90_ CHI_J_APP KUBBS Feeder J/J C90_ CHI_E_APP OKK Feeder E/E C90_ CHI_X_APP Plano Feeder X/X C90_ CHI_B_DEP East Departure B/B C90_ CHI_D_DEP North Departure D/D C90_ CHI_M_DEP South Departure M/M C90_ CHI_G_DEP West Departure G/G C90_ CHI_K_DEP Kane Departure K/K C90_ CHI_N_DEP Loop Departure N/N C90_ CHI_A_APP North Satellite A/A C90_ CHI_S_APP South Sat S/S C90_ CHI_P_APP South Sat P/P C90_ CHI_L_APP South Sat L/L C90_ CHI_U_APP South Sat U/U C90_

6 a.) Every controller is encouraged to use voice as the primary method of communication with aircraft per VATSIM. Regulations. However, aircraft utilizing non-voice communications (text or receive only) will never be denied ATC services. Controllers shall use text to clarify instructions and/or when instructed by an aircraft. b.) Every C90 position will maintain a standard and common position ATIS. VRC s Controller Info dialog automates many of these elements of a standard position ATIS. The position ATIS will include the following elements at minimum: Position Current ATIS Letter ID Active Runways c.) Voice ATIS. At Class D airports located within C90, Local Control shall be responsible for keeping an updated voice ATIS with all necessary information pertaining to operations its respective airport. The standard VOICE ATIS for C90 if no other controller is online, is KORD_ATIS. The secondary Voice ATIS will be KMDW_ATIS. If both of those airports have a voice ATIS currently active, it will be up to the C90 controller on whether to connect an ATIS for a C90 Class Delta airport, however it is not required to do so. The ATIS should also be recorded with the voice server as rw.liveatc.net. Sample voice ATIS templates can be found below. 1. O Hare Airport Information (code), (time of wx observation) Zulu, (weather sequence wind, vis, precip/phenomena, clouds, temp, dewpoint, altimeter) 2. Arrivals expect vectors (choose one: ILS, Visual) Runway (#) approach 3. Departures expect runways (#, #, #) 4. Notices to Airmen: PIREP; Closures; Birds; Noise abatement, MU readings Wind shear; SIGMET; HIWAS; Braking action; SWAP. 5. For Clearance Delivery contact (position name) on frequency (frequency) 6. VFR aircraft say direction of flight, aircraft type and requested altitude 7. Pilots readback all runway hold short and taxi instructions. 8. Advise on initial contact you have information (code). NOTE 1- When ORD is landing converging runways or simultaneous approaches, place a message in the voice ATIS advising of converging operations to converging runways in use and/or that simultaneous approaches are in use. Also, when LAHSO operations are in effect, place an appropriate message in the voice ATIS. NOTE2- Prior to broadcasting, review the pending ATIS to ensure accuracy and inform pilots via voice and text of the update information code being broadcast. 6

7 1.4 Hierarchy of Opening Positions The following is the order in which positions will be opened/split in the event more than one controller is manning C90. All splits will be governed by the event parameters and may not occur as shown below. CallSign Position Name Frequency Airspace Delegation Notes CHI_Z_APP Central Final C90 Combined 1 CHI_W_APP South Final N/S Split/Z>North CHI_S_APP South Sat South Sat combined 1 CHI_B_DEP East Departure DEP combined + SATs 1 CHI_X_APP PLANO Feeder South Feeder/W>Final 3 CHI_J_APP KUBBS Feeder North Feeder/Z>North Final 4 CHI_P_APP South Sat South Sat Feeder/Final Split CHI_M_DEP South Departure N/S Dep Split/B>South Dep CHI_E_APP OKK Feeder SE Feeder/X>South West 2 CHI_F_APP North Final Third Final (E/W Flow) CHI_D_DEP North Departure NW Dep/B>East Dep 2 CHI_L_APP South Sat West Sat (ARR/DPA) 2 CHI_Y_APP FARMM Feeder NW Feeder/J>North East 2 CHI_G_DEP West Departure West Dep/D>North only 2 CHI_A_APP North Sat North Sat (PWK/UGN) 2 CHI_U_APP South Sat South Sat 4 split 2 CHI_N_DEP Loop Departure South East Dep corridor 2 CHI_K_DEP Kane Departure South West Dep corridor 2 a.) Notes (1) Must be opened first (2) No hierarchy (3) Cannot be used while running 4 s configuration. (4) Cannot be used while running 22 s configuration. 7

8 1.5 Shelfs 8

9 1.6 MKE Boxes 9

10 Chapter 2: O Hare Approach 2.1 O Hare Approach Control Airspace Chicago TRACON Feeder controllers are delegated the following airspace as depicted below. Defined airspace for each of the Feeder controllers is configuration specific and detailed in the graphic for each arrival configuration. C90 O Hare Feeder Controller Airspace 10

11 2.2 Feeder a.) b.) c.) d.) Feeder shall accept handoffs from ZAU and adjacent facilities for ORD arrivals, initiate handoffs to the appropriate Feeder or Final position, and be responsible for initial control and sequence of aircraft in the active descent area. Feeders may adjust speed, heading or altitude to ensure appropriate in-trail spacing and separation for Final Approach. Feeder is also responsible for coordinating with adjacent facilities and C90 positions regarding any situation or condition that may impact ideal operation. Feeder should feed aircraft to another C90 controller on a published arrival or assigned heading, that will enter the receiving controller s airspace. Accomplish communication transfer and radar handoff. The receiving controller has control of the aircraft on contact, not upon entering airspace, unless otherwise coordinated. Feeder may hand off aircraft to Final Approach on a downwind or base heading, or on a published arrival within the depicted arrival airspace for the runway configuration. Accomplish communication transfer and radar handoff as soon as possible. Final has control on contact, not upon entering airspace, unless otherwise coordinated. 2.3 Final Approach a.) b.) c.) d.) e.) f.) Final Approach shall accept handoffs from Feeders, and/or adjacent facilities when appropriate, and provide approach clearances to their designated runways. Final Approach is also responsible for coordinating with ORD regarding any situation or condition that may impact ideal operation including missed approaches that will remain inbound on the localizer. Final Approach shall inform any aircraft when they exit and re-enter the Class Bravo airspace prior to handing the aircraft to Tower Local Control. When conducting simultaneous approaches to parallel runways, turns in the descent area should be no greater than 210kts. Final decent altitudes should be issued no later than when aircraft on downwind are abeam ORD. C90 shall assume track of targets until dropping from radar. 11

