AIR TRAFFIC ROUTE CONTROL CENTER

Size: px
Start display at page:

Download "AIR TRAFFIC ROUTE CONTROL CENTER"

Transcription

1 JACKSONVILLE AIR TRAFFIC ROUTE CONTROL CENTER KCHS CHARLESTON AFB/INT L AIRPORT STANDARD OPERATING PROCEDURES CHS

2 TABLE OF CONTENTS CHAPTER 1 General Purpose Positions Departure Gates VFR Aircraft Handoffs and Radar Tracking Releases and Rolling Calls Scratchpad Entries Temporary Altitudes General Departure Procedures Opposite Direction Procedures Multiple Aircraft Flights... 6 CHAPTER 2 Airspace Diagrams HIGH Arrival Radar... 7 CHAPTER 3 RADAR Radar Video Maps Arrival and Departure Radar Position Duties and Responsibilities Frequency Position Procedures Practice Instrument Approaches... 9 CHAPTER 4 Charleston ATCT Local Control Area of Jurisdiction Frequency Information Runway Use Program Runway Change Traffic Patterns and Altitudes Opposite Direction Procedures Departure Procedures Virtual Jacksonville ARTCC Page 2 of 17

3 4.8 Arrival Procedures Automatic Release Non-Tag VFR Tower ATIS Construction Line Up and Wait (LUAW) Procedures Land and Hold Short (LAHSO) Procedures CHAPTER 5 Charleston ATCT Ground Control Position Responsibilities Frequency Information Arrival Procedures Departure Procedures Push Backs and Startups CHAPTER 6 Charleston ATCT Clearance Delivery Position Responsibilities Frequency Information IFR Departure Instructions SID Pronunciation VFR Departure Procedures VFR Tower Pattern Procedures APPENDIX A Radar Identifiers for Interfacility Handoffs Beaufort RAPCON Myrtle Beach ATCT Shaw Approach ZJX En-Route Appendix B - Video Map Descriptions Appendix C - Branch of Service Prefix Appendix D - Approach Scratchpads Virtual Jacksonville ARTCC Page 3 of 17

4 1.1 Purpose CHAPTER 1 General Information obtained in this document is for use on the VATSIM network and in no way intended for real world purpose. This document, site and organization are not affiliated with the FAA, actual Charleston ATCT or any other governing aviation body. The purpose of this document is to establish standard operating procedures within the Charleston ATCT, Charleston ATCT Radar positions, neighboring Air Traffic Control Towers (ATCT), and En-Route controllers. You should be familiar with this document prior to controlling within CHS ATCT Airspace. This document describes procedures meant for busier times, and can be taken as guidelines so long as affected controllers approval of the deviation prior to execution. Daytona Beach International Airport is a busy training field with multiple aviation schools including Embry-Riddle Aeronautical University, 1st Class Aviation School of Aeronautics, Air America Flight Center, ATP Flight School, Daytona Aviation Academy and Phoenix East Aviation. There are high volumes of piston aircraft performing training procedures. 1.2 Positions Sector Name Callsign Relief Callsign Frequency Voice Room ID Tag WR West Radar CHS_W_APP 1W CHS_8W 8W W ER East Radar CHS_E_APP 1E CHS_8E 8E E The primary position is CHS_W_APP. After CHS_W_APP has been staffed, additional controllers may opt to open CHS_E_APP. 1.3 Departure Gates Real world Charleston ATCT Departure gates are not used on VATSIM. 1.4 VFR Aircraft VFR aircraft entering the Class Charlie airspace will be given and discrete beacon code. If departing KCHS, aircraft will be handed off to departure from LC and released to a frequency change once clear of the Class Charlie airspace unless otherwise requesting flight following. 1.5 Handoffs and Radar Tracking Charleston ATCT is a VFR tower. No radar handoffs shall be accomplished to Charleston ATCT. Approach sectors shall not drop track on any arriving aircraft as they drop automatically. This allows a controller to maintain radar identification in the instance of a missed approach without having to use a radar identification method. Virtual Jacksonville ARTCC Page 4 of 17

5 1.6 Releases and Rolling Calls Charleston Departure sectors give automatic releases to all departures from Charleston ATCT when departures follow the standard departure procedures as specified in this document. All other airports within Charleston ATCT shall request a release for all departures receiving radar services. Upon approval of the release, the release shall be good for five minutes. Upon issuance of the takeoff clearance, a departure message shall be sent to the appropriate departure sector. This can be accomplished non-verbally by the Local Controller ensuring the aircraft is squawking the appropriate code and mode C is enabled when airborne. Failing this, a non-tag message should be sent to the appropriate departure controlling consisting of its approximate location, callsign, and departure runway (example, 1 mile north, UAL147, 36R ). 1.7 Scratchpad Entries The following scratch pad format is the standard format for use within the Jacksonville Air Route Traffic Control Center for coordination between the Approach Controllers and ATCT controllers. It uses a 3 letter format consisting of XYY where X identifies the type of approach and YY consists of the runway truncated to 2 characters. For example, runway 9 would be 09, runway 18R would be 8R and so on. When conducting other than the approaches advertised in the ATIS, the approach must be indicated in the scratchpad or verbally coordinated. See Table Charleston Delivery will utilize scratch pad entries for VFR Flight Following. See Table Type Letter Name Abbreviation Localizer RNAV Z RNAV Y ILS VOR TACAN NDB Visual L G Y I R T N V VFR Flight Following VFF Table Delivery Scratchpad Entries Overhead Break Table Approach Scratchpad Entries B Charleston Radar Controllers shall ensure that all scratch pads are removed prior to initiating a radar handoff with the En-Route sector. Virtual Jacksonville ARTCC Page 5 of 17

