1 Illustrated Evidence of Legoland Traffic Delays August 2015 Prepared by The Royal Windsor Website

2

3 Introduction Windsorians have been experiencing major traffic problems locally for over 45 years since the days of the Safari Park and I speak on behalf of those Windsor residents who are now seeking effective solutions including a cap to visitor numbers at the Legoland park. Safari Park traffic queuing on the Relief Road in looking north Safari Park traffic queuing on the Relief Road in looking south During the summer months I have been using a dash-cam to record traffic conditions on the roads leading to Legoland. I have an archive of images from May 2015 and have included here records of traffic queues on Friday 21st, Saturday 22nd and Friday 28th August which resulted in the worst delays of this year, and quite possibly worse than any previous year. Page 1 of 12

4 The 2015 route through the Great Park This year RBWM erected permanent signposts to Legoland from the Relief Road, along Osborne Road, and around through the Great Park via the A332, in an attempt to relieve pressure on Imperial Road and the Clewer Hill Road junctions. The situation this summer was that, whenever the weather was good, both these routes were congested with Legoland traffic. This has had a major impact at the Woodside roundabout where traffic from the M4 and the west was joined by traffic from Slough and the north, and traffic from the M4 east all of which had been signposted into Windsor and out again via this route. At the Woodside roundabout this significant extra traffic flow from the Great Park met traffic from the Sunninghill area (to the south) and the M3, via Ascot and Bracknell, from the south west. The result on many occasions this summer was a massive queue and near standstill at the Woodside area as all this traffic, from all areas, was funnelled into the single carriageway approach road, the B3022, towards Legoland. Queues of stationary and very slow moving traffic, from as far as five miles away, were witnessed on a regular basis at weekends and during the school holidays and have been illustrated below, but only examples from the end of August have been included It should be noted that despite the altered signposting in the area, Imperial Road remained very busy throughout the summer despite two weekends where the RBWM arranged for 'traffic professionals' to manually control the lights at the Imperial Road, St Leonards Road and Clewer Hill Road intersection. Example 1-21 August 2015 Delays at Woodside roundabout B Woodside roundabou C A This location map shows Woodside roundabout, (bottom of map) and the locations for the three images included below. Google image A. The approach to the Woodside roundabout from Ascot B. The exit north towards Legoland B3022 C. The east side of the roundabout with Great Park traffic holding up south and south west bound traffic Page 2 of 12

5 21 August 2015 at A. Stationary traffic west of the Loch Fyne restaurant on the approach to the Woodside roundabout from Ascot/Bracknell 21 August 2015 at B. Traffic exit the Woodside roundabout but is regularly stationary Page 3 of 12

6 21 August 2015 at C. Traffic is delayed south & west bound by Legoland queuing traffic on the east side of the Woodside roundabout Example 2-22 August 2015 Traffic Delays in Windsor & Woodside B Long Walk roundabout A This location map shows Windsor for the three images included below. A. St Leonards Road traffic delays B. Osborne Road east towards the Long Walk roundabout C. The exit from the Long Walk roundabout towards the Great Park Google image Page 4 of 12 C

7 22 August A. Slow queuing traffic in St Leonards Road westbound and backed up past the Bulkeley Avenue junction for 700 yards (600m) from the Imperial Road traffic lights. 22 August B. Slow moving and stationary traffic in Osborne Road following the new signs east towards the Long Walk roundabout Page 5 of 12

8 22 August C. Slow moving and stationary traffic exiting the Long Walk roundabout. Traffic from the east, M25, Staines and Old Windsor, joined the Legoland traffic route at this point. The above queues of traffic all converged on the Woodside roundabout, as mentioned above and illustrated below. 22 August :10 Woodside roundabout and queueing traffic from Sunninghill to the south delayed by stationary traffic on the roundabout itself. This photograph is taken just a short distance after Photo C on page 4 above. Page 6 of 12

9 Example 4-28 August 2015 Traffic Delays through the Great Park, Woodside & North Street, Winkfield F E A B C D 28 Aug Google Traffic Map at 11.13am showing slow (orange) and stationary (dark red) traffic throughout the area and illustrated below. Google Traffic image Page 7 of 12

10 28 Aug :53 A. Traffic is slow moving and stationary west of Rangers Gate in the Great Park some 4.5 miles from the Legoland car parks 28 Aug :52 B. Slow moving and stationary Legoland traffic at Cranbourne 4.0 miles from the car parks Page 8 of 12

