1 Reference Number YPPH Date of DRAFT Issue 12 th May2017 Amendment Number Date of Amendment CONTENTS: PERTH AIRPORT TERMINAL 4 APRON TAXIWAY REALIGNMENT AND TAXIWAYS DELTA, BRAVO AND WHISKEY CATEGORY III UPGRADE DRAFT METHOD OF WORKING PLAN 1. Work Information 2. Restrictions to Aircraft Operations 3. Restrictions to Works Organisation 4. Administration 5. Authority 6. Drawings 7. Distribution List 8. Commissioning Date of DRAFT Approval 12 th May 2017 Estimated Commencement Date 9 th June 2017 Estimated Completion date 29 th June 2017 Expiry Date Amendment Index Amendment number Date Amended by (Position title) Reasons & details of change/s Amendment approved by (Position title) Signature Date

2 1. WORKS INFORMATION 1.1 Description of Works This Method of Working Plan (MOWP) details the realignment and upgrade of the Terminal 4 Apron Taxilane behind Bays 7 to 10, to a full Code C Taxiway and the introduction of a new rear of stand road behind bays 7 to 10. Stand-off bays 1 & 2 will be decommissioned to introduce a new road intersection and a zipper crossing, this crossing will replace the existing zipper crossing behind bay 12 which will also be removed at the end of Stage 1. This MOWP also includes the next package of works for the upgrade of lighting infrastructure for Category III operations. This encompasses the installation of all the remaining new taxiway light fittings for the Terminal 4 Apron Taxiway (behind bays 7-10), Terminal 3 Apron Taxiway (behind bays ), Taxiway Bravo, Taxiway Whiskey and Taxiway Delta. Two sets of intermediate holding point lights are also to be installed on Taxiway Charlie. Works will be completed in 6 stages over approximately 18 working days. Works will include: - Removal of old line markings; - Set out and painting of new taxiway and roadway markings; - Removal of A321 parking positions on bays 8 & 10; - Changes to the Bay 10 lead-in line, alignment line and parking positions; - The installation of in pavement conduit and secondary cabling; - The installation of new taxiway centreline light fittings; - Installation of intermediate holding points As a result of the works outlined above the following facilities will be affected: - Taxiways: Terminal 3 & 4 Apron Taxiways Taxiway Bravo Taxiway Delta Taxiway Whiskey Taxiway Charlie - Taxiway Links: Link 1 & Link 2 Link 4 - Aprons & Bays: Bays 7 to 10 Bays Execution of Works Timings Works are scheduled to commence at 0700hrs (WST) on 9 th June 2017 and be completed by 1700hrs (WST) 29 th June The works program is based on a 6 day working week from Monday to Saturday. Restrictions for all stages (except for Stage 5) will be in place H24. Stage 5 restrictions will be in place from daily. Contractors may request to work outside the nominated hours however the work must not cause any further restrictions to aircraft operations than those detailed within this MOWP. Perth Airport Pty Ltd DRAFT MOWP YPPH

3 1.3 Sequence of Works The works will be conducted in 6 stages, as detailed in attached drawings, FS Sheet 1 to FS Sheet 7. Listed below, as required by the Manual of Standards (MOS) - Part 139 Aerodromes, are the stage commencement and completion dates only. Stage: Commencement Date: Completion Date: Stage 1 T4 Apron Twy Realignment 09/06/ (WST) 17/06/ (WST) Stage 2 Twy Bravo 09/06/ (WST) 12/06/ (WST) Stage 3 Twy Whiskey 19/06/ (WST) 20/06/ (WST) Stage 4 Twy Delta 19/06/ (WST) 29/06/ (WST) Stage 5 T3 Apron Twy behind /06/ (WST) 23/06/ (WST) Stage 6 Twy C between Twy P & Link 4 24/06/ (WST) 24/06/ (WST) Notes: The dates shown in the table above are estimated and may change once work commences. Actual dates will be promulgated via NOTAM which will be published not less than 48 hours prior to the commencement of the MOWP and not less than 24 hours prior to a change of a stage. This MOWP will not be amended for changes to estimated dates unless the change exceeds 1 week. 1.4 Stage Planning Stage 1 T4 Apron 2 Twy B 3 Twy W 4 Twy D 5 T3 900s 6 Twy C June M T W T F S S M T W T F S S M T W T F S S M T W T F S S July Day Shift Working Days - restrictions H24, unless specified Non-working Day Restrictions still in place Perth Airport Pty Ltd DRAFT MOWP YPPH

4 2. RESTRICTIONS TO AIRCRAFT OPERATIONS 2.1 Location and Duration of Works Stages STAGE 1 Work: Realignment of Terminal 4 Apron Taxiway behind Bays 7 to 10 Estimated Duration: 9 days H24 (8 working days) Airfield Restrictions: Terminal 4 Apron Taxiway west of bay 12 not available; Link 1 and Link 2 not available; Bays 7-10 and SO1 & SO2 not available (vacant) Note: During line removal and marking vehicle detours will be in place STAGE 2 Work: Category III Lighting Installation on Taxiway Bravo Estimated Duration: 4 days H24 (3 working days) Airfield Restrictions: Taxiway Bravo not available between Taxiway Hotel and Bay 703; Pushback from Bay 703 tail north only; STAGE 3 Work: Category III Lighting Installation on Taxiway Delta Estimated Duration: 11 days H24 (10 working days) Airfield Restrictions: Taxiway Delta not available Taxiway Hotel 3 not available Taxiway Alpha not available north of Runway 06/24 STAGE 4 Work: Category III Lighting Installation on Taxiway Whiskey between Taxiway Romeo & Hotel Lane Estimated Duration: 2 days H24 Airfield Restrictions: Taxiway Whiskey not available between Taxiway Romeo & Hotel Lane Perth Airport Pty Ltd DRAFT MOWP YPPH

5 STAGE 5 Work: Category III Lighting Installation on Terminal 3 Apron Taxiway west of Taxiway Juliet 1 Estimated Duration: 2 days Daily Airfield Restrictions: Terminal 3 Apron Taxiway not available west of Taxiway Juliet 1; Taxiway Victor north of Runway 06/24 not available; Bays available for parking only between WST (not available for arrivals or departures) STAGE 6 Work: Intermediate Holding Point Light Installations Estimated Duration: 1 day Taxiway Charlie not available between Taxiway Papa and Link 5 Link 4 not available; Taxiway Charlie, C6, C9 and C11 not available Code D and above; Arrivals on Rwy 03 bound for Bays must exit at Taxiway P or later; Arrivals on Rwy 21 bound for Bays must exit Runway 21 to the right. Code C aircraft and below may exit Runway 21 at Taxiway Papa (refer local traffic regulations) Departures from Bay 146 and 147 to push back tail west and tow forward to the 143, 144 & 145 disconnect marking; Perth Airport Pty Ltd DRAFT MOWP YPPH