6 1.7 Temporary Altitudes Use of temporary altitude fields is unauthorized for departures. Temporary altitude fields may be used for approach control. 1.8 General Departure Procedures Forward instructions to appropriate Class Delta or Class Charlie local control for aircraft executing practice missed approaches. 1.9 Opposite Direction Procedures 1. General a) All coordination must state "opposite direction". b) The provisions of Order , Paragraph 7-2-1, Visual Separation, cannot be applied when conducting opposite direction operations. c) All coordination must include callsign, aircraft type, arrival and departure runway. 2. Opposite Direction Departures a) Local Control must request release and departure headings for opposite direction departures from CHS Radar, stating the call sign, type aircraft, the departure runway. b) CHS Radar must suspend all arrivals until Local Control verbally advises the opposite direction departure is airborne. c) The Departing aircraft must be airborne and turned to avoid all conflicts prior to an arrival reaching a 10 mile final to the opposite direction runway. 3. Opposite Direction Arrivals a) CHS Radar must verbally request approval for opposite direction arrivals from Local Control stating the call-sign, aircraft type, arrival runway. b) Local Control must stop all departures on the opposite direction runway until the opposite direction arrival has landed. c) Any departing aircraft must be airborne and turned to avoid all conflicts prior to the opposite direction arrivals reaching a 10 mile final. d) The tower may not resume normal operations on the opposite direction runway until the aircraft has landed Multiple Aircraft Flights When there are multiple aircraft in a flight departing or arriving at CHS, this must be indicated in the prefix of the aircraft type in the flight plan. Example: A flight of two F-18s would be shown as 2/F18 in the LEAD aircraft's flight plan. Virtual Jacksonville ARTCC Page 6 of 17

7 2.1 Airspace Diagram CHAPTER 2 Airspace Diagrams Virtual Jacksonville ARTCC Page 7 of 17

8 3.1 Radar Video Maps CHAPTER 3 RADAR Highlighting "Basic Operations with Shelf" from the main sector file under CHS will draw the radar video map for East/West split operations. 3.2 Arrival and Departure Radar Position Duties and Responsibilities Unless otherwise coordinated, West Radar (WR) and East Radar (ER) are responsible for areas indicated in the appropriate diagrams in Chapter 2. WR and ER provide overflight services and approach sequence to airports landing in the Charleston ATCT airspace. WR area of jurisdiction Virtual Jacksonville ARTCC Page 8 of 17

9 is west of the Runway 15/33 extended centerline, surface to feet MSL. WR is responsible for departure control for South and Westbound traffic. ER area of jurisdiction is east of the Runway 15/33 extended centerline, surface to feet MSL. ER is responsible for departure control for North and Eastbound traffic Frequency West Radar (WR) East Radar (ER) Position Procedures 1. Ensure that all departures are on course as soon as practical. All departures should be on course before handoff to Enroute Control unless otherwise coordinated. Aircraft shall be climbed to or less if filed as such. 2. WR and ER shall work together to coordinate and determine the arrival sequence for all aircraft arriving CHS. Ensure that a handoff to LC is not initiated until the approach sequence has been determined. Communications transfer of arriving aircraft must be accomplished no later than 5 flying miles from the end of the arrival runway. 3. When vectoring to final from parallel downwinds, aircraft on opposing base legs shall be assigned altitudes to ensure vertical separation unless other approved separation has been applied. This ensures approved separation in the event of an overshoot for late turn-on to final. 4. WR and ER shall inform the other of any aircraft intending to stay in closed traffic with the tower. 5. Coordinate with LC for any aircraft conducting approaches to other than the designated runway(s) in use. 6. Provide airspace for automatic departures and radar final. 7. Protect for missed approach on all runways. 8. When vectoring heavy aircraft over uncontrolled satellite airports, controller should remain aware of VFR aircraft operating in these areas and provide sufficient service to maintain wake turbulence separation. 9. Comply with Opposite Direction Procedures as noted in Chapter 1, Section Practice Instrument Approaches Climb out/missed approach instructions must be verbally coordinated with local control. 4.1 Area of Jurisdiction CHAPTER 4 Charleston ATCT Local Control Charleston ATCT Local Control (LC) is responsible for providing departure/landing sequence for aircraft departing/landing Charleston AFB/INTL Airport within 5 mile radius of the airport up to and including 2000ft MSL. LC is also authorized to control 4000ft MSL and below at the departure ends of the runways in use as depicted in Figure when automatic departures are in use. Virtual Jacksonville ARTCC Page 9 of 17

10 Figure Frequency Information Primary Frequency Runway Use Program Determination of the active runway(s) shall be determined based on wind as well as all known factors that may affect the safety of takeoff/landing operations including the initial departure and the instrument approach phases of flight within the terminal area airspace. Calm wind runway is runway Runway Change When changing runways, LC must verbally coordinate with the appropriate radar approach position(s) for the last departure/arrival off the previously used runway and the first departure/arrival off the newly selected active runway(s). 4.5 Traffic Patterns and Altitudes 1. Rectangular feet MSL 2. Overhead feet MSL 3. Light Aircraft (Small GA) feet MSL 4. C-5A Aircraft feet MSL 5. Helicopter feet MSL Virtual Jacksonville ARTCC Page 10 of 17

11 4.6 Opposite Direction Procedures Comply with Opposite Direction Procedures as noted in Chapter 1, Section 11. Assign all Opposite Direction aircraft Runway Heading unless otherwise coordinated. 4.7 Departure Procedures 1. Local Control will provide separation for aircraft in the LC delegated airspace (pattern traffic). 2. LC shall provide initial separation between all successive departures. 3. When automatic departures are in effect, IFR departures may be released on a heading as depicted in Figure 4.1.1, climbing to 4000 feet. 4. When automatic departures are in effect, VFR departures may be released on a heading as depicted in Figure 4.1.1, climbing at or below 3500 feet. 4.8 Arrival Procedures 1. LC shall be responsible for separation of all arrival aircraft that have been handed off by Radar from all departing aircraft still under LC jurisdiction. 2. Go Around/unplanned Missed Approach a. LC shall assign IFR aircraft runway heading and 2000 feet. b. LC must verbally coordinate with departure prior to frequency change. 3. Practice Instrument Approaches a. Climbout instructions will be given by approach control and coordinated with LC. 4. LC shall NOT change the approach sequence without coordination. 4.9 Automatic Release Charleston ATCT is authorized automatic releases from the departure controller so long as the aircraft is assigned runway heading on departure and departs on the pre-coordinated active departing runway(s). In order for Automatic Releases to be authorized, procedures in paragraph 4-8 of this document shall be followed. Departure releases must be obtained if automatic releases are suspended Non-Tag An aircraft that departs and is not squawking the correct beacon code or mode C shall have a verbal rolling call issued to Charleston Departure. A verbal call may be affected using Ground-to-Ground Communications via Override or Intercom, TeamSpeak, Skype or via private message communications. Format for rolling calls is 1 mile off the departure end is UAL123. If the aircraft is squawking an incorrect code, append squawking (code). No response is required from the departure controller VFR Tower Charleston ATCT is a Visual/VFR Tower and shall not initiate or accept any radar handoffs and shall not initiate control/start track on any target. Virtual Jacksonville ARTCC Page 11 of 17