12 2.4 Simultaneous Approaches O Hare is authorized to conduct simultaneous independent approaches to parallel runways. When conducting simultaneous approaches controllers shall ensure the ATIS is broadcasting Simultaneous approaches in use. Aircraft should state they have the current ATIS upon initial contact; aircraft that do not check in with the current ATIS shall be advised by using the phraseology Simultaneous Approaches in Use. Dual Parallel Approaches Dual simultaneous independent approaches may be conducted if Dual parallel runway centerlines are at least 3,600 feet apart, or dual parallel runway centerlines are at least 3,000 feet apart with a 2.5 to 3.0 offset approach to either runway and the airport field elevation is 2,000 feet MSL or less. This rule allows O Hare to run parallel approaches. Triple Parallel Approaches Triple parallel approaches may be conducted under one of the following conditions: (a) Parallel runway centerlines are at least 3,900 feet apart and the airport field elevation is 2,000 feet MSL or less; or (b) Parallel runway centerlines are at least 3,000 feet apart, a 2.5 to 3.0 offset approach to both outside runways, and the airport field elevation is 2,000 feet MSL or less; or (c) Parallel runway centerlines are at least 3,000 feet apart, a single 2.5 to 3.0 offset approach to either outside runway while parallel approaches to the remaining two runways are separated by at least 3,900 feet, and the airport field elevation is 2,000 feet MSL or less. No Transgression Zone (NTZ) An NTZ at least 2,000 feet wide is established an equal distance between extended runway final approach courses and must be depicted on the monitor display. The primary responsibility for navigation on the final approach course rests with the pilot. Control instructions and information are issued only to ensure separation between aircraft and to prevent aircraft from penetrating the NTZ. Final Monitor The final monitor is used to prevent aircraft from crossing the NTZ while conducting simultaneous independent approaches. This gives O Hare the ability to run independent approaches without having them staggered. The states Dual parallel runway centerlines are at least 3,000 and no more than 4,300 feet apart require a final monitor. In the real world dual and simultaneous approaches require a final monitor which is another position primed on the O Hare tower frequency for each runway with the ability to override if needed. For the purposes of VATSIM this position is not needed and will be the responsibility of the final controller. 12

13 2.5 Dual Simultaneous ILS Approaches Simultaneous ILS Approach procedures are to be utilized when approaches are being conducted on two or more parallel runways. a.) For two runways, traffic vectored for the low side (28R/C, 22L, 4L) shall be at 4,000 feet when joining the localizer at least 2 miles outside the approach gate. Traffic vectored for the high side (27L, 22R, 4R) shall be at or above 5,000 feet at least 2 miles outside the approach gate. b.) c.) d.) Traffic from the High and Wide Stream (SHAIN and WATSN STARs) will always be vectored for the high side when utilizing dual Simultaneous approaches. In the event an aircraft has to be pulled off the final for any reason, attempt to obtain visual separation between that aircraft and cancel the approach clearance. Assign the aircraft 3,000 feet, or if above, an altitude that ensures separation and does not conflict with downwind traffic. Coordinate with the appropriate controller for altitude, heading and speed with that aircraft. Point out the aircraft to any effected TRACON control position. Aircraft must be established on final and instructed to contact the appropriate local control frequency prior to the Capture Points but no further out than 25 NM final. 2.6 Triple Simultaneous ILS Approaches Simultaneous ILS Approach procedures are to be utilized when approaches are being conducted to three parallel runways, and capture points will be utilized.. a.) b.) c.) d.) e.) Traffic vectored for the low side (North) shall be at 4,000 feet prior to 2NM from the approach gate. Traffic vectored for the middle side (South) must be established on final at 5,000 feet, at the defined capture points. Traffic on the hide side (Middle) shall be AOA 6,000 feet prior to 2NM from the approach gate. Aircraft must be level at the intercept altitude prior to 2NM from the approach gate if traffic is inbound on the parallel runway final approach course. Traffic vectored for the Central localizer shall cross WASCO (9R) or GRABL (27L) at 7,000 feet, unless otherwise coordinated. In the event an aircraft has to be pulled off the final of the central localizer runway for any reason, attempt to obtain visual separation between that aircraft and cancel the approach clearance. Instruct the aircraft to climb and maintain 4,000 feet and track the localizer, or issue the localizer heading if unable to track. Coordinate with the appropriate departure controller and initiate a handoff if necessary. Traffic vectored for Triple Simultaneous approaches shall be conducted at ORD utilizing only and east or west flow runway configuration. Aircraft should normally be established on final outside the defined capture point Aircraft must be instructed to contact the appropriate local control frequency prior to the Capture Points but no further out than 25 NM final. 13

14 East Flow Capture Points (the point at which aircraft may join/capture the localizer) Arrival Runway Turn On Altitude Capture Point 9L 4,000 5,000 FIX 9R AOA 7,000 7,000 FIX 10C 5,000 6,000 FIX West Flow Capture Points (the point at which aircraft may join/capture the localizer) Arrival Runway Turn On Altitude Capture Point 27R 4,000 6,000 FIX 27L AOA 7,000 7,000 FIX 28C 5,000 6,000 FIX Traffic may be turned onto final inside the Capture Point if no parallel traffic exists and prior coordination is affected. 2.7 PRM Approaches (East Flow) a.) Runways 10C and 10R are only separated by 3,100 feet which requires PRM approaches and an offset localizer. 14

15 2.8 Dual Parallel Visual Approaches Weather requirements must be a ceiling of 4,500 feet or higher, and visibility of 10 miles or greater for use as the primary approach procedure. a.) b.) Traffic vectored for the low side shall be issued, and have acknowledged, a visual approach clearance prior to 3NM of the high side localizer unless visual or vertical separation is being applied with parallel runway traffic. Traffic vectored for the high side shall not be descended below 5,000 feet until established on the localizer or cleared for a visual approach. With coordination the high side may run visual approaches and the low side may run ILS approaches. 2.9 Triple Parallel Visual Approaches Triple Parallel Visual Approaches are not operated at O Hare. Up to two parallel runways, the outboard runways, may be utilized for visual approaches while a third, the center runway, must be primarily an ILS approach. a.) b.) c.) The one exception to having three runways operating visual approaches constitutes that the Center final shall primarily conduct ILS approaches. Individual aircraft, however, may be cleared for a visual approach to the center runway provided the pilot is instructed to fly the localizer. When visual approaches are being conducted to one runway and ILS approaches are being conducted to two runways, weather must be a ceiling of 4,500 feet or higher, and visibility 10 miles or greater for use as the primary approach procedure. When visual approaches are being conducted to two runways and ILS approaches are being conducted to one runway, weather must be a ceiling of 5,500 feet or higher, and visibility 10 miles or greater for use as the primary approach procedure Fix Pronunciations As much as possible fix names are designed to be pronounceable. The following is a list of frequently used fixes in the airspace and their pronunciations: ACITO BACEN BUGSE CHSTR CMSKY DUFEE EARND GRABL HZLET LEWKE MOBLE AH-SEE-TOE BACON BUG-ZEE CHESTER COMISKY DUFFY EARNED GRAY-BULL HAYSLETT LOU- KEY MOW-BULL 15

16 2.10 West Flow Three Runway Configuration a.) Feeder airspace ORD West Flow Three Runway Operation RED=FINAL BLUE=FEEDER 16

