1 St. Albans Town Forest Comprehensive Trail Plan Prepared by Brooke Scatchard and Mariah Keagy Sinuosity, LLC For RiseVT and the Town of St. Albans December 30, 2015 The St. Albans Town Forest is a 162 acre forest located on French Hill in St. Albans Town, VT. It is in active management for a variety of human powered recreation and serves as a demonstration of active Migratory Bird Habitat Enhancement.

2 Table of Contents 1. Executive Summary 2 2. Introduction Location 2.2 Goals 2.3 General Property Trail Suitability Assessment 3. Planning Team and Process Planning Team 3.2 Assessment Process 3.3 New Trail Layout and Design Process 4. Summary of Considerations Minimizing Impacts 4.2 Other Considerations 5. Trail Inventory Inventory of Existing Trails 5.2 New Trail Additions 6. Implementation and Construction Annual Maintenance 6.2 Trail Improvement Inventory, Construction Summary, and Phasing 6.3 Notes on Cost 6.4 Bird Habitat Considerations 7. Preparation for Implementation Community Involvement 7.2 Funding 8. Trailhead and Signage Trailhead Recommended Features 7.2 Signage and Marking 7.3 Motorized Encroachment 9. Summary of Recommendations Appendix Meeting Notes 10.2 References 10.3 Recommended Trail Structure Examples 10.4 Cost Estimate Tables 10.5 Trail Map 1

3 1. Executive Summary This Comprehensive Trail Plan for St. Albans Town Forest makes reccomendations to enhance and expand the recreational opportunities available to residents of St. Albans Town. The goal of these improvments is to provide a larger and greater variety of nearby reacreational opportunities to promote physical activity, thereby increasing access to the related health benefits for the residents of St. Albans Town. Other goals of the project include increasing access to the property for a greater range of abilities and ableness, increasing overall human powered recreation, as well as creating trail options accessible to schools and groups. To achieve these goals, the 2.65 miles of exisiting trails were assessed for improvements to increase the variety of user groups it serves, as well as bringing all trails up to a level of sustainability and maintainability. The entire property was then assesed for areas suitable for new trail development. These were further refined to provide 2 miles of new trail alignment, increasing the overall recreational opportinities on the property by 43%. While areas accessible from the parking did not prove to be cost effictively suitable for ABA status, the new trail additions recommended in this plan will provide as great a range of ability and skill levels for a variety of uses as the terrain would allow: from introductory to advanced, from a smooth 6 foot wide trail to a 18 inch footpath furthest from the main trailhead. Trail are desinged for sustainability and to highight the natural features present on the property, while minimizing costs of construction and off trail impacts. 2

4 2. Introduction 2.1 Location The St. Albans Town Forest is a 162 acre property located on Forest Drive off of French Hill in St. Albans, VT. 2.2 Goals The overall goal of this project is to enhance and expand non-motorized, human powered trail experiences available for residents of the St. Albans town in order to provide appealing, nearby opportunities for physical activity and promote healthy lifestyles. The first objective is to develop a trail network design and comprehensive plan for improvements and expansion to the current trail system on St. Albans Town Forest. Target trail uses identified thus far are non-motorized, human powered. Targeted potential user groups include a diversity of walkers, hikers, runners, skiers, snowshoers, mountain bikers, bird watchers, naturalists, and school groups. Care will need to be taken to accommodate as great a diversity of ages and abilities as possible. This may include sections of surfaced or ABA trail, as the terrain allows. (FROM ST. ALBANS TOWN FOREST MEETING NOTES, 9/3/15, ST. ALBANS TOWN HALL) 2.3 General Property Trail Suitability Assessment Terrain is challenging due to rocky outcrops with thin organic soils interspersed with low lying seepy areas. Trails in lower areas generally need to be raised by either retained soil, wood or rock and are cost or labor intensive, but can result in flatter less challenging trail characters. Trails that skirt the edges of rocky outcrops travel through naturally challenging terrain. This results in generally more advanced trails, though labor/high costs can be invested in altering the natural features to create smoother, less challenging trail tread. 3

5 3. Planning Team and Process 3.1 Planning Team This plan was created by Brooke Scatchard and Mariah Keagy of Sinuosity, LLC. Brooke specializes in GIS mapping and mountain bike trail construction, layout and design. Mariah s specialties encompass a broad range of multi-use, non-motorized and pedestrian recreation management practices. Prior to data collection, a stakeholder meeting was held (see meeting notes in Appendix) for visioning, background information sharing, public input and guidance in the goals of recreational improvements and enhancement on the property. The development of the St. Albans Town Forest Comprehensive Trail Plan was additionally developed under the guidance of the Management Plan (2010, Amended 2012), Town Forest Survey Summary (2008), Forest Bird Habitat Assessment (2010), and other available forest inventory data provided by Nancy Patch, Franklin-Grand Isle County Forester. 3.2 Assessment Process The trail system was systematically assessed by Sinuosity, LLC over the course of multiple field days. Data was collected for: current condition, existing structures, areas of needed trail improvement (based on user safety), existing and potential erosion (based on user group, use of trail, trail slope and substrate), trail widening, and potential for new trails. A range of recommendations for trail improvements were made. This data was collected in coordination with GPS data points to allow for the creation of GIS maps to clearly indicate the location of all data sites on their corresponding trail section. These maps and associated data will assist land managers in the implementation of trail improvement projects according to Trail Improvement Inventory included. Costs for labor, equipment, and materials are included for each recommended improvement for each section of trail. 3.3 New Trail Layout and Design Process Research and discovery began with review of available documents and a meeting with the St. Albans Town Forest Planner, project sponsor Rise VT, County Forester, and stakeholders. St. Albans Town Forest information was shared to inform the design process. Through meeting, clearer direction was given regarding additional priorities and vision for the end product of the property s recreational goals. Among these were: access to areas of interest on the property, trail loops, diversity of trail difficulty experiences, use of trails to highlight sustainable forest and wildlife management (bird gaps), and opportunities for school group access. With a clear vision of the desired recreational opportunities to expand and create on the St. Albans Town Forest, the available spatial data and other available information resources were used to further narrow the possible trail locations. Data used to determine suitable areas for new trail layout include: property boundaries, planned timber harvests, topography, hydrology, soils, natural communities, existing trails and roads and migratory bird habitat. The overlay of 4

6 pertinent data combined with knowledge of the target areas of interest allowed Sinuosity to define areas most likely to support sustainable and cost effective trail building. Further field explorations and field assessments as well as draft conceptual maps shared with the St. Albans Town Forest stakeholder group eventually refined general trail locations and possible routes to identified trail corridors which have been flagged in the field and mapped. The trail structures which will need to be installed on new sections of trail were inventoried and have been included in the New Trail Structure Inventory. 4. Summary of Considerations 4.1 Minimizing Impacts The sections of existing trail as well as proposed new sections of trail were designed and assessed utilizing known standards for sustainable trail design in order to minimize and mitigate impacts to surrounding natural resources. Of these main considerations addressed in the trail design process, three are specifically noted below. Soils and Water Each trail section was designed or assessed for the possibility to mitigate both user created and water created erosion. By minimizing and mitigating both forms of erosion and using proper building techniques, soils that make up the tread and trail corridor will remain in place, keeping nearby waterways and drainages clear of excess siltation. Some of the solutions used to address these challenges include taking into account slope and soil type, designing trails to avoid the need for bikers to brake or skid excessively. Other considerations taken in this trail design to protect water quality are minimizing stream crossings as well as keeping buffers and maximizing proximity to waterways whenever possible. Trail layouts avoid wet areas as much as possible. However, with their prevalence on this property some seasonally low-lying wet areas will require boardwalk installation in order to allow for trail development. All of these steps, along with utilizing industry standards in lower impact trail construction as well as following the construction specifications that accompany this report will protect the trail surface and surrounding soils and waterways. Sensitive Species or Natural Communities No identified sensitive, rare or endangered species are known in the area and the proposed trails do not come near any natural community considered rare on a state level. No deer yards have been identified on the property. Archaeology/Historic Features No archaeological or historic features have been identified on this property. 5

