MEMORANDUM. Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator
|
|
- Hilda Atkins
- 5 years ago
- Views:
Transcription
1 AGENDA ITEM 1A MEMORANDUM DATE: January 17, 2017 TO: FROM: SUBJECT: Honorable Mayor and City Councilmembers William S. Joynes, Sr., City Administrator Sue Polka, Interim Asst. Public Works Director/City Engineer Old Snelling Trail Project Background The City has an agreement with Bethel University to construct Old Snelling Trail from Bethel Drive to County Road E and County Road E from Old Snelling Avenue to Freeway Park by the end of On September 26, 2016, the City Council awarded a contract to Elfering & Associates for the preliminary trail design. Elfering has completed a survey, wetland delineations, preliminary design and a feasibility report for the Old Snelling Trail. Discussion The Old Snelling Trail Improvements project proposes the addition of 8-ft wide bituminous trails along the west side of Old Snelling Avenue N between Bethel Drive and County Road E and along the south side of County Road E between Old Snelling Avenue N and existing trail at Freeway Park (see Attachment A). The proposed trail section between Bethel Drive and 3641 Snelling Avenue N constructs the trail as close to the edge of the drive lane as possible to minimize wetland impacts. This construction will include the replacement of the existing curb and potentially 2 feet of the existing pavement. The proposed trail section along the open water body will require the construction of a retaining wall and fence. A boardwalk option was also considered, but in discussions with Ramsey County it was determined that the trail could be located within the existing right of way just behind the curb. The proposed trail section for the remaining portion of Old Snelling Avenue N and along County Road E includes a 5-ft to 6-ft boulevard between the existing curb and gutter and the 8-ft wide trail. The section also includes a 2-ft clear zone between the edge of the trail and the edge of the existing right-of-way. Ramsey County stated that the 5-ft to 6-ft boulevard is necessary except where the open water body and wetland impacts prevent it from being constructed. The Page 1 of 3
2 boulevard provides trail users a separation from vehicles, provides snow storage that minimizes maintenance time and costs for the City, and meets the Rice Creek Watershed District requirements for storm water runoff. Cross sections showing the trail sections with and without the boulevard are shown in Attachment B. Additional storm water facilities will be needed for the portion of the proposed trail that does not include a boulevard per Rice Creek Watershed District rules. Based on the amount of impervious surface being installed, a total storm water volume reduction of 782 cubic feet of storm water treatment will be needed. In discussion with representatives from Bethel University, it was determined that these facilities may be placed on University property with final approval from the University. Such facilities potentially include and are not limited to bio-filtration basins, rainwater gardens, filtration strips, and constructed wetlands. No additional traffic control will be needed at the intersections with the proposed crosswalks at this time. Since the number of future trail users is unknown, no traffic control changes are proposed for the 4-way stop at Old Snelling Avenue N and County Road E. Ramsey County said that a signal can be placed at Bethel Drive and Old Snelling Avenue N if it eventually meets the necessary warrants, but there is not funding for a signal at this time. The total cost for the project including construction fees, contingencies, and overhead is estimated to be $882,170. The funding breakdown for this project can be found in the feasibility report and is included below. Funding Source Cost Bethel University $ 800,000 Ramsey County $ 10, 820 Arden Hills $ 71,350 Property owners in the area were invited to an open house on January 5th to discuss view the preliminary trail layout and provide their comments. Two Bethel University representatives and four residents who live along Old Snelling Avenue attended. Of these four residents, three expressed concerns of having the trail located on their property and of the trail negatively affecting the landscape and vegetation of the area. One resident filled out a comment card in favor of the proposed trail and one additional property owner along Old Snelling Avenue sent an in support of the trail. After the open house one of the attendees provided written comments which will be provided to Council at the work session. Proposed Schedule Completion of Preliminary Design January 2017 Council Approve Contract for Final Design February 2017 Conduct 2 nd Informational Meeting May 2017 Completion of Schedule 2 (Final Design) June 2017 Page 2 of 3