17 b.) Final Airspace 17

18 2.11 West Flow Two Runway Configuration a.) Feed Airspace ORD West Flow Two Runway Operation RED=FINAL BLUE=FEEDER 18

19 b.) Final Airspace 19

20 2.12 East Flow Three Runway Configuration a.) Feeder Airspace ORD East Flow Three Runway Operation RED=FINAL BLUE=FEEDER 20

21 b.) Final Airspace 21

22 2.13 East Flow Two Runway Configuration a.) Feeder Airspace ORD East Flow Two Runway Operation RED=FINAL BLUE=FEEDER 22

23 b.) Final Airspace 23

24 s A pair Runway Configuration ORD 4R only Traffic Flows RED=FINAL BLUE=FEEDER 24

25 2.15 4s a pair configuration. ORD 4R/L A Pair/Single/Parallel visual/ils/loc Traffic Flows RED=FINAL BLUE=FEEDER 25

26 s a pair configuration. ORD 22s A Pair/Single/Parallel visual/ils/loc Traffic Flows RED=FINAL BLUE=FEEDER 26

27 2.17. Scratchpad Entries a.) All O Hare feeder positions shall enter the applicable scratchpad into the aircraft s FDB. b.) All aircraft entering the final approach airspace have a scratchpad entry to indicate the runway and approach assigned. c.) Scratchpad s should be entered with the letter of the approach type, and the last number of the runway, and designated runway side. (L/C/R) V VISUAL V8R G RNAV Y (GPS) G4L L LOC L2R I ILS I8R R RNAV Z (RNP) R7L P PRM P0C Practice Approaches a.) The 2 nd Scratchpad must be used when entering approach types. b.) When conducting practice approaches, the 2 nd scratchpad entries must be used to indicate the type of approach being flown. Chapter 3: Departure 3.1 General Operational Procedures ORD Departure is delegated the airspace depicted below, with the exception of airspace delegated to ORD Tower and is exclusive of Feeder, Final, South Satellite, and North Satellite airspace as defined in this document. ORD Departure Delegated Airspace 27

28 a.) b.) c.) d.) e.) f.) Departure control is delegated all airspace that is exclusive of Feeder, Final, South Satellite, and North Satellite airspace as defined in this order. Adjoining boundaries: Feeder and Departure boundaries are uncommon boundaries. Dashed line (A) illustrates the boundary between WEST and KANE Departure. Dashed lines (B) illustrates the north boundary of the South Satellite climb corridors. The EAST/LOOP sector boundary is coincident with the CRIBB/SWEET boundary with ZAU east departure corridor. Approach Control shall be responsible to ensure 3 miles of lateral or diverging separation from aircraft that have departed ORD airport, on Tower assigned headings, that will parallel the active arrival descent area. Departure control shall ensure 1.5NM lateral separation from the active arrival descent area, where the Tower assigned heading does not parallel the descent area. 28

29 g.) After radar identification of an ORD departure, Departure Control shall assume control for altitude and unless otherwise permitted, not alter the assigned heading prior to leaving ORD Tower airspace. h.) i.) j.) Departure traffic shall be climbed under arrival delegated airspace if arrival traffic exists 6,000 ft shall be assigned until aircraft can be climbed higher. The use of 6,000 ft outside the active arrival descent area is to be used by Departure Control for the shuttling of traffic. The use of 6,000 ft is not intended as a blanket altitude and should only be used when needed for safety and traffic. Excessive use of 6,000 ft is discouraged as it creates a burden on approach and departure to issue mandatory merging traffic advisories. Unless the speed restriction is included in the Departure Procedure, the position issuing a climb clearance to 10,000 ft or above to a jet aircraft is responsible to issue the speed assignment. 3.2 West Departure ( ) ( when Kane is open) West Departure shall work MZV, SIMMON,, PLL, MYKIE, OLINN, NOONY, remaining clear of the active final approach and feeder airspace. 3.3 North Departure ( ) North Departure shall work BAE, PETTY, RAYNR, and PMPKN remaining clear of the active final approach and feeder airspace. 3.4 East Departure ( ) West Departure shall work EBAKE, DUFEE, ELX, and MOBLE, remaining clear of the active runway final approach courses. 3.5 Loop Departure (B) (Remain north of an east/west line through HOBEL) (North of an east/west line through MDW by the ORD 20NM when MDW 22L configuration) Loop Departure shall work LEWKE and GIJ departures, remaining clear of the active final approach and feeder airspace. 3.6 South Departure ( ) South Departure shall work ACITO, BACEN, CMSKY, DENNT, EARND, RBS and EON remaining clear of the active runway final approach courses and crossing the 270 bearing of MDW at or above 5,000 ft southbound 3.7 Kane Departure (A) ( ) Kane Departure shall work IOW and PEKUE departures, remaining clear of the active final approach and feeder airspace. 29

30 3.8 Splits Chicago Departure is designed to be split as shown below. Kane and Loop departures serve mainly to accommodate Midway departures but shall normally be combined with West and East respectively. 3.9 Radar Hand Offs Aircraft shall be tagged once airborne, vstars users are encouraged to use auto track, targets will be tagged within 1 mile of the departure end. Automatic handoffs to center should be accomplished as early as possible; aircraft should be handed off by 10,

31 Chapter 4: North Satellite 4.1 General Procedures The following are the general procedures and duties for north satellite within the Chicago TRACON: Provide radar services, information, and control instructions to all satellite aircraft within north satellite (NSAT) airspace. 4.2 Operational Procedures North Satellite is delegated the airspace depicted below. North Satellite (NSAT) Delegated Airspace a.) b.) c.) North Satellite shall ensure 1.5NM lateral or standard IFR/VFR vertical separation as appropriate from the O Hare descent area in use. Traffic inbound to North Satellite from Sector 3 must be vectored outside the ORD 20NM range mark at 4,000 ft., and outside the ORD 30NM range mark when O Hare is on East Flow parallel/simultaneous approaches. Traffic inbound to Sector 3 from North Satellite shall be vectored outside the ORD 15NM range mark at 3,000 ft. Traffic inbound to North Satellite from Sector 4 must be vectored outside the ORD 15NM range mark at 3,000 ft. and established on a 360 track. Traffic inbound to Sector 4 from North Satellite must be vectored outside the ORD 31

32 20NM range mark at 4,000 ft. and outside the 30NM range mark when O Hare is on West Flow, established on a 180 track. d.) North Satellite will handle all departures out of its controlled fields up to the top altitude, which then, the aircraft must be handed off to a Chicago Departure. 4.3 Chicago Executive Airport Special Procedures When a PWK IFR departure requires runway 16, the Chicago TRACON shall advise ORD Tower of the aircraft prior to releasing the departure. Chicago Executive arrivals requesting a circling approach under IFR shall advise ORD Tower of the aircraft. CallSign Position Name Frequency Voice Channel PWK_TWR Executive Tower PWK_ PWK_GND Executive Ground PWK_ KPWK_ATIS Executive ATIS UGN_TWR Waukegan Tower UGN_ UGN_GND Waukegan Ground UGN_ KUGN_ATIS Waukegan ATIS North Satellite Class Delta Arrival Runway Configurations PWK Chicago Executive Airport Direction Winds <5kts ,34 Direction Winds 6-19kts ,34 Direction Winds >20kts UGN Waukegan Regional Airport Direction Winds <5kts 23 5 Direction Winds 6-19kts 23 5 Direction Winds >20kts