7 4.2 Other Considerations Other vital considerations in addition to protection of natural and cultural resources include cost effectiveness of the overall project and designing trails to minimizing user conflict and maximize user safety provide for an enjoyable trail user experience for a diversity of trail users. The trail locations and recommended alignments include the most cost effective solutions when taken into consideration all goals of the project. User conflict is mitigated in the providing alternate routes, limiting numbers of trail junctions, and providing appropriate sight lines. Many of these same solutions also provide for increased user safety and when constructed will prove to provide a trail user experience accessible and enjoyable to a diversity of abilities and interests. Care was taken in creating the greatest diversity of trail user experiences and accommodating the largest range of physical abilities and interests as possible within the balance of cost, impact, and topography constraints. Natural/Cultural History The property highlights for educational interest include the bird patches, beaver pond, and general forest ecology of northern hardwood forest. Opportunities to compile information to share with the trail users could take a variety of forms: brochures, trailhead signage, trail side plaques, trailside markers corresponding with maps/handouts, online scavenger hunts, etc. In order to incorporate this, it is advised to either work with local schools or students from nearby colleges to develop and design this content. It will be imperative that the community and stakeholders are involved as the project moves forward. While education about appropriate trail use is mandatory, it will work best paired with opportunities to educate trail users about the features and ecology of St. Albans Town Forest. It is advised that trail user education be paired with opportunities for interpretative education to aid in instilling a respect for the ecological landscape that exists alongside the public recreational opportunities. Educational sign highlighting efforts to enhance migratory bird habitat in St. Albans Town Forest 6

8 5. Trail Inventory 5.1 Existing Trails Bird Patch Trail Length: 4440 feet Current Trail Uses: Ski, Hike (primitive) Recommended Trail Uses: Hike, Ski, Snowshoe Recommended Improvement Cost: $500 General Description: This is the main trail out to the Bird Patches, beginning at the saddle of the height of land in the center of the property. The character of this trail is more primitive as it travels further into the property and accesses multiple patch cuts designed to increase migratory bird habitat. Summary of Recommended Improvements: There is a short reroute of the existing trail necessary where the trail follows close to a stream. Ski Trail Length: 1280 feet Current Trail Uses: Ski, Hike, Bike Recommended Trail Uses: Ski ONLY Recommended Improvement Cost: $0 General Description: This section of the existing logging road begins just beyond the junction of the VYCC WEST trail. It climbs to the saddle at the height of land. Too many wet areas exist on this section of trail to be cost effective to raise and drain for non-frozen use. Summary of Recommended Improvements: The new Saddle Trail provides an adjacent route for hikers and bikers, as well as snowshoers in the winter months. This would leave the existing trail open only to skiing and therefore only in winter months with frozen temperatures and snowpack to protect the saturated and thereby fragile soils. Road to Beaver Pond-West Length: 1365 feet Current Trail Uses: walk, snowshoe, ski Recommended Trail Uses: walk, snowshoe, ski, bike (introductory) Recommended Improvement Cost: $300 General Description: Trail begins on old, wide roadbed and travels directly north from the parking lot. Wet sections have been rerouted to better draining terrain and are a much more narrow tread. Summary of Recommended Improvements: A short wet section of trail is in need of drainage. 7

9 Road to Beaver Pond-East Length: 1300 feet Current Trail Uses: hike, bike, snowshoe Recommended Trail Uses: walk, snowshoe, ski, bike (introductory) Recommended Improvement Cost: $495 General Description: Old road bed looping around from the east side of the parking lot then north the meet up with the old road to the beaver pond. Recommended Improvements: A wet, low lying section of trail can be routed to a higher and drier alignment. VYCC Loop East Length: 1865 feet Current Trail Uses: Hike, bike (intermediate), snowshoe Recommended Future Trail Uses: Hike, bike (intermediate), snowshoe Recommended Improvement Cost: $0 General Description: Trail begins east of the parking on an old road bed. It cuts north, looping around to the eastern shore of the beaver pond. Recently built, this trail has a rugged character on a steep side slope. It is most suitable for biking and hiking with the current trail structures. Summary of Recommended Improvements: None VYCC Loop West Length: 1615 feet Current Trail Uses: Hike, bike (intermediate) Recommended Future Trail Uses: Hike, bike (intermediate) Recommended Improvement Cost: $2850 General Description: Also recently worked on by the VYCC, this section of trail is suitable for intermediate travel with a narrow tread and multiple rock trail structures in sections. With the exclusion of a small set of stairs it is generally suitable for more technical biking, though less technical than the Eastern Loop. Summary of Recommended Improvements: Includes a few small alterations for bike travel as well as installing bog bridges in two sections to prevent tread widening and erosion. Intro Loop Length: 1715 feet Current Trail Uses: walk, bike Recommended Future Trail Uses: Walk, bike (intermediate) Recommended Improvement Cost: $2200 General Description: An old road bed gently climbs up from near the beginning of the Saddle Trail and travels north. Upon cresting the mixed oak forest at a small height of land it drops down and turns east through a series of switchbacks and stone steps through a small seep and along another old road bed to meet with the Road to Beaver Pond. 8

10 Summary of Recommended Improvements: The northern section of this trail that loops back around to the Road to Beaver Pond is recommended for inclusion in the New Intro Loop. This will include grading and filling in sections to achieve a manicured, wide and trail with a more compact surface accessible to many levels and abilities of trail users. The section of this trail with switchbacks and steps makes the entire loop less feasible for all trail users. 5.2 New Trail Additions Saddle Trail Length: 2030 feet new trail, 420 feet existing trail Designed Trail Uses: bike (intermediate), run, hike, snowshoe Estimated Construction Cost: $18,950 General Description: Trail provides access to a nice ledge with seasonal views at the height of land. It would traverse and cross a low lying wet area to provide a sustainable alternative to the existing logging road when the ground is un-frozen and muddy. Sections of bridging and boardwalk will be necessary to pass through unavoidable areas of saturated soils and seeps crossing thin soils over bedrock. Short Trailhead Loop Length: 1800 feet Designed Trail Uses: bike (intermediate), run, hike Estimated Construction Cost: $9,000 General Description: A loop of intermediate rocky terrain, split by the more moderate old road bed off the Connector. This area is recommended for a release cut by the Forest Management Plan. It is not recommended that trail construction begin in this area until after the recommended tree thinning takes place. Ridge Trail Length: 975 feet Designed Trail Uses: hike, bike (advanced), snowshoe, run Estimated Construction Cost: $2,925 General Description: Trail traverses over the top of the rocky ridgeline between the parking area and the VYCC Loop East. Thin soils over a ridge of bedrock running north south create intermediate options. This trail section would provide an alternate route through hemlock covered terrain dropping down to the main road to the beaver pond at the Intro Loop intersection. New Intro Loop Length: 660 feet new, plus existing and improved Designed Trail Uses: walk, bike (introductory), snowshoe, ski, groups Estimated Construction Cost: $5,120 9

