1 qji gar.- gy~ k~u g 4 3f" The two Abu Simbel temples, in their ancient and original position by the Nile By LENNART The two Abu Simbel temples, see above, and their salvage, have been written about in many other connections. Thus, in this article, only a brief description will be given for orientation, special emphasis being accorded to the problems of drainage. Both temples were cut out of the cliff proper about years ago, under the reign of King Rameses, the Great in honour of the King himself, the Small being spouse, dedicated to his favourite Queen Nefertari. The Great consists of an outer facade with four colossal statues of Rameses himself and a number of smaller statues, wall decorations, etc.. and fourteen rooms hewn out in the interior of the cliff. The Small has a facade with six main statues, smaller than those of the Great, and five inner rooms. Aff rooms have richly decorated Chief Consulting Engineer, Vattenbyggnads- byran VBB), Stockholm, Sweden tsenior Engineer, VBB, Malmb, Sweden engineers and VBB acted as consulting for the architects to the UAR Government entire operation temples of salvaging the Abu Simbel BERG.'Sc and AKE DAHLSTROM,t The major operation of salvaging the two famous Abu Simbel temples in southern Egypt in the years involved many different and unusual problems. One problem of the utmost importance was to prevent the Nile water, free or as ground water, from with the friable in touch coming sandstone of the temples. This article gives a short description of the measures taken to deal with this problem, especially the ground water walls, pillars while in some and statues. there are also Both temples were situated near the shore of the Nile, only a few metres above the Nile water level. When, in 1964, raising of the Nile water level was to be started behind the High Dam at Aswan, the Nile water would have flooded the temples had no precautions been taken. Such an inundation would have rapidly destroyed the temples, which consist of a rather friable sandstone with poor cementation. Thus the salvage operation not only MSc meant cutting out and moving the temples to a higher level, but also involved the building of a cofferdam outside the temples, combined with a drainage system, to function until all parts of the temples had been dismantled and reassembled at a safe elevation. sites and cofferdam A plan of the two temple sites and the cofferdam is shown in Fig. 2, with the Great to the south and the Small to the north, the distance between amounting to them about 150m. n order to keep both sites safely dry, the protective cofferdam was given a length of about 350m and a height of more than 20 m above the river bed. t was planned that the removal of the temples should be completed by the middle of As can be seen from the Nile water level diagram in Fig. 3, the cofferdam had to be built for a maximum water level of about SSL m during the winter season of The design of the cofferdam section can be seen in Figs. 3 and 4. The Ground Engineering 13

2 Fig. 1. Progress picture taken during the erection of the cofferdam construction of the cofferdam was started with the placing of a sandfill on the Nile bottom reaching well above the present water level. From the platform thus established, steel sheet piling was sunk by means of vibroflotation through the sandfill and the natural river bed deposits down to the underlying bedrock. The steel sheet piling was then extended upwards, and rockfill was placed on both sides. On the inside, the cofferdam was provided with filters and a drain pipe. As a further precautionary measure, a row of deep well pipes was placed WE inside of the drain pipe. n fact, these deep wells were operated before the filters and the drain pipe of the cofferdam had been completed. Three deep wells in front of the Small were also operated later, as will be referred to later. Previous investigations Before the salvage operation proper was started, extensive investigations had been carried out, dealing among other aspects of the scheme, with the drainage problem being considered here. By means of boring in the river bed and in the shore outside the temples. the composition and the thickness of the natural deposits above the rock ground had been established Figs. 3 and 4). As could be expected, the deposits consisted of sand and silt in layers of varying thickness and distribution. From the foot of the cliff, on the southern side of both temples, vertical pits and sloping galleries tunnels 17 and 18 in Fig 2) were excavated into the sandstone rock down to a depth of about 8 m under the present Nile water. By pumping in these pits and galleries the amount of leakage under various conditions could be calculated. Since the Nile water level was to rise above the ceilings of the temple rooms, exploratory borings were also made in the sandstone rock beside and above the temples. Although the sandstone consisted of layers of varying thickness and grain size, it could be considered fairly homogeneous from the leakage point of view. Tests carried out on sandstone samples gave permeability coefficients varying between 10-'nd 10-'s. On the basis of these values, as well as of the practical pumping tests and the other investigations mentioned above, it was calculated in advance that the total quantity of leakage ought not to exceed about 500 litress Fig. 2. Plan of the temple area with ground water table. mid-march, 1965 FG. 3 W RVER NLE Fe L~ 0 50 o DEEP WELLS 14