33 Chapter 5: South Satellite 5.1 General Procedures The following are the general procedures and duties of a south satellite controller within the Chicago C90 TRACON: Provide radar services, information, and control instructions to all satellite aircraft within south satellite (SSAT) airspace and perform strip marking duties (VRC Users only). a.) South Satellite will handle all departures out of its controlled fields up to the top altitude, which then, the aircraft must be handed off to a Chicago Departure. 5.2 Operational Procedures South Satellite is delegated the airspace depicted below. NOTE The numbers on each diagram represent the ceiling of South Satellite airspace in a given area. a.) South Satellite airspace Not Utilizing MDW 13C South Satellite (SSAT) Delegated Airspace (ORD West Flow) Vertical limits are depicted below. (ORDW DESCENT AREA IN USE) 33

34 b.) South Satellite airspace Utilizing MDW 13C Vertical limits are depicted below. (ORDW) 34

35 South Satellite (SSAT) Delegated Airspace (ORD East Flow) c.) South Satellite airspace Not Utilizing MDW 13C Vertical limits are depicted below. (ORDE, DESCENT AREA IN USE) 35

36 d.) South Satellite airspace Utilizing MDW 13C Vertical limits are depicted below. (ORDE) 36

37 South Satellite (SSAT) Delegated Airspace (ORD 22s A Pair) a.) South Satellite Sector Boundaries Not Utilizing MDW 13C Vertical limits are depicted below. (ORD 22s DESCENT AREA IN USE) 37

38 b.) South Satellite Sector Boundaries Utilizing MDW 13C Vertical limits are depicted below. (ORD 22s DESCENT AREA IN USE) 38

39 South Satellite (SSAT) Delegated Airspace (ORD 4s A Pair) a.) South Satellite Sector Boundaries Utilizing MDW 13C Vertical limits are depicted below. (ORD 4s DESCENT AREA IN USE) 39

40 South Satellite (SSAT) Delegated Airspace (ORD 4R Only) a.) South Satellite Sector Boundaries Not Utilizing MDW 13C Vertical limits are depicted below. (ORD 4R DESCENT AREA IN USE) 40

41 South Satellite Sector Boundaries MDW 31C Configuration a.) Sector 3 acts as satellite approach for ARR/DPA. b.) Sector 1 acts as final approach for runway 31R, 31C, 31L c.) Sector 2 acts as feeder approach for sector 1. d.) Sector 4 acts as feeder approach for sector 1. e.) Sectors 3 and 4 act as Midway Departure. 41

42 MDW 4R Configuration a.) Sector 3 acts as satellite approach for ARR/DPA. b.) Sector 2 acts as final approach for runways 4R, 4L c.) Sector 1 acts as feeder approach for sector 2. d.) Sector 4 acts as feeder approach for sector 2. e.) Sectors 3 and 4 act as Midway Departure. 42

43 MDW 13C Configuration a.) Sector 3 acts as satellite approach for ARR/DPA. b.) Sector 2 acts as final approach for runways 13L, 13C, 13R. c.) Sector 1 acts as feeder approach for sector 2. d.) Sector 4 acts as feeder approach for sector 2. e.) Sectors 1 and 4 act as Midway Departure. 43

44 MDW 22L Configuration a.) Sector 3 acts as satellite approach for ARR/DPA. b.) Sector 4 acts as final approach for runways 22L, 22R. c.) Sector 2 acts as feeder approach for sector 4. d.) Sector 4 acts as feeder approach for sector 2. e.) Sectors 2 and 3 act as Midway Departure. 44

45 6-5. Midway Parallel 31s/13s Due to runway centerline distances and other restrictions on the use of MDW runways 31L/13R, Chicago Approach Control shall not issue any approach clearance to runway 31L or 13R. This will not preclude the use of this runway by Midway Tower with aircraft that are on IFR approach clearances. CallSign Position Name Frequency Voice Channel ARR_TWR Aurora Tower ARR_ ARR_GND Aurora Ground ARR_ KARR_ATIS Aurora ATIS DPA_TWR Dupage Tower ARR_ DPA_GND Dupage Ground ARR_ KDPA_ATIS Dupage ATIS GYY_TWR Gary Tower GYY_ GYY_GND Gary Ground GYY_ KGYY_ATIS Gary ATIS GYY_ South Satellite Class Charlie/Delta Arrival Runway Configurations ARR Aurora Municipal Airport Direction Winds <5kts 9 9, ,33 Direction Winds 6-19kts 9 9, ,33 Direction Winds >20kts DPA DuPage Airport Direction Winds <5kts 10,2L,2R 28,20L,20R 28,2L,2R Direction Winds 6-19kts 2L,2R 10,2L,2R 10,20L,20R 20L,20R 28,20L,20R 28,2L,2R Direction Winds >20kts 10 20R 28 2L GYY Gary/Chicago International Airport Direction Winds <5kts Direction Winds 6-19kts Direction Winds >20kts

46 + Chapter 6: Special Procedures 6.1 Uncontrolled Satellite Airport Instrument Approach Procedures The following procedures shall be applied when an approach procedure to an uncontrolled airport originates in one sector s airspace and the destination airport is in another controller s airspace. a.) b.) The initiating controller shall coordinate with the receiving controller to determine whether a communication handoff is necessary. The receiving controller will be the one to determine whether such handoff is necessary. The initiating controller will commence a point out of the aircraft to the receiving controller. If the receiving controller accepts the point out, the initiating controller shall issue as part of the cancellation procedure to report cancellation on the receiving controller s frequency. Even though no communication transfer has been made it is the responsibility of the receiving controller to ensure the cancellation of IFR by the aircraft. 6.2 Uncontrolled Satellite Airport Instrument Approach Restrictions Whether the aircraft will transfer from one sector to another, it is the responsibility of the initiating controller to ensure the aircraft does not breach the vertical or lateral limits of the satellite airspace while flying the approach procedure. a.) If the pilot is unable to abide by the following restrictions, coordination with the affected position may be made based on controller workload. REST OF PAGE INTENTIONALLY LEFT BLANK 46

