1 Successive steps towards the creation of a Marina at Loutraki - West end of Korinth Canal - Greece AJ. Rogan, SJ. Rogan, G. Papageorgiou, C. Solomonidis Rogan Associates, Consulting Engineers - Architects rogan@matrix.kapatel.gr Abstract The scope of this paper is the presentation of all the necessary stages for the creation of a marina in a maritime European country, such as Greece, from the starting point of its scheduling as a node in the National network of leisure harbours, to it's final design phase. The whole procedure is demonstrated with the example of a new 700 berthing places Marina at Loutraki, a well-known resort at the northwestern end of the Gulf of Korinthos. A number of parameters are examined, such as the hinterland, which the marina will serve as well as the existing transport accesses. A thorough analysis of the existing and future demand for berthing places in leisure harbours, both for the whole of Greece, and more specifically for the Attica and Argolis areas is performed, setting as time horizon for the estimates the year The demand is compared to the existing capacity in berthing places, thus establishing the necessity of creating new marinas in the area. The required capacity of the marina is then calculated in terms of places in the sea and on dry, in relation to the local demand, but subject to geographical and other constraints. The main goals of the Master Plan of the marina are outlined and the design proposal is presented with emphasis given on the architectural concept which was followed.
2 474 Coastal Engineering and Marina Developments 1 Introduction The Greek National Tourism Organisation (ONTO), having realized the need for leisure harbours and the possibilities offered by Greece's natural and cultural attractions, asked the then Chair of Harbour Works of the National Technical University of Athens (NTUA) to study the 1* Phase of a National System of Navigational Zones for Leisure (NZL). According to this study, which was completed in 1982 and approved by the GNTO, Greece was divided into eight (8) subsystems or NZ. The Marina at Loutraki belonged to NZ No 6: Corinthiakos-Saronikos-Argolikos Gulfs. After a public invitation to tender, ROGAN ASSOCIATES was commissioned by the Municipal Enterprise for Tourist Development of Loutraki-Perachora (DETALP) to carry out the project aiming at selecting the most appropriate site for the development of a Marina. The study proposed three sites from which DETALP approved and selected the one at Poseidonia. At the end of 1993, the Ministry of National Economy (meanwhile the GNTO had become a "General Secretariat" of this Ministry) passed Law 2160/1993 on "Regulations for Tourism and other provisions", of which Article 30 5 approved sixteen sites for development of Leisure Harbours. The site approved under the name LOUTRAKI KORINTHIAS coincided with the one at Poseidonia (see Figure 1). Further to this, another company belonging to the Loutraki Municipality, the "Tourist Development Company of the Casino-Loutraki", the ATEKL, in Joint Venture with "Club Hotel Loutraki SA", owner of the Casino of Loutraki, invited a restricted number of contractors to bid for the design-construction of the "Marina Loutraki" on the site approved by Law 2160/1993. AEGEK SA Contractors and ROGAN ASSOCIATES SA Designers were selected, and these latter were asked to adapt their initial preliminary design to the regulations of Law 2160/1993. The Marina Loutraki will have a capacity of 700 yachts. In August 1997, the joint Venture ATEKL - CLUB HOTEL LOUTRAKI submitted to the Secretariat for Support of Tourist Harbours (SSTH), which was created by Law 2160/1993, a request for the planning and creation of a leisure harbour. The final decision is still pending due to diverging interpretations of some articles of Law 2160.
3 Coastal Engineering and Marina Developments 475 Figure 1: Geographical location of the Marina
4 476 Coastal Engineering and Marina Developments 2 The served hinterland The proposed Marina is practically serving (due to the submerged bridge at the west end of Korinth canal), both the towns of Loutraki (11,000 permanent inhabitants and 70,000 in summer) and Korinth (27,500 permanent inhabitants) thus totalizing 38,500 inhabitants (97,500 in summer). Several archaeological sites are close to the site: Ancient Corinthos at 15 km, Mycenae at 50 km, Epidaurus at 70 km, Delphy at 220 km and Olympia at 240 km. The most important is that yachts sailing from west (Ionian Sea - Adriatic Sea) are not obliged to cross the Korinth Canal in order to visit Athens, which is only at 85 km distance. 3 Transport accesses The Marina at Loutraki is connected through a 7 km long secondary road to the PATHE Motorway (Thessaloniki-Athens-Patra). A suburban rail is connecting Loutraki to Athens and R.R. Station of Korinth is at 10 km distance. The new international airport of Athens at Spata will be at a distance of 80 km upon completion of the peripheral road Stavros- Elefsis. 4 Potential future demand for berthing space in leisure harbours 4.1 Total demand for berthing space in Greece ( ) The present chapter is based on the results of the study "Dynamics of Marina Market in Greece" completed on July 1994 by ROGAN ASSOCIATES. The international and the domestic demands have been evaluated for various Scenarios (3 Scenarios for the international and 3 for the domestic demands). The time horizon of related estimates was the year 2014 (20 years from the then study year, or 15-years from today). The results are compiled in Table 1. The following are noted regarding these forecasts: In each case (international and domestic demand), the final estimates of total demand are derived as the average of three scenarios, two of which are based on trends (related to tourism development in general and to incomes) while the third although is based and one is of substantial greater order of magnitude, based, however, on modest assumptions - in the case of international demand, on a modest share of
5 Coastal Engineering and Marina Developments 477 international boats cruising the Mediterranean and selecting Greece for berthing; and, in the case of domestic demand, on per capita leisure boat ownership in Greece after 20 years only half the corresponding index in Italy and France in , it is of substantially greater order of magnitude. Thus, overall these forecasts are considered modest. For the demand of boats for charter, it is assumed that the number will increase at the same rate as the number of individual leisure boaters in Greek waters (international and domestic). All the above are summarised in Table 2 and Figure 2. Table 1: Alternative scenarios of demand for berthing space in organised leisure harbours in Greece in the period International Demand Scenario I- 1 Scenario 1-2 Scenario 1-3 Average Domestic Demand Scenario D- 1 Scenario D-2 Scenario D-3 Average Total Demand (Average) ,000 2,000 2,000 2,000 5,300 5,300 5,300 5,300 7, ,700 2,200 3,100 2,700 7,100 6,200 11,200 8,200 10, ,100 2,500 4,400 3,300 8,200 7,200 21,000 12,100 15, ,600 2,700 6,200 4,200 9,500 8,400 39,200 19,000 23, ,100 3,300 8,200 5,200 10,700 9,400 64,600 28,200 33, Future demand for berthing space in Attica and Argolis areas The Marina at Loutraki, situated at only 85 km distance from Athens Great Area, with a population of 4,500,000 inhabitants (more than 40% of Greece's population), is easily reached during the week-end (maximum one hour drive). It is, therefore, an attractive leisure harbour for domestic users originating the Attica area.
