Regional Transport Committee Approved Organisation Update March 2016
|
|
- Damian Riley
- 5 years ago
- Views:
Transcription
1 Regional Transport Committee Approved Organisation Update March 2016 ORGANISATION NAME: Horowhenua District Council RTC REPRESENTATIVE: Mayor Brendan Duffy 1. MAINTENANCE, OPERATIONS AND RENEWALS The renewals and minor improvements work have progressed well with the onset of the warmer weather. Over half of the annual reseals were completed in January with the remainder planned for completion in early March. The AWPT on Tane Road is nearly complete and the AWPT on CD Farm Road has progressed well with the overlay aspect due to start shortly. Emergency Works the final remedial work from the weather event of the 19/20 June, that caused damage to parts of the roading network, is being completed. The final cost will be below the initial estimate. Joint Roading Maintenance Contract - The contract with Higgins is going well. Regular meetings and workshops between the three councils and Higgins staff are being held to provide continuous improvement to the delivery of the contract and to ensure that expectations are aligned. The Tane Road AWPT includes improvements to the Tane Rd / Linton Drain Road intersection, to move it further from the single lane bridge. The bridge has been struck multiple times by trucks and milk tankers turning out of the intersection onto the bridge. Foxton Main St Redevelopment has progressed with the final design due in March. The final project dates are subject to change but planning at this stage is around an August 2016 start date. 2. WALKING AND CYCLING The footpath renewal work has continued. McKenzie Street from Makomako Road to Keepa Street is to have a full footpath renewal on both sides of the road. Construction of the new pedestrian refuge planned in Salisbury Street, adjacent to Reevdon Home, has been pushed out and will now be constructed in the New Year. LTP submissions highlighted pedestrian issues around the Queen Street and service lane intersection. Safety initiatives were investigated, including making the service lane one way, and consultation is being carried out with affected businesses that back onto the service lane. 3. ROAD SAFETY The Horowhenua Road Safety Action Plan committee continues to meet on a regular basis. The Horowhenua Road Safety Group, a forum for community groups/organisations to come together, is now meeting regularly and is being chaired by Councillor Tony Rush. 4. PLANNING Discussions/consultation between Horowhenua District Council and the Transport Agency continue around the Otaki to Levin section of the RoNS. Discussions have centered on the Waitarere
2 Curves section and route options around the Manakau area. The Transport Agency is planning to carry out further consultation within the next two months. Boffa, with assistance from Beca, are working on a study of the transport requirements around Levin, its interactions with the State Highway network and the effect of the RoNS. ORGANISATION NAME: Horizons Regional Council RTC REPRESENTATIVES: Cr. Bruce Gordon, Cr. Rachel Keedwell 1. PUBLIC TRANSPORT Work is advancing on implementing a number of new trial services to commence during the 2016 calendar year, including a Wanganui to Palmerston North commuter service, the Levin Day Out In Town service, a new service covering the Summerhill area in Palmerston North and a regular weekday service between Ashhurst and Palmerston North. Work is also underway on the business case for the enhancements to the Palmerston North urban bus services. The business case is expected to be complete by April-May Tender documents have been released for the re-tender of the Levin to Palmerston North commuter service and a review is underway of the Marton to Palmerston North service to see if this can be incorporated into the Wanganui to Palmerston North trial service. In February 2016, the Passenger Transport and Strategy and Policy Committees endorsed a submission on the Small Passenger Services Review consultation paper. The small passenger services sector includes taxi, private hire, shuttle, dial a driver and ridesharing services and will have some impact on the delivery of the Total Mobility Scheme. 2. ROAD SAFETY Work continues on implementing the regional Road Safety programme for the current year. Further detail can be found in the Road Safety Update report contained elsewhere in the agenda. 3. PLANNING Planning has begun for the Regional Land Transport Plan A separate report on this is included elsewhere in the agenda. ORGANISATION NAME: Manawatu District Council RTC REPRESENTATIVE: Mayor Margaret Kouvelis 1. MAINTENANCE, OPERATIONS AND RENEWALS The new road maintenance contract is now in its eighth month. There have been some settling in issues, notably problems experienced by the contractors ability to deliver rural roadside mowing operations. Several factors added to this issue including poor subcontractor support and lack of available replacement plant, now with a district wide fire ban in place this has further delayed mowing. Despite these settling in issues the relationship between Higgins Contractors Limited (Higgins) and Manawatu District Council is good. The annual reseal programme is progressing well and is approximately 25% complete. Higgins are undertaking annual resealing for all three councils under the collaborative maintenance contracts, all programmes are on track to be completed within the expected time frames. The new streetlight maintenance contract is also in its eighth month. This contract involves a collaborative approach but unlike the road maintenance contract it is a single contract which covers