11 28 Aug :25 C. Woodside roundabout and traffic from Great Park (to the left in this view) blocks traffic south bound to Sunninghill as shown in two similar images above on 21 & 22 August 28 Aug :28 D. The stationary and slow moving traffic extended as far as Ascot Racecourse. At this point the queue extended 4.2 miles from the Legoland car parks. NB According to the Google Traffic map timed at and included above, some 45 minutes after this photograph was taken, slow moving and stationary traffic had extended past Ascot Racecourse by Heatherwood Hospital roundabout. The traffic queues would have continued to build up as a result of the severe congestion illustrated above around the Woodside roundabout. Page 9 of 12

12 Example 5-28 August 2015 Traffic Delays at North Street, Winkfield 28 Aug :49 E. North Street roundabout west of Legoland and a Greenline 702 bus (Bracknell to London) rejoins the main road having taken a diversion through Winkfield village to avoid the extensive queues at Woodside roundabout I have checked with the transport department operating this service and they have stated that their drivers are permitted to divert from the set route when traffic conditions severely disrupt their schedule. 28 Aug :35 F. Drift Road and North Street junction slow moving and stationary traffic. A driver has abandoned the queue and is performing a U turn. Page 10 of 12

13 Summary It has been my intention to provide photographic evidence of the regular and significant delays that occur on a regular basis throughout the spring and summer months and without doubt when the weather is fair during all school holidays and half-term breaks. There is much more that I could add to this presentation but I feel that the above fully and fairly represents the situation regarding traffic congestion as it currently stands. I believe that the time has now come for Legoland to significantly limit visitor numbers whenever there is the likelihood that near gridlock will occur in the surrounding roads. It is a great surprise to me and to many other people, including Legoland's own visitors, that on one of the days illustrated above, Legoland failed to state that the park had reached capacity until 1.30 in the afternoon when it was plain to see that the park would be full, and visitors would be required to queue for rides for way over an hour or more. Their visitors remarks on the Legoland Facebook pages indicate the level of dissatisfaction that regularly arises and so I and many others are asking for a cap on visitor numbers for the benefit of all concerned. Step One in achieving this objective would be to reject the application to build a new attraction which, by Legoland's own admission, is designed to attract new visitors AND to encourage previous visitors to return. A clear intention to increase yet further visitor numbers regardless of the fact that the nearby road system regularly exceeds saturation point during the summer months. Thank you for your time and for considering the above. Page 11 of 12

14 Page 12 of 12

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options.

Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear your views on our options. Welcome Welcome to the Highways England A27 Arundel Bypass public consultation. Thank you for coming. Today we are showing you the early designs to improve the A27 at Arundel and we would like to hear

More information

M2 Junction 5. improvements scheme. Preferred route announcement

M2 Junction 5. improvements scheme. Preferred route announcement M2 Junction 5 improvements scheme Preferred route announcement May 2018 Investing in your roads Why is the scheme needed? At Highways England we believe in a connected country and our network makes these

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

BLACK POTTS BLACK POTTS ISLAND, ETON, BERKSHIRE. A unique development opportunity on the River Thames

BLACK POTTS BLACK POTTS ISLAND, ETON, BERKSHIRE. A unique development opportunity on the River Thames BLACK POTTS BLACK POTTS ISLAND, ETON, BERKSHIRE A unique development opportunity on the River Thames BLACK POTTS BLACK POTTS ISLAND, ETON An Island on the River Thames with views of Windsor Castle and

More information

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First

2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First 2017 POLICY DOCUMENT Putting 2 Contents Message from the Premier 3 Our Commitment 4 The Newman-Nicholls Legacy 5 The Palaszczuk 6 Government s Record Our Plans: Putting 8 Call: 07 3844 8101 Mail: PO Box

More information

M4 Junctions 3 to 12 Smart motorway

M4 Junctions 3 to 12 Smart motorway Welcome The Highways Agency is proposing to improve the M4 motorway between Junction 3 and Junction 12 by introducing a Smart motorway scheme, which will: Relieve congestion and smooth the flow of traffic

More information

Public consultation exhibition

Public consultation exhibition Public consultation exhibition 2018 Welcome Improving reliability, safety, local life and regional growth Welcome to the A30 Chiverton to Carland Cross consultation, and thank you for your interest in

More information

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 July 20, 2018 Media Contact: Keith Bilbrey Public Involvement Manager The Southern Gateway Project kbilbrey@kstrategies.com 972-989-9995 Full I-35E Mainlane Closure at Beckley Avenue - July 27-30 DALLAS

More information

A31 Ringwood improvement scheme

A31 Ringwood improvement scheme A31 Ringwood improvement scheme Public consultation June/July 2017 Improving the A31 Ringwood: The proposed improvements will smooth the fl ow of traffic and improve journey time by reducing average delays.

