1 Inženjering Engineering Projektovanje Designing Konsalting Consulting Izvođenje radova Performance of Works Proizvodnja opreme Manufacture of Equipement Kontrolne aktivnosti Control Activities delta in enjering ı 08

2 Izdavač DELTA INŽENJERING Privredno društvo za konsalting, projektovanje i inženjering Beograd 11000, Zaplanjska 86 Telefoni: ; ; delta.ing@sezampro.yu Urednik Aleksandra Todorović-Sučević, PR manager Dizajn Nenad Pavlović Tipodizajn Metodije Karadžov Prevod na Engleski Stanimirka Đurđević Stručni saradnici Milorad Stevanović, stručni konsultant Nada Zorić-Grujić, dipl.ing.građ. Bojan Tomić, dipl.ing.maš. Miroslav Novaković.dipl.ing.maš. Dejan Kažić, dipl.ing.maš. Aleksandar Mečanin, dipl.ing.maš. Vesna Marjanović, dipl.ing.maš. Dragan Zeljković, dipl.ing.maš. Svetislav Petrić, dipl.ing.maš. Aleksandar Sučević, dipl.ing.maš. Željko Antić, dipl.ing.maš. Dragoljub Kos, dipl.ing.maš. Milan Marjanović, dipl.ing.maš. Goran Sofronić, dipl.ing. el. Štampa Publish, Beograd Tiraž 500 primeraka Publisher DELTA INŽENJERING Commercial Entity for Consulting, Designing and Engineering 86, Zaplanjska, Belgrade Phone: ; ; delta.ing@sezampro.yu Editor Aleksandra Todorović-Sučević, PR Manager Design Nenad Pavlović Typographic design Metodije Karadžov Translated by Stanimirka Đurđević Expert Associates Milorad Stevanović, adviser Nada Zorić-Grujić, Dipl.Eng.Civ. Bojan Tomić, Dipl.Eng.Mech. Miroslav Novaković, Dipl.Eng.Mech. Dejan Kažić, Dipl.Eng.Mech. Aleksandar Mečanin, Dipl.Eng.Mech. Vesna Marjanović, Dipl.Eng.Mech. Dragan Zeljković, Dipl.Eng.Mech. Svetislav Petrić, Dipl.Eng.Mech. Aleksandar Sučević, Dipl.Eng.Mech. Željko Antić, Dipl.Eng.Mech. Dragoljub Kos, Dipl.Eng.Mech. Milan Marjanović, Dipl.Eng.Mech. Goran Sofronić, Dipl.Eng.El. Printed by Publish, Beograd Number of copies printed 500 printed copies

3 01 delta in enjering

4 02

5 03 Sadržaj / Contents: Uvodna reč / Welcome note/ Vojislav Todorović / 05 Delta Inženjering Group / Delta Engineering Group / Milan Kovačević / 06, 07 PR aktivnosti / PR Activities / Aleksandra Todorović Sučević / 08, 09 Messer Group, Ukrajina / Messer Group, Ukraine / 10, 11 RB Kolubara / Kolubara Mining Basin / 12, 13 Recirklaza olovnih akumulatora, Monbat, Zajaca / Re-cycling of lead accu-batteries, Monbat, Zajaca / 14, 15 U.S. Steel, Smederevo / U.S.Steel, Smederevo / 18, 19 Hotel Metropol / Hotel Metropol / 16, 17 Rafinerija Beograd / Oil refinery Belgrade / 20, 21 NIS Rafinerija Pančevo / Oil Refinery Pancevo / 22 PPOV Holcim / Waste Water treatement Holcim / 23 Alfa Mont / Alfa Mont / 25 Zavod za zavarivanje / Welding Institute / 26, 27 Čelik, Fabrika za proizvodnju čelične konstrukcije, Žitoradja / Čelik, Factory for manufacturing of steel structures, Zitoradja / 28, 29 Centroprojekt / Centroprojekt / 30, 31 delta in enjering ı 08

6 04

7 05 Uvodna reč Welcome note Poštovani čitaoci, Prethodnu godinu obeležili smo mnogobrojnim poslovima i poduhvatima, kako u Delta Inženjeringu, tako i u Delta Inženjering Group. U godini promet je bio veći od 18 miliona evra, što je znatno više nego 2007, kao rezultat znanja, iskustva i ambicija svih zaposlenih. Neke poslove smo širili sklapajući nove ugovore na objektima, poput Fabrike cementa Holcim, gde smo višegodišnji i pouzdan partner. Uspešno održavamo poziciju i u Smederevu u fabrici U. S. Steel. Naš sektor za prečišćavanje otpadnih voda vodio je poslove u oblasti tretmana otpadnih voda u Holcimu Novi Popovac i u Rafineriji nafte Beograd. Visok kvalitet u projektovanju, izgradnji i poštovanju dogovorenih rokova na domaćem otvorio nam je mogućnost dokazivanja i na evropskom tržištu. U Dnjepropetrovsku je Delta Inženjering odabran za kompletno vođenje projekata u izgradnji fabrike za razlaganje vazduha. Naši proizvodi, čelične konstrukcije iz fabrike»čelik«žitorađa, našli su kupce u Ukrajini, Bugarskoj, Turskoj, Rusiji, Poljskoj, Bosni i Hercegovini, Sloveniji... Širenjem poslova i potrebom da integrišemo različite delatanosti, kupili smo Zavod za zavarivanje u Beogradu i tako ušli među vodeće kompanije sposobne da ideju pretvore u gotov objekat sopstvenim snagama. Naše ambicije rastu iz godine u godinu, jer mi znamo... Zajedno izgrađujemo budućnost! Dear Sir/Madam, The year that is behind us was marked by various business activities at both Delta Inženjering and at Delta Inženjering Group. In the last year our turnover exceeded EUR 18 million, even exceeding the record year of 2007, which has by all means been the result of working activities of all the people employed by Delta Inženjering Group. Some of the important jobs were awarded by the expansion of the existing ones and by concluding the new contracts with already known investors, such as Holcim Cement Factory, being its already recognized and reliable partner. We have also been keeping successfully our position with U.S.Steel Smederevo. It has already become traditional that our sector for waste water treatment is awarded new jobs in the field of treatment of waste water at both Holcim and the Belgrade Oil Refinery. Simultaneously with the personnel expansion, where we join the youth and the experience, Delta Inženjering Group has also been experiencing the business expansion in the country and abroad in particular. In Dnjepropetrovsk, Ukraine Delta Inženjering has been managing for a year a large and complex project of the construction of the Air Separation Factory for Messer Company. Steel construction from Žitoradja were exported to Ukraine, Bulgaria, Turkey, Russia, Poland, Bosnia i Herzegovina, Slovenia,... By the purchase of the Welding Institute, we closed the circle. Our ambitions have been growing each year for we know how to do the job. Constructing the future together! Vaš, Vojislav Todorović Sincerely yours, Vojislav Todorović

8 06 Delta Inženjering Group Delta Engineering Group Godinu karakterišu potpuno različiti periodi. Počelo je sjajno. Svi delovi Delta Inženjering sistema bili su veoma angažovani u prva tri kvartala. Ovo se naročito odnosi na izvoz robe i usluga. Kako smo predviđali i planirali, spoljnotrgovinska aktivnost bila je intenzivna i plodotvorna. Osvajamo nova tržišta kao što su Ukrajina, Rusija, Turska, Poljska, Bosna i Hercegovina, i proširujemo stara, Nemačka, Slovenija, Austrija. Cilj je bio da se više od 50% prometa ostvari izvozom. Saradnja sa bankama, špediterima, transporterima i državom vrlo je profesionalna i procesi se odvijaju bez zastoja. Ispunjavali smo ugovorene poslove u pogledu kvaliteta, rokova, isporuka, pakovanja i sticali osnove za dugoročnu saradnju. Našu viziju kao vodeće kompanije u regionu počeli smo da ostvarujemo. Međutim, u najnezgodnijem trenutku, kada su stremljenja nadohvat ruke ili nam je tako izgledalo, svetska finansijska kriza stigla je i do nas. Najpre se odrazila na izvozno orijentisane kompanije kao što je naš sistem. U početku se teškoće u realizaciji porudžbina, odnosno ugovora, samo najavljuju, traže se načini za prevazilaženje, niko ne sluti razmere nepogoda koje stižu, niti vreme trajanja. Svi su bili zatečeni. Sledeću fazu, od novembra karakteriše osvešćivanje, ali i suočavanje sa: otkazivanjem dogovorenih isporuka odlaganjem isporuka pomeranjem rokova i preciziranjem novih termina. Pitanje koje se postavlja iz dana u dan jeste koliko će kriza još trajati, a na njega nažalost još nema odgovora. Izabrali smo da se ne predamo, a namera nam je da opstanemo. Pod pretpostavkom da će sve trajati do kraja has been characterized by entirely different periods. We started it splendidly. All parts of Delta Inženjering system were engaged in too many jobs during the first three quarters. It especially concerns the export of goods and services. As foreseen and planned, foreign trade activities were intensive and fruitful. We mastered new markets, such as: Ukraine, Russia, Turkey, Poland, Bosnia & Herzegovina and expanded the activities on the already mastered markets. Germany, Slovenia, Austria. The goal was to achieve more than 50% of turnover in export, which started to be implemented. The co-operation with the banks, forwarding companies, transport companies, state administration was professional and there were no delays in these processes. The contracted terms and conditions were fulfilled in respect of quality, deadlines, deliveries, packing and provided basis for long-term co-operation. Our vision of the leading company in the region started to be implemented. However, at the crucial moment when we thought we had almost achieved our goals or it seemed so to us, the world financial crisis struck us as well. It primarily struck the companies orientated towards export, such as our system. At first the difficulties in the realization of orders, namely the contracts were only announced, we were looking for ways to overcome the delays, no one could imagine the scope of problems arriving nor how long they were going to last. We all were confused. The next stage, as from November 2008 is characterized with acceptance of reality and facing: The cancellation of fixed orders, Postponement of deliveries, Postponement of delivery terms and conditional fixing of new delivery terms.

9 07 godine (imamo argumente za ovaj optimistički rok): Moraćemo da sačuvamo kadrovske i materijalne resurse realizujući ranije ugovorene poslove, da ugovaramo nagoveštene poslove predano i temeljnije nego do sada. Održavaćemo i produbljivati već ostvarene kontakte sa partnerima, hrabreći ih i pomažući im da što spremnije dočekaju novi početak, a i mi sa njima. Pripremaćemo se za dalju profesionalizaciju svih aspekata poslovanja da bismo period»preporoda sačekali što spremniji. Detaljno ćemo analizirati buduće poslovne orijentacije našeg sistema i tražiti najperspektivnije i najprofitabilnije. How long is it going to last this is the question being asked every day and, unfortunately, no one can answer it as yet. We have decided to behaviour without giving up with the aim to survive. Under the assumption that all this is going to last up to the of 2009 (we have arguments to be this optimistic). In 2009 we shall have to keep our resources, both financial and human resources, by the implementation of the previously contracted jobs, to contract the previously announced jobs with all our efforts and more thoroughly than earlier. We shall maintain and deepen our previously made contacts with the partners we estimate to survive the crisis, encouraging them and helping them to live up to the new beginning together with us. We shall properly prepare ourselves that all aspects of our business activities remain further professional in order to wait for the period of renewal as ready as possible. We shall analyze in details the future business orientations of our system looking for the most perspective and the most profitable ones. Ako svi shvatamo da nas čeka teška godina, sa mnogo obaveza, sigurni smo da ćemo prebroditi nevolje i biti spremni za nastavak samo nakratko prekinute vizije, a ona glasi»biti vodeći u regionu. Milan Kovačević If we all take that a very difficult year is in front of us burdened with many obligations, we are then sure we are going to overcome the difficulties and remain ready for the continuation of our business vision, which has been stopped for a short time only and which says»to be a leading company in the region. Milan Kovačević

