CHAPTER 15. (Volume 3 Bound Separately) Loch Urr Aviation Impact Assessment

Size: px
Start display at page:

Download "CHAPTER 15. (Volume 3 Bound Separately) Loch Urr Aviation Impact Assessment"

Transcription

1 CHAPTER AVIATION Introduction Methodology Baseline Assessment of Effects Mitigation Residual Effects and Conclusions References Appendices Appendix 15.1 (Volume 3 Bound Separately) Loch Urr Aviation Impact Assessment LOCH URR WIND FARM 15 - i

2 15.0 AVIATION 15.1 Introduction This Chapter has been prepared by Osprey Consulting Services Ltd (Osprey), a technical consultancy providing aviation expertise to the wind industry. It identifies and assesses the potential effects that the Proposed Development, as described in Chapter 5.0 Scheme Description and Construction Methods, may have on aviation and air safeguarding, and the mitigation measures to be implemented to prevent, reduce or offset potential adverse effects, where required The potential effects of wind turbines on aviation interests have been widely publicised. There are two dominant scenarios: Physical obstruction: turbines can present a physical obstruction at, or close to, an aerodrome or other aviation activity site; and Radar/Air Traffic Services (ATS): turbine clutter appearing on a radar display can affect the safe provision of air traffic services as it can mask unidentified aircraft from the air traffic controller and/or prevent him from accurately identifying aircraft under his control. In some cases, radar reflections from the turbines can affect the performance of the radar itself This chapter presents a summary of the results of the Aviation Impact Assessment (AIA) undertaken by Osprey (Appendix 15.1). The AIA identifies potential effects on aviation receptor groups in the area of the Proposed Development and provides an objective assessment of the effects and any necessary mitigation measures. Osprey considered the potential for the Proposed Development to have an effect on the aviation interests, either in terms of operations or Air Traffic Control (ATC) radar or flight operations, of National Air Traffic Services (NATS) and the Ministry of Defence (MOD). There are no other potentially affected aviation stakeholders The assessment considers all radar systems within operational range of the Site and has been informed by the results of a desktop baseline study and with reference to the existing evidence base regarding effects of onshore wind farm development. This chapter is supported by the following document: LOCH URR WIND FARM 15-1

3 Technical Appendix 15.1; Loch Urr Aviation Impact Assessment, Issue 2 (Osprey, 2014). LOCH URR WIND FARM 15-2

4 15.2 Methodology Scope of Assessment The AIA was conducted in accordance with Civil Aviation Authority (CAA) Civil Air Publication (CAP) 764, Policy and Guidelines on Wind Turbines (CAA, 2013). Potential aviation stakeholders were identified for each receptor, the physical obstruction and/or radar effect, and the operational effects were subsequently evaluated. Any impact to operations pays heed to, but is not limited to, consideration of the orientation of approach and departure flight paths, physical safeguarding of flight, airspace characteristics and flight procedures as published in the NATS UK Integrated Aeronautical Information Package (UK IAIP) (NATS, 2014) Radar performance and propagation modelling has been undertaken to determine the theoretical detection of the proposed turbines by the regions radar infrastructure. Osprey utilised the ATDI ICS LT V tool to model the terrain elevation profile between the identified Primary Surveillance Radars (PSRs) and each wind turbine blade tip height, to provide a graphical representation of the intervening terrain and theoretical direct Line of Sight (LoS), in order to determine the affected radar systems within the baseline The AIA considers the potential solutions that would mitigate the effects of the Proposed Development on the operations of identified aviation receptors. This chapter summarises the results of the AIA which are contained in full in the Technical Appendix Assessment Guidelines The aviation industry and the provision of Air Navigation Services are regulated through extensive legislation, with the mechanism for wind development enabled through the consenting system and in accordance with regulatory guidance. The following policy and guidance documents were considered during the baseline definition and assessment activities: (CAA, 2014(a)) CAA, CAP 393 Air Navigation: The Order and the Regulations (known as the Air Navigation Order (ANO)); 1 Advanced Topographic Development and Images Ltd ICS Lite Version LOCH URR WIND FARM 15-3

5 (CAA, 2014(b)) CAA, CAP 670 Air Traffic Services Safety Requirements; (CAA, 2013) CAA, CAP 764 Policy and Guidance on Wind Turbines; (MOD, 2012) MOD Specification for IR and Low Intensity Red Vertical Obstruction Lighting; and (RenewableUK, 2012) Renewable UK Guidance on Low Flying Activity and Onshore Tall Structures Including Anemometer Masts and Wind Turbines. Other data sources and guidance considered under desktop review of the definition of the baseline environment include the following: (MOD, 2011(a)) MOD UK Low-Flying System (UKLFS) Priority Areas map; (MOD, 2014) Military Aeronautical Information Publication (Mil AIP); (NATS, 2012) NATS Project RM: Wind Turbine Mitigation Briefing note for developers; (NATS, 2013(b)) Visual Flight Rules chart; and (NATS, 2014) CAA, CAP 32 UK Integrated Aeronautical Information Publication. UK IAIP is the main resource for information and flight procedures at all licensed UK airports as well as airspace, en-route procedures, charts and other air navigation information. Impact Assessment Methodology Magnitude The magnitude criterion of the potential effects on aviation and radar receptors is assessed using the following method and terminology: Table 15.1 Magnitude Criteria Descriptor or Criteria High Magnitude Medium Magnitude Low Magnitude Description Receptor unable to continue safe operations or safe provision of air navigation services (radar) in the presence of the turbines. Technical and/or operational mitigation of the effect is required. Receptor able to continue safe operations but with some restrictions or non-standard mitigation measures in place. Receptor able to continue operations with standard LOCH URR WIND FARM 15-4