3 streetlight maintenance for both the Manawatu and Horowhenua District Councils. The contract is tracking well with positive relationships in place between the two councils and the contractor, Alf Downs Streetlighting Limited. Investigation into a district wide LED replacement programme including funding is continuing. A collaborative contract between Manawatu, Rangitikei and Horowhenua District Councils for Annual Pavement Marking was awarded to Road Marking Services Limited at the end of December Two bridges on Reserve Road have been identified through the bridge inspection programme as being deficient for this HPMV route, renewals are planned for Condition monitoring of these bridges will be undertaken on a monthly basis until they are replaced. The Transport Agency carried out a procedural and technical audit of MDC operations in October 2015, the report is due within the next few months. 2. CAPITAL PROGRAMME Pharazyn Street Stage 2 Arnott Street to Roots Street, growth project. The contract works are well underway and approximately 30% complete, completion is expected by the end of May Minor safety improvements for the corner on Halcombe Road at the intersection of Fergusson Road are 75% through the design and planning stage. We are currently in the process of land acquisition with physical works completion expected this financial year. Minor safety improvements at the junction of Awahuri Feilding Road and Lees Road are in the design and planning stage with physical works planned for the financial year. Pavement rehabilitation of Taipo Road between Fairfeild Road and Highden Road has been deferred until a bridge within the design area is assessed and is either widened or replaced. Pavement rehabilitation of McKays Line is underway with completion of physical works expected by the end of February. Design of pavement rehabilitation for a 1.4km section of Rongotea Road east of Lockwood Road is complete with construction commencing in early March. We are currently finalising the last pavement rehabilitation site at McDonell Road. Seal extension at Cheltenham Cross Road pavement preparation and drainage improvements were undertaken last year, sealing of the entire length of 4.5km is expected to be completed in two stages with completion in the financial year. Seal Extension at Makoura Road pavement preparation and drainage improvements are in the planning stage and will be started this financial year. This project will be undertaken in two stages, stage one from the Cone Creek Bridge to Makoura Lodge (1km section) is expected to be completed by June , stage two from Makoura Lodge to meet the existing seal near Apiti (4.5km section) will be undertaken in the financial year. 3. EMERGENCY WORKS The initial response repairs following the June 2015 weather event have been completed. The majority of the permanent reinstatement work required is repair of underslips, there are multiple sites on multiple roads requiring construction of retaining walls to reinstate a safe road width. There are also three bridges which require extensive repair or replacement, a temporary Bailey bridge is in place on Arapata Road, the other two bridges are passable with restrictions. Contracts for the permanent reinstatement work are currently being prepared. The total cost estimate for emergency works is being refined monthly as contracts are let. The current estimate is $3.8M. There have been barriers to expeditious design and procurement for many of the more complex repairs. This has been due to a significant number of sites throughout the Wanganui, South Taranaki, Rangitikei and Manawatu districts which have put a drain on available professional design services. It is anticipated that this problem may continue into the construction phase as
4 each authority tries to get the repairs undertaken by a limited number of skilled and experienced contractors. 4. WALKING AND CYCLING Concept planning is underway for the Feilding to Palmerston North cycle way. 5. OTHER Manawatu District Council has recently appointed John Jones as Roading Asset Manager. John joins MDC from the New Zealand Transport Agency and brings a wealth of knowledge from his previous experiences with Transport Agency and other local authority roles. ORGANISATION NAME: Palmerston North City Council RTC REPRESENTATIVE: Cr Jim Jeffries 1. MAINTENANCE, OPERATIONS AND RENEWALS Resealing contracts for the construction season have now been largely completed. The contract for chipseal and asphaltic concrete (AC) surfacing was for a total of $1,732,559 and was awarded to Higgins Contractors. The contract covers 282,329m 2 of chipseal surfaces and 21,518m 2 of AC surfaces. The latter work includes a section of John F Kennedy Drive which should be completed by March Area wide pavement treatment to rehabilitate roading pavement in Tremaine Avenue and Railway Road are complete. 2. CAPITAL PROGRAMME Subsidised work Construction of a roundabout at Cambridge Avenue and Mulgrave Street in Ashhurst is complete. The roundabout is at the junction where state highway traffic turns on the alternate route in operation when the Manawatu Gorge is closed. Route signage for the new roundabout junction is being designed and will be implemented early in the new year. Non-subsidised work Council will shortly be going out to tender for the reconstruction of James Line. The Council budget for is $2.247m and involves the section of road between State Highway 3 and the railway line. The work includes installation of services, footpaths, streetlights, drainage channels and new side road connections. The carriageway will be constructed to collector road standard. Construction will allow planned residential growth to occur on both sides of the road. Stage 4 is planned for and will complete the section at the northern end to the intersection with Kelvin Grove Road. 3. EMERGENCY WORKS Work to reinstate roads and pathways damaged in the June 2015 storm event is now complete with the exception of Flygers Line. Reinstatement of that road is more complex and options will be reported to Council in May 2016 for decisions before work is completed. 4. WALKING AND CYCLING Work has commenced on design of the proposed pathway to Linton Camp from the Fitzherbert Avenue Bridge. A Steering Group for the pathway and bridge project has been formed and a
