1 CW /9/2015 Community and Corporate Services Committee November 10, Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization of the Report The Trail Network Design Guidelines Implementation ti 2 1
2 Background Policy Support at the Federal, Provincial, Regional, and Local level The Strategy for Greenways and Trails on Burlington Public Lands (1994) Relationship to other key policy documents Burlington Cycling Master Plan (2009) Burlington Transportation Master Plan (update currently in development) Burlington Strategic Plan (currently in development) 3 Vision and Objectives What the plan is A long-range, Flexible Blueprint for Trails A set of Tools to Facilitate Implementation What the plan is not Prescriptive / Set-in Stone Intended only as a City Initiative Vision Community Trails in the City of Burlington are designed and developed as a means of connecting residents and visitors to open spaces, parks, community destinations and surrounding communities for recreational and day to day activities. The network is made up of off-road routes which reflect current design standards and unique municipal characteristics. Objectives 1. Build upon existing on and off-road connections 2. Improve connectivity 3. Bridge gaps and missing links 4. Accommodate a range of trail user groups 5. Review accessibility of trails 6. Identify municipal processes for trail development 7. Identify funding and partnership opportunities 8. Contribute to a more walkable community 4 2
3 Study Process and Timeline Project Commencement November 20 Final Report: May 2015 Phase 1: Project Initiation & Building the Foundation Engage the Public & Study Team Members Assemble and Review Background Information Phase 2: Inventory & Assessment Prepare study vision & criteria to select routes Identify Potential Trail Linkages and Investigate in the field Review trail standards Phase 3: Collecting Feedback Gather input from and engage the public Analyze public input Phase 4: Developing the Strategy Prepare Draft Trails Network Identify Facility Types & design guidelines Prepare a strategy for implementation Phase 5: Finalizing the Strategy Present network and strategy to the public Develop & submit the draft report Finalize the strategy & present to Council Engage Public Public Open House #1 Public Open House #2 5 Public and Stakeholder Engagement Drop - in Session with Councillors Focus Group Sessions (Stakeholders &C Committee Members) Public Open Houses Individual Stakeholder Meeting Let s Talk Burlington Questionnaires i January 27 th, 2014 May 6, 2014 January 27 th, 2014 May 6, Locations in February 2014 May 22, 2014 April 16, Discussion Boards between December 20 & May
4 A Few Themes that Emerged Network Upgrades and maintenance on existing trails Close gaps in the existing trail network Create new routes in areas not currently served by trails Crossing barriers such as the QEW Explore natural trails along the small creeks Explore connections to regional trails (e.g. Bruce Trail, Waterfront Trail, Trans Canada Trail) Other User conflicts on some trails Examine winter maintenance on trails Add / improve trail amenities (e.g. benches and wayfinding signage) 7 Organization of the Report Volume 1 Background and support for trails in policy documents, relationship to other key policies (e.g. Cycling Master Plan) Benefits of Trails Public and Stakeholder Views Vision for Community Trails Appendices Other policy supporting trails Consultation record Trail Designer s Toolbox Network Costs Performance Measures Volume 2 The Community Trails Network existing and proposed routes, facility types Implementing the Strategy network priorities, promotion and outreach, funding, tracking progress 8 4
5 The Trail Network: Investigations Fall 20 Spring 2014 Desktop review using digital mapping, Google Earth etc. Across entire city, with focus on the urban area 170 GPS waypoints 850 photos 9 The Trail Network: Route Selection Principles Is the network Cost Effective to construct and maintain? Are the routes Linked to form a continuous network? Are the routes Accessible? Is the system Visible? Are the routes Connected to important destinations? Are the routes Conveniently located? Are the trails Well Designed? Are the trails in Context with the trail location? Are the routes designed and located to maximize Safety? Is the network Expandable? Does the network provide a Diverse experience? 10 5
6 The Proposed Trails Network 11 The Proposed Trail Network 12 6
7 Design Guidelines A designer s toolbox / resource Review existing trail guidelines and update where appropriate Develop additional guidelines where needed Implementation Identifies short, medium and long term priorities Short term (Map 5.0) separated into Build Projects = Upgrades to Existing + New Links Advance Planning Initiatives = Planning now so we can be ready for building in the future 14 7
