1 Transit Vehicle Scheduling: Problem Description Outline Problem Characteristics Service Planning Hierarchy (revisited) Vehicle Scheduling /24/03.224J/ESD.204J

2 Problem Characteristics Consolidated Operations (vs. Direct Operations) Passengers (vs freight) being moved Urban vs. intercity (short vs. long trip lengths) Relatively high service frequency (several trips per hour vs one trip per day) High temporal variation in demand within day Feasible speeds vary by time of day if vehicles affected by traffic congestion Operations/service plan is stable over a period of months Different type of competition May be a public agency or a private company Crew costs are significant fraction of total costs Routes have many nodes /24/03.224J/ESD.204J 2

3 Temporal Variation in Vehicle Requirements and Vehicle Blocks Vehicles in service :00 2:00 5:00 2:00 Time of day /24/03.224J/ESD.204J 3

4 Service Planning Hierarchy Input Function Output Demand characteristics Infrastructure Resources Policies (e.g. coverage) Demand characteristics Resources Policies (e.g. headways and pass loads) Route travel times Demand characteristics Resources Policies (e.g. reliability) Route travel times Resources Policies (e.g. reliability) Work rules and pay provisions Resources Policies Network and Route Design Frequency Setting Timetable Development Vehicle Scheduling Crew Scheduling Set of routes Service Frequency by route, day, and time period Departure/Arrival times for individual trips on each route (per stop) Revenue and Non-revenue Activities by Vehicle Crew duties /24/03.224J/ESD.204J 4

5 Service Planning Hierarchy Network Design Frequency Setting Timetable Development Vehicle Scheduling Crew Scheduling Service and Lost Infrequent Considerations Incremental Analysis Decisions both significant Methods Dominate Frequent Decisions Cost Considerations Dominate Computer Dominates Optimization-Based Methods /24/03.224J/ESD.204J 5

6 Input: Vehicle Scheduling Problem The timetable: a set of vehicle revenue trips to be operated, each characterized by: - starting point and time - ending point and time Possible layover/recovery arcs between the end of a trip and the start of a (later) trip at the same location Possible deadhead arcs connecting: - depot to trip starting points - trip ending points to depot - trip ending points to trips starting at a different point /24/03.224J/ESD.204J 6

7 Observations: there are many feasible but unattractive deadhead and layover arcs, generate only plausible non-revenue arcs layover time affects service reliability, set minimum layover (recovery) time Objective: define vehicle blocks (sequences of revenue and non-revenue activities for each vehicle) covering all trips so as to: - - Observation: Vehicle Scheduling Problem minimize fleet size (i.e. minimize #crews) minimize non-revenue time (i.e. minimize extra crew time) these are proxies for cost, but a large portion of cost will depend on crew duties which are unknown at this stage of solution. /24/03.224J/ESD.204J 7

8 Vehicle Scheduling Problem (continued) Constraints: Minimum vehicle block length Maximum vehicle block length Variations: Each vehicle restricted to a single line vs. interlining permitted Single depot vs multi-depot Vehicle fleet size constrained at depot level Routes (trips) assigned to specific depot Multiple vehicle types /24/03.224J/ESD.204J 8

9 Example: Single Route AB A B (Central City) Results of earlier planning and scheduling analysis: AM Peak Period Base Period (6-9 AM) (after 9 AM) Headways 20 min 30 min Scheduled trip time 40 min 35 min (A B or B A) Minimum layover time 0 min 0 min Dominant direction of travel in AM is A B /24/03.224J/ESD.204J 9

10 Timetable and Vehicle Block Development Depart A 6:00 6:20 0:00 0:30 :00 Arrive B 9:20 9:35 0:05 0:25 :05 :35 /24/03.224J/ESD.204J 0

11 Timetable and Vehicle Block Development Depart A Arrive B Depart B Arrive A 6:00 6:50 7:30 6:20 7:0 7:30 8:0 8:0 9:0 9:5 9:50 9:20 9:35 9:45 0:20 0:05 0:5 0:50 0:00 0:25 0:45 :20 0:30 :05 :5 :50 :00 :35 :45 2:20 /24/03.224J/ESD.204J

12 Timetable and Vehicle Block Development Veh # Depart A Arrive B Depart B Arrive A x-->6:00 6:50 7:30---> 6:20 7:0 7:30 8:0 8:0 9:0 9:5 9:50 9:20 9:35 9:45 0:20 0:05 0:5 0:50 0:00 0:25 0:45 :20 0:30 :05 :5 :50 :00 :35 :45 2:20 x = from depot /24/03.224J/ESD.204J 2

13 Timetable and Vehicle Block Development Veh # Depart A Arrive B Depart B Arrive A x-->6:00 6:50 7:30---> 6:20 7:0 7:30 8:0 8:0 9:0 9:5 9:50 9:20 9:35 9:45 0:20 0:05 0:5 0:50 0:00 0:25 0:45 :20 0:30 :05 :5 :50 :00 :35 :45 2:20 x = from depot /24/03.224J/ESD.204J 3

14 Timetable and Vehicle Block Development Veh # Depart A Arrive B Depart B Arrive A x-->6:00 6:50 7:30---> 6:20 7:0 7:30 8:0 8:0 9:0 9:5 9:50 9:20 9:35 9:45 0:20 0:05 0:5 0:50 0:00 0:25 0:45 :20 0:30 :05 :5 :50 :00 :35 :45 2:20 x = from depot /24/03.224J/ESD.204J 4