47 Chapter 7: Position Relief 7.1 Relief Restrictions Critically dependent positions must not be simultaneously relieved. In this case, a second position may not be relieved until after the first is complete and transfer of control has been confirmed. 7.2 Relief Procedures These procedures shall apply at all positions utilizing radio capabilities, acting in handoff duties for radio positions or working in the split mode for a radio position. a.) The relieving controller shall observe the position for a period of time including the operational situation and listening to voice communications. The relieving controller shall indicate when he/she is ready to be briefed on the position being relieved. The relieving controller may ask any questions necessary to ensure a complete understanding of the operational situation after the verbal briefing is complete. b.) The controller being relieved shall commence the verbal briefing at the request of the relieving controller. The relief checklist should be followed by the active controller. Any abnormal traffic should be pointed out to the relieving controller. After the checklist has been completed and all questions have been answered, the active controller may release the position. The now-inactive-controller shall remain on the frequency for a period of time to ensure the position has been successfully transferred. c.) At the point in which the transfer is complete, the relieving controller, now-active-controller shall make a statement or otherwise indicate to the now-inactive-controller that position responsibility has been assumed. d.) When both parties agree that the relieving controller has assumed responsibility, they must end coordination communication with their operating initials Relief Checklist Order When transferring a position to a relieving controller, the following items shall be communicated verbally as part of this checklist and in the following order: 1). Runway Configuration at all noteworthy airports 2). Approach procedures in use at all noteworthy airports 3). Weather conditions, including PIREPs 4). Special activities including Emergencies, abnormal traffic 5). Current ZAU, C90, and ATCT positions online and splits, if applicable 6). Current traffic, headings, altitudes, speeds, point-outs, spacing requirements, coordination agreements, status of traffic. 47

CHICAGO TRACON (C90) O HARE INTERNATIONAL AIRPORT MIDWAY INTERNATIONAL AIRPORT SATELLITE AIRFIELDS STANDARD OPERATING PROCEDURES

CHICAGO TRACON (C90) O HARE INTERNATIONAL AIRPORT MIDWAY INTERNATIONAL AIRPORT SATELLITE AIRFIELDS STANDARD OPERATING PROCEDURES vzau Chicago ARTCC 1 CHICAGO TRACON (C90) -- -- -- -- -- O HARE INTERNATIONAL AIRPORT MIDWAY INTERNATIONAL AIRPORT SATELLITE AIRFIELDS STANDARD OPERATING PROCEDURES EFFECTIVE AS OF JANUARY 1, 2016 VIRTUAL

More information

VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT

VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT EFFECTIVE: 02/01/2019 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of

More information

VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT

VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT VATUSA CHICAGO ARTCC AND C90 TRACON LETTER OF AGREEMENT EFFECTIVE: 01/16/2019 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of

More information

CHICAGO MIDWAY INTERNATIONAL AIRPORT (KMDW) STANDARD OPERATING PROCEDURES

CHICAGO MIDWAY INTERNATIONAL AIRPORT (KMDW) STANDARD OPERATING PROCEDURES vzau Chicago ARTCC 1 CHICAGO -- -- -- -- -- MIDWAY INTERNATIONAL AIRPORT (KMDW) STANDARD OPERATING PROCEDURES CURRENT AS OF MAY 1, 2017 VIRTUAL CHICAGO AIR ROUTE TRAFFIC CONTROL CENTER VIRTUAL AIR TRAFFIC

More information

MILWAUKEE MKE TRACON GEN. MITCHELL INTL AIRPORT (KMKE) MKE TRACON SATELLITE AIRPORTS STANDARD OPERATING PROCEDURES

MILWAUKEE MKE TRACON GEN. MITCHELL INTL AIRPORT (KMKE) MKE TRACON SATELLITE AIRPORTS STANDARD OPERATING PROCEDURES vzau Chicago ARTCC 1 MILWAUKEE -- -- -- -- -- MKE TRACON GEN. MITCHELL INTL AIRPORT (KMKE) MKE TRACON SATELLITE AIRPORTS STANDARD OPERATING PROCEDURES CURRENT AS OF DECEMBER 31, 2017 VIRTUAL CHICAGO AIR

More information

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011 ZTL ARTCC Asheville Regional Air Traffic Control Tower Standard Operating Procedures AVL 7110.65B Effective: May 1, 2011 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1 1-1-1. Callsign Usage and Frequency

More information

ERIE ATCT STANDARD OPERATING PROCEDURES

ERIE ATCT STANDARD OPERATING PROCEDURES ORDER ERI ATCT 7110.10I ERIE ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION

More information

Charlotte - Douglas International Airport Traffic Control Tower

Charlotte - Douglas International Airport Traffic Control Tower Charlotte - Douglas International Airport Traffic Control Tower Standard Operating Procedures CLT ATCT 7110.65D Effective: May 1, 2011. 1 1-1-1. Callsign Usage and Frequency Delegation: CHAPTER 1. GENERAL

More information

Charlotte - Douglas International

Charlotte - Douglas International Charlotte - Douglas International Standard Operating Procedures CLT TRACON 7110.65D Effective: May 1, 2011. 1 CHAPTER 1. Departure/Satellite Radar SECTION 1. EQUIPMENT 1-1-1. Callsign Usage and Frequency

More information

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION ALBUQUERQUE ARTCC ORDER PHX ATCT v7110.1a Effective Date: Sept. 18, 2014 SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating

More information

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES January 3, 2017 BULLETIN NUMBER RECORD OF CHANGES SUBJECT AUTHORIZED BY DATE ENTERED DATE REMOVED 7110.100 Initial RR 1/3/17 3/25/17 7110.101 Added

More information

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE BOSTON ARTCC (ZBW) RELEASE RECORD Version Date Author Notes 1.0 10 Dec 2006 SK Initial Release 2.0 01 Oct 2011 DO Major update, transformed from more of

More information

Greenville Spartanburg International

Greenville Spartanburg International ZTL ARTCC Greenville Spartanburg International Airport Traffic Control Tower Standard Operating Procedures GSP 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 2-1-1. Callsign

More information

Burlington ATCT Standard Operating Procedures

Burlington ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

ZTL ARTCC. Augusta Regional

ZTL ARTCC. Augusta Regional ZTL ARTCC Augusta Regional Air Traffic Control Tower Standard Operating Procedures AGS 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign Usage and Frequency

More information

Cape Area Airports Standard Operating Procedures

Cape Area Airports Standard Operating Procedures Cape Area Airports Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world

More information

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP EFFECTIVE OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 I. PURPOSE With the establishment of the VATNZ division of the Oceania Region on 1 January 2007, the Oakland

More information

Piedmont Triad International Airport

Piedmont Triad International Airport ZTL ARTCC Piedmont Triad International Airport Airport Traffic Control Tower Standard Operating Procedures GSO 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign

More information

Albany ATCT Standard Operating Procedures

Albany ATCT Standard Operating Procedures Albany ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world

More information

D01 TERMINAL RADAR APPROACH CONTROL

D01 TERMINAL RADAR APPROACH CONTROL Order D01 7110.65A D01 TERMINAL RADAR APPROACH CONTROL December 5, 2016 VATSIM D01 7110.65A Effective Date: Denver TRACON December 5, 2016 Northwest Mountain District VATUSA Subject: D01 Air Traffic Control