8 Implementation: Build Projects Example: Initiative #3 Cumberland Hydro Corridor Multi-use Trail (Northern Section) 15 Implementation: Advance Planning Initiatives Engaging in discussions and planning with owners, public agencies and stakeholders in the short term to advance medium and long term projects Advance key projects to shovel-ready status Position the City to take advantage of future opportunities as they come available (e.g. stimulus funding etc.) Includes Lands that t are currently owned or managed by the City New growth areas of the City (i.e. developer lands, linear utilities) 16 8
9 Implementation 17 Implementation: Promoting Community Trails Engineering Education Encouragement Source: MMM Group Source: City of Toronto Source: Google Source: MMM Group The way facilities and amenities are planned, designed, constructed and maintained. Providing users with important information regarding how and where to safely use trail infrastructure. Promoting the use of the trails network as well as active forms of transportation on a daily basis. Enforcement Evaluation Source: Metroparkstoledo.com Orelans Star, Ottawa Source: Credit Valley Conservation Ensuring the users of the trail network understand and adhere to the rules and regulations. Monitoring the success of facilities and programs and making the necessary adjustments and improvements. 18 9
10 A long term strategic plan, founded on a vision Based on community Presentation engagement to Council Each individual project within the Community Trails Strategy contributes to a more livable and walkable city 19 Alignment with Other Initiatives Strategic Plan Official Plan Review Cycling Master Plan The Bruce Trail Cootes to Escarpment Ecopark System 10
11 Draft Strategic Plan A City that Moves A Complete Streets vision is implemented through a coordinated active transportation plan which will include on and off-road bikelanes, sidewalks, multi-use paths and trails that are well-connected throughout the City A Healthy and Greener City There will be a trail system linked to the City s park network and to other regional systems, ensuring that the City s rural area and waterfront are easily accessible The Bruce Trail will be supported by planning and investments to ensure usability, safety and access Official Plan Review The Official Plan Currently contains policies related to trails and active transportation Will be updated to better reflect the opportunities and connections identified ifi d in the Community Trails Strategy 11
12 Cycling Master Plan Provided framework for the Community Trails Strategy Coordinated to create a continuous network of on and off road trails The Bruce Trail Work currently underway to examine opportunity for enhanced pedestrian crossings and parking at key Bruce Trail locations Conceptual design has been completed for parking at Walker s Line/ No. 2 Sideroad 12
13 Cootes to Escarpment Ecopark Community Trails Strategy identifies trail initiatives within study boundary Key reference for ongoing and future Master Plans Capital Budget and Forecast Proposed 2016 Capital Budget & Forecast includes a number of the priority projects for implementation in the next 10 years Future budget processes to consider medium to long-term projects Opportunities for implementation through other initiatives and funding sources
14 Thank you 20 14
Strengthening the Ontario Trails Strategy. Report on Consultations and the Environmental Bill of Rights Registry
Strengthening the Ontario Trails Strategy Report on Consultations and the Environmental Bill of Rights Registry Purpose To report on the feedback and information received through the regional consultations,
More information2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE
2.1 Item: VMC Sub-committee Report DATE: Tuesday, June 12, 2018 WARD: 4 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE FROM: Jason Schmidt-Shoukri, Deputy City Manager, Planning
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012
CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF OCTOBER 30, 2012 Item 36, Report No. 39, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationPEMBERTON VALLEY RECREATIONAL TRAILS MASTER PLAN UPDATE Community Open House. April 2018
PEMBERTON VALLEY RECREATIONAL TRAILS MASTER PLAN UPDATE Community Open House April 2018 Introductions Introductions Matt Bakker, BHA Project Coordinator Other Team Members: Liz Scroggins, Grey Owl Consulting
More information3.0 LEARNING FROM CHATHAM-KENT S CITIZENS