15 Timetable and Vehicle Block Development Veh # Depart A Arrive B Depart B Arrive A x-->6:00 6:50 7:30---> 6:20 7:0 7:30 8:0 8:0 9:0 9:5 9:50 9:20 9:35 9:45 0:20 0:05 0:5 0:50 0:00 0:25 0:45 :20 0:30 :05 :5 :50 :00 :35 :45 2:20 x = from depot /24/03.224J/ESD.204J 5

16 Timetable and Vehicle Block Development Veh # Depart A Arrive B Depart B Arrive A x-->6:00 6:50 7:30---> 2 x-->6:20 7:0 7:30 8:0 8:0 9:0 2 -> y 9:5 9:50 9:20 9:35 9:45 0:20 0:05 0:5 0:50 0:00 0:25 0:45 :20 0:30 :05 :5 :50 :00 :35 :45 2:20 x = from depot /24/03.224J/ESD.204J 6

17 Timetable and Vehicle Block Development Veh # Depart A Arrive B Depart B Arrive A x-->6:00 6:50 7:30---> 2 x-->6:20 7:0 3 x--> 7:30 8:0 8:0 9:0 2 -->y 3 9:5 9:50 9:20 9:35 9:45 0:20 0:05 0:5 0:50 3 0:00 0:25 0:45 :20 0:30 :05 :5 :50 :00 :35 :45 2:20 x = from depot /24/03.224J/ESD.204J 7

18 Timetable and Vehicle Block Development Veh # Depart A Arrive B Depart B Arrive A x-->6:00 6:50 7:30---> 2 x-->6:20 7:0 3 x--> 7:30 8:0 4 x--> 8:0 9:0 2 -->y 3 9:5 9:50 4 9:20-> y 9:35 9:45 0:20 0:05 0:5 0:50 3 0:00 0:25 0:45 :20 0:30 :05 :5 :50 :00 :35 :45 2:20 x = from depot /24/03.224J/ESD.204J 8

19 Timetable and Vehicle Block Development Veh # Depart A Arrive B Depart B Arrive A x-->6:00 6:50 7:30---> 2 x-->6:20 7:0 3 x--> 7:30 8:0 4 x--> 5 x--> 8:0 9:0 2 -->y 3 9:5 9:50 4 9:20 ->y 5 9:35 9:45 0:20 0:05 0:5 0:50 3 0:00 0:25 0:45 :20 5 0:30 :05 :5 :50 :00 :35 :45 2:20 x = from depot /24/03.224J/ESD.204J 9

20 Example: Vehicle Blocks Block : Depot - A (6:00) - B (6:50) - A () - B () - A () B (0:5 ) - A (:00) - B (:45)... Block 2: Depot - A (6:20) - B (7:0) - A () - B () - Depot Block 3: Depot - A () - B (7:30) - A () - B (9:5) - A (0:00) B (0:45)... Block 4: Depot - A () - B () - A () - Depot Block 5: Depot - A () - B (8:0) - A () - B (9:45) - A (0:30) B (:5) -... /24/03.224J/ESD.204J 20

21 Vehicle Scheduling Model Approaches Heuristic approaches:. Define compatible trips at same terminal k such that trips i and j are compatible iff : t s j - t e i > M k t s j - t e i < 2 D k where t s j = starting time for trip j t e i = ending time for trip i M k = minimum recovery/layover time at terminal D k = deadhead time from terminal k to depot k /24/03.224J/ESD.204J 2

22 Vehicle Scheduling Model Approaches 2. Apply Restricted First-in-First-out rules at each terminal (a) Order arrivals and departures at the terminal chronologically (b) Start with (next) earliest arrival at terminal; if none, go to step (e) (c) Link to earliest compatible trip departure; if none, return vehicle to depot and return to step (b) (d) Check vehicle block length against constraint: if constraining, return vehicle to depot and return to step (b); otherwise return to step (c) with new trip arrival time (e) Serve all remaining unlinked departures from depot /24/03.224J/ESD.204J 22

23 Time-Space Network Representation Route Route N A B A N B N Depot Depot revenue arc Time of Day /24/03.224J/ESD.204J 23

24 Time-Space Network Representation Route Route N A B A N B N Depot Depot revenue arc layover arc Time of Day /24/03.224J/ESD.204J 24

25 Time-Space Network Representation Route Route N A B A N B N Depot Depot revenue arc layover arc deadhead arc Time of Day /24/03.224J/ESD.204J 25

26 Time Space Network Representation Detail Time of Day (,,0) (0,,c ij ) (,,0) (0,,c. j ) (0,,c j.) (,,0) (0,N k,0) D E P O T Storage at Depot (0,N,C) D E P O T (l ij,u ij,c ij ) ( minimum flow, maximum flow, cost per unit of flow) correspond to revenue trips deadhead trip to or from the depot or between routes, or layovers between revenue trips on same route /24/03.224J/ESD.204J 26

27 Minimum Cost Network Flow Formulation Minim iz e (i, j ) A c ij x ij s.t. x ij x ji = 0 { j: ( i, j ) A } { j: ( j,i ) A} i N...( ) x ij lij, (i, j ) A...( 2 ) x ij u ij, (i, j ) A...( 3 ) x ij Z +, (i, j ) A...( 4 ) /24/03.224J/ESD.204J 27