More information

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures TLH 7110.65 Effective Date: May 11, 2015 Chapter 1. General 1 1. General Information obtained in this

More information

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES OCTOBER 7, 2018 Definition of Airspace Colorado Springs Class C airspace is defined as show in Appendix 1. Definition of Positions

More information

Providence ATCT Standard Operating Procedures

Providence ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating

More information

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:

More information

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures Raleigh-Durham Air Traffic Control Tower Standard Operating Procedures 1) Purpose This order defines duties and responsibilities, depicts areas of airspace, runways, and taxiways allocated to each position

More information

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) San Juan CERAP Standard Operation Procedures Version 2.2 May 5th, 2013 Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) You are entering one of the most fascinating Combined Enroute Radar Approach Control

More information

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC ZKC ORDER 01.110A Effective Date: March 18, 2017 SUBJECT: ZKC Center Standard Operating Procedures This

More information

- Updated formatting - Re-drawn airspace delegation diagram

- Updated formatting - Re-drawn airspace delegation diagram Z D C A R T C C - Updated formatting - Re-drawn airspace delegation diagram Change Log... 2 Table of Contents... 3 Chapter 1. Positions... 4 Chapter 2. Clearance Delivery... 5 Chapter 3. Ground Control...

More information

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE ALBANY ATCT (KALB( KALB) ALBANY APPROACH (ALB APP) RELEASE RECORD Version Date Author Notes 1.0 24 April 2009 Initial Release 1.1 30 Jan 2015 BN Match ALB5

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

ORDER MSY V. New Orleans. Standard Local Operating Procedures. Rev 3 December 7, 2011

ORDER MSY V. New Orleans. Standard Local Operating Procedures. Rev 3 December 7, 2011 ORDER MSY 7110.1V New Orleans Standard Local Operating Procedures Rev 3 December 7, 2011 Foreword This order defines the duties and responsibilities for personnel providing air traffic control services

More information

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016!1 GENERAL Proper use of phraseology is one of the most important thing in aviation and

More information

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION EFFECTIVE: 10/15/2018 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA

More information

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES ORDER PIT ATCT 7110.1I PITTSBURGH ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION

More information

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons. VFR PHRASEOLOGY 1. Introduction 1.1. What is phraseology? The phraseology is the way to communicate between the pilot and air traffic controller. This way is stereotyped and you shall not invent new words.

More information

CHICAGOLAND SPEEDWAY NASCAR RACES

CHICAGOLAND SPEEDWAY NASCAR RACES CHICAGOLAND SPEEDWAY NASCAR RACES JUNE 28 THROUGH JULY 2, 2018 In anticipation of a significant number of aircraft traveling to the Chicago, Illinois, area during the Chicagoland Speedway NASCAR races,

More information

SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 Table of Contents SECTION 1. GENERAL 4 1-1. PURPOSE 4 1-2. SCOPE OF

More information

Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures

Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures DAB 7210.3E Effective Date: May 11, 2015 Chapter 1. General 1 1. General Information obtained in this

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

Jacksonville ARTCC. F11 TRACON Standard Operating Procedures

Jacksonville ARTCC. F11 TRACON Standard Operating Procedures Document Number ZJX-10 Version A Effective Date 9/19/2018 Purpose Document Information ZJX 10A establishes procedures for staffing of the Central Florida TRACON radar positions (herein referred to as F11

More information

STANDARD OPERATING PROCEDURES (CLE SOP) December 3, 2016

STANDARD OPERATING PROCEDURES (CLE SOP) December 3, 2016 ORDER VATSIM CLEVELAND ATCT ORDER CLE ATCT CLEVELAND HOPKINS INTERNATIONAL AIRPORT 7110.65I STANDARD OPERATING PROCEDURES (CLE SOP) December 3, 2016 Order CLE ATCT 7110.65I Standard Operating Procedures

More information

10-February 2019 ZTL JO B VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER

10-February 2019 ZTL JO B VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER NOTICE VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER JO 7210.10 B SUBJ: Training Progression Flow 1. Purpose of this Notice. This notice provides procedural guidance and clarification for the Atlanta

More information

VATUSA Approval 3/21/18

VATUSA Approval 3/21/18 PANC SOP beta 1.0 2/30/2018 Ted Stevens Anchorage International Airport - PANC Air Traffic Control Tower STANDARD OPERATING PROCEDURES SUBJ: PANC SOP This order provides direction and guidance for the

More information

Chapter 6. Nonradar. Section 1. General DISTANCE

Chapter 6. Nonradar. Section 1. General DISTANCE 12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) KDAL Dallas Love International Airport ATCT Standard Operating Procedures Rev. December 17, 2014 Approved:

More information

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Effective Date: 1 November 2007 0400Z I. Scope: This agreement is made by and between Miami ARTCC (herein ZMA) and Jacksonville ARTCC

More information

Standard Operating Procedures

Standard Operating Procedures Allentown TRACON Standard Operating Procedures General This document describes the standard operating procedures for controlling at any of the positions within the Allentown TRACON and the airports it

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

CHICAGOLAND SPEEDWAY NASCAR RACES

CHICAGOLAND SPEEDWAY NASCAR RACES CHICAGOLAND SPEEDWAY NASCAR RACES SEPTEMBER 15 THROUGH SEPTEMBER 19, 2016 In anticipation of a significant number of aircraft traveling to the Chicago, Illinois, area during the Chicagoland Speedway NASCAR

More information

CLEARANCE INSTRUCTION READ BACK

CLEARANCE INSTRUCTION READ BACK CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely

More information

Vertiport Chicago is a private facility, open to authorized users. Prior permission and/or landing reservations are required (PPR).

Vertiport Chicago is a private facility, open to authorized users. Prior permission and/or landing reservations are required (PPR). Heliport Information Vertiport Chicago is a private facility, open to authorized users. Prior permission and/or landing reservations are required (PPR). Location Identifier: 43IL Lat/Long: 41 51 47.3"N

More information

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004 HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division Letter of Agreement Revised: July 25, 2004 Effective: July 25, 2004 Purpose Scope This Letter of Agreement (LOA) establishes operating

More information

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control SUBJ: Air Traffic Control This order prescribes air traffic control procedures and phraseology for use by personnel providing air traffic control services. Controllers are required to be familiar with

More information

LETTER OF AGREEMENT (LOA)

LETTER OF AGREEMENT (LOA) LETTER OF AGREEMENT (LOA) East Hampton Airport (revision 1) EFFECTIVE: July 16, 2012 SUBJECT: VISUAL FLIGHT RULES (VFR)/SPECIAL VFR (SVFR) HELICOPTER OPERATIONS TO/FROM EAST HAMPTON AIRPORT 1) PURPOSE:

More information

Operational Authorization Process for ILS Precision Runway Monitor (PRM) and Simultaneous Offset Instrument Approach (SOIA)

Operational Authorization Process for ILS Precision Runway Monitor (PRM) and Simultaneous Offset Instrument Approach (SOIA) GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 4 OF 2016 Date: 29 th February 2016 OPERATIONS CIRCULAR File No AV 22024/20/2015-FSD Subject: Operational Authorization

More information

OPERATIONS MANUAL PART A

OPERATIONS MANUAL PART A PAGE: 1 Table of Contents A.GENERAL /CHAPTER 32. -...3 32. OF THE AIRBORNE COLLISION AVOIDANCE... 3 32.1 ACAS Training Requirements... 3 32.2 Policy and Procedures for the use of ACAS or TCAS (as applicable)...