3 Fig. 3. Section of cofferdam and Great, with Nile water level variations >SL WO WATER LEVEL OF THE NLE J '31 T'A 1, liu COFFERDAH W U SEL N ~ NWDLE NOT. HS S. NL ESL TS S NDDLE NAOCN HS ~E mt JJJJJJlJ1T1~qMUO WATfO TAOLE N' NDDLf NOU HS $$LRE $$S 1$$5 1$$$ 1$$ SANO ANO SLT DEDOSH OATUOAL NCE LOEDUND WATEO TAELE NOOLE NADCN SSS SSL 1$0 SSL 1$0 SSL LO ~WL SSL 133.$ HDDLE NOV 100$ ~WL SSL 1205 HDDLE HARCH 100$ ~,Q DCK SSL 120 SSL 110 SSL 100 ~ f7t",o a 'ANO F ; '.':. V ''W'AND AND SLT OEPDS TS% COFFERDAM ASSL 13$ ~. 0LL '1 Oo FLTERS X~MAL~QE DEEP WELL -OROVNO WATER TASLE ll llh8 U ~A HDOLE NOV 1005 FLL DRAN 0ROVND WATER TASLE HDDLE HARCH 1005 NATVRAL ROCK Fig. 4. Section of cofferdam and Small t could also be foreseen that water would penetrate into the sandstone during the winter season , when the Nile water level was to reach its maximum during the working period in question. Drainage aims Before the building of the High Dam but after the raising of the Nile behind the Old Aswan Dam, the water level normally reached its maximum during the winter at SSL 120, i.e. practically up to the floor of the Small Fig. 4). As could be seen from marks in the Small facade and walls, the water had reached about one metre higher under exceptional conditions. Above these levels, there was also an effect of capillary water, the height of capillarity, however, seldom exceeding one metre. The condition of the sandstone in the lower parts of the Small was thus comparatively bad. However, it was known that the wet sandstone regained at least some of its original strength when dried again, and it was decided that the ground water level beneath the Small should be kept below SSL 119 from the summer of 1964 until the summer of 1966, when the temple would have been removed. Under the Great, with its floor at about SSL , it was deemed sufficient to keep the ground water table below SSL 121. A further aim of the drainage was, of course, to keep the shore in front of the temples and the whole working area conveniently dry. Drainage arrangements The drainage arrangements had to be designed to meet the following eventualities: 1. Leakage through the cofferdam. 2. Leakage through the rock under the cofferdam. 3. Leakage into the rock outside the abutments of the cofferdam. The upper part of the steel sheet piling in the cofferdam had been specially tightened, and practically no leakage was expected from that quarter. For leakage through and under the lower part of the cofferdam, filters and a drainage pipe had been arranged on the inside of the cofferdam, as previously mentioned. The drainage pipe led to a specially arranged pump pit, which also collected the leakage water from other parts of the site and discharged it back to the Nile. However, even at the beginning it was found that the ground water table in the shore, on the inner side of the drainage pipe, was about 2m higher than at the pipe itself Figs. 3 and 4). Evidently the cofferdam drainage was separated by a layer of silt from underlying, more pervious layers of sand. Therefore it was decided that three deep wells situated in front of the Small, should be maintained for later operation, if necessary. rock outside the abutments of the cofferdam. Thus water could be expected to find its way through the cliff proper and reach the temples from the sides and even from the rear. To prevent this, the investigation tunnels 17 and 18 had also been planned to serve as drainage galleries. t was also prescribed that the contractor should excavate a third tunnel, No. 19, north of the Small, for the same purpose see Fig. 2 as well as Fig. 5). The latter figure shows a longitudinal section through the cofferdam abutments, the drainage galleries and the temples proper, as indicated in plan on Fig. 2. n case some water might follow specially pervious layers, if any, above the galleries, boreholes were drilled upwards from the gallery roofs. Actually only a little water came from these holes, and the galleries very efficiently lowered the ground water table as intended. The eventuality of ground water reaching the temples from the rear was very much a question of time. Since the periods of high water were limited, the risk in this respect could be deemed as small. However, the movements of the ground water table were closely followed by means of a number of observation holes, see Fig. 2, some of them being arranged in the floors of the innermost temple rooms. f found necessary, these holes were planned to be enlarged and used as additional drainage pits. Ground Engineering 15

4 SOUTH ABUTMENT COFFEROAM WL SSL 1334 SS. 13$ SSL HGGLE NOV 1$$$ GREAT TEMPLE Me'~ GROUND WATER TARLE HDDLE NOV 1$$$ SMALL TEMPLE 4 3 HDOLE HARCH 1$$$ ~SS 13$ EO OO GROUND WATER TARLE RDDLE HARCH 1$$ $ SSL SCALE OF LENGTH room Fig. 5. Longitudinal section of the temple site Generally, the leakage of the galleries was pumped to the collecting pump pit, as mentioned above, for final discharge into the Nile. From tunnel 18, however, the leakage was pumped directly to the water plant of the site colony, and served as an excellent raw water for this purpose. The total capacity of the pump installation as measured at the final discharge from the working area amounted to 500 litress, in accordance with the figures mentioned above. The actual figure of the total leakage discharge was recorded continuously. Winter of During the winter season of , the Nile water level reached its maximum, SSL , in the middle of January. The maximum total leakage amounted to about 100 s. The ground water table below the innermost part of the Small reached a maximum level of SSL in the middle of March and maintained this level until the middle of April. Under the innermost part of the Great, the ground water table did not reach its maximum, SSL 118.5, until the middle of April. A compilation of some observed water levels, illustrating the above, is shown in Table below. The position of the ground water table in the middle of March, 1965, can be seen from the vertical sections in Figs. 3, 4 and 5, as well as from the plan in Fig. 2. From the experience thus gained during the winter season , 16 TABLE. WATER LEVELS, SSL, N: Date The Nile The shore valuable conclusions could be drawn as to what could be expected during the winter season , when the Nile water was to be raised a further 5.5 m, to SSL The risk of too high a ground water table under the Great was deemed to be low, although the variations of the water level would be closely followed. As regards the Small, it was foreseen that it might be necessary to make use of the well points in front. n addition, a pump pit was made inside the Small. t could also be estimated that the maximum total leakage would probably be about 150 litress and would certainly not exceed the figure of 250 litress, corresponding to half of the installed pump capacity. Winter of During the winter season of , the Nile water level varied as shown in Fig. 6. t reached a maximum of SSL at the beginning of November, was some decimetres lower in December, but very nearly reached during the whole of January. At the beginning of March it began to fall rapidly. Below the inner part of the Great, the ground water table reached SSL in December and in January Fig. 6). However, the dismantling of the inner rooms of the Great was completed in December. Under the other rooms of the Great, finally dismantled in March, the ground water table was lower. T e inne Pa t of Great The inner part of Small The ground water table under the Small rose continually from SSL at the beginning of September to SSL in the middle of November Fig. 6). At this time pumping in the deep wells in front of the temple was started, to be continued untff the dismantling of this temple was completed at the end of February. This additional measure was enough to keep the ground water table below SSL 119 as prescribed, and it was never necessary to use the pump pit inside the temple. An example of the configuration of the whole ground water table during this season, namely in the middle of November, 1965, is given in the sections of the Figs. 3-5 and in the plan of Fig. 7. During the following three or four months, the ground water table continued to rise behind the temples, but its influence on the water level below the temples proper was dealt with as stated above. The total leakage amounted to 150 litress already at the end of September and it maintained this value until the latter half of November, when it began to decrease slowly. Such successive diminishing of the leakage, in spite of the same or even higher outer water level, had also been observed during the last season, and surely depended on the tightening effect of high flood silt sedimentation over the infiltration area. The maximum leakage was distributed as follows: Cofferdam drainage litress Deepwells in front of Small 15 Tunnel 17, south of Great 55 Tunnel 18, south of Small 25 Tunnel 19, north of Small 15 Total leakage 150 litress Conclusion A description has been given above of one of the many interesting problems associated with the salvage of