11 General Description: Loop of natural smooth natural surface or imported surface trail, 6 wide to accommodate a large variety of uses. This loop joins the two existing logging roads north and west of the parking lot, creating a loop around the oak knoll northwest of the parking lot. Top Loops Length: 3625 feet Designed Trail Uses: bike (advanced), run Estimated Construction Cost: $20,105 General Description: These loops make use of the high rocky outcrops near the saddle at the height of land of the property. The terrain is rugged but with good drainage and interesting features. Loops may be too short to be of interest for hikers, but will be suitable for bikers and runners. Bird Patch Loop Length: 800 feet Designed Trail Use: hike, ski Estimated Construction Cost: $1700 General Description: This section forms a loop from the first 2 bird patches, allowing for bird watchers, skiers and hikers to have a more continuous loop as opposed to a dead end before the return trip. 6. Improvement and Construction Recommendations 6.1 Annual Maintenance Every trail requires annual maintenance. A well-built trail system, up to standard for the current use, still requires at least one annual maintenance patrol in which blow downs are removed and drainages are cleared of leaf litter and sediment. Additional general maintenance tasks may include light brushing out of trail corridors as well as the closing of new or old bootleg trails using dead and down brush and leaf litter. Ideally the trails are monitored and patrolled for light maintenance needs throughout their popular use seasons, especially after larger wind or rain events. With timely light maintenance, long term trail degradation can be avoided, such as when trail users look for alternative routes around fallen trees, causing undue vegetation trampling and trail widening. Trail adoption for trail sections can provide ownership and delegate trail system care, and may be a viable option for this property. The only known current organized group of maintainers are the Franklin County Mountain Bike Club. 10

12 6.2 Trail Improvement Inventory, Construction Summary and Phasing PLEASE REFER TO COST ESTIMATES IN THE APPENDIX Trail Improvement Summary The recommended trail work is primarily intended to reduce the existing erosion and trail widening caused by inadequate drainage structures. The recommended improvements will also enable a wider range of trail users to enjoy the existing trails. Construction Summary The new trail segments and reroutes have been designed to accommodate a variety of trail users in the places they are most likely to travel. The most widely accessible and heavily constructed trails are focused near the trailhead and more primitive trails are further out on the property. Some of the new trail segments would only be effectively constructed with equipment, while other segments could be easily constructed with hand tools and volunteer labor. The segments and structures with associated Equipment Costs indicate our recommendations for where professional labor with specialized equipment for trail building would be most effective. Phasing Due to all the variables of funding, trail contractor selection and availability, volunteer availability, and timing to minimize disturbance to sensitive bird habits, this plan may be implemented in a variety of ways. One recommendation of this is as follows: Phase 1 Trail Segments: Intro Loop, Road to Beaver Pond East and West, Saddle Trail Cost Estimate for Phase 1: $28,765 Phase 2 Trail Segments: VYCC West, Ridge Trail, Bird Patch Trail and Loop Cost Estimate for Phase 2: $7,975 Phase 3 Trail Segments: Top Loops, Short Trailhead Loop Cost Estimate for Phase 3: $29, Notes on Construction Costs Labor- Construction cost estimates are based on average professional labor rates. While use of volunteer labor is recommended for certain projects, others require more skills and training to be constructed efficiently, effectively and to safety and durability specifications. General recommendations for this project fall under the lines of a hybrid project where the work of a Professional Trail Contractor is assisted by Volunteer labor to save costs. Materials-Material costs may vary. Cost estimates are given at current costs from local suppliers. Each material was chosen for its ability to be both durable and cost effective and all are standard industry building materials. 11

13 Supply Donations and Grants- Donations from local hardware store, individuals or businesses may be available for hardware for structures. Lowe s Education grants also fund projects, such as nature trails: Bird Habitat Considerations During the construction and annual maintenance, the following recommendations are given to minimize impacts to forest bird habits and habitat. This and further guidance has been offered by Bridget Butler, Bird Diva Consulting ( When to Plan Disturbance: August 1 January 31 is the best time to plan for tree removal, invasive plant species management, and grubbing and clearing. When to Avoid Disturbance: February 1 April 15 is the early nesting season. Disturbance to vegetation, especially trees, should be avoided during this time. April 15 July 31 is the primary nesting season. Disturbance to vegetation should be avoided during this time. If birds are not present during nesting season, vegetation removal and other disturbance activities may proceed. If work must occur in the recommended avoidance time frames, the project area and specific vegetation impacted should be surveyed for nesting birds. 7. Preparation for Implementation 7.1 Community Involvement More community engagement would support trail efforts and allow for ownership of the trails by local residents. Offering trail adoption opportunities to groups, such as Franklin Country Mountain Bike Club, organizers of area running/biking events, or schools could strength the community s long term commitment, ownership and enjoyment of the St. Albans Town Forest trails. Training Volunteers Along with community engagement, volunteer labor can help defray the costs of the overall project construction as well as general maintenance. However, training and direction are necessary. There are multiple trail trainings available. For Vermont Mountain Bike Association Chapter Members, there is an annual training offered. Sinuosity, LLC can also provide volunteer trainings, if requested. 12

14 7.2 Funding Funding Sources Various funding strategies can be used to support the construction phase of this project. Considering the size of the project, a funding strategy that employs multiple means will most likely be needed. Public fundraising campaigns can work in multiple ways to publicize and gain support for a project, as well as raise funds to support it. Additional funding might even be raised through trail adoption by local businesses. Also more creative ideas like crowd funding and trail name auction could be part of a funding plan. Fundraising events could be sponsored by the various groups who may have interest in using the trails. Possible Grant Options Grant Source Deadline Maximum Amount Website Special Notes Land and Water Conservation Fund Rivers, Trails, and Conservation Assistance Program Recreation Trails Program People for Bikes - Community Grant Recreational Facilities Grant National Recreation and Park Association TBD Varies ov/recreation/grants /lwcf August 1st /orgs/rtca/apply.htm TBD for next round Spring: Jan 31 - Letter of Interest: April 4 - Full Application. TBD for next round Feb. 2nd Lintilhac Foundation March 1st $5,000- $30,000 Vermont Mountain Bike Association Trail Grants TBD 2016 $50,000 ov/recreation/grants /rtp $10,000 orbikes.org/pages/g rant-guidelines $25,000 gov/sites/bgs/ g/fund-your-park/ Varies Range: $500- $6,000 foundation.org/guid elines.html mba-chapter-trailgrant Funds are for municipalities and state agencies only Consult with NPS 30 days prior to discuss project 80%/20% match - St. Albans Town Forest Awarded $16,000 in 2014 Crowd funding platform for parks and recreation (platform takes 5%) Chapter leader will receive with grant information, usually in the Fall 13