More information

DO NOT BEGIN THIS WORK UNTIL YOU HAVE COMPLETED ALL REQUIRED ASSIGNED READING AND EXERCISES.

DO NOT BEGIN THIS WORK UNTIL YOU HAVE COMPLETED ALL REQUIRED ASSIGNED READING AND EXERCISES. DO NOT BEGIN THIS WORK UNTIL YOU HAVE COMPLETED ALL REQUIRED ASSIGNED READING AND EXERCISES. Gardner Textbook Review Questions to prepare for Class #12 Answer these on notebook paper (or a text file) then

More information

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT EFFECTIVE: September 13, 2012 SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES 1. PURPOSE. This agreement establishes procedures

More information

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION

VATUSA CHICAGO ARTCC AND VATUSA INDIANAPOLIS ARTCC LETTER OF AGREEMENT EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION EFFECTIVE: 01/01/2017 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA

More information

IVAO Switzerland Division

IVAO Switzerland Division IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating

More information

SID/STAR phraseology FAQ Canadian implementation April 27, 2017

SID/STAR phraseology FAQ Canadian implementation April 27, 2017 SID/STAR phraseology FAQ Canadian implementation April 27, 2017 The International Civil Aviation Organization (ICAO) has developed harmonized phraseology for Standard Instrument Departures (SIDs) and Standard

More information

Instrument Proficiency Check Flight Record

Instrument Proficiency Check Flight Record Instrument Proficiency Check Flight Record Date: Flight Time: Sim. Inst. Time: Pilot Name: Aircraft Type: Aircraft Tail Number: Act. Inst. Time: Instructor Name: Holding Procedures Task Notes N/A Satisfactory

More information

VFR Arrival and Departure Procedures Rocky Mountain Airshow 2012 Rocky Mountain Metropolitan Airport (KBJC)

VFR Arrival and Departure Procedures Rocky Mountain Airshow 2012 Rocky Mountain Metropolitan Airport (KBJC) VFR Arrival and Departure Procedures Rocky Mountain Airshow 2012 Rocky Mountain Metropolitan Airport (KBJC) Revision Date 07/26/2012 The Rocky Mountain Airshow will be held at Rocky Mountain Metropolitan

More information

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT EFFECTIVE: July 10, 2010. SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services in the airspace described

More information

Instrument Refresher Course. Airfield Operations Flight Tower 412 OSS/OSAT

Instrument Refresher Course. Airfield Operations Flight Tower 412 OSS/OSAT Instrument Refresher Course Airfield Operations Flight Tower 412 OSS/OSAT Overview Mission Priorities Class D Airspace Tower Services Traffic Patterns IFR Departures Lakebed Ops Miscellaneous Special Procedures

More information

THE AREA CONTROL CENTRE (CTR) POSITION

THE AREA CONTROL CENTRE (CTR) POSITION THE AREA CONTROL CENTRE (CTR) POSITION 1. Introduction The Area Control Centre (ACC) also known as en-route controller and called CTR on IVAO, has the responsibility of ensuring Air Traffic Control (ATC)

More information

TABLE OF CONTENTS. 3 Airport Managers Notice, Arlington Airport Closures. 4 Air Show Operations, Arlington Area Frequencies

TABLE OF CONTENTS. 3 Airport Managers Notice, Arlington Airport Closures. 4 Air Show Operations, Arlington Area Frequencies 2 In anticipation of the large number of aircraft operating to and from Arlington Municipal Airport during the Arlington Fly-In, the following procedures will be used to enhance safety and minimize air

More information

GENERAL OPERATING PROCEDURES FINLAND(GOP)

GENERAL OPERATING PROCEDURES FINLAND(GOP) [Nyckelord] 2013 GENERAL OPERATING PROCEDURES FINLAND(GOP) General operating procedures (GOP) ACC 1 Introduction This document includes general operating procedures for ACC in. A good understanding of

More information

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC LETTER OF AGREEMENT Effective: April 10,2012 SUBJECT:

More information

Virtual Minneapolis Air Route Traffic Control Center vzmp ARTCC. Air Traffic Operations Manual. Revision October 2011

Virtual Minneapolis Air Route Traffic Control Center vzmp ARTCC. Air Traffic Operations Manual. Revision October 2011 Virtual Minneapolis Air Route Traffic Control Center vzmp ARTCC Air Traffic Operations Manual 20 October 2011 Volume 2 Air Traffic Control Standard Operating Procedures (ATCSOP) LIST OF EFFECTIVE PAGES

More information

40 BEALEAFBI OCTOBER Chapter 8 RQ-4 OPERATIONS

40 BEALEAFBI OCTOBER Chapter 8 RQ-4 OPERATIONS 40 BEALEAFBI11-250 1 OCTOBER 2012 Chapter 8 RQ-4 OPERATIONS 8.1. CERTIFICATE OF AUTHORIZATION. Pilots will comply with each COA and LOA in effect between Beale and other Air Traffic Control (ATC) facilities.

More information

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office: Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations

More information

AIR TRAFFIC ROUTE CONTROL CENTER

AIR TRAFFIC ROUTE CONTROL CENTER JACKSONVILLE AIR TRAFFIC ROUTE CONTROL CENTER KCHS CHARLESTON AFB/INT L AIRPORT STANDARD OPERATING PROCEDURES CHS 7110.65 TABLE OF CONTENTS CHAPTER 1 General... 4 1.1 Purpose... 4 1.2 Positions... 4 1.3

More information

Version O January 21, 2019

Version O January 21, 2019 Bradley ATCT and Y90 TRACON Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not

More information

LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT

LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT LAS PILOT BRIEFING MCCARRAN INTERNATIONAL AIRPORT COAST, LAKE, DESERT FNO FRIDAY, AUGUST 17, 2018 TABLE OF CONTENTS GENERAL BRIEFING 2 AIRPORT/RUNWAY CONFIGURATIONS 3 DEPARTURE BRIEFING 4 ARRIVAL BRIEFING

More information

NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION

NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION LAS VEGAS, October 10 12, 2017 In anticipation of a large number of aircraft operating to and from the Las Vegas area in conjunction with the 2017

More information

A PILOT S GUIDE To understanding ATC operations at Lancaster Airport

A PILOT S GUIDE To understanding ATC operations at Lancaster Airport A PILOT S GUIDE To understanding ATC operations at Lancaster Airport - 1 - Welcome to the Lancaster Airport (This material shall be used for informational purposes only) The Air Traffic Controllers at