6 Descriptor or Criteria Description mitigation in place. Negligible Magnitude No effect on this Receptor. Sensitivity The sensitivity of a receptor is subjective in aviation terms and therefore difficult to quantify. Whereas an Air Defence Radar installation would be an obvious high value and high sensitivity receptor to most (due to its role in UK national security), the sensitivity of a local aerodrome can often be rated high if the Planning Authority considers the receptor to be significant asset to the local area. The identified receptors in this analysis are considered to have a high sensitivity to effects, given their safety critical function. Significance Significance criteria for aviation effects are difficult to establish as they are not strictly based on the sensitivity of the receptor or magnitude of change but on whether the industry regulations for safe obstacle avoidance or radar separation (from radar clutter) can be maintained in the presence of the turbines. However, where practicable the following matrix has been used to assist in determining the likelihood of a significant effect arising from the Proposed Development. Table 15.2 Significance Criteria Magnitude of Effect Sensitivity of Receptors High Medium Low Negligible High Significant Significant Significant Not Significant Medium Significant Significant Not Significant Not Significant Low Significant Not Significant Not Significant Not Significant Negligible Not Significant Not Significant Not Significant Not Significant LOCH URR WIND FARM 15-5

7 Approach to the Assessment Potential aviation stakeholders were identified in accordance with CAA guidance (CAA, 2013). The guidance states that any wind turbine development within 30 km of an aerodrome with a surveillance radar facility might have an effect upon civil aerodrome related operations. The guidance goes on to say that the distance can, however, be far greater than 30 km depending upon a number of factors, including the type and coverage of the radar and the particular operation at the aerodrome Consideration was given to any ATC, Air Defence or other radar systems that are within operational range of the Proposed Development. Operational range varies by radar and by using a database of all ATC and air defence radars in the UK, the study areas can be defined on a case-by-case basis in this respect Definition of the baseline environment for aviation can often be a subjective process. For this reason, at least one ATC expert, and one safeguarding and regulatory expert are involved in the selection of the study area The AIA (Osprey, 2014) is a desk-based study involving a systematic review of the charts and data available through the UK IAIP (NATS, 2014) as well as utilisation of Visual Flight Rules charts (NATS, 2013(b)). The review seeks to identify all potential aviation receptors. Summary of Consultation The approach to the assessment has identified those radars or systems and practices that have the potential to interact with the Proposed Development. Those with no identifiable interaction are not taken through to the assessment phase. Table 15.3 highlights those systems and aviation receptors which are considered to be potentially effected and hence, whom the Applicant has sought to engage through consultation. Table 15.3 summarises the response received from aviation receptors. LOCH URR WIND FARM 15-6

8 Table 15.3 Summary of Consultation Receptor Type Assessment Terms NATS Technical and Operational Assessment (TOPA) W(F)11396 dated July 2011 The Proposed Development would conflict with NATS Safeguarding criteria, causing false primary plots to be generated on the Lowther Hill and Great Dun Fell radar (NATS, 2011). NATS has indicated that the effects of the Proposed Development would be technically mitigated by the implementation of a Project Raytheon Modification (Project RM) upgrade to the Great Dun Fell PSR (NATS, 2013(a)) as discussed further below in para In addition, Osprey analysis has concluded that a similar upgrade to the NATS Lowther Hill PSR would also mitigate the effect of the Proposed Development on this radar system (Osprey, 2014). Further consultation will follow to conclude NATS mitigation requirements. MOD Pre-application assessment (DE/C/SUT/43/10/1/12311) The MOD stated that they had no concerns with the Proposed Development and provided their lighting requirements based on the original site design, noting at the point of consultation the Proposed Development comprised 28 turbines. Further consultation will follow to ascertain the MOD lighting requirements based on the finalised development parameters. LOCH URR WIND FARM 15-7

9 15.3 Baseline NATS En-Route NATS is the UK civil en-route Air Navigation Service Provider (ANSP). NATS operate a number of long-range radars positioned to provide maximum coverage of UK airspace, which are important for the safe provision of air traffic services to civil and military, national and international air traffic The Proposed Development is located within operational range of the NATS Lowther Hill and Great Dun Fell PSR systems. The Lowther Hill PSR is sited at a distance of approximately 28 km and on a bearing of 205 from the Proposed Development and the Great Dun Fell PSR is sited at a distance of approximately 107 km and on a bearing of 300 from the Proposed Development. These radar systems contribute to the network of en-route radars providing vital coverage of UK airspace; the sensitivity of the receptor is determined to be high. In addition, surveillance data from these systems are also used by other air navigation service providers. Military ATC Units are based in NATS Control Centres to facilitate the control of aircraft that require ATC services outside or crossing the civil airspace structure. NATS have a contracted responsibility to provide appropriate PSR coverage to support this task. United Kingdom Low Flying System Low flying is a demanding but essential skill for military aircrew, gained through progressive training and continuous practice within the United Kingdom Low Flying System (UKLFS). The ability to operate effectively at low level by day and night is vital to fast jets, transport aircraft and helicopter operations as they support forces on the ground, and hence the UKFLS is a high sensitivity receptor. The Proposed Development is located within the UKLFS Low Flying Area (LFA) 16 and within Tactical Training Area (TTA) 20T, when this area is active Height in the UKLFS can be referred to in terms of minimum separation distance (MSD). This is the distance that must be maintained between any part of an aircraft in flight and the ground, the water or any other object. In an LFA aircraft can operate down to 250 feet (ft) MSD; however, in a TTA fast LOCH URR WIND FARM 15-8