More information

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION The A19 Trunk Road The A19 tends to live in the shadow of the more well known A1 it runs more or less parallel with. However, it is no less important

More information

Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk

Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Traffic Advisory Leaflet 14/99 December 1999 Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Introduction This leaflet summarises the impact of a traffic calming scheme on

More information

WOKING INTEGRATED TRANSPORT PROJECT

WOKING INTEGRATED TRANSPORT PROJECT Civic Offices Gloucester Square Woking Surrey GU21 6YL Telephone (01483) 755855 Facsimile (01483) 768746 DX 2931 WOKING Email wokbc@woking.gov.uk Website www.woking.gov.uk 20 January 2017 Dear Resident/Business

More information

M621. Junctions 1 to 7 Improvement scheme. Share your views

M621. Junctions 1 to 7 Improvement scheme. Share your views M621 Junctions 1 to 7 Improvement scheme Share your views Investing in your roads Every road user wants less congested roads to enable swift, safe, comfortable and informed travel. On behalf of the government,

More information

A303 Stonehenge Amesbury to Berwick Down

A303 Stonehenge Amesbury to Berwick Down A303 Stonehenge Amesbury to Berwick Down The case for the scheme Contents The A303 Corridor 4 Amesbury to Berwick Down 5 The case for the scheme 5 Map of the area 6 Objective 1: Transport 7 Objective 2:

More information

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011.

MEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011. MEMORANDUM Date: January 12, 2012 To: Congestion Management Process Files From: Seth Asante, Ryan Hicks, and Efi Pagitsas MPO Staff Re: Historical Trends: Travel Times and Vehicle Occupancy Levels for

More information

AIRLINE SCHEME RULES. (Updated July 2017)

AIRLINE SCHEME RULES. (Updated July 2017) 1 AIRLINE SCHEME RULES (Updated July 2017) INTRODUCTION AviationADR is an independent non-statutory organisation which is approved by the Civil Aviation Authority as an authorised ADR provider. The AviationADR

More information

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016 Sparkford to Ilchester Dualling Scheme Public consultation Welcome Background The /A358 corridor provides vital east-west connectivity between the south west and London and the south east for people, communities

More information

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

Report on the Crafthole Traffic Light Project 3 rd July th September 2017

Report on the Crafthole Traffic Light Project 3 rd July th September 2017 Report on the Crafthole Traffic Light Project 3 rd July 2017 4 th September 2017 Brief History The village of Crafthole sits on the B3247 road, one of the 2 Gateways to the Rame Peninsula, the other being

More information

Disaster! The Great San Francisco Earthquake And Fire Of 1906 By Dan Kurzman READ ONLINE

Disaster! The Great San Francisco Earthquake And Fire Of 1906 By Dan Kurzman READ ONLINE Disaster! The Great San Francisco Earthquake And Fire Of 1906 By Dan Kurzman READ ONLINE If looking for the book by Dan Kurzman Disaster! The Great San Francisco Earthquake and Fire of 1906 in pdf form,

More information

Possible traffic snarls ahead for 60 Freeway with lane/ramp closures on the weekends in Diamond Bar

Possible traffic snarls ahead for 60 Freeway with lane/ramp closures on the weekends in Diamond Bar Possible traffic snarls ahead for 60 Freeway with lane/ramp closures on the weekends in Diamond Bar A construction truck drives along the newly paved westbound 60 freeway Lemon Avenue on-ramp in City of

More information

20mph Speed Limit Zones

20mph Speed Limit Zones Traffic Advisory Leaflet 7/91 May 1991 20mph Speed Limit Zones Summary This leaflet illustrates the main steps in the procedures for the implementation of 20mph zones. It provides brief details on: the

More information

Performance monitoring report 2017/18

Performance monitoring report 2017/18 Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March

More information

1. Summary of key points 2

1. Summary of key points 2 Petitions Committee NEVAR petition: Cardiff Airport access road This brief sets out the history and policy background to the development of proposals for improved surface access to Cardiff Airport (CA).