6 478 Coastal Engineering and Marina Developments Table 2 Total Demand for Berthing Space in Greece Individual Yachtsmen International Boats Domestic Boats Total ,000 5,300 7, ,700 8,200 10, ,100 12,100 15, ,600 19,000 23, ,100 28,200 33,400 Boats for Charter 3,700 5,500 7,800 11,700 16,800 Grand Total 11,000 16,400 23,200 34,900 50,200 60, o - - International Boats o- - Boats for Charter Domestic Boats Grand Total Figure 2: Total Demand for Berthing Space in Greek Leisure Harbours Future demand for berthing space in the greater area of Attica/Argolis, where the Marina at Loutraki can be considered as a gate to the next NZ for leisure (Korinthiakos Golf), is estimated on the basis of: Total demand for berthing space in the country estimated in the previous section and presented in Table 2 and Figure 2. Existing demand for berthing space in these areas. Logical assumptions, on the basis of which alternative scenarios of shares of the national totals are formulated. Existing demand for berthing space is estimated on the basis of available facilities, observations and trends in Greece as a whole.
7 Coastal Engineering and Marina Developments 479 In 1994 there were a total of 3,985 berths in the organised leisure harbours of Attica. It was assumed that the existing berthing space represents approximately 60% of total demand. Thus, existing demand for the two areas is estimated as follows: 4 Attica area: 6,600 berths, of which 1,055 by private boats under international flag, 3,167 by boats under Greek flag and 2,378 by boats for charter. + Argolis area: 400 berths, of which 76 by boats under international flag, 168 by boats under Greek flag and 156 by boats for charter. Scenarios of future demand for berthing space are formulated on the basis of population, tourism and arrivals of leisure boats in various ports. Those scenarios are summarized in Table 3 and Figure 3. The final estimates are the averages of the three alternative scenarios. Demand in years intermediate to 1994 and 2014 is estimated assuming constant annual compound rate of growth in the period in question. Table 3: Estimate of future demand for berthing space in Attica and Argolis areas Attica Area Scenario 1 (Population - Tourism) Scenario 2 (Boat arrivals - Charter Leases) Scenario 3 (Overnight stays by bed) Scenario 4 (Average - Total Attica Area) Argolis Area Scenario 1 (Population - Tourism) Scenario 2 (Boat arrivals - Charter Leases) Scenario 3 (Overnight stays by bed) Scenario 4 (Average - Total Argolis Area) Total Attica and Argolis Area ,600 6,600 6,600 6, , ,779 8,663 10,874 9, , ,149 10,928 16,649 12, , , ,989 13,847 25,711 16, , ,368 18, ,897 16,782 36,617 22, ,470 1,006 2,044 24,142
8 480 Coastal Engineering and Marina Developments 25, Total of Lagontssi Area - Total of Porto Hydra Area Figure 3: Future demand for berthing space in Attica/Argolis areas It is interesting to note that plans and programmes for creation of leisure harbours in the areas under study will meet only limited proportions of the total demand for berthing space in the year 2013 (Table 4). Table 4: Planned Capacity of Leisure Harbours in Relation to Demand for Berthing - Space in Attica/Argolis Areas in Year 2014 Capacity Demand Capacity % Demand Attica 6,095 22, Argolis 1,150 2, Capacity will be a very low proportion of total demand, especially in the greater area of Attica which includes the capital city of the country. It is quite possible that this will induce expansion of leisure harbour capacity in this area far beyond the level of existing plans and programmes. In addition, spillover effects will probably appear in the form of leisure harbour expansion around the area of Athens. This confirms the necessity of creating new Marinas at areas with good air, rail and road access from Athens, which is the case of the Marina at Loutraki.
9 Coastal Engineering and Marina Developments Capacity of the marina related to local demand A leisure harbour (Marina) in addition to satisfying demand from the wider Attica area can also be justified simply based on demand expected to be generated in the future in the narrow area around the Marina, which includes the cities of Korinth and Loutraki-Perachora. Taking into account the population figures given in 2 and making the basic assumption that the leisure boat ownership per 1,000 population in Greece by the year 2014 will reach half the level of Italy and France in , we can evaluate that the average leisure boat ownership in Greece in the year 2014 will be 9.2 per 1,000 population. It is estimated that due to the physical barrier of the Isthmus of Korinth and the limited northern hinterland of Loutraki, the ownership index has to be reduced to 2/3 i.e roughly to 6 per 1,000 capita. Thus, the demand for berths for the residents of Loutraki - Korinth urban complex (which is expected to have a population of around 47,000 in year 2014) will be: 47,000 x 6 =2 82 berths. 1,000 For the 70, ,000 = 59,000 summer residents it is estimated that 1/3 pocess a secondary residence in Loutraki-Korinth area and to each secondary residence correspond 4 persons. The basic assumption is that 15% of those residences will need a berth, thus the demand for berth for the summer residents will be: 0.33x59, x - =730 berths It is estimated that the demand of foreigners for berths will correspond to 5% of the number of berths for the permanent and summer residents i.e.: ( ) -51 berths ^ / Finally, it is estimated that transit boats will need additional berths amounting to 10% of number of berths for the permanent and summer residents i.e. ^( ) = 102 berths 100
10 482 Coastal Engineering and Marina Developments Thus, the total demand is: = 1,165 berths. This demand falls within the forecast given in Table 4 for Attica and Argolis areas estimated to 17,960 berths. The morphology of the site has allowed the design of Marina with a capacity of 700 berths < 1,105 of estimated demand C = 700. According to the recommendations of PIANC if Np = Number of permanent boats then the Number of transit boats is: N, = N/3 and the number of berths for boats under repairs is: 1 1 Thus C = Np + Nt + K = Np(l+- + ) ~ C = ~ 490 berths ( N. in the sea and ~ 3 " ( ~ 1 60 berths( N< < in the sea and on dry) Np 1 4 N,. = - ~ 50 berths ( N, in the sea and on dry) 700 berths This was the split for the initial DETALP study. The final split corresponding to the proposal submitted in by the Joint Venture ATEKL - CLUB LOUTRAKI is: 452 in the sea and 248 on dry = 700 as port capacity. The master plan of the proposed marina with the berths and occupancy, as well as dry storage area, is shown in Figure 4.