10 jets can fly at 100 ft MSD and helicopters can fly down to 100 ft above ground level (agl) or down to ground level in support of troops on the ground. Airspace The airspace above the Proposed Development is categorised as follows, this is illustrated below on Diagram 15.1: Class G uncontrolled airspace up to Flight Level (FL) 85 (approximately 8,500 ft above mean sea level (amsl)); any aircraft can operate in this area of uncontrolled airspace without any requirement to be in communication with any ATC Unit. Pilots of aircraft operating in Class G airspace are ultimately responsible for seeing and avoiding other aircraft or obstacles; Class A Controlled Airspace (CAS) established from FL 85 up to FL 195; aircraft operating within this airspace must be in receipt of an air traffic service (ATS) from NATS Prestwick Area Control Centre (ACC). The air traffic controller is responsible for maintaining typically 5 nautical mile lateral separation between aircraft; Class C CAS established from FL 195 up to FL 245; all aircraft operating in this airspace must be in receipt of an ATS from NATS or Military controllers located at a NATS control centre; and Class C CAS established above FL 245; again all aircraft operating in this airspace must be in receipt of an ATS from NATS or Military controllers located at a NATS ACC. LOCH URR WIND FARM 15-9

11 Diagram 15.1 Cross Sectional View of Airspace Structure Other Aviation Stakeholders No other aviation stakeholders (i.e. small airfields, glider sites, etc.) were identified as likely to be affected during the assessment of the baseline environment. Potential Receptors The approach to the assessment has identified those radar or systems and practices which have the potential to interact with the Proposed Development. Those with no identifiable interaction are not taken forward to the assessment phase e.g. Glenswinton Airstrip. The following Table 15.4 highlights those systems which are considered in the assessment. Table 15.4 Summary of Receptors taken forward to the Assessment Receptor Type To Assessment Phase NATS Lowther Hill PSR En-Route Radar Yes NATS Great Dun Fell PSR En-Route Radar Yes LOCH URR WIND FARM 15-10

12 Receptor Type To Assessment Phase MOD UKLFS LFA 16 and TTA 20T Yes LOCH URR WIND FARM 15-11

13 15.4 Assessment of Effects NATS Lowther Hill and Great Dun Fell PSR Systems Construction Phase The infrastructure required in the process of the construction of the Proposed Development would have no significant effect on either of the NATS Lowther Hill or Great Dun Fell PSR systems. The static nature of the infrastructure is such that it would not be processed and presented onto ATC display screens by the PSR system. No significant effect on radars and operations is expected ahead of the turbines commencing operation. Operational Phase NATS uses the Lowther Hill and Great Dun Fell PSR systems to support their provision of navigational services to flights into and out of Edinburgh, Glasgow and Prestwick Airports, aircraft operating between UK airports and mainland Europe and also to those overflying the UK Flight Information Region (FIR) Air Traffic Controllers are responsible for maintaining typically 5 nautical miles lateral separation between aircraft. Where turbines are detectable by a PSR system, they may appear as aircraft targets and could mask genuine aircraft responses. The radar may also be de-sensitised by clutter processing within the sector containing turbines, meaning that real aircraft targets may not be detected or may disappear from radar. At an anticipated maximum height of metres (m) to blade tip, the Proposed Development is predicted to cause clutter to be presented on NATS ATC displays Radar propagation modelling has been undertaken and the interaction of radar with the proposed wind turbines is well understood (Osprey, 2014). Therefore, the magnitude of the effect is high. The sensitivity of the receptor is also high. This effect has therefore been assessed as Significant. Decommissioning Phase Agreed mitigation is required to remain operational until the Site has been fully decommissioned; consequently, this phase would have no significant effect on the NATS Lowther Hill and Great Dun Fell PSR systems. LOCH URR WIND FARM 15-12

14 Micro-siting No additional effect on this receptor is anticipated should the micro-siting of any individual turbine(s) be required. MOD Low Flying Construction Phase The infrastructure required in the construction process of the Proposed Development may present a physical obstruction and effect operations of Military Low Flying aircraft. Operational Phase The Proposed Development would be located within LFA 16 and when active, within TTA 20T. These areas are considered by the MOD to be of key importance for Military low flying training Pilots are obliged to plan their flying activities in advance and to be familiar with any en-route obstacles they may encounter. During the flight, weather conditions or military exercises may necessitate route adjustments. However, pilots are ultimately responsible for seeing and avoiding tall structures such as wind turbines. Despite this, it is acknowledged that there is an increased risk in low visibility conditions where pilots performing high energy manoeuvres could experience a delay in visually acquiring the turbines The airspace in the vicinity of the Proposed Development is considered to be of high priority in terms of the UKLFS, indicating an area where the MOD may raise objections to wind developments. However, during initial consultation in 2011, the MOD stated that they had no concerns with the layout provided. The consultation layout comprised 28 turbines, two more than now being proposed. On the basis of the consultation response the sensitivity of the receptor is considered to be low. The magnitude of effect is determined to be medium, resulting in the effect being Not Significant. LOCH URR WIND FARM 15-13

15 Decommissioning Phase The infrastructure required in the process of the turbine decommissioning process may present a physical obstruction and effect operations of Military Low Flying aircraft. Micro-siting No additional effect on this receptor is anticipated should the micro-siting of any individual turbine(s) be required. LOCH URR WIND FARM 15-14

16 15.5 Mitigation General It is good practice to notify Aviation Stakeholders of the location and dimension of any wind energy development and the associated construction activities. Information regarding construction should be passed to the Defence Geographic Centre and the General Aviation Awareness Council at least 6 weeks in advance of the erection of the first turbine and to follow up on the day with a confirmation that the activity has taken place. The data should include: Location, height (of all structures over 150 ft, date of erection, date of removal and lighting type (none, infra-red or lighting brightness); and RenewableUK should be copied on the submission of all such information as an independent record and that they might share the information with other relevant official agencies. Appropriate information about the Site construction and any associated lighting (where applicable), for example the height and temporary location of construction cranes, should be provided to the UK Aeronautical Information Service (NATS AIS) for promulgation throughout the UK IAIP (NATS, 2014). NATS Lowther Hill and Great Dun Fell PSR Systems Construction Phase As stated at above, the construction phase would have no significant effect on the NATS Lowther Hill and Great Dun Fell PSR systems; there is no requirement for mitigation. Operational Phase NATS in conjunction with the supplier of their PSR systems, Raytheon, have developed a technical solution that allows clutter generated by wind turbines to be removed from a controllers display whilst ensuring that the current ability to detect, track and provide navigational assistance to aircraft is not degraded (Project Raytheon Modification (RM)). LOCH URR WIND FARM 15-15