6 2.2 Emergency Information Aircraft Emergencies, Medical Emergencies & Diversions Due to the nature of the works, re-opening of closed portions of the movement area for emergencies will be dependent on serviceability of the closed areas. Airport Emergencies If an incident should occur at Perth Airport and emergency procedures are activated as detailed in the Perth Airport Aerodrome Emergency Plan, based on the size and scale of the incident, works may be temporarily suspended or ceased for that particular shift. The Works Safety Officer (WSO) supervising the works site is responsible for communicating suspensions or cessations to the works party during an emergency. For extended emergencies the Perth Airport, Emergency Co-ordination Centre (ECC) will determine if the restricted parts of the manoeuvring area can be made available to assist in the recovery from an emergency. Due to the nature of the reconstruction, an Aviation Rescue & Fire Fighting (ARFF) vehicle route will NOT be provided through the works site. During all stages there will be sufficient room between the work site and the apron roadway or other taxiways that the ARFF may utilise. ARFF should, as a first resort, request routing from ATC that avoids active works areas. ARFF vehicles responding to an incident in close proximity to an active work site shall be limited to a maximum speed of 40km/h. Airport/Airfield Emergency Notification (to WSO) Upon declaration of an Airfield or Airport Emergency the Senior Airport Operations Officer is responsible for notifying all site supervising Works Safety Officers. The SAOO will advise the nature of the emergency and whether or not a specific works site will be affected by the response (e.g. cessation of works/removal from site). 2.3 Markers, Markings & Lighting Unserviceability Markers & Lights During the works the closed portions of the manoeuvring area will be marked by red and white unserviceability markers and red lights, in accordance with the Manual of Standards (MOS) - Part 139 Aerodromes. Works Limit Markers The works area will be marked by works limit lines and amber lights. Where required, an alternative colour marker (cones) will be use to define pull back limits as detailed in attached drawings, FS-10161Sheet 2 to FS-10161Sheet 7. Works Safety Officers may, at their discretion, reduce the works area. However, doing so must not cause any further restrictions to aircraft operations than those detailed within this MOWP. Lighting All lighting within and directly leading into the closed movement area will be extinguished either by electrical isolation or by physical mean (covering or blanking). Extinguished lighting will be as shown in attached drawings, FS Sheet 2 to FS-10161Sheet 7. Lights will be reinstated by the end of each stage. Separate NOTAMs will be published for lighting outages. Perth Airport Pty Ltd DRAFT MOWP YPPH

7 General The Works Safety Officer is to ensure all markings and markers are appropriately maintained for the duration of the works. Aerodrome markings and markers in areas affected by the works will be provided by, or placed under the direction of the Works Safety Officer in accordance with the MOS and this MOWP appropriate to the plans for each stage. Temporary markings and lights must not be installed, altered or removed without the authority of the Works Safety Officer. Markings will be reinstalled as soon as pavement conditions allow if those pavements are to become operational at the completion of the works period. 2.3 Adverse Weather & Low Visibility Operations Adverse weather such as very heavy showers, storms or fog may result in a cancelled works shift. Perth Airport, Air Traffic Control (ATC) and the Contractor will consult as a group prior to each shift to determine if the weather forecast is not suitable for works to commence. Should adverse weather such as very heavy showers, storms or fog generate after works have begun Perth Airport, ATC and the Contractor will consult as a group to determine if the weather event requires a suspension During declared Low Visibility Operations all works shall be ceased. Re-opening of closed portions of the movement area will be dependent on serviceability of the closed areas. Perth Airport Pty Ltd DRAFT MOWP YPPH

8 2.4 NOTAM Information The Works Safety Officer is to initiate the appropriate NOTAM through the Australian NOTAM Office (NOF). The NOTAM associated with the works will be issued not less than 48 hours prior to the commencement of the works and 24 hours prior to a change of stage. Refer to Works Schedule for date and times of closures. STAGE 1 NOTAM N A) YPPH B) DATE 2300 UTC C) DATE 0900 UTC E) TERMINAL 4 APN TWY BTN LINK 2 AND BAY 12 NOT AVBL LINK 1 AND LINK 2 NOT AVBL REF METHOD OF WORKING PLAN YPPH STAGE 1 STAGE 2 NOTAM N A) YPPH B) DATE 2300 UTC C) DATE 0900 UTC E) TWY B BTN TWY H AND BAY 703 NOT AVBL REF METHOD OF WORKING PLAN YPPH STAGE 2 STAGE 3 NOTAM N A) YPPH B) DATE 2300 UTC C) DATE 0900 UTC E) TWY D NOT AVBL TWY H3 NOT AVBL TWY A N OF RWY 0624 NOT AVBL REF METHOD OF WORKING PLAN YPPH STAGE 3 STAGE 4 NOTAM N A) YPPH B) DATE 2300 UTC C) DATE 0900 UTC E) TWY W BTN TWY R AND H LN NOT AVBL REF METHOD OF WORKING PLAN YPPH STAGE 4 STAGE 5 NOTAM N A) YPPH B) DATE 2300 UTC C) DATE 0900 UTC D) DAILY E) TWY V N OF RWY 06/24 NOT AVBL TERMINAL 3 APN TWY WEST OF TWY J1 NOT AVBL REF METHOD OF WORKING PLAN YPPH STAGE 5 Perth Airport Pty Ltd DRAFT MOWP YPPH

9 STAGE 6 NOTAM N A) YPPH B) DATE 2300 UTC C) DATE 0900 UTC E) TWY C BTN TWY P AND LINK 5 NOT AVBL LINK 4 NOT AVBL TWY C6, C9, C11 AND TWY C S OF LINK5 NOT AVBL CODE D AND ABOVE ARR RWY 03 FOR BAYS EXIT TWY P OR LATER ARR RWY 21 FOR BAYS EXIT TWY RIGHT EXC CODE C AND BELOW MAY EXIT AT TWY P REF METHOD OF WORKING PLAN YPPH STAGE 6 Perth Airport Pty Ltd DRAFT MOWP YPPH