3 Council Approve Plans and Specifications/ Authorize Ad for Bid June 2017 Open Bids July 2017 Begin Construction August/September 2017 Completion of Schedule 3 (Construction) November 2017 Final Project Payment and Record Plans December 2017 Conclusion Staff will incorporate discussion items and provide a scope of work for completion of the project to be approved by Council at the February 13 th City Council meeting. ATTACHMENT A: Location map ATTACHMENT B: Typical Trail Sections Page 3 of 3
4 City of Arden Hills Attachment A Old Snelling Avenue North Trail Project - Location Map N Existing crosswalk el th Be Terminate trail at existing crossing point Bethel Railroad under-pass crossing (complete) Arden Oaks Arden Forest Glenarden Trail Connection Delineated Wetlands n Legend B Hwy E To S lling e Ard Connect to existing trail CO RD Sne lling Sne ewo od E Lake Johanna Ridg Siems Oak Pascal Striping realignment to avoid pond and wetland Hamline Connect to existing trail on either side of railroad under-pass Copyright: 2013 Esri, DeLorme, NAVTEQ, TomTom, Source: Pedestrian Crossing Locations 8' Bituminous TrailEsri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Roadway Alterations Existing Ponds Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
5
Attachment B: Treatment Area Maps
Attachment B: Treatment Area Maps BEACH BOAT RENTAL LAUNCH NO.1 LAUNCH NO. 2 LAUNCH NO. 3 LAUNCH NO. 4 CHANNEL BOG Black Moshannon Lake 0 0.125 0.25 0.5 Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics,
More informationBOARD OF ZONING APPEALS CASE SUMMARY FOR APPLICATION FOR SPECIAL EXCEPTION Garners Ferry Road
BOARD OF ZONING APPEALS CASE SUMMARY FOR APPLICATION FOR SPECIAL EXCEPTION 7609 Garners Ferry Road June 14, 2016 at 10:00 A.M. City Council Chambers, 1737 Main Street, 3 rd Floor Columbia, South Carolina
More informationPublic Notice. Latitude: N Longitude: W 7.5 Minute Quad: KY-BURLINGTON
Public Notice US Army Corps of Engineers Louisville District Public Notice No. Open Date: Close Date: 1 Dec 2014 31 Dec 2014 Please address all comments and inquiries to: U.S. Army Corps of Engineers,
More informationCounty of Sonoma Agenda Item Summary Report
Revision No. 20170501-1 of Sonoma Agenda Item Summary Report Agenda Item Number: 37 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To:
More informationRAMPART BLVD DURANGO DR RAINBOW BLVD NELLIS BLVD DECATUR BLVD DECATUR BLVD MARYLAND PKWY EASTERN AVE PECOS RD PECOS RD LAMB BLVD LAMB BLVD N RANCHO DR S RANCHO DR INDUSTRIAL RD W SAHARA AVE 1 W CHARLESTON
More informationElevation. Plate 1 - Study Area Geomorphology. Glacial Deposition. Unit. 1-ft Contours. 1,000 Feet. batavia member carmi member haeger till member
Plate 1 - Study Area Geomorphology Glacial Deposition Unit flowage basin batavia member carmi member haeger till member marshy valley wadsworth till member Streams & Flowage Paths Elevation /"% 1-ft Contours
More informationSECTION 4(f) DE MINIMIS FINDING
Lake Merritt Improvement Project Bellevue Ave., Children s Fairyland and Garden Center Pedestrian and Bicycle Access Improvement Project SECTION 4(f) DE MINIMIS FINDING Oakland, California Ref: HP2IL 5012
More informationImagery 2017 Google, Map data 2017 Google Commercial Land with finished offsites
6/7/2017 Google Maps Highway & Monterey Road, Gilroy, CA Gilroy, CA 5980 Travel Park Circle, Gilroy, CA ±1.87 Acres of Freeway Imagery 2017 Google, Map data 2017 Google Commercial Land with finished offsites
More informationFOR SALE SILVER CREEK ESTATES
FOR SALE SILVER CREEK ESTATES NEC Interstate 80 and Highway 40 Park City Utah Offered at $1,078,000 SILVER CREEK ESTATES Woodside Development 80+ homes Silver Creek Village 1290 single/multi- family homes
More informationParks, Trails, and Recreation Committee January 15, :30 p.m. City Hall. City Vision. Agenda
Chair: Rich Straumann Committee Members: Nancy O'Malley Harold Petersen John Van Valkenburg Terry Finlay Paul Beggin Council Liaison: David Grant Parks, Trails, and Recreation Committee January 15, 2019
More informationTHREE MILE PLAN TOWN OF SUPERIOR COLORADO
THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate
More informationProposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street
STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure
More informationSteer Creek Campground Corral
Steer Creek Campground Corral Purpose and Need The purpose of this project is to increase the availability of camping experiences and services for equestrians at the Steer Creek Campground in the Samuel
More informationChapter 4.0 Alternatives Analysis
Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities
More informationA428 Cambourne to Cambridge Better Bus Journeys. Landscape & Planning Appraisal Study Area. Key. Study Area. Westwick. Oakington.