17 NATS has indicated that the implementation of a Project RM upgrade mitigation solution to the Great Dun Fell PSR has the potential to be an acceptable option to resolve the impact of the Proposed Development on this system (NATS, 2013(a)) Osprey analysis concludes that the potential base of PSR coverage that may exist when a Project RM upgrade to the Lowther Hill PSR is implemented by NATS would be approximately 3,620 ft amsl. The base of controlled airspace above the Proposed Development is 8,500 ft amsl. Therefore, it is concluded that approximately 4,880 ft of radar coverage is likely to be available below the base of the existing controlled airspace, which is considered sufficient to meet NATS operational task (Osprey, 2014). Further comprehensive consultation would follow the grant of consent to conclude NATS mitigation requirements. It is anticipated that this would be controlled by way of a suitably worded planning condition. Decommissioning Phase Any agreed mitigation would remain operational until the Proposed Development has been fully decommissioned; as such this phase would have no significant effect on the Lowther Hill and Great Dun Fell PSR systems. MOD Low Flying Construction Phase Construction of the Proposed Development, including turbines and the assembly infrastructure, may present a physical obstruction to Military Low Flying aircraft. Appropriate details regarding the site s construction, for example the height and temporary location of construction cranes, and any associated lighting (where applicable) should be provided to the Defence Geographic Centre (DGC) and UK Aeronautical Information Service (NATS AIS) for promulgation throughout the UK IAIP (NATS, 2014). Operational Phase Pilots of Military Low Flying VFR aircraft are ultimately responsible for their own terrain and obstacle clearance. Pilots refer to aviation charts detailing the relevant terrain and any obstacles; this mapping would depict the location of LOCH URR WIND FARM 15-16

18 the Proposed Development and its parameters in the event of it being constructed. Details of the Proposed Development are required to be promulgated through the DGC and the UK AIS to enable the site s depiction on appropriate aviation charts and documentation as required The MOD stated in their original response a requirement in the interests of air safety, that the corner most turbines and 6 other turbines within the Proposed Development are fitted with a form of aviation obstruction lighting for day and night operations (MOD, 2011(b)). Although the layout has since been significantly reduced in terms of turbine numbers, it is considered that the MOD is unlikely to alter their position The requirement for aviation lighting is stipulated for structures which extend greater than 150 m agl. However, the CAA may further support the use of aviation obstruction lighting at the request of an aviation stakeholder for shorter structures, should this be deemed necessary. Consultation with the MOD through the Defence Infrastructure Organisation (DIO) would determine the finalised lighting requirements. It is anticipated that this would be controlled by way of a suitably worded planning condition. Decommissioning Phase Decommissioning of the Proposed Development, including both the turbines and the associated infrastructure, may present a physical obstruction to Military Low Flying aircraft. In order to safeguard the general use of the area by military traffic, the Applicant would adhere to the notification requirements outlined at Paragraph and any lighting requirements should this be deemed necessary. LOCH URR WIND FARM 15-17

19 15.6 Residual Effects and Conclusions It is acknowledged that the Proposed Development is likely to have an effect on the NATS Lowther Hill and Great Dun Fell PSR systems. It has been identified that it is highly likely that technical mitigation solutions can be implemented to resolve the predicted significant effects of the Proposed Development on their radar and operations. Should consent be granted for the Proposed Development, it is considered that, with the collaboration of NATS, a technically and operationally acceptable mitigation solution can be implemented prior to the Proposed Development becoming operational The configuration of the aviation obstruction lighting requested by the MOD is anticipated to be sufficient in terms of the UKLFS, resulting in an insignificant residual effect. Comprehensive formal consultation would follow any grant of consent and would identify the finalised requirements for the fitting of aviation obstruction lighting to the Proposed Development. It is anticipated that this would be controlled by way of a suitably worded planning condition. Cumulative Effects There are a number of operational and consented wind farms within the vicinity of the Proposed Development which may be considered by NATS and the MOD to result in an increasing cumulative effect on their individual operations within the region However, it has been demonstrated that there are technically feasible solutions available to avoid significant effects on aviation receptors from the Proposed Development and as such it is considered unlikely that the scheme would result in any significant cumulative effects with other operational, consented or proposed wind farm projects On this basis it is considered there would not be any significant aviation effects from the Proposed Development. LOCH URR WIND FARM 15-18

20 15.7 References CAA. (2013). CAP CAA Policy and Guidance on Wind Turbines. CAA. CAA. (2014(a)). CAP 393 Air Navigation: The Order and the Regulations. CAA. CAA. (2014(b)). CAP 670 Air Traffic Services Safety Requirements. CAA. MOD. (2011(a)). MOD UK Low-Flying System (UKLFS) Priority Areas map. MOD. (2011(b)). Pre-application Assessment DE/C/SUT/43/10/1/ MOD. MOD. (2012). MOD Specification for IR and Low Intensity Red Vertical Obstruction Lighting. MOD. MOD. (2014). Military Aeronatical Information Publication. MOD. NATS. (2011). Technical and Operational Assessment (TOPA) W(F) NATS. NATS. (2012). NATS Project RM: Wind Turbine Mitigation Briefing note for developers. NATS. NATS. (2013(a)). NATS Project RM Mitigation Capability Correspondence. NATS. NATS. (2013(b)). Visual Flight Rules Chart Scotland Edition 28. NATS. NATS. (2014). CAP 32 UK Integrated Aeronautical Information Package. NATS. Osprey. (2014). Loch Urr Aviation Impact Assessment. Osprey. RenewableUK. (2012). Guidance on Low Flying Aircraft and Onshore Tall Structures Including Anemometer Masts and Wind Turbines. RenewableUK. LOCH URR WIND FARM 15-19