10 08 PR aktivnosti PR Aktivities U godini koja ostaje za nama uspeli smo da podignemo na viši nivo informaciju o aktuelnostima u našoj firmi i pokrenuli časopis News Delta Inženjering. News objavljujemo kvartalno, tri do četiri puta godišnje, u skladu sa dinamikom radova i uz mogućnost da značajne poslove i partnere predstavimo u vanrednom broju. Želja nam je da u izdanjima Newsa afirmišemo neke članice grupe: u jesenjem izdanju posebnu pažnju posvetili smo Alfa Montu, a sledeća je Fabrika čeličnih konstrukcija»čelik«, Žitorađa. U oblasti eksternog PR-a, Delta Inženjering, sa još 13 srpskih kompanija iste delatnosti, potpisao je projekat osnivanja Udruženja inženjera konsultanata Srbije, u sklopu svetskog Udruženja FIDIC (Federation International Des Ingenieurs Conseils), kako bi se povećala konkurentnost firmi iz Srbije na međunarodnom i lokalnom graditeljskom tržištu. In the last year we succeeded in upgrading the current information to a higher level and initiated the publishing of the magazine under the name of News Delta Inženjering. We publish the News quarterly, namely three or four times a year in accordance with the schedule of projects and if we are aware of the fact that some job is of special importance, finding it necessary to write about it in a special edition of the magazine. We wish to inform the public properly about some members of the group in the editions of the News. For example, in the autumn edition we paid special attention to Alfa Mont, and an illustration of Čelik, Žitoradja, the factory of steel structures will follow. In the field of external PR activities, Delta Inženjering has signed, together with another 13 Serbian companies doing the same job, the project to establish an Association of Consulting Engineers of Serbia, within the FIDIC (Federation International Des Ingenieurs Conseils), in order to increase competitiveness of Serbian companies at the international and local construction markets. Promocija časopisa News na brodu»sirona«. Zaposleni su se pred Novu godinu družili u restoranu»tabor«, a dodela paketića najmlađima organizovana je u Pozorištancu»Puž«. Aleksandra Todorović-Sučević The promotion of the News magazines was arranged at the Sirona vessel. The employees had an opportunity to attend a dinner party at the Tabor restaurant just before the New Year s holidays and the children of the employees have been granted Christmas parcels at the Puž Children s Theatre. Aleksandra Todorović-Sučević

11 09 FIDIC Udruženje inženjera konsultanata Srbije, oktobar, Novogodišnja proslava, restoran»tabor«fidic Association of Consulting Engeneers of Serbia, october New Year s Dinner party,»tabor«restaurant

12 10 Objekat: Fabrika za razlaganje vazduha, Dnjepropetrovsk, Ukrajina Investitor: Messer Group, Nemačka Unit: air separation unit, dniepropetrovsk, ukraine Investor: Messer Group, Germany Na osnovu pozitivnih iskustava u godini na projektu Postrojenja za razlaganje vazduha u Ribniku (Poljska), Messer Group iz Nemačke je početkom nastavio saradnju sa Delta Inženjeringom i poverio našoj kompaniji kompletno vođenje projekata Fabrike za razlaganje vazduha (ASU - Air Separation Unit) u Dnjepropetrovsku (Ukrajina). Fabrika za razlaganje vazduha ASU Dnjepropetrovsk ima kapacitet proizvodnje m 3 /h gasovitih i oko m 3 /h tečnih tehničkih gasova. Kako je u pitanju Greenfield investicija, osim proizvodnog dela postrojenja bilo je neophodno izgraditi i svu prateću podzemnu i nadzemnu infrastrukturu, poslovne objekte, prateće radionice, saobraćajnice, trafo-stanicu, skladišne rezervoare itd. Postrojenje se nalazi u neposrednoj blizini nove čeličane firme Dnepro Steel, koja će biti i njihov najveći kupac tehničkih gasova. Kao deo Messer Inženjeringa, Delta Inženjering obavlja dužnosti direktora projekta (project managera), glavnog projektanta, poslove nabavke opreme i vođenja gradilišta. Shvatajući ozbiljno poverene dužnosti, Delta Inženjering je u skladu sa svojom tradicijom uspostavio strogu hijerarhijsku strukturu vođenja posla, na čelu sa direktorom projekta. Sastavljeni su projektantski timovi (glavni inženjer On the grounds of the positive experience based in the plant for air separation Rybnik (Poland) in 2007., Messer Group from Germany elected Delta Inženjering to manage completely the project of ASU - the Air Separation Unit in Dnjepropetrovsk (Ukraine). ASU - the Air Separation Unit in Dnepropetrovsk has the production capacity of 7,600 m 3 /h of gas oxygen, 2,400m 3 /h of liquid oxygen, 2,100m 3 /h of liquid nitrogen and 353Nm 3 /h of liquid argon. This is about a Green field investment so it is necessary to construct, within the site of 1.7 hectare in size, in addition to the production plant, all the accompanying underground and ground infrastructure, business buildings, accompanying workshops, roads, a transformer station, storage tanks, etc. The plant is in the immediate vicinity of the new steel works of Dnepro Steel Company, which is going to be the biggest purchaser of technical gases (oxygen, nitrogen and argon). Delta Inženjering performs the duties of the project manager, the main designer, purchases of equipment and management of the site. Seriously taking the duties assigned to it, Delta Inženjering has established, in accordance with its tradition, the strict hierarchy structure of the project management headed by the project manager. The design teams were formed (the main project engineer with designers in charge and

13 11 projekta sa odgovornim projektantima i asistentima), tim za izvođenje radova na gradilištu (šef gradilišta sa odgovornim izvođačima radova), tim za nabavku opreme i materijala i tim za praćenje finansijske realizacije ugovora. Poslovi na projektovanju započeti su u februaru izradom i usaglašavanjem opšte dispozicije budućeg postrojenja, a nastavljeni izradom baznih projekata svih struka za dobijanje potrebnih građevinskih i ekoloških dozvola i pratećih saglasnosti. U junu mesecu uspostavljena je kancelarija Delta Inženjeringa u Dnjepropetrovsku i izabrana je lokalna projektantska kuća za prilagođavanje naših projekata ukrajinskom zakonodavstvu. assistants), a team to manage the works on the site (the site manager with the contractors in charge), a team to purchase the equipment and materials and a team to monitor the financial implementation of the contract. The designing jobs started in February 2008 by the preparation and harmonization of the general lay-out of the future plant and continued with the preparation of basic designs of all branches necessary to obtain building and ecological permits and relevant approvals. In June 2008 an office of Delta Inženjering was opened in Dnjepropetrovsk and a local designing company was selected to harmonize our designs with the Ukraine legislation. Od oktobra meseca teku i građevinski radovi na pripremi terena i izradi temelja za opremu i objekte. U saradnji sa biroom za inženjering Messer Group izrađene su narudžbinske specifikacije za opremu pod pritiskom, kompresore, automatske, ručne i sigurnosne ventile, merne instrumente, elektroopremu i opremu kontrolnog upravljačkog sistema (DCS). Izrada tendera i izbor isporučilaca opreme, izrada podizvođačkih ugovora i kontrola kvaliteta opreme i izvršenih radova na gradilištu takođe su deo posla Delta Inženjeringa. Zbog vrlo rigoroznog zakonodavstva u Ukrajini, obavljaju se i poslovi sertifikacije i usaglašavanja sa domacim standardima i tehničkom regulativom, kao i tehničke dokumentacije za kompletnu opremu koja se proizvodi u inostranstvu. Potrebno je istaći odličnu saradnju svih članica Delta Inženjering Group u toku realizacije ovog projekta. Poslovi se, i pored finansijske krize koja je u toku, odvijaju u skladu sa ugovorenom dinamikom, a završetak radova na izgradnji postrojenja planiran je za početak godine. Parallel to this, in October 2008 there were civil engineering works for the preparation of the terrain and the construction of foundations for the equipment and buildings. In the co-operation with the engineering bureau of Messer Group, purchase specifications for the pressure equipment had been made, as well as for the compressors, automatic, manual and safety valves, measuring instruments, electric equipment and the equipment required for the control system (DCS). The preparation of tenders and the selection of suppliers of equipment, preparation of sub-contractors contracts and the quality control of the equipment and the performed works on the site are also within the framework of Delta Inženjering jobs. Due to very strict legislation prevailing in Ukraine, the certification and harmonization with the Ukraine legislation are also carried out in respect of the standards and technical regulations, technical documentation for the complete equipment, which is manufactured abroad. It is also necessary to stress an excellent co-operation between all units of Delta Inženjering Group in the course of the implementation of this project. In spite of the general financial crisis in progress, the jobs are carried out in accordance with the agreed schedule and the completion of works on the plant has been planned to take place at the beginning of 2010.

14 12 Objekat: Fabrika cementa Holcim, Novi Popovac Preheater Investitor: Holcim (Srbija) a.d. Unit: Cement factory»holcim«, Novi Popovac preheater Investor: Holcim (Srbija) a.d. Najveća investicija u okviru industrijske proizvodnje cementa u Srbiji trenutno je realizacija projekta modernizacije i rekonstrukcije fabrike cementa Holcim Srbija d.o.o. u Novom Popovcu. Projekat nosi naziv PETRUS i obuhvata rekonstrukciju dopreme i skladištenja sirovina, rekonstrukciju pripreme sirovina i proizvodnju klinkera. Tehničku projektnu dokumentaciju, koja podrazumeva formiranje idejnih i glavnih projekata na osnovu baznog projekta investitora, radi Delta Inženjering. Potrebno je da se u skladu za Zakonom o planiranju i izgradnji, dobiju neophodna odobrenja. Realizacija ovog velikog projekta planirana je po fazama. U prvoj fazi, projekat koji se sprema za realizaciju jeste postrojenje za predgrevanje i predkalcinaciju rotacione peći za proizvodnju klinkera preheater (predgrejač). Delta Inženjering je krajem završio idejne projekte predgrejača i od nadležnog ministarstva je dobijeno odobrenje za gradnju. U toku je izrada glavnih projekata, da bi se obezbedila sva neophodna tehnička dokumentacija za The largest investment within the framework of the industrial production of cement in Serbia has at present been the implementation of the project of modernization and reconstruction of HOLCIM Srbija Ltd. Cement factory in Novi Popovac. The project is called PETRUS and it includes the reconstruction of the supply and storage of raw materials, reconstruction of the preparation of raw materials and the production of clinker. The technical project documentation, which includes the preliminary and the main designs based on the design prepared by the team of experts of the Investor, is being made by Delta Inženjering with a task to provide the necessary building permit and register the beginning of works in accordance with the Law on Planning and Construction. Since the implementation of the project, which consists of several parts, has been planned to be carried out in stages, the first in the series of the designs necessary to be implemented is the construction of the plant for pre-heaters and preliminary calcinations of the rotary furnace for the production of clinker. At the end of 2008 Delta Inženjering completed the preliminary design of pre-heaters, presented it to the review board of the competent ministry and obtained the building permit,

15 13 prijavu početka radova. U tehničkom smislu važno je napomenuti da se prvi put u Srbiji primenjuje novi tip predgrejača, razvijen po originalnom konceptu japanske kompanije Taiheiyo Cement Corporation, poznat pod nazivom RSP - Reinforced Suspension Preheater, u slobodnom prevodu, pojačani fleksibilni predgrejač. Prednost primene ovog tipa predgrejača jeste efikasna razmena toplote, viši stepen dekarbonizacije rovnog materijala pre ulaza u rotacionu peć i povećan kapacitet proizvodnje klinkera, što i jeste cilj ove modernizacije. Pored povećanja kapaciteta proizvodnje klinkera smanjuje se utrošak energije potrebne za rad peći, što rezultira nižom cenom konačnog proizvoda. Ovaj novi tehnološki postupak, kao gorivo u proizvodnji koristri široki opseg raznih vrsta otpadnih materijala. Pored starih guma, drveta i plastike, sistem je odgovarajući i za sagorevanje niskokaloričnih čvrstih goriva, kao i gasa i nafte. Sagorevanje ovog alternativnog goriva ne utiče na emisiju CO 2. after their positive reply had been received. The main design is being prepared at the moment with the aim to provide all the technical documentation necessary to register the commencement of works so that it is expected the commencement of construction would be on 1 January It is of particular importance to mention that the new type of pre-heaters is being applied in Serbia for the first time, which had been developed according to the original concept of the Japanese company Taiheiyo Cement Corporation, known under the name of RSP - Reinforced Suspension Pre-heater, namely, freely translated, the enforced flexible pre-heater. The basic properties of this type of preheater are a specially designed whirl furnace, which consists of whirl burner and whirl calcinations unit below the lower cyclone, and a chamber above the frame of the inlet into the rotary furnace. This combination results in efficient heat exchange, it increases the degree of de-carbonization of duct material before it enters the rotary furnace and also increases its capacity very much, namely it increases the clinker production capacity, as the objective of this modernization. Also, it uses high temperature tertiary air, which is introduced from the clinker cooling unit to the part of the calcinations unit where burning takes place.