11 Coastal Engineering and Marina Developments 483 Figure 4: Master plan of the 700 berths marina at Loutraki, Korinthos, Greece.
12 484 Coastal Engineering and Marina Developments 6 Main goals for the master plan The main goals, which are taken into consideration for the layout of the different functions of the Loutraki Marina, are the following: a. To concentrate the larger part of the buildings around the northern basin of the harbour. There are two reasons for this choice: To reach the possibility, after a decent architectural concept, for the development of a quite dense building context and To give a feeling of "urbanity" among the building complexes, instead of a feeling of dispersion and looseness which might derive after scattering unconnected functions in different places of the onshore area. b. To concentrate in the Southwest onshore area of the Marina all the functions which need minor or not at all building installations. Such type of functions are the onshore boat storage (dry storage), a large part of parking areas, the boat repair yard, which includes the necessary repair shop, and finally a group of sales areas for new and used boats combined with ship chandleries. The above mentioned functions, by leaving almost free of building volumes the area near the exit of the Korinth Canal, facilitate the navigation. In addition, since these functions give both an impression of "disorder" (repairs, dry storage) and a feeling of increased noise, they may be adjusted better with the relative functions of the Canal and its surrounding context than with commercial functions, entertainment and housing which might be developed around the opposite onshore area (north basin). c. To extend inside the marina the pedestrian mall which is going to be developed along the Loutraki coast. This mall might start up to the northeast edge of the Marina and finish in its southeast edge near the Korinth Canal. The same mall might connect, inside the marina, different areas which might be spots of life for both the clients of the Marina and the different visitors. In addition, a bicycle way, which would run in an almost parallel direction to the mall, could offer a strong possibility of connection by bicycle of the Marina together with the city of Loutraki and the Korinth Canal. 7 Design proposal for the master plan 7.1 Architectural concept, urban and architectural acceptances The main architectural concept for the layout of the onshore facilities in the Loutraki Marina Master Plan corresponds to different distinctive design criteria. One of them is the basic acceptance that the very interesting
13 Coastal Engineering and Marina Developments 485 northern view towards both the city of Loutraki and the Gulf of Corinth should be exploited by most of the parts of the building complexes. This acceptance leads to the combination of two grid systems in order to reach better escapes towards the views as well as a simultaneous protection, as much as possible, from the preponderant northwest and west winds of the area. Furthermore, an important design criterion was to achieve the possibility of the construction of the building complexes along three distinctive phases. By this way, the operation of the Marina might start earlier as well as the flow of capitals for its construction might be more rational. From a design point of view, this design criterion leads to a division of larger building complexes into smaller distinctive ones without neglecting to keep an overall design sense of unity. Another general design criterion for the marina was to divide into smaller groups the required superficies of parking areas which are very extended. Where that is not possible, the solution of covered parking areas is preferred. The reason for these choices is to achieve both an equilibrium in the offer of parking places allover the Marina and a minimum aesthetical damage from the concentration of vehicles. All the above mentioned design criteria, in combination with the main goals of the master plan, area leading to a design proposal in which the main concept is to develop a "wall-building" between the two basins in the central onshore area. This "wall-building" is going to be the main unifying element of the proposal or the central "spine" of the whole complex. In a parallel direction to the central complex and in the opposite side of the north basin is going to be developed a housing complex. This housing complex together with both the central complex and a linear complex vertically arranged between them along the south-east pier, they enclose the northwest basin which is destinated for the smallest boats. By this way, an atmosphere of a small traditional harbour might be reached. The second basin of the marina is enclosed by the central complex, the repair and dry storage areas in the opposite side and another linear development between them. This building context is not dense as in the previous complex. The above mentioned linear development acts mainly as a transition towards a more void area where repair and storage functions are concentrated. According to the general design proposal for the onshore facilities, the whole complex is composed by four distinct units, which are the following with their responsive construction phases in parenthesis:
14 486 Coastal Engineering and Marina Developments a) The central mixed-uses complex with its vertical "finger" complex (Phase B). b) The housing complex (Phase C). c) The linear complex in between the repair areas and the central complex including cafeterias, super-market and nautical schools (Phase A). d) The repair, sales and storage area (Phase A) with an isolated discotheque (Phase B or C). For each of the above units, the following specific concepts should be mentioned Central mixed uses complex The main design concept in this complex was the formation of the central "wall building" which is its main unifying element. This building has such a form that it leads to memories from both a boat and a trip. That's why it might be also described as a "boat-building". Its longitudinal form is broken partially from a group of volumes which are interconnected to it following another grid system and reaching successful transition of view towards the Korinthian Gulf and the City of Loutraki. In addition, the end of this linear building is emphasized by a smaller linear and vertical to it volume. This last volume functions also as a limit between the open air entertainment areas and the main street of the Marina. The "plaza", which is enclosed between the volumes of this building complex, might create a basic "nucleus" of life like in the small traditional greek harbours Housing complex The main design concept for the housing complex was the development of multilevel groups of apartments around a central "plaza" forming altogether an "idealized" trapezoidal scheme. The central "plaza" includes a swimming pool complex, green areas and walkways towards the entrances of the apartments. Every group of apartments has three levels: A ground floor with independent apartments, and two more levels where are arranged maisonettes accessible from the 1st floor by balcony access.