3.0 LEARNING FROM CHATHAM-KENT S CITIZENS An important aspect in developing the Chatham-Kent Trails Master Plan was to obtain input from stakeholders and the general public. Throughout the course of the
More informationMUNICIPALITY OF ANCHORAGE
MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-56 DATE: 5 August 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Holly Spoth-Torres, Park Planner PRC 08-56 Far North Bicentennial
More informationREGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017
REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 Contact: Chris Wood, Airport General Manager cwood@regionofwaterloo.ca (519) 648-2256 ext. 8502 Airport Master
More informationPart 005 Implementation Strategy _
Part 0 Implementation Strategy www. landlab.co.nz Queenstown Town Centre Masterplan Version 7 14 June 28 Section 0 Page 4 5.1 Implementation Plan The projects and initiatives contained within the Queenstown
More informationEconomic Development and Tourism
SECTION 4 SECTION 4 Economic Development and Tourism 4. Economic Development and Tourism Tourism plays a very important role in Niagara s economy, providing employment and generating business for support
More informationItem No Halifax Regional Council April 10, 2018
P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 14.3.2 Halifax Regional Council April 10, 2018 TO: SUBMITTED BY: Mayor Savage and Members of Halifax Regional Council Original Signed Councillor
More informationA Master Plan is one of the most important documents that can be prepared by an Airport.
The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport
More informationStrategic Objectives, Initiatives and Actions
Strategic Objectives, Initiatives and Actions The following Strategic Objectives and the associated Initiatives and Actions for each have been developed to meet the challenges associated with trail development
More informationEP8.2 Presentation Exhibition GO Station Improvements
EP8.2 Presentation Exhibition GO Station Improvements JANUARY 30, 2018 WORKING TOGETHER Metrolinx is working collaboratively with the City of Toronto, Exhibition Place, and the TTC to co-ordinate efforts
More informationThose with Interest in the City of Cambridge Trail System
Community Services Department City Hall 50 Dickson Street, P.O. Box 669 Cambridge ON N1R 5W8 Tel: 519-740-4681 July 20, 2010 To: Re: Those with Interest in the City of Cambridge Trail System City of Cambridge
More informationMASTER PLAN UPDATE Toronto Pearson International Airport. City of Toronto Planning and Growth Management Committee September 5, 2007
MASTER PLAN UPDATE Toronto Pearson International Airport City of Toronto Planning and Growth Management Committee September 5, 2007 Connecting Toronto 59 non-stop International destinations 8.5 million
More informationSport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services
Sport Capital Improvement Plan Paul Borci Manager, Campus Planning Property & Campus Services What is SCIP? Property and Campus Services (PCS) in collaboration with Melbourne University Sport (MU Sport)
More informationFINCH HYDRO CORRIDOR TRAIL PROJECT
FINCH HYDRO CORRIDOR TRAIL PROJECT Pharmacy Avenue to Birchmount Road January 29 th, 2018 L Amoreaux Community Centre (2000 McNicoll Avenue) 1 Purpose of Drop In Event The purpose of today s drop-in event
More informationBILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE
BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE City of Toronto Local Issues & Initiatives Bryan Bowen City Planning Waterfront Secretariat June 25, 2018 PRESENTATION OUTLINE BACKGROUND: ISSUES
More informationX Respond to staff direction
Page 1 of Report TO: Community Services Committee Corporate Services Division SUBJECT: Apeldoorn Mundalization Project Report Number: Report Date: February 17, 2010 File Number(s): Ward(s) Affected: 1
More informationThe Corporation of the City of Kawartha Lakes Council Report
The Corporation of the City of Kawartha Lakes Council Report Report Number ENG2017-008 Date: September 12, 2017 Time: 2:00 p.m. Place: Council Chambers Ward Community Identifier: All Subject: Author Name
More informationCounty of Peterborough Active Transportation Master Plan
The TMP developed a conceptual AT/cycling network for Peterborough County that identified both on-road and off-road (trail) AT facilities. This was a coarse network based on the existing trails and off-road
More informationDraft Executive Summary
Draft Executive Summary The Juneau Tourism Plan development process was undertaken by Egret Communications and ARA Consulting in April 2001, under contract with the City and Borough of Juneau, Alaska.