16 14 OBJEKAT: PD Rudarski basen»kolubara«d.o.o. Površinski kop Tamnava - Zapadno polje INVESTITOR: RB KOLUBARA d.o.o. UNIT: COMMERCIAL ENTITY THE KOLUBARA MINING BASIN Ltd. THE TAMNAVA-ZAPADNO POLJE OPEN PIT INVESTOR: KOLUBARA MINING BASIN Ltd. Elektroprivreda Srbije je, obezbeđujući pouzdano i stabilno snadbevanje ugljem TE Nikola Tesla u Obrenovcu (preko 60% ukupne proizvodnje struje u Srbiji), dobila kredit od EBRD i KfW banke u vrednosti 73 miliona evra za izgradnju novog BTO sistema (bager-transporteri-odlagač) na površinskim kopovima Kolubara. Uvozna oprema renomiranih proizvođača (Tissen-Krupp, ABB i dr.) koja predstavlja vitalne komponente BTO sistema, prema uslovima ugovora ne može se skladištiti na otvorenom prostoru, već se zahtevaju posebni uslovi skladištenja. Delta Inženjering Group, odnosno Delta Inženjering d.o.o., PCE2004 d.o.o. i Alfa Mont d.o.o. su u svojim oblastima izgradili savremeni magacin površine m 2 za smeštaj ovih delova. Urađeni su kompletna projektno-tehnička dokumentacija, izrada i montaža čelične konstrukcije, kao i pokrivanje i oblaganje objekta. Ovaj magacin, prvi ovakve vrste, prema mišljenju stručnjaka Površinskog kopa Baroševac, predstavlja model za buduće potrebe u basenu Kolubara. The Electric Power Industry of Serbia, with the objective to secure reliable and stable supply of coal to the Nikola Tesla Thermal Power Plant in Obrenovac (generating over 60% of the total electricity production in Serbia), has been granted a loan in the amount of EUR 73 million by EBRD and KfW Bank for the construction of a new BTO system (dredgertransporters- disposal units) at the open pits in Kolubara. The imported equipment manufactured by the esteemed manufacturers (Tissen-Krupp, ABB, etc.), which represents the vital components of BTO system, cannot be stored outside according to the contractual conditions, but special storage conditions are required. Delta Inženjering Ltd., Delta Group Ltd., PCE2004 Ltd. and Alfamont Ltd. have built, each of them within the field of their activities, a modern warehouse having the surface of 2,000 m 2 to place such equipment. The complete designtechnical documentation has been prepared, the steel structure has been made and erected, and the warehouse has been covered and lined accordingly. This warehouse, the first of such a type, according to

17 15 the opinion of the experts of the Open Pit in Baroševac, presents a model of future requirements in the Kolubara Basin. On the occasion of the assembly of the dredger and the disposal units, as well as during the trial operation and testing of performances, a large number of foreign and domestic experts will be present for a longer time. In order to provide the offices for these experts, an office building having the total surface of 1,100 m2 has been constructed in the vicinity of assembly site. Upon the completion of the construction of BTO system, the building will be used by the experts of the Zapadno Polje Open Pit. Prefabricated barracks of simple manufacture have been Prilikom montaže bagera i odlagača, kao i pri probnom radu i proveri radnih performansi opreme, biće prisutan veći broj stranih i domaćih stručnjaka u dužem periodu. Za potrebe ovih stručnjaka, na lokaciji koja je blizu montažnog placa, izgrađen je poslovni objekat ukupne površine 1100 m 2. Posle završetka izgradnje BTO sistema, objekat će koristiti stručnjaci Površinskog kopa Zapadno polje. U dosadašnjoj praksi koristile su se montažne barake jednostavne izrade, čak i do dvadeset godina, koje su pružale vrlo skromne uslove rada i boravka u njima, u klimatskim uslovima na kopovima koji su teški i u zimskom i u letnjem periodu. Stoga je naša grupacija, u dogovoru sa stručnjacima površinskih kopova, projektovala i izgradila poslovni objekat koji će, prvi put, da omogući boravak i radne uslove u skladu sa evropskim standardima. Izveli smo konstrukciju objekta koja je omogućila brzu izradu i montažu. used so far for such needs, which had provided very modest working conditions and stay, and they have even been used for years, under the severe weather conditions in pits both in winter and summer periods. Therefore, our group has designed and constructed, in accordance with the experts of the open pits, an office building, which will for the first time provide the stay and working conditions in compliance with the European standards. Such a building presents a novelty at the Kolubara Mining Basin, which proved to be justified, so we have soon been awarded to prepare the project documentation for the building for accommodation of the shift personnel of the Zapadno Polje Open Pit. The documentation has been completed and the construction of the building has been in progress.

18 16 Reciklaža olovnih akumulatora RE-CYCLING OF LEAD ACCU-BATTERIES U godini Ministarstvo životne sredine i planiranja usvojilo je pravilnik o upravljanju istrošenim baterijama i akumulatorima. Ovo je jedan u nizu postupaka za usklađivanje domaćih zakonskih propisa sa evropskоm zakonskom regulativom. Ovim pravilnikom (između ostalog) propisuju se način i postupak upravljanja istrošenim baterijama. Zabranjuje se odlaganje i spaljivanje istrošenih baterija i akumulatora na klasičnim deponijama smeća. Pored ekoloških, tehnoekonomski kriterijum je veoma bitan. Dobijanje olova na klasičan način, eksploatacijom iz rudnika, višestruko je skuplje u odnosu na postupak dobijanja olova reciklažom olovnih akumulatora. Preduzeće Delta Inženjering, kao lider na tržištu inženjeringa u oblasti ekološki čistih industrija, tokom realizovalo je jedina dva projekta u Srbiji iz oblasti reciklaže olovnih akumulatora: Monbat PLC u Inđiji i postrojenje u rudnicima i topionici u Zajači. In the course of 2008 the Ministry of Environment and Urban Planning adopted the Book of Rules on Management of Used Batteries and Accubatteries. This is one in a series of procedures of harmonization of the domestic regulations with the European legislation. This Book of Rules, among other things, prescribes the method and the procedure how to manage the used batteries. This Book of Rules PROHIBITS to dispose and burn the used batteries and accu-batteries on the standard waste disposal sites. In addition to the ecological, the thermaleconomic criterion is also very important. Namely, to produce lead in the standard method, by exploitation from the mine is much more expensive than the procedure of providing lead by re-cycling of lead accubatteries. Delta Inženjering company, as the leading company on the market of engineering in the field of ecologically pure industries, is the only company in Serbia, which implemented in the course of 2008, two projects in the domain of re-cycling pf lead accu-batteries: MONBAT PLC in Indjija and the plant at the Zajača Mines and Smelting Works.

19 17 Objekat: Postrojenje za reciklažu starih akumulatora Monbat PLC Investitor: Monbat PLC, Inđija Unit: MONBAT PLC RE-CYCLING PLANT FOR USED ACCU-BATTERIES Investor: MONBAT PLC, INDJIJA Projekat za izgradnju fabrike za reciklažu starih akumulatora, Monbat Inđija, započet u godini, realizovan je u decembru Fabrika na površini od m 2, locirana u industrijskoj zoni Inđije, bila je složen zadatak za sve inženjerske struke. Preduzeće Delta Inženjering na ovom projektu angažovano je kao: generalni izvođač radova projektant za pojedine faze realizacije gradnje (glavni projekat trafo-stanice, glavni elektroprojekat kabliranja tehnološke opreme, glavni projekat kompresorskih stanica i razvoda komprimovanog vazduha, glavni projekat parne kotlarnice itd.). Radovi su obuhvatili izgradnju administrativnog objekta, temelje tehnološkog objekta, infrastrukturu (spoljne instalacije, ograda i saobraćajnice), unutrašnje instalacije, montažu tehnološke opreme. Izazov na polju građevinskih radova bila je izrada složenih temelja mašina jer su morali biti ispoštovani strogi zahtevi italijanskih i francuskih proizvođača opreme. Mašinski radovi obuhvatili su blokovanje i montažu tehnološke opreme, kao i elektromotorni razvod. Nakon završetka m 2 asfaltnih i betonskih saobraćajnica, u decembru kompletirani su svi radovi na izgradnji objekta. Ovaj projekat rezultat je saradnje stranih i domaćih projektanata i proizvođača opreme. Tehnološki, to je prva fabrika ove vrste montirana u Srbiji, koja će, nadamo se, dokazati valjanost projektovanih parametara, kako na proizvodne kapacitete, tako i u domenu zaštite životne sredine. The project for the construction of the factory for recycling of used accu-batteries, Monbat Indjija, started in 2007 and was completed in December The factory having the construction concept at the surface of 20,000 m2, located in the industrial area of Indjija, was a comprehensive and a very complex task to do in respect of all engineering branches. In this project, Delta Inženjering company was engaged as: The general contractor of works, The designer of certain phases of construction implementation (the main design of the transformer station, the main electric design of cabling of technological equipment, the main design of the compressor stations and compressed air distribution, the main design of steam boiler room, etc.). The works included the construction of the administrative building, the foundations of the technological building, infrastructure (external installations, fence and roads), internal installations, assembly of technological equipment. A challenge in the field of civil engineering works was by all means the construction of very complex foundations of the machines, where very strict requirements of the Italian and the French manufacturers of the equipment had to be complied with. The mechanical works included grouping and assembly of technological equipment and distribution of electric motors. Upon the completion of 6,500m2 asphalt and concrete roads in December 2008, all the works related to the construction of the building have been completed. This project is the result of the co-operation between the foreign and the domestic designers, the foreign and the domestic manufacturers of the equipment and in the technological sense, it is the first factory of this type constructed in Serbia, which, we hope, will prove the designed parameters in the field of both the designed parameters and in the domain of the protection of environment.

20 18 Objekat: Postrojenje za reciklažu starih akumulatora Zajača Investitor: RT Zajača a.d. (Farmakom koncern), Zajača (Loznica) Unit: THE ZAJAČA RE-CYCLING PLANT FOR USED ACCU-BATTERIES Investor: RT ZAJAČA A. D. (FARMAKOM CONCERN), ZAJAČA (LOZNICA) Iskustva stečena na montaži opreme za reciklažu starih akumulatora sa objekta Monbat bila su značajna za ugovaranje i za realizaciju sličnog postrojenja u Zajači. Projekat je započet u septembru godine, a obaveza Delta Inženjeringa je montaža opreme italijanskog proizvođača SERI namenjena za sekciju dezintegracije akumulatora (sekcija pripreme sirovina separacija i kristalizacija) i montaža opreme za sekciju topionice i rafinacije. Ugovorom su predviđeni blokovanje i montaža opreme koja je isporučena iz Italije u delovima, montaža kompletnih linija cevovoda, isporuka i montaža kompletnog elektromaterijala i opreme, ispitivanja i puštanje u rad. U sklopu radova Delta Inženjeringa izvršene su prefabrikacija, isporuka i montaža nosećih konstrukcija opreme, galerija, podesta i stepeništa. Oprema se montira u postojećem kompleksu topionice Zajača. Projekti za montažu opreme obavila je SERI Italija, a razradu i izradu izvođačke dokumentacije uradili su inženjeri Delta Inženjeringa. The experience gained in the field of assembly of equipment for re-cycling of used accu-batteries at the Monbat plant was of considerable importance for both the contracting and the implementation of a similar plant in Zajača. The implementation of the project started in September 2008 and the obligation of Delta Inženjering is to assemble the equipment manufactured by the Italian manufacturer SERI, which is intended for the section of disintegration of accu-batteries (section for preparation of raw materials separation and crystallization) and the assembly of equipment for the smelting section and refining section. The contract stipulates grouping and assembly of equipment supplied in components from Italy, assembly of the entire pipelines, supply and installation of the entire electric materials and equipment, testing and putting into operation. Within the framework of Delta Inženjering works, prefabrication, supply and assembly of the supporting structures of the equipment, galleries, platforms and staircases have also been performed. The equipment is being assembled at the existing complex of the Zajača Smelting Works. The documentation for the assembly has also been prepared by Seri, Italy while the engineers of Delta Inženjering have worked out and made the relevant documentation.