15 8. Trailhead and Signage 8.1 Trailhead Recommended Features The trailhead is a prime opportunity where people are often looking for information and moving slowly enough to read signs, therefore it provides a key opportunity for trail user education. It is advisable to utilize the trailhead kiosk to both mark the beginning of the trail as well as draw trail users to an area of official information, such as: Leave No Trace principles, trail map and descriptions, and permitted uses. A variety of opportunities to share education information could be presented in this area. Formats could include: a posted flyer highlighting natural and cultural landmarks, a scavenger hunt of features and landmarks, a naturalists brochure or informational sheet for trail users to take with them and use during their travels. Possible partners in development of these resources may include nearby schools or college students majoring in environmental education. Other pertinent information could include any other regulations or trail user guidelines for respectful sharing of multi-use trails. 8.2 Trail Signage and Marking Placement: Trails should be signed at all junctions. Signposts are recommended, which can be securely placed in clear viability at all trail junctions. Using appropriately placed trees can save costs, but care should be taken not to completely tighten fasteners. Signs should be affixed with screws or lag bolts. Materials: Trail markers should be of metal or plastic for longevity and affixed with small lag bolts to help prevent theft. Costs and suppliers are listed below. Blazing: Trails should be marked along their length as well as signed at junctions. This may be done with paint or markers. Signage Two types of signs are recommended for different applications: Trail names and trail user designation (i.e. ski, snowshoe, etc.) Sign Suppliers and Cost: Type of Sign Cost Each Supplier Designated Trail User $ (aluminum, custom) Named Trail (engraved) $

16 8.3 Motorized Vehicle Encroachment On numerous occasions during field data collection for this project signs of motorized vehicle encroachment were seen on sections of old road, now designated for non-motorized, human powered recreation. As this can cause a great amount of damage, especially in wet areas or during times that soils are saturated, it is recommended that measures be taken to protect the trails from motorized damage. There are a variety of options the town may consider, based on the town s need and frequency of need to access these roads for maintenance or public safety. Gates work for areas needing to be easily accessed, though they can invite vandalism. Very large and well placed boulders invite less vandalism and can be moved by large equipment, if necessary. Other options include either removable bollards with locks, or non-removable. 9. Summary of Recommendations This Comprehensive Trail Plan include both assessment and recommended improvements to existing trails as well as the addition of new trails (2 miles) to increase the recreational opportunities offered by this property to the residents of St. Albans. This plan includes a 43% increase in total trail mileage available as well as opening up opportunities for multiple levels and recreational abilities. Aside from the enhancements and additions with the implementation of this plan, trail signs, maintenance, and trail user information/education at the existing kiosk will support and encourage the use of this underutilized town property for the health and enjoyment of those living in the nearby communities. Outreach to schools and the community of trail users and businesses will help to achieve these goals in implementation and momentum of the project, as well as achieving the stewardship and maintenance needed annually to sustain trails. 15

17 10. Appendix 10.1 Meeting Notes St. Albans Town Forest Meeting Notes 9/3/15 St. Albans Town Hall Attendees: Nathaniel Neider, Nancy Patch, Stephen Bernard Steve Beauregard, Jessica Purvis Frost, Susan Bruce, adjacent landowner John Thoren, local trail user and maintainer Brooke Scatchard and Mariah Keagy, Sinuosity Background: (provided by Nancy Patch) The property has a Forest Management Plan which was accepted by the town. It has some current trails which are used minimally for hiking and skiing primarily, though there are no trail signs and no current organized maintenance. Trail construction was completed in some areas by the VYCC. Additional recent management on the property include a comprehensive survey, plan and management for Forest Bird Responsibility Species, with the guidance and support of the Audubon Society. This includes recent patch cuts and corresponding educational signs on location. A parking lot and trail head exist with a kiosk near the Southeast corner of the property. Supporting materials, such as maps, bird and user survey, and forest management plan have been shared with Sinuosity. Goals: The overall goal of this project is to enhance and expand non-motorized, human powered trails for residents of the St. Albans town in order to provide appealing opportunities for physical activity and promote healthy lifestyles. The first objective is to develop a trail network design and comprehensive plan for improvements and expansion to the current trail system on St. Albans town Forest. Target trail uses identified thus far are non-motorized, human powered. Targeted potential user groups include a diversity of walkers, hikers, runners, skiers, snowshoers, mountain bikers, bird watchers, naturalists, and school groups. Care will need to be taken to accommodate as great a diversity of ages and abilities as possible. This may include sections of surfaced or ABA trail, as the terrain allows. User conflict will also need to be addressed in the design and plan, which may also take the form of education (i.e. snowshoe tracks next to, not on top of, ski tracks). 16

18 Scope: This project will culminate in a Comprehensive Trail Plan and trail design that incorporates the expressed desires of the representative trail users and stakeholders (those in attendance at this meeting and additional stakeholders invited to a draft review meeting), while taking into account the landscape and natural features of the Town Forest. The Plan will be accompanied by a GIS map, construction cost estimates, and a list of possible funding sources to support the implementation the project. Proposed new trails will be flagged in the field. Signage recommendations will be provided if requested. Timeline: September-October Initial field work and Conceptual design Mariah and Nancy meet and walk on site and identify natural features to include as points of interest and interpretive sites where possible Follow-up meeting to review and discuss conceptual design November Revisions to conceptual design as needed after October meeting Trail corridors are identified in the field Recommended trail alignments are flagged and mapped December Comprehensive Trail Plan, cost estimates and final maps are prepared Materials and project are presented to the working group Revisions, if necessary Follow Up Tasks: 1. Reach out to others who should be involved in this process and provide Mariah with their (Steve? Nancy? John? Susan?) 2. Schedule October Meeting via Doodle Poll (Mariah) 3. Schedule site visit (Nancy and Mariah) 17

19 10.2 References Appalachian Trail Conservancy. Planning a Trailhead Kiosk, 2012.A Revision to Planning a Trailhead Bulletin Board (1998). Available at: Birkby, Robert C. Lightly on the Land: The Student Conservation Association Trail-Building and Maintenance Manual. Seattle, WA: The Mountaineers, ISBN pp. Available at Davies, Mary, Hesselbarth, Woody, Vachowski, Brian. Trail Construction and Maintenance Notebook Edition. Missoula, MT: U.S. Department of Agriculture, Forest Service, Missoula Technology and Development Center, / International Mountain Bike Association. Trail Solutions: IMBA s guide to building sweet singletrack. Boulder, CO: IMBA, ISBN Jeswald, P. How to Build Paths, Steps and Footbridges. North Adams, MA: Storey Publishing, ISBN Parker, Troy Scott Natural surface trails by design: physical and human design essentials of sustainable, enjoyable trails. ISBN: Natureshape LLC. ( Staff of AMC s Trails Department. AMC s Complete Guide to Trail Building & Maintenance: Proven techniques, safety guidelines, equipment tips, 4 th ed. Boston, MA: Appalachian Mountain Club Books, ISBN Steinholz, Robert T.; Vachowski, Brian. "Wetland Trail Design and Construction 2007 Edition." Missoula, MT: U.S. Department of Agriculture, Forest Service, Missoula Technology and Development Center, p. 18