10 3. RESTRICTIONS TO WORKS ORGANISATION 3.1 Work Sites and Access Routes All personnel associated with the work shall be bound by the instructions issued by the Works Safety Officer. All Contractors or Sub-Contractors must be directly supervised by a Works Safety Officer at all times. Works will be confined to the areas shown on the drawings. The Contractor will observe the Limit of Works markers and remain within the defined area as detailed in the stage drawings. No movement of vehicles or plant may occur outside the defined work areas without the prior approval of the Works Safety Officer. All vehicles must have an escort to travel within the aircraft movement area or as directed by the Works Safety Officer. The Works Manager or Contractor Superintendents are responsible for ensuring that no children, non-essential visitors or animals approach the access gates to request access under any circumstances. With regard to aircraft safety and airport security, this MOWP will take precedence over other contract documents that may be in place for any person to carry out works at the Airport. 3.2 Security and Emergency All personnel entering the work site must display either a current ASIC or a Visitor Identification Card. These cards or passes must be displayed at all times. The Contractor's Superintendents will be responsible for the employees, subcontractors and personnel under their control. The Works Safety Officer may refuse access to persons who in their opinion are likely to present a safety risk to airfield operations. Communicating Incidents to Perth Airport The contractor is responsible for ensuring that Emergency Incidents are reported to the Airport Control Centre (ACC) on This includes fires or hazards. Upon notification to ACC the WSO supervising the works site must be notified. All life threatening incidents must be reported to Emergency Services on Induction & Briefings All personnel requiring entry to the site for a period in excess of 2 working days must have attended a Perth Airport Airside Works Induction for the Cat III project. The induction is specific to this project and cannot be transferred to other work sites not included in this MOWP. The Contractors superintendents, following approval from Perth Airport, may carry out the inductions. The Contractor superintendents are responsible for notifying Perth Airport of all new staff, Contractors or Subcontractors and ensuring inductions a completed. Prior to the commencement of each period of works, the Project Managers representative, the Contractors representative and the Works Safety Officer will meet with the Contractors, Sub-contractors and their personnel for a tool box meeting to discuss the day s works, incidents or any other matter of safety. Perth Airport Pty Ltd DRAFT MOWP YPPH

11 3.4 Smoking Smoking airside is a fire and FOD risk and is not permitted airside at Perth Airport. 3.5 Equipment Storage At the end of each work period, all mobile plant and equipment must be stored inside the storage area. No vehicles, plant or equipment may be left within works sites outside of works hours unless it is contained within the defined storage area. 3.6 Vehicle/Equipment Condition All vehicles and plant shall be in full working condition to ensure full mobility around the work areas as required. Unserviceable or mechanically unsound vehicles and plant shall be removed from the work area as directed by the Works Safety Officer or the Project Manager and shall be replaced by fully serviceable plant. All vehicles and plant must have a flashing amber beacon operational whilst moving airside. 3.7 Cleanliness of Work Sites Foreign Object Debris (FOD) is any item (from small stones to equipment) on the manoeuvring area that is not intended to be there. FOD is a significant hazard to aircraft operations. The Contractors must leave the works area in an acceptable operational condition to the full satisfaction of the Works Safety Officer prior to the completion of the work period. This is an essential safety requirement which must be achieved within the prescribed time periods for each stage to ensure minimal disruption to airfield operations. The Contractors shall be responsible for the cleanliness of the work areas together with its access routes for the duration of the works. All loose material and equipment must be secured against movement in strong wind or by aircraft jet blast. The occurrence of dust, debris and loose foreign materials is to be minimised to the satisfaction of the Works Safety Officer. The Contractors shall employ continuous approved methods of dust suppression and debris removal throughout the duration of the works and at other times when directed by the Works Safety Officer. Where the Contractor is required to supply a sweeper it must not be fitted with steel wire brushes, but shall be fitted with non-metallic brushes of nylon or other approved material. It shall be operated by a dedicated and experienced responsible person and shall be available at all times during every work period. The Contractors shall supply after hours contact details should emergency sweeping be required. Vehicles transporting materials to or from the site shall, prior to movement be cleaned in all areas where materials may lodge including body rails, wheels, wheel arches, tailgates and rear fittings to the full satisfaction of the Works Safety Officer. 3.8 Jet Blast Jet Blast is the exhaust (thrust) from aircraft engines which, for a Boeing 777, can reach a velocity of 400kph. Works sites have been assessed for potential exposure to jet blast. All stages that incorporate a pullback area should be considered at risk of jet blast. However, on all works sites, jet blast remains a constant hazard at Perth Airport and all works personnel should use caution when working close to operational runways and taxiways or behind aircraft. Light materials, tools and equipment should be secured at all times when not in use (or where possible, when in use) if there is a risk of exposure to jet blast. Perth Airport Pty Ltd DRAFT MOWP YPPH

12 3.9 Vehicle Critical Areas Vehicle Critical Areas (VCA) are protected areas around air navigation equipment. No works are planned to take place within an active VCA and as a result all vehicles will remain clear of sensitive areas Height Restrictions Obstacle Limitation Surfaces (OLS) are a series of surfaces that set the height limits of objects, in and around an aerodrome. Vehicles, plant and equipment are restricted to 9m in height for all works stages. Operations above 9m may require specific written approval from the aerodrome operator. This approval is normally provided by the issuing of a Crane Permit via the Perth Airport Protected Airspace Assessment Tool (PAAT) available via the following link Crane Permits do not constitute an approval for the operation itself; it is a permit to operate at a nominated height above ground. The Contractor is to ensure any other approval required under the Construction Safety Management Plan for the operation is obtained Protection of Electrical Services Perth Airport Pty Ltd has an Excavation Permit Procedure (EPP) which ensures pre-planning is undertaken to manage all risks associated with excavation and it is critical that the EPP is followed prior to any excavation proceeding. The EPP includes specific more extensive pre-planning procedures for High Risk Excavation. The EPP ensures the following is completed by Managers and Contractors during the pre-planning phase: 1. Identifying in advance of Excavation whether it is High Risk Excavation for the purposes of the Buried Services Disturbance Major Hazard Management Plan. 2. Causing appropriate procedures to be in place for the effective identification of Buried Services in the area to be excavated. 3. Causing appropriate methods of Excavation to be identified having regard to the nature of the Buried Services. 4. Identified who within PAPL is responsible for ensuring that the procedures for identifying Buried Services and performing the Excavation are properly implemented. 5. Identified who on behalf of the contractor is responsible ensuring implementation of the methods of work that have been identified during the planning phase. 6. In relation to High Risk Excavation Zone, identifying the specific direct supervision that will be in place during the Excavation Construction Safety Management Plan (CSMP) & Environmental Management Plan (EMP) The Contractor is required to have an approved CSMP & EMP for the works. These Restrictions to Works Organisations are not intended in any way to change, alter or remove the Contractors obligations under the CSMP or EMP. Particular areas of concern for airside safety are; The immediate reporting of damage to any airside facilities, regardless of the severity, to the Project Manager or the Works Safety Officer. The immediate reporting of incidents and near misses, regardless of the severity, to the Project Manager or the Works Safety Officer. Provision for hot works permits airside. Procedures for the containment and clean-up of any fluid spill. The Drug and Alcohol Management Plan. The wearing of hi visibility clothing at all times, compliant for the conditions (day or night). The protection of buried services. Perth Airport Pty Ltd DRAFT MOWP YPPH

13 4. ADMINISTRATION 4.1 Works Organisation Perth Airport Pty Ltd and its Contractors and Sub-contractors will undertake the works. 4.2 Works Manager The Works Manager is the Contractor s Site Representative, as nominated by the contractor. The Works Manager shall remain responsible on behalf of the works organisation for complying with the requirements of this MOWP. Contact details of the Works Manager are; Contractor Works Manager Ryan Oliver ryan.oliver@westcoastcivil.com.au After Hours: Ryan Oliver Project Manager Perth Airport Pty Ltd will manage the project, the Project Manager for the Category III upgrade is: Project Manager Cat III Don Bridges (08) Don.bridges@perthairport.com.au After Hours: Don Bridges Perth Airport Pty Ltd DRAFT MOWP YPPH