21 19 Objekat: U. S. Steel Serbia Investitor: U. S. Steel Serbia, Smederevo Otprašivanje vazduha Unit: U.S.STEEL SERBIA Investor: U. S. Steel Serbia, Smederevo Air- dedusting Ponovo pokrenuta proizvodnja čelika u smederevskoj železari, pored brojnih pozitivnih efekata, ima i neke negativne. Jedan od njih je velika emisija produkata sagorevanja pri proizvodnji, pa je pokrenut investicioni projekat da se smanji emisija štetne prašine u atmosferu. Za potrebe U. S. Steel Serbia u Smederevu, Delta Inženjering radi na glavnom i izvođačkom projektu postrojenja za sekundarno otprašivanje Konvertorskog i Mikserskog odeljenja čeličane. U ova dva odeljenja odvijaju se tehnološki procesi proizvodnje čelika pri kojima se emituje znatna količina prašine i produkata sagorevanja, koje je potrebno na odgovarajući način prikupiti a zatim filtriranjem izdvojiti iz vazduha. Izmerene vrednosti ovih emisija prelaze zakonom propisane vrednosti. U Konvertorskom odeljenju izvori emisije su sami konvertori u kojima se proizvodi čelik iz tečnog gvožđa i drugih legura. Svaki od tri konvertora ima ugrađen samo primarni sistem otprašivanja, koji ne može prikupiti sve gasove i prašinu. Ovaj sistem sekundarnog otprašivanja, čije je projektovanje i izvođenje u toku, treba da zadrži više od 95% dimnih gasova koji se oslobađaju tokom proizvodnje, tako da smederevska čeličana postaje deo ekološki prihvatljivog procesa proizvodnje čelika. For the requirements of U. S. Steel Serbia in Smederevo for the reduction of harmful matter from the technological processes that take place at the steelworks, we have been working on the main and the performance design for the plant for secondary de-dusting at the converter and the mixer departments of the steel. The technological processes of steel production take places in these two departments, whereas a considerable quantity of dust and combustion products are emitted, which need to be collected in an adequate manner and extruded from air by filtering. The measured values of these emissions exceed the values prescribed by law so an investment project had been initiated the objective of which is to reduce dust in atmosphere. In the converter department, the sources of emissions are the very converters wherein steel is produced from liquid iron and other alloys. Each of these three converters has a built-in primary de-dusting system only, which cannot collect all the gases and dust. The system we have been designing should keep more than 95% of smoke gases being released during the production.

22 20 Objekat: Hotel Metropol, Beograd Investitor: Metropol Palace, deo grupacije Classical hotels, Grčka Raznovrsnost poslovanja Delta Inženjeringa ogleda se u uspešno realizovanim projektima iz oblasti zgradarstva (stambeni, poslovni i javni objekti). U ovoj oblasti gradnje Delta Inženjering pretežno se bavi projektovanjem unutrašnjih instalacija. Jedan od projekata koji je u toku jeste rekonstrukcija hotela Metropol Palace, jednog od najstarijih i najznamenitijih hotela u Beogradu. U ovom zahtevnom poslu preuzeli smo ulogu projektanta izvođačkog projekta i projektantskog nadzora za instalacije. Rekonstrukcija hotela je potpuna, zadržavaju se samo betonska konstrukcija i fasada, koja je pod zaštitom države, a menja se kompletna unutrašnjost hotela i uvode se savremene instalacije. S obzirom da enterijer hotela na gosta ostavlja najveći utisak, neophodno je da se projektovane instalacije prilagode novom rešenju prostora, a da se pri tom zadrži njihova funkcionalnost. Sobe u hotelu biće opremljene raznovrsnim ambijentalnim osvetljenjem, savremenim telekomunikacionim vezama, moderno dizajniranim sanitarnim uređajima i uređajima za ostvarivanje optimalnih parametara vazduha. U saradnji sa projektantom enterijera iz Grčke, uspeli smo da ispunimo zahtev da sve instalacije budu skrivene, a da se pri tome minimalno smanji visina prostora.

23 21 Unit: The Metropol Palace Hotel, Belgrade, reconstruction Investor: The Metropol Palace, a part of the Classical Hotels Group, Greece The variety of Delta Inženjering business also reflects in the successfully implemented projects in the field of civil engineering (dwelling houses, business buildings and public buildings). In this field of civil engineering Delta Inženjering mainly designs all internal installations. The reconstruction of the Metropol Palace Hotel, one of the oldest and the most monumental hotel in Belgrade, is one of the projects in progress. In this demanding job, we have undertaken the role of design supervision of installations, as well as the role of the designer of the contractor s design. The hotel has been undergoing the complete reconstruction, namely, the original concrete structure and the front walls that are under the state protection will be only kept, whereas the entire interior of the hotel will be changed and new modern installations will be introduced. Since the interior is the fact that makes the greatest impression on the guests at buildings such as hotels, it was necessary to adapt the designed installations to the new solution of the interior, accomplishing their functionality at the same time. The rooms at the hotel will be equipped with very different ambient lighting, modern telecommunication capabilities, sanitary equipment of modern design and with the devices providing pleasant air parameters. In co-operation with the interior designer from Greece, we have succeeded in making all the installations hidden also achieving the biggest possible height in space.

24 22 Objekat: Rafinerija nafte Beograd Investitor:»Neokimiki GROUP«, Beograd Unit: Belgrade oil refinery Investor:»NEOCHIMIKI GROUP OF COMPANIES«, BEOGRAD Delta Inženjering je potpisao nekoliko ugovora za adaptaciju, rekonstrukciju i kontrolu objekata u Rafineriji nafte Beograd. Adaptirano je skladište za šest i po hiljada bačvi i dobijena je neophodna dokumentacija za upotrebnu dozvolu. Potpisan je ugovor za projektovanje i izvođenje interne saobraćajnice sa parking mestima (5 000 m 2 ). Do kraja prošle godine izvedena je prva faza, a nastavak se očekuje na proleće godine. Završena je adaptacija i rekonstrukcija uređaja za prečišćavanje zauljenih otpadnih voda: sanacija uređaja za prečišćavanje zauljenih atmosferskih voda sanacija postrojenja za prečišćavanje tehnoloških otpadnih voda sanacija postrojenja za neutralizaciju kiselo-baznih otpadnih voda iz HPV-a (hemijske pripreme vode). Građevinski radovi na rezervoaru za neutralizaciju otpadnih voda i obradu mulja iz HPV-a privedeni su kraju. U rad je pušten pogon»10«za rerafinaciju (preradu) ulja, nakon remonta koji je podrazumevao kontrolisanje sudova pod pritiskom i skladišnih rezervoara, što je povereno Sektoru kontrole Delta Inženjeringa. Opremu pod pritiskom u istoimenom pogonu čine: 66 posuda, pripadajući cevovodi, zaporna i sigurnosna armatura, regulaciona i merna oprema. Delta Inženjering has signed several contracts for remodelling, re-designing and inspection of the buildings at the Belgrade Oil Refinery. The storage yard for six thousand and five hundred barrels has been re-designed and all relevant approvals to provide the use permit have been obtained. The contract for designing and construction of internal road including parking lots (5,000 sq. m.) has been signed. The first section of the road was completed until the end of the last year, and the continuation of these works is expected in spring The re-designing and reconstruction of the oily waste water treatment plant have been completed. Recovery of the device for oily atmospheric water treatment Recovery of the plant for industrial waste water treatment Recovery of the plant for neutralization of acid-base waste water from HPV (Chemical water treatment) The civil engineering works in the tank for neutralization of waste water and mud treatment from HPV have almost been finished. The plant number 10 for oil refining (treatment) has been put into operation, after the overhaul repair including the check-up of the pressure vessels and the storage tanks. The check-up of the pressure equipment in this plant is assigned to the Control Sector of Delta Inženjering. The pressure equipment of this plant consists of 66 vessels, accompanying pipelines, sealing and safety fittings, control and measuring equipment.

25 23 Objekat: Rafinerija nafte Pančevo Investitor: NIS - Rafinerija nafte Pančevo Tehnički gasovi u laboratoriji Rafinerije nafte Pančevo Unit: NIS Oil refinery Pancevo Investor: NIS Oil refinery Pancevo TECHNICAL GASES AT THE LABORATORY OF PANČEVO OIL REFINERY NIS - Rafinerija nafte Pančevo obavlje sve analize neophodne za proizvodne procese u okviru Rafinerije u sopstvenoj laboratoriji. Laboratorija NIS - RNP u svom sastavu ima brojna odeljenja, kao što su: odeljenja hromatografije, odeljenja za spektrometriju i katalizu, odeljenja vode, odeljenja kontrole i odeljenja službe razvoja proizvoda i katalize. U postupku izvođenja najvećeg broja analiza u odeljenjima laboratorije NIS RNP koriste se različiti tehnički gasovi, zapaljivi, neutralni i oksidacioni gasovi. Uređaji za analize koji koriste ove gasove do sada su gasovima snabdevani iz boca koje su stajale uz uređaje u odeljenjima laboratorije. Delta Inženjering je na zahtev NIS - RNP izvršio modernizaciju sistema snabdevanja tehničkim gasovima uređaja za analizu po odeljenjima laboratorije projektujući sistem za centralno snabdevanje i razvod tehničkih gasova. Urađeni su kompletni arhitektonsko-građevinski projekti novog objekta, podstanica sa skladištima boca za tehničke gasove pored postojeće zgrade laboratorije, kao i mašinsko-tehnološki i elektro projekat instalacija tehničkih gasova od podstanica do potrošnih mesta u odeljenjima laboratorije. Urađen je i projekat detekcije pojave zapaljivih gasova u smeši sa vazduhom u odeljenju podstanice u kojem su smeštene boce sa zapaljivim gasovima i svim odeljenjima laboratorije u kojima se koriste ovi zapaljivi gasovi. Pored projekata, Delta Inženjering izveo je i kompletnu mašinsku i elektro instalaciju ovog sistema. Mašinska instalacija izvedena je u saradnji sa isporučiocem gasne opreme Messer - Tehnogas. NIS THE PANČEVO OIL REFINERY in Pančevo carries out all the analyses necessary for the production processes within the refinery at its own laboratory. The laboratory of NIS - RNP consists of numerous departments, such as: chromatography departments, spectrometry and catalysis departments, water department, inspection department and product and catalysis development department. In the process of performance of the largest number of analysis at the departments of the laboratory of NIS RNP, various technical gases are used: flammable gases, neutral and oxidation gases. Gases to the analysis devices, using such gases, have been so far supplied from the cylinders placed next to the devices at the departments of the laboratory. At the request of NIS RNP, DELTA INŽENJERING carried out the modernization of the supply system of technical gases to the analysis devices at the departments of the laboratory, having designed the system for central supply and distribution of technical gases. Complete architectural and civil engineering designs of the new unit of substations have been made, including the storage of technical gas cylinders next to the existing laboratory building, as well as the mechanical technological and electric designs of the installations of technical gases from the substations to the consumption points at the laboratory departments. Also, the design was prepared how to detect flammable gases in the mixture with air at the substation where the flammable gas cylinders are placed and at all laboratory departments where these flammable gases are used. In addition to the design, DELTA INŽENJERING also made the complete mechanical and electric installation of this system. The mechanical installations were made in cooperation with the sub-supplier of gas equipment MESSER - TEHNOGASOM.