20 U.S. Department of Agriculture Forest Service Forest Service National trail drawings and specifications. EM Washington, DC: U.S. Department of Agriculture Forest Service. Vermont Trails and Greenways Manual. Prepared by the Vermont Trails and Greenways Council, September p. 19

21 10.3 Recommended Structures Bog Bridging/Puncheon Design specifications: Overhangs at the end of the stringers should not exceed 6 inches. Spikes must exceed over 2 inches beyond the depth of the stringer in to the sill log and be off-set in their placement so as to minimize the risk of splitting. Tread should total 24 minimum, with dimensional decking instead of milled native timber. Source: Standard Specifications for Construction and Maintenance of Trails (USFS) 20

22 Photo Examples: Native Sills, Dimensional Decking- Clark s Pond Trail, Portland, ME Bog Bridging, Dimensional sills and decking. Cady Hill, Stowe, VT. Built by Sinuosity

23 Foot bridges: Bridge heights will not need handrails. Width should be maintained at 3 feet or greater and constructed without bumpers. Bridge should be constructed to fit with landscape and character of trails and terrain whenever possible. Source: Standard Specifications for Construction and Maintenance of Trails (USFS) 22

24 Drainages Design Specifications: Drainages should be made of soil, unless they are requiring armoring. Follow guidelines specified for various natural drainage features during new trail construction. Appropriate drainage features should be installed at a minimum frequency of 100 feet during construction. i.e. grade reversals, grade dips, knicks etc. Knick Source: Trail Construction and Maintenance Notebook Edition. 23

25 Source: Standard Specifications for Construction and Maintenance of Trails (USFS) 24

26 Grade Reversal Source: Trail Construction and Maintenance Notebook Edition. 25

27 Source: Standard Specifications for Construction and Maintenance of Trails (USFS) 26

28 Sign Posts Source: Standard Specifications for Construction and Maintenance of Trails (USFS) 27

29 Trail Re-grading Source: Standard Specifications for Construction and Maintenance of Trails (USFS) 28

30 BOARDWALKS 29

31 10.4 Cost Estimate Tables Existing Trail Improvement Inventory Phase Trail Length Problem Prescription Labor Cost Materials Equipment Total Cost Labor Source 1 Road to Beaver Pond-East 45 wet section reroute $270 $225 $495 DPW/Pro 1 Road to Beaver Pond-West 20 wet drain $160 $140 $300 DPW/Pro 1 Intro Loop 60 wet drain $480 $420 $900 DPW/Pro 1 Intro Loop 20 wet culvert $160 $200 $140 $500 DPW/Pro 1 Intro Loop 100 wet regrade drain culvert $900 $200 $800 $1,900 DPW/Pro 1 Intro Loop 30 low raise tread /culvert $240 $200 $210 $650 DPW/Pro 1 Intro Loop 30 low wet ditch/drain $240 $210 $450 DPW/Pro Phase 1 Total 305 $2,450 $600 $2,145 $5,195 2 VYCC West 6 narrow challenging area remove rock $90 $90 Volunteer/Pro 2 VYCC West 8 narrow challenging area move crush $160 $160 Volunteer/Pro 2 VYCC West 40 wet bog bridge $1,000 $800 $1,800 Volunteer/Pro 2 VYCC West 10 stairs rock pavers $400 $400 Professionals 2 VYCC West 4 wet bog bridge $100 $80 $180 Volunteer/Pro 2 VYCC West 20 off camber corner bench $220 $220 Volunteer/Pro 2 Bird Patch Trail reroute 500 wet section reroute $500 $500 Volunteer Phase 2 Total 588 $2,470 $880 $3,350

32 New Trail Segment Inventory Phase Trail Length (ft) Length (mi) Prescription Labor Cost Materials Equipment Total Cost Labor Source 1 New Intro Loop New Doubletrack Trail $2,640 $1,980 $4,620 Professionals 1 Saddle Trail 2, New Dual Direction Trail $6,090 $4,060 $10,150 Professionals Phase 1 Total 2, $8,730 $6,040 $14,770 2 Ridge Trail New Singletrack Trail $2,925 $2,925 Volunteer/Pro 2 Bird Patch Loop Improve Skid Trail for Hiking $800 $800 Volunteer Phase 2 Total 1, $3,725 $3,725 3 Short Trailhead Loop 1, New Singletrack Trail $5,400 $3,600 $9,000 Professionals 3 Top Loops 3, New Singletrack Trail $10,875 $7,250 $18,125 Volunteer/Pro Phase 3 Total 5, $16,275 $10,850 $27,125 New Trail Structure Inventory Phase Trail Length Problem Prescription Labor Cost Materials Equipment Total Cost Labor Source 1 Saddle Trail 12 stream crossing bridge $360 $300 $660 DPW/Pro 1 Saddle Trail 45 wet seepy area bog bridge $1,350 $1,125 $2,475 Professionals 1 Saddle Trail 75 wet area with season flows bog bridge $2,250 $1,875 $4,125 Professionals 1 Saddle Trail 28 stream crossing bridge $840 $700 $1,540 Professionals Phase 1 Total 160 $4,800 $4,000 $8,800 Phase 2 Bird Patch Loop 20 wet bog bridge $500 $400 $900 Volunteer/Pro 3 Top Loops 20 wet bog bridge $600 $500 $1,100 Volunteer/Pro 3 Top Loops 16 wet bridge $480 $400 $880 Volunteer/Pro Phase 3 Total 36 $1,080 $900 $1,980 Overall Costs Length (ft) Length (mi) Labor Cost Materials Equipment Total Cost Phase 1 Total 3, $15,980 $4,600 $8,185 $28,765 Phase 2 Total 2, $6,695 $1,280 $7,975 Phase 3 Total 5, $17,355 $900 $10,850 $29,105 Project Total 10, $40,030 $6,780 $19,035 $65,845 1

33 St Albans Town Forest Bird Patch Loop Existing Trails Bird Patch Trail Top Loops Ski Trail Saddle Trail Intro Loop VYCC West Beaver Pond West VYCC East Walking Trails Hike/Bike Trail Ski/Snowshoe Only Trail Hike/Bike/Walk Trails Hike/Ski/Snowshoe Trails Saddle Trail Ridge Trail Beaver Pond East VYCC Hike/Bike Trails Trails to Close Trail Work Types Proposed New Trails Walking Trail Hike/Bike Trails Hike/Ski/Snowshoe Trail Advanced Bike Trails Bog Bridge Bridge Culvert Drainage Reroute Rock Work December FRENCH HILL RD

St. Albans Recreation Reserve

St. Albans Recreation Reserve St. Albans Recreation Reserve Trail Sustainability and Management Plan Prepared by Brooke Scatchard and Mariah Keagy Sinuosity, LLC For Friends of Northern Lake Champlain on behalf of the St. Albans Recreation

More information

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update APPENDIX D: SUSTAINABLE TRAIL DESIGN APPENDICES Town of Chili Parks and Recreation Master Plan Update Sustainable Trail Construction Sustainable trails are defined by the US Forest Service as trails having

More information

Waitsfield Scrag Forest

Waitsfield Scrag Forest Waitsfield Scrag Forest Trail Design Report and Construction Plan Prepared by Sinuosity, LLC For the Waitsfield Conservation Commission on behalf of the Town of Waitsfield Brooke Scatchard and Mariah Keagy