5 SSL 133 SSL 125 L NLE WATER LEVEL AT ABU SMBEL TE- DSMANTLNG OF THE NNER ROOMS OF GREAT TEMPLE FNSHED N DEC 1965 SSL 120 GROUND WATER LEVEL AT GREAT TEMPLE SSL 115 rf GROUND WATER LEVEL AT SMALL TEMPLE o DSMANTLNG FNSHED AT SMALL TEMPLE N DEEP WELLS AT SMALL TEMPLE STARTED TO OPERATE SEPT. OCT. NOV. DEC. JAN Fi g. 6. Water levels during the winter season of FESR MARCH the Abu Simbel temples, i.e. the problem of keeping the ground water away from the temples during the last two years in their old location, when the Nile had started to rise, threatening to destroy them, wholly or partly. The problem was solved, and the Great had no contact whatsoever with the ground water, even when the Nile had risen 13 m from its old high flood level. For the Small, conditions were better during the last two years than previously. The ground water table was maintained more than 2 m lower during the second last winter season and about 1.5 m lower during the last winter season, as compared with previous normal high water levels. The temple facade and room walls could be safely cut, down to the desirable level of about SSL 119.8, and removed to their new position without damage. t may be of interest to note that an attempt to dismantle some rock under the facade, down to about SSL 119.0, did not succeed. The sandstone here was still moist from capillary water and disintegrated into small fragments and sand, when the blocking out cutting had been finished and lifting started. j Fig. 7. Plan of the temple area with ground water table, mid-november FG. 3 P RVER NLE FG 4~ 50 o DEEP WELLS Ground Engineering 17

REAL EGYPT 8 Days Including 3 nights Cruise

REAL EGYPT 8 Days Including 3 nights Cruise REAL EGYPT 8 Days Including 3 nights Cruise Egypt is a country of myths and mysteries, the cradle of ancient civilizations with some of the most awesome monuments to be seen in the world. Known as the

More information

Installing a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52

Installing a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52 Many, many years ago when we put the first tanks on the back of the garage, the council inspector had said that I needed to put in a rubble drain to take the stormwater from the roof of the garage. This

More information

Thirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249

Thirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249 Thirteenth International Water Technology Conference, IWTC 13 2009, Hurghada, Egypt 1249 EVALUATION OF LOCAL SCOUR AROUND BRIDGE PIERS (RIVER NILE BRIDGES AS CASE STUDY) Sherine Ismail Assoc. Prof., Survey

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 15, 2016 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0328985 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

Amarna Workers Village

Amarna Workers Village Amarna Workers Village The Egyptian city of Amarna was the pet building project of the pharaoh Akhenaten, who oversaw construction of his new capital between 1346 and 1341 BCE. The city was largely abandoned

More information

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY

HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY HYDRAULIC DESIGN OF THE TOURISTIC BERTHING IN ASWAN CITY Dr. Hossam El-Sersawy Researcher, Nile Research Institute (NRI), National Water Research Center (NWRC), Egypt E-mail: h_sersawy@hotmail.com Dr.

More information

Ancient and Egyptian Architecture

Ancient and Egyptian Architecture Ancient and Egyptian Architecture Topics Egyptian Civilization Egyptian Architectural Characteristics Mastabas Saqqara Pyramid at Medum Khufu s Pyramid at Giza Additional Giza Structures Characteristics

More information

Specification for Grip blocking using Peat Dams

Specification for Grip blocking using Peat Dams Technical Guidance Note 1 Specification for Grip blocking using Peat Dams 1. Introduction Moorland drains (grips) have been dug across much of the Yorkshire upland peatlands. Many of these grips have become

More information

: southern pilaster of the entrance. The tomb owner, Redi, is depicted in painted raised relief ( a 8014) Plate 15

: southern pilaster of the entrance. The tomb owner, Redi, is depicted in painted raised relief ( a 8014) Plate 15 15. 2086: southern pilaster of the entrance. The tomb owner, Redi, is depicted in painted raised relief ( a 8014) Plate 15 16. 2086: south wall. Redi is seated with a woman, receiving a lotus, and entertained

More information

3.0 OVERVIEW OF HUECO BOLSON

3.0 OVERVIEW OF HUECO BOLSON 3.0 OVERVIEW OF HUECO BOLSON The Hueco Bolson covers about 2,500 square miles, or 1.6 million acres in New Mexico, Texas, and Chihuahua (Figure 3-1). In Texas, the Hueco overlies portions of El Paso and

More information

We have compared the way a historian works to the way a detective

We have compared the way a historian works to the way a detective 2.8 Primary and Secondary Sources We have compared the way a historian works to the way a detective works. The main difference between detectives and historians is the evidence they work with. Detectives

More information

Architectural Analysis in Western Palenque

Architectural Analysis in Western Palenque Architectural Analysis in Western Palenque James Eckhardt and Heather Hurst During the 1999 season of the Palenque Mapping Project the team mapped the western portion of the site of Palenque. This paper

More information

INLAND STEEL COMPANY, INDIANA HARBOR WORKS PHOTOGRAPHS,

INLAND STEEL COMPANY, INDIANA HARBOR WORKS PHOTOGRAPHS, Collection # P 0711 INLAND STEEL COMPANY, INDIANA HARBOR WORKS PHOTOGRAPHS, 1926 Collection Information 1 Historical Sketch 2 Scope and Content Note 3 Contents 4 Processed by Dalton Gackle July 2018 Manuscript

More information

IMTO Italian Mission to Oman University of Pisa 2011B PRELIMINARY REPORT (OCTOBER-DECEMBER 2011)

IMTO Italian Mission to Oman University of Pisa 2011B PRELIMINARY REPORT (OCTOBER-DECEMBER 2011) IMTO Italian Mission to Oman University of Pisa 2011B PRELIMINARY REPORT (OCTOBER-DECEMBER 2011) The 2011B research campaign took place in the area around Salut from October, 19 th, to December, 16 th.