14 4.4 Works Safety Officer The Works Safety Officer shall be nominated by the Airside Operations Manager. A list of nominated Works Safety Officers can be found within the Perth Airport Aerodrome Manual at Attachment 3 of Part 2, Section 8 Aerodrome Works Safety. Works Safety Officers can be contacted as per below: Senior Works Safety Officer: As rostered (08) or Senior Airport Operations Officer As rostered (08) or This Works Safety Officer has responsibility for all aviation safety matters relating to the works. The Works Safety Officer is responsible for ensuring that the work, in so far as it affects the safety of aircraft, is conducted in accordance with the requirements of this MOWP and MOS Part 139. The Works Safety Officer s responsibilities include, but are not limited to the following; Ensure the safety of aircraft operations in accordance with the standards for aerodrome works and this MOWP; Ensure that, where applicable, the aerodrome works are notified by issue of a NOTAM and that the text of each NOTAM is exactly as set out in this MOWP; Supply the ATC Line Manager, on a daily basis, with whatever information is necessary to ensure the safety of aircraft operations, via the Perth Tower recorded line; Discuss with the works organisation, on a daily basis, any matters necessary to ensure the safety of aircraft operations; Ensure that unserviceable portions of the movement area, temporary obstructions, and the limits of the works area are correctly marked and lit in accordance with MOS Part 139 Paragraph , and this MOWP; Ensure that the vehicles, plant and equipment carrying out aerodrome works are properly marked and lit or are under works safety officer supervision or within properly marked and lit works area; Ensure that all other requirements of the directions and MOWP relating to vehicles, plant, equipment and materials are complied with; Ensure that access routes to work areas are in accordance with the applicable MOWP and clearly identified and that access is restricted to these routes; Ensure that excavation is carried out in accordance with this MOWP and, in particular, so as to avoid damage or loss of calibration to any underground power or control cable associated with a precision approach and landing system or any other navigational aid; Report immediately to the air-traffic controller and the Airside Operations Manager any incident, or damage to facilities, likely to affect air-traffic control services or the safety of aircraft; Remain on duty at the works area while work is in progress and the aerodrome is open to aircraft operations; Ensure that ATC is kept informed of the radio call signs of the vehicles used by the works safety officer; Require the immediate removal of vehicles, plant and personnel from the movement area where necessary to ensure the safety of aircraft operations; Ensure that the movement area is safe for normal aircraft operations following removal of vehicles, plant, equipment, personnel and FOD from the works area; In the case of time-limited works, ensure that the works area is restored to normal safety standards not less than 5 minutes before the time scheduled or notified for an aircraft movement; and Ensure that floodlighting or any other lighting required for carrying out aerodrome works is shielded so as not to represent a hazard to aircraft operations. Perth Airport Pty Ltd DRAFT MOWP YPPH

15 4.5 Airside Safety Management The Airfield Operations Team are responsible for the development and execution of the MOWP. Questions related to the MOWP or execution of works may be directed to; Airside Operations Manager: (Responsible for day to day operations.) Chris Fox (08) Airside Works Coordinator: (Responsible for MOWP development.) Liam Smith (08) General Manager Airfield Operations: (Overall responsibility for airside safety.) Robert Mikhail (08) After Hours: Senior Airport Operations Officer As rostered (08) N/A After Hours: Distribution and Acknowledgment This MOWP will be distributed via the Perth Airport Pty Ltd Extranet. Those organisations listed in section 7 will receive an and link to the document. It is essential that acknowledgement of the DRAFT MOWP YPPH is received by Perth Airport via or by survey to the Airside Works Coordinator liam.smith@perthairport.com.au prior to 25 th May 2017 Perth Airport Pty Ltd DRAFT MOWP YPPH

16

17 6. DRAWINGS The drawings associated with MOWP YPPH are attached as FS-10161Sheet 1 to FS-10161Sheet 7. Stage MOWP Staging Overview FS-10161Sheet 1 Stages 1-6 FS-10161Sheets 2-7 Perth Airport Pty Ltd DRAFT MOWP YPPH

18 7. DISTRIBUTION This MOWP will be distributed to those organisations and agencies listed below. Essential Contacts: Ad Astral Aviation Aero Care Air Asia X Airflite Air Mauritius Air New Zealand Air North Airport Coordination Australia Airservices Australia (ATC, ARFF, MTCE, NOF) Alliance Airlines AvWest Awesome Aviation CASA Cathay Pacific China Southern Cobham Aviation Cobham Special Operations Emirates Etihad Airways Garuda Indonesia Hawker Pacific Jetstar Malaysia Airlines Maroomba Airlines Maxem Aviation Network Aviation Perth Flight Centre Qantas Airways Limited Qantas Freight Qatar Airways Remorex Pty. Ltd. Regional Express (Rex) Royal Flying Doctors Scoot Airlines Singapore Airlines Skippers Aviation Skystar Airport Services South African Airways Star Aviation Thai Airways Tigerair Australia Toll Priority Virgin Australia Virgin Australia Regional Airlines Information Contacts: Aeroadapt Air BP Aircraft Maintenance Services Australia Airwork Flight Operations Aviation Management Aviation Performance Systems EuroNautical Execujet Flight Focus Jeppesen JMI Aerospace Limited Menzies Aviation Navtech Systems Support Inc Perth Airport Pty Ltd Perth In-flight Catering RAAF Base Pearce Royal Aero Club of Western Australia Safe Gate West Coast Civil JV Singapore Air Cargo Singapore Flying School Shell Weston Aviation Perth Airport Pty Ltd DRAFT MOWP YPPH

19 8. COMMISSIONING At the completion of each stage an inspection shall be conducted by Perth Airport Airfield Operations, Electrical, Assets & Project Teams. A Commissioning Inspection Checklist & Certificate shall be completed, for all new infrastructure, by the Project Manager as verification that the works have been completed to the satisfaction of the Airport Civil Engineer and General Manager Airfield Operations or delegated authority/s that the area meets the requirements of the CASR Part 139 and MOS Part 139 standards. The commissioning documents shall be distributed to each team along with a list of defects and a scheduled date for each defect to be rectified. All commissioning documentation must be completed and signed by the required representatives prior to opening any bay(s), apron, taxiway(s) and/or runway to aircraft operations. The relevant commissioning certificate and checklist/s are included at the end of this document. Commissioning Process Asset may be open if safe to do so as per commissioning certificate Commissioning Inspection/s Commissioning Certificate & Checklist Sign Off Defects Register Developed Defects Rectified Final Checklist Sign-Off Project Closed Perth Airport Pty Ltd DRAFT MOWP YPPH