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts Note: Trails in the Clear Creek Canyon area (Segments 2 5 and a future JCOS connection) will be finalized in the future to minimize wildlife impacts Trail Phasing Plan P Parking 3 Easy Trail Intermediate

More information

National Forests and Grasslands in Texas

National Forests and Grasslands in Texas United States Department of Agriculture Forest Service National Forests and Grasslands in Texas Sam Houston NF 394 FM 1375 West New Waverly, Texas 77358 Phone 936-344-6205 Dear Friends, File Code: 1950

More information

Port Gamble Shoreline Area Conceptual Trail Proposal

Port Gamble Shoreline Area Conceptual Trail Proposal The North Kitsap Trails Association is pleased to be a partner to the Kitsap Forest and Bay Project and assist Kitsap County, Forterra, Olympic Property Group, Great Peninsula Conservancy and the Port

More information

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1 M E M O R A N D U M DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America RE: Accessible Trails Checklist 1 The purpose of the Accessible Trails Checklist (below) is to help the community review

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

Trails Technical Committee

Trails Technical Committee Trails Technical Committee Winter 2017 Draft Report Alignment Proposals for the Inyo National Forest and the Town of Mammoth Lakes Map ID #S18 February 08, 2017 Map ID #S18 Key Agreements As of February

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

Tracy Ridge Shared Use Trails and Plan Amendment Project

Tracy Ridge Shared Use Trails and Plan Amendment Project Tracy Ridge Shared Use Trails and Plan Amendment Project Scoping Document Forest Service Allegheny National Forest Bradford Ranger District McKean, County, Pennsylvania In accordance with Federal civil

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

Non-motorized Trail Plan & Proposal. August 8, 2014

Non-motorized Trail Plan & Proposal. August 8, 2014 Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan

More information

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Background As part of Mass Audubon s mission to preserve the nature of Massachusetts for people and

More information

GATEWAY PHASE 2. U.S. Forest Service and the Mount Shasta Trails Association

GATEWAY PHASE 2. U.S. Forest Service and the Mount Shasta Trails Association GATEWAY PHASE 2 U.S. Forest Service and the Mount Shasta Trails Association PROJECT DEVELOPMENT Brief history - Gateway Phase 1 - IMBA conceptual plan - BikeShasta: concert series - USFS & MSTA partnered

More information

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating.

Blueways: Rivers, lakes, or streams with public access for recreation that includes fishing, nature observation, and opportunities for boating. Parks, Open Space and Trails PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN TRAILS PLAN CONTENTS The components of the trails plan are: Intent Definitions Goals, Policies, and Action Strategies Trails Map

More information

2. STAKEHOLDER FEEDBACK // What We Heard

2. STAKEHOLDER FEEDBACK // What We Heard 1. QUARRY ROAD TRAIL // Welcome to the Information Session PROJECT DESCRIPTION WHY WE ARE HERE Quarry Road Trail is a popular commuter trail and recreational area for Calgarians. 1. To report citizen feedback

More information

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land 1.0 Authority 1.1 This rule is promulgated pursuant to 23 V.S.A. 3506. Section 3506 (b)(4) states that an

More information

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts September 30, 2016 Superintendent Yosemite National Park Attn: Wilderness Stewardship Plan P.O. Box 577 Yosemite, CA 95389 RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan,

More information

Kit Carson-Challenger Ridge Trail Project

Kit Carson-Challenger Ridge Trail Project Kit Carson-Challenger Ridge Trail Project Project Accomplishments Report-USFS December 15, 2015 Photo courtesy of Justin Peterson 815 South 25 th Street, Suite 101 Colorado Springs, CO 80904 Dedicated

More information

MUNICIPALITY OF ANCHORAGE

MUNICIPALITY OF ANCHORAGE MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-56 DATE: 5 August 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Holly Spoth-Torres, Park Planner PRC 08-56 Far North Bicentennial

More information

Continental Divide National Scenic Trail Legislative History and Planning Guidance

Continental Divide National Scenic Trail Legislative History and Planning Guidance Continental Divide National Scenic Trail Legislative History and Planning Guidance Legislation, Policy, and Direction Regarding National Scenic Trails The National Trails System Act, P.L. 90-543, was passed

More information

Evergreen Trail School

Evergreen Trail School Evergreen Trail School Making Washington a Better Place to Ride Preston, WA & Tiger Mt. Sat, April 9, 2015 8-11:45am: Classroom 11:45-12:45pm: Lunch 12:45-4pm: Trail Work Classroom Agenda Introduction

More information

Project Planning, Compliance, and Funding

Project Planning, Compliance, and Funding Project Planning, Compliance, and Funding The plans above offer high level guidance to ensure that the A.T. is managed effectively as a whole unit in a decentralized management structure. Cooperative management

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project

Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Great Pond Mountain Conservation Trust Request for Bids Wildlands Hillside Trail Relocation and Restoration Project Project Description: Great Pond Mountain Conservation Trust (GPMCT), a nonprofit land

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS

Chapter 6: POLICY AND PROCEDURE RECOMMENDATIONS Chapter 6 POLICY AND PROCEDURE RECOMMENDATIONS FOR SRRA Below are seven policy elements that should be considered for adoption by the Southwest Regional Recreation Authority of Virginia: 1. Develop strategies

More information

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan Appendix 3 Greenway Design Standards This chapter discusses two design standards for the greenway types discussed above. First, trail design standards are presented together with trailhead facilities and

More information

Form for Project Descriptions - December 2013 version! 1. Stone Valley Cooperative Recreation Area (SVCRA) Project Description

Form for Project Descriptions - December 2013 version! 1. Stone Valley Cooperative Recreation Area (SVCRA) Project Description Form for Project Descriptions - December 2013 version 1 Stone Valley Cooperative Recreation Area (SVCRA) Project Description The Stone Valley partners request that proposed work on land within the SVCRA

More information

CRAZY HORSE TRAIL GUIDE

CRAZY HORSE TRAIL GUIDE CRAZY HORSE TRAIL GUIDE Abridged Version: July 2016 This is a short form of our interpretive trail guide for the Crazy Horse Trail. The full version of the guide has a more detailed description of the

More information

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE As the culmination of the first phase of the master planning process, this Program Development Report creates the framework to develop the Calero County

More information

Trail Assessment Report

Trail Assessment Report Trail Assessment Report Trail Options for the Bear Creek Canyon located in Pikes Peak Ranger District, Pike National Forest and on Colorado Springs Utility Lands Due to the presence of a unique species

More information

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

PRESERVE TRAIL GUIDELINES Resource Management Guidelines for Trails in Preserves

PRESERVE TRAIL GUIDELINES Resource Management Guidelines for Trails in Preserves PRESERVE TRAIL GUIDELINES Resource Management Guidelines for Trails in Preserves County of San Diego Department of Parks and Recreation April 2018 sdparks.org Table of Contents CHAPTER 1: INTRODUCTION...