26 24 Objekat: Fabrika cementa»holcim«, Novi Popovac Investitor: Holcim (Srbija) a.d. Postrojenja za prečišćavanje otpadnih voda Unit: CEMENT FACTORY»HOLCIM NOVI POPOVAC Investor: HOLCIM (SRBIJA) A.D. WASTE WATER TREATMENT PLANT U Fabrici cementa Holcim u Novom Popovcu jedinstveno je rešavano vodosnabdevanje i prečišćavanje otpadnih voda u okviru programa zaštite životne sredine koji fabrika sprovodi od vremena završene vlasničke transformacije. Uklopivši se u ovu globalnu koncepciju tretmana voda, Delta Inženjering je izradio projektnu dokumentaciju za objekte vodosnabdevanja i za prečišćavanje upotrebljenih voda, a nakon toga je započeta realizacija. Prioritet pri realizaciji imali su objekti prečišćavanja zagađenih voda pa je do sada realizovano: Prečišćavanje otpadnih voda U proteklom periodu izgradili smo dva postrojenja za prečišćavanje otpadnih voda: postrojenje za prečišćavanje otpadnih voda sa dela fabrike Polysius, sa ispustom prečišćenog efluenta u potok Toplik postrojenje za prečišćavanje otpadnih voda sa dela fabrike FLS, sa ispustom prečišćenog efluenta u reku Crnicu. Prvo postrojenje je u eksploataciji dve godine, dok je drugo pušteno u rad u novembru godine. Kapacitet postrojenja»toplik«je 4 l/s, dok je kapacitet postrojenja»crnica«20 l/s. Na oba postrojenja prečišćavaju se zbirne otpadne vode (zagađene atmosferske i sanitarnofekalne otpadne vode). Nakon odvojenih predtretmana, zbirne otpadne vode se prečišćavaju na postrojenjima na HOLCIM-SRBIJA cement factory in Popovac has the uniform solution of water supply and water treatment system within the programme of the environment protection, which the factory has been implementing since the time of the completion of the property transformation. Having respected this global concept of water treatment, Delta Inzenjering had prepared the project documentation for both the water supply units and for the units for the treatment of utilised water and then started the construction of these units. The priority has been given to the units for the polluted water treatment, and so far that the following: Waste Water Treatment Within the recent period, we have constructed two plants for waste water treatment, as follows: The plant for the treatment of waste water coming from the part of POLYSIUS factory and with the discharge of the resulting effluent into the Toplik stream The plant for the treatment of waste water coming from the part of FLS factory and with the discharge of the resulting effluent into the Crnica river. The first plant has been in operation for 2 years, while the second plant was constructed in the course of 2008, namely it was put into operation in November The capacity of the Toplik plant is 4 l/s, while the capacity of the Crnica plant is 20 l/s. Collective waste water is treated at both plants (polluted atmospheric and sanitary-discharge

27 25 kojima su primenjeni kombinovani, klasični i savremeni načini prečišćavanja. Pored predfiltracije i fizičko-hemijskih metoda prečišćavanja (koagulacije, flokulacije i taloženja), primenjeni su i savremeni metodi vakuumske ultrafiltracije. Rezultat ovako integrisanog tehnološkog procesa prečišćavanja otpadnih voda jeste visok kvalitet izlaznih voda, radi zaštite potoka Toplik i reke Crnice. Fizičko-hemijske i bakteriološke analize prečišćenih otpadnih voda i sprovedene analize njihovog uticaja na recipijente, koje je radio Institut za nuklearne nauke Vinča, dokazale su visoku efikasnost postrojenja, a time i ispravnost primenjenih tehnologija na postrojenjima koje su u direktnoj funkciji zaštite ekosistema vodotokova, water). After the separate pre-treatment, collective waste water is treated at the plants combining the classic and the modern methods of treatment. In addition to pre-filtration and physical-chemical methods of treatment (coagulation, flocculation and settlement), the modern methods of vacuum ultra-filtration are also applied. The result of such an integrated technological process of waste water treatment is the high quality of outlet water, all this with the aim to protect the Toplik stream and the Crnica river. Physical-chemical and bacteriological analyses of the treated waste water and the performed analyses of their effect to the recipients, which had been made by the Vinča Nuclear Scientific Institute, have proved the pa stoga i životne sredine u širem smislu. Pored ovih postrojenja realizovan je i rashladni sistem fabrike sa pumpnom stanicom za recirkulaciju rashladne vode, rashladnim kulama i distributivnim cevovodom. Planirano za naredni period Vodosnabdevanje U narednom periodu očekuje se izgradnja vodozahvata sirove vode na reci Crnici, postrojenja za preradu sirove vode i dobijanje kvalitetne tehnološke vode za potrebe fabrike, na osnovu urađene projektne dokumentacije Delta Inženjeringa. Očekuje se i investicija za izgradnju objekata postrojenja koje će prerađivati i dehidrirati mulj. Na postrojenju za obezvodnjavanje mulja prerađivaće se muljevi dobijeni u procesima prečišćavanja otpadnih voda na postrojenjima»crnica«i»toplik«i postrojenju za preradu sirove vode. Time bi se realizovali svi objekti vodosnabdevanja i prečišćavanja otpadnih voda koje Fabrika cementa Holcim sprovodi u okviru sveobuhvatnog programa zaštite životne sredine, pri čemu zaštita voda ima značajnu ulogu. high efficiency of the plant, and thus, the adequacy of the applied technologies in the plants in the direct function of the protection of the ecological system of water flows, and in the function of the protection of the environment in the wider sense as well. In addition to those plants, the cooling system of the factory has also been implemented, with a pumping station for re-circulation of cooling water, cooling towers and distribution pipeline. Plans in the Forthcoming period Water Supply It is expected that the raw water intake from the Crnica river will be constructed within the forthcoming period, the raw water treatment plant and provision of good quality industrial water for the factory requirements, all based on the project documentation prepared by Delta Inzenjering. It is also expected that there will be an investment for the construction of mud treatment and de-hydration plant. The plant for water discharge from mud will be used to treat mud obtained in the processes of waste water treatment at the Crnica and the Toplik plants and the plants for raw water treatment. This means that all the units for water supply and treatment of waste water would be implemented, which is carried out by Holcim - Srbija cement factory within the framework of the entire programme of environment protection, where water protection has an important role.

28 26 ZNAČAJNI PROJEKTI ALFA MONT D.O.O. U 2008 GOD. MAJOR PROJECTS OF ALFA MONT LTD. in 2008 U toku 2008.god. Alfa mont d.o.o. je radio na nekoliko projekata, a kao najznačajnije izdvajamo radove u Fabrici cementa Holcim u Popovcu i to: Rekonstrukciju (proširenje) zgrade aditiva (CM2) noseća čelična konstrukcija, potporni stubovi, platforme, stepeništa oko 250 t čelika i pripadajuća tehnološka oprema. O ovom projektu već je bilo reči u prethodnim izdanjima»news-a Delta inženjering«. Izgradnja Druge linije za utovar rinfuznog cementa kapaciteta 250 t/h. Objekat se naslanja na postojeću konstrukciju i predstavlja aneks postojeće linije za utovar cementa. Uvođenjem novog postrojenja (druge linije) za utovar rinfuznog cementa duplira se kapacitet punjenja cementa u kamionske cisterne, a samim tim se smanjuje potrebno vreme zadržavanja i izbegava nepotrebno čekanje na utovaru. Montirana je kompletna čelična konstrukcija, platforme, stepeništa kao i pripadajuća ugrađena nova tehnološka oprema»ibau«i»scheuch«ukupne mase oko 58 t. In the course of 2008 Alfa Mont Ltd. worked on several projects, the works at Holcim Cement Factory in Popovac being distinguished as the most important one: The reconstruction (expansion) of the additive building (CM2) the bearing steel structure, support columns, platforms, staircases of about 250 t of steel and the accompanying technological equipment. We have already mentioned this project in the previous editions of the NEWS Delta Inženjering. As the last important project in 2008 we would like to mention the construction of the second line for loading of cement in bulk for the requirements of Holcim Serbia Cement Factory in Popovac. The building is next to the existing structure and presents an annex to the existing line for the cement loading. The introduction of a new plant (the second line) for loading of cement in bulk would mean the duplication of the cement loading capacity into the truck tanks, thus decreasing the time required for waiting and avoiding unnecessary waiting for loading.

29 27 The complete steel structure, platforms, staircases and the accompanying newly fitted equipment of IBAU company (a mobile machine with a telescopic device for cement loading into trucks, flow shutters, air slides, high pressure centrifugal fan for fluid circulation in air ducts, loading suction unit,...) and SCHEUCH (bag filter, rotary valve, centrifugal fan) have the weight of about 58 t. The capacity of the new loading system of the second line amounts to 250 t/h.

30 28 Zavod za zavarivanje novi član Delta Inženjering Group WELDING INSTITUTE NEW MEMBER OF DELTA INZENJERING GROUP Vitalan i zreo poput pedesetogodišnjaka, Zavod je proslavio rođendan prisećajući se svojih prvih koraka. Osnovali su ga godine vizionari-entuzijasti, članovi Društva za unapređenje zavarivanja u NR Srbiji, sa željom da Zavod obrazuje zavarivačke kadrove, uvodi tehnike zavarivanja u industriju i zanatstvo i kontroliše kvalitet zavarivačkih radova, zavarenih proizvoda i konstrukcija. Nije se ni slutilo da će Zavod od tog dana biti prvi u mnogo čemu... prvi i jedini punopravni član iz Srbije u Međunarodnom institutu za zavarivanje (International Institute of Welding - IIW) prvo nacionalno odobreno telo za obrazovanje zavarivačkog osoblja (ATB), uključujući međunarodne inspektore, inženjere i tehnologe zavarivanja prvi koji su davnih šezdesetih godina 20. veka uveli terensku radiografiju zavarenih spojeva prvi koji su edukovali kadrove za ultrazvučno ispitivanje u Srbiji... Danas je Zavod za zavarivanje firma koja pravi spoj između Vital and mature as a fifty years old person, the Welding Institute celebrated its fiftieth birthday remembering its first steps. It was established in 1958 by some people who had visions by enthusiasts, the members of the Welding Promotion Association in the People s Republic of Serbia, wishing that qualified welding personnel is educated at the Institute, that welding techniques are introduced into industry and handicrafts and that the quality of welding works, welded products and structures is controlled. No one had any idea that the Institute will one day be the first one in many things... The first and the only lawful member of the International Welding Institute (International Institute of Welding-IIW) from Serbia. The first national certified body to educate the welding personnel (ATB) including international welding inspectors, engineers and technologists. The first to introduce radiography of welded joints in the sixties of the last century. The first to educate the personnel for ultrasonic testing in Serbia...

31 29 tradicionalnog i modernog, tržišno orijentisana, sa oko 50 zaposlenih, od čega je jedna trećina visokoobrazovanog kadra, osposobljenog i kvalifikovanog za najsloženije aktivnosti u oblasti zavarivanja. Akreditovana laboratorija i kontrolna organizacija samo su neki od dokaza da su na prvom mestu kvalitet i zadovoljan klijent. Provera stručne osposobljenosti zavarivača, kontrola ispunjenosti zahteva kvaliteta pri zavarivanju, kao i reparaturno zavarivanje samo su mali deo široke lepeze usluga koje pruža Zavod u oblastima elektroprivrede, naftne i hemijske industrije, brodogradnje, mostogradnje, itd. Bio je i ostao iskren dobrotvor pravoslavlja, nauke, sporta... Pravio je krstove na hramu Svetog Save i drugim The Welding Institute is today a company that joins the traditional and modern requirements, market orientated having about 50 employees, of whom one third are university educated people, skilled and qualified to perform the most complex activities in the field of welding. The accredited laboratory and the control organization are only some of evidence that quality takes the first place as well as a satisfied client. Check-ups of the qualifications of welders, check-ups of quality control requirements during welding, as well as repair welding are only a small part of the wide range of services rendered by the Institute in the fields of electric power industry, oil industry and chemical industry, ship building, bridge building, etc. beogradskim crkvama, ispitivao figurine iz Egipta stare više od godina, koje je Naser darivao Titu, ispitivao bicikle»maunti bajkera«srbije, koji su se spuštali sa Himalaja... Zavod je svoja znanja nesebično razmenjivao i kao aktivan član u strukovnim asocijacijama poput Društva za unapređivanje zavarivanja u Srbiji (DUZS) i Srpskog društva za ispitivanje bez razaranja (SDIBR). Godina u kojoj ova firma proslavlja jubilej sigurno je i jubilej zavarivanja u Srbiji, ali i godina u kojoj Zavod postaje deo velike i progresivne porodice Delta Inženjering Group, čineći jaku i značajnu kariku u lancu zajedničkog poslovanja sa istim ciljem - biti najbolji! Budućnost i misija u narednih pedeset godina sada su mnogo izvesnije, pa neka pola veka bude zanemarljivo vreme u odnosu na postojanje i trajanje Zavoda za zavarivanje. It has been and remains a sincere donor for orthodox religion, science, sports...it made crosses for the Saint Sava and other Belgrade churches, tested figures from Egypt more than 4,000 years old, gifted by president Nasser to Tito, tested»mount bikes«of Serbia, who went down the Himalayas. All its knowledge the Institute shared willingly with other companies and has been an active member in the branch associations such as the Welding Promotion Association in Serbia and the Serbian Association for Testing without Destruction. The year in which this company celebrates the jubilee is surely the jubilee of welding in Serbia, but also the year in which the Institute becomes a part of the large and progressive family of Delta Inženjering Group, making an important and significant link in the chain of common business operations with the same objective to be the best! The future and the missions in the next fifty years are now clearer, so let another half of the century be neglected time in relation to the existence and duration of the Welding Institute.