20

21

22

23

24

25

26

ORANGE AIRPORT METHOD OF WORKING PLAN. Orange Airport

ORANGE AIRPORT METHOD OF WORKING PLAN. Orange Airport METHOD OF WORKING PLAN MOWP: ISSUE NO: DATE OF ISSUE: AMENDMENT NO. YORG 14/01 Version 1 9 February 2015 21 AERODROME: Orange Airport PROJECT DESCRIPTION: Runway 11/29 Extension, Runway 04/22 Extension,

More information

OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH This document is uncontrolled when printed

OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH This document is uncontrolled when printed OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH 2015 Produced by Melbourne Airport in the interest of Airport Safety and Security Printed on Maine Recycled Digital Paper Table of Contents SECTION

More information

Airport Operating Standard. Transfer of Explosive Cargo

Airport Operating Standard. Transfer of Explosive Cargo Airport Operating Standard Transfer of Explosive Cargo June 2018 Contents Introduction 2 Responsibilities 3 Approvals 4 Safe distances 6 Preferred aircraft parking position 7 Handling agent vehicular

More information

Effective: PERTH AIRPORT AIRSIDE SURFACE MONITORING FOR FORRESTFIELD AIRPORT LINK TUNNELLING

Effective: PERTH AIRPORT AIRSIDE SURFACE MONITORING FOR FORRESTFIELD AIRPORT LINK TUNNELLING AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AERONAUTICAL INFORMATION CIRCULAR

More information

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page 1.0 Disabled Aircraft Recovery Plan Overview 4 1.1 Overview 4 2.0 Aircraft Incident/Accidents 6 3.0 TAA

More information

PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS

PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS H-3-1 PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS 1. Regulations 1.1 These requirements are intended to ensure that

More information

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS F-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 31 January 2011 PART F SECTION 2 RESPONSIBILITIES AND ACTIONS 1. Overview 1.1 This section outlines the responsibilities and actions of the airport organizations

More information

MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES. Effective from 27th November :01 hrs local.

MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES. Effective from 27th November :01 hrs local. MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES Effective from 27th November 2018. 00:01 hrs local. Operational changes from previous revision; TRPs 216 and NA permanently withdrawn from use. Choice of

More information

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan GRANDE PRAIRIE AIRPORT Reduced Visibility Operations Plan Amended November 8, 2017 Distribution List: (Updates to the Reduced Visibility Operations Plan will be circulated to this list.) Name and Title

More information

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety Vancouver Airport Authority Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety - 2017 CSMP Contractor Expectations - 2017 i Contents Contents Contents Introduction ii

More information

Dates: Date of Approval Date Works

Dates: Date of Approval Date Works Method of Working Plan: YMML 2017/4 Date of Issue: November 2017 Method of Working Plan Melbourne Airport Foxtrot Apron Works Dates: Important Date of Approval Date Works 15 th January 2018 Commence Date

More information

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT THE CIVIL AVIATION AUTHORITY OF THAILAND AIRAC Phone: 66 02 568 8831 Fax: 66 02 576 1903 Aeronautical Information Service Department AIP SUPPLEMENT AFTN: VTBAYOYX E-mail: aisthai@caat.or.th 333/105 Lak

More information

San Bernardino International Airport Authority Building 795

San Bernardino International Airport Authority Building 795 San Bernardino International Airport Authority Building 795 Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized representative of, (Company) I (Name

More information

OPERATIONAL AND AIRCRAFT RESTRICTIONS

OPERATIONAL AND AIRCRAFT RESTRICTIONS Method of Working Plan: YMML 2017/4 Date of Issue: January 2017 Method of Working Plan Melbourne Airport Foxtrot Apron Works Amendment No.2 Dates: Important Date of Approval 9 th January 2018 Date Works

More information

Form No. OPS-20 Issue No. 01 Airport Safety Induction Revision No. 01

Form No. OPS-20 Issue No. 01 Airport Safety Induction Revision No. 01 Form No. OPS-20 Issue No. 01 Airport Safety Induction Revision No. 01 As the Airport operator, Archerfield Airport Corporation Pty Ltd ( AAC ) has a responsibility to provide a safe work environment for

More information

TITLE PAGE. Method of Working Plan Melbourne Airport. Runway Maintenance to Runway 16/34 and Runway 09/27. Method of Working Plan: YMML 2018/4

TITLE PAGE. Method of Working Plan Melbourne Airport. Runway Maintenance to Runway 16/34 and Runway 09/27. Method of Working Plan: YMML 2018/4 TITLE PAGE Method of Working Plan: YMML 2018/4 Date of issue: March 2018 Method of Working Plan Melbourne Airport Runway Maintenance to Runway 16/34 and Runway 09/27 Important Dates: Date of Approval April

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

Runway Crossings at Brisbane International Airport

Runway Crossings at Brisbane International Airport Runway Crossings at Brisbane International Airport All instructions to cross runways will be issued by Ground on 121.7 MHz All runway crossings require a specific CROSSING clearance. Runway Crossing Requirements

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

East Midlands Airport 2018 Aerodrome Manual

East Midlands Airport 2018 Aerodrome Manual East Midlands Airport 2018 Aerodrome Manual Version 1.0 Not Valid after 31 st December 2018 Department Operations Document Owner Operations Director (Accountable Manager) Document Administrator Ops Development

More information

Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft

Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft Airside Operational Instruction TBA Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft Airside Operation Instruction

More information

2 Definitions Ardmore Airport Limited. Ardmore Airport Limited, as owner and operator. Airside Driving Permit.

2 Definitions Ardmore Airport Limited. Ardmore Airport Limited, as owner and operator. Airside Driving Permit. 1 Background Ardmore Airport Limited is required under the Civil Aviation Act 1990 and Civil Aviation Authority rule part 139 to establish and implement procedures for limiting and controlling access of

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure)

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure) AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure) Produced by Airfield Services Document Author Operations Support Manager Contents 1 SECTION 1 - LOW VISIBILITY PROCEDURES (LVP S)...