Outline. 1. Timetable Development 2. Fleet Size. Nigel H.M. Wilson. 3. Vehicle Scheduling J/11.543J/ESD.226J Spring 2010, Lecture 18

Outline. 1. Timetable Development 2. Fleet Size. Nigel H.M. Wilson. 3. Vehicle Scheduling J/11.543J/ESD.226J Spring 2010, Lecture 18 Vehicle Scheduling Outline 1. Timetable Development 2. Fleet Size 3. Vehicle Scheduling 1 Timetable Development Can translate frequency into timetable by specifying headways as: equal -- appropriate if

More information

Airline Schedule Development Overview Dr. Peter Belobaba

Airline Schedule Development Overview Dr. Peter Belobaba Airline Schedule Development Overview Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 18 : 1 April 2016

More information

Transportation Timetabling

Transportation Timetabling Outline DM87 SCHEDULING, TIMETABLING AND ROUTING Lecture 16 Transportation Timetabling 1. Transportation Timetabling Tanker Scheduling Air Transport Train Timetabling Marco Chiarandini DM87 Scheduling,

More information

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE Outline 1. SRTP -- Definition & Introduction 2. Measures and Standards 3. Current Practice in SRTP & Critique 1 Public Transport Planning A. Long Range (>

More information

Airline Scheduling Optimization ( Chapter 7 I)

Airline Scheduling Optimization ( Chapter 7 I) Airline Scheduling Optimization ( Chapter 7 I) Vivek Kumar (Research Associate, CATSR/GMU) February 28 th, 2011 CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH 2 Agenda Airline Scheduling Factors affecting

More information

Airline Scheduling: An Overview

Airline Scheduling: An Overview Airline Scheduling: An Overview Crew Scheduling Time-shared Jet Scheduling (Case Study) Airline Scheduling: An Overview Flight Schedule Development Fleet Assignment Crew Scheduling Daily Problem Weekly

More information

Real-Time Control Strategies for Rail Transit

Real-Time Control Strategies for Rail Transit Real-Time Control Strategies for Rail Transit Outline: Problem Description and Motivation Model Formulation Model Application and Results Implementation Issues Conclusions 12/08/03 1.224J/ESD.204J 1 Problem

More information

SAMTRANS TITLE VI STANDARDS AND POLICIES

SAMTRANS TITLE VI STANDARDS AND POLICIES SAMTRANS TITLE VI STANDARDS AND POLICIES Adopted March 13, 2013 Federal Title VI requirements of the Civil Rights Act of 1964 were recently updated by the Federal Transit Administration (FTA) and now require

More information

UC Berkeley Working Papers

UC Berkeley Working Papers UC Berkeley Working Papers Title The Value Of Runway Time Slots For Airlines Permalink https://escholarship.org/uc/item/69t9v6qb Authors Cao, Jia-ming Kanafani, Adib Publication Date 1997-05-01 escholarship.org

More information

CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS

CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS 91 CHAPTER 5 SIMULATION MODEL TO DETERMINE FREQUENCY OF A SINGLE BUS ROUTE WITH SINGLE AND MULTIPLE HEADWAYS 5.1 INTRODUCTION In chapter 4, from the evaluation of routes and the sensitive analysis, it

More information

Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld

Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld Lessons Learned from Rebuilding the Muni Subway Schedule Leslie Bienenfeld Manager of Fixed Guideway Scheduling San Francisco Municipal Transportation Agency San Francisco, California SFMTA & the Municipal

More information

HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING

HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING HOW TO IMPROVE HIGH-FREQUENCY BUS SERVICE RELIABILITY THROUGH SCHEDULING Ms. Grace Fattouche Abstract This paper outlines a scheduling process for improving high-frequency bus service reliability based

More information

Integrated Optimization of Arrival, Departure, and Surface Operations

Integrated Optimization of Arrival, Departure, and Surface Operations Integrated Optimization of Arrival, Departure, and Surface Operations Ji MA, Daniel DELAHAYE, Mohammed SBIHI ENAC École Nationale de l Aviation Civile, Toulouse, France Paolo SCALA Amsterdam University

More information

Date: 11/6/15. Total Passengers

Date: 11/6/15. Total Passengers Total San Diego Metropolitan Transit System POLICY 42 PERFORMANCE MONITORING REPORT Page 1 of 6 OBJECTIVE Develop a Customer-Focused and Competitive System The following measures of productivity and service

More information

SERVICE NETWORK DESIGN: APPLICATIONS IN TRANSPORTATION AND LOGISTICS

SERVICE NETWORK DESIGN: APPLICATIONS IN TRANSPORTATION AND LOGISTICS SERVICE NETWORK DESIGN: APPLICATIONS IN TRANSPORTATION AND LOGISTICS Professor Cynthia Barnhart Massachusetts Institute of Technology Cambridge, Massachusetts USA March 21, 2007 Outline Service network

More information

Att. A, AI 46, 11/9/17

Att. A, AI 46, 11/9/17 Total s San Diego Metropolitan Transit System POLICY 42 PERFORMANCE MONITORING REPORT Page 1 of 6 Date: 11/8/17 OBJECTIVE Develop a Customer-Focused and Competitive System The following measures of productivity

