Installation & Commissioning Report
|
|
- Collin Hoover
- 6 years ago
- Views:
Transcription
1 Installation & Commissioning Report Mukalla Iron & Steel Plant Place: Hadramout Investment Power Company (HIPC). Al-Harshiyat Power Station 75 MW Power Plants Mukalla, Yemen. Engine Model : Wärtsilä18V32. Engine Serial Number: PAAE150665, PAAE150666, PAAE150667, PAAE150668, PAAE150669, PAAE150670, PAAE167202, PAAE PAAE & PAAE Wärtsilä 23 January 2011
2 Contents General Information Shipment Technical Installation Civil Mechanical Electrical Pre-commissioning Commissioning 2 Wärtsilä 23 January 2011
3 General Information Owner :Hadramout Investment Power Company (HIPC). Al-Harshiyat Power Station 75 MW Power Plants Mukalla, Yemen. Suppliers : Wärtsilä Finland Oy. Tarhaajantie 2, Fin Vaasa, Finland. Engine Model : 10XWärtsilä18V32 Engine Serial Number: PAAE150665, PAAE150666, PAAE150667, PAAE150668, PAAE150669, PAAE150670, PAAE167202, PAAE202656, PAAE & PAAE Alternator Type : AMG 1120 MR08 DSE Alternator Serial No. : , , , , , , , , & General Information about Mukalla sites: Site Location: Al-Harshiyat Power station, Mukalla, Yemen. Type of Power Plant: Light Fuel Oil (LFO) and Heavy Fuel Oil (HFO) Power Plant. Capacity of Plant: 75 MW Power Plants. Owner of the Plant: Hadramout Investment Power Company Ltd (HIPC). Site Altitude above Main sea level: 220m Grid Connection: 33/11 kv. Grid Frequency: 50 Hz. Rural country side, Sand stone, Hill, Rock and Mount area (Dusty area). 3 Wärtsilä 23 January 2011
4 Shipment First Shipment: Ship arrived at Mukalla sea port on Unloading started on Unloading completed on Second Shipment (Indian Portion): Ship arrived at Mukalla sea port on Material arrived at site on Main Shipment: Ship arrived at Mukalla sea port on Unloading started on Unloading completed on Third Shipment (Extended part): Vessel arrived at Mukalla sea port on Material arrived at site on Wärtsilä 23 January 2011
5 Shipment DG unloaded from vessel to Tailor DG unloaded from vessel to Tailor 5 Wärtsilä 23 January 2011
6 Shipment DG unloaded from Tailor to Foundation Container unloaded from vessel to Tailor 6 Wärtsilä 23 January 2011
7 Technical Mechanical Basic Design received on Electrical basic design received on Mechanical detailed design received on Electrical detailed design received on Installation Civil Civil is not Wartsila scope but before placing the DG sets and others equipment to ensure that the foundation leveling, center line and 0-line are marked as per Wartsila drawing. Checked all DG sets foundation leveling, center line and 0-line, checked Engine auxiliary module foundation, Compact booster unit foundation. Checked Exhaust gas Boiler, Exhaust gas silencer, Auxiliary boiler container, Charge air filter, Cooling water radiator, Station transformer and Black start container foundation. Fuel treatment house (Feeder unit, HFO Separator & Oily water treatment unit foundation), Day tanks foundation, Fire water tank, Treated water tank, and Water treatment unit container foundation checked. HFO & LFO Storage tank, Unloading station and transfer pump units foundation checked.. 7 Wärtsilä 23 January 2011
8 Foundation Power House concreting DG sets Foundation 8 Wärtsilä 23 January 2011
9 Foundation Stack Foundation Tank Foundation 9 Wärtsilä 23 January 2011
10 Mechanical DG-sets Installation DG-sets placed on foundation and checked spring location, centre line and 0-line Engine auxiliary module alignment along with Engine and fixed on foundation with anchor bolts Compact booster unit alignment with Engine auxiliary module and inter connect the flanges. Exhaust gas module Installed respect to the DG sets. DG sets Engine Auxiliary Module Compact Booster Unit 10 Wartsila 23 January 2011
11 DG-sets, EAM, CBU & EGM Installation DG sets Engine Auxiliary Module Compact Booster Unit DG sets on Foundation 11 Wärtsilä 23 January 2011