More information

Driving Training Class. Presented by: Lancaster Airport Authority

Driving Training Class. Presented by: Lancaster Airport Authority Driving Training Class Presented by: Lancaster Airport Authority Driving is a Privilege Driving on the airport, airport apron and ramps is a privilege and can be revoked at anytime for any reason. Violations

More information

Guidelines for NOTAM Workflow and Allocation of Responsibilities

Guidelines for NOTAM Workflow and Allocation of Responsibilities Guidelines for NOTAM Workflow and Allocation of Responsibilities May 19 2011 INDEX 1- MAIN OBJECTIVES 1 2- ORIGINATION OF NOTAM 1 3- VALUE OF A NOTAM 3 4- DURATION OF NOTAM 4 5- THE AERONAUTICAL DATA CHAIN

More information

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012 ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome

More information

San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project

San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project San Bernardino International Airport Authority Ramp Joint Seal Replacement & Pavement Repair Project Construction Safety and Phasing Plan 1601 E. Third St. San Bernardino, California 92408 As an authorized

More information

AIRSIDE VEHICLE CONTROL HANDBOOK

AIRSIDE VEHICLE CONTROL HANDBOOK AIRSIDE VEHICLE CONTROL HANDBOOK BANKSTOWN AND CAMDEN AIRPORTS Revised September 2016 CONTENTS Contents... 2 INTRODUCTION... 3 DEFINITIONS... 4 ADA REQUIREMENTS... 6 1. AUTHORITY TO DRIVE AIRSIDE AND THE

More information

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007 STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS 202.15b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007 AIRCRAFT INCIDENTS AND ACCIDENTS Goals 1. To familiarize with Airport Index 2. To familiarize

More information

Low Visibility Operations

Low Visibility Operations Airside Operational Instruction 21 Uncontrolled when printed Page 0 of 7 1 LOW VISIBILITY OPERATIONS Policy East Midlands Airport (EMA) is committed to providing facilities and procedures to enable aircraft

More information

IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax

IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel Fax IRELAND AERONAUTICAL INFORMATION SERVICE IRISH AVIATION AUTHORITY BALLYCASEY CROSS SHANNON CO. CLARE Tel +353 61 703750 Fax +353 61 366245 DUBLIN AIRPORT (EIDW) RUNWAY 10/28 UPGRADE PHASE 1 AND PHASE 2

More information

PERTH AIRPORT OPERATING PROTOCOL

PERTH AIRPORT OPERATING PROTOCOL PERTH AIRPORT OPERATING PROTOCOL AUTHORITY TABLE Authorised By Executive General Manager - Operations & Customer Experience Policy Manager Manager Business Systems Development Responsible Officer Senior

More information

Sample Regulations for Water Aerodromes

Sample Regulations for Water Aerodromes Sample Regulations for Water Aerodromes First Edition (unedited version) March 2015 Notice to users: This document is an unedited version which is made available to the public for convenience. Its content

More information

AERODROME SAFETY COORDINATION

AERODROME SAFETY COORDINATION AERODROME SAFETY COORDINATION Julio Garriga, RO/TA International Civil Aviation Organization North American, Central American and Caribbean Office ICAO NACC Regional Office Page 1 Coordination of the aerodrome

More information

SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES DURATION 6 MONTHS

SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES DURATION 6 MONTHS SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES START DATE 20 th April 2015 END DATE 11 TH September 2015 DURATION 6 MONTHS Issue 1

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

SECTION 32. Airfield and Aircraft Operations

SECTION 32. Airfield and Aircraft Operations SECTION 32 Airfield and Aircraft Operations 32.A Airfields General. 32.A.01 The following safety requirements shall be in addition to the airfield's safety requirements. When an airfield has safety requirements

More information

OPERATIONAL SAFETY POLICY TRANSFER OF EXPLOSIVE CARGO MARCH This document is uncontrolled when printed

OPERATIONAL SAFETY POLICY TRANSFER OF EXPLOSIVE CARGO MARCH This document is uncontrolled when printed OPERATIONAL SAFETY POLICY TRANSFER OF EXPLOSIVE CARGO MARCH 2015 Produced by Melbourne Airport in the interest of Airport Safety and Security Table of Contents SECTION ONE INTRODUCTION 1.1 Introduction...4

More information

Airside Vehicle Control Manual

Airside Vehicle Control Manual Reference No: 9004MKY Version 4 27 September 2017 MACKAY AIRPORT PTY LTD ACN 132 228 534 9004_MKY_MAPLAirsideVehicleControlManualV4_EffectiveDate_27/09/2017_ReviewDate_27/09/2018 Foreword The Mackay Airport

More information

Airside Driving Policy

Airside Driving Policy Owner: Eibhlin McGrath Creation Date: May 2011 Last Updated: 14-09-2015 Version: 2.2 Document Number AMUVP-03 September 2015 Document No.: AMUVP-03 1 CONTENTS Document Control... 3 Airside Driving Policy...

More information

CAUTION! JET BLAST ON APRON

CAUTION! JET BLAST ON APRON CAUTION! JET BLAST ON APRON 23.-24.5.2017 2 Prague Airport video Prague Airport facts and figures Prague Airport Václav Havel Main Gateway to the Czech Republic LKPR / PRG 11 km distance from the downtown

More information

PERTH AIRPORT OPERATING PROTOCOL

PERTH AIRPORT OPERATING PROTOCOL PERTH AIRPORT OPERATING PROTOCOL AUTHORITY TABLE Authorised By Chief Operating Officer Policy Manager Manager Business Systems Development Responsible Officer Manager Terminal and Landside Operations Commencement

More information

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012 TO BE READ IN CONJUNCTION WITH THE CPA MODEL CONDITIONS FOR THE HIRING OF PLANT (2011) EXPLANATORY NOTE: The purpose of these Supplementary Conditions

More information

(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or

(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or PART - XI Aerodromes 78. Licensing of Aerodromes (1) No aerodrome shall be used as a regular place of landing and departure by a scheduled air transport service or for a series of landings and departures

More information

Airside Driving Policy

Airside Driving Policy Owner: Creation Date: Eibhlin McGrath Last Updated: 19/02/2015 Version: 2.0 Document Number AMUVP-03 March 2015 Document No.: AMUVP-03 1 CONTENTS Document Control... 3 Airside Driving Policy... 4 Introduction...

More information

SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN. Los Angeles International Airport

SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN. Los Angeles International Airport SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN Los Angeles International Airport Surface Movement Guidance and Control System (SMGCS) Plan The SMGCS Plan for Los Angeles International Airport (LAX)

More information

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS Return to Contents Page Liverpool John Lennon Airport 0 20161012LJAAOI26V6.0pdf AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

More information

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations

More information

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 145. Aircraft Maintenance Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 145 CAA Consolidation 10 March 2017 Aircraft Maintenance Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 145 prescribes rules governing the certification

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 02/19

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

Effective: CANBERRA AIRPORT (YSCB) LIGHTING UPGRADE AND STOP BAR INSTALLATION RUNWAY 17/35 AND RUNWAY 12/30

Effective: CANBERRA AIRPORT (YSCB) LIGHTING UPGRADE AND STOP BAR INSTALLATION RUNWAY 17/35 AND RUNWAY 12/30 AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 92/18

More information

14 WING GREENWOOD ATC STANDARD OPERATIONAL PROCEDURES

14 WING GREENWOOD ATC STANDARD OPERATIONAL PROCEDURES EFFECTIVE 05 Jan 2017 1. PURPOSE 14 WING GREENWOOD ATC STANDARD OPERATIONAL PROCEDURES 1.1 To inform Freedom Aviation Society of the procedures for the operations of civilian aircraft into and out of Freedom