5 project manager has been appointed. A tender for professional services associated with the bridge project has been awarded to Opus International Consultants. The consultant will be responsible for completing the investigation stages, including the business case, and carrying out consultation with the community. Subsequent phases for consent, design and construction will be contracted out once this work is completed. A Tender for first stage of the path construction is expected to be awarded in February with construction likely to start in April Stage 1 of the path will follow the river from the Fitzherbert Avenue bridge to the Turitea Stream mouth. The second stage of the path linking to the army camp at Bells Road is still being investigated. Several minor bridge structures will be required. The preliminary budget for the entire project is $9.6 million. As part of the New Zealand Transport Agency programmed intersection upgrade at Rangitikei Street (SH3) and Tremaine Avenue a footpath extension has been completed to the top of the overbridge. By agreement PNCC will complete the remainder of the footpath from the top of the overbridge to Bennett Street through the minor improvement programme. The physical works will be tendered within the next month with the work expected to be completed by 30 June This will provide a complete facility suitable for pedestrians and cyclists in both directions, providing improved access, particularly for school students accessing three high schools in the area. Budgeted cost is $300, PLANNING Council s Integrated Transport Strategy was adopted in November Work to develop a programme business case will be undertaken in the financial year and will form the basis of an implementation plan for future capital expenditure programmes. Work has started on a strategic business case for the transport components of the Food HQ proposal. Investment Logic Mapping was completed in December 2015 and a draft Strategic Business Case has been received. The next stage for development of a Programme Business Case was approved for funding in December 2015 and is expected to start in March ORGANISATION NAME: Rangitikei District Council RTC REPRESENTATIVE: Mayor Andy Watson 1. MAINTENANCE, OPERATIONS AND RENEWALS The maintenance of the roading network of RDC has at times been let down by delays by the contractor to react to the identified situation. This could be applicable to the so called settling in phase. Considerable effort within the roading team to address this fact takes place regularly to ensure a positive forward movement. The mowing of the network s berms especially has suffered due to the lateness of the commencement of the mowing and subsequently the network has been out of the accepted contract standard and basically still is. Higgins at one stage had up to six mowers on the network but due to the height of the grass, progress was very slow. This has caused a major concern not only to RDC management but also the ratepayers. Higgins has been issued a non-conformance. Higgins had reacted most positively to the emergency works work and the majority of the work that has been carried out by them has been carried out to a good standard. Higgins still is carrying out remedial work applicable to the June 2015 event and is doing a relatively good job. The crew based out of Taihape is keeping the northern section of the network fairly well under control. Metaling of the unsealed sections is continuing. Due to the extremely hot weather that is being experienced on the Napier Taihape Road, especially the Gentle Annie, some serious flushing has taken place but is under control. The lighting contract for RDC is about to expire with the new one to commence on 1 March 2016 let to ADSL.
6 The footpath renewal programme has six sites planned for this year. The intention is two contracts incorporating the capital element also are planned a northern and southern contract similar to the previous year. Currently on hold. 2. CAPITAL PROGRAMME The resurfacing contract commenced in mid January for RDC with this work being carried out by the Higgins crew from the Wairarapa. The standard of work to date is very good. The only site planned for an AWPT for this year is a site on Wanganui Road within the urban area and this project is a combined one with Utilities. Work has commenced and is well advanced. The capital footpath programme is indicating five sites but currently on hold. 3. EMERGENCY WORKS Stage 1 of the June 2015 storm event, this is the cleanup phase i.e. removal of slips, drainage clean up, clearing of culverts etc., has now been completed. This clean up involved expenditure of approximately $3 million. Some 37 drop out sites have been identified as projects and the intention is to let them in packages, of which three packages have been let and are currently underway (value $580,000.00). Four sites comprising a package are about to be let with the design element completed. The remaining 25 sites are still in the design phase. One road still basically remains closed on the network and this is Mount Curl, although it is open to small vehicles. This site is currently undergoing an intensive investigation and looking at a number of options to mitigate. On going dialogue with the landowners to ensure they are kept well in the loop continues. An experienced bridge consultant is currently working on a bridge design for the replacement of a bridge over the Pourewa stream Rata which is currently serviced by a bailey bridge. The recommendation will go to Council in April OTHER A new roading engineer has joined the RDC team - Philip Gifford ex MWH who replaced Kevin Whelan. Also changes to the Higgins senior management team RDC where Bryce Balsley has replaced Neil O Hara. ORGANISATION NAME: Ruapehu District Council RTC REPRESENTATIVE: Mayor Don Cameron 1. MAINTENANCE, OPERATIONS AND RENEWALS Health and Safety The new legislation changes come into effect of 4 April Staff are receiving training on the new requirements and responsibilities of the legislation as well as how collectively we can support each other improve Health and Safety outcomes. It is proposed that all contractors working in the road environment under the Transport Team have a joint focus on new legislative requirements at regular depot meetings to help ensure all contractors continue to understand their roles and comply with health and safety requirements and responsibilities.