12 DG-sets, EAM, CBU & EGM Installation EGM Placed on Foundation Fuel system: HFO and LFO unloading pump unit are placed on foundation. HFO and LFO Feeder unit has been placed on foundation. LFO transfer pump unit has been placed on foundation. HFO and LFO Piping (Inside Power house and outside Power house) fabrication, welding, pressure test, pickling and flushing checked with customer representative. HFO and LFO Storage tank Fabrication, welding and pressure test checked with customer representative. HFO day tank, buffer tank and LFO day tank fabrication, welding and pressure test checked with customer representative. 12 Wärtsilä 23 January 2011
13 Fuel oil system HFO & LFO Storage tank, & Unloading pump units HFO & LFO transfer pump unit HFO & LFO Feeder Unit 13 Wärtsilä 23 January 2011
14 Mechanical Installation Cooling water system: Maintenance water tank placed on foundation. Radiators has been placed on foundation (with legs) including railings. Cooling water piping (Inside & outside power house) fabrication and welding checked. Cooling water piping pressure test and flushing checked. Cooling water Radiator Cooling water Piping 14 Wärtsilä 23 January 2011
15 Mechanical Compressed air system: Starting air Compressor unit and Starting air vessel has been placed on foundation. Instrument air compressor unit and control air bottle has been placed on foundation. Starting air and Control air piping fabrication, welding and pressure test checked. 15 Wärtsilä 23 January 2011
16 Mechanical Lubricating oil system: Lubricating oil unloading pump unit has been placed on foundation. Lubricating oil transfer pump unit (Stationary) have been placed on foundation. LO piping (Inside and outside power house) fabrication, welding, pickling & flushing checked. LO storage tank (Fresh & Used) and service tank fabrication, welding, and pressure test checked. LO Unloading pump unit LO Transfer pump unit 16 Wärtsilä 23 January 2011
17 Mechanical Compressed air system: Starting air Compressor unit and Starting air vessel has been placed on foundation. Instrument air compressor unit and control air bottle has been placed on foundation. Starting air and Control air piping fabrication, welding and pressure test checked. Starting & Instrument Air compressor unit Starting Air Vessel Instrument air system Commissioning: Checked all suction/delivery valve in the compressor, air vessel & Dryer. Checked oil level in compressor, power supply in the local panel, checked vessel & dryer drainage solenoid valve functionality, start compressor and fill-up the vessel and checked any leakage. Supply the air in the main distributions line and checked any leakage. 17 Wärtsilä 23 January 2011
18 Mechanical Heat recovery system: All exhaust gas boiler has been placed on foundation. Auxiliary boiler container are placed in foundation with feed water tank. Steam header has been placed on foundation and piping works completed. Boiler washing water pump and tank has been placed on foundation & piping completed. Steam and Condensate piping fabrication, welding, pressure test and insulation completed. Exhaust gas Boiler (EGB) 18 Wärtsilä 23 January 2011
19 Mechanical Oily water system: Oily water treatment unit has been placed on foundation. Oily water transfer pump unit and feed pump unit has been placed on foundation. Oily water piping fabrication, welding and pressure test completed. Oily water buffer tank fabrication, welding sand blasting, pressure test & painting completed. Sludge loading pump has been placed on foundation and piping works completed. Sludge tank fabrication, welding, sand blasting, pressure test & painting completed. Oily water treatment unit Oily water transfer pump 19 Wärtsilä 23 January 2011
20 Auxiliary system Commissioning Instrument air system Commissioning: Checked all suction/delivery valve in the compressor, air vessel & Dryer. Checked oil level in compressor, power supply in the local panel, checked vessel & dryer drainage solenoid valve functionality, start compressor and fill-up the vessel and checked any leakage. Supply the air in the main distributions line and checked any leakage. Instrument Air compressor units 20 Wärtsilä 23 January 2011