15 Coastal Engineering and Marina Developments The linear complex between repair areas and the central mixeduse complex The linear complex between the repair areas and the central mixed use complex constitutes, by a design point of view, a continuation of the second one The repair, sales and storage area Also the repair complex constitutes a synthetical continuation of the previous complexes. At the top end of the repair area, with a special view towards the entrance of the Canal of Korinth, is situated a discotheque the main organizing concept of which is the development of two main volumes around a central open air space. The first volume includes the disco area, and the second volume includes a restaurant Parking areas Required parking places for a Marina supporting activities as described above, are 1,3 places for each berthing place in the sea. According to this acceptance, the total required parking places for the Loutraki Marina are approximately 452x1,3=586 places. Taking into consideration that the construction of 105 apartments is proposed, it is necessary to have 105x1,20=125 more places for parking. Consequently the total disposable parking places should be at least =711.Actually in the Marina, the total places offered for parking are References [1] Examen des normes selectionnees qpplicables a la conception d' appontements flottants, AIPCN, Supplement au Bulletin N 95 (juin 1997) [2] Empfehlungen des Arbeitsausschusses, Ufereinfassungen Hafen und Wasserstrassen EAU 1996, Ernst & Sohn, Berlin 1997 [3] A.J.Rogan, C.G.Antonopoulos, Development of nautical tourism in Cyprus, Comp.Mech.Public., Southampton 1995
16 488 Coastal Engineering and Marina Developments [4] A.J.Rogan, The development of the National System of Leisure Harbours in Greece, Marina Technology, Comp.Mech.Public., Thomas Telford, London 1992 [5] Donald W.Adie, "MARINAS" a working guide to their development and design, The Architectural Press Ltd., London 1984 [6] Rapport final de la Commission Internationale pour la navigation de sport et de plaisance, AIPCN, annexe au bulletin NO 25 (Vol. IH/1976)
Egnatia Odos: An axis for development and co-operation
Egnatia Odos: An axis for development and co-operation Egnatia Odos is one of the two Trans-European transport axes (the other being PATHE) which cross through our country and, together with the Eleftherios
More informationCrossroads of the Adriatic: Corfu
Crossroads of the Adriatic: Corfu BEING IN THE MIDST OF THE ADRIATIC MARITIME ROUTES OF PEOPLES & CULTURES An International Tourist Destination The Island of Corfu is a pioneer Tourist Destination for
More informationWESTERN PELOPONNESE RAILWAY, PORTS AND ROADS
WESTERN PELOPONNESE RAILWAY, PORTS AND ROADS Project Key Features Short Description: Project Components: Design and/or Construction, Financing, Operation, Maintenance and Exploitation of rail lines, ports
More informationRelated Expertise Concession Projects - PPP
Related Expertise Concession Projects - PPP IMPETUS-ISIS for Attiki Odos ISIS and Impetus developed a traffic model for the offer that Attiki Odos, SA had provided in the bidding process and won the contract
More informationDr. Dimitris P. Drakoulis THE REGIONAL ORGANIZATION OF THE EASTERN ROMAN EMPIRE IN THE EARLY BYZANTINE PERIOD (4TH-6TH CENTURY A.D.
Dr. Dimitris P. Drakoulis THE REGIONAL ORGANIZATION OF THE EASTERN ROMAN EMPIRE IN THE EARLY BYZANTINE PERIOD (4TH-6TH CENTURY A.D.) ENGLISH SUMMARY The purpose of this doctoral dissertation is to contribute
More informationForecast and Overview
Forecast and Overview DENVER INTERNATIONAL AIRPORT Overall goals of the (MPR): Work with DEN to refine the preferred airport development plan to guide the development over an approximate 25-year planning
More informationMEASURING ACCESSIBILITY TO PASSENGER FLIGHTS IN EUROPE: TOWARDS HARMONISED INDICATORS AT THE REGIONAL LEVEL. Regional Focus.