Westwick Boxworth Lower Gate Caldecote Highfields Cambridge Crow End Croft Newtown Roman Hill Harlton Source: Esri, DigitalGlobe, GeoEye, Earthstar Haslingfield Geographics, CNES/Airbus DS, USDA, USGS,
More informationWashington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. 6th Working Group Briefing 1/7/19
Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update 6th Working Group Briefing 1/7/19 Study Purpose Agenda Background Summary of last stakeholder meetings Refresher on DNL,
More informationApplication for Rezoning Site Address: 2121 Floyd Bradford Road; Trussville, AL 35173
NOTICE OF PUBLIC HEARING City of Leeds, Alabama Planning and Zoning Commission Application for Rezoning Site Address: 2121 Floyd Bradford Road; Trussville, AL 35173 APPLICATION An application has been
More informationGrove Field Airport Environmental Assessment
Grove Field Airport Environmental Assessment Advisory Committee Meeting #2 December 9, 2008 Port of Camas-Washougal Conference Room 6:00 7:30 PM Agenda: Welcome and Overview Dave Ripp, Director, Port of
More informationAgenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer
Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012
More informationMETROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)
METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602 1000 TDD (651) 291 0904 DATE: June 19, 2007 TO: Metropolitan Parks and Open Space Commission FROM: Jan Youngquist, Senior
More informationNorthcentral PA ATV Initiative Update December 14, Making Sustainable Connections and Supporting Local Economies Started June 2014
Northcentral PA ATV Initiative Update December 14, 2018 Making Sustainable Connections and Supporting Local Economies Started June 2014 Beginning Objective: Connect communities and four DCNR ATV Trail
More informationCommittee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.
Committee Report Business Item No. 2015-168 Community Development Committee For the Metropolitan Council meeting of August 12, 2015 Subject: Coon Creek Regional Trail Master Plan, Anoka County Proposed
More informationSite Location and Setting
Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and
More informationFinal Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado
Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado Prepared for: Pikes Peak Community College 5775 South Academy Boulevard Colorado Springs, CO 80906-5422
More informationBusiness Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.
Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting
More informationThe Baker/Carver Regional Trail is intended to
Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.
More informationAGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY
March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails
More informationLOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017
LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE CALABASAS CITY COUNCIL LOST HILLS ROAD INTERCHANGE PROJECT UPDATES Construction of CIDH piles for the soundwall foundation commenced on March 20
More informationAuburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012
Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationCommittee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.
Committee Report Business Item No. 2016-48 Community Development Committee For the Metropolitan Council meeting of April 13, 2016 Subject: Harriet Island-South St. Paul Regional Trail Master Plan, Saint
More information1.2 Corridor History and Current Characteristics
SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part
More informationLegend. à à Glacier à à Ã. CRA Tenure Amendment Line CRA Tenure Amendment Area Land File Toby Creek Adventures Tenure Mapping 2016
500000 550000 CRA Amendment Overview Map Map 1 of 15 5650000 5650000 2 3 Arrow 4 6 5 10 7 9 8 11 Whiteswan Getmapping, Aerogrid, IGN, Alpine 1:400,000 Kilometers 0 10 20 Document Path: P:\16.0002.00_Toby
More informationAirport Background Data and Assumptions Report New Cuyama Airport. Santa Barbara County Airport Land Use Compatibility Plan Update
Airport Background Data and Assumptions Report Santa Barbara County Airport Land Use Compatibility Plan Update June 25, 212 Updated August 17, 217 Airport Background Data and Assumptions Report 1. Introduction
More informationUnited States Department of the Interior National Park Service. Boundary Expansion Listed in National Register January 11, 2017
NPS Form 10900-a (Rev. 8/2002) OMB No. 10240018 United States Department of the Interior National Park Service Boundary Expansion Listed in National Register January 11, 2017 National Register of Historic
More informationPublic Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702
Queens Mirror Circle Pedestrian Safety Improvements Quail Pond Circle Complete Street/Pedestrian Connectivity Improvements Southcot Drive Bicycle/Pedestrian Improvements Public Workshop Preliminary Plans
More informationREQUEST FOR PLANNING COMMISSION ACTION
REQUEST FOR PLANNING COMMISSION ACTION DATE: 06/03/09 ITEM NO: 5e Department Approval: Agenda Section: PUBLIC HEARINGS Item Description: Request by City of Roseville for the vacation of public right-of-way
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More information2013 Regional Water System Improvements Program Public Hearing March 14, 2013
In support of Illinois Environmental Protection Agency State Revolving Fund Loan Application 2013 Regional Water System Improvements Program Public Hearing March 14, 2013 Village of Oak Lawn Customer Communities:
More informationCommunity Development Committee
C Community Development Committee For the Metropolitan Council meeting of October 31, 2012 Committee Report Item:2012-316 ADVISORY INFORMATION October 16, 2012 Date Prepared: Subject: Intercity Regional
More informationRIO VISTA MUNICIPAL AIRPORT
DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Recommendation to Approve the Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route
More informationWhat is an Airport Master Plan?