21 Auxiliary system Commissioning Water supply system commissioning: Raw Filling in raw water tank, Control air line blow throwing, Suction & delivery valve checking in raw water booster unit. Multi layer & water softener tank checked, Nacl filling in Nacl Solution tank, Nalco PC- 191 filling in chemical dosing tank. Power supply in the panel board. Checking motor rotation in raw water Booster, treated water booster, RO pump & chemical dosing pump. Start the system and checked as per manufacturer instruction (Pump suction /delivery pressure, air pressure etc). Flow meter and level switch adjusted and successfully commissioning the water treatment system & producing treated water, test the water and found ph value is satisfactory. System run continuously and producing treated water as per boiler & DG sets requirement. Water Treatment unit 21 Wärtsilä 23 January 2011
22 Auxiliary system Commissioning Fuel (LFO) oil system: LFO unloading pump and transfer pump suction and delivery valve checked and kept open position, power supply on in the local panel board, checked motor/pump rotation after that pump started and unloading LFO from tank lorry to LFO storage tank (Flow meter reading checked with customer representative) and same procedure LFO transfer from Storage tank to LFO day tank. LFO feeder unit: LFO day tank to Feeder unit and feeder unit to auxiliary boiler day tank and power pouse all valve checked and kept open position. Control air checked, power supply to feeder unit local panel board, checking Motor/pump rotation after that LFO Feeder started and shifting LFO day tank to Auxiliary boiler day tank and also checked all LFO pipe line any leakage. Fuel (HFO) oil system: HFO unloading pump and transfer pump suction and delivery valve checked and kept open position, power supply on in the local panel board, checked motor/pump rotation after that pump started and unloading HFO from tank lorry to HFO storage tank (Flow meter reading checked with customer representative) and same procedure HFO transfer from Storage tank to HFO buffer tank. Fuel oil 3-way valve checking and found actuator solenoid valve defective and replaced solenoid valve from extension part. Pre-heating the HFO buffer tank. Separator Commissioning: Checked HFO buffer tank to separator all suction/delivery valve and kept open position, checked instrument air, steam and condensate line and treated water line etc. all HFO separator started and completed commissioning (Separator commission by Westfalia commissioning engineer). HFO feeder unit: HFO day tank to Feeder unit and power house all valve checked and kept open position. Control air checked, power supply to feeder unit local board, checking Motor/pump rotation, Auto and manual filter checked, Viscometer function checked after that HFO Feeder started and checked main HFO pipe up to CBU. 22 Wärtsilä 23 January 2011
23 Auxiliary system Commissioning HFO & LFO Feeder unit HFO Separators units 23 Wärtsilä 23 January 2011
24 Auxiliary system Commissioning Cooling water system: Filling treated water with cooling additives in Maintenance water tank. checked maintenance water transfer pump rotation, mixing water with additives, maintenance water tank to system suction & delivery valve kept open position, after that cooling water filling in the system and checked leakage, water filling radiator also. Radiator fan functionality checking. Expansion vessel checked. Cooling water Radiator 24 Wärtsilä 23 January 2011
25 Auxiliary system Commissioning Compressed air system: Checked all pipe line up to start air vessel & engine auxiliary modules, checked all suction & delivery valves in compressor & air vessel, oil filling in compressor as per manufacture instruction. Power supply in local panel board, compressor rotation checked. Start compressor fill-up the vessel and checked any leakage in compressor to vessel. Supply the air in the main distributions line and checked any leakage. Starting compressor unit Starting Air Vessel 25 Wärtsilä 23 January 2011
26 Auxiliary system Commissioning Charge air & Exhaust gas system: Charge air duct and charge air silencer inspect, Charge air filter (dry pack) cleaned, oil filling in charge air filter. Exhaust gas ducting & silencer inspect, water lock inspect. 26 Wärtsilä 23 January 2011