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

Launceston City Council. Kings Meadows Traffic Management Report for Public Consultation

Launceston City Council. Kings Meadows Traffic Management Report for Public Consultation Launceston City Council Kings Meadows Traffic Management Report for Public Consultation November 2013 This report: has been prepared by GHD for Launceston City Council and may only be used and relied on

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov Major Operation: 36 massive beams will be placed at Sunland & I 10. Operation

More information

South East Traffic Solution

South East Traffic Solution South East Traffic Solution A MAJORITY LIBERAL GOVERNMENT WILL: Complete the Hobart Airport Interchange project Fix the Tasman Highway near Tasmania Golf Club Replace the Midway Point Roundabout with additional

More information

4 Are you responding on your own behalf or on behalf of an organisation or group?

4 Are you responding on your own behalf or on behalf of an organisation or group? RHA response to Highways England Lower Thames Crossing Consultation About you The following questions will help us to understand the range of people and organisations who have responded to this consultation

More information

M56. New Junction 11a Preferred route announcement

M56. New Junction 11a Preferred route announcement New Junction 11a Preferred route announcement August 2017 New Junction 11a Preferred route announcement Introduction The New Junction 11A scheme introduces a new motorway junction to the motorway between

More information

ISO/IEC JTC 1/SC 32 N 1920

ISO/IEC JTC 1/SC 32 N 1920 ISO/IEC JTC 1/SC 32 N 1920 Date: 2009-09-19 REPLACES: -- ISO/IEC JTC 1/SC 32 Data Management and Interchange Secretariat: United States of America (ANSI) Administered by Farance Inc. on behalf of ANSI

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

FINAL TERMINAL TRAFFIC MONITORING STUDY

FINAL TERMINAL TRAFFIC MONITORING STUDY FINAL TERMINAL 91 216 TRAFFIC MONITORING STUDY Prepared for: Port of Seattle February 15, 217 Prepared by: 12131 113 th Avenue NE, Suite 23 Kirkland, WA 9834-712 Phone: 425-821-3665 www.transpogroup.com

More information

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY Final Report Research Project Agreement No. T1803, Task 4 HOV Monitoring V HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY by Jennifer Nee TRAC Research Engineer John Ishimaru TRAC Senior

More information

King s Dyke Level Crossing Replacement - Initial Investigation

King s Dyke Level Crossing Replacement - Initial Investigation King s Dyke Level Crossing Replacement - Initial Investigation Cambridgeshire County Council 7 th June 2013 Notice This document and its contents have been prepared and are intended solely for Cambridgeshire

More information

Public Document Pack MINUTES OF THE HARLOW LOCAL HIGHWAYS PANEL HELD ON. 18 February pm

Public Document Pack MINUTES OF THE HARLOW LOCAL HIGHWAYS PANEL HELD ON. 18 February pm Public Document Pack MINUTES OF THE HARLOW LOCAL HIGHWAYS PANEL HELD ON 18 February 2014 7.00-8.12 pm PRESENT Committee Members Councillor Eddie Johnson, Essex County Council (Chairman) Councillor Mike

More information

M56. New Junction 11a Summary of the consultation report

M56. New Junction 11a Summary of the consultation report M56 New Junction 11a Summary of the consultation report August 2017 M56 New Junction 11a Summary of the public consultation The scheme The M56 New Junction 11a scheme is part of our continued programme

More information

Road Signs, Markings and Their Meaning

Road Signs, Markings and Their Meaning Road Signs, Markings and Their Meaning FUNCTIONS OF ROAD SIGNS AND MARKINGS 1. Guides 2. Directs 3. Warns 4. Informs 5. Prohibits 6. Regulates CLASSIFICATION OF ROAD SIGNS 1. Warning 2. Regulatory 3. Informatory

More information

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes

Appendix 9. Impacts on Great Western Main Line. Prepared by Christopher Stokes Appendix 9 Impacts on Great Western Main Line Prepared by Christopher Stokes 9 IMPACTS ON GREAT WESTERN MAIN LINE Prepared by Christopher Stokes Introduction 9.1 This appendix evaluates the impact of

More information

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

Dyke Road Cycle and Pedestrian Improvements 14/02/2014 Reference number PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT

Dyke Road Cycle and Pedestrian Improvements 14/02/2014 Reference number PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT 14/02/2014 Reference number 102470 PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT DYKE ROAD CYCLE AND PEDESTRIAN IMPROVEMENTS PEDESTRIAN CROSSING AND GUARDRAILING ASSESSMENT IDENTIFICATION TABLE Client/Project

More information

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

K SIGNAGE & TRAFFIC CONTROL. Table of Contents Table of Contents K1. ACCOMMODATION OF TRAFFIC... 1 K2. MINIMUM CONSTRUCTION SIGNING... 1 K3. SUBDIVISION SIGNS... 2 K4. TRAFFIC CONTROL DEVICES... 2 K4.1 Traffic Signs Regulations... 2 K4.2 Materials...