More information

MASTER PLAN EXECUTIVE SUMMARY

MASTER PLAN EXECUTIVE SUMMARY Biscuit Run State Park Scottsville Road (State Route 20) Charlottesville, VA 22902 Biscuit Run State Park MASTER PLAN EXECUTIVE SUMMARY Department of Conservation and Recreation Division of Planning and

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014 1 Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014 Willow Lake and Kit Carson Peak 2 SUMMARY The Rocky Mountain Field Institute began Phase 1 of a multi-phase,

More information

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction Page 1 of 6 Background DECISION MEMO USDA Forest Service Jefferson Ranger District Jefferson County, Montana Rawhide Trail #7073 is located in the Elkhorn Mountain Range approximately 10 miles east of

More information

Peter Axelson. Beneficial Designs, Inc. Minden, NV

Peter Axelson. Beneficial Designs, Inc. Minden, NV Peter Axelson Beneficial Designs, Inc. Minden, NV Arroya Sit Ski Mono Ski Dynamic Seating Spring Assist Cross Country Ski Hand Bike Adaptive Canoe Seating Available from Chosen Valley Canoe Accessories

More information

Proposed Peninsula Bay Bike Track Development

Proposed Peninsula Bay Bike Track Development Proposed Peninsula Bay Bike Track Development May 2018 BACKGROUND The area of land at the northern extreme of Wanaka's Peninsula Bay development (Lot 923 DP 501325), currently owned by Infinity Investment

More information

General Issues with the Portland Parks & Recreation Trail Design Guidelines for Portland s Park System ( Portland Guidelines )

General Issues with the Portland Parks & Recreation Trail Design Guidelines for Portland s Park System ( Portland Guidelines ) Why the City of Portland s current Trail Design Guidelines (2009) are substandard & need to be updated. For purposes of this discussion we will be referring to the following natural surface trail guidelines:

More information

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC REQUEST FOR QUALIFICATIONS: PROFESSIONAL, EXPERIENCED TRAIL BUILDERS FOR THE CONSTRUCTION OF THE FONTA FLORA STATE TRAIL LAKE JAMES SECTION BURKE COUNTY COMMUNITY DEVELOPMENT INTRODUCTION Burke County

More information

RATTLESNAKE HILL PHILLIPS, HARRIS FARM, LIME KILN & QUARRY

RATTLESNAKE HILL PHILLIPS, HARRIS FARM, LIME KILN & QUARRY Town of, MA Trails Map 6a SPLIT ROCK PRIMARY SECONDARY PRIVATE PRIVATE PROPERY STAY ON HEAD FUTURE TO SKINNER (NOT MARKED) 0 miles 0.25 0.250 0.5 Mapbox, Data Odbl, OpenStreetMap contributors primary use

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION Abstract The vision for the East Coast Greenway is an off-road urban trail system running from Calais, Maine

More information

Assessing Your Trails, Keeping Them Safe and Enjoyable

Assessing Your Trails, Keeping Them Safe and Enjoyable Jon Wood, PLA, ASLA Associate Vice President Stewart Bert Lynn, PLA, ASLA, LEED AP Project Manager Mecklenburg County Asset and Facility Management Assessing Your Trails, Keeping Them Safe and Enjoyable

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

Stephens State Park Trails

Stephens State Park Trails TRAILS OF ALLAMUCHY MOUNTAIN & STEPHENS STATE PARKS Allamuchy Mountain and Stephens State Parks contain 28 marked trails providing access to diverse landscapes for walking, hiking, biking, bird-watching,

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute I. Proposed Action: This project proposes to reroute approximately 1,800 feet of a 50 inch wide trail, off of private property

More information

Thank you for the opportunity to comment on the proposed action to add trails and trailheads to the Red Rock District trail system.

Thank you for the opportunity to comment on the proposed action to add trails and trailheads to the Red Rock District trail system. July 14, 2010 Jennifer Burns Red Rock Ranger District PO Box 20429 Sedona, AZ 86341 Flagstaff Biking Organization PO Box 23851 Flagstaff, AZ 86002 Dear Jennifer- Thank you for the opportunity to comment

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

Kelly Motorized Trails Project Proposed Action

Kelly Motorized Trails Project Proposed Action Kelly Motorized Trails Project Proposed Action November 28, 2011 The Flagstaff Ranger District of the Coconino National Forest is seeking public input on the proposed Kelly Motorized Trails Project (formerly

More information

Jericho Research Forest Recreational Trail Mapping and Assessment. Prepared for the University of Vermont Natural Areas

Jericho Research Forest Recreational Trail Mapping and Assessment. Prepared for the University of Vermont Natural Areas Jericho Research Forest Recreational Trail Mapping and Assessment Prepared for the University of Vermont Natural Areas By the Land Stewardship Program (LANDS), July 2014 Table of Contents Executive Summary..

More information

SEGMENT ASSESSMENT REPORT

SEGMENT ASSESSMENT REPORT 2017 SEGMENT ASSESSMENT REPORT SEGMENT 3: MT ROSE / TAHOE MEADOWS TO SPOONER SUMMIT REPORT SUMMARY This report is a compilation of information collected on the Tahoe Rim Trail during assessments performed

More information

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012 Purpose of Feasibility Study Purpose Evaluate the feasibility of constructing a multiuse

More information

LANDER AREA MASTER TRAILS PLAN. Lander Cycling Club November 2012

LANDER AREA MASTER TRAILS PLAN. Lander Cycling Club November 2012 LANDER AREA MASTER TRAILS PLAN Lander Cycling Club November 2012 Table of Contents A. Overview 3 B. Introduction 4 C. Visitor Profile 5 D. Benefits to the Community 6 E. Area wide Goals and Objectives

More information

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown Launched April 27th, 2010 1 Table of Contents page 3 Long term Goals Project Scope Project History 4 User Groups Defined Trail Representative Committee 5 Trail Users Breakdown 13 Trail Users Desires 16

More information

Marilla Reservoir to Chestnut Ridge via Marilla Trails and Bullis Hollow Trail east to west

Marilla Reservoir to Chestnut Ridge via Marilla Trails and Bullis Hollow Trail east to west USGS topographic maps useful to this hike are the Bradford and Stickney 7.5 minute sectionals. These notes are designed to assist in identifying distance and location using geophysical and man-made characteristics

More information

Suggested Day Hikes. Mount Greylock State Reservation 3, 4 1, 2. Take a Hike! Things to remember:

Suggested Day Hikes. Mount Greylock State Reservation 3, 4 1, 2. Take a Hike! Things to remember: Suggested Day Hikes Mount Greylock State Reservation Take a Hike! This guide offers suggested day hike routes in two parts: 1) Year-round Hikes and 2) Seasonal Hikes (late-may to Nov.1). Use this guide

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

General Implementation

General Implementation Features 1 General Implementation Allow vehicle travel for the purposes of dispersed camping within 300 feet of designated Forest roads and motorized trails except for the fen areas identified above, and

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950 Date: February 26,

More information

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Regional Wayfinding Sign Strategy Thurston County Trails 2017 Regional Wayfinding Sign Strategy Thurston County Trails 2017 Partners: Members and partnering organizations of the Thurston Thrives Community Design Action Team City of Lacey, City of Olympia, City of

More information

BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics BRACEVILLE NATURE PRESERVE Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics Introduction Braceville Nature Preserve is one of MetroParks largest preserves.