More informationApplewood Heights Community Open House
Applewood Heights Community Open House Agenda TORONTO PEARSON BACKGROUND Toronto Pearson: For you. The World. Our goal: To become North America s premier gateway airport. Our job is to get you better connected
More informationCoast to Coast Connector Summit
Project Partners Welcome to the Coast to Coast Connector Summit Winter Garden, Florida City Hall October 1, 2014 1 Why are we here? Objectives 1. Inform key stakeholders on the current state of the C2C
More informationGUEST EXPERIENCE MANAGEMENT AND PASSENGER AMENITIES SURVEY FEBRUARY 2017
GUEST EXPERIENCE MANAGEMENT AND PASSENGER AMENITIES SURVEY FEBRUARY 2017 BREAKDOWN OF RESPONDING AIRPORTS 15.94% 25 U.S. Large Hub Airports 36.23% 10.14% 14 U.S. Medium Hub Airports 12 U.S. Small Hub Airports
More informationSTITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes
SHORE STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH Re-connect the city to the waterfront and link the east and west Core Circle landscapes 126 LINE PUBLIC WORK 127 TRANSFORMATIVE IDEA 3. SHORELINE STITCH
More informationMEDIUM SIZE STADIUM STRATEGY
MEDIUM SIZE STADIUM STRATEGY Approved by City Council on March 12, 2014 This plan is available online at www.edmonton.ca I. Executive Summary... 4 II. Medium Size Stadium Strategy... 5 1. Background...
More informationETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7
ETOBICOKE CREEK NORTH TRAIL PROJECT May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7 1 Purpose of Open House The purpose of today s open house is to present the design
More informationLand Management Summary
photo credit: ANGAIR Anglesea Heath Land Management Summary The Anglesea Heath (6,501 ha) was incorporated into the Great Otway National Park in January 2018. This provides an opportunity to consider the
More informationTOWN OF PORT HEDLAND INNOVATE RECONCILIATION ACTION PLAN
TOWN OF PORT HEDLAND INNOVATE RECONCILIATION ACTION PLAN www.porthedland.wa.gov.au Chief Executive Officer s Message The Town of Port Hedland is committed to reconciliation with its Aboriginal and Torres
More informationEstablishing a National Urban Park in the Rouge Valley
STAFF REPORT ACTION REQUIRED Establishing a National Urban Park in the Rouge Valley Date: March 29, 2012 To: From: Wards: Reference Number: Executive Committee Deputy City Manager, Cluster B All p:\2012\cluster
More informationBACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM
BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant
More informationGeorgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.
Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide
More informationRegional Wayfinding Sign Strategy Thurston County Trails 2017
Regional Wayfinding Sign Strategy Thurston County Trails 2017 Partners: Members and partnering organizations of the Thurston Thrives Community Design Action Team City of Lacey, City of Olympia, City of
More informationACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN
Doc. 1S-26-O-11-5/1-2 ACTION PLAN FOR THE PERIOD 2011-2015 concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN April 2011 Table of Contents INTRODUCTION... 5 1.
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationSection II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.
Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection
More informationParkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan
Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference
More informationWelcome. Green Line in Your Community
Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.
More information8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT
8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner
More informationThis page has been intentionally left blank.