12 4.12 ATIS Construction LC shall produce a voice and text ATIS for KCHS Line Up and Wait (LUAW) Procedures 1. Do not authorize a landing clearance to an aircraft requesting a full stop, touch and go, stop and go, option, or low approach on the same runway with an aircraft that is holding in position or taxiing to line up and wait until the aircraft in position starts the takeoff roll. 2. Do not authorize an aircraft to LUAW if an aircraft has been cleared to land, touch and go, stop and go, option, or low approach on the same runway. 3. Do not authorize multiple aircraft to LUAW on the same runway Land and Hold Short (LAHSO) Procedures 1. LAHSO operations are authorized at CHS. 2. During LAHSO operations, if requested by the pilot, issue the following available distances for CHS. a) "Runway 15 available landing distance 5700 feet." b) "Runway 21 available landing distance 900 feet." c) "Runway 33 available landing distance 2900 feet." d) "Runway 03 available landing distance 5500 feet." CHAPTER 5 Charleston ATCT Ground Control 5.1 Position Responsibilities Responsible for all movement areas at Charleston AFB/INTL Airport. 5.2 Frequency Information Primary Frequency Arrival Procedures Issue taxi instructions to the arriving aircraft. 5.4 Departure Procedures Issue taxi instructions and the current ATIS information to the pilot on request. 1. To the active runway 2. To other than the active runway after coordinating with LC and the appropriate radar position. 3. Coordinate with LC for the use of intersection departures. 4. Prior to taxiing aircraft, coordinate with LC for opposite direction departures. 5. Ensure that all aircraft have current ATIS information before issuing taxi instructions. 6. Use positive coordination and control when crossing active runways. (See JO , 3-1-3) Virtual Jacksonville ARTCC Page 12 of 17

13 5.5 Push Backs and Startups Aircraft calling for push backs and/or startups shall be instructed to do so at their own discretion and contact when ready to taxi. Aircraft may be advised of the runway to expect. Charleston Ground Control is not responsible for ramp areas. CHAPTER 6 Charleston ATCT Clearance Delivery 6.1 Position Responsibilities Relay IFR clearances and VFR information to aircraft at the Charleston AFB/INTL Airport. 6.2 Frequency Information Primary Frequency IFR Departure Instructions All jet aircraft on a published SID shall be instructed to maintain an initial altitude of 4000 feet or requested altitude if less than 4000 feet. 1. Assign the departure frequency as follows: a. Aircraft departing on a course of 150 clockwise to a heading of 330 must be assigned the West Radar frequency. b. Aircraft departing on a course of 331 clockwise to 149 must be assigned the East Radar frequency. c. See Table below with recommended departure frequencies based on the SID and common VORs. 2. Issue a beacon code. 3. When Gamecock D MOA is active, amend the SWPFX SID departures to the following: a. Northeast bound departures filed for routes east of J55/V437 must amended to the PLMTO SID. b. Northwest bound departures filed for routes on or west of J55/V437 must be amended to the MLTRE SID. Sector Frequency Associated SID/ Fix CHS_W_APP LGRHD, PLFMD, CAE, ALD, SAV, SSI, CRG CHS_E_APP MLTRE, PLMTO, SWPFX, VAN FLO, CRE, SDZ, ILM, CTF Table Recommended Departure Frequencies Virtual Jacksonville ARTCC Page 13 of 17

14 6.4 SID Pronunciation LGRHD1- Loggerhead One MLTRE1- Moultrie (Mull Tree) One PLFMD1- Pluff Mud One * PLMTO1- Palmetto One SWPFX1- Swamp Fox One * Pluff Mud is a gooey mud found in the marshy areas of the low country. It contains lots of organic matter and produces its own distinctive aroma. If you step in it up to your knees and pull out your foot, chances are the resulting sound will be similar to "pluff". 6.5 VFR Departure Procedures 1. Instruct the pilot to maintain VFR at or below Assign the departure frequency. The departure frequency shall be determined as noted above in section 6-3 based on requested direction of flight. 3. Issue a beacon code to all aircraft. 6.6 VFR Tower Pattern Procedures 1. Instruct the pilot to maintain VFR in the pattern. 2. Issue a beacon code to all aircraft Virtual Jacksonville ARTCC Page 14 of 17

15 APPENDIX A Radar Identifiers for Interfacility Handoffs Beaufort RAPCON Callsign Frequency Description ID Tag NBC_APP Beaufort Approach 6M M Myrtle Beach ATCT Callsign Frequency Description ID Tag MYR_W_APP Myrtle Beach West Approach 8M M MYR_E_APP Myrtle Beach East Approach 8J J Shaw RAPCON Callsign Frequency Description ID Tag SSC_APP Shaw Approach 7G G Columbia ATCT Callsign Frequency Description ID Tag CAE_N_APP Columbia Radar North 7D D CAE_S_APP Columbia Radar South 7E E CAE_F_APP Columbia Radar Final 7F F ZJX En-Route Callsign Frequency Description Altitudes ID Tag JAX_10_CTR METTA LOW SFC-230 C10 C JAX_13_CTR ASHBURN LOW SFC-230 C13 C JAX_15_CTR OCALA LOW SFC-230 C15 C JAX_30_CTR NEPTA HIGH 240-UNL C30 C JAX_33_CTR TORRY HIGH 240-UNL C33 C Virtual Jacksonville ARTCC Page 15 of 17