What is an Airport Master Plan? The goal of a master plan is to provide the framework needed to guide future airport development that will cost-effectively satisfy aviation demand, while considering potential
More informationEvergreen Trails Master Plan
Evergreen Trails Master Plan Final Plan December 2015 December 2015 Final Plan Evergreen Trails Master Plan Table of Contents ACKNOWLEDGEMENTS i A. INTRODUCTION A-1 B. EXISTING CONDITIONS B-1 C. COMMUNITY
More informationMarch 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018
OFFICE OF THE CITY MANAGER (757) 385-4242 (757) 427-5626 FAX MUNICIPAL CENTER BUILDING 1, ROOM 234 2401 COURTHOUSE DRIVE VIRGINIA BEACH, VA 23456-9001 March 2, 2018 The Honorable Mayor Williams D. Sessoms,
More informationAction Recommendation: Budget Impact:
City of Fayetteville Staff Review Form Matt Mihalevich 1/16/2019 DEVELOPMENT SERVICES (620) Submitted By 2019 0050 Legistar File ID February 5th, 2019 City Council Meeting Date Agenda Item Only N/A for
More informationWashington County Ostrum Trail North/Broadway Street (CSAH 4)
Washington County Ostrum Trail North/Broadway Street (CSAH 4) Open House Agenda Introductions Project Presentation Group Questions & Answers Breakout Sessions by Zones Discuss project details, issues,
More informationProject Deliverable 4.1.3d Individual City Report - City of La Verne
Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS
More informationCity Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering
City Council Report To: From: Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering City Council Meeting: February 28, 2017 Agenda Item: 3.H Subject: Award of Feasibility/Design-Build
More informationSt. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes
STAFF REPORT ACTION REQUIRED St. Dennis Drive Conversion of Traffic s to On- Street Parking and Bicycle s Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationFirst rail. August 2011
August 2011 First rail A downtown resident showed his son in early August the first completed section of embedded track on Fourth Street in front of the Farmer s Market. During July, the Central Corridor
More informationCOMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail
COMMUNITY MEETING NOVEMBER 1, 2012 MEETING AGENDA I. Introduction of Project Team II. Trail Renovation Process III. Wheaton Regional Park IV. Pine Lake Trail Renovation Project V. Comments and Questions
More informationHudson Highlands Fjord Trail Draft Master Plan. April 29, 2015
Hudson Highlands Fjord Trail Draft Master Plan April 29, 2015 Agenda Route Overview Proposed Segment Results of Community Survey on that Segment Next Steps Municipal Endorsement Environmental Review Implementation
More informationPURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40
PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major
More informationMEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, April 4, 2017
Minutes of the MEETING OF THE METROPOLITAN PARKS AND OPEN SPACE COMMISSION Tuesday, April 4, 2017 Committee Members Present: Tony Yarusso, Rick Theisen, Robert Moeller, Todd Kemery, Sarah Hietpas, Margie
More informationNDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT
NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT PM DIVISION RESPONSIBILITIES FHWA MAJOR PROJECTS TOTAL PROJECT COST
More informationAttachment G STREAM IMPACTS. Ridge Road Extension Alternatives Analysis
Attachment G STREAM IMPACTS for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA 33617
More informationCITY COUNCIL AGENDA MEMORANDUM
To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development
More informationREQUEST FOR COUNCIL ACTION
REQUEST FOR COUNCIL ACTION Date: 10-24-2016 Item No.: 14.e Department Approval City Manager Approval Item Description: Roseville Deer Management 1 2 3 4 5 6 7 BACKGROUND The City of Roseville, in conjunction
More informationCensus 2010 Map Book Genoa Township
Census Map Book Sources: Esri, DeLorme, NAVTEQ, TomTom, Intermap, AND, USGS, NRCAN, Kadaster NL, IGN, and the GIS User Community. About this map book SEMCOG Community Map Books provide easy to understand,
More informationAttachment No. 20 RRLRT No. 1. Committee. Busway Grade Crossings STATUS/DATE OF ACTION
Attachment No. 20 RRLRT No. 1 TECHNICAL COMMITTEE: Railroad / Light Rail Transit Technical Committee TOPIC: Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014
More informationAppendix H1 Traffic Study Hill St Obispo Ave Obispo Ave Student Drop-off & Pick-up Area Parking Lot Plaza Level Hill St Fire Lane Access Service Lane Access Redondo Ave Redondo Ave Parking Lot N No