7 General and Sealed Pavement The Roadmen have spent 876 hours and travelled 8,142km undertaking routine works such as culvert waterblasting and clearing, filling potholes and edgebreaks, repairing signs and sight rails, clearing detritus and fallen trees, cleaned four bridges, sealed 4,880m 2 of seal repairs and picked up dumped offal and rubbish from two sites. Vegetation Control Mulch & Mow undertook arm (high lift) mowing in the Kaitieke Valley and Pipiriki Valley during the month as well as on the unsealed roads south of Raetihi. Water channel spraying was carried out predominantly in the Ruatiti area. Berm mowing on sealed roads took place across the central district. A total of 156kms of arm mowing, 321kms of roadside spraying and 110kms of berm mowing was achieved during December. Unsealed Pavement Maintenance The two maintenance graders continue to work across both the northern and southern regions. Grader driver Francie Collerton retired in December and will be sorely missed for his attention to detail and considerable grading experience. He is succeeded by Peter Hamiora who is determined to continue the same quality of workmanship. The application of maintenance metal to the network roads is minimised during the dry summer months as the lack of moisture prohibits the binding quality of the aggregate. Heavy Maintenance and Improvements The majority of the work during the month has been reinstatement of 16 Emergency Work sites on eight roads. Slips (Minor Events), trees and detritus cleared on 10 roads, carted sealing chip to one stockpile site, water channels cleared on six roads, repaired large softspots on two roads, replaced four culverts, supplied pipes for two large culvert replacement sites and undertook retreats on four minor improvement sites. Pavement rehabilitation Ohakune Mountain Road: Work on Ohakune Mountain Road continued with vegetation removal throughout December, pavement construction is now well underway with first coast sealing expected in late February Of interest is the harvesting of Toii from the work site by Ngati Rangi and Uenuku. It was decided to harvest the larger Toii and attempt to relocate the smaller plants. The small and medium sized Toii were relocated to the Marae and nearby location on the Ohakune Mountain Road. The below photos show Sara Roberts watering the baby Toii after relocation to the Marae and Jilesen Contractors working with iwi to relocate a medium sized Toii. It is noted that the translocation and growing of Toii is a difficult process and there may be immediate or delayed effects to its health. Poro O Tarao Road Designs are complete with works programmes for late in the season. This site may be deferred if poor weather defers start dates. Whangaehu Valley Road Works were competed in January 2016 Ruapehu Road The site is being established and construction teams will be transferred to the site as the OMR works become complete. The table below is a summary of all pavement rehabilitation sites for the year.
8 Work Order Road Name Location (km) Length (km) Status Estimate ($0,000) 1 Whangaehu Valley Complete $475.0 Road 2 Ohakune Mountain Construction $472.9 Road 3 Ruapehu Road Establishment $ Ohura Road Design $ Ohura Road Design $ Poro O Tarao Road Design $294.0 Total Pavement 7.20 $2, Rehabilitation 2. CAPITAL PROGRAMME Bridge renewals Waitewhena Rail Over Bridge is programmed for renewal this financial year and is expected to be complete by June Works to date include site survey and design consideration for both a level crossing and single span bridge. Both options will be evaluated prior to the final option being recommended. Negotiations continue with KiwiRail to discuss relaxing the clearance rules to minimise cost. Application of the rules over a mothballed line (Stratford-Okahukura Line) will add significant unnecessary cost should the line not reopen. Council is seeking to commit to additional clearance works in the future should the line reopen and additional clearances be required. Bridge 353 Upokonui Stream culvert on Whanganui River Road about 2.2km south of Pipiriki, suffered deterioration during the 20 June emergency event. The replacement bridge was completed during December and the site blessed and formally opened by Ngati Kurawhatia. The River Road is now fully accessible although there are many sites still to be repaired in both Ruapehu and Whanganui Districts. 3. EMERGENCY WORKS Heavy rain on June led to the largest flood in Whanganui for 84 years. Significant damage estimated at $4.86m has occurred to the network, this has risen from $3.8m due to the inclusion of the Upokonui Bridge at Pipiriki in flood damage works. The majority of the initial response clean-up has been completed and site safe initial response is nearing completion. There are 257 major work sites throughout the District as a result of the event. The table below represents the December and Year End estimates. Estimated Expenditure Estimate December 2015 Initial Response Estimate $400,000 $1,376,836 Major Works Estimate $1,611,024 $2,644,306 Professional Services $223,163 $475,268 Total Estimated Expenditure $2,234,187 $4,496, WALKING AND CYCLING There was limited activity in walking and cycling for the period however funding for the Mountains to Sea Cycle Trail has been secured from the New Cycle Trail (MBIE) Great Rides
9 maintenance and enhancement fund for distance marking, interpretation and way finding. This work is expected to be completed this financial year in association the DoC and Whanganui District Council. Routine trail maintenance is programmed for March - April ROAD SAFETY The revised joint Road Safety Action Plan between Ruapehu District Council, New Zealand Transport Agency, Horizons Regional Council, NZ Police and other road safety partners has been agreed. The RSAP adopts the Safer Systems approach and aligns with the National Road Safety campaigns and advertising calendar. Road Safety advertising campaigns have been delivered over the festive season with a focus on international drivers (keep left), fatigue and alcohol. 6. PLANNING The Ruapehu District Council has been part of the Local Government Focus Group assisting the Ministry of Transport and Statistic NZ to produce a Transport Domain Plan for New Zealand. The goal of the Transport Domain Plan is to ensure the right transport statistics and information are collected and shared efficiently and effectively to maximise the economic and social benefits of the transport system and minimise harm. Our stakeholder engagement process developed 45 enduring questions, 108 recommendations across 11 topics, and 9 overarching recommendations to help achieve this goal. The Ruapehu District represented low volume networks as part of a local government team comprising Auckland Transport, Southland District, Napier City and Greater Wellington Regional Council transport staff. The publication of the final Transport Domain Plan is expected mid 2016 with the team being assembled in March to review the current draft findings and feedback. ORGANISATION NAME: Tararua District Council RTC REPRESENTATIVE: Mayor Roly Ellis 1. MAINTENANCE, OPERATIONS AND RENEWALS As targeted our Preseal repairs where completed and 60km of Reseals have been completed prior to Christmas. With previous sealing seasons work has not commenced until January/February of the following years so this has been very positive to complete work prior to Christmas. Work has also continued on the Pavement Rehabilitation with crews currently working on the Weber Road Sections
10 2. EMERGENCY WORKS Design work has continued on repairing damage following the September 2015 Event. One of the significant sites being this damage which has occurred on River Road located towards the Coastal Area. Estimated work to repair being approximately $ 300, SADDLE ROAD UPGRADE Good progress has been made on sites on Saddle Road along with the Ashhurst Roundabout nearing completion. Sites which have been completed are the sections nearest the Saddle Road Bridge on the Manawatu Section with sealing completed and overlays completed to the Tararua District Council Boundary. The section from the Tararua District Council Boundary is currently under construction with Pavement being constructed and earthworks nearing completion to remove the very narrow winding section of the road. A further completed section is also the section of road near the Meridian Headquarters.