16 Appendix B - Video Map Descriptions Runway 15/21 VOR/TACAN Approaches Airways Runway 33/3 VOR/TACAN Approaches VFR Map MVAs Basic Operations with Shelf Arrivals and North Departures Arrivals and South Departures Military IFR Training Routes (IR) Secondary/Satellite Approaches Tower Dbrite Appendix C - Branch of Service Prefix Prefix A C G R VM VV Branch US Air Force US Coast Guard Air or Army National Guard US Army US Marine Corps US Navy Virtual Jacksonville ARTCC Page 16 of 17

17 Appendix D - Approach Scratchpads Type Localizer RNAV Z RNAV Y ILS VOR TACAN NDB Visual Letter L G Y I R T N V Overhead Break B Virtual Jacksonville ARTCC Page 17 of 17

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures

Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures Virtual Jacksonville Air Route Traffic Control Center Tallahassee ATCT Standard Operating Procedures TLH 7110.65 Effective Date: May 11, 2015 Chapter 1. General 1 1. General Information obtained in this

More information

Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures

Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures Virtual Jacksonville Air Route Traffic Control Center Daytona Beach ATCT Standard Operating Procedures DAB 7210.3E Effective Date: May 11, 2015 Chapter 1. General 1 1. General Information obtained in this

More information

ERIE ATCT STANDARD OPERATING PROCEDURES

ERIE ATCT STANDARD OPERATING PROCEDURES ORDER ERI ATCT 7110.10I ERIE ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION

More information

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT EFFECTIVE: 01/08/08 SUBJECT: Interfacility Coordination Procedures 1. PURPOSE. This Letter of Agreement establishes procedures for coordinating

More information

ZTL ARTCC. Augusta Regional

ZTL ARTCC. Augusta Regional ZTL ARTCC Augusta Regional Air Traffic Control Tower Standard Operating Procedures AGS 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign Usage and Frequency

More information

Greenville Spartanburg International

Greenville Spartanburg International ZTL ARTCC Greenville Spartanburg International Airport Traffic Control Tower Standard Operating Procedures GSP 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 2-1-1. Callsign

More information

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011 ZTL ARTCC Asheville Regional Air Traffic Control Tower Standard Operating Procedures AVL 7110.65B Effective: May 1, 2011 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1 1-1-1. Callsign Usage and Frequency

More information

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES OCTOBER 7, 2018 Definition of Airspace Colorado Springs Class C airspace is defined as show in Appendix 1. Definition of Positions

More information

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES

RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES RALEIGH-DURHAM ATCT/TRACON STANDARD OPERATING PROCEDURES January 3, 2017 BULLETIN NUMBER RECORD OF CHANGES SUBJECT AUTHORIZED BY DATE ENTERED DATE REMOVED 7110.100 Initial RR 1/3/17 3/25/17 7110.101 Added

More information

Burlington ATCT Standard Operating Procedures

Burlington ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

Piedmont Triad International Airport

Piedmont Triad International Airport ZTL ARTCC Piedmont Triad International Airport Airport Traffic Control Tower Standard Operating Procedures GSO 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign

More information

Charlotte - Douglas International Airport Traffic Control Tower

Charlotte - Douglas International Airport Traffic Control Tower Charlotte - Douglas International Airport Traffic Control Tower Standard Operating Procedures CLT ATCT 7110.65D Effective: May 1, 2011. 1 1-1-1. Callsign Usage and Frequency Delegation: CHAPTER 1. GENERAL

More information

Albany ATCT Standard Operating Procedures

Albany ATCT Standard Operating Procedures Albany ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world

More information

Providence ATCT Standard Operating Procedures

Providence ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

Cape Area Airports Standard Operating Procedures

Cape Area Airports Standard Operating Procedures Cape Area Airports Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world

More information

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION ALBUQUERQUE ARTCC ORDER PHX ATCT v7110.1a Effective Date: Sept. 18, 2014 SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating

More information

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures

9/23/2010 RDU B. Raleigh-Durham Air Traffic Control Tower. Standard Operating Procedures Raleigh-Durham Air Traffic Control Tower Standard Operating Procedures 1) Purpose This order defines duties and responsibilities, depicts areas of airspace, runways, and taxiways allocated to each position

More information

Virtual Jacksonville Air Route Traffic Control Center Orlando International ATCT Standard Operating Procedures

Virtual Jacksonville Air Route Traffic Control Center Orlando International ATCT Standard Operating Procedures Virtual Jacksonville Air Route Traffic Control Center Orlando International ATCT Standard Operating Procedures 1) Disclaimer: The information contained herein is meant for flight simulation purposes only

More information

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES

PITTSBURGH ATCT STANDARD OPERATING PROCEDURES ORDER PIT ATCT 7110.1I PITTSBURGH ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION

More information

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) KDAL Dallas Love International Airport ATCT Standard Operating Procedures Rev. December 17, 2014 Approved:

More information

Charlotte - Douglas International

Charlotte - Douglas International Charlotte - Douglas International Standard Operating Procedures CLT TRACON 7110.65D Effective: May 1, 2011. 1 CHAPTER 1. Departure/Satellite Radar SECTION 1. EQUIPMENT 1-1-1. Callsign Usage and Frequency

More information

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB

BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE KALB) ALBANY APPROACH (ALB BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE ALBANY ATCT (KALB( KALB) ALBANY APPROACH (ALB APP) RELEASE RECORD Version Date Author Notes 1.0 24 April 2009 Initial Release 1.1 30 Jan 2015 BN Match ALB5

More information

VATUSA Approval 3/21/18

VATUSA Approval 3/21/18 PANC SOP beta 1.0 2/30/2018 Ted Stevens Anchorage International Airport - PANC Air Traffic Control Tower STANDARD OPERATING PROCEDURES SUBJ: PANC SOP This order provides direction and guidance for the

More information

Version O January 21, 2019

Version O January 21, 2019 Bradley ATCT and Y90 TRACON Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not

More information

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release

RELEASE RECORD. Version Date Author Notes Dec 2006 SK Initial Release BOSTON ARTCC (vzbw) STANDARD OPERATING PROCEDURE BOSTON ARTCC (ZBW) RELEASE RECORD Version Date Author Notes 1.0 10 Dec 2006 SK Initial Release 2.0 01 Oct 2011 DO Major update, transformed from more of

More information

- Updated formatting - Re-drawn airspace delegation diagram

- Updated formatting - Re-drawn airspace delegation diagram Z D C A R T C C - Updated formatting - Re-drawn airspace delegation diagram Change Log... 2 Table of Contents... 3 Chapter 1. Positions... 4 Chapter 2. Clearance Delivery... 5 Chapter 3. Ground Control...