More informationMason Street Bike/Pedestrian Trail Project
Construction of the much-anticipated Mason Trail is underway! Mountain Constructors was awarded the contract in September but had to go through a 2- month process to obtain construction clearance permits
More informationMemorandum. Pauline Medrano Mitchell Rasansky Steve Salazar. Power Transmission Lines in the Trinity River Corridor Follow-up CITY OF DALLAS
Memorandum CITY OF DALLAS DATE April 18, 2008 TO Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Mayor Pro Tern Dr. Elba Garcia (Vice-Chair) Deputy Mayor Pro Tern Dwaine Caraway
More informationDelaware County Engineer
2018 Project Presentation Delaware County Engineer 2018 ASHE LUNCHEON JANUARY 30, 2018 What s New at DCEO? New County Logos and Website Redesign GIS Upgrades Drone Program Planning for the Future ROADS,
More informationPublic Open House. Chief Peguis Trail Project
Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your
More informationSR 934 Project Development And Environment (PD&E) Study
SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW
More informationBlue River Trail Master Plan JSA to Town Hall June 2004
Blue River Trail Master Plan JSA to Town Hall June 2004 Prepared for: Silverthorne Town Council Silverthorne SPORT Committee Department of Recreation and Culture Silverthorne Public Works Silverthorne
More informationMemorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV
More informationHORSESHOE RANCH DAYTON, SHERIDAN COUNTY, WYOMING
HORSESHOE RANCH DAYTON, SHERIDAN COUNTY, WYOMING Offered by Auction July 27, 2017 HORSESHOE RANCH DAYTON, SHERIDAN COUNTY, WYOMING AUCTION: JULY 27, 2017 PREVIOUSLY $17,500,000 / SELLING WITHOUT RESERVE
More information4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE
4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT
More informationWelcome to Dayton Parkway Interchange Open House. November 26, 2018
Welcome to Dayton Parkway Interchange Open House November 26, 2018 Project Partners Minnesota DOT Hennepin County City of Rogers Dayton Project History NW Hennepin County I94 Study 2007/08 Interchange
More informationAttachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT
01051-09004 Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT DRAFT: June 30, 2010 Applicant: City of Arcata 736 F Street Arcata, CA 95521 Phone (707) 825-2154 Prepared by: Winzler
More informationBecker County Trail Routing Feasibility Study
2016 Becker County Trail Routing Feasibility Study CONNECTING DETROIT MOUNTAIN AND MOUNTAIN VIEW RECREATIONAL AREA TO THE HEARTLAND TRAIL BECKER COUNTY ULTEIG ENGINEERS Contents Acknowledgements...2 INTRODUCTION...3
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT
More informationConstruction Staging Adelaide Street West
REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationAVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:
Property Features: Free - Standing; Entitled 53,8 SF;,311 SF Office (3) Dock High Loading Rare, New Planned Wholesale Warehouse Corner Location (Live Oak Ave. & Washington Dr.) 1 Block South Of Valley
More information4. Safety Concerns Potential Short and Medium-Term Improvements
NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationFarmington Canal Heritage Trail Section
REVISED DRAFT TOWN COUNCIL REVIEW FINAL REPORT Farmington Canal Heritage Trail Section February 2018 PREPARED FOR IN COORDINATION WITH The Towns of Plainville and Southington, CT The City of New Britain,
More informationCommunity Development Department Council Chambers, 7:30 PM, December 20, 2012
STAFF REPORT 2012-56P: Alley Vacation Community Development Department Council Chambers, 7:30 PM, December 20, 2012 To: From: Re: Paul Luke, Chairman, Skokie Plan Commission Mike Voitik, Planning Technician
More informationGulf Coast MPO Obligated Projects
Gulf Projects */ 104866/801000 STPD-9370-00(004) Dedeaux Rd. From Three Rivers Rd. to SR 605. MS $3,259,353 106448/701000 STP-8971-00(005) City of City of - widen to include three lanes on Hospital Road
More informationTRAIL ANNUAL REPORT
TRAIL ANNUAL REPORT 2016-17 Identify Undeveloped projects identified in the City s Greenprint or trail database 15.90 miles Study Projects that have been or are currently being studied to determine a feasible
More informationThis report recommends that Council approve concept plan 021-CP-001-B (see Attachment 1), for detailed design and delivery this financial year.