11 Site three completed cut batters Sealed Meridian entrance (Site three) Site three completed seal looking toward Cook Road
12 Site seven completed seal Site Three completed Beginning of site five works
13 ORGANISATION NAME: Whanganui District Council RTC REPRESENTATIVE: Mayor Annette Main 1. MAINTENANCE, OPERATIONS AND RENEWALS Road maintenance delivery continues to be delivered through the Whanganui Alliance, a Private- Public performance tensioned shared-risk contract with Downer, with specialist support from specialist consultants. 2. CAPITAL PROGRAMME This year two key projects will be commencing: o LED Street Lighting upgrade o Whanganui Urban Shared Pathway Project (refer to Walking and Cycling below) 3. WALKING AND CYCLING Council is currently preparing tender documents for the first stage of the Urban Cycleway Programme. This will be a shared pathway from the Whanganui City Bridge, under Cobham Bridge and on to Bedford Avenue. 4. EMERGENCY WORKS Emergency Works arising from the October 2013 event has been estimated at $3.6M, with $2.7M having been repaired by 30 June The remaining $900,000 (earthworks) have recommenced and be completed during this construction season. On the 20 June 2015 another emergency event impacted on 79% of Council s rural roads and 7% of the urban roading network. Over a thousand major slips and dropouts have been identified and the reinstatement of our roading network has been estimated at $25M, with just under $9.5M along the Whanganui River Road alone. The Transport Agency has resolved to enhance the reinstatement of the Whanganui River Road at 100% FAR and the remainder at the standard rates. 5. ROAD SAFETY The Road Safety Action Plan (RSAP) group, consisting of Council, Horizons, Police, ACC, DHB and the Transport Agency, will be meeting again in late February This working group has a good understanding of each other s goals and programs.
14 6. OTHER Roading managers are currently working on the transition process to the One Network Road Classification (ONRC) system and its full integration by 1 July Council s significant 10-year roading issue remains the need to reinvest an additional $18M to reinstate the roads damaged by the hauling of 15 million tonnes of timber (worth $1.5B) through its rural roads.
Regional Transport Committee Approved Organisation Update December 2016
Regional Transport Committee Approved Organisation Update December 2016 ORGANISATION NAME: Horowhenua District Council RTC REPRESENTATIVE: Mayor Michael Feyen 1. MAINTENANCE, OPERATIONS AND RENEWALS The
More informationRangitikei District Council
Rangitikei District Council Assets/Infrastructure Committee Meeting Order Paper Thursday 14 July 016 9:30 a.m. Contents 1 3 4 Welcome Council Prayer Apologies/Leave of absence Confirmation of Order of
More informationRangitīkei District Council
Rangitīkei District Council Assets and Infrastructure Committee Meeting Agenda Thursday 9 August 2018 9:30 AM Contents 1 Welcome...3 2 Council Prayer...3 3 Apologies/leave of Absence...3 4 Members conflict
More informationReport. Recommendation: Mayor and Councillors. To: District Engineer and Roading Manager. From: Date: 11 th April 2012
Report To: From: Mayor and Councillors District Engineer and Roading Manager Date: 11 th April 2012 File reference: Portfolio holder: Document: 873742 Appendix A: 873811 Appendix B: 871432 Councillor Harris
More informationOpen Report on behalf of Richard Wills, Executive Director for Environment and Economy
Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1
More informationOperations Committee. District Engineer and Roading Manager
Report To: From: Operations Committee District Engineer and Roading Manager Date: 3 rd November 2014 Document: 1281760 File reference: Appendix A: 1281901 Appendix B: 1274346 Meeting date: 12 th November
More informationSeek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and
3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital
More informationBlackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL
Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings
More informationMayor and Councillors. District Engineer and Roading Manager. Councillor Harris
Report To: From: Mayor and Councillors District Engineer and Roading Manager Date: 1 st February 2011 File reference: Document: 690387 Portfolio holder: Councillor Harris Meeting date: 9 th February 2011
More informationBusiness Case Approved. Under Construction. Business Case Approved. Under Construction
Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations
More informationWellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY
National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is
More informationLYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS
APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District
More informationPort Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT
Port Macquarie-Hastings Pedestrian Access and Mobility Plan Working Paper COMMUNITY ENGAGEMENT December 2014 Table of Contents Table of Contents... 2 1 Introduction... 3 2 Submissions... 3 2.1 Stakeholder
More informationWELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION
WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,
More informationRegional Transport Committee OPEN MINUTES
Regional Transport Committee OPEN MINUTES Minutes of a meeting of the Regional Transport Committee held in Council Chambers, Waikato Regional Council, 401 Grey Street, Hamilton East on 11 June 2018 at
More informationBUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway
BUSINESS ZONE - OPTION 400 (Western footpath) Have your say Love the Bay Delivering on the Cycleway Consultation open from 31 July to 13 August 2017 1 Introduction After the Love the Bay community-based
More informationOpen Meeting. To update the Board on issues arising from the previous meeting.