More information

VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT

VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT VATUSA C90 TRACON AND O HARE ATCT LETTER OF AGREEMENT EFFECTIVE: 02/01/2019 SUBJECT: INTERFACILITY COORDINATION 1. PURPOSE: This agreement establishes coordination procedures and defines delegation of

More information

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016!1 GENERAL Proper use of phraseology is one of the most important thing in aviation and

More information

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC Effective Date: 1 November 2007 0400Z I. Scope: This agreement is made by and between Miami ARTCC (herein ZMA) and Jacksonville ARTCC

More information

ORDER MSY V. New Orleans. Standard Local Operating Procedures. Rev 3 December 7, 2011

ORDER MSY V. New Orleans. Standard Local Operating Procedures. Rev 3 December 7, 2011 ORDER MSY 7110.1V New Orleans Standard Local Operating Procedures Rev 3 December 7, 2011 Foreword This order defines the duties and responsibilities for personnel providing air traffic control services

More information

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012

VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 VATUSA-VATNZ-VATPAC OCEANIC PARTNERSHIP EFFECTIVE OAKLAND OCEANIC FSS GENERAL SOP 1 OCT 2012 I. PURPOSE With the establishment of the VATNZ division of the Oceania Region on 1 January 2007, the Oakland

More information

Jax Navy Flying Club Course Rules

Jax Navy Flying Club Course Rules Jax Navy Flying Club Course Rules Responsibilities. The Jax Navy Flying Club maintains responsibility for ensuring that all pilots operating out of Naval Air Station Jacksonville are familiar with local

More information

Jacksonville ARTCC. F11 TRACON Standard Operating Procedures

Jacksonville ARTCC. F11 TRACON Standard Operating Procedures Document Number ZJX-10 Version A Effective Date 9/19/2018 Purpose Document Information ZJX 10A establishes procedures for staffing of the Central Florida TRACON radar positions (herein referred to as F11

More information

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control SUBJ: Air Traffic Control This order prescribes air traffic control procedures and phraseology for use by personnel providing air traffic control services. Controllers are required to be familiar with

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

D01 TERMINAL RADAR APPROACH CONTROL

D01 TERMINAL RADAR APPROACH CONTROL Order D01 7110.65A D01 TERMINAL RADAR APPROACH CONTROL December 5, 2016 VATSIM D01 7110.65A Effective Date: Denver TRACON December 5, 2016 Northwest Mountain District VATUSA Subject: D01 Air Traffic Control

More information

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES

Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES Southern California TRACON and Lindbergh Tower LETTER OF AGREEMENT EFFECTIVE: September 13, 2012 SUBJECT: INTER-FACILITY COORDINATION AND CONTROL PROCEDURES 1. PURPOSE. This agreement establishes procedures

More information

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) San Juan CERAP Standard Operation Procedures Version 2.2 May 5th, 2013 Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR) You are entering one of the most fascinating Combined Enroute Radar Approach Control

More information

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004

HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division. Letter of Agreement. Revised: July 25, 2004 Effective: July 25, 2004 HOUSTON AIR ROUTE TRAFFIC CONTROL CENTER VATSIM United States Division Letter of Agreement Revised: July 25, 2004 Effective: July 25, 2004 Purpose Scope This Letter of Agreement (LOA) establishes operating

More information

A PILOT S GUIDE To understanding ATC operations at Lancaster Airport

A PILOT S GUIDE To understanding ATC operations at Lancaster Airport A PILOT S GUIDE To understanding ATC operations at Lancaster Airport - 1 - Welcome to the Lancaster Airport (This material shall be used for informational purposes only) The Air Traffic Controllers at

More information

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:

More information

Jax Navy Flying Club Course Rules

Jax Navy Flying Club Course Rules Jax Navy Flying Club Course Rules Responsibilities. The Jax Navy Flying Club maintains responsibility for ensuring that all pilots operating out of Naval Air Station Jacksonville are familiar with local

More information

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE

ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT. EFFECTIVE: July 10, SUBJECT: APPROACH CONTROL SERVICE ZTL ARTCC / CLT ATCT LETTER OF AGREEMENT EFFECTIVE: July 10, 2010. SUBJECT: APPROACH CONTROL SERVICE 1. PURPOSE: To delegate authority and responsibility for approach control services in the airspace described

More information

10-February 2019 ZTL JO B VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER

10-February 2019 ZTL JO B VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER NOTICE VIRTUAL AIR TRAFFIC SIMULATION NETWORK ATLANTA CENTER JO 7210.10 B SUBJ: Training Progression Flow 1. Purpose of this Notice. This notice provides procedural guidance and clarification for the Atlanta

More information

- Initial. - Added MCRAY and new PDC s. - General update. - Added ATIS frequency - Added gate diagram appendix - Typo fixes - Minor formatting changes

- Initial. - Added MCRAY and new PDC s. - General update. - Added ATIS frequency - Added gate diagram appendix - Typo fixes - Minor formatting changes Z D C A R T C C - Initial - Added MCRAY and new PDC s - General update - Added ATIS frequency - Added gate diagram appendix - Typo fixes - Minor formatting changes - Added altitude restrictions to nearby

More information

Chapter 6. Nonradar. Section 1. General DISTANCE

Chapter 6. Nonradar. Section 1. General DISTANCE 12/10/15 JO 7110.65W Chapter 6. Nonradar Section 1. General 6 1 1. DISTANCE Use mileage based (DME and/or ATD) procedures and minima only when direct pilot/controller communications are maintained. FIG