FPOL1711-9 HILTON TOWN CENTRE PROJECT SCOPE Meeting Date: 0 Responsible Officer: Manager Infrastructure Engineering Decision Making Authority: Council Agenda Attachments: 1. Concept Plan no 021-CP-001-B
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests
More informationDavid Magney Environmental Consulting
David Magney Environmental Consulting DELINEATION OF JURISDICTIONAL WATERS AND RIPARIAN HABITATS FOR LYONS CANYON RANCH, NEWHALL, CALIFORNIA Prepared for: UNITED STATES ARMY CORPS OF ENGINEERS and CALIFORNIA
More informationProject Focus Group (PFG) Meeting Notes- Final Meeting #1
Meeting Date: Monday August 2, 2010 Time: 5 to 7 p.m. Rock Creek Community Church PFG Members Bob Adams Janice Erickson Charlie Rutkowski Mary Beth Cottle John Hartsock (for James Owens) Melody McMurry
More informationPedestrian Safety Review Spadina Avenue
STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District
More informationCorridor Management Committee Meeting. April 2, 2014
Corridor Management Committee Meeting April 2, 2014 1 Today s Topics Welcome Approval of Minutes Resolutions Response to March 26 CMC Questions Staff Recommendation on Project Scope and Budget Public Testimony
More informationAnnual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)
Annual Listing of Federally Obligated Projects in County Federal Fiscal Year 2015 (October 1, 2014 to September 30, 2015) Annual List of Projects with Federal Funding for Federal Fiscal Year 2015 Federal
More informationFINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO
City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL
More informationPublic Service Department MONTHLY REPORT November 2017
- Public Service Department MONTHLY REPORT Professionalism Integrity Be inspired. Reliability Quality Pride Inside This Issue: Department Highlights 2 Project Planning Updates 3 City Construction Projects
More informationGreater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave
Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave Prepared by: Raelene Stratton Team Leader Integrated Transport and Land Use, North Eastern
More informationIron Range OHV State Recreation Area
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Iron Range OHV State
More informationRAILROAD QUIET ZONE PROJECT
RAILROAD QUIET ZONE PROJECT VILLAGE OF ROSELLE Village of Roselle 31 S. Prospect Street Roselle, IL 60172 9575 WEST HIGGINS ROAD, SUITE 600 ROSEMONT, IL 60018 TEL. (847) 823-0500 FAX (847) 823-0520 Table
More informationTransCanada PipeLines Limited Section 58 Application Emerson Extension Delivery Point Reconnections Attachment 6. Survey and Access Maps
Section 58 pplication ttachment 6 Survey and ccess Maps RGE 4 RGE 5 Dufrost Ste Elizabeth St Malo Saint Malo Sales 216 St Jean 200 Baptiste Carlowrie rnaud 217 Barkfield Morris 218 218 Halbstadt 7 1-4-EPM
More informationLincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016
Lincoln Village Pedestrian Bicycle Bridge Community Meeting September 13th, 2016 Purpose of the Meeting Introduce the project and the proposed improvements Review existing conditions Discuss the needs
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.