27 Mechanical Auxiliary system Auxiliary Boiler Container Exhaust gas Boiler Black start container Steam Header Oily water treatment unit 27 Wärtsilä 23 January 2011
28 Electrical Wartsila Scope for Electrical system: 1. LV system: Complete 2. MV system: Complete 3. DC system: Complete 4. Control and monitoring system: Complete HV system was in scope of Customer. And it was supplied by M/S MN Dashtur, India, Ltd. Installation and erection with commissioning support was covered by M/S HIDELECO Evaluation Delivery and Material Handling: Delivery Time from Wärtsilä Satisfactory HV system including Transformer delivery was delayed customer scope Custom Clearance Moderate It was in customer scope. Transport to Site- Quite Satisfactory Storage/ Store Keeping Quite Satisfactory Material Handling in sitequite Satisfactory and in safe way Erection Contractor used proper tools Contractor followed wartsila s guide line and safety instruction Wartsila Supervisory support was well behind to the contractor Erection failure was minor- in MV panel some analog meters and selector switch were damaged 28 Wärtsilä 23 January 2011
29 Electrical - continued Contractor s skill and competency were well satisfactory Co-ordination among electrical, mechanical and civil was Moderate Erection Difficulties and suggestion: Cable Ladder Layout- MV panel Doors Less space in Switchgear In some places, cable ladder routing was so difficult due to less space. Specially in the Auxiliary Module area. we found couple of MV cubicle doors are misaligned. And lock was not properly operable. Specially the breaker doors. Rectified at site. It was a compact switchgear room including LV, MV and MV (33KV). The space was not sufficient. For better cooling, air flow path and safely operation, a more specious room would be better. Frequency Converter of Feeder Unit Three frequency converters for Fuel feeder unit were located in Fuel treatment unit. Due to * heavy high temperature * humidity * Possibility of more dirt in fuel treatment room It would be better to put those frequency converter in a separate cubicle with force ventilation facility. That cubicle would be placed along with BFA902 (LV panel at Fuel treatment house). Engine hall ventilation unit (Generator side) Frequency converters were inside the ventilation unit. and there was no maintenance plat form/ ladder around the ventilation unit. It was difficult to work with the Frequency converters. BJA panel FC could be relocated in the engine hall just bellow the louver of ventilation unit/ near by the Neutral cubicle. Sensor/actuator end connections were open, at site they were connected. It should be connected from factory. We have reported this issue in a separate report during installation. 29 Wärtsilä 23 January 2011
30 Electrical - continued Pre-Commissioning Pre-commissioning was performed according to the co-ordination plan with mechanical system requirement and completion We got sufficient man power with satisfactory skill from contractor. Contractor was quite helpful and knowledgeable. The over all pre-commissioning was : - Well coordinated and planned - Less error found for connection - quick rectification support whenever modification advised or required Pre-commissioning Difficulties and Suggestion LV Power This was quite enough cited issue ever for this project. Delay of 33KV System initiated the difficulty. We had to use our black start unit for pre-commissioning support though customer arranged small generators. But it was very risky when multiple generators are connected to the LV system and frequent change over required. 30 Wärtsilä 23 January 2011
31 Electrical- Continued Pre-Commissioning Sequence- 31 Wärtsilä 23 January 2011
32
33 Electrical - continued Engine governed by UNIC-C1. the followings are to note for UNIC-C1: a. The hardware configuration was not exact the supplied installation drawings. The Speed control signal from AVR during Sync was connected to different port b. The Base software for UNIC-C1 had very fast PID parameters c. The Speed sensors ( Flywheel) needed to adjust AVR synchronization Soft-start Very stable synchronization obtained Very stable soft start performed 33 Wärtsilä 23 January 2011