More information

Clearance & Ground Air Traffic Control. Clearance Delivery An Introduction to Ground Control... 2

Clearance & Ground Air Traffic Control. Clearance Delivery An Introduction to Ground Control... 2 Clearance & Ground Air Traffic Control Table of Contents Clearance Delivery.................................. 1 An Introduction to Ground Control...................... 2 Initial Contact and Position Determination.................3

More information

VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION

VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION Clearance Delivery [CALLSIGN], YOU ARE CLEARED TO [DESTINATION] VIA [INSTRUCTION-1], THEN [ANOTHER INSTRUCTION

More information

LETTER OF AGREEMENT 1. PURPOSE: 2. Cancellation: 3. vzdc Responsibilities, Arrivals: CAE MYR: FLO: CLT: 4. vzjx Responsibilities, Arrivals: RDU: FAY

LETTER OF AGREEMENT 1. PURPOSE: 2. Cancellation: 3. vzdc Responsibilities, Arrivals: CAE MYR: FLO: CLT: 4. vzjx Responsibilities, Arrivals: RDU: FAY LETTER OF AGREEMENT BETWEEN: JACKSONVILLE AIR ROUTE TRAFFIC CONTROL CENTER AND WASHINGTON AIR ROUTE TRAFFIC CONTROL CENTER EFFECTIVE: 15 JULY 2011 19 NOVEMBER 2011 1. PURPOSE: This agreement between Washington

More information

Understanding the Jeppesen. Updates: Changes, Errata and What s New

Understanding the Jeppesen. Updates: Changes, Errata and What s New Understanding the Jeppesen Updates: Changes, Errata and What s New www.understandingaviation.com info@understandingaviation.com Table of Contents Changes... 1 Errata... 5 What s New... 5 Changes Law Amendment

More information

Standard Operating Procedures

Standard Operating Procedures Allentown TRACON Standard Operating Procedures General This document describes the standard operating procedures for controlling at any of the positions within the Allentown TRACON and the airports it

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

SFAR 93 and Minimum Altitudes

SFAR 93 and Minimum Altitudes SFAR 93 and Minimum Altitudes Stuart W. Goering FAA Aviation Safety Counselor 1/14/2003 22:12 Copyright 2003 Stuart W. Goering 1 You Make the Call Too Low or Just Fine? 1/14/2003 22:12 Copyright 2003 Stuart

More information

VFR Arrival and Departure Procedures Rocky Mountain Airshow 2012 Rocky Mountain Metropolitan Airport (KBJC)

VFR Arrival and Departure Procedures Rocky Mountain Airshow 2012 Rocky Mountain Metropolitan Airport (KBJC) VFR Arrival and Departure Procedures Rocky Mountain Airshow 2012 Rocky Mountain Metropolitan Airport (KBJC) Revision Date 07/26/2012 The Rocky Mountain Airshow will be held at Rocky Mountain Metropolitan

More information

NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION

NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION LAS VEGAS, October 10 12, 2017 In anticipation of a large number of aircraft operating to and from the Las Vegas area in conjunction with the 2017

More information

UNIVERSITY OF ALABAMA FOOTBALL

UNIVERSITY OF ALABAMA FOOTBALL UNIVERSITY OF FOOTBALL SPECIAL AIR TRAFFIC PROCEDURES TUSCALOOSA, AL September 16, 2017 November 18, 2017 The following procedures will be implemented to enhance safety and minimize delays during the following

More information

Holland-America Line Pilot Briefing. December 14, bvartcc.com

Holland-America Line Pilot Briefing. December 14, bvartcc.com Holland-America Line Pilot Briefing December 14, 2018 bvartcc.com /BVARTCC @BVARTCC When given a frequency change, you may be told either to monitor or contact the next controller. If you are told to monitor

More information

Southern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower

Southern California Terminal Radar Approach Control and Ontario Airport Traffic Control Tower Southern California Terminal Radar Approach Control and Ontario Airport Traffic LETTER OF AGREEMENT SUBJECT: Interfacility Coordination and Control Procedures Effective: August 16, 2013 1. PURPOSE: This

More information

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC

VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK NORTH AMERICA REGION - USA DIVISION vzkc KANSAS CITY ARTCC ZKC ORDER 01.110A Effective Date: March 18, 2017 SUBJECT: ZKC Center Standard Operating Procedures This

More information

CHICAGOLAND SPEEDWAY NASCAR RACES

CHICAGOLAND SPEEDWAY NASCAR RACES CHICAGOLAND SPEEDWAY NASCAR RACES JUNE 28 THROUGH JULY 2, 2018 In anticipation of a significant number of aircraft traveling to the Chicago, Illinois, area during the Chicagoland Speedway NASCAR races,

More information

STANDARD OPERATING PROCEDURES (CLE SOP) December 3, 2016

STANDARD OPERATING PROCEDURES (CLE SOP) December 3, 2016 ORDER VATSIM CLEVELAND ATCT ORDER CLE ATCT CLEVELAND HOPKINS INTERNATIONAL AIRPORT 7110.65I STANDARD OPERATING PROCEDURES (CLE SOP) December 3, 2016 Order CLE ATCT 7110.65I Standard Operating Procedures

More information

PILOT BRIEFING GENEVA RFE 2018

PILOT BRIEFING GENEVA RFE 2018 PILOT BRIEFING GENEVA RFE 2018 Introduction The aim of this pilot briefing for the RFE is to inform pilots about local procedures and to prepare them for a lot of traffic. To be able to achieve a good

More information

COLLEGE FOOTBALL PLAYOFF NATIONAL CHAMPIONSHIP

COLLEGE FOOTBALL PLAYOFF NATIONAL CHAMPIONSHIP 2017 College Football Playoff National Championship Notices to Airmen COLLEGE FOOTBALL PLAYOFF NATIONAL CHAMPIONSHIP SPECIAL AIR TRAFFIC PROCEDURES TAMPA, January 8 10, 2017 In anticipation of a large

More information

Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement

Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement Cleveland ARTCC and Boston Virtual ARTCC Letter of Agreement Effective: 1 Oct 2017 1. PURPOSE: This agreement defines the necessary pre-defined air traffic control procedures and coordination responsibilities

More information

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51) Northern Regional Training Scheme EGNT Newcastle Aerodrome Pilot s Guide REVISION 2 (Wednesday, 03 August 2011 at 15:51) PUBLISHED Wednesday, 03 August 2011 1 Contents 1 Contents... 2 2 Departures... 3

More information

SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC SOUTHERN CALIFORNIA TRACON LOS ANGELES AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 Table of Contents SECTION 1. GENERAL 4 1-1. PURPOSE 4 1-2. SCOPE OF

More information

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons. VFR PHRASEOLOGY 1. Introduction 1.1. What is phraseology? The phraseology is the way to communicate between the pilot and air traffic controller. This way is stereotyped and you shall not invent new words.