More information

Inauguration 2017 Dulles Tower

Inauguration 2017 Dulles Tower Inauguration 2017 Dulles Tower Presented to: IAD Users By: IAD Staff, Management and NATCA Date:1/3/2017 General Information Inauguration takes place Friday, January 20, 2017 at 1200 (noon) local. The

More information

VATUSA CHICAGO ARTCC AND VATUSA MINNEAPOLIS ARTCC LETTER OF AGREEMENT

VATUSA CHICAGO ARTCC AND VATUSA MINNEAPOLIS ARTCC LETTER OF AGREEMENT SUBJECT: INTERFACILITY COORDINATION EFFECTIVE: 04/15/2015 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of airspace between VATUSA Chicago ARTCC (ZAU) and VATUSA

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

Buttonville Flying Club

Buttonville Flying Club Buttonville Flying Club 2833 16th Ave. Markham, ON L3R 0P8 Date: February 6, 2019 Subject: Mandatory Frequency Area at TORONTO Buttonville Municipal Airport (CYKZ) Procedures Executive Summary FOR VFR

More information

KTPF PETER O. KNIGHT AIRPORT TAMPA, FL 10/27 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE

KTPF PETER O. KNIGHT AIRPORT TAMPA, FL 10/27 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE KTPF PETER O. KNIGHT AIRPORT TAMPA, FL 10/27 17 10/28 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon EDT until 7:00 PM EDT Thursday, October 26, 2017 7:00 AM EDT until 7:00 PM EDT Friday, October

More information

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017 Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment

More information

NOTAM. Aircraft Owners and Pilots Association (AOPA) Fly-In Colorado Springs Airport (COS) Colorado Springs, CO SPECIAL FLIGHT PROCEDURES

NOTAM. Aircraft Owners and Pilots Association (AOPA) Fly-In Colorado Springs Airport (COS) Colorado Springs, CO SPECIAL FLIGHT PROCEDURES NOTAM Aircraft Owners and Pilots Association (AOPA) Fly-In Colorado Springs Airport (COS) Colorado Springs, CO SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon Local Friday, September 25, 2015 Until 6:00

More information

Pilot RVSM Training Guidance Material

Pilot RVSM Training Guidance Material Pilot RVSM Training Guidance Material Captain Souhaiel DALLEL IFALPA RVP AFI WEST RVSM Pilot Procedures ICAO requires states to establish for flight crews specific: Initial training programs and Recurrent

More information

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC.

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC. AD 2.ELLX-15 DISKI 2Y GTQ 7X GTQ 7Y MMD 7X RAPOR 4X 3.2.2 Climb Requirements RWY 24 Designator Route Remarks R-238 LUX to 8 DME LUX, RT to intercept R-222 NTM to 24 DME NTM, RT R-156 DIK, LT R-115 LUX

More information

From: Commanding Officer, Naval Air Station Pensacola. Subj: NAVAL AIR STATION PENSACOLA CLOSED CONTROL TOWER AIRFIELD OPERATIONS

From: Commanding Officer, Naval Air Station Pensacola. Subj: NAVAL AIR STATION PENSACOLA CLOSED CONTROL TOWER AIRFIELD OPERATIONS DEPARTMENT OF THE NAVY COMMANDING OFFICER NAS PENSACOLA 150 HASE ROAD STE-A PENSACOLA, FLORIDA 32508-1051 NAVAL AIR STATION PENSACOLA INSTRUCTION 3710.1 NASPCOLAINST 3710.1 N32 From: Commanding Officer,

More information

UNIVERSITY OF ALABAMA FOOTBALL

UNIVERSITY OF ALABAMA FOOTBALL UNIVERSITY OF FOOTBALL SPECIAL AIR TRAFFIC PROCEDURES TUSCALOOSA, AL September 16, 2017 November 18, 2017 The following procedures will be implemented to enhance safety and minimize delays during the following

More information

Letter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008

Letter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008 Letter of Agreement Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008 Purpose: This Letter of Agreement (LOA) outlines standard operating policies and procedures to

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

ILS/MLS Approaches to Parallel Runways

ILS/MLS Approaches to Parallel Runways 5-4-13. ILS/MLS Approaches to Parallel Runways a. ATC procedures permit ILS instrument approach operations to dual or triple parallel runway configurations. ILS/MLS approaches to parallel runways are grouped

More information

Scenario Training VGT - IWA

Scenario Training VGT - IWA Scenario Training VGT - IWA This lesson is divided into two separate scenario flights; KVGT to 61B, and KVGT to KIWA. The first flight to 61B will emphasize a DP out of KVGT and IFR operations into an

More information

Continuous Descent? And RNAV Arrivals

Continuous Descent? And RNAV Arrivals Continuous Descent? And RNAV Arrivals From an ATC Perspective Presentation to: CDA Workshop GA Tech Name: Don Porter RNP Project Lead FAA, RNAV RNP Group Date: 18 April 2006 My Background 22 years Terminal

More information

EFFECTIVE NOTAM KGON 10/06 SPECIAL FLIGHT PROCEDURES GROTON, CT

EFFECTIVE NOTAM KGON 10/06 SPECIAL FLIGHT PROCEDURES GROTON, CT KGON GROTON-NEW LONDON AIRPORT GROTON, CT 17 10/06 10/07 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon EDT until 6:00 PM EDT Thursday, October 5, 2017 7:00 AM EDT until 6:00 PM EDT Friday, October

More information

THE TOWER CONTROL POSITION (TWR)

THE TOWER CONTROL POSITION (TWR) 1. Introduction THE TOWER CONTROL POSITION (TWR) The Aerodrome Local Control, or Tower (called TWR) controller has the responsibility of ensuring Air Traffic Control (ATC) Services within a restricted

More information

PASCO (Pacific Soaring Council) ADVISORY TO GLIDER PILOTS

PASCO (Pacific Soaring Council) ADVISORY TO GLIDER PILOTS PASCO (Pacific Soaring Council) ADVISORY TO GLIDER PILOTS RECOMMENDED COMMUNICATIONS PROCEDURES FOR FLYING GLIDERS IN THE VICINITY OF RENO, NV The airspace around Reno has the highest number of glider-commercial

More information

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL FLIGHT STRIP MANAGEMENT - APPROACH LEVEL 1. Introduction The flight strip management for ATC is an important point in order to ensure aircraft management and improve safety when controlling. In real aviation,

More information

Glossary. Part I Acronyms/Data Terminology. AIFSS -- Automated International Flight Service Station.

Glossary. Part I Acronyms/Data Terminology. AIFSS -- Automated International Flight Service Station. Glossary Part I Acronyms/Data Terminology AC -- Air Carrier. AFSS -- Automated Flight Service Station. AIFSS -- Automated International Flight Service Station. ARTCC -- Air Route Traffic Control Center.

More information