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity

More information

Workshop on Advances in Public Transport Control and Operations, Stockholm, June 2017

Workshop on Advances in Public Transport Control and Operations, Stockholm, June 2017 ADAPT-IT Analysis and Development of Attractive Public Transport through Information Technology Real-time Holding Control Strategies for Single and Multiple Public Transport Lines G. Laskaris, PhD Candidate,

More information

Overview of the Airline Planning Process Dr. Peter Belobaba Presented by Alex Heiter

Overview of the Airline Planning Process Dr. Peter Belobaba Presented by Alex Heiter Overview of the Airline Planning Process Dr. Peter Belobaba Presented by Alex Heiter Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

ATM Seminar 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY. Wednesday, June 24 nd 2015

ATM Seminar 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY. Wednesday, June 24 nd 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY Christabelle Bosson PhD Candidate Purdue AAE Min Xue University Affiliated Research Center Shannon Zelinski NASA Ames Research

More information

MIT ICAT. Robust Scheduling. Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation

MIT ICAT. Robust Scheduling. Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation Robust Scheduling Yana Ageeva John-Paul Clarke Massachusetts Institute of Technology International Center for Air Transportation Philosophy If you like to drive fast, it doesn t make sense getting a Porsche

More information

Involuntary assignments shall only be made according to the Priority of Open Trip Assignment language specified in Reserve Duty, Section 12.

Involuntary assignments shall only be made according to the Priority of Open Trip Assignment language specified in Reserve Duty, Section 12. TTS daily processing occurs on any day, the Company may not change the red flag designation until the TTS awards are complete for that day. I. INVOLUNTARY ASSIGNMENT Involuntary assignments shall only

More information

Airline Network Structures Dr. Peter Belobaba

Airline Network Structures Dr. Peter Belobaba Airline Network Structures Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 8: 11 March 2014 Lecture Outline

More information

Condor Ferries schedule 2018/19. August 2017

Condor Ferries schedule 2018/19. August 2017 Condor Ferries schedule 2018/19 August 2017 1 Our goal : To create a comprehensive timetable that balances the needs of both Jersey & Guernsey, the freight & passenger markets, visitors & residents travel

More information

Alternatives: Strategies for Transit Systems Change

Alternatives: Strategies for Transit Systems Change Alternatives: Strategies for Transit Systems Change There is a broad array of options for modification of transit operations to make it more cost effective and efficient. These are typically examined to

More information

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time.

PREFACE. Service frequency; Hours of service; Service coverage; Passenger loading; Reliability, and Transit vs. auto travel time. PREFACE The Florida Department of Transportation (FDOT) has embarked upon a statewide evaluation of transit system performance. The outcome of this evaluation is a benchmark of transit performance that

More information

Metrobus Service Evaluations

Metrobus Service Evaluations Metrobus Service Evaluations Routes B30, 87-88, & 89-89M Public Meeting Laurel Library May 25, 2011 Ben Schumin Purpose of the Evaluation Identify strategic needs; Review capacity, productivity, reliability,

More information

Mathematical modeling in the airline industry: optimizing aircraft assignment for on-demand air transport

Mathematical modeling in the airline industry: optimizing aircraft assignment for on-demand air transport Trabalho apresentado no CNMAC, Gramado - RS, 2016. Proceeding Series of the Brazilian Society of Computational and Applied Mathematics Mathematical modeling in the airline industry: optimizing aircraft

More information

Optimized Itinerary Generation for NAS Performance Analysis

Optimized Itinerary Generation for NAS Performance Analysis Optimized Itinerary Generation for NAS Performance Analysis Feng Cheng, Bryan Baszczewski, John Gulding Federal Aviation Administration, Washington, DC, 20591 FAA s long-term planning process is largely

More information

Business Intelligence Development at Winnipeg Transit

Business Intelligence Development at Winnipeg Transit ITS Canada Webinar February 28, 2013 Business Intelligence Development at Winnipeg Transit Bill Menzies Senior Transit Planner, Dillon Consulting Limited Manager of Service Development, Winnipeg Transit

More information

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005

MODAIR: Measure and development of intermodality at AIRport. INO WORKSHOP EEC, December 6 h 2005 MODAIR: Measure and development of intermodality at AIRport INO WORKSHOP EEC, December 6 h 2005 What is intermodality? The use of different and coordinated modes of transports for one trip High Speed train

More information

Duty-Period-Based Network Model for Crew Rescheduling in European Airlines. Abstract

Duty-Period-Based Network Model for Crew Rescheduling in European Airlines. Abstract Duty-Period-Based Network Model for Crew Rescheduling in European Airlines Rüdiger Nissen 1 and Knut Haase 2 Abstract Airline rescheduling is a relatively new field in airline Operations Research but increasing

More information

PERFORMANCE MEASUREMENT

PERFORMANCE MEASUREMENT PERFORMANCE MEASUREMENT Outline 1. Roles for Performance Measures 2. Alternative Approaches 3. Fielding's Approach Framework Steps in Analysis Initial Measures Factor Analysis Results Recommended Measures

More information

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 5: 10 March 2014

More information

Airfield Capacity Prof. Amedeo Odoni

Airfield Capacity Prof. Amedeo Odoni Airfield Capacity Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 10 May 27, 2015 Airfield Capacity Objective:

More information

Passenger Arrival Rates at Public Transport Stations. Prof. Dr. U. Weidmann, M. Lüthi, A. Nash TRB 86 th Annual Meeting, 22 th January 2007

Passenger Arrival Rates at Public Transport Stations. Prof. Dr. U. Weidmann, M. Lüthi, A. Nash TRB 86 th Annual Meeting, 22 th January 2007 IVT ETH Zürich Washington - 22 January 2007 Passenger Arrival Rates at Public Transport Stations Prof. Dr. U. Weidmann, M. Lüthi, A. Nash TRB 86 th Annual Meeting, 22 th January 2007 Public Transport Passenger

More information

DRAFT Service Implementation Plan

DRAFT Service Implementation Plan 2017 Service Implementation Plan October 2016 SECTION NAME 2017 Service Implementation Plan October 2016 2017 SERVICE IMPLEMENTATION PLAN TABLE OF CONTENTS Table of Contents... I List of Tables... III

More information

PTN-128 Reporting Manual Data Collection and Performance Reporting

PTN-128 Reporting Manual Data Collection and Performance Reporting 2016 PTN-128 Reporting Manual Data Collection and Performance Reporting Sponsored by the Texas Department of Transportation Table of Contents PTN-128 WHAT, WHY AND WHO... 6 What is the PTN-128... 13 Why

More information

Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling

Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling Yan Xu and Xavier Prats Technical University of Catalonia (UPC) Outline Motivation & Background Trajectory optimization

More information

An Airline Crew Scheduling for Optimality

An Airline Crew Scheduling for Optimality International Journal of Mathematics and Computer Science, 11(2016), no. 2, 187 198 M CS An Airline Crew Scheduling for Optimality K. Rauf 1, N. Nyor 2, R. U. Kanu 3,J. O. Omolehin 4 1 Department of Mathematics

More information

Technical Memorandum Number 777. Scheduling Multiple Types of Fractional Ownership Aircraft With Crew Duty Restrictions

Technical Memorandum Number 777. Scheduling Multiple Types of Fractional Ownership Aircraft With Crew Duty Restrictions Technical Memorandum Number 777 Scheduling Multiple Types of Fractional Ownership Aircraft With Crew Duty Restrictions by Itir Karaesman Pinar Keskinocak Sridhar Tayur Wei Yang December 2003 Department

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

HOUSEHOLD TRAVEL SURVEY

HOUSEHOLD TRAVEL SURVEY HOUSEHOLD TRAVEL SURVEY Household Travel Survey i TABLE OF CONTENTS Page 1.0 INTRODUCTION... 1 2.0 SUMMARY OF TRAVEL... 2 2.1 All-Day Travel Patterns... 2 2.1.1 Automobile Availability... 2 2.1.2 Trip

More information

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California LA Metro Rapid - Considerations in Identifying BRT Corridors Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California LA Metro Transportation planner/coordinator, designer, builder

More information

Central Oregon Intergovernmental Council

Central Oregon Intergovernmental Council Central Oregon Intergovernmental Council Regional Transit Master Plan (RTMP) Technical Advisory Committee March 8, 2013 Agenda Introductions (5 min) Project Update (5 min) Updated Demand Estimates (5 min)

More information

U.Md. Zahir, H. Matsui & M. Fujita Department of Civil Engineering Nagoya Institute of Technology,

U.Md. Zahir, H. Matsui & M. Fujita Department of Civil Engineering Nagoya Institute of Technology, Investigate the effects of bus and passenger arrival patterns and service frequency on passenger waiting time and transit performance of Dhaka metropolitan area. U.Md. Zahir, H. Matsui & M. Fujita Department

More information

Antitrust Review of Mergers and Alliances

Antitrust Review of Mergers and Alliances Antitrust Review of Mergers and Alliances Istanbul Technical University Air Transportation Management, M.Sc. Program Aviation Economics and Financial Analysis Module 13 Outline A. Competitive Effects B.

More information

Abstract. Introduction

Abstract. Introduction COMPARISON OF EFFICIENCY OF SLOT ALLOCATION BY CONGESTION PRICING AND RATION BY SCHEDULE Saba Neyshaboury,Vivek Kumar, Lance Sherry, Karla Hoffman Center for Air Transportation Systems Research (CATSR)

More information

Bus Corridor Service Options

Bus Corridor Service Options Bus Corridor Service Options Outline Corridor Objectives and Strategies Express Local Limited Stop Overlay on Local Service 1 Deadhead 1 Stacey Schwarcz, "Service Design for Heavy Demand Corridors: Limited-Stop

More information

Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW

Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW Airport Capacity, Airport Delay, and Airline Service Supply: The Case of DFW Faculty and Staff: D. Gillen, M. Hansen, A. Kanafani, J. Tsao Visiting Scholar: G. Nero and Students: S. A. Huang and W. Wei

More information

Jeppesen Pairing & Rostering

Jeppesen Pairing & Rostering Jeppesen Pairing & Rostering Johan Kristofferson Global Program Sales Leader Crew, Ops & Analytics October 5th, 2016 What successful Airlines have in common Network (Commercial) Aircraft planning Fleeting