More information

Trench 91 revealed that the cobbled court extends further to the north.

Trench 91 revealed that the cobbled court extends further to the north. Report on the 2013 Gournia Excavations The 2013 excavations at Gournia were conducted June 17 July 26 under the aegis of the American School of Classical Studies at Athens and the supervision of the KD

More information

Glacial Geomorphology Exercise

Glacial Geomorphology Exercise James Madison University Field Course in western Ireland Glacial Geomorphology Exercise 3-day road log (abbreviated) Striations Large kame terrace Cirque with moraines Kame delta Striations Eskers Raised

More information

Archaeological Investigations Project South East Region SOUTHAMPTON 2/842 (C.80.C004) SU

Archaeological Investigations Project South East Region SOUTHAMPTON 2/842 (C.80.C004) SU SOUTHAMPTON City of Southampton 2/842 (C.80.C004) SU 4382 1336 125 BITTERNE ROAD WEST, SOUTHAMPTON Report on the Archaeological Evaluation Excavation at 125 Bitterne Road West, Southampton Russel, A. D

More information

MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR

MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR Installation & Maintenance LISTED Tested to *UL 103HT & ULC-S641 Instructions MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR A MAJOR CAUSE OF CHIMNEY RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR

More information

A TOPOGRAPHIC FEATURE OF THE HANGING VALLEYS OF THE YOSEMITE.

A TOPOGRAPHIC FEATURE OF THE HANGING VALLEYS OF THE YOSEMITE. A TOPOGRAPHIC FEATURE OF THE HANGING VALLEYS OF THE YOSEMITE. THE larger hanging valleys around the Yosemite valley have topographic features in common that are interesting in themselves, and they likewise

More information

The Sand House A Victorian Marvel

The Sand House A Victorian Marvel The Sand House A Victorian Marvel A talk given by Richard Bell to Tickhill & District Local History Society in April 2007 The majority of Doncaster s 21st Century residents are oblivious to the unique

More information

(12) Patent Application Publication (10) Pub. No.: US 2011/ A1

(12) Patent Application Publication (10) Pub. No.: US 2011/ A1 (19) United States (12) Patent Application Publication (10) Pub. No.: US 2011/0297005 A1 Mariller US 201102.97005A1 (43) Pub. Date: Dec. 8, 2011 (54) (76) (21) (22) (86) (30) CAPSULE FOR PREPARING A DRINK

More information

Warehouse case study. Cargo Facility, Stansted. 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport

Warehouse case study. Cargo Facility, Stansted. 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport Warehouse case study Cargo Facility, Stansted 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport This new facility shows how BAA Lynton can deliver large complex

More information

Just how big is Africa?

Just how big is Africa? The United States China India The United Kingdom Portugal Spain France Belgium Germany The Netherlands Switzerland Italy Eastern Europe Japan 11.7 million sq. miles Just how big is Africa? Chapter 18 Section

More information

Hydrological study for the operation of Aposelemis reservoir Extended abstract

Hydrological study for the operation of Aposelemis reservoir Extended abstract Hydrological study for the operation of Aposelemis Extended abstract Scope and contents of the study The scope of the study was the analytic and systematic approach of the Aposelemis operation, based on

More information

The Nile is the world s longest river. It is 4,160 miles long. It flows north and empties into the Mediterranean Sea

The Nile is the world s longest river. It is 4,160 miles long. It flows north and empties into the Mediterranean Sea The Nile is the world s longest river. It is 4,160 miles long It flows north and empties into the Mediterranean Sea Lower Egypt is at the Nile s mouth near the Mediterranean Sea. It is in Northern Egypt

More information

Egyptian Achievements

Egyptian Achievements N4 SECTION Egyptian Achievements What You Will Learn Main Ideas 1. The Egyptians developed a writing system using hieroglyphics. 2. The Egyptians created magnificent temples, tombs, and works of art. The

More information

History of the Oak Island, NS, Treasure Hunt

History of the Oak Island, NS, Treasure Hunt History of the Oak Island, NS, Treasure Hunt Western Shore Money Pit Oak Island 1992 Presentation by D'Arcy O'Connor to Independent Activities Period 2008 Massachusetts Institute of Technology Cambridge,

More information

EGYPT HIGHLIGHTS TOUR ITINERARY. February 20 - February 27, 2020

EGYPT HIGHLIGHTS TOUR ITINERARY. February 20 - February 27, 2020 EGYPT HIGHLIGHTS TOUR ITINERARY February 20 - February 27, 2020 Day 1 We arrive in Cairo, where a host will meet us and transfer our group from the airport to the Ramses Hilton Hotel, overlooking the Nile

More information

Installation Instructions

Installation Instructions Installation Instructions C 880 www.contura.eu 50 CERTIFICATE EC Declaration of conformity www.contura.eu Manufacturer name address Place of manufacture NIBE AB/NIBE STOVES Box 134, Skulptörvägen, SE-285

More information

vinterbad bryggen skitseforslag

vinterbad bryggen skitseforslag vinterbad bryggen skitseforslag 2012-07-06 vinterbad bryggen skitseforslag s.2 `VINTERBAD BRYGGEN Vinterbad Bryggen is a winter bathing club with 600 members, though without facilities. They have now found

More information

EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST

EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE COAST Proceedings of the 7 th International Conference on Asian and Pacific Coasts (APAC 203) Bali, Indonesia, September 2-26, 203 EFFECT OF THE COASTAL CONSERVATION DUE TO BEACH NOURISHMENT OF TOTORI SAND DUNE

More information

MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR

MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR Installation & Maintenance LISTED Tested to *UL 103HT & ULC-S641 Instructions MODEL DCC DOUBLE WALL CHIMNEY CONNECTOR A MAJOR CAUSE OF CHIMNEY RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR

More information

Installation Instructions

Installation Instructions Installation Instructions C750 C750A www.contura.eu 50 CERTIFICATE EC Declaration of conformity www.contura.eu Manufacturer name address Place of manufacture NIBE AB/NIBE STOVES Box 134, Skulptörvägen