This page has been intentionally left blank. Chapter 2 2-2 2. Growing the Economy In many ways, the Niagara Region is a community of communities and this is becoming increasingly so. It is made up of towns
More informationRidership Growth Strategy (RGS) Status Update
For Information Ridership Growth Strategy (RGS) Status Update Date: July 10, 2018 To: TTC Board From: Deputy Chief Executive Officer Summary The TTC s Ridership Growth Strategy (RGS), with all its components,
More informationMohawk Hudson Bike Hike Trail Crossroad Connection Study
Summary Report - April 21, 2003 Mohawk Hudson Bike Hike Trail Crossroad Connection Study Summary Report Introduction The Capital District Transportation Committee (CDTC), in partnership with Albany County,
More informationChina Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017
China Creek North Park Upgrades and Glen Pump Station Park Board Committee Meeting Monday, July 10, 2017 Purpose The purpose of this presentation is to: Share the results of the public engagement processes;
More informationJOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012
1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley
More informationBloor Street West Rezoning Application for a Temporary Use By-law Final Report
STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council
More informationSTUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES
INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes
More informationEngagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.
Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018 Engagement Summary Report April 2018 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada Highway 1
More informationPARKLAND COUNTY TOURISM ACTION PLAN
PARKLAND COUNTY TOURISM ACTION PLAN 2018-2020 CONTENTS Introduction............................................... 05 Organizational Alignment.................................. 07 Action Plan Development..................................
More informationThe Future of the Road to Revolutions. A Battle Road Scenic Byway Public Forum November 9, 2010
The Future of the Road to Revolutions A Battle Road Scenic Byway Public Forum November 9, 2010 Who is the Battle Road Scenic Byway? Four Towns: Arlington, Lexington, Lincoln, Concord Minute Man National
More informationGeneral Issues Committee Item Transit Operating Budget Ten Year Local Transit Strategy
General Issues Committee Item 4.1 2017 Transit Operating Budget Ten Year Local Transit Strategy January 27, 2017 Presentation Outline 2017 Operating Budget Overview Ten Year Local Transit Strategy 2 2017
More informationOREGON TOURISM LISTENING SESSION SUM M ARY
OREGON TOURISM LISTENING SESSION SUM M ARY June 2018 T O U R I S M L I S T E N I N G S E S S I O N O V E R V I E W Travel Oregon, in partnership with the Central Oregon Visitors Association, hosted an
More informationPart four. In this part you will find: The next steps to deliver the master plan
Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master
More informationCREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017
CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than
More informationSUSTAINING OUR ENVIRONMENT, PLANNING FOR OUR FUTURE
SUSTAINING OUR ENVIRONMENT, PLANNING FOR OUR FUTURE Key Recommendations to Inform the 2015 Provincial Review of the Oak Ridges Moraine Conservation Plan APRIL 2015 KEY RECOMMENDATIONS TO INFORM THE 2015
More informationPARKS, RECREATION AND WATERFRONT ADVISORY COMMITTEE
PARKS, RECREATION AND WATERFRONT ADVISORY COMMITTEE Bell Homestead National Historic Site 94 Tutela Heights Rd. Wednesday, November 27, 2013 4:30 p.m. Present: Chair S. McMannis, Councillor L. Kings, E.
More informationDogpatch Community Task Force Meetings. April 24, 2017 Meeting #6
Dogpatch Community Task Force Meetings April 24, 2017 Meeting #6 Agenda I. Welcome and Introductions II. Agenda Overview, Recap of Meeting #5 and Dogpatch Community Task Force Process III. Comments from
More informationINFORMATION ONLY. Subject: Metrolinx Presentation Date: June 22, 2015
INFORMATION ONLY Subject: Metrolinx Presentation Date: June 22, 2015 At its meeting on June 22, 2015, the TTC Board will receive a presentation on Metrolinx from Robert Prichard, Metrolinx Board Chair
More informationRegion of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development
Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development To: Chair Tom Galloway and Members of the Planning and Works Committee
More informationMetrolinx Projects: Temporary Delegation for Long- Term Road Closures
PW29.1 REPORT FOR ACTION Metrolinx Projects: Temporary Delegation for Long- Term Road Closures Date: April 24th, 2018 To: Public Works and Infrastructure Committee From: General Manager, Transportation
More informationEngagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017
Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project Community Engagement November 15, 2016 to January 15, 2017 Engagement Summary Report February 2017 Prepared by Kirk & Co. Consulting Ltd. Trans-Canada
More informationEXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND
EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE As the culmination of the first phase of the master planning process, this Program Development Report creates the framework to develop the Calero County
More informationLINCOLNSHIRE PARKING POLICY DRAFT
LINCOLNSHIRE PARKING POLICY DRAFT Draft 17/11/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take
More information2 YORK REGION TRANSIT MOBILITY PLUS 2004 SYSTEM PERFORMANCE REVIEW
2 YORK REGION TRANSIT MOBILITY PLUS 2004 SYSTEM PERFORMANCE REVIEW The Joint Transit Committee and Rapid Transit Public/Private Partnership Steering Committee recommends the adoption of the recommendation
More informationWaterfront Concept Plan: Community Survey Summary
Waterfront Concept Plan: Community Survey Summary Published April 20, 2016 #1100085 Introduction The survey was one component of the public consultation process endorsed by Council in October, 2015. This
More informationThe Vision for the San Juan Islands Scenic Byway
The Vision for the San Juan Islands Scenic Byway 2 Judd Cove, Orcas Island, Courtesy of Kurt Thorson (kurtthorson.com) and San Juan County Land Bank Vision for the San Juan Islands Scenic Byway The San
More informationMinistry of Parks, Culture and Sport. Plan for saskatchewan.ca
Ministry of Parks, Culture and Sport Plan for 2018-19 saskatchewan.ca Table of Contents Statement from the Minister... 1 Response to Government Direction... 2 Operational Plan... 3 Highlights... 7 Financial
More informationHaldimand County TRAILS MASTER PLAN and PARTNERSHIP FRAMEWORK STUDY
Haldimand County TRAILS MASTER PLAN and PARTNERSHIP FRAMEWORK STUDY Table of Contents 1.0 INTRODUCTION...1 1.1 THE NEED FOR A TRAILS MASTER PLAN...1 1.1.1 Background and Policy Context...3 1.2 THE STUDY
More informationWelcome to the future of Terwillegar Park a Unique Natural Park
Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines
More informationRE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above.
Iain Macleod Project Manager Victoria Road upgrade Roads and Traffic Authority PO Box 743 Drummoyne NSW 1470 e : Victoria_Road_Info@rta.nsw.gov.au 21 February 2008 RE: Victoria Road upgrade (RTA December
More informationBorders Railway - Scottish Borders Work Plan
Borders Railway - Scottish Borders Work Plan March 2015 This Scottish Borders Work Plan sets out the short, medium and longer term actions that the Council and other local partners need to take to ensure
More informationPLANNING THE SUNBURY GROWTH CORRIDOR
SUNBURY GROWTH CORRIDOR NOVEMBER 2016 PLANNING THE SUNBURY GROWTH CORRIDOR Sunbury Planning Background The Victorian Planning Authority, in consultation with Hume City Council, is undertaking a number
More informationExhibition Place Service Level Review
Exhibition Place Service Level Review Standing Committee Presentation June 30, 2015 Overview Recommended Service Levels by Program Program Map Service Levels and Service Performance Service Challenges
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the
More informationKelly Field at Port San Antonio Airport Master Plan
Kelly Field at Port San Antonio Airport Master Plan Board of Directors / Steering Committee Briefing Today s Agenda What is an Airport Master Plan? Master Planning Process and Project Background Community
More informationMercer Island Town Center Stakeholder Meeting E. June 10, 2015
Mercer Island Town Center Stakeholder Meeting E June 10, 2015 DATE Tue. June 16 (5:30 7:30 pm) Wed. June 24 (5:30-7:00 pm) Council Chambers Tue. June 30 (5:30 8:30 pm) July 11/12 Thur. July 16 (5:30 7:30
More informationPlanning and Building Department
Page 1 of Report PB-27/11 CITY OF Burlington Planning and Building Department TO: Chair and Members of the Community Development Committee SUBJECT: Niagara Escarpment Plan Amendment 179 (NEPA 179) Addition
More informationNorthern Rockies District Value of Tourism Research Project December 2007
Northern Rockies District Value of Tourism Research Project December 2007 Project Partners: Northern Rockies Regional District, Tourism British Columbia, Northern Rockies Alaska Highway Tourism Association,
More informationTourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)
Tourism Development Framework for Scotland Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016) Introduction The Tourism Development Framework for Scotland refresh 2016:
More informationCrown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan
Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR 2014 2015 Trade Centre Limited Business Plan 2014 2015 Table of Contents Message from the CEO and the Chair... Mission... Planning Context... Strategic
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011
Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA
More informationSPLASH PAD EVALUATION SUMMARY REPORT January 2016
Public Utility District No. 1 of Chelan County Public Power Benefit Recreation and Parks Phase: Pre-feasibility For full report, refer to Appendix A SPLASH PAD EVALUATION SUMMARY REPORT January 2016 Photo
More informationCrown Corporation Business Plans. Trade Centre Limited
Crown Corporation Business Plans Trade Centre Limited Contents Message from the CEO and the Chair... 5 Mandate... 7 Alignment with Government s Priorities... 7 Core Responsibilities... 9 Budget Context...