More information

Accessibility Statement

Accessibility Statement Accessibility Statement This access statement aims to accurately describe the facilities and services that we offer all visitors. If you wish to discuss specific requirements please email access@winchestersciencecentre.org

More information

Mystery shop of rail ticket retailing research summary

Mystery shop of rail ticket retailing research summary Mystery shop of rail ticket retailing research summary March 2007 Mystery shop of rail ticket retailing research summary Introduction The latest results of the Passenger Focus National Passenger Survey

More information

Traffic Management Plan 2018

Traffic Management Plan 2018 Traffic Management Plan 2018 Jesuit College Preparatory School of Dallas Amendment to Planned Development No. 353 Dallas, Texas June 6, 2018 Prepared for Jesuit College Preparatory School of Dallas Prepared

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

TRAFFIC MANAGEMENT. Planned Works and Night Closures Review EAST MIDLANDS GATEWAY RAIL FREIGHT INTERCHANGE

TRAFFIC MANAGEMENT. Planned Works and Night Closures Review EAST MIDLANDS GATEWAY RAIL FREIGHT INTERCHANGE EAST MIDLANDS GATEWAY RAIL FREIGHT INTERCHANGE TRAFFIC MANAGEMENT Planned Works and Night Closures Review W/C Mon 20 th Nov 17 W/C Mon 27 th Nov 17 W/C Mon 4 th Dec 17 Updated Tuesday 15 th Nov 17 EAST

More information

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement

A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement A5-M1 Link (Dunstable Northern Bypass) Explanatory Statement Broadway Broad Street Birmingham B15 1BL HIGHWAYS AGENCY A5-M1 LINK (DUNSTABLE NORTHERN BYPASS) EXPLANATORY STATEMENT Introduction The Highways

More information

8 DETACHED HOUSE PLOTS, JAMESFIELD FARM STEADING, NEWBURGH, PERTHSHIRE, KY14 6EW

8 DETACHED HOUSE PLOTS, JAMESFIELD FARM STEADING, NEWBURGH, PERTHSHIRE, KY14 6EW 8 DETACHED HOUSE PLOTS, JAMESFIELD FARM STEADING, NEWBURGH, PERTHSHIRE, KY14 6EW Jamesfield Farm Steading, Newburgh, Perthshire, KY14 6EW A903 0.7m, Abernethy 2m, Newburgh 3m, M90 J9 6m, Perth 10m, Cupar

More information

IN THE SUPREME COURT OF BELIZE, A. D J U D G M E N T

IN THE SUPREME COURT OF BELIZE, A. D J U D G M E N T IN THE SUPREME COURT OF BELIZE, A. D. 2015 CLAIM NO. 703 OF 2015 BETWEEN (EMIL BRADLEY ( (AND ( (DANNY TEJEDA ----- CLAIMANT DEFENDANT BEFORE THE HONOURABLE MADAM JUSTICE MICHELLE ARANA Mr. Jaraad Ysaguirre

More information

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER Proposal to Eliminate Traffic Gridlock in South North York Centre Area With Southbound Yonge Street to Eastbound Highway 401 Fly-UNDER A much

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure

Boxley Parish Council Highway Issues Briefing Note M2 junction 3 A229 Local Traffic Infrastructure Boxley Parish Council www.boxleyparishcouncil.org.uk Chairman: Bob Hinder Clerk: Pauline Bowdery Assistant Clerk: Melanie Fooks 28 November 2017 Boxley Parish Council Highway Issues Briefing Note M2 junction

More information

8 HOUSE PLOTS, JAMESFIELD FARM STEADING, NEWBURGH, CUPAR, KY14 6EW

8 HOUSE PLOTS, JAMESFIELD FARM STEADING, NEWBURGH, CUPAR, KY14 6EW 8 HOUSE PLOTS, JAMESFIELD FARM STEADING, NEWBURGH, CUPAR, KY14 6EW Jamesfield Farm Steading, Newburgh, Cupar, Perthshire, KY14 6EW A903 0.7m, Abernethy 2m, Newburgh 3m, M90 J9 6m, Perth 10m, Cupar 13m,

More information

The Commission invited respondents to comment on the The assumptions, conclusions, analysis and factual basis of the SH & E report.