More information

Presentation Title: Aerodromes Licensing Requirements

Presentation Title: Aerodromes Licensing Requirements Presentation Title: Aerodromes Licensing Requirements Presenter s name: Ms Mary-Ann Joubert Manager: Aerodrome Operations Date: 29 March 2017 Content Establishment of ICAO Chicago Convention Members Status

More information

Part 115. Adventure Aviation, Initial Issue - Certification and Operations. CAA Consolidation. 18 May 2018

Part 115. Adventure Aviation, Initial Issue - Certification and Operations. CAA Consolidation. 18 May 2018 Part 115 CAA Consolidation 18 May 2018 Adventure Aviation, Initial Issue - Certification and Operations Published by the Civil Aviation Authority of New Zealand DESCRIPTION This Part prescribes the requirements

More information

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS. Civil Aviation 1 GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS. REGULATIONS ARRANGEMENT OF REGULATIONS 1. Citation. 2. Interpretation. 3. Applicability of Regulations. PART A GENERAL REQUIREMENTS

More information

A.3 List of Effective Pages

A.3 List of Effective Pages A.3 List of Effective Pages 1/10 Contents 0 Change History and Overview... 3 1 A General... 4 2 B Management and Administration... 5 3 C Airport Premises... 6 4 D Aviation Data Publication Requirements...

More information

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN TERRACE-KITIMAT AIRPORT SOCIETY 2018-19 APRON MANAGMENT PLAN Table of Contents List of Effective Pages... 3 Manual Distribution and Amendment Procedures... 5 Record of Amendments... 5 Apron Management

More information

Airside Safety Awareness Guide Incorporating Airside Driving Authority Category 2 & 2.5

Airside Safety Awareness Guide Incorporating Airside Driving Authority Category 2 & 2.5 Airside Safety Awareness Guide Incorporating Airside Driving Authority Category 2 & 2.5 Contents Introduction 2 Part 1 Airside Safety Awareness Guide 3 Aerodrome Hazards 4 1. Aircraft hazards 4 2. Vehicle

More information

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop Presented To: Caribbean States By: FAA Office of Airports OBJECTIVE Development of an Aerodrome Manual (AM). 2 ICAO ANNEX 14 - SECTION

More information

CHANGE CONTROL PROCEDURE

CHANGE CONTROL PROCEDURE CHANGE CONTROL PROCEDURE Page - 1 - of 9 Revision Record Date Revision By Approver Description 13/02/15 V1.0 Jez Davis Jez Davis Original Issue 23/03/15 V2.0 Jez Davis Jez Davis Amended following CAA SARG

More information

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules

Current Rules Part 175 Aeronautical Information Service Organisations - Certification Pending Rules Subpart B Certification Requirements 175.51 Personnel Requirements (a) Each applicant for the grant of an aeronautical information service certificate shall engage, employ or contract: (1) a senior person

More information

INTERNATIONAL FIRE TRAINING CENTRE

INTERNATIONAL FIRE TRAINING CENTRE INTERNATIONAL FIRE TRAINING CENTRE LOW CATEGORY AERODROME SUPERVISOR INITIAL AERODROME CATEGORISATION Throughout this note he means he/she and his means his/hers. It is considered that all of the document

More information

OPS General Rules for Operations Manuals

OPS General Rules for Operations Manuals CAR OPS 1 Subpart P (Manuals Logs and Records) Date of audit: 20 th December 2016 Audit conducted by: Stephanie Vella Gera. Audit Ref: QM_13 Compliant Reference/Question es No Comment/Remark OPS 1.1040

More information

Appendix D AIRSIDE VEHICLE DRIVING BEST PRACTICES

Appendix D AIRSIDE VEHICLE DRIVING BEST PRACTICES Appendix D AIRSIDE VEHICLE DRIVING BEST PRACTICES Note. This guidance is a compilation of material drawn from many sources including ICAO, IATA, ACI and a number of aerodromes that already operate vehicle

More information

CONTENTS FOREWORD...1 PART ONE...2 RESPONSIBILITIES OF VEHICLE OPERATORS...2 PART TWO...4 AUTHORITY FOR USE AIRSIDE...4

CONTENTS FOREWORD...1 PART ONE...2 RESPONSIBILITIES OF VEHICLE OPERATORS...2 PART TWO...4 AUTHORITY FOR USE AIRSIDE...4 CONTENTS FOREWORD...1 PART ONE...2 RESPONSIBILITIES OF VEHICLE OPERATORS...2 PART TWO...4 AUTHORITY FOR USE AIRSIDE...4 PART THREE...6 AUTHORITY TO DRIVE AIRSIDE...6 PART FOUR...9 APPROVED ISSUING AUTHORITIES...9

More information

LANCASTER AIRPORT DRIVER TRAINING PROGRAM

LANCASTER AIRPORT DRIVER TRAINING PROGRAM LANCASTER AIRPORT DRIVER TRAINING PROGRAM INTRODUCTION 1. Airfield Driving Basics 2. Movement / Non-Movement Area 3. Airfield Signs, Markings & Lighting 4. Airfield Communications 5. Aviation Phonetics

More information

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR SURVEILLANCE INSPECTION OF AERODROMES

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR SURVEILLANCE INSPECTION OF AERODROMES Page 1 of 10 This checklist broadly covers all areas of aerodrome operation, services & facilities. Efforts shall be made to cover areas depending on the time allocated for the inspection and deficiencies

More information

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016

Part 149. Aviation Recreation Organisations - Certification. CAA Consolidation. 1 February 2016 Part 149 CAA Consolidation 1 February 2016 Aviation Recreation Organisations - Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 149 prescribes rules governing the

More information

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting

Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting 10.27.16 Dallas/Fort Worth International Airport Winter Weather Season Kick-Off Meeting Agenda Welcome / Introductions DFW

More information

CONTENTS SECTION CONTENTS FOREWORD RESPONSIBILITIES OF VEHICLE OPERATORS AUTHORITY TO USE AIRSIDE AUTHORITY TO DRIVE AIRSIDE

CONTENTS SECTION CONTENTS FOREWORD RESPONSIBILITIES OF VEHICLE OPERATORS AUTHORITY TO USE AIRSIDE AUTHORITY TO DRIVE AIRSIDE March 2015 2012 CONTENTS SECTION CONTENTS FOREWORD PART 1 PART 2 PART 3 PART 4 PART 5 PART 6 PART 7 ANNEX A ANNEX B ANNEX C ANNEX D ANNEX E ANNEX F ANNEX G ANNEX H ANNEX I RESPONSIBILITIES OF VEHICLE

More information

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand

Part 105. Parachuting - Operating Rules. CAA Consolidation. 15 December Published by the Civil Aviation Authority of New Zealand Part 105 CAA Consolidation 15 December 2012 Parachuting - Operating Rules Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 105 prescribes rules relating to parachute operations,