More informationInternational Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview
International Civil Aviation Organization Aviation System Block Upgrade (ASBU) Methodology An Overview Outline Today s Challenges Tomorrow s Needs Why ASBU methodology ASBU explanation Global Plan Next
More informationMAC Meeting. February 2, 2017
MAC Meeting February 2, 2017 Community Engagement Over 1,000 stakeholders consulted Board and Staff workshops 90 participants 9 Focus Groups (arts & culture, festivals/music, hotels, dining & beer, sports,
More informationImplementation Strategy for the Lethbridge Destination Management Organization (LDMO)
Implementation Strategy for the Lethbridge Destination Management Organization (LDMO) IMPLEMENTATION AND TRANSITION STRATEGY LDMO MANDATE: To establish a destination management organization that provides
More informationBelfountain Complex - Stakeholder Advisory Committee Meeting Belfountain Conservation Area Property Tour Date: Time: Meeting Purpose
Belfountain Complex - Stakeholder Advisory Committee Meeting Belfountain Conservation Area Property Tour Date: Thursday, October 9, 2014 Time: 6:00pm 7:30pm Meeting Purpose: A tour of Belfountain Conservation
More informationThis Executive Summary highlights the results of a multi-year planning process and includes recommendations of the New Jersey Trails Plan.
Purpose and Scope The New Jersey Trails Plan presents a renewed vision, goals and strategic actions to help guide the efforts of all those who plan, build, operate and maintain New Jersey s trails. Building
More informationHillsborough MPO Technical Advisory Committee. Monday, February 20, 2017
Hillsborough MPO Technical Advisory Committee Monday, February 20, 2017 1 Study Purpose Support the vision for a livable, connected, and competitive downtown. Evaluate alternatives for the system s modernization
More informationDATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1
M E M O R A N D U M DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America RE: Accessible Trails Checklist 1 The purpose of the Accessible Trails Checklist (below) is to help the community review
More information(905) , Extension 2725
TO: CITY OF HAMILTON CITY MANAGER S OFFICE Strategic Partnerships and Communications and PUBLIC WORKS DEPARTMENT Energy, Fleet & Facilities Management Division Mayor and Members General Issues Committee
More informationWELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION
WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,
More informationCredit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel:
Sub:Selection of Consultants for preparation of eco-tourism management plan forvedaranyam area in Tamil Nadu. ICZMP (Integrated Coastal Zone Management Project) Credit No. 4765 0 IN Amendment #1 The TOR
More informationTrail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding
I. Welcome / Introductions Bethany Creek Trail #2 Segment 3 Neighborhood Meeting #1 Bethany Presbyterian Church 15505 NW Springville Road, Portland, OR 97229 Tuesday, June 26, 2018 @ 6:00PM Meeting Minutes
More informationPSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information
PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate
More information2012 Performance Framework AFI
2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical
More information2016 Regional Transportation Alternatives Program (TAP) Grant Application
2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City
More information