The Commission invited respondents to comment on the The assumptions, conclusions, analysis and factual basis of the SH & E report. Our Ref: PM/u pmdf\2001\1405011 4 th June 2001 Mr C Guiomard Head of Economic Affairs Commission for Aviation Regulation 36 Upper Mount Street Dublin 2 IRELAND Head Office Axis House 242 Bath Road Hayes

More information

07/08 08/09 09/10 Total Carisbrooke Rest of Newport

07/08 08/09 09/10 Total Carisbrooke Rest of Newport 1 2 3 kjh 4 Forecasting The base year models have been developed to assist in forecasting the likely impacts of a number of development proposals in the Newport area and to inform the suitability of the

More information

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL

USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL USING SCOOT MULTI-NODES TO REDUCE PEDESTRIAN DELAY AT DUAL CROSSINGS IN BRISTOL Jackie Davies, Senior Technical Officer (UTC), Bristol City Council Traffic Signals Synopsis Bristol City Council has received

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Chapter 25 Route Window SE6 Plumstead portal. Transport for London

Chapter 25 Route Window SE6 Plumstead portal. Transport for London Chapter 25 Route Window SE6 Plumstead portal PLUMSTEAD PORTAL 25 Route Window SE6 Plumstead portal Introduction 25.1 The Crossrail route will follow the present alignment of the North Kent Line from a

More information

Chertsey - Base, travel and arrival information

Chertsey - Base, travel and arrival information Chertsey - Base, travel and arrival infmation Please read the following pages befe your journey to our base. They contain lots of imptant and useful infmation to help you plan your trip and to prepare

More information

Performance monitoring report for first half of 2015

Performance monitoring report for first half of 2015 Performance monitoring report for first half of 2015 Gatwick Airport Limited 1. Introduction Date of issue: 11 November 2015 This report provides an update on performance at Gatwick in the first half of

More information

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2 The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2 Operational Hazards Workload issues during taxi that can result in a loss of situational

More information

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council TORONTO STAFF REPORT ACTION REQUIRED Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road Dnte: February 16,2009 To: From: Toronto and East York Community

More information

8 THE CHASE ASCOT BERKSHIRE

8 THE CHASE ASCOT BERKSHIRE 8 THE CHASE ASCOT BERKSHIRE THE CHASE ASCOT, BERKSHIRE beautiful Family home situated in a gated development Ground floor: Entrance hall Drawing room Kitchen / Breakfast room / Family room Dining room

More information

Still waiting for a ticket? Ticket queuing times at large regional rail stations. Foreword

Still waiting for a ticket? Ticket queuing times at large regional rail stations. Foreword Ticket queuing times at large regional rail stations Report of Findings July 2010 Foreword Train companies are investing heavily in installing ticket machines at stations, many tickets can now be bought

More information

RESPONSE TO REVISED DRAFT, ADUR LOCAL DEVELOPMENT PLAN 2013

RESPONSE TO REVISED DRAFT, ADUR LOCAL DEVELOPMENT PLAN 2013 To: Adur Council planning dpt 8 th November 2013 Dear Sir, RESPONSE TO REVISED DRAFT, ADUR LOCAL DEVELOPMENT PLAN 2013 The Shoreham Society welcomes being consulted on the Revised Draft Adur Local Plan.

More information

Performance monitoring report for the second half of 2015/16

Performance monitoring report for the second half of 2015/16 Performance monitoring report for the second half of 2015/16 Gatwick Airport Limited 1. Introduction DATE OF ISSUE: 7 JUNE 2016 This report provides an update on performance at Gatwick in the second half

More information

University of Wollongong Innovation Campus Masterplan

University of Wollongong Innovation Campus Masterplan University of Wollongong Innovation Campus University of Wollongong Innovation Campus Masterplan Traffic and Transport Assessment Traffic and Transport Assessment Prepared for University of Wollongong

More information

Lower Thames Crossing

Lower Thames Crossing Lower Thames Crossing Post-Consultation Scheme Assessment Report Volume 2 Volume 2: Introduction and Existing Conditions Lower Thames Crossing 2017 - INTRODUCTION AND EXISTING CONDITIONS Contents Section