More information

SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE

SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE SHEET PILE WALLS A SPACE-SAVING AVALANCHE DEFENCE STRUCTURE ÁRNI JÓNSSON, ORION Consulting Engineers * ERIK HESTNES, Norwegian Geotechnical Institute** ABSTRACT: Steel sheet piles, primarily used as retaining

More information

IAS Prelims Exam: Ancient History NCERT Questions: The Harappan Civilisation Set II

IAS Prelims Exam: Ancient History NCERT Questions: The Harappan Civilisation Set II IAS Prelims Exam: Ancient History NCERT Questions: The Harappan Civilisation Set II Questions asked from Ancient Indian History section in IAS Prelims Exam are quite easy but the candidates need to memorise

More information

B 500: The Great Amun Temple under the Kushites. B 500-Phases VI and VII: Piankhy

B 500: The Great Amun Temple under the Kushites. B 500-Phases VI and VII: Piankhy B 500: The Great Amun Temple under the Kushites B 500-Phases VI and VII: Piankhy Not until the rise of the Kushites in the early 8th century BC were new renovations undertaken on B 500. By this time the

More information

Egypt: The Nubia Museum, Aswan, Egypt. The Nubia Museum. Location: Aswan, Egypt. How to get there: 1 / 5

Egypt: The Nubia Museum, Aswan, Egypt. The Nubia Museum. Location: Aswan, Egypt. How to get there: 1 / 5 The Nubia Museum Location: Aswan, Egypt How to get there: 1 / 5 International flights direct to Aswan, or via many European and Eastern European cities. Also package tours and charter flights. Contact

More information

WAIKARAKA CYCLEWAY: LESSONS LEARNT. Daniel Newcombe & Ina Stenzel Auckland City Council

WAIKARAKA CYCLEWAY: LESSONS LEARNT. Daniel Newcombe & Ina Stenzel Auckland City Council WAIKARAKA CYCLEWAY: LESSONS LEARNT Daniel Newcombe & Ina Stenzel Auckland City Council Introduction Waikaraka cycleway is key link in Auckland regional cycle network Lessons learnt from two sections: Pikes

More information

Blocking Sea Intrusion in Brackish Karstic Springs

Blocking Sea Intrusion in Brackish Karstic Springs European Water 1/2: 17-23, 3. 3 E.W. Publications Blocking Sea Intrusion in Brackish Karstic Springs The Case of Almiros Spring at Heraklion Crete, Greece A. Maramathas, Z. Maroulis, D. Marinos-Kouris

More information

Tunnel design underneath the operating runway of Incheon airport

Tunnel design underneath the operating runway of Incheon airport Geotechnical Aspects of Underground Construction in Soft Ground Yoo, Park, Kim & Ban (Eds) 2014 Korean Geotechnical Society, Seoul, Korea, ISBN 978-1-138-02700-8 Tunnel design underneath the operating

More information

You Will Need: Your notebook Your textbook Your pencil

You Will Need: Your notebook Your textbook Your pencil You Will Need: Your notebook Your textbook Your pencil Today you will learn about the kingdoms of Kush and Aksum who developed advanced civilizations with large trading networks. Kush and Aksum Kush and

More information

Plates. Kom Firin I 193. Plate 96 View of the southwestern part of Kom Firin, looking west-southwest.

Plates. Kom Firin I 193. Plate 96 View of the southwestern part of Kom Firin, looking west-southwest. Plates Plate 96 View of the southwestern part of Kom Firin, looking west-southwest. Plate 97 Ramesside temple: wall 0157 and clean sand 0189 (TG), view to north. Plate 98 Ramesside temple: wall 0135 (TD),

More information

The Greek-Swedish-Danish Excavations at Kastelli, Khania 2010 a short report

The Greek-Swedish-Danish Excavations at Kastelli, Khania 2010 a short report The Greek-Swedish-Danish Excavations at Kastelli, Khania 2010 a short report During six weeks from 19 July to 27 August the Greek-Swedish-Danish Excavations continued work in the Ag. Aikaterini Square

More information

Cairo Pyramids Hotel MS Royal Princess

Cairo Pyramids Hotel MS Royal Princess HELLO, I m here in duty for Mr. NOUR / Mr. SALAH General Manager Budget Oasis Pyramids Hotel Superior MS Princess Sara Cairo Pyramids Hotel MS Royal Princess Superior Le Passage Heliopolis MS Semeramis

More information

BUNKHOUSE ASSESSMENT REPORT

BUNKHOUSE ASSESSMENT REPORT FEBRUARY 2014 EXECUTIVE SUMMARY As a response to the need to provide temporary shelters for the victims of Typhoon Haiyan, the Philippine government through the DSWD and the DPWH decided to build bunkhouses.

More information

THE FORMER GIRLS' HIGH SCHOOL IN MOSTAR A D A P T I V E R E - U S E P R O P O S A L F O R

THE FORMER GIRLS' HIGH SCHOOL IN MOSTAR A D A P T I V E R E - U S E P R O P O S A L F O R THE FORMER GIRLS' HIGH SCHOOL IN MOSTAR A D A P T I V E R E - U S E P R O P O S A L F O R A M A J O R P U B L I C B U I L D I N G I N T H E O L D C I T Y 1. INTRODUCTION Dr. Stefano Bianca, Director, Historic

More information

Installation Instructions

Installation Instructions Installation Instructions C 710 www.contura.eu 50 CERTIFICATE Declaration of performance according to Regulation (EU) 305/2011 No. C710-CPR-160329-SE-1 PRODUCT Product type Stove lit with solid biofuels

More information

glacier Little Ice Age continental glacier valley glacier ice cap glaciation firn glacial ice plastic flow basal slip Chapter 14

glacier Little Ice Age continental glacier valley glacier ice cap glaciation firn glacial ice plastic flow basal slip Chapter 14 Little Ice Age glacier valley glacier continental glacier ice cap glaciation firn glacial ice plastic flow basal slip glacial budget zone of accumulation zone of wastage glacial surge abrasion glacial

More information

SACAA INTERIM REPORT ON AIRLINK GEORGE AIRPORT ACCIDENT

SACAA INTERIM REPORT ON AIRLINK GEORGE AIRPORT ACCIDENT SACAA INTERIM REPORT ON AIRLINK GEORGE AIRPORT ACCIDENT Midrand - Following an Airlink accident that took place at the George Airport on 07 December 2009, the South African Civil Aviation Authority s Accident