More information

JACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006

JACKSONVILLE CENTER AND SAVANNAH TRACON. LETTER OF AGREEMENT EFFECTIVE: December 22, 2006 SUBJECT: APPROACH CONTROL SERVICE EFFECTIVE: December 22, 2006 1. PURPOSE. This agreement between Jacksonville Center and SAV TRACON covers approach control service for airports within TRACON delegated

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

MILWAUKEE MKE TRACON GEN. MITCHELL INTL AIRPORT (KMKE) MKE TRACON SATELLITE AIRPORTS STANDARD OPERATING PROCEDURES

MILWAUKEE MKE TRACON GEN. MITCHELL INTL AIRPORT (KMKE) MKE TRACON SATELLITE AIRPORTS STANDARD OPERATING PROCEDURES vzau Chicago ARTCC 1 MILWAUKEE -- -- -- -- -- MKE TRACON GEN. MITCHELL INTL AIRPORT (KMKE) MKE TRACON SATELLITE AIRPORTS STANDARD OPERATING PROCEDURES CURRENT AS OF DECEMBER 31, 2017 VIRTUAL CHICAGO AIR

More information

JAX NAVY FLYING CLUB COURSE RULES EXAM

JAX NAVY FLYING CLUB COURSE RULES EXAM JAX NAVY FLYING CLUB COURSE RULES EXAM NAME DATE GRADE CFI 1. Describe the standard North VFR departure procedure 2. Describe the standard South VFR departure procedure 3. Describe the standard North VFR

More information

Letter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008

Letter of Agreement. Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008 Letter of Agreement Between Jacksonville ARTCC and Virtual United States Navy Effective Date: Sept 1, 2008 Purpose: This Letter of Agreement (LOA) outlines standard operating policies and procedures to

More information

CHICAGO MIDWAY INTERNATIONAL AIRPORT (KMDW) STANDARD OPERATING PROCEDURES

CHICAGO MIDWAY INTERNATIONAL AIRPORT (KMDW) STANDARD OPERATING PROCEDURES vzau Chicago ARTCC 1 CHICAGO -- -- -- -- -- MIDWAY INTERNATIONAL AIRPORT (KMDW) STANDARD OPERATING PROCEDURES CURRENT AS OF MAY 1, 2017 VIRTUAL CHICAGO AIR ROUTE TRAFFIC CONTROL CENTER VIRTUAL AIR TRAFFIC

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

CHICAGOLAND SPEEDWAY NASCAR RACES

CHICAGOLAND SPEEDWAY NASCAR RACES CHICAGOLAND SPEEDWAY NASCAR RACES SEPTEMBER 15 THROUGH SEPTEMBER 19, 2016 In anticipation of a significant number of aircraft traveling to the Chicago, Illinois, area during the Chicagoland Speedway NASCAR

More information

CE 563 Airport Design

CE 563 Airport Design CE 563 Airport Design Prevent aircraft collisions Prevent aircraft collisions with obstructions Expedite and maintain an orderly flow of air traffic Air traffic control system command center Herndon, VA

More information

Standard Operating Procedures

Standard Operating Procedures New York ARTCC - Harrisburg TRACON Standard Operating Procedures General This document describes the standard operating procedures for controlling at any of the positions within the Harrisburg TRACON and

More information

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017 Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment

More information

SEATTLE AIR ROUTE TRAFFIC CONTROL CENTER SEATTLE GLIDER COUNCIL LETTER OF AGREEMENT. EFFECTIVE: June 1, 2015

SEATTLE AIR ROUTE TRAFFIC CONTROL CENTER SEATTLE GLIDER COUNCIL LETTER OF AGREEMENT. EFFECTIVE: June 1, 2015 SEATTLE AIR ROUTE TRAFFIC CONTROL CENTER SEATTLE GLIDER COUNCIL LETTER OF AGREEMENT EFFECTIVE: June 1, 2015 SUBJECT: GLIDER OPERATIONS WITHIN CLASS A AIRSPACE 1. PURPOSE. This Letter of Agreement establishes

More information

LETTER OF AGREEMENT. Between

LETTER OF AGREEMENT. Between LETTER OF AGREEMENT Between Romania vacc and Moldova vacc Bucharest FIR Chisinau FIR Effective: 01/12/2015 Version: 1.0 Purpose: The purpose of this Letter of Agreement is to define the coordination procedures

More information

SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC

SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC SOUTHERN CALIFORNIA TRACON BURBANK AREA STANDARD OPERATING PROCEDURES VIRTUAL AIR TRAFFIC SIMULATION NETWORK LOS ANGELES ARTCC 1 Table of Contents SECTION 1. GENERAL 3 1-1. PURPOSE 3 1-2. SCOPE OF RESPONSIBILITIES

More information

FSBREAK $100 Hamburger Fly in to KSAN

FSBREAK $100 Hamburger Fly in to KSAN FSBREAK $100 Hamburger Fly in to KSAN 1. Position your aircraft off the runway. It is important to always move your aircraft to an appropriate position before connecting to VATSIM. Many simulators start

More information

Understanding Role of Flight Data Processing Across NAS Operational Domains

Understanding Role of Flight Data Processing Across NAS Operational Domains Understanding Role of Data Processing Across NAS Operational Domains Elvan McMillen August 24, 1999 Organization: F062 Project: 02991204-O5 2 Context Presentations such as this can be used: - For developing