Regional Focus A series of short papers on regional research and indicators produced by the Directorate-General for Regional and Urban Policy 01/2013 SEPTEMBER 2013 MEASURING ACCESSIBILITY TO PASSENGER
More informationPOLLUTION MONITORING OF SHIP EMISSIONS: AN INTEGRATED APPROACH FOR HARBOURS OF THE ADRIATIC BASIN (POSEIDON)
POLLUTION MONITORING OF SHIP EMISSIONS: AN INTEGRATED APPROACH FOR HARBOURS OF THE ADRIATIC BASIN (POSEIDON) Implementation between 01/06/2014 and 31/05/2015 http://www.medmaritimeprojects.eu/section/poseidon
More informationMapping of the theoretical potential for wind energy and small hydropower plants in the region of Peloponnesus
Mapping of the theoretical potential for wind energy and small hydropower plants in the region of Peloponnesus Peloponnesus covers an area of some 21,550 km² (8,320 square miles) and constitutes the southernmost
More informationAffiliation to Hotel Chains: Requirements towards Hotels in Bulgaria
Affiliation to Hotel Chains: Requirements towards Hotels in Bulgaria Maya Ivanova CEO, Zangador Ltd., Bulgaria International University College, Dobrich, Bulgaria Stanislav Ivanov International University
More informationWhangarei Airport. Prepared by Carine Andries 10/20173
Whangarei Airport Prepared by Carine Andries 10/20173 March 2010 TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2
More informationThe Next International Cruise Tourism Hub
The Next International Cruise Tourism Hub Contents Market Scenario and Projections Demand & Supply Factors Current Scenario in India Vision & Formulation of Task Force Standard Operating Procedures Ministry
More informationDevelopments and Opportunities
Investing in Tourism: Developments and Opportunities Yannis Pyrgiotis General Secretary, Cultural and Tourism Infrastructure Ministry Capitallink New York City, November 2010 Greek Tourism in numbers Among
More informationWhat do local businesses expect from the cruise industry. The experience of the AIC Forum. Olympia, 23 th May 2015
What do local businesses expect from the cruise industry. The experience of the AIC Forum. Olympia, 23 th May 2015 Mr. Andrea Mosconi Business Manager Ancona Chamber of Commerce WHAT IS THE FORUM OF THE
More informationMeasure 67: Intermodality for people First page:
Measure 67: Intermodality for people First page: Policy package: 5: Intermodal package Measure 69: Intermodality for people: the principle of subsidiarity notwithstanding, priority should be given in the
More informationvisits4u Case Studies: Historical Centre of Athens Athens, Greece
visits4u Case Studies: Historical Centre of Athens Athens, Greece Historical Centre of Athens Athens, Greece Title: The Historical Centre of Athens as an Accessible Destination Description Tourism in Greece
More informationreviewed paper Sustainability via Soft Natural Resource Management. The Coastal Area of Vouliagmeni Agisilaos Economou
reviewed paper (Phd, Laboratory of Geographic Information Systems in Urban and Regional Planning, National Technical University of Athens, Nikaias 18, 17122, Athens, Greece, aghs@mail.ntua.gr) 1 ABSTRACT
More informationAPPENDIX B: NPIAS CANDIDATE AIRPORT ANALYSIS
APPENDIX B: NPIAS CANDIDATE AIRPORT ANALYSIS The National Plan of Integrated Airport Systems (NPIAS) is the Federal Aviation Administration s (FAA) national airport plan. The NPIAS includes nearly 3,500
More informationThe contribution of Tourism to the Greek economy in 2017
The contribution of Tourism to the Greek economy in 2017 1 st edition (provisional data) May 2018 Dr. Aris Ikkos, ISHC Research Director Serafim Koutsos Analyst INSETE Republishing is permitted provided
More informationCapital Link Forum «Delivering Results Investments & Business Opportunities in Greece Today» November 9, 2007 Investment Opportunities in Real Estate
Capital Link Forum «Delivering Results Investments & Business Opportunities in Greece Today» November 9, 2007 Investment Opportunities in Real Estate t and Tourism Harry Coccossis CEO Tourism Development
More informationINVITATION TO PRE-QUALIFICATION FOR PARALLEL PROJECTS. +One
INVITATION TO PRE-QUALIFICATION FOR PARALLEL PROJECTS +One A HUB IN TOMORROW S GOTHENBURG By 2030, there will be no borders between the Swedish Exhibition & Congress Centre, Gothenburg and the wider world.
More informationPetrovac Business residential development
Petrovac Business residential development About Atlas Group Atlas Group has over 30 members operating in the area of banking, financial services, insurance, real estate, production, tourism, media, education,
More informationPERFORMANCE MEASURE INFORMATION SHEET #16
PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days
More informationNEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS
INTRODUCTION The Municipal docks in both Newboro and Portland were transferred to the Township of Rideau Lakes by Parks Canada in 2002. Little has been done to improve the docks physical condition or role
More informationEnvironmental Performance Evaluation of Ro-Ro Passenger Ferry Transportation
Environmental Performance Evaluation of Ro-Ro Passenger Ferry Transportation Authors: Hans Otto Holmegaard Kristensen (hohk@mek.dtu.dk) The Technical University of Denmark Constantin Hagemeister. Nordic
More informationThe implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.
The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10
More information2. Our response follows the structure of the consultation document and covers the following issues in turn:
Virgin Atlantic Airways response to the CAA s consultation on Economic regulation of capacity expansion at Heathrow: policy update and consultation (CAP 1658) Introduction 1. Virgin Atlantic Airways (VAA)
More informationAppendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited
Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information
More informationREVISIONS IN THE SPANISH INTERNATIONAL VISITORS ARRIVALS STATISTICS
Revisions in the Spanish International Visitor Arrivals Statistics REVISIONS IN THE SPANISH INTERNATIONAL VISITORS ARRIVALS STATISTICS Carlos Romero Dexeus 1 Abstract: This article concerns the revision
More informationDaHar Danube Inland Harbour Development
The European Union's Southeast Europe programme supporting DaHar Danube Inland Harbour Development DaHar WP 4 A4: Local Action Plan of the Port of Novi Sad Final version: 30 th of December 2013 This project
More informationFrankfurt Hotel 2014/2015. Frankfurt. Market Report. Accelerating success.
Market Report Frankfurt Hotel 2014/2015 Frankfurt Market Report Accelerating success. Overall information Frankfurt am Main has a population of just under 700,000 and is a major hub of the financial industry
More informationRIJEKA GATEWAY PROJECT
RIJEKA GATEWAY PROJECT Situated at the crossroads of the main trade routes, by land and sea, Rijeka has a perfect position and has always been the lever of living and growth in the whole region. Development
More informationRE: PROPOSED MAXIMUM LEVELS OF AIRPORT CHARGES DRAFT DETERMINATION /COMMISSION PAPER CP6/2001
RE: PROPOSED MAXIMUM LEVELS OF AIRPORT CHARGES DRAFT DETERMINATION /COMMISSION PAPER CP6/2001 ------------------------------------------------------------------------------------------------------- Bord
More informationNovember 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.