32 30

33 31

34 32 Fabrika čeličnih konstrukcija Čelik, Žitorađa H&H, Danska Čelik, Factory for manufacturing of steel structures, Zitoradja H&H, DENMARK Centroprojekt - Delta Inženjering Group Centroprojekt - Delta Inženjering Group Fabrika ČELIK iz Žitorađe ugovorila je izvozni posao sa danskom kompanijom H&H, za proizvodnju opreme za fabrike gas betona u Rusiji Sankt Peterburg i Poljskoj Varšava. Proizvedeno je više od 1000 tona opreme - kalupa, kolica i rostova, neophodnih pri proizvodnji gas betona. Prema utvrđenoj dinamici izvršen je kontrolni pregled ovlašćenih kontrolora kupca bez primedbi. Sva oprema za Rusiju je isporučena, a oprema za Poljsku, nažalost, čeka bolje dane, ili bar naznaku da svetska ekonomska kriza gubi svoju početnu snagu. ČELIK factory from Žitoradja has contracted export for the Danish company H&H. It is the contract for the production of equipment for the factory of gas concrete in Russia Saint Petersburg and in Poland Warsaw. The quantity of the contracted equipment exceeds 1,000 tons of moulds, trolleys, etc., which is necessary for the production go gas concrete. According to the agreed schedule, the authorized control entities of the buyers have been inspected and the results of the inspection are satisfactory. All the equipment has been delivered to Russia. However, as the consequence of the world economic crisis, the delivery of the equipment to Poland has been stopped. We hope that the continuation of this export will be possible in the near future after the circumstances on the world scene change. Delta Inženjering proširio je svoju delatnost u oblasti geomehanike i geodezije kupovinom jedne od najstarijih i najvećih projektantskih firmi u Srbiji, Centroprojekta. Centroprojekt je nekada bio specijalizovan za projektovanje objekata u vojnoj industriji. Delta Inženjering je time dopunio kadrovsku strukturu i omogućio bolje uslove za rad u novih 1000 m² prostora u centru grada, a Centroprojekt je obezbedio dalji razvoj u okviru Delta Inženjering Group. Delta Inženjering has expanded its activities in the field of geo-mechanical engineering and geodesy by the purchase of Centroprojekt, one of the oldest and the biggest designing companies in Serbia. Centroprojekt used to be specialized in designing of buildings in military industry. Delta Inženjering has thus supplemented its personnel structure and provided better working conditions in the new prestigious working area of 1,000 m² in the centre of the city. In this way Centroprojekt has secured further development within Delta Inženjering Group.

STRUČNA PRAKSA B-PRO TEMA 13

STRUČNA PRAKSA B-PRO TEMA 13 MAŠINSKI FAKULTET U BEOGRADU Katedra za proizvodno mašinstvo STRUČNA PRAKSA B-PRO TEMA 13 MONTAŽA I SISTEM KVALITETA MONTAŽA Kratak opis montže i ispitivanja gotovog proizvoda. Dati izgled i sadržaj tehnološkog

More information

LIST OF REFERENCE PROJECTS

LIST OF REFERENCE PROJECTS LIST OF REFERENCE PROJECTS ENVIRONMENTAL IMPACT ASSESSMNET 1. TIGAR TYRES, Pirot Environmental impact assessment for the construction of new production facility (2013) Environmental impact assessment for

More information

Podešavanje za eduroam ios

Podešavanje za eduroam ios Copyright by AMRES Ovo uputstvo se odnosi na Apple mobilne uređaje: ipad, iphone, ipod Touch. Konfiguracija podrazumeva podešavanja koja se vrše na računaru i podešavanja na mobilnom uređaju. Podešavanja

More information

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of environment, mining and spatial planning Department of project

More information

The exhibition is carried out through international exhibitions and commodity groups, which saves time of exhibitors.

The exhibition is carried out through international exhibitions and commodity groups, which saves time of exhibitors. ABOUT FAIR Factories of the Future - 4.0 Industry and Smart Factories Machine tools, machining and accessories for metal working and forming Industrial automation, Electronics and Measuring equipment Processing

More information

The role of Serbia in the security of supply in Europe

The role of Serbia in the security of supply in Europe 1 The role of Serbia in the security of supply in Europe What is the goal of security of supply? 1. Obtaining sufficient natural gas quantities to cover end-customer demand even under extreme conditions.

More information

LAW ON THE AGENCY FOR PRESCHOOL, PRIMARY AND SECONDARY EDUCATION

LAW ON THE AGENCY FOR PRESCHOOL, PRIMARY AND SECONDARY EDUCATION Pursuant to Article IV.4.a) of the Constitution of Bosnia and Herzegovina, at the 16th session of the House of Representatives, held on October 11th and 30th, 2007, and at the 9th session of the House

More information

Fig. 1 Varadin Bridge on February 25 th, 1999 Fig. 2 Varadin Bridge on April 1 st, 1999 (Zezelj's bridge is seen in the background)

Fig. 1 Varadin Bridge on February 25 th, 1999 Fig. 2 Varadin Bridge on April 1 st, 1999 (Zezelj's bridge is seen in the background) Dr Zoran Čekerevac, professor 1 Dragi Nestorović, dipl.ing. 2 Abstract REVITALIZATION OF THE VARADINSKA DUGA BRIDGE Military operations on the Serbian territory resulted in a large scale destruction of

More information

GODIŠNJI IZVEŠTAJ ANNUAL REPORT

GODIŠNJI IZVEŠTAJ ANNUAL REPORT GODIŠNJI IZVEŠTAJ ANNUAL REPORT 4 3 26 HOLCIM 28 ARCELOR MITTAL Zenica 28 MONBAT PLC 29 MESSER 29 IMG POSLOVI U 2014. GODINI PROJECTS IN 2014 32 HENKEL SRBIJA Kruševac HENKEL SERBIA Kruševac 35 HENKEL

More information

Bosnia and Herzegovina

Bosnia and Herzegovina UNCTAD Compendium of Investment Laws Bosnia and Herzegovina Law on the Policy of Foreign Direct Investment (1998) Unofficial translation Note The Investment Laws Navigator is based upon sources believed

More information

Stoves Development in China

Stoves Development in China Stoves Development in China Presentation at 2005 ETHOS Chen Xiaofu Liu Guangqing China Association of Rural Energy Industry (CAREI) Introduction 900 million rural population, 22 thousand households in

More information

The results of the National Tourism Development Strategy Assessments

The results of the National Tourism Development Strategy Assessments The results of the National Tourism Development Strategy Assessments - 2012 (I) The assessment tool In 2012 the Sustainable Tourism Working Group of the CEEweb for Biodiversity prepared a guidance for

More information

Expertise hub for a market uptake of energy-efficient supermarkets by awareness raising, knowledge transfer and pre-preparation of an EU Ecolabel

Expertise hub for a market uptake of energy-efficient supermarkets by awareness raising, knowledge transfer and pre-preparation of an EU Ecolabel VASIL CICONKOV, Ing. Energija doo, R.Macedonia Expertise hub for a market uptake of energy-efficient supermarkets by awareness raising, knowledge transfer and pre-preparation of an EU Ecolabel OVERVIEW

More information

The Development of International Trade: The Future Aim of Macedonia

The Development of International Trade: The Future Aim of Macedonia The Development of International Trade: The Future Aim of Macedonia PhD Nasir SELIMI Business and Economics Faculty, South East European University, lindenska nn, 1200 Tetovo, Republic of Macedonia E-mail:

More information

SIMPLE PAST TENSE (prosto prošlo vreme) Građenje prostog prošlog vremena zavisi od toga da li je glagol koji ga gradi pravilan ili nepravilan.

SIMPLE PAST TENSE (prosto prošlo vreme) Građenje prostog prošlog vremena zavisi od toga da li je glagol koji ga gradi pravilan ili nepravilan. SIMPLE PAST TENSE (prosto prošlo vreme) Građenje prostog prošlog vremena zavisi od toga da li je glagol koji ga gradi pravilan ili nepravilan. 1) Kod pravilnih glagola, prosto prošlo vreme se gradi tako

More information

GROUP ULJANIK PLOVIDBA CONSOLIDATED AUDITED FINANCIAL STATEMENTS FOR THE PERIOD JANUARY - DECEMBER 2014

GROUP ULJANIK PLOVIDBA CONSOLIDATED AUDITED FINANCIAL STATEMENTS FOR THE PERIOD JANUARY - DECEMBER 2014 GROUP ULJANIK PLOVIDBA CONSOLIDATED AUDITED FINANCIAL STATEMENTS FOR THE PERIOD JANUARY - DECEMBER 2014 Pula, April 2015 CONTENT: Consolidated audited Financial Statements of GROUP ULJANIK PLOVIDBA with

More information

SMEDEREVO / PREMIUM INVESTMENT LOCATION

SMEDEREVO / PREMIUM INVESTMENT LOCATION Easy access to 180 mil. Consumer market Perfect strategic location for business The lowest corporate TAX in Europe - 10% VAT from 8% to 18% Special discounts for investors Trained and experienced workforce

More information

BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES

BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES Energy & Utilities NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK We design, manufacture

More information

Biznis scenario: sekcije pk * id_sekcije * naziv. projekti pk * id_projekta * naziv ꓳ profesor fk * id_sekcije

Biznis scenario: sekcije pk * id_sekcije * naziv. projekti pk * id_projekta * naziv ꓳ profesor fk * id_sekcije Biznis scenario: U školi postoje četiri sekcije sportska, dramska, likovna i novinarska. Svaka sekcija ima nekoliko aktuelnih projekata. Likovna ima četiri projekta. Za projekte Pikaso, Rubens i Rembrant

More information

AVIATION ENVIRONMENT CIRCULAR 2 OF 2013

AVIATION ENVIRONMENT CIRCULAR 2 OF 2013 GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI AVIATION ENVIRONMENT CIRCULAR 2 OF 2013 File No. 04-01/2010-AED Dated: 13 th June

More information

THE ALBANIAN NATIONAL MINORITY IN THE REPUBLIC OF SERBIA. Minority Rights Guaranteed by Internal Regulations

THE ALBANIAN NATIONAL MINORITY IN THE REPUBLIC OF SERBIA. Minority Rights Guaranteed by Internal Regulations Republic of Serbia MINISTRY OF HUMAN AND MINORITY RIGHTS THE ALBANIAN NATIONAL MINORITY IN THE REPUBLIC OF SERBIA Minority Rights Guaranteed by Internal Regulations Individual and collective rights are

More information

YMA TRAINING CATALOG 2017

YMA TRAINING CATALOG 2017 E Learning Solutions Centum VP Virtual Operator Trainer Process, Safety and basic Engineering courses Safe System of Work Range Safety Awareness range Environmental Range Process Operation and technology

More information

FACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON

FACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON FACTORY CONSTRUCTION FOR THE PRODUCTION OF FERROSILICIUM IN GORNJI VAKUF - USKOPLJE MINISTRY OF ECONOMY, CENTRAL BOSNIAN CANTON Travnik, september 2013 Ministry of economy, Central Bosnian Canton Construction

More information

FOREIGN TRADE OF KOSOVO AND IMPACT OF FISCAL POLICY

FOREIGN TRADE OF KOSOVO AND IMPACT OF FISCAL POLICY FOREIGN TRADE OF KOSOVO AND IMPACT OF FISCAL POLICY Agim Berisha, PHD candidate College of Business, Pristine, Kosovo Abstract Negative trading balance is only one of the economical problems by which Kosovo

More information

THE ROLE OF THE AUTONOMOUS PROVINCE OF VOJVODINA DEVELOPMENT FUND Maja Štrbac 1, Danilo Tomić 1, Branislav Vlahović 3

THE ROLE OF THE AUTONOMOUS PROVINCE OF VOJVODINA DEVELOPMENT FUND Maja Štrbac 1, Danilo Tomić 1, Branislav Vlahović 3 THE ROLE OF THE AUTONOMOUS PROVINCE OF VOJVODINA DEVELOPMENT FUND Maja Štrbac 1, Danilo Tomić 1, Branislav Vlahović 3 1. INTRODUCTION Providing sufficient quantity of food in the world is big problem today.