Open Meeting To Raglan Community Board From Tony Whittaker General Manager Strategy & Support Date 28 August 2017 Prepared by Sharlene Jenkins PA General Manager Strategy & Support Chief Executive Approved
More informationPERTH-ADELAIDE CORRIDOR STRATEGY
INTRODUCTION The Royal Automobile Association of SA Inc (RAA), the State s principal advocate for motorists on a broad range of motoring-related issues, represents the views of more than 560,000 South
More informationNOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT
1 July 2016 Planning Manager Westland District Council 36 Weld Street HOKITIKA Attn Alex Dunn Dear Alex NOTICE OF REQUIREMENT: NZ TRANSPORT AGENCY: SH6 TARAMAKAU BRIDGE PROJECT On 15 June 2016 you issued
More informationProposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:
Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of
More informationRangitīkei District Council
Rangitīkei District Council Assets and Infrastructure Committee Meeting Minutes Thursday 11 October 2018 9:30 a.m. Contents 1 Welcome...3 2 Council Prayer...3 3 Public Forum...3 4 Apologies/leave of Absence...3
More informationMajor Scheme Business Case Summary Report for Programme Entry
Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date
More informationRegional summary - Wellington
Regional summary Wellington Regional summary - Wellington This is a summary of data relevant to transportation in this region, viewed from a Land Transport NZ perspective. It s purpose is to inform the
More informationDate 24/10/2011. Date 04/11/2011. Date 25/10/2011. Date 10/11/2011. Date 25/10/2011. Date 25/10/2011. Date 10/11/2011.
DELEGATED POWERS REPORT NO. 1489 SUBJECT: Traffic Signal Review, Junction of Oakleigh Road North and the A1000 Control sheet All of the following actions MUST be completed at each stage of the process
More informationQueen s Circus Roundabout
Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member
More informationRangitīkei District Council
Rangitīkei District Council Assets and Infrastructure Committee Meeting Agenda Thursday 21 March 2019 9:30 a.m. Contents 1 Welcome...2 2 Council Prayer...2 3 Public Forum...2 4 Apologies/leave of Absence...2
More informationThe Strategic Commercial and Procurement Manager
Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose
More informationItem 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.
Item 1 To: Leadership Board On: 1 April 2015 Report by: Director of Development and Housing Services Heading: Update on City Deal 1. Summary 1.1 This report seeks to update the Board on the work that has
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationOther Principle Arterials Minor Arterial Major Collector Minor Collector Local
CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition
More informationCHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010
CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF
More informationGold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content
Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239
More informationSANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION
Page 41 REPORT TITLE: SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION REPORT PROVIDED BY: Road Services Engineer Director City Infrastructure 1.
More informationClyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project
Item 1 To: Leadership Board On: 3 June 2015 Report by: Director of Development and Housing Services Heading: City Deal Strategic Business Cases 1. Summary 1.1 This report seeks approval from the Board
More informationAppendix 8 Sawston Greenway Review
Appendix 8 Sawston Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More information3. COLTA / HUGA CONNECTIONS - PRELIMINARY
9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The
More informationEconomic Development Sub- Committee
Report title: Economic Development Sub- Committee Item No. Date of meeting: 24 November 2016 A47 Road Investment Strategy - update Responsible Chief Tom McCabe Executive Director, Community Officer: and
More information$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY
2015 18 National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY OVERVIEW Transport investment in the Bay of Plenty is targeted to support significant residential growth, new industrial
More informationEXPLANATORY STATEMENT
THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.