15 AVIATION & AIR SAFEGUARDING

15 AVIATION & AIR SAFEGUARDING Knockskae Wind Farm Environmental Statement Volume 2 Main Report 15-1 15 AVIATION & AIR SAFEGUARDING 15.1 Introduction 15.1.1 This Chapter has been prepared by (Osprey), a technical consultancy providing

More information

Loch Urr Wind Farm Aviation Impact Assessment

Loch Urr Wind Farm Aviation Impact Assessment Loch Urr Wind Farm Aviation Impact Assessment Date: 11th November 2014 Author: Steve Hyam Revision: Issue 1 Osprey Ref: 70802 001 This document is of UK origin and has been prepared by Osprey Consulting

More information

Osprey Consulting Services Ltd

Osprey Consulting Services Ltd Osprey Consulting Services Ltd Appendix 20B Aviation Lighting Requirements This document is of UK origin and has been prepared by Osprey Consulting Services Limited (Osprey) and, subject to any existing

More information

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

FASI(N) IoM/Antrim Systemisation Airspace Change Decision Safety and Airspace Regulation Group FASI(N) IoM/Antrim Systemisation Airspace Change Decision CAP 1584 Contents Published by the Civil Aviation Authority, August 2017 Civil Aviation Authority, Aviation

More information

Control of Cranes and Other Temporary Obstacles

Control of Cranes and Other Temporary Obstacles United Kingdom Overseas Territories Aviation Circular OTAC 139-27 140-11 171-8 172-11 178-10 Control of Cranes and Other Temporary Obstacles Issue 1 1 June 2018 Effective on issue GENERAL Overseas Territories

More information

Appendix N. Telecommunications and Aviation. Appendix N1 Consultation Appendix N2 ESB Report Appendix N3 Aviation Briefing Appendix N4 2RN Protocol

Appendix N. Telecommunications and Aviation. Appendix N1 Consultation Appendix N2 ESB Report Appendix N3 Aviation Briefing Appendix N4 2RN Protocol Appendix N Telecommunications and Aviation Appendix N1 Consultation Appendix N2 ESB Report Appendix N3 Aviation Briefing Appendix N4 2RN Protocol APPENDIX N1 CONSULTATION Paul O'Brien From: SHERIDANT@eircom.ie

More information

NEWCASTLE INTERNATIONAL AIRPORT RADAR BLANKING STRATEGY. Newcastle International Airport Radar Blanking Strategy. April 2011

NEWCASTLE INTERNATIONAL AIRPORT RADAR BLANKING STRATEGY. Newcastle International Airport Radar Blanking Strategy. April 2011 NEWCASTLE INTERNATIONAL AIRPORT RADAR BLANKING STRATEGY 1 Contents 1. Introduction 2. Impact of wind turbines on radar 2.1 PSR 2.2 SSR 3. 3.1 Location, ownership and airspace 3.2 Safeguarding process 4.

More information

SgurrEnergy Ltd Linfairn Wind Farm Environmental Statement: Chapter 12

SgurrEnergy Ltd Linfairn Wind Farm Environmental Statement: Chapter 12 12 AVIATION AND TELECOMMUNICATIONS 12.1 INTRODUCTION This chapter provides an assessment of the potential effects of the Project on aviation and telecommunications. AARDVaRC Ltd has undertaken the aviation

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS.

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. NATIONAL AIRPORTS SAFEGUARDING FRAMEWORK GUIDELINE D MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. REVISION DATE VERSION NUMBER CHANGES MADE APPROVED

More information

SAFEGUARDING OF AERODROMES. Advice Note 1

SAFEGUARDING OF AERODROMES. Advice Note 1 AIRPORT OPERATORS ASSOCIATION & GENERAL AVIATION AWARENESS COUNCIL supported by CIVIL AVIATION AUTHORITY Working in Co-operation SAFEGUARDING OF AERODROMES Advice Note 1 Safeguarding - An Overview 1. The

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

GUIDANCE ON CIVIL AVIATION AUTHORITY (CAA) PLANNING CONSULTATION REQUIREMENTS. 2 August Introduction

GUIDANCE ON CIVIL AVIATION AUTHORITY (CAA) PLANNING CONSULTATION REQUIREMENTS. 2 August Introduction GUIDANCE ON CIVIL AVIATION AUTHORITY () PLANNING CONSULTATION REQUIREMENTS 2 August 2012 1. Introduction 1.1 As a general rule, decisions concerning local land use and planning issues, including cases

More information

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE SAFETYSENSE LEAFLET 8e AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE 1 INTRODUCTION 2 NON-RADAR SERVICES 3 RADAR SERVICES 4 HOW TO OBTAIN A SERVICE 5 RADAR SERVICE LIMITATIONS 1 INTRODUCTION a) In this

More information

Aeronautical Studies (Safety Risk Assessment)

Aeronautical Studies (Safety Risk Assessment) Advisory Circular Aeronautical Studies (Safety Risk Assessment) FIRST EDITION GEORGIAN CIVIL AVIATION AGENCY Chapter LIST OF EFFECTIVE PAGES Pages Amend. No Date of Issue List of effective pages 2 0.00

More information

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ)

NATMAC INFORMATIVE INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) Directorate of Airspace Policy NATMAC Representatives DAP/STNTMZ 23 July 2009 NATMAC INFORMATIVE Dear Colleagues INTRODUCTION OF STANSTED TRANSPONDER MANDATORY ZONE (TMZ) INTRODUCTION 1.1 NATS issued a

More information

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures

Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures Proposed Changes to Inverness Airport s Airspace The Introduction of Controlled Airspace and Optimisation of Instrument Flight Procedures What is an Airspace Change Proposal? It is a formal UK Civil Aviation