More information

Implementing an Air Taxi System

Implementing an Air Taxi System Departamento de Ingeniería Industrial, FCFM, Universidad de Chile, Chile August 11, 2006 Outline 1 Introduction 2 The Routing Problems 3 Final Comments Work Team Work Team Mo Bazaraa (Georgia Institute

More information

CRANE CREW MANAGEMENT

CRANE CREW MANAGEMENT CRANE CREW MANAGEMENT Crew costs are the second highest expenditure of the airline industry. It s essential to maximize crew efficiency while ensuring welfare and fairness. Overview Crane CREW is designed

More information

Applying Integer Linear Programming to the Fleet Assignment Problem

Applying Integer Linear Programming to the Fleet Assignment Problem Applying Integer Linear Programming to the Fleet Assignment Problem ABARA American Airlines Decision Ti'chnohi^ics PO Box 619616 Dallasll'ort Worth Airport, Texas 75261-9616 We formulated and solved the

More information

MTA Bus Network Improvement Project July 22, 2013

MTA Bus Network Improvement Project July 22, 2013 3 TRAVEL PATTERNS 3.1 Key Locations within Service Area Outside of the Maryland suburbs of DC, the Baltimore region forms Maryland s economic and population center. Central Baltimore is home to many of

More information

Research in Coastal Infrastructure Reliability: Rerouting Intercity Flows in the Wake of a Port Outage

Research in Coastal Infrastructure Reliability: Rerouting Intercity Flows in the Wake of a Port Outage Research in Coastal Infrastructure Reliability: Rerouting Intercity Flows in the Wake of a Port Outage Megan S. Ryerson, Ph.D Department of City and Regional Planning Department of Electrical and Systems

More information

Corridor Analysis. Corridor Objectives and Strategies Express Local Limited Stop Overlay on Local Service 1 Deadhead

Corridor Analysis. Corridor Objectives and Strategies Express Local Limited Stop Overlay on Local Service 1 Deadhead Corridor Analysis Outline Corridor Objectives and Strategies Express Local Limited Stop Overlay on Local Service 1 Deadhead 1 Stacey Schwarcz, "Service Design for Heavy Demand Corridors: Limited-Stop Bus

More information

Simulation of disturbances and modelling of expected train passenger delays

Simulation of disturbances and modelling of expected train passenger delays Computers in Railways X 521 Simulation of disturbances and modelling of expected train passenger delays A. Landex & O. A. Nielsen Centre for Traffic and Transport, Technical University of Denmark, Denmark

More information

Why does 2010 feel like the dark ages for fare collection? Fred Combs Lextran, Planning and Technology Manager Lexington, Kentucky

Why does 2010 feel like the dark ages for fare collection? Fred Combs Lextran, Planning and Technology Manager Lexington, Kentucky Why does 2010 feel like the dark ages for fare collection? Fred Combs Lextran, Planning and Technology Manager Lexington, Kentucky Outline Lexington and Lextran s Fixed-Route System Technology and fare

More information

Northfield to Ingle Farm #2 66 kv Sub transmission line

Northfield to Ingle Farm #2 66 kv Sub transmission line Header Reasonableness Test RT 011/11 Northfield to Ingle Farm #2 66 kv Sub transmission line RT011-11 Northfield to Inglefarm Page 1 of 8 Reasonableness Test: Northfield to Ingle Farm 66 kv line DISCLAIMER

More information

DMAN-SMAN-AMAN Optimisation at Milano Linate Airport

DMAN-SMAN-AMAN Optimisation at Milano Linate Airport DMAN-SMAN-AMAN Optimisation at Milano Linate Airport Giovanni Pavese, Maurizio Bruglieri, Alberto Rolando, Roberto Careri Politecnico di Milano 7 th SESAR Innovation Days (SIDs) November 28 th 30 th 2017

More information

Potomac River Commuter Ferry Feasibility Study & RPE Results

Potomac River Commuter Ferry Feasibility Study & RPE Results 1.1 Introduction The Prince William County Department of Transportation conducted a route proving exercise (RPE) and feasibility study of a proposed commuter ferry service on the Potomac River between

More information

Analysis of Gaming Issues in Collaborative Trajectory Options Program (CTOP)

Analysis of Gaming Issues in Collaborative Trajectory Options Program (CTOP) Analysis of Gaming Issues in Collaborative Trajectory Options Program (CTOP) John-Paul Clarke, Bosung Kim, Leonardo Cruciol Air Transportation Laboratory Georgia Institute of Technology Outline 2 Motivation

More information

Towards a 100% renewable energy future: WÄRTSILÄ Energy Solutions

Towards a 100% renewable energy future: WÄRTSILÄ Energy Solutions Towards a 100% renewable energy future: WÄRTSILÄ Energy Solutions Marco Golinelli, Director Energy Solutions X Conferenza Nazionale per l Efficienza Energetica THIS IS WÄRTSILÄ A global leader in smart

More information

IMPROVING THE ROBUSTNESS OF FLIGHT SCHEDULE BY FLIGHT RE-TIMING AND IMPOSING A NEW CREW BASE

IMPROVING THE ROBUSTNESS OF FLIGHT SCHEDULE BY FLIGHT RE-TIMING AND IMPOSING A NEW CREW BASE Jurnal Karya Asli Lorekan Ahli Matematik Vol. 6 No.1 (2013) Page 066-073. Jurnal Karya Asli Lorekan Ahli Matematik IMPROVING THE ROBUSTNESS OF FLIGHT SCHEDULE BY FLIGHT RE-TIMING AND IMPOSING A NEW CREW