More information

2 Purpose and Need. 2.1 The Need for the CLT OAPM Project Description of the Problem

2 Purpose and Need. 2.1 The Need for the CLT OAPM Project Description of the Problem 2 Purpose and Need Under NEPA, an Environmental Assessment (EA) must describe the purpose and need for the Proposed Action. The following sections discuss the need for the Proposed Action and provide specific

More information

ATC PRACTICE. 20 miles South inbound landing Lincoln 22 miles SW inbound for the Denton. airport

ATC PRACTICE. 20 miles South inbound landing Lincoln 22 miles SW inbound for the Denton. airport ATC PRACTICE Reading Back Making a request Initial Contact Squawk 0219 and ident Lincoln altimeter 2992 say altitude Radar contact 23 miles east of Lincoln proceed inbound left base for 35 say altitude

More information

APPENDIX F AIRSPACE INFORMATION

APPENDIX F AIRSPACE INFORMATION APPENDIX F AIRSPACE INFORMATION Airspace Use DEFINITION OF AIRSPACE Airspace, or that space which lies above a nation and comes under its jurisdiction, is generally viewed as being unlimited. However,

More information

GENERAL OPERATING PROCEDURES FINLAND(GOP)

GENERAL OPERATING PROCEDURES FINLAND(GOP) [Nyckelord] 2013 GENERAL OPERATING PROCEDURES FINLAND(GOP) General operating procedures (GOP) ACC 1 Introduction This document includes general operating procedures for ACC in. A good understanding of

More information

VIRTUAL AIR TRAFFIC SIMULATION NETWORK CARIBBEAN DIVISION ZSU SAN JUAN CERAP

VIRTUAL AIR TRAFFIC SIMULATION NETWORK CARIBBEAN DIVISION ZSU SAN JUAN CERAP VIRTUAL AIR TRAFFIC SIMULATION NETWORK CARIBBEAN DIVISION ZSU SAN JUAN CERAP ORDER SJU 7110.1T SUBJ: San Juan Luis Muñoz Marín International Airport Air Traffic Control Tower Standard Operating Procedures

More information

Unit II Clearance Delivery

Unit II Clearance Delivery Unit II Clearance Delivery 1- Introduction The function of the Clearance Delivery controller is to issue an IFR clearance to aircraft planning to depart IFR, and to gather and issue flight information

More information

Jax Navy Flying Club

Jax Navy Flying Club Jax Navy Flying Club Course Rules Exam Answer Form NAME DATE CFI SCORE 1. Describe the standard north VFR departure procedure: 2. Describe the standard south VFR departure procedure: 3. Describe the standard

More information

IVAO Switzerland Division

IVAO Switzerland Division IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating

More information

Section 5. Radar Separation

Section 5. Radar Separation 7/24/14 JO 7110.65V CHG 1 4/3/14 JO 7110.65V Section 5. 5 5 1. APPLICATION a. Radar separation must be applied to all RNAV aircraft operating at and below FL450 on Q routes or random RNAV routes, excluding

More information

Instrument Refresher Course. Airfield Operations Flight Tower 412 OSS/OSAT

Instrument Refresher Course. Airfield Operations Flight Tower 412 OSS/OSAT Instrument Refresher Course Airfield Operations Flight Tower 412 OSS/OSAT Overview Mission Priorities Class D Airspace Tower Services Traffic Patterns IFR Departures Lakebed Ops Miscellaneous Special Procedures

More information

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Pag.1 of 11 Standard Operating Procedures (SOPs) for BAGHDAD (ORBI) Index 1. FOREWORD... 3 2. ATC UNITS... 3 3. RECOMMENDATIONS... 3 3.1. TRANSITION ALTITUDE/LEVEL... 3 3.2. SEMI-CIRCULAR FLIGHT LEVEL

More information

Scenario Training VGT - IWA

Scenario Training VGT - IWA Scenario Training VGT - IWA This lesson is divided into two separate scenario flights; KVGT to 61B, and KVGT to KIWA. The first flight to 61B will emphasize a DP out of KVGT and IFR operations into an

More information

PTK AIR TRAFFIC CONTROL TOWER OPERATION GOOD CHEER PROCEDURES 2018 (rev A, 12/05/18)

PTK AIR TRAFFIC CONTROL TOWER OPERATION GOOD CHEER PROCEDURES 2018 (rev A, 12/05/18) PTK AIR TRAFFIC CONTROL TOWER OPERATION GOOD CHEER PROCEDURES 2018 (rev A, 12/05/18) TABLE OF CONTENTS GENERAL INFORMATION.. 1 o Phone Numbers o Frequencies PREFLIGHT PLANNING o IFR Aircraft 2 o VFR Aircraft.3

More information

FLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA

FLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA FLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA EFFECTIVE October 11, 201609 0400 This Notice does not supersede restrictions pertaining to the use of airspace contained

More information

This section sets forth all Los Angeles World Airports (LAWA) noise abatement procedures, restrictions, and regulations involving aircraft operations.

This section sets forth all Los Angeles World Airports (LAWA) noise abatement procedures, restrictions, and regulations involving aircraft operations. This section sets forth all Los Angeles World Airports (LAWA) noise abatement procedures, restrictions, and regulations involving aircraft operations. 13.1. Aircraft Noise Abatement 13.1.1. All aircraft

More information

AIRPORTS There are two types of airport environments: controlled and uncontrolled. A controlled airport has an operating control tower, staffed by

AIRPORTS There are two types of airport environments: controlled and uncontrolled. A controlled airport has an operating control tower, staffed by AIRPORTS There are two types of airport environments: controlled and uncontrolled. A controlled airport has an operating control tower, staffed by either Federal or privately-contracted air traffic controllers.

More information

MASTERS GOLF TOURNAMENT

MASTERS GOLF TOURNAMENT MASTERS GOLF TOURNAMENT SPECIAL AIR TRAFFIC PROCEDURES AUGUSTA, APRIL 1 9, 2018 THESE PROCEDURES MAY BE REVISED OR UNAVAILABLE AT THE TIME OF THE EVENT. PILOTS SHOULD CHECK NOTAMS AND TRAFFIC ADVISORIES

More information