More information

LETTER OF AGREEMENT. Between. and RELATING TO

LETTER OF AGREEMENT. Between. and RELATING TO LETTER OF AGREEMENT Between NATS (En Route) plc, Scottish Area Control (Prestwick) NATS (Services) Ltd, Edinburgh ATC NATS (Services) Ltd, Glasgow ATC and BRITISH GLIDING ASSOCIATION (BGA) RELATING TO

More information

PLUME RISE ASSESSMENTS

PLUME RISE ASSESSMENTS Advisory Circular AC 139-5(1) NOVEMBER 2012 PLUME RISE ASSESSMENTS CONTENTS Page 1. References 1 2. Purpose 2 3. Status of this advisory circular 2 4. Acronyms 2 5. Definitions 3 6. Background 3 7. Key

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Linfairn Wind Farm Addendum Appendix A12: Aviation Report. APPENDIX A12: Aviation Report

Linfairn Wind Farm Addendum Appendix A12: Aviation Report. APPENDIX A12: Aviation Report SgurrEnergy Ltd Linfairn Wind Farm Addendum Appendix A12: Aviation Report APPENDIX A12: Aviation Report SgurrEnergy Ltd Linfairn Wind Farm Addendum Appendix A12: Aviation Report Aviation Impact Assessment

More information

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR)

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Version 1.0 Director NSS 14 February 2018 Guidance for Complexity and Density Considerations

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original

AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-06-0532 V2 15 June 2016 15 June 2016 BRITISH GLIDING ASSOCIATION : COMPETITIONS 2016

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

NDS Subject to NOTAM: No

NDS Subject to NOTAM: No AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2017-00-0131 1.1 29 November 2016 29 November 2016 RAF VALLEY (MONA) MSSR CALIBRATION NDS

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Page 1 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Title of Airspace Change Proposal Change Sponsor Isle of Man/Antrim Systemisation (Revised ATS route structure over the

More information

AERODROME LICENCE APPLICATION PROCESS

AERODROME LICENCE APPLICATION PROCESS 0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,

More information

It is essential that planning take full account of air safety and efficiency of operations.

It is essential that planning take full account of air safety and efficiency of operations. Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural

More information

Draft airspace design guidance consultation

Draft airspace design guidance consultation Draft airspace design guidance consultation Annex 2: CAP 1522 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority Aviation House Gatwick Airport South West Sussex RH6 0YR You can copy

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

Civil and military integration in the same workspace

Civil and military integration in the same workspace Civil and military integration in the same workspace Presented by PLC 1 introduction Civilian and Military ATCOs work alongside each other in various countries and are employed in a number of different

More information

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981 Introduction The First Edition of Doc. 9981 was approved by the President of the Council on 20 October 2014 The document becomes

More information

CHAPTER 16 TELECOMMUNICATIONS AND AVIATION

CHAPTER 16 TELECOMMUNICATIONS AND AVIATION ELEMENT POWER IRELAND LTD. ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED MAIGHNE WIND FARM, IN COUNTY KILDARE AND COUNTY MEATH VOLUME 2 MAIN EIS CHAPTER 16 TELECOMMUNICATIONS AND AVIATION MARCH 215 TABLE

More information

CAT E Subject to NOTAM: No

CAT E Subject to NOTAM: No AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2015-09-0091 V1.0 10 June 2016 10 June 2016 TALLA DVOR/DME CALIBRATION CAT E Subject to

More information

Contents. Subpart A General 91.1 Purpose... 7

Contents. Subpart A General 91.1 Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group 24 August 2015 Policy Statement POLICY FOR POINT MERGE AND TROMBONE TRANSITION PROCEDURES 1 Introduction 1.1 The Point Merge transition procedure is an Area Navigation

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW

TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW NAV CANADA Level of Service & Aeronautical Studies 77 Metcalfe Street, 5th Floor Ottawa, Ontario K1P 5L6 April, 2013 The information and diagrams contained

More information

Assessment of Flight and Duty Time Schemes Procedure

Assessment of Flight and Duty Time Schemes Procedure Assessment of Flight and Duty Time Schemes Procedure Purpose Fatigue is a major human factors hazard because it affects a crew member s ability to perform their tasks safely. Operator fatigue management

More information

SECTION 6 - SEPARATION STANDARDS

SECTION 6 - SEPARATION STANDARDS SECTION 6 - SEPARATION STANDARDS CHAPTER 1 - PROVISION OF STANDARD SEPARATION 1.1 Standard vertical or horizontal separation shall be provided between: a) All flights in Class A airspace. b) IFR flights

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL Directorate of Airspace Policy NATMAC Representatives 13 July 2012 CAA DECISION LETTER MANSTON KENT INTERNATIONAL AIRPORT (KIA) RNAV (GNSS) HOLD AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 During late

More information

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

Introduction. Appendix D: Airspace Protection

Introduction. Appendix D: Airspace Protection Preliminary PreliminaryDraft DraftMaster MasterPlan Plan Bankstown Airport Introduction : Airspace Protection D Preliminary Master Plan Draft Master Plan Airspace protection D1 OVERVIEW The protection

More information

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION FIT FOR : A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR INFORMATION I TABLE OF CONTENTS SECTION A: GENERAL MATERIAL 2 SECTION B: PUBLICATION SPECIFIC FIT

More information

Date: 01 Aug 2016 Time: 1344Z Position: 5441N 00241W

Date: 01 Aug 2016 Time: 1344Z Position: 5441N 00241W AIRPROX REPORT No 2016157 Date: 01 Aug 2016 Time: 1344Z Position: 5441N 00241W Location: Langwathby PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft AS365 King Air

More information

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory. AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which

More information

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM. Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide

More information

DEPARTMENT OF CIVIL AVIATION ANNEX 1 REPUBLIC OF MAURITIUS

DEPARTMENT OF CIVIL AVIATION ANNEX 1 REPUBLIC OF MAURITIUS DEPARTMENT OF CIVIL AVIATION ANNEX 1 REPUBLIC OF MAURITIUS APPLICATION FOR REMOTELY PILOTED AIRCRAFT OPERATING PERMISSION OPERATIONS MANUAL TEMPLATE The following table provides an outline of the sort

More information

UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM GLIDING CLUB

UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM GLIDING CLUB AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-04-0110 V2.0 05 May 2016 22 April 2016 UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM

More information

Cuadrilla Elswick Ltd

Cuadrilla Elswick Ltd Cuadrilla Elswick Ltd Tewmporary Shale Gas Exploration Description Roseacre Wood, Lancashire Planning Inspectorate Reference APP/Q2371/W/15/3134385 Local Authority Reference: LCC/2014/0101 CE 1/3 Summary

More information

Chapter 15 Civil and Military Aviation and Radar

Chapter 15 Civil and Military Aviation and Radar East Anglia TWO Offshore Windfarm Chapter 15 Civil and Military Aviation and Radar Preliminary Environmental Information Volume 1 Document Reference: EA2-DEVWF-ENV-REP-IBR-000810 Prepared by: Checked by:

More information

INTERNATIONAL FIRE TRAINING CENTRE

INTERNATIONAL FIRE TRAINING CENTRE INTERNATIONAL FIRE TRAINING CENTRE RFFS SUPERVISOR INITIAL LICENSING OF AERODROMES CHAPTER 8 THE MINIMUM REQUIREMENTS TO BE MET IN THE PROVISION OF RESCUE AND FIRE FIGHTING SERVICES AT UK LICENSED AERODROMES

More information

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace

Title: Airway Q41: Reclassify to Class G below Flight level 55. Subject Release of Controlled and Segregated Airspace Title: Airway Q41: Reclassify to Class G below Flight level 55 Subject Release of Controlled and Segregated Airspace Version: V3.0 Status: Final Reference FASVIG 20161026 V3.0 Author: Publication Date:

More information

Date: 29 Apr 2017 Time: 1119Z Position: 5226N 00112W Location: 10nm ENE Coventry

Date: 29 Apr 2017 Time: 1119Z Position: 5226N 00112W Location: 10nm ENE Coventry AIRPROX REPORT No 2017080 Date: 29 Apr 2017 Time: 1119Z Position: 5226N 00112W Location: 10nm ENE Coventry PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft C560 PA28

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

AERIAL LiDAR SURVEY OF OVERHEAD POWERLINES GLASGOW / EDINBURGH AREA CAT Z

AERIAL LiDAR SURVEY OF OVERHEAD POWERLINES GLASGOW / EDINBURGH AREA CAT Z AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-06-0216 V1 01 June 2016 Date. AERIAL LiDAR SURVEY OF OVERHEAD POWERLINES GLASGOW /

More information

CAA AIRSPACE CHANGE DECISION

CAA AIRSPACE CHANGE DECISION Safety and Airspace Regulation Group All NATMAC Representatives 14 April 2016 CAA AIRSPACE CHANGE DECISION RECLASSIFICATION OF THE BELFAST TERMINAL CONTROL AREA AIRSPACE Organisation proposing the change:

More information

COLLISION AVOIDANCE FOR RPAS

COLLISION AVOIDANCE FOR RPAS COLLISION AVOIDANCE FOR RPAS Johan Pellebergs, Saab Aeronautics ICAS workshop, September 2017 This document and the information contained herein is the property of Saab AB and must not be used, disclosed

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB AIRPROX REPORT No 2015052 Date: 20 Apr 2015 Time: 1010Z Position: 5324N 00211W Location: 4nm NE Manchester Airport PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft

More information

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. The text of the amendment is arranged to show deleted text, new or amended

More information

AIR NAVIGATION ORDER

AIR NAVIGATION ORDER CLEARANCE AREAS AND OBSTACLE LIMITATION SURFACES AT AIR NAVIGATION ORDER VERSION : 2.0 DATE OF IMPLEMENTATION : 15-02-2013 OFFICE OF PRIME INTEREST : AERODROME STANDARDS BRANCH. (Directorate of Airspace

More information

Advisory Circular AC19-1. Test Pilot Approvals 03 July Revision 0

Advisory Circular AC19-1. Test Pilot Approvals 03 July Revision 0 Advisory Circular AC19-1 Revision 0 Test Pilot Approvals 03 July 2009 General Civil Aviation Authority Advisory Circulars contain information about standards, practices, and procedures that the Director

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B

Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B Doncaster Sheffield Airport Airspace Change Proposal for the Introduction of RNAV (GNSS) Departure and Approach Procedures ANNEX B TO PART B ANNEX B TO PART B: Runway 20 Westerly Departure UPTON 2B 2 Contents

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group All NATMAC Representatives 18 August 2014 CAA DECISION LETTER 1. INTRODUCTION BRISTOL INTERNATIONAL AIRPORT (BIA) RNAV STARS 1.1 During January 2014, the Civil Aviation

More information

-and- CIVIL AVIATION AUTHORITY. -and- (1) SECRETARY OF STATE FOR TRANSPORT (2) GATWICK AIRPORT LIMITED (3) NATS EN ROUTE PLC Interested Parties

-and- CIVIL AVIATION AUTHORITY. -and- (1) SECRETARY OF STATE FOR TRANSPORT (2) GATWICK AIRPORT LIMITED (3) NATS EN ROUTE PLC Interested Parties IN THE HIGH COURT OF JUSTICE QUEEN S BENCH DIVISION ADMINISTRATIVE COURT In the matter of a claim for judicial review B E T W E E N: THE QUEEN On the application of MARTIN BARRAUD -and- Claim No. CO/1063/2015