November 11, 2009 Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1 BY E-MAIL Attention: Mr. Don Herweyer Dear Mr. Herweyer: Reference: Abbott-Fernbank
More information9 th EURO-MED CONVENTION FROM LAND TO SEA THE ECONOMIC INTEGRATION OF EUROPE: THE ROLE OF THE MOTORWAYS OF THE SEA MALTA - 21 st OCTOBER 2005
trasporti - diritto, economia, politica volume 2006 - n. 98 Dr. MARCO BONELLO* Chairman Malta Maritime Authority 9 th EURO-MED CONVENTION FROM LAND TO SEA THE ECONOMIC INTEGRATION OF EUROPE: THE ROLE OF
More informationD2. Islands and tourism
5 th European Conference on Sustainable Urban Mobility Plans 14-15 MAY 2018 NICOSIA, CYPRUS D2. Islands and tourism S I M P Year-round Sustainable Island Mobility Planning Alexia Spyridonidou Kosmas Anagnostopoulos
More informationPCAL Case Study Retail Areas: Rouse Hill Town Centre
PCAL Case Study Retail Areas: Rouse Hill Town Centre Introduction Rouse Hill Town Centre is a new mixed use development on a greenfield site in Sydney s North West. It has been planned to be a major hub
More informationSetting the Stage for an Independent and Vibrant Life
Chapter 4: Setting the Stage for an Independent and Vibrant Life Coping with a falling birth rate and a graying population Steady progress has been made toward barrier-free buildings, public facilities
More informationOnline Case. Practice case. Slides HTS de préparation - fev 2016_rev HC.pptx Draft for discussion only
Copyright 2016 by The Boston Co onsulting Group, Inc. All rights reserved. Online Case Practice case Slides HTS de préparation - fev 2016_rev HC.pptx Draft for discussion only 0 INSTRUCTIONS (1/3) During
More informationThe Economic Impact of Tourism on Oxfordshire Estimates for 2014
The Economic Impact of Tourism on Oxfordshire Estimates for 2014 County and District Results August 2015 Prepared by: Tourism South East Research Unit 40 Chamberlayne Road Eastleigh Hampshire SO50 5JH
More informationSection 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps
Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate
More informationThe Economic Impact of Tourism on Oxfordshire Estimates for 2013
The Economic Impact of Tourism on Oxfordshire Estimates for 2013 County and District Results September 2014 Prepared by: Tourism South East Research Unit 40 Chamberlayne Road Eastleigh Hampshire SO50 5JH
More informationCRITICAL FACTORS FOR THE DEVELOPMENT OF AIRPORT CITIES. Mauro Peneda, Prof. Rosário Macário AIRDEV Seminar IST, 20 October 2011
CRITICAL FACTORS FOR THE DEVELOPMENT OF AIRPORT CITIES Mauro Peneda, Prof. Rosário Macário AIRDEV Seminar IST, 20 October 2011 Introduction Airports are becoming new dynamic centres of economic activity.
More information10 th INSULEUR FORUM Palma de Mallorca, 10-11/6/2010
10 th INSULEUR FORUM Palma de Mallorca, 10-11/6/2010 Sustainable Development and Insularity - Planning a development policy for insular areas covering a wide typology Agatha Lagi Special Service for Strategy,
More information1. INTRODUCTION 2. OTAS AND THE MFN CLAUSE
HOTEL ONLINE BOOKING SECTOR: THE COMMITMENTS OF BOOKING AND THE MOST FAVORED NATION CLAUSES. A CASE CONDUCTED IN COOPERATION WITH OTHER NATIONAL COMPETITION AUTHORITIES Giulia Cipolla 1 Keywords: Italian
More informationTHE EXTENSIONS PROGRAMME
THE EXTENSIONS PROGRAMME OF ATHENS METRO PRESENTATION AT THE ISIGE UTNA COLLOQUE ASPECTS D ATHENES: ARCHITECTURE URBANISME TRANSPORT - SOCIETE Athens, March 4 th, 2009 George Yannis, Ass.Professor NTUA
More informationINTER-MOBILITY AS A ROLL FOR URBAN (RE) DEVELOPMENT OF BELGRADE PUBLIC SPACE AREAS - BETWEEN MOBILITY AND SUSTAINABILLITY IN CASE OF BELGRADE
INTER-MOBILITY AS A ROLL FOR URBAN (RE) DEVELOPMENT OF BELGRADE PUBLIC SPACE AREAS - BETWEEN MOBILITY AND SUSTAINABILLITY IN CASE OF BELGRADE Transport system in Belgrade Metropolitan Area Introduction
More informationIAMI EUROPE 20th ANNUAL CONFERENCE. GLYFADA - ATHENS, GREECE OCTOBER 15th 17th, 2017
IAMI EUROPE 20th ANNUAL CONFERENCE GLYFADA - ATHENS, GREECE OCTOBER 15th 17th, 2017 Dear Members, future members and friends of IAMI, Our Chairman along with the steering committee would like to invite
More information2009 Muskoka Airport Economic Impact Study
2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end
More informationAuckland Port and the Unitary Plan Dr Douglas Fairgray
Auckland Port and the Unitary Plan Dr Douglas Fairgray Source: Auckland 1886 - Sir George Grey Special Collections, Auckland Libraries, NZ Map 374 Scope The interface between the Unitary Plan and the Port
More informationACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN
Doc. 1S-26-O-11-5/1-2 ACTION PLAN FOR THE PERIOD 2011-2015 concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN April 2011 Table of Contents INTRODUCTION... 5 1.