More information

DRY- DOCK HULL INSPECTION OF NILE CRUISERS

DRY- DOCK HULL INSPECTION OF NILE CRUISERS 18 th International Conference on Ships and Shipping Research 2015, June 24 th 26 th, Lecco, Italy M. Altosole and A. Francescutto (Editors) DRY- DOCK HULL INSPECTION OF NILE CRUISERS Arwa. W. HUSSEIN

More information

The Potentially Dangerous Glacial Lakes

The Potentially Dangerous Glacial Lakes Chapter 11 The Potentially Dangerous Glacial Lakes On the basis of actively retreating glaciers and other criteria, the potentially dangerous glacial lakes were identified using the spatial and attribute

More information

4. Bronze Age Ballybrowney, County Cork Eamonn Cotter

4. Bronze Age Ballybrowney, County Cork Eamonn Cotter 4. Bronze Age Ballybrowney, County Cork Eamonn Cotter Illus. 1 Location map of the excavated features at Ballybrowney Lower (Archaeological Consultancy Services Ltd, based on the Ordnance Survey Ireland

More information

The Improvement of Airline Tickets Selling Process

The Improvement of Airline Tickets Selling Process The Improvement of Airline Tickets Selling Process Duran Li (103034466) Department of Industrial Engineering and Engineering Management, National Tsing Hua University, Taiwan Abstract. The process of a

More information

Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master

Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master 1. Assembly instructions 2. Attaching the plastic coated steel cables on the Ultimate frame

More information

A487 PONT SEIONT ARCHAEOLOGICAL RECORDING REPORT NO Y mddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust

A487 PONT SEIONT ARCHAEOLOGICAL RECORDING REPORT NO Y mddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust A487 PONT SEIONT ARCHAEOLOGICAL RECORDING REPORT NO. 148 Y mddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust A487 PONT SEIONT ARCHAEOLOGICAL RECORDING prepared for Welsh Office Highways

More information

Breakthrough of the Tunnel with the Biggest Overburden in Croatia

Breakthrough of the Tunnel with the Biggest Overburden in Croatia 289 Breakthrough of the Tunnel with the Biggest Overburden in Croatia Redovnikovi, L., Ališi, I., and Džapo, M. University of Zagreb, Faculty of Geodesy, Fra Andrija Ka i a Mioši a 26, 1 Zagreb, Croatia,

More information

READING QUESTIONS: Chapter 7, Glaciers GEOL 131 Fall pts. a. Alpine Ice from larger ice masses flowing through a valley to the ocean

READING QUESTIONS: Chapter 7, Glaciers GEOL 131 Fall pts. a. Alpine Ice from larger ice masses flowing through a valley to the ocean READING QUESTIONS: Chapter 7, Glaciers GEOL 131 Fall 2018 63 pts NAME DUE: Tuesday, October 23 Glaciers: A Part of Two Basic Cycles (p. 192-195) 1. Match each type of glacier to its description: (2 pts)

More information

READING QUESTIONS: Glaciers GEOL /WI 60 pts. a. Alpine Ice from larger ice masses flowing through a valley to the ocean

READING QUESTIONS: Glaciers GEOL /WI 60 pts. a. Alpine Ice from larger ice masses flowing through a valley to the ocean READING QUESTIONS: Glaciers GEOL 131 18/WI 60 pts NAME DUE: Tuesday, March 13 Glaciers: A Part of Two Basic Cycles (p. 192-195) 1. Match each type of glacier to its description: (2 pts) a. Alpine Ice from

More information

National Standard for Tonnage Measurement and Calculation of the Vessels Engaged on International Voyages General Definitions 2.

National Standard for Tonnage Measurement and Calculation of the Vessels Engaged on International Voyages General Definitions 2. National Standard for Tonnage Measurement and Calculation of the Vessels Engaged on International Voyages General 1. (1) The tonnage of a ship shall consist of gross tonnage and net tonnage. (2) The gross

More information

ASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama

ASTM E 1886 and ASTM E 1996 TEST REPORT. Report No.: A Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama Architectural Testing ASTM E 1886 and ASTM E 1996 TEST REPORT Report No.: A2651.02 401 44 Rendered to: CORAL ARCHITECTURAL PRODUCTS Tuscaloosa, Alabama PRODUCT TYPE: 90 Corner Curtain Wall SERIES/MODEL:

More information

ESS Glaciers and Global Change

ESS Glaciers and Global Change ESS 203 - Glaciers and Global Change Friday January 5, 2018 Outline for today Please turn in writing assignment and questionnaires. (Folders going around) Questions about class outline and objectives?

More information

Installation Instructions

Installation Instructions Installation Instructions For use in and IE only C i4 FS www.contura.eu 2 CERTIFICATE DECLARATION OF PERFORMANCE No. Ci4FS-CPR-130619-SE-1 PRODUCT Product type Type designation Manufacturing number Intended

More information

Draft Report. 7. Excavations in the temenos gateway, Area (TG5) Author - D. A. Welsby Period 1-2. Period 1. Period 2. Derek A.

Draft Report. 7. Excavations in the temenos gateway, Area (TG5) Author - D. A. Welsby Period 1-2. Period 1. Period 2. Derek A. 7. Excavations in the temenos gateway, Area (TG5) Derek A. Welsby When Griffith excavated the temples at Kawa in 1929-31, work followed by that of Macadam and Kirwan in the winter of 1935-6, the temenos

More information

THE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL

THE ICs INTERNATIONAL BRISBANE AREA AQUA PARK PROPOSAL Contacts: Mr Evan Pryor, Ph 38702756, evanpryor2002@yahoo.com.au Mr Bob Beatty, Ph 32883101, BobBeatty@BOSMIN.com Web Address: http://www.bosmin.com/ics/icharter.htm Postal Address: GPO Box 2927, Brisbane,