More informationErmine Street Environmental Enhancements
Ermine Street Environmental Enhancements As part of Urban&Civic s commitment to minimise the impacts and maximise the benefits of the Alconbury Weald development, the design team have worked up a scheme
More informationPart four. In this part you will find: The next steps to deliver the master plan
Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master
More informationReport of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018
Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control
More information9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING
Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST
More informationOtorohanga Stopbank Pathway - Project Overview
Otorohanga Stopbank Pathway - Project Overview Introduction Otorohanga District Council with the support of the Otorohanga Community Board are constructing a 3.5 km long gravel pathway for shared use on
More informationA63 Castle Street, Hull HullBID Network Lunch 24 August 2017
A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme
More informationArrangements for the delivery of minor highway maintenance services by Town and Parish Councils
Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils Cabinet Date of Meeting 8 March 2017 Officer Cllr Peter Finney, Cabinet Member for Environment, Infrastructure
More informationIRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City
IRISH PARKING ASSOCIATION The use of Pay and Display in Traffic Management in Kilkenny City Kilkenny City and Environs Draft Mobility Management Plan 2009-2014 2014 Draft Mobility Management Plan Background
More informationCouncil Briefing Minutes
1 Council Briefing Minutes Date: Time: Location: In Attendance Not in Attendance Wednesday, 24 October, 2018 2:30 p.m. Council Chamber Forum North, Rust Avenue Whangarei Cr Greg Innes (Chairperson) Cr
More informationRangitīkei District Council
Rangitīkei District Council Assets/Infrastructure Committee Meeting Minutes Thursday 10 May 2018 9:30 AM Contents 1 Welcome... 3 2 Council Prayer... 3 3 Apologies/leave of Absence... 3 4 Members conflict
More information4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE
4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation
More informationEketahuna Community Board
Eketahuna Community Board Minutes of a meeting of the Eketahuna Community Board held in the Eketahuna War Memorial Hall, corner of Jones Street and State Highway 2, Eketahuna on Friday 3 November 2017
More informationA303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016
Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities
More information2. STAKEHOLDER FEEDBACK // What We Heard
1. QUARRY ROAD TRAIL // Welcome to the Information Session PROJECT DESCRIPTION WHY WE ARE HERE Quarry Road Trail is a popular commuter trail and recreational area for Calgarians. 1. To report citizen feedback
More informationUpdate Report - Etobicoke Creek and South Mimico Creek Trails
REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward
More informationMINUTES OF THE MEETING OF THE TRANSPORT COMMITTEE HELD ON FRIDAY, 21 APRIL 2017 AT COMMITTEE ROOM A, WELLINGTON HOUSE, WELLINGTON STREET, LEEDS
MINUTES OF THE MEETING OF THE TRANSPORT COMMITTEE HELD ON FRIDAY, 21 APRIL 2017 AT COMMITTEE ROOM A, WELLINGTON HOUSE, 40-50 WELLINGTON STREET, LEEDS Present: Councillor Keith Wakefield OBE (Chair) Councillor
More informationAppendix 6 Fulbourn Greenway Review
Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationThe Point Roundabout Improvement Scheme
The Point Roundabout Improvement Scheme Background and Existing Situation The junction of North Wall Quay, East Wall Road and the East Link Bridge, also known as the Point roundabout, is located in the
More information6 Road infrastructure
6 Road infrastructure 51 ƨƨsummary New Zealand does not score highly for its road infrastructure when compared to other developed nations. This may partly be due to geography and population size, which
More informationBACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM
BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant
More informationTransit s forecasts of expenditure in Waikato for the next 10 years are set out in Table WK1.
WAIKATO STATE HIGHWAY PLAN EXECUTIVE SUMMARY Transit s forecasts of expenditure in Waikato for the next 10 years are set out in Table WK1. These forecasts of expenditure are based on a 10-year plan of
More informationTown Centre Master Plan Sub-Committee Meeting 27/04/2017
PRESENT Members: Councillor Michael Cusato (Deputy Chair) Jeffery Sharp (Director Infrastructure and Asset Management) Jeff Gillespie (CBD Landowner) Robert Sagolj (CBD Landowner) Michael Mowle (CBD Trader
More informationSunshine Coast Airport Master Plan September 2007
Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT
More information2016 Manawatu Airspace Review
Civil Aviation Authority Table of Contents 1. 2015 Manawatu airspace review... 1 2. Review Process... 1 Scope of review... 1 a) Airways Corporation of New Zealand... 2 b) Aerodrome operators... 2 c) Airline
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of
More informationChapter 6 Route Window NE5 Seven Kings station. Transport for London
Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated
More informationLevel Crossings Configuration Standards
Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document
More informationCulpeper District. Albemarle County Monthly Report. September 2012
Culpeper District Albemarle County Monthly Report September 2012 Special Issues Bridges on Route 745, Arrowhead Valley Road The road will be closed at the Rail Road Bridge on the southern end of the road
More informationUpdate on the Thameslink programme
A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts
More informationSmart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017
Smart Cities Plan IMPLEMENTATION Townsville City Deal April 2017 ACKNOWLEDGEMENTS The Commonwealth Government, Queensland Government and the Townsville City Council would like to thank the Townsville community
More informationENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016
CITY & COUNTY OF CARDIFF DINAS A SIR CAERDYDD ENVIRONMENTAL SCRUTINY COMMITTEE 6 DECEMBER 2016 EASTERN BAY LINK JOINT STUDY PROPOSAL Reason for the Report 1. To provide Members with the opportunity to
More informationCalderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan
Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1
More information$745 $10 $41 OVERVIEW
2015 1 National Land Transport Programme Southern SOUTHERN REGIONAL SUMMARY The NZ Transport Agency s Southern region comprises the local government regions of Canterbury, Otago, Southland and the West
More informationWestern Bay of Plenty District Council
Western Bay of Plenty District Council Minutes of Meeting No. TP13 of the Te Puke Community Board held on 14 June 2018 at the Te Puke Library and Service Centre commencing at 7.00pm Present Members P Miller
More informationDraft Marine and Harbour Facilities Strategy
Draft Marine and Harbour Facilities Strategy Vision The Coromandel peninsula is a destination of choice for safe, sustainable and accessible marine and harbour facilities that are fit for purpose to meet
More informationPart 005 Implementation Strategy _
Part 0 Implementation Strategy www. landlab.co.nz Queenstown Town Centre Masterplan Version 7 14 June 28 Section 0 Page 4 5.1 Implementation Plan The projects and initiatives contained within the Queenstown
More informationMUNICIPALITY OF ANCHORAGE
MUNICIPALITY OF ANCHORAGE ANCHORAGE PARKS & RECREATION Memorandum PRC 08-56 DATE: 5 August 2008 TO: FROM: SUBJECT: Parks & Recreation Commission Holly Spoth-Torres, Park Planner PRC 08-56 Far North Bicentennial
More informationQuarterly report Q1 2016/17. 1 June 30 September 2016
Quarterly report Q1 2016/17 1 June 30 September 2016 CONTENTS Contents... 3 Executive summary... 4 Our performance this quarter... 4 Our results at a glance... 6 Summary of delivering our strategy...