More informationTOURISM STATISTICS REPORT 2016 EAST REGION VISIT GREENLAND
TOURISM STATISTICS REPORT 2016 EAST REGION VISIT GREENLAND INTRODUCTION In Q1 of 2015 Visit Greenland made its first regional tourism report based on data on air passengers, overnight stays in accommodations
More informationCosta Rica. Tourism in the economy. Tourism governance and funding. Tourism policies and programmes
Costa Rica Tourism in the economy Tourism in Costa Rica has been growing firmly since 2009. In 2014 the country received 2.5 million international tourists, an increase of 4.1% over 2013 and more than
More informationVisual and Sensory Aspect
Updated All Wales LANDMAP Statistics 2017 Visual and Sensory Aspect Final Report for Natural Resources Wales February 2018 Tel: 029 2043 7841 Email: sw@whiteconsultants.co.uk Web: www.whiteconsultants.co.uk
More informationTreasure Island Supplemental Information Report Addendum
1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land
More informationLake Tahoe Shoreline Plan 03 Policy Topic: Access Issues
Lake Tahoe Shoreline Plan 03 Policy Topic: Access Issues V9 Last Updated 03.10.2017 1 Brief Description Physical access to the waters of Lake Tahoe is one of the key issues surrounding the Shoreline Plan
More informationINNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS
INNOVATIVE TECHNIQUES USED IN TRAFFIC IMPACT ASSESSMENTS OF DEVELOPMENTS IN CONGESTED NETWORKS Andre Frieslaar Pr.Eng and John Jones Pr.Eng Abstract Hawkins Hawkins and Osborn (South) Pty Ltd 14 Bree Street,
More informationPeculiarities in the demand forecast for an HSRL connecting two countries. Case of Kuala Lumpur Singapore HSRL
València, Universitat Politècnica de València, 2016 DOI: http://dxdoiorg/104995/cit201620163458 Peculiarities in the demand forecast for an HSRL connecting two countries Case of Kuala Lumpur Singapore
More informationFrequently Asked Questions on the Route 29 Solutions Improvements Projects
Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy
More informationNew Trends & Challenges in City Tourism by Alex Galinos Managing Director Athens, October 23, 2006
New Trends & Challenges in City Tourism by Alex Galinos Managing Director Athens, October 23, 2006 In Athens was founded in May 2005 as a non-profit organization In Athens is the official tourism board
More informationActivity Concept Note:
Activity Concept Note: Summary Provide a short summary of the proposed Activity including indicative New Zealand funding level and note whether this is a New Zealandled or partner-led process. Why: Rationale
More information12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization
REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,
More informationESTIMATING REVENUES AND CONSUMER SURPLUS FOR THE GERMAN AIR TRANSPORT MARKETS. Richard Klophaus
ESTIMATING REVENUES AND CONSUMER SURPLUS FOR THE GERMAN AIR TRANSPORT MARKETS Richard Klophaus Worms University of Applied Sciences Center for Aviation Law and Business Erenburgerstraße 19 D-67549 Worms,
More informationTourism Towards 2030
Tourism Towards 23 Agenda Item 5a 24 th Joint Meeting of the UNWTO Commission for East Asia and the Pacific and the UNWTO Commission for South Asia 4 May 212 Chiang Mai, Thailand million Tourism 22 Vision
More informationPolicy Research Corporation
Policy Research Corporation SOUND SOLUTIONS BASED ON SCIENTIFIC RESEARCH The role of Maritime Clusters to enhance the strength and development of maritime sectors Country report Malta INTRODUCTION TO COUNTRY
More informationThe project comprises the design of the following works:
An integrated approach to the design of the port and marina infrastructure of the island of Mykonos D. Avgoustinos, N. Panagopoulos, I. Sioris TRITON Consulting Engineers Ltd, 10 Makedonon Str., 11521
More informationScienceDirect. Prediction of Commercial Aircraft Price using the COC & Aircraft Design Factors
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 67 ( 2013 ) 70 77 7th Asian-Pacific Conference on Aerospace Technology and Science, 7th APCATS 2013 Prediction of Commercial
More informationWho goes where? How long do they stay? How much do they spend?
Who goes where? How long do they stay? How much do they spend? Analysis of inbound tourism by Region and Market Summary Evangelia Lamprou Researcher - Statistician Dr. Aris Ikkos, ISHC Research Director
More informationDESTIMED PROJECT CALL FOR EXPRESSION OF INTEREST FOR THE IMPLEMENTATION OF ECOTOURISM PILOT ACTIONS IN CROATIAN MPAS
DESTIMED PROJECT CALL FOR EXPRESSION OF INTEREST FOR THE IMPLEMENTATION OF ECOTOURISM PILOT ACTIONS IN CROATIAN MPAS Terms of Reference TABLE OF CONTENTS 1 Background... 3 2 Objectives of the call for
More informationTour of the Holy Lands - The Corinth Canal PELOPONNESE
Tour of the Holy Lands - The Corinth Canal Delphi New bridge built in 2004 Old bridge built in 1893 Olympia Corinth Mycenae Athens Sounion PELOPONNESE Sparta To catch up with Paul, we have to get from
More informationMethodology and coverage of the survey. Background
Methodology and coverage of the survey Background The International Passenger Survey (IPS) is a large multi-purpose survey that collects information from passengers as they enter or leave the United Kingdom.
More informationMOSE PROJECT: STATE-OF-THE-ART AND FUTURE DEVELOPMENT
AIPCN-France Third Mediterranean Days of Coastal and Harbour Engineering Troisièmes journées méditerranéennes de génie côtier et portuaire 23/05/2013 Marseille MOSE PROJECT: STATE-OF-THE-ART AND FUTURE
More informationPaper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA
Paper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA CIORTAN R.; DUMITRU M.; SUCIU I.; KRKLJUS D. Ph.D, Corresponding Member of the Romanian Academy of Technical Sciences,
More information- Online Travel Agent Focus -
North American Online Travel Report 2009 - Online Travel Agent Focus - EyeforTravel Research 7-9 Fashion Street London E1 6PX UK For queries contact: amy@eyefortravel.com www.eyefortravelresearch.com EyeforTravel
More informationNorth American Online Travel Report
North American Online Travel Report 2009 - Hotel Focus - EyeforTravel Research 7-9 Fashion Street London E1 6PX UK For queries contact: amy@eyefortravel.com www.eyefortravelresearch.com EyeforTravel Ltd,
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationTHE ECONOMIC IMPACT OF NEW CONNECTIONS TO CHINA
THE ECONOMIC IMPACT OF NEW CONNECTIONS TO CHINA A note prepared for Heathrow March 2018 Three Chinese airlines are currently in discussions with Heathrow about adding new direct connections between Heathrow
More informationTime-Space Analysis Airport Runway Capacity. Dr. Antonio A. Trani. Fall 2017
Time-Space Analysis Airport Runway Capacity Dr. Antonio A. Trani CEE 3604 Introduction to Transportation Engineering Fall 2017 Virginia Tech (A.A. Trani) Why Time Space Diagrams? To estimate the following:
More informationStructure of presentation
Inbound tourism Slovak Republic CAPACITY BUILDING PROGRAMME ON TOURISM STATISTICS, Regional Seminar, Vienna (Austria), 1st July 2009 Structure of presentation 1. System of Tourism Statistics 2. Developments
More informationSTAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D
STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings
More informationAirport Planning Area
PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose
More informationAssessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry
Unofficial translation of the original document produced in Czech language Assessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry Assessment team:
More informationWestover Metropolitan Airport Master Plan Update
Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The
More informationC. SYKIANAKI, President, Organization for Planning and Environmental Protection of Athens.