More information

Solution Repair/Recovery in Uncertain Optimization Environment

Solution Repair/Recovery in Uncertain Optimization Environment Solution Repair/Recovery in Uncertain Optimization Environment PhD Candidate: Oumaima Khaled IBM PhD Supervisor : Xavier Ceugniet Lab PhD Supervisors: Vincent Mousseau, Michel Minoux Séminaire des doctorants

More information

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study

Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study An Agent-Based Computational Economics Approach to Strategic Slot Allocation SESAR Innovation Days Bologna, 2 nd December

More information

NOTES ON COST AND COST ESTIMATION by D. Gillen

NOTES ON COST AND COST ESTIMATION by D. Gillen NOTES ON COST AND COST ESTIMATION by D. Gillen The basic unit of the cost analysis is the flight segment. In describing the carrier s cost we distinguish costs which vary by segment and those which vary

More information

UK Experience with Bus Restructuring

UK Experience with Bus Restructuring UK Experience with Bus Restructuring Outline 1. Background 2. Bus Deregulation outside London 3. London strategy 4. Results to date 5. Edinburgh Case Study 1 Background Prior to mid-1980s, UK local bus

More information

Collaborative Decision Making By: Michael Wambsganss 10/25/2006

Collaborative Decision Making By: Michael Wambsganss 10/25/2006 Collaborative Decision Making By: Michael Wambsganss 10/25/2006 TFM History De-regulation: leads to new demand patterns High fuel prices Air Traffic Controller s Strike*** TFM is born (mid 80s: eliminate

More information

COLT RECOMMENDED BUSINESS PLAN

COLT RECOMMENDED BUSINESS PLAN COLT RECOMMENDED BUSINESS PLAN 2008 INTRODUCTION The past decade has been one of change in Lebanon County and this situation is expected to continue in the future. This has included growth in population,

More information

Review & Redesign of Retail and F&B area at Indore airport

Review & Redesign of Retail and F&B area at Indore airport Review & Redesign of Retail and F&B area at Indore airport Agenda Objective : Capturing next generation commercial excellence Approach : Project Approach Actions taken : Comprehensive 6-step process Result

More information

What is Rail Futures?

What is Rail Futures? What is Rail Futures? Rail Futures Institute is an independent nonpartisan group. It was formed to advocate cost-effective rail and intermodal solutions for public transport and freight problems based

More information

Tour route planning problem with consideration of the attraction congestion

Tour route planning problem with consideration of the attraction congestion Acta Technica 62 (2017), No. 4A, 179188 c 2017 Institute of Thermomechanics CAS, v.v.i. Tour route planning problem with consideration of the attraction congestion Xiongbin WU 2, 3, 4, Hongzhi GUAN 2,

More information

Abruzzo Airport. Commercial Policy Development Routes

Abruzzo Airport. Commercial Policy Development Routes Abruzzo Airport Commercial Policy Development Routes Abruzzo Airport's main objective is to stimulate the development of air traffic by encouraging carriers to operate new routes and upgrade existing ones,

More information

SRTA Year End Fixed Route Ridership Analysis: FY 2018

SRTA Year End Fixed Route Ridership Analysis: FY 2018 SRTA Year End Fixed Route Ridership Analysis: FY 2018 2018 Contents Introduction... 1 A. Key Terms Used in this Report... 1 Key Findings... 2 A. Ridership... 2 B. Fare Payment... 4 Performance Analysis

More information

Regional Planning for Tri-Rail Coastal Link

Regional Planning for Tri-Rail Coastal Link 2013 APTA Rail Conference Regional Planning for Tri-Rail Coastal Link William L. Cross, P.E. South Florida Regional Transportation Authority Director of Planning and Capital Development Pompano Beach,

More information

Approximate Network Delays Model

Approximate Network Delays Model Approximate Network Delays Model Nikolas Pyrgiotis International Center for Air Transportation, MIT Research Supervisor: Prof Amedeo Odoni Jan 26, 2008 ICAT, MIT 1 Introduction Layout 1 Motivation and

More information

Aviation, Rail, & Trucking 6-1

Aviation, Rail, & Trucking 6-1 6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be

More information

Available online at ScienceDirect. Transportation Research Procedia 10 (2015 )

Available online at   ScienceDirect. Transportation Research Procedia 10 (2015 ) Available online at www.sciencedirect.com ScienceDirect Transportation Research Procedia 10 (2015 ) 891 899 18th Euro Working Group on Transportation, EWGT 2015, 14-16 July 2015, Delft, The Netherlands

More information

NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California

NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California NextGen AeroSciences, LLC Seattle, Washington Williamsburg, Virginia Palo Alto, Santa Cruz, California All Rights Reserved 1 Topics Innovation Objective Scientific & Mathematical Framework Distinctions

More information

2018 Service Changes Ada County

2018 Service Changes Ada County 2018 Service Changes Ada County System Benefits 15 minute headways on State Street during peak hours o 30 minutes on Saturdays 30 minute headways on Emerald all day on weekdays More frequent and direct

More information

ICAO Air Connectivity and Competition. Sijia Chen Economic Development Air Transport Bureau, ICAO