More information

Cairo Pyramids Hotel MS Royal Princess

Cairo Pyramids Hotel MS Royal Princess HELLO, I m here in duty for Mr. NOUR / Mr. SALAH General Manager Budget Oasis Pyramids Hotel Superior MS Princess Sara Cairo Pyramids Hotel MS Royal Princess Superior Le Passage Heliopolis MS Semeramis

More information

In September, 1966, an

In September, 1966, an ANNE S. ROBERTSON, D LITT THE ROMAN CAMP(S) ON HILLSIDE FARM, DUNBLANE, PERTHSHIRE This paper is published with the aid of a grantfrom H.M.Treasury In September, 1966, an emergency excavation was begun,

More information

HOME OWNER PRE- DELIVERY INSTRUCTIONS

HOME OWNER PRE- DELIVERY INSTRUCTIONS Congratulations on your decision to enjoy the finest spas available Welcome to the growing family of Sundance Spa owners HOME OWNER PRE- DELIVERY INSTRUCTIONS Please take the time to read these instructions

More information

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance

More information

Installation Instructions

Installation Instructions Installation Instructions C 780 www.contura.eu 50 CERTIFICATE PERFORMANCE DECLARATION No. C780-CPR-130612-SE-1 PRODUCT Product type Stove lit with solid biofuels Type designation Contura 780 Manufacturing

More information

SHELTER DESIGN: IGLOO SNOW SHELTER

SHELTER DESIGN: IGLOO SNOW SHELTER CONSTRUCTION: CHALLENGING 2 to 3 hours for two people. EQUIPMENT: Sawing instrument SEASON: Winter The Igloo shelter is not a shelter that should be built in an emergency situation as they are hard to

More information

(12) Patent Application Publication (10) Pub. No.: US 2017/ A1

(12) Patent Application Publication (10) Pub. No.: US 2017/ A1 (19) United States US 20170203844A1 (12) Patent Application Publication (10) Pub. No.: Hawkins et al. (43) Pub. Date: Jul. 20, 2017 (54) SPACE EFFICIENT LAVATORY MODULE FOR COMMERCIAL AIRCRAFT (71) Applicant:

More information

Introduction. Implementation of the Village of Capac Master Plan

Introduction. Implementation of the Village of Capac Master Plan Implementation of the Village of Capac Master Plan Introduction The key to a well-planned community is the actual day-to-day use of planning documents, like this Master Plan. Because this plan is to be

More information

Comparison Study between Vault Seismometers and a New Posthole Seismometer

Comparison Study between Vault Seismometers and a New Posthole Seismometer Comparison Study between Vault Seismometers and a New Posthole Seismometer Presented in Salt Lake City, Utah at the Seismological Society of America s Annual Meeting, April 2013 250 Herzberg Road, Kanata,

More information

GOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013

GOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013 GOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013 Progress of a restoration trial at Gooseneck Swamp - Grampians National Park, Victoria Gooseneck Swamp is situated at the far south-eastern

More information

Ancient River Valley Civilizations Egypt

Ancient River Valley Civilizations Egypt Ancient River Valley Civilizations Egypt Geography of Egypt The first civilization in Africa developed along the Nile River, in a place called Egypt. These humans were at first nomadic, also known as hunter-gatherers.

More information

UC Berkeley Working Papers

UC Berkeley Working Papers UC Berkeley Working Papers Title The Value Of Runway Time Slots For Airlines Permalink https://escholarship.org/uc/item/69t9v6qb Authors Cao, Jia-ming Kanafani, Adib Publication Date 1997-05-01 escholarship.org

More information

Installation Instructions

Installation Instructions Installation Instructions C810 www.contura.eu 50 CERTIFICATE Declaration of performance according to Regulation (EU) 305/2011 No. C810-CPR-130610-SE-1 PRODUCT Product type Stove lit with solid biofuels

More information

FOUNDATIONS OF ARCHAEOLOGY A WALK IN VERNDITCH CHASE

FOUNDATIONS OF ARCHAEOLOGY A WALK IN VERNDITCH CHASE FOUNDATIONS OF ARCHAEOLOGY A WALK IN VERNDITCH CHASE 1. A Tale of two Long Barrows Long barrows were constructed as earthen or drystone mounds with flanking ditches and acted as funerary monuments during

More information

Excavations in a Medieval Market Town: Mountsorrel, Leicestershire,

Excavations in a Medieval Market Town: Mountsorrel, Leicestershire, Excavations in a Medieval Market Town: Mountsorrel, Leicestershire, by John Lucas Mountsorrel is situated 12 kms north of Leicester and forms a linear settlement straddling the A6, Leicester to Derby road.

More information

Installation instruction

Installation instruction Installation instruction Ci51 116 FACTS Technical specifications Model i51 Log box (option) Output 6-11 kw Nominal output 8 kw Efficiency 80 % Weight (kg) 215 50 Powerstone (option): + 100 kg Width (mm)

More information

Unit 9 The Middle East SG 1 - Physical Geography, Population & Demographics

Unit 9 The Middle East SG 1 - Physical Geography, Population & Demographics Unit 9 The Middle East SG 1 - Physical Geography, Population & Demographics I. Physical Geography A. The Middle East includes southwestern Asia and North Africa. 1. The name is Eurocentric. Middle East

More information

Report on the excavations on the site Novopokrovskoe II in V. Kol'chenko, F. Rott

Report on the excavations on the site Novopokrovskoe II in V. Kol'chenko, F. Rott Report on the excavations on the site Novopokrovskoe II in 2016 V. Kol'chenko, F. Rott In 2016 the Novopokrovskiy archeological group of the Institute of History and Heritage of the National Academy of

More information

REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox

REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox During the early morning hours of Wednesday, October 10, 2001, twelve hopper rail cars traveling on the Wheeling

More information

ARDESTIE EARTH HOUSE HISTORIC ENVIRONMENT SCOTLAND STATEMENT OF SIGNIFICANCE. Property in Care no: 24

ARDESTIE EARTH HOUSE HISTORIC ENVIRONMENT SCOTLAND STATEMENT OF SIGNIFICANCE. Property in Care no: 24 Property in Care no: 24 Designations: Scheduled Monument (SM90021) Taken into State care: 1953 (Guardianship) Last reviewed: 2004 HISTORIC ENVIRONMENT SCOTLAND STATEMENT OF SIGNIFICANCE ARDESTIE EARTH