More information

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report

Woodbine Station Easier Access Project Public Open House January 27, :30 pm 8:30 pm Consultation Summary Report Woodbine Station Easier Access Project Public Open House January 27, 2014 6:30 pm 8:30 pm Consultation Summary Report Danforth Mennonite Church 2174 Danforth Ave Prepared by Lito Romano February 18, 2014

More information

AN GARDA SIOCHANA TRAFFIC PLAN INFORMATION FOR PAPAL VISIT TO KNOCK

AN GARDA SIOCHANA TRAFFIC PLAN INFORMATION FOR PAPAL VISIT TO KNOCK AN GARDA SIOCHANA TRAFFIC PLAN INFORMATION FOR PAPAL VISIT TO KNOCK THE VISIT OF HIS HOLINESS POPE FRANCIS TO KNOCK SHRINE IN THE MAYO GARDA DIVISION ON THE 26TH OF AUGUST 2018 Travel Advice We encourage

More information

National Park Authority Planning & Access Committee Meeting

National Park Authority Planning & Access Committee Meeting Present: In Attendance: George Freeman Depute Chair David Warnock (DW) Willie Nisbet (WN) Angus Allan (AA) David McCowan (DMcC) Fergus Wood (FW) Hazel Sorrell (HS) Billy Ronald (BR) - Observing Park Authority

More information

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities

FUTURE PASSENGER PROCESSING. ACRP New Concepts for Airport Terminal Landside Facilities FUTURE PASSENGER PROCESSING ACRP 07-01 New Concepts for Airport Terminal Landside Facilities In association with: Ricondo & Associates, TransSolutions, TranSecure RESEARCH Background Research Objective

More information

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement

A303. Sparkford to Ilchester Dualling Scheme Preferred Route Announcement A303 Sparkford to Ilchester Dualling Scheme Preferred Route Announcement About this booklet This booklet presents the preferred route for the A303 Sparkford to Ilchester dualling scheme and a summary of

More information

Arts & Crafts in the Cotswolds

Arts & Crafts in the Cotswolds Arts & Crafts in the Cotswolds Travel The tour commences and concludes at the Blunsdon House Hotel, Swindon. Blunsdon Swindon Wiltshire SN26 7AS England Tel: 0844 387 6035 Please note that transport to

More information

Project 43. Modular HST journeys for Western Mainlines (v4) from Just Trains

Project 43. Modular HST journeys for Western Mainlines (v4) from Just Trains Project 43 Modular HST journeys for Western Mainlines (v4) from Just Trains Build your own journey with handy bite size scenarios that reflect common FGW HST services around 2015 by driving scenarios in

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

The Newcastle Central Motorway East and Other Plans

The Newcastle Central Motorway East and Other Plans THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION The Newcastle Central Motorway East and Other Plans In the 1960s it was apparent the centre of Newcastle would not cope with future traffic. Major

More information

Airport accessibility report 2016/17 CAP 1577

Airport accessibility report 2016/17 CAP 1577 Airport accessibility report 2016/17 CAP 1577 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority, Aviation House, Gatwick Airport South, West Sussex, RH6 0YR. You can copy and use

More information

Baltimore Ravens Egress Study

Baltimore Ravens Egress Study Baltimore Ravens Egress Study Presented by: Matt Snare, P.E., PTOE Amy Jackson, P.E. April 19, 2016 Agenda History of Ravens in Baltimore Traditional Traffic Studies vs. Stadium Work Ravens Egress Study

More information

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118

More information

NEWSLETTER #04 June 2018

NEWSLETTER #04 June 2018 A5 Old Stratford Roundabout Improvements NEWSLETTER #04 June 2018 PROJECT TIMING UPDATE We are now entering into the final stages of the roundabout improvement works. Despite a number of operational challenges,

More information

SUTTON UNDER WHITESTONECLIFFE PARISH COUNCIL

SUTTON UNDER WHITESTONECLIFFE PARISH COUNCIL SUTTON UNDER WHITESTONECLIFFE PARISH COUNCIL A170 Sutton Bank Application for a Permanent Traffic Regulation Order (TRO) for Prohibition of HGVs The purpose of this document is to support a request from

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

National No. 2 (Bob Ciminel 2012)

National No. 2 (Bob Ciminel 2012) National No. 2 (Bob Ciminel 2012) Coming timetable east out of Muse Junction, we begin ascending the 1% grade to National Tunnel at MP 27. After passing through the tunnel s 823-foot bore we begin our