More information

Introduction. Appendix D: Airspace Protection

Introduction. Appendix D: Airspace Protection Preliminary PreliminaryDraft DraftMaster MasterPlan Plan Bankstown Airport Introduction : Airspace Protection D Preliminary Master Plan Draft Master Plan Airspace protection D1 OVERVIEW The protection

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 66 AIRCRAFT MAINTENANCE PERSONNEL LICENSING AND AUTHORISATION Published by Air Safety Support International Ltd Air Safety Support International

More information

OPERATIONAL ADVICE NOTICE (OAN) OAN 07 / 2018 MAN-TP AIRSIDE SURVEYS

OPERATIONAL ADVICE NOTICE (OAN) OAN 07 / 2018 MAN-TP AIRSIDE SURVEYS OAN 07 / 2018 MAN-TP AIRSIDE SURVEYS OAN REF:- 07/2018 DATE OF ISSUE:- 19/01/18 EFFECTIVE DATE:- 28/01/18 MANUAL REFERENCE(S):- N A EXPIRY DATE:- 30/03/18 PLEASE ENSURE THIS INFORMATION IS PROMULGATED

More information

Contents. Subpart A General 91.1 Purpose... 7

Contents. Subpart A General 91.1 Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91

More information

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN Background to BARNZ BARNZ is an incorporated society comprising 19 member airlines

More information

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE ADVISORY CIRCULAR CAA-AC-OPS009A July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE This Advisory Circular (AC) specifies the objectives and content of company indoctrination curriculum segments applicable

More information

KBLI MEDIUM. Bellingham Intl Airport Bellingham, Washington, United States. Diagram #1: All Runways. NOISE ABATEMENT PROCEDURES by Whispertrack

KBLI MEDIUM. Bellingham Intl Airport Bellingham, Washington, United States. Diagram #1: All Runways. NOISE ABATEMENT PROCEDURES by Whispertrack Diagram #1: p. 1 of 5 Diagram #2: p. 2 of 5 OVERVIEW Bellingham International Airport (BLI) is a full service commercial airport located in Whatcom County, approximately 3 miles N.W. of the city limits

More information

Control of Cranes and Other Temporary Obstacles

Control of Cranes and Other Temporary Obstacles United Kingdom Overseas Territories Aviation Circular OTAC 139-27 140-11 171-8 172-11 178-10 Control of Cranes and Other Temporary Obstacles Issue 1 1 June 2018 Effective on issue GENERAL Overseas Territories

More information

Part 175. Aeronautical Information Service Organisations Certification. CAA Consolidation. 10 March 2017

Part 175. Aeronautical Information Service Organisations Certification. CAA Consolidation. 10 March 2017 Part 175 CAA Consolidation 10 March 2017 Aeronautical Information Service Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 175 prescribes rules governing

More information

Steve Parry has left for pastures new and you can contact Richie Gallagher on Steve s old mobile number

Steve Parry has left for pastures new and you can contact Richie Gallagher on Steve s old mobile number Issue 11 Volume 1 / Issue 9 October 2017 Welcome to the latest edition of Aerodrome Safety Central. The newsletter is published on a quarterly basis and includes articles on Airfield news, Work in Progress

More information

Pre-Coordination Runway Scheduling Limits Winter 2014

Pre-Coordination Runway Scheduling Limits Winter 2014 Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

Air Accident Investigation Unit Ireland

Air Accident Investigation Unit Ireland Air Accident Investigation Unit Ireland INCIDENT REPORT Boeing 737-8AS, EI-EBE, Cork Airport, Ireland 22 July 2009 Tourism and Sport An Roinn Iompair Turasóireachta Agus Spóirt Boeing 737-8AS EI-EBE Cork

More information

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS) Page 1 of 11 AERODROME NAME: ICAO REFERENCE CODE: TRAFFIC DENSITY CLASS: (see Note 3) VISIBILITY CONDITION: (see Note 3) AERODROME INSPECTOR: DATE: S/N ICAO A SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM 1

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

Cork Airport Airside Driving Policy

Cork Airport Airside Driving Policy Owner: Eibhlin McGrath Creation Date: May 2011 Last Updated: 17/12/2015 Version: 2.3 Document Number AMUVP-03 CONTENTS Document Control... 3 Airside Driving Policy... 4 Introduction... 4 Cork Airport Managing

More information

PART D SECTION 2 STAND ALLOCATION

PART D SECTION 2 STAND ALLOCATION D-2-1 AIRPORT OPERATIONS MANUAL AIRFIELD OPERATIONS 7 March 2014 PART D SECTION 2 STAND ALLOCATION 1. Overview To optimize the overall utilization of aircraft parking facilities, aircraft stands for passenger

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA FEDERATED STATES OF MICRONESIA 2001 [THIS PAGE INTENTIONALLY LEFT BLANK] 10-ii

More information

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017 Part 171 CAA Consolidation 10 March 2017 Aeronautical Telecommunication Services - Operation and Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 171 provides the

More information

a qualifying aerodrome operator certificate. It is also recommended to operators of non-certificated aerodromes.

a qualifying aerodrome operator certificate. It is also recommended to operators of non-certificated aerodromes. Advisory Circular AC139-3 Aerodrome Inspection Programme and Condition Reporting Revision 4 30 October 2015 General Civil Aviation Authority advisory circulars contain information about standards, practices

More information

Guideline: Rules and appropriate practices for disabled aircraft removal

Guideline: Rules and appropriate practices for disabled aircraft removal Guideline for the Airport Community Guideline: Rules and appropriate practices for disabled aircraft removal Date of issue: May 2018 GUIDELINE-OCD001-R0 TABLE OF CONTENTS 1. Purpose and Scope... 3 2. Definitions

More information

Civil Aviation Authority. Information Notice. Number: IN 2016/052

Civil Aviation Authority. Information Notice. Number: IN 2016/052 Civil Aviation Authority Information Notice Number: IN 2016/052 Issued: 9 June 2016 EASA ED Decision 2016/09/R Rescue and Firefighting Services Remission Factor, Cargo Flights, etc. This Information Notice

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

Andres Lainoja Eesti Lennuakadeemia

Andres Lainoja Eesti Lennuakadeemia Andres Lainoja Eesti Lennuakadeemia In the beginning was the Word... Convention on International Civil Aviation (Doc 7300) was signed on 7 December 1944 International Civil Aviation Organization began

More information

HIGHLANDS AND ISLANDS AIRPORTS LIMITED

HIGHLANDS AND ISLANDS AIRPORTS LIMITED HIGHLANDS AND ISLANDS AIRPORTS LIMITED ARRANGEMENTS FOR FLIGHTS OUTSIDE OFFICIAL OPENING HOURS The term Company or HIAL Group applies to Highlands and Islands Airport Limited (HIAL) and any subsidiary

More information

Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular

Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular Subject: TECHNICAL GUIDANCE MATERIAL FOR RESCUE & FIRE FIGHTING SERVICES Date: 27 JULY 2011 APPLICABILITY: 1.

More information