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

Aerodrome Obstacle Survey Information Checks

Aerodrome Obstacle Survey Information Checks United Kingdom Overseas Territories Aviation Circular OTAC 139-20 Aerodrome Obstacle Survey Information Checks Issue 2.00 26 May 2017 Effective on issue GENERAL Overseas Territories Aviation Circulars

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

Effective Altitude. R-3103 To 30,000 (To 9,144 meters) Source: NACO 2002 Notes: 1 By NOTAM issued 12 hours in advance

Effective Altitude. R-3103 To 30,000 (To 9,144 meters) Source: NACO 2002 Notes: 1 By NOTAM issued 12 hours in advance 8.4 AIRSPACE USE 8.4.1 Affected Environment The affected airspace environment is described below in terms of its principal attributes, namely controlled and uncontrolled airspace, special use airspace,

More information

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016) AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan

More information

Air Navigation (Amendment) Order Guidance for small unmanned aircraft users

Air Navigation (Amendment) Order Guidance for small unmanned aircraft users July 2018 Air Navigation (Amendment) Order 2018 - Guidance for small unmanned aircraft users Introduction On 30 May 2018, the United Kingdom Government published an amendment to the UK Air Navigation Order

More information

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB AIRPROX REPORT No 2016061 Date: 28 Apr 2016 Time: 1135Z Position: 5047N 00314W Location: Exeter (EX) NDB hold PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft C17

More information

2.2 For these reasons the provision of tourist signing will only be considered:

2.2 For these reasons the provision of tourist signing will only be considered: TOURIST SIGNING POLICY 2015 1. DEFINITION 1.1 A tourist destination is defined as a permanently established attraction which attracts or is used by visitors to an area and is open to the public without

More information

IFR SEPARATION USING RADAR

IFR SEPARATION USING RADAR IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,

More information

SPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR

SPECIAL PROCEDURES FOR IN-FLIGHT CONTINGENCIES IN OCEANIC AIRSPACE OF SEYCHELLES FIR Phone: 248-4384186 AFS: FSIAYNYX FAX: 248-4384179 Email: sezais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIP SUPPLEMENT

More information

Civil Approach Procedural Controller Military Terminal Radar Controller

Civil Approach Procedural Controller Military Terminal Radar Controller AIR TRAFFIC CONTROLLER APPRENTICESHIP STANDARD Air Traffic Controller Civil Area/ Terminal Controller Civil Approach Controller Military Weapons Controller Military Area Radar Controller Civil Approach

More information

AIRSPACE INFRINGEMENTS

AIRSPACE INFRINGEMENTS AIRSPACE INFRINGEMENTS Eurocontrol Airspace Infringements Workshop 24 January 2008 Dave Drake UK CAA Directorate of Airspace Policy The Problem Can lead to disruption to traffic Can lead to adverse economic

More information

Guidelines for NOTAM Workflow and Allocation of Responsibilities

Guidelines for NOTAM Workflow and Allocation of Responsibilities Guidelines for NOTAM Workflow and Allocation of Responsibilities May 19 2011 INDEX 1- MAIN OBJECTIVES 1 2- ORIGINATION OF NOTAM 1 3- VALUE OF A NOTAM 3 4- DURATION OF NOTAM 4 5- THE AERONAUTICAL DATA CHAIN

More information

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation

More information

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL

CAA DECISION LETTER. LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL Safety and Airspace Regulation Group All NATMAC Representatives 13 August 2015 CAA DECISION LETTER LUTON RUNWAY 26 BROOKMANS PARK RNAV1 SIDs AIRSPACE CHANGE PROPOSAL 1. INTRODUCTION 1.1 For over 10 years

More information

Airspace Structure Changes and ATC Operational Procedure Changes. Stuart Lindsey Airspace Regulation

Airspace Structure Changes and ATC Operational Procedure Changes. Stuart Lindsey Airspace Regulation Airspace Structure Changes and ATC Operational Procedure Changes Stuart Lindsey Airspace Regulation July 2015 Notified Airspace Structure Airspace Change Process Airspace Charter (CAP 724) provides

More information

NZQA registered unit standard version 1 Page 1 of 5

NZQA registered unit standard version 1 Page 1 of 5 Page 1 of 5 Title Demonstrate approach control surveillance for air traffic services under simulated conditions Level 6 Credits 30 Purpose People credited with this unit standard are able to: demonstrate

More information

Terms of Reference CYR301 Airspace Modification TERMS OF REFERENCE. Airspace Modification CYR301. Camp Dundurn, SK

Terms of Reference CYR301 Airspace Modification TERMS OF REFERENCE. Airspace Modification CYR301. Camp Dundurn, SK TERMS OF REFERENCE Airspace Modification CYR301 Camp Dundurn, SK NAV CANADA Navigation and airspace Level of Service 77 Metcalfe Street, 4th Floor Ottawa, Ontario K1P 5L6 Sept 2016 The information and

More information

THIRTEENTH AIR NAVIGATION CONFERENCE

THIRTEENTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,

More information

ATC PROCEDURES WORKING GROUP. Transition Level

ATC PROCEDURES WORKING GROUP. Transition Level SAFETY & AIRSPACE REGULATION GROUP ATC PROCEDURES WORKING GROUP Transition Introduction 1 In 2013, ICAO adopted a proposal by the European Air Navigation Planning Group to amend the method of determining

More information

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR OBJECTIVE: This ATS Contingency plan s objective is to ensure the continued safety and supplies of air navigation services in the event of partially or total

More information

ACAS on VLJs and LJs Assessment of safety Level (AVAL) Outcomes of the AVAL study (presented by Thierry Arino, Egis Avia)

ACAS on VLJs and LJs Assessment of safety Level (AVAL) Outcomes of the AVAL study (presented by Thierry Arino, Egis Avia) ACAS on VLJs and LJs Assessment of safety Level (AVAL) Outcomes of the AVAL study (presented by Thierry Arino, Egis Avia) Slide 1 Presentation content Introduction Background on Airborne Collision Avoidance

More information