More informationVariances to Council s Ten Year Plan for. Lake Water Quality Initiatives. Preparation of Council s next Ten Year Plan
Annual Plan 2008/2009 9 The following table shows how this capital work will be funded for 2008/09 Funding for Capital Expenditure 2008/09 Ten Yr Description 2007/08 Plan 2008/09 2006/07 Annual 2008/09
More informationStrategic Transport Forum 7 th December 2018
Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft
More informationAppendix 9 Melbourn Greenway Review
Appendix 9 Melbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationHEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:
7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk
More informationAir Operator Certification
Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance
More informationRoundhouse Way Transport Interchange (Part of NATS City Centre Package)
Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal
More informationTransport Delivery Committee
Agenda Item No. 11 Transport Delivery Committee Date 6 th March 2016 Report title Accountable Director Accountable Employee Virgin Trains Partnership Agreement Update Pete Bond, Director of Transport Services
More informationMEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM
MEMORANDUM OF UNDERSTANDING WITH BUSINESS IMPROVEMENT DISTRICTS WITHIN BIRMINGHAM For services in respect of: Highway Maintenance and Management Car Parking Traffic Management Signatories: For Birmingham
More informationA Master Plan is one of the most important documents that can be prepared by an Airport.
The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport
More informationCONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand
CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE 26 th Australasian Transport Research Forum Wellington New Zealand 1-3 October 2003 By, Manager Strategic Policy, Transit New Zealand Abstract New Zealand
More informationCouncillors Noble (Chair), Gollick and Worton. There were no declarations of pecuniary or non-pecuniary interests.
MEETING: Dearne Area Council DATE: Monday, 4 April 2016 TIME: 10.00 am VENUE: Meeting Room, Goldthorpe Library MINUTES Present Councillors Noble (Chair), Gollick and Worton. 43 Declarations of Pecuniary
More informationFirst proposed route Purangi Estuary to Hot Water Beach. Stella Evered Reserve. Purangi Estuary
Great Walks Project First proposed route Purangi Estuary to Hot Water Beach PACIFIC OCEAN Cathedral Cove Hahei Hereheretaura Ngati Hei Pa site Stella Evered Reserve Proposed Carpark Lees Rd Blow Hole site
More informationChristchurch City Council. Major Cycleways. Activity Management Plan. Long Term Plan
Major Cycleways Activity Management Plan Long Term Plan 2015 2025 3 December 2014 Quality Assurance Statement Christchurch City Council Civic Offices 53 Hereford Street PO Box 73015 Christchurch 8154 Tel:
More informationWhether travelling on two wheels or two feet, we help communities stay active and sustainable.
Creating pathways Whether travelling on two wheels or two feet, we help communities stay active and sustainable. Stantec is a local leader in providing cycleway expertise to clients throughout New Zealand.
More informationRegulatory Committee
Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director
More informationFellow of the Royal Institution of Charted Surveyors (FRICS) since Member of the Royal Institution of Charted Surveyors (MRICS) since 1986
Derek Owen Telephone: 0121 285 2251 Mobile: 07767 672578 Email: derek.owen@slcproperty.co.uk Website: www.slcproperty.co.uk Profile Derek is an experienced property professional with over 30 years post
More informationItem 3.1 Attachment 1
Island Bay Cycleway-Working Party Report Purpose 1. To report on the outcomes of the Island Bay Cycleway community working party. Summary 2. At its 30 April 2015 meeting, Council agreed that a working
More informationGotherington Parish Council Action Plan 2018/19 Working document adopted at Parish Council Annual Meeting on 8 May 2018 and reviewed annually
Action Plan 2018/19 Working document adopted at Parish Council Annual Meeting on 8 May 2018 and reviewed annually Parishes are the smallest areas of civil administration in England and provide the statutory
More informationGold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging
Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section
More information1 INFORMATION REQUIREMENTS
1 INFORMATION REQUIREMENTS 1.1 BACKGROUND 2 1.2 WHAT IS THE DISTRICT PLAN 3 1.3 DISTRICT PLAN STRUCTURE 4 1.4 HOW TO USE THE DISTRICT PLAN 5 1.5 STRATEGIC FRAMEWORK 6 Whanganui District Plan (15 January
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: ISLINGTON STATION TEMPORARY BUS TERMINAL ACTION ITEM RECOMMENDATIONS It is recommended that the Board: 1.
More informationSOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016
SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 Go Ultra Low City Bid Success Announced on Monday 25 January, the Department for Transport (DfT) allocated 7M to the four West of England authorities
More informationAppendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited
Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information
More information