More information

17500 VRANJE, SRBIJA Radnička 1, Tel.: 017/ INSTRUCTIONS FOR INSTALLATION, ADJUSTMENT AND USE

17500 VRANJE, SRBIJA Radnička 1, Tel.: 017/ INSTRUCTIONS FOR INSTALLATION, ADJUSTMENT AND USE 17500 VRANJE, SRBIJA Radnička 1, Tel.: 017/421-121 STOVE OF THICK METAL SHEETS PREMIJER PREMIJER K INSTRUCTIONS FOR INSTALLATION, ADJUSTMENT AND USE 1.Technical data about continuously burning stove of

More information

Installation & Commissioning Report

Installation & Commissioning Report Installation & Commissioning Report Mukalla Iron & Steel Plant Place: Hadramout Investment Power Company (HIPC). Al-Harshiyat Power Station 75 MW Power Plants Mukalla, Yemen. Engine Model : Wärtsilä18V32.

More information

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO) EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1. APPLICABILITY 1.1 This notice is applicable to operator engaged in Commercial Air Transport Operations beyond the threshold time established by DCA for EDTO

More information

UNIVERZITET U BEOGRADU RUDARSKO GEOLOŠKI FAKULTET DEPARTMAN ZA HIDROGEOLOGIJU ZBORNIK RADOVA. ZLATIBOR maj godine

UNIVERZITET U BEOGRADU RUDARSKO GEOLOŠKI FAKULTET DEPARTMAN ZA HIDROGEOLOGIJU ZBORNIK RADOVA. ZLATIBOR maj godine UNIVERZITETUBEOGRADU RUDARSKOGEOLOŠKIFAKULTET DEPARTMANZAHIDROGEOLOGIJU ZBORNIKRADOVA ZLATIBOR 1720.maj2012.godine XIVSRPSKISIMPOZIJUMOHIDROGEOLOGIJI ZBORNIKRADOVA IZDAVA: ZAIZDAVAA: TEHNIKIUREDNICI: TIRAŽ:

More information

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC

ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC ICAO Universal Safety Oversight Audit Programme ICAO SUMMARY REPORT AUDIT OF THE DEPARTMENT OF CIVIL AVIATION OF THE LAO PEOPLE S DEMOCRATIC REPUBLIC (Vientiane, 22 to 30 April 1999) INTERNATIONAL CIVIL

More information

(i) Adopted or adapted airworthiness and environmental standards;

(i) Adopted or adapted airworthiness and environmental standards; TECHNICAL ARRANGEMENT FOR THE ACCEPTANCE OF AIRWORTHINESS AND ENVIRONMENTAL APPROVAL OF CIVIL AERONAUTICAL PRODUCTS BETWEEN THE CIVIL AVIATION BUREAU, MINISTRY OF LAND, INFRASTRUCTURE AND TRANSPORT, JAPAN

More information

Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro

Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro Project of E-763 Motorway Construction, Section: Belgrade Ostružnica - Požega Boljare/ Border of Montenegro I Legal Framework: Preparation of design for construction of E-763 motorway, section: Belgrade

More information

FRAMEWORK LAW ON THE PROTECTION AND RESCUE OF PEOPLE AND PROPERTY IN THE EVENT OF NATURAL OR OTHER DISASTERS IN BOSNIA AND HERZEGOVINA

FRAMEWORK LAW ON THE PROTECTION AND RESCUE OF PEOPLE AND PROPERTY IN THE EVENT OF NATURAL OR OTHER DISASTERS IN BOSNIA AND HERZEGOVINA Pursuant to Article IV4.a) of the Constitution of Bosnia and Herzegovina, at the 28 th session of the House of Representatives held on 29 April 2008, and at the 17 th session of the House of Peoples held

More information

KAPACITET USB GB. Laserska gravura. po jednoj strani. Digitalna štampa, pun kolor, po jednoj strani USB GB 8 GB 16 GB.

KAPACITET USB GB. Laserska gravura. po jednoj strani. Digitalna štampa, pun kolor, po jednoj strani USB GB 8 GB 16 GB. 9.72 8.24 6.75 6.55 6.13 po 9.30 7.89 5.86 10.48 8.89 7.30 7.06 6.61 11.51 9.75 8.00 7.75 7.25 po 0.38 10.21 8.66 7.11 6.89 6.44 11.40 9.66 9.73 7.69 7.19 12.43 1 8.38 7.83 po 0.55 0.48 0.37 11.76 9.98

More information

Main Features Location. 2 EUROPEAN CORRIDORS Koridor VII Danube River 22km of riverbank, road bridge, Smederevo Fortress monument of culture

Main Features Location. 2 EUROPEAN CORRIDORS Koridor VII Danube River 22km of riverbank, road bridge, Smederevo Fortress monument of culture Main Features Location 46km from Belgrade 2 EUROPEAN CORRIDORS Koridor VII Danube River 22km of riverbank, road bridge, Smederevo Fortress monument of culture Koridor X Highway E-75 27km of highway, with

More information

Keeping Fun Safe. A public discussion paper on a new Amusement Ride Regulation for Manitoba

Keeping Fun Safe. A public discussion paper on a new Amusement Ride Regulation for Manitoba Keeping Fun Safe A public discussion paper on a new Amusement Ride Regulation for Manitoba October 2016 This information is available in alternate formats upon request. 2 Overview: The Government of Manitoba

More information

EU GPP CRITERIA FOR INDOOR CLEANING SERVICES 1. INTRODUCTION

EU GPP CRITERIA FOR INDOOR CLEANING SERVICES 1. INTRODUCTION EU GPP CRITERIA FOR INDOOR CLEANING SERVICES (please note that this document is a compilation of the criteria proposed in the 3 rd Technical Report, which should be consulted for a full understanding of

More information

Energy Community Regulatory Board Status review of transmission tariffs and treatment of cross - border transmission flows and recommendations By

Energy Community Regulatory Board Status review of transmission tariffs and treatment of cross - border transmission flows and recommendations By Energy Community Regulatory Board Status review of transmission tariffs and treatment of cross - border transmission flows and recommendations By Aleksandar Popadic, AERS Senior Natural Gas Expert 5 th

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office TERMS OF REFERENCE Drone Advisory Committee (DAC) Committee Leadership Role Name or Title Organization Chairman Lead Designated Federal Officer Subcommittee Oversight Oversight Brian Krzanich Administrator

More information

Evaluation of realized investments in Belgrade s and Danube region

Evaluation of realized investments in Belgrade s and Danube region MPRA Munich Personal RePEc Archive Evaluation of realized investments in Belgrade s and Danube region Jonel Subić and Lana Nastić and Marijana Jovanović Institute of Agricultural Economics, Volgina 15,

More information

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA

GOVERNMENT GAZETTE REPUBLIC OF NAMIBIA GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA r N$383u WINDHOEK- 15 August 1997 No 1637 CONTENTS Page GENERAL NOTICE No 211 Proposed Civil Aviation Regulations: Part 141 -Organisations: Aviation Training

More information

WORLD TRADE ORGANIZATION

WORLD TRADE ORGANIZATION WORLD TRADE ORGANIZATION Trade Policy Review Body RESTRICTED 1 October 2007 (07-3988) Original: English TRADE POLICY REVIEW Report by SAINT KITTS AND NEVIS Pursuant to the Agreement Establishing the Trade

More information

EU ECOLABEL USER MANUAL TOURIST ACCOMMODATION Commission Decision for the award of the EU Ecolabel for tourist accommodation (2017/175/EC)

EU ECOLABEL USER MANUAL TOURIST ACCOMMODATION Commission Decision for the award of the EU Ecolabel for tourist accommodation (2017/175/EC) Check-List This checklist (in blue table) summarises the documentation to be provided for each mandatory criterion. The documentation described below has to be submitted to the Competent Body. Applicant

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

BUDUCNOST JSC PRESEVO Presevo

BUDUCNOST JSC PRESEVO Presevo BUDUCNOST JSC PRESEVO Presevo General Information Full legal name ENTERPRISE OF BUILDING MATERIAL BUDUCNOST JSC PRESEVO, PRESEVO Address No. 38 Dimitrija Tucovica Street Identification Number 07179243

More information

INTERNATIONAL RULES AND INDUSTRY _ ISSUES OF OHS

INTERNATIONAL RULES AND INDUSTRY _ ISSUES OF OHS IMPLEMENTATION OF INTERNATIONAL RULES AND STANDARDS IN SHIPBREAKING INDUSTRY _ ISSUES OF OHS AND ENVIRONMENT S. S. Gadkar E &SS, Dy. D. G.(Tech) Directorate General of Shipping BACKGROUND The international

More information

CROATIA Business climate and opportunities for cooperation with Finland. Helsinki, 14th December 2015

CROATIA Business climate and opportunities for cooperation with Finland. Helsinki, 14th December 2015 CROATIA Business climate and opportunities for cooperation with Finland Helsinki, 14th December 2015 CROATIA...... in numbers CROATIA 2014 Area: 56,594 km² Population: 4.3 million Capital: Zagreb (800,000

More information

JP TRANSNAFTA PETROLEUM PRODUCTS PIPELINE SYSTEM THROUGH SERBIA. October 2017

JP TRANSNAFTA PETROLEUM PRODUCTS PIPELINE SYSTEM THROUGH SERBIA. October 2017 JP TRANSNAFTA PETROLEUM PRODUCTS PIPELINE SYSTEM THROUGH SERBIA October 2017 PUBLIC ENTERPRISE TRANSNAFTA FACT SHEET Public enterprise founded by the Government of the Republic of Serbia in 2005 Licensed

More information

Capacity kw. Thermal turndown from specified maximum capacity 8:1 8:1

Capacity kw. Thermal turndown from specified maximum capacity 8:1 8:1 3-18.3-5 Specifications of OXY-THERM TITAN burners Typical burner data Fuel: natural gas at 15 C with 10.9 kwh/nm 3 HHV - sg = 0.6 Oxygen: 90-100% purity Stated pressures are indicative. Actual pressures

More information

OÜ Skamet Reg. Nr Savi 9, Pärnu, Estonia

OÜ Skamet Reg. Nr Savi 9, Pärnu, Estonia OÜ Skamet Reg. Nr 11135000 Savi 9, Pärnu, Estonia +372 440 1000 info@skamet.ee www.skamet.ee ABOUT US Our enterprise OÜ Skamet was established in January 2006, when we bought a former metal manufacturer

More information

INVEST IN VALJEVO INDUSTRY

INVEST IN VALJEVO INDUSTRY VAlley of opportunities INVEST IN VALJEVO INDUSTRY Belgrade 03.03.2010. Tijana Todorović Head of LED office Nenad Branković LED office Why invest in Serbia Tax Incentives Lowest corporate profit tax rate

More information

Official Journal of the European Union L 146/7

Official Journal of the European Union L 146/7 8.6.2007 Official Journal of the European Union L 146/7 COMMISSION REGULATION (EC) No 633/2007 of 7 June 2007 laying down requirements for the application of a flight message transfer protocol used for

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

The Technology Enabler

The Technology Enabler The Technology Enabler Christoph Vitzthum Group Vice President, ead of Wärtsilä Power Plants 1 Wärtsilä Capital Markets Day 2007 / Christoph Vitzthum, Wärtsilä Power Plants Agenda 1. Fuelling Power Plants

More information

Vision. MEGA programme Marth 1 st 2010, Belgrade. Presented by: Agency for Local Economic Development. Vladimir Kostic.

Vision. MEGA programme Marth 1 st 2010, Belgrade. Presented by: Agency for Local Economic Development. Vladimir Kostic. Vision MEGA programme Marth 1 st 2010, Belgrade Presented by: Agency for Local Economic Development Vladimir Kostic Predrag Ranic City of Leskovac as regional center of Southern Serbia will: create business

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY ICAO UNIVERSAL SAFETY OVERSIGHT AUDIT PROGRAMME (USOAP) Continuous Monitoring Approach (CMA) FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY (16 to 20 November

More information

A stove is an appliance used for generating heat. A range is an appliance used for cooking.