More information

THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics

THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics THOMAS A. SWIFT METROPARK Introductions History Present Conditions Future Development Plans Implementation Strategies Statistics Introduction As an open meadow park positioned along the Mahoning River,

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

USDA Trails Strategy WRI: ENGLISH PEAK SURVEY. Theodore Mendoza San Diego State University June 6 th 2016 August 18 th Advisor: Sam Commarto

USDA Trails Strategy WRI: ENGLISH PEAK SURVEY. Theodore Mendoza San Diego State University June 6 th 2016 August 18 th Advisor: Sam Commarto WRI: ENGLISH PEAK SURVEY Theodore Mendoza San Diego State University June 6 th 2016 August 18 th 2016 Advisor: Sam Commarto Klamath National Forest Submitted: March 21, 2017 Table of Contents Acknowledgements

More information

Trail Management Objectives (TMO s)

Trail Management Objectives (TMO s) Trail Management Objectives (TMO s) TMO s are the foundation for solid, consistent trail planning, survey & design, construction, maintenance, periodic condition assessment & prescriptions, and on-going

More information

Recreation News. Welcome. Chris Jackson. In this Issue: O S U C o l l e ge F o r e s t s

Recreation News. Welcome. Chris Jackson. In this Issue: O S U C o l l e ge F o r e s t s Recreation News O S U C o l l e ge F o r e s t s In this Issue: Welcome New tree identification posts... New Arboretum Trails New Interpretive Signs Ridge Trail Seasonal Closures Leave No Trace reminder

More information

Chatsworth Branch Library Devonshire Street, Chatsworth, CA Thursday, November 16, :00-8:00 pm

Chatsworth Branch Library Devonshire Street, Chatsworth, CA Thursday, November 16, :00-8:00 pm Chatsworth Branch Library 21052 Devonshire Street, Chatsworth, CA 91311 Thursday, November 16, 2017 6:00-8:00 pm Project Team County of Los Angeles Department of Parks and Recreation Kathline King Chief

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

Sawtooth National Forest Fairfield Ranger District

Sawtooth National Forest Fairfield Ranger District United States Department of Agriculture Forest Service Sawtooth National Forest Fairfield Ranger District P.O. Box 189 Fairfield, ID. 83327 208-764-3202 Fax: 208-764-3211 File Code: 1950/7700 Date: December

More information

Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016

Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016 - Dixon Trail Construction - From the Top of the Mountain 2016 Interim Report Friends of Cheyenne Mountain State Park September 2 nd, 2016 Prepared by: Andy Riter, Program Coordinator, and Joe Lavorini,

More information

EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT

EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT SESW, SWSE Section 15, NWNE, NENW, SWNE, SENE Section 22, Township 138, Range 27 (City of Fifty Lakes) Crow Wing County Land Services Department

More information

Stevenson Ranch Library The Old Road, Stevenson Ranch, CA Thursday, November 9, :00-8:00 pm

Stevenson Ranch Library The Old Road, Stevenson Ranch, CA Thursday, November 9, :00-8:00 pm Stevenson Ranch Library 25950 The Old Road, Stevenson Ranch, CA 91381 Thursday, November 9, 2017 6:00-8:00 pm Project Team County of Los Angeles Department of Parks and Recreation Kathline King Chief of

More information

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE

APPENDIX OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE APPENDIX A OFFICIAL MAP ORDINANCE OF HAMILTONBAN TOWNSHIP OFFICIAL MAP NARRATIVE INTRODUCTION: The Official Map of Hamiltonban Township has been prepared to identify those lands and features that Hamiltonban

More information

Hermosa Area Preservation The Colorado Trail Foundation 4/11/2008

Hermosa Area Preservation The Colorado Trail Foundation 4/11/2008 Hermosa Area Preservation The Colorado Trail Foundation 4/11/2008 Legend d o Tr ail NPA - National Protection Area ra NCA - National Conservation Area o e C Th The Colorado Trail lo FS inventoried Roadless

More information

Segment 2: La Crescent to Miller s Corner

Segment 2: La Crescent to Miller s Corner goal of the USFWS refuges is to conserve, protect and enhance fish, wildlife and plants and their habitats for the continuing benefit of the American people. Refuge lands are used largely for fishing,

More information

3.0 EXISTING PARK & RECREATION SPACE

3.0 EXISTING PARK & RECREATION SPACE 3.0 EXISTING PARK & RECREATION SPACE TOWN PARK & RECREATION SPACE An inventory of current parks and recreation area in the Town of Cedarburg is shown in Table 3. These areas total roughly 381.89 acres.

More information

Wallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall

Wallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall Wallace Falls State Park Classification and Management Planning Stage 3 Preliminary Recommendations July 18, 2018 Sultan City Hall Thanks for coming! This document contains State Parks preliminary recommendations

More information

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture United States Department of Agriculture Forest Service January 2012 Proposed Action Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties Payette National Forest Valley, Adams

More information

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks Name of Best Management Practice Best Management Practices for Hang Gliding and Paragliding in Jasper National

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

Map 1.1 Wenatchee Watershed Land Ownership

Map 1.1 Wenatchee Watershed Land Ownership Map 1.1 Wenatchee Watershed Land Ownership Map 1.1 Wenatchee Watershed Land Ownership The Wenatchee watershed lies in the heart of Washington state in Chelan County. Just larger than the state of Rhode

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

National Recreation Trail Application for Designation

National Recreation Trail Application for Designation National Recreation Trail Application for Designation Introduction Thank you for your interest in the National Recreation Trail (NRT) program. Completed NRT application packages must be submitted by December

More information

3.0 LEARNING FROM CHATHAM-KENT S CITIZENS

3.0 LEARNING FROM CHATHAM-KENT S CITIZENS 3.0 LEARNING FROM CHATHAM-KENT S CITIZENS An important aspect in developing the Chatham-Kent Trails Master Plan was to obtain input from stakeholders and the general public. Throughout the course of the

More information

CHESTER-SAWMILL WINTER TRAIL ENHANCEMENT PLAN KANANASKIS COUNTRY. Draft May 9, 2016

CHESTER-SAWMILL WINTER TRAIL ENHANCEMENT PLAN KANANASKIS COUNTRY. Draft May 9, 2016 CHESTER-SAWMILL WINTER TRAIL ENHANCEMENT PLAN KANANASKIS COUNTRY Draft May 9, 2016 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 PLAN AREA... 4 2.1 Biophysical... 4 2.2 Park Management Zoning... 6 2.3 Existing

More information

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through recreation ecological restoration opportunities Collaboration

More information

Connie Rudd Superintendent, Black Canyon of the Gunnison National Park

Connie Rudd Superintendent, Black Canyon of the Gunnison National Park National Park Service U.S. Department of the Interior Black Canyon of the Gunnison National Park and Curecanti National Recreation Area Information Brochure #1 Wilderness and Backcountry Management Plan

More information

American Conservation Experience

American Conservation Experience ACE Project Report For Tonto National Forest, Arizona Trail Association and Arizona State Parks Title of Project: 4 Peaks Trail Maintenance Award Contract Number: ASP NM11021 Project Partner: Paul Burghard

More information

Discussion Paper: Development of a Plan for Trails on Public Land

Discussion Paper: Development of a Plan for Trails on Public Land Discussion Paper: Development of a Plan for Trails on Public Land APRIL 2017 The purpose of this Discussion Paper is to summarize the status & issues relating to District trails and feedback to date, and

More information