! GENERAL PRESENTATION OF THE ATHENS METROPOLITAN REGION (AMR) C. SYKIANAKI, President, Organization for Planning and Environmental Protection of Athens. Athens, July 2006 1 ! The capital city of Athens
More informationCase No IV/M DELTA AIR LINES / PAN AM. REGULATION (EEC) No 4064/89 MERGER PROCEDURE. Article 6(1)(b) NON-OPPOSITION Date:
EN Case No IV/M.130 - DELTA AIR LINES / PAN AM Only the English text is available and authentic. REGULATION (EEC) No 4064/89 MERGER PROCEDURE Article 6(1)(b) NON-OPPOSITION Date: 13.09.1991 Also available
More informationNew Zealand Transport Outlook. Leg-Based Air Passenger Model. November 2017
New Zealand Transport Outlook Leg-Based Air Passenger Model November 2017 Short name Leg-Based Air Passenger Model Purpose of the model The Transport Outlook Leg-Based Air Passenger Model projects domestic
More informationBasic Idea Regarding the Selection of Cruise Ship Liners. to have a Partnership with the Naha Port Authority on a
Basic Idea Regarding the Selection of Cruise Ship Liners to have a Partnership with the Naha Port Authority on a International Cruise Hub Formulation Plan by Public-Private Partnerships Naha Port Authority
More informationCHAPTER FIVE PROSPECTS FOR FUTURE ECONOMIC DEVELOPMENT
CHAPTER FIVE PROSPECTS FOR FUTURE ECONOMIC DEVELOPMENT 5.1 GENERAL The recommended type and location of future land uses in Alpine should, in part, consider potential opportunities for future economic
More informationSAVE THE DATE Ancient Olympia, Greece Saturday, May 23 rd, 2015
SAVE THE DATE Ancient Olympia, Greece Saturday, May 23 rd, 2015 Economic Impacts of the Cruise Industry on Coastal and Insular and River Destinations A Forum organized by the Chamber of Commerce of Ilia
More informationCultural routes of Greece, some examples:
Cultural routes of Greece, some examples: Walking tours of the unified archaeological sites of Athens In the footsteps of Paul the Apostle in Greece Ancient theatres, a work in progress Mrs Penelope Nompilaki,
More information34 TH ATHENS AUTHENTIC MARATHON SUNDAY 13 NOVEMBER 2016
34 TH ATHENS AUTHENTIC MARATHON SUNDAY 13 NOVEMBER 2016 ONE OF THE TOP TEN MARATHONS ACROSS THE GLOBE Why this race -A legendary course (2504 years) -The course that gave its name to the race -A technical
More informationWater Space. A development opportunity at the Canting Basin, Pacific Quay, Glasgow
Water Space A development opportunity at the Canting Basin, Pacific Quay, Glasgow Summary Canting Basin Lower Harbour The Pacific Quay development, which Graving Docks Quay includes the new BBC Scotland
More informationProtection of Ulcinj Saline
Strasbourg, 25 March 2015 T-PVS/Files (2015) 21 [files21e_2015.docx] CONVENTION ON THE CONSERVATION OF EUROPEAN WILDLIFE AND NATURAL HABITATS Standing Committee 35 th meeting Strasbourg, 1-4 December 2015
More informationSHIP MANAGEMENT SURVEY. July December 2017
SHIP MANAGEMENT SURVEY July December 2017 INTRODUCTION The Ship Management Survey is conducted by the Statistics Department of the Central Bank of Cyprus and concentrates primarily on transactions between
More information1. FORECAST VISITATION FOR GREAT OCEAN ROAD
1. FORECAST VISITATION FOR GREAT OCEAN ROAD 1.1. INTRODUCTION This section provides a 20-year forecast of visitation to the Great Ocean Road Region, modelled from Australian Tourism Forecast Committee
More informationJUNE18 NEWSLETTER GREECE IN NUMBERS RENEWABLE ENERGY SOURCES GREEK F&B EXPORTS
GREEK F&B EXPORTS RENEWABLE ENERGY SOURCES GREECE IN NUMBERS The newsletter is a monthly publication of Enterprise Greece, the national investment and trade promotion agency. Greek F&B Industry Enters
More informationPreliminary Findings of Proposed Alternative
Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be
More informationSESSION 1: Q&A summary of session with Will Apps (Head of Energy Development) and Helen Elphick (Senior Development Manager)
Meeting Potential new offshore wind leasing - industry event: Q&A summary Date/time Wednesday 25 July 2018 Venue Glaziers Hall, 9 Montague Close, London Bridge, SE1 9DD Chair Presenters Clare Collard,
More informationMODAIR. Measure and development of intermodality at AIRport
MODAIR Measure and development of intermodality at AIRport M3SYSTEM ANA ENAC GISMEDIA Eurocontrol CARE INO II programme Airports are, by nature, interchange nodes, with connections at least to the road
More information