A stove is an appliance used for generating heat. A range is an appliance used for cooking. CPC - F24B - 2016.11 F24B DOMESTIC STOVES OR RANGES FOR SOLID FUELS Domestic stoves or ranges for solid fuel. The solid fuel can be in the form of lumps or pieces, e.g. coal, briquettes or firewood, or

More information

AMRES eduroam update, CAT alat za kreiranje instalera za korisničke uređaje. Marko Eremija Sastanak administratora, Beograd,

AMRES eduroam update, CAT alat za kreiranje instalera za korisničke uređaje. Marko Eremija Sastanak administratora, Beograd, AMRES eduroam update, CAT alat za kreiranje instalera za korisničke uređaje Marko Eremija Sastanak administratora, Beograd, 12.12.2013. Sadržaj eduroam - uvod AMRES eduroam statistika Novine u okviru eduroam

More information

DRAGAN MARKOVIC, JSC Obrenovac

DRAGAN MARKOVIC, JSC Obrenovac DRAGAN MARKOVIC, JSC Obrenovac General Information Full legal name JSC for production, processing and sale of agricultural products DRAGAN MARKOVIC, OBRENOVAC Address No 27 Kralja Petra I Street, Obrenovac

More information

Bilfinger The international engineering and services group. April 7, 2016

Bilfinger The international engineering and services group. April 7, 2016 Bilfinger The international engineering and services group April 7, 2016 Bilfinger The best of two worlds THE ENGINEER THE SERVICE PROVIDER Bilfinger combines the qualities of its employees like no other

More information

Airmen s Academic Examination

Airmen s Academic Examination Airmen s Academic Examination E4 Qualification Airline Transport Pilot (Airplane) (Rotorcraft) (Airship) No. of questions; time allowed 20 questions; 40 minutes Subject Civil Aeronautics Law (subject code:

More information

USAGE AND MAINTENANCE MANUAL FOR A SOLID FUEL STOVE

USAGE AND MAINTENANCE MANUAL FOR A SOLID FUEL STOVE PREDUZEĆE ZA PROIZVODNJU, PROJEKTOVANJE I PROMET BELOŠEVAC BB, 14000 VALJEVO, SRBIJA USAGE AND MAINTENANCE MANUAL FOR A SOLID FUEL STOVE DEAR CUSTOMER, Congratulations on your purchase of BLIST solid fuel

More information

Tourist Traffic in the City of Rijeka For the Period Between 2004 and 2014

Tourist Traffic in the City of Rijeka For the Period Between 2004 and 2014 Tourist Traffic in the City of Rijeka For the Period Between 2004 and 2014 Rijeka, February 2015. Table of Contents Pg No. 1. Introduction 3 2. Physical indicators on an annual level 4 2.1. Structure and

More information

EXPANDED METAL MESHES CATALOGUE 2015/16

EXPANDED METAL MESHES CATALOGUE 2015/16 EXPANDED METAL MESHES CATALOGUE 2015/16 First 25 years 1990 On 27 th February 1990 Milica and Božidar Panović established Pan Komerc Ltd which dealt with trade in aluminum, copper and zinc plates. 1991

More information

4 Rights and duties in connection with the conduct of petroleum activities

4 Rights and duties in connection with the conduct of petroleum activities Guidelines for application for Acknowledgment of Compliance (AoC) for mobile facilities intended for use in the petroleum activities on the Norwegian Continental Shelf (Unofficial translation), issued

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

Development & Infrastructure projects

Development & Infrastructure projects European Investment Bank financing Urban Development & Infrastructure projects 2 nd Serbian Property & Infrastructure Development Conference, Belgrade, 21 February 2017. Dubravka Nègre, Head of EIB Regional

More information

Greece. Tourism in the economy. Tourism governance and funding

Greece. Tourism in the economy. Tourism governance and funding Greece Tourism in the economy Tourism is an important economic sector in Greece. Tourism directly contributed EUR 8.5 billion to the Greek economy in 2013, equivalent to 5.3% of GDP. Tourism is also an

More information

Act on Aviation Emissions Trading (34/2010; amendments up to 37/2015 included)

Act on Aviation Emissions Trading (34/2010; amendments up to 37/2015 included) NB: Unofficial translation, legally binding only in Finnish and Swedish Finnish Transport Safety Agency Act on Aviation Emissions Trading (34/2010; amendments up to 37/2015 included) Section 1 Purpose

More information

CUSTOM HOSE FABRICATION

CUSTOM HOSE FABRICATION INNOVATIVE SOLUTIONS IN CUSTOM HOSE FABRICATION AN ISO 9001:2000 COMPANY Designs to Meet Any Requirement At MFC, we work closely with our customers to develop the best products for their specific applications.

More information

Roads Company Belgrade JSC Belgrade

Roads Company Belgrade JSC Belgrade Roads Company Belgrade JSC Belgrade General Information Full legal name Roads Company Belgrade JSC, Belgrade Address No. 24 Vidska Street, 11000 Belgrade Identification Number 07014104 Core activity Construction

More information

INSTRUCTIONS MANUAL CAST IRON STOVE

INSTRUCTIONS MANUAL CAST IRON STOVE INSTRUCTIONS MANUAL CAST IRON STOVE CA-SGB06 Warning: Use outdoors only Read the instructions before using the appliance and retain for future reference. 1 These instructions give some important information

More information

Port Community System

Port Community System Port Community System Konferencija o jedinstvenom pomorskom sučelju i digitalizaciji u pomorskom prometu 17. Siječanj 2018. godine, Zagreb Darko Plećaš Voditelj Odsjeka IS-a 1 Sadržaj Razvoj lokalnog PCS

More information

Signature: Signature:

Signature: Signature: Application for ETOPS approval Applicants Statement The undersigned certifies the following information to be correct and true and that aeroplane system installation, continuing airworthiness of systems,

More information

AVIATION RULES OF THE KYRGYZ REPUBLIC APKR-6 "OPERATION OF AIRCRAFT" Annex 6 Flight time limitations and flight duty time 01-Sep-2016

AVIATION RULES OF THE KYRGYZ REPUBLIC APKR-6 OPERATION OF AIRCRAFT Annex 6 Flight time limitations and flight duty time 01-Sep-2016 AVIATION RULES OF THE KYRGYZ REPUBLIC APKR-6 "OPERATION OF AIRCRAFT" Annex 6 Flight time limitations and flight duty time 01-Sep-2016 Contents Contents... 2 1 Definitions... 3 2 Purpose and scope... 3

More information

PROJEKTNI PRORAČUN 1

PROJEKTNI PRORAČUN 1 PROJEKTNI PRORAČUN 1 Programski period 2014. 2020. Kategorije troškova Pojednostavlj ene opcije troškova (flat rate, lump sum) Radni paketi Pripremni troškovi, troškovi zatvaranja projekta Stope financiranja

More information

COURTESY TRANSLATION ORDINANCE (PORTARIA) 303-A / 2004

COURTESY TRANSLATION ORDINANCE (PORTARIA) 303-A / 2004 COURTESY TRANSLATION ORDINANCE (PORTARIA) 303-A / 2004 Council Regulation (EEC) Nº 2408/92 of 23 July 1992 on access for Community air carriers to intra-community air routes lays down, in articles 8 and

More information

Carbon footprint reduction

Carbon footprint reduction Carbon footprint reduction Aéroports de Paris achievements Press kit 6 December 2010 Contents AEROPORTS DE PARIS CUTS BACK CO 2 EMISSIONS AND RECEIVES THE AIRPORT CARBON ACCREDITATION... 3 REDUCING ENERGY

More information

DRAFT COMMISSION REGULATION (EU) / of XXX. laying down rules and procedures for the operation of unmanned aircraft

DRAFT COMMISSION REGULATION (EU) / of XXX. laying down rules and procedures for the operation of unmanned aircraft DRAFT COMMISSION REGULATION (EU) / of XXX laying down rules and procedures for the operation of unmanned aircraft THE EUROPEAN COMMISSION, Having regard to the Treaty on the Functioning of the European

More information

Gas Conversion Kits and Instructions

Gas Conversion Kits and Instructions Gas Conversion Kits and Instructions INSTALLATION FORM RGM 432/433-GC (Version D.1) Obsoletes Form RGM 432/433-GC (Version D) APPLIES TO: Model FT and Model SFT All gas conversion must be done by a qualified

More information

Visit to METSO Alwar (22Mar.2014) A Brief Review

Visit to METSO Alwar (22Mar.2014) A Brief Review Visit to METSO Alwar (22Mar.2014) A Brief Review The Indian Institute of Metals Delhi Chapter regularly organizes visits to eminent industries in and around NCR, for benefit of its members. In this series,

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish

Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish Ministry of Social Affairs and Health, Finland N.B. Unofficial translation. Legally valid only in Finnish and Swedish No. 395/2012 Adopted in Helsinki on 15 June 2012 Act on the Working and Living Environment

More information

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Safety Regulatory Oversight of Commercial Operations Conducted Offshore Page 1 of 15 Safety Regulatory Oversight of Commercial Operations Conducted Offshore 1. Purpose and Scope 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.3 What are the regulatory

More information

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar Critical Elements of a State s Aviation Security Oversight System Cairo, Egypt, 26 to 28 January 2015 Module

More information

Press Release August 2017 Page 1

Press Release August 2017 Page 1 Page 1 From the Blue Angel to the EU Ecolabel A meaningful environmental label for European laminate flooring Laminate flooring manufactured in Europe is top of the league when it comes to floor coverings

More information

INTERNATIONAL INSTITUTE FOR DEMOCRACY AND ELECTORAL ASSISTANCE

INTERNATIONAL INSTITUTE FOR DEMOCRACY AND ELECTORAL ASSISTANCE INTERNATIONAL INSTITUTE FOR DEMOCRACY AND ELECTORAL ASSISTANCE TERMS OF REFERENCE 1. Background The International Institute of Democracy IDEA seeks proposals from qualified firms to provide consolidated

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

Belgrade Chamber of Economy.

Belgrade Chamber of Economy. Belgrade Chamber of Economy www.kombeg.org.yu Facts about Belgrade Belgrade, the capital of the State Union of Serbia and Montenegro and the capital of the Republic of Serbia, is not only the seat of

More information

WWF. Jahorina

WWF. Jahorina WWF For an introduction Jahorina 23.2.2009 What WWF is World Wide Fund for Nature (formerly World Wildlife Fund) In the US still World Wildlife Fund The World s leading independent conservation organisation

More information

REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL

REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL STATE OF FLORIDA Report No. 95-05 James L. Carpenter Interim Director Office of Program Policy Analysis And Government Accountability September 14, 1995 REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL PURPOSE

More information

WAIPU COVE RESERVE BOARD POLICY DOCUMENT ANNUAL SITE DEVELOPMENT REGULATIONS

WAIPU COVE RESERVE BOARD POLICY DOCUMENT ANNUAL SITE DEVELOPMENT REGULATIONS WAIPU COVE RESERVE BOARD POLICY DOCUMENT ANNUAL SITE DEVELOPMENT REGULATIONS This signed document, along with a plan and detail of any proposed works, must be submitted for approval to the board via management

More information

Ship Owner Expectations

Ship Owner Expectations Sibrand Hassing, Director Fleet Operations Europe, Holland America Group Workshop Sustainable Energy Supply & Innovative Solutions for Emission Reduction Improved Ports Cruise Line Collaboration, Bergen/Norway

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/42 9/10/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 2: Aerodrome operations improving airport

More information

THE REPUBLIC OF SERBIA - YOUR TRADE PARTNER

THE REPUBLIC OF SERBIA - YOUR TRADE PARTNER THE REPUBLIC OF SERBIA - YOUR TRADE PARTNER Slobodan Milosavljević, PhD Minister of Trade and Services Republic of Serbia Vicenza, May 2010 GEOSTRATEGIC POSITION Location: : South-East Europe, central

More information

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title: BASIC PROJECT DATA Full project title: Short project title: (acronym) Rehabilitation and Development of Transport and Navigation on the Sava River Waterway Project logo: Project website: www.savacommission.org

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

Russia Energy as Diplomacy in the 21 st Century HOW DID THE SOUTH STREAM FAIL?

Russia Energy as Diplomacy in the 21 st Century HOW DID THE SOUTH STREAM FAIL? Russia Energy as Diplomacy in the 21 st Century HOW DID THE SOUTH STREAM FAIL? Main gas lines to EU go via Ukraine and Belarus Russia controls around 25% of global gas reserves (as per Gazprom) Energy

More information