More information

I-405 Express Toll Lanes Coming in 2015

I-405 Express Toll Lanes Coming in 2015 I-405 Express Toll Lanes Coming in 2015 Jennifer Charlebois Roadway Toll Systems PE, Toll Division Anne Broache Public Information, I-405/SR 167 Lynn Peterson Secretary of Transportation Market Neighborhood

More information

Terms and Conditions of the Carrier

Terms and Conditions of the Carrier Terms and Conditions of the Carrier Article 1 - Definitions The below Conditions of Carriage has the meaning expressed respectively assigned to them where the Carrier reserves the rights to maintain and

More information

John Betts School Crossing Review

John Betts School Crossing Review John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the

More information

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011)

Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) Forest Hill Society response to the draft London and South East Route Utilisation Strategy (February 2011) 1. The Forest Hill Society represents residents in and around the Forest Hill and Honor Oak Park

More information

Scheme Evidence Update Planning & Sustainable Development. Adran yr Economi a r Seilwaith Department for Economy and Infrastructure

Scheme Evidence Update Planning & Sustainable Development. Adran yr Economi a r Seilwaith Department for Economy and Infrastructure Adran yr Economi a r Seilwaith Department for Economy and Infrastructure This document is an update to the Proof of Evidence Planning & Sustainable document. It contains an update following the addition

More information

What We ve Learned About Highway Congestion

What We ve Learned About Highway Congestion What We ve Learned About Highway Congestion BY PRAVIN VARAIYA THERE ARE 26,000 SENSORS buried under the pavements of California freeways. Every thirty seconds, those sensors send data to our computers

More information

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TECHNICAL COMMITTEE: ITEM NUMBER: TOPIC: ORIGIN OF REQUEST: AFFECTED SECTIONS OF MUTCD: NCUTCD Proposal for Changes

More information

CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206)

CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206) CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA 98040-3732 (206) 275-7600 www.mercergov.org August 18, 2016 Mr. Daniel M. Mathis Division Administrator Federal

More information

Leicester Square Action Plan Summary

Leicester Square Action Plan Summary Leicester Square Action Plan Summary The Leicester Square Action Plan was developed by Westminster City Council, together with the Leicester Square Association, the Metropolitan Police Service, and the

More information

CITY OF EDINBURGH COUNCIL (PORTOBELLO PARK) BILL PPAG RESPONSE TO THE PROMOTER S WRITTEN RESPONSE TO CONVENER S LETTER DATED 11 OCTOBER 2013

CITY OF EDINBURGH COUNCIL (PORTOBELLO PARK) BILL PPAG RESPONSE TO THE PROMOTER S WRITTEN RESPONSE TO CONVENER S LETTER DATED 11 OCTOBER 2013 CITY OF EDINBURGH COUNCIL (PORTOBELLO PARK) BILL PPAG RESPONSE TO THE PROMOTER S WRITTEN RESPONSE TO CONVENER S LETTER DATED 11 OCTOBER 2013 We are writing to clarify some points made in the above letter

More information

LETTER OF AGREEMENT LETTER OF AGREEMENT BETWEEN LONDON SOUTHEND AIRPORT AND STOKE AIRFIELD

LETTER OF AGREEMENT LETTER OF AGREEMENT BETWEEN LONDON SOUTHEND AIRPORT AND STOKE AIRFIELD LETTER OF AGREEMENT BETWEEN LONDON SOUTHEND AIRPORT AND STOKE AIRFIELD LOA LSA/ Stoke Airfield Version 1.1 Page 1 of 11 Date: 16 July 2014 Letter of Agreement Between London Southend Airport and Stoke

More information

Waverley Council Executive Manager, Creating Waverley Waverley Council Manager, Transport and Development Waverley Council Traffic Engineer

Waverley Council Executive Manager, Creating Waverley Waverley Council Manager, Transport and Development Waverley Council Traffic Engineer MINUTES OF THE WAVERLEY TRAFFIC COMMITTEE MEETING HELD AT WAVERLEY COUNCIL CHAMBERS, CNR PAUL STREET AND BONDI ROAD, BONDI JUNCTION ON THURSDAY, 25 MAY 2017 Voting Members Present: Cr B Mouroukas Sgt L

More information

ACORNS PROJECTS LIMITED

ACORNS PROJECTS LIMITED ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project

More information

Smart Motorways Programme

Smart Motorways Programme Smart Motorways Programme M27 Junction 4 to 11 Smart Motorway Response to Statutory Instrument Consultation The introduction of variable mandatory speed limits July 2018 Contents Executive Summary 3 1.

More information