More information

Wessex Archaeology. Little Stubbings, West Amesbury, Salisbury, Wiltshire. Archaeological Watching Brief. Ref:

Wessex Archaeology. Little Stubbings, West Amesbury, Salisbury, Wiltshire. Archaeological Watching Brief. Ref: Wessex Archaeology Little Stubbings, West Amesbury, Salisbury, Wiltshire Ref: 63280.02 March 2007 LITTLE STUBBINGS, WEST AMESBURY, NR SALISBURY, WILTSHIRE ARCHAEOLOGICAL WATCHING BRIEF Prepared for: P

More information

SAVE THE TREASURES OF NUBIA I

SAVE THE TREASURES OF NUBIA I SAVE THE TREASURES OF NUBIA I PREFACE In order to ensure a better use of the Nile, by exercising control at all seasons over a river which must be checked when in flood and which must serve for irrigation,

More information

Ancient Greek Buildings/ Fortifications. Matthew Jackson

Ancient Greek Buildings/ Fortifications. Matthew Jackson Ancient Greek Buildings/ Fortifications Matthew Jackson What is a fortification? -The combination of terrain and available materials to form a means of defense against potential attackers -Represent the

More information

The Rosetta Stone. Writing in Ancient Egyptian

The Rosetta Stone. Writing in Ancient Egyptian Writing in Ancient Egyptian The Rosetta Stone The hieroglyphic writing system used more than 600 symbols, mostly pictures of objects. Each symbol represented one or more sounds in the Egyptian language.

More information

CENTER PIVOT TRACK MANAGEMENT OPTIONS

CENTER PIVOT TRACK MANAGEMENT OPTIONS Proceedings of the 28th Annual Central Plains Irrigation Conference, Kearney, Nebraska, February 23-24, 2016 Available from CPIA, 760 N. Thompson, Colby, Kansas CENTER PIVOT TRACK MANAGEMENT OPTIONS Steven

More information

The Appleton Wetland; Its Decline, Cause and Recommended Action. Appendix K: Wetland Inspection

The Appleton Wetland; Its Decline, Cause and Recommended Action. Appendix K: Wetland Inspection The Appleton Wetland; Its Decline, Cause and Recommended Action Appendix K: Wetland Inspection Report prepared by Appleton Wetland Research Group of the Mississippi Valley Field Naturalists Research Group

More information

Elegance 52 & Elegance 72 Curtain Walling

Elegance 52 & Elegance 72 Curtain Walling Uniclass L3811+L411+L413:P43 CI/SfB (21.4)+(31.4)+(31.5) EPIC C421+D11+D13:X46 Xh4 March 2010 Elegance 52 & Elegance 72 Curtain Walling Technical Data Sheet Sapa Building System 2 Elegance 52 & 72 Contents

More information

OÜ Skamet Reg. Nr Savi 9, Pärnu, Estonia

OÜ Skamet Reg. Nr Savi 9, Pärnu, Estonia OÜ Skamet Reg. Nr 11135000 Savi 9, Pärnu, Estonia +372 440 1000 info@skamet.ee www.skamet.ee ABOUT US Our enterprise OÜ Skamet was established in January 2006, when we bought a former metal manufacturer

More information

made by made by NEW UK 17/18

made by made by NEW  UK 17/18 NEW made by A true Viking Raw strength and strong family ties are classic symbols of the Scandinavian Vikings. These symbols also provide the foundation for our WIKING stoves, which radiate high quality

More information

Evaluation Report 569

Evaluation Report 569 Printed: March 1988 Tested at: Lethbridge ISSN 0383-3445 Group Evaluation Report 569 Vern Seed Boot and Banding Knife A Co-operative Program Between ALBERTA FARM MACHINERY RESEARCH CENTRE PAMI PRAIRIE

More information

PYRAMIDS IN BOSNIA. Pyramid of the Sun

PYRAMIDS IN BOSNIA. Pyramid of the Sun PYRAMIDS IN BOSNIA Pyramid of the Sun Bosnian Pyramid of the Sun (former Visocica), with its height of over 220 meters, is one third taller than the Great pyramid of Egypt. Four sides of the pyramid are

More information

Alternative Highest & Best Use Analysis Boutique Hotel

Alternative Highest & Best Use Analysis Boutique Hotel Alternative Highest & Best Use Analysis In response to numerous comments received from the public, as well as issues raised by the CCC in the Appeal Staff Report Substantial Issue Determination, the following

More information

MAKING IGLOOS IN THE SUMMER

MAKING IGLOOS IN THE SUMMER International Conference on Textile Composites and Inflatable Structures STRUCTURAL MEMBARNES 2005 A.D.C. Pronk, D.R. Osinga Keywords: Igloo, Inflatable Mould MAKING IGLOOS IN THE SUMMER Arno D.C. Pronk

More information

Common Ground Drainage Channel Diversion. Design Report

Common Ground Drainage Channel Diversion. Design Report Common Ground Drainage Channel Diversion Design Report Resource Management International Inc Consulting Engineers May 2017 COMMON GROUND DRAINAGE CHANNEL DIVERSION PREPARED FOR: QUILL LAKES WATERSHED NO.

More information

ARTICLE 34 AIRPORT HEIGHT COMBINING ZONE (AH) (Amended by Ordinance #295 Effective June 26, 2009)

ARTICLE 34 AIRPORT HEIGHT COMBINING ZONE (AH) (Amended by Ordinance #295 Effective June 26, 2009) ARTICLE 34 AIRPORT HEIGHT COMBINING ZONE (AH) (Amended by Ordinance #295 Effective June 26, 2009) Section 34.10 - Purpose and Intent The purpose of the Airport Height Combining Zone (AH) is to protect

More information

Henderson Mess, RAF Halton, Buckinghamshire

Henderson Mess, RAF Halton, Buckinghamshire Henderson Mess, RAF Halton, Buckinghamshire An archaeological watching brief for Stepnell Ltd by Stephen Hammond Thames Valley Archaeological Services Ltd Site Code RHA03/85 October 2003 Summary Site name:

More information