ICAO Air Connectivity and Competition. Sijia Chen Economic Development Air Transport Bureau, ICAO ICAO Air Connectivity and Competition Sijia Chen Economic Development Air Transport Bureau, ICAO Connectivity Concept Connectivity Concept Capacity of the transport value chain to move passengers, mail

More information

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives

Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level and BRT Route Pattern Alternatives June 1, 2018 Development of SH119 BRT Route Pattern Alternatives for Tier 2 - Service Level

More information

SHIP MANAGEMENT SURVEY. July December 2017

SHIP MANAGEMENT SURVEY. July December 2017 SHIP MANAGEMENT SURVEY July December 2017 INTRODUCTION The Ship Management Survey is conducted by the Statistics Department of the Central Bank of Cyprus and concentrates primarily on transactions between

More information

Special edition paper Development of a Crew Schedule Data Transfer System

Special edition paper Development of a Crew Schedule Data Transfer System Development of a Crew Schedule Data Transfer System Hideto Murakami* Takashi Matsumoto* Kazuya Yumikura* Akira Nomura* We developed a crew schedule data transfer system where crew schedule data is transferred

More information

Integrated Disruption Management and Flight Planning to Trade Off Delays and Fuel Burn

Integrated Disruption Management and Flight Planning to Trade Off Delays and Fuel Burn Integrated Disruption Management and Flight Planning to Trade Off Delays and Fuel Burn The MIT Faculty has made this article openly available. Please share how this access benefits you. Your story matters.

More information

APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW

APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW The following pages are excerpts from a DRAFT-version Fare Analysis report conducted by Nelson\Nygaard

More information

Considerations for Facility Consolidation

Considerations for Facility Consolidation Considerations for Facility Consolidation ATC Guild, New Delhi, India October 21, 2010 Mimi Dobbs Overview Why consider consolidation? Co location vs Consolidation Consolidating Methodologies Areas to

More information

Final Proposed Route Changes for GLTC

Final Proposed Route Changes for GLTC Final Proposed Route for GLTC FINAL PROPOSAL DEVELOPED FROM THE RECOMMENDATIONS IN THE TRANSIT DEVELOPMENT PLAN (TDP) AND INPUT RECEIVED FROM CUSTOMERS DURING PUBLIC MEETINGS Proposed Routes 1A/1B Routes

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

The impact of scheduling on service reliability: trip-time determination and holding points in long-headway services

The impact of scheduling on service reliability: trip-time determination and holding points in long-headway services Public Transp (2012) 4:39 56 DOI 10.1007/s12469-012-0054-4 ORIGINAL PAPER The impact of scheduling on service reliability: trip-time determination and holding points in long-headway services N. van Oort

More information

MONTHLY OPERATIONS REPORT SEPTEMBER 2015

MONTHLY OPERATIONS REPORT SEPTEMBER 2015 MONTHLY OPERATIONS REPORT SEPTEMBER 215 Table of Contents SEPTEMBER 215 Section Page September Highlights... 3 Strategic Goals Progress Update... 4 Ridership... 6 Revenue... 9 Expenses... 1 System Summary...

More information

INTEGRATE BUS TIMETABLE AND FLIGHT TIMETABLE FOR GREEN TRANSPORTATION ENHANCE TOURISM TRANSPORTATION FOR OFF- SHORE ISLANDS

INTEGRATE BUS TIMETABLE AND FLIGHT TIMETABLE FOR GREEN TRANSPORTATION ENHANCE TOURISM TRANSPORTATION FOR OFF- SHORE ISLANDS INTEGRATE BUS TIMETABLE AND FLIGHT TIMETABLE FOR GREEN TRANSPORTATION ENHANCE TOURISM TRANSPORTATION FOR OFF- SHORE ISLANDS SUILING LI, NATIONAL PENGHU UNIVERSITY OF SCIENCE AND TECHNOLOGY,SUILING@NPU.EDU.TW

More information

Research Article Study on Fleet Assignment Problem Model and Algorithm

Research Article Study on Fleet Assignment Problem Model and Algorithm Mathematical Problems in Engineering Volume 2013, Article ID 581586, 5 pages http://dxdoiorg/101155/2013/581586 Research Article Study on Fleet Assignment Problem Model and Algorithm Yaohua Li and Na Tan

More information

Rail Car Allocation Problems

Rail Car Allocation Problems Rail Car Allocation Problems Marco E. Lübbecke and Uwe T. Zimmermann Mathematical Optimization Braunschweig Germany Rail Car Allocation Problems p.1 Freight Cars... Rail Car Allocation Problems p.2 Freight

More information

II. Terminology and Basic

II. Terminology and Basic II. Terminology and Basic Relationships Public Transport Planning and Regulation: An Introduction II-1 Planning and Analysis Building Blocks Schedule Building Cost Analysis and Financial Planning Performance

More information

Transit Performance Report FY (JUNE 30, 2007)

Transit Performance Report FY (JUNE 30, 2007) Transit Performance Report FY 2006-2007 (JUNE 30, 2007) J ANUARY 2008 TRANSIT PERFORMANCE REPORT FY 2006 2007 (JUNE 30, 2007) Transit Performance Report I SSUED: JANUARY 2008 The Transit Performance Report

More information