34 Electrical- Continued Some pictures 34 Wärtsilä 23 January 2011
35 Electrical- Continued 35 Wärtsilä 23 January 2011
36 Electrical- Continued Overall Evaluation Wartsila Scope: Erection Contractor: Customer s Scope 36 Wärtsilä 23 January 2011
37 37 Wärtsilä 23 January 2011 Engine hall with DG-sets
38 38 Wärtsilä 23 January 2011 Power House
39 39 Wärtsilä 23 January 2011 Power House
40 40 Wärtsilä 23 January 2011 Control Room
41 41 Wärtsilä 23 January 2011 Electrical Switchgear
W20 Containerized Power Plant
W20 Containerized Power Plant 18.2.2008 1 Wärtsilä W20 Containerized Power Plant W20 Containerized Power Plant Stack Cooling water expansion vessel Alarm indicator Satellite antenna Radiator fans Generating
More informationPacked to perfection. FAST, FUNCTIONAL AND FLEXIBLE For industrial self-generation, small utilities, industrial and IPP customers who do not
POWER CUBES 2 Packed to perfection Are you looking for a great package deal for power generation in the 5-30 MW range? With our GasCube and OilCube power generation solutions for smaller power plants,
More informationHUDSON LEADER. Classification society: American Bureau of Shipping. Recognized Organization: American Bureau of Shipping
HUDSON LEADER IMO no.: 8607749 Flag: Panama Ship type: Car carrier MMSI: 355123000 Call sign: H9JS Gross tonnage: 47307 Ship length: 180 m Keel laying date: 20.03.1987 Deadweight: 14104 Classification
More informationTM COMPRESSOR, ROTARY: AIR DIESEL ENGINE DRIVEN; 250 CFM ORGANIZATIONAL, DS, GS, AND DEPOT MAINTENANCE MANUAL
TM 5-4310-250-15 DEPARTMENT OF THE ARMY TECHNICAL MANUAL ORGANIZATIONAL, DS, GS, AND DEPOT MAINTENANCE MANUAL COMPRESSOR, ROTARY: AIR DIESEL ENGINE DRIVEN; 250 CFM 100 PSI; SKID MOUNTED (DAVEY FSN MODEL
More informationInstallation and operation instructions for KINEMAX burners
-. - Installation and operation instructions for KINEMAX burners Application requirements View port A view port to observe burner flame is essential to inspect the flame aspect. Locate the view port downstream
More informationCapacity kw. Thermal turndown from specified maximum capacity 8:1 8:1
3-18.3-5 Specifications of OXY-THERM TITAN burners Typical burner data Fuel: natural gas at 15 C with 10.9 kwh/nm 3 HHV - sg = 0.6 Oxygen: 90-100% purity Stated pressures are indicative. Actual pressures
More informationWÄRTSILÄ EXHAUST GAS CLEANING. 28 October 2013 WÄRTSILÄ ENVIRONMENTAL SOLUTIONS PRODUCTS / MORTEN LETNES
WÄRTSILÄ EXHAUST GAS CLEANING 1 Wärtsilä 28 October 2013 WÄRTSILÄ ENVIRONMENTAL SOLUTIONS PRODUCTS / MORTEN LETNES PIONEERING SOX SCRUBBER SYSTEMS LOWEST COST FOR MEETING MARPOL ANNEX VI REQUIREMENTS 2
More informationENGINEERING AND TECHNICAL CHALLENGES IN LNG CONVERSIONS. 1 Wärtsilä
ENGINEERING AND TECHNICAL CHALLENGES IN LNG CONVERSIONS 1 Wärtsilä Content Introduction Principles of Gas fuelled vessels Gas storage onboard ships Classification society requirements Bunkering of LNG
More informationEfficient Propulsion for Seagoing Vessels
Efficient Propulsion for Seagoing Vessels Wärtsilä Switzerland Application Development Heinrich Schmid 1 Wärtsilä Ecological power for ship propulsion / H. Schmid Introduction Engine design RT-flex electronic
More informationCheck burner weight and reinforce burner mounting flange or combustion chamber/furnace back wall if necessary to take complete burner weight.
-.9-4 Installation instructions for KINEDIZER LE burners Application requirements View port A view port to observe burner flame is essential to inspect flame aspect. Locate the view port downstream of
More informationMaintenance 45 Serie CAUTION. Before resetting your electronic card that displays an error code.
29-10-2013 CAUTION Before resetting your electronic card that displays an error code. Error Code H Service the stove COMPLETELY as described in this manual. Check the chimney pipe. Error Code O Service
More informationWärtsilä 20 Dual Fuel (DF) Engine Presentation
Wärtsilä 20 Dual Fuel (DF) Engine Presentation List of contents 1. Wärtsilä 20DF engine main features and technical data 2. Wärtsilä dual-fuel engine portfolio and technology 3. Emission legislation 4.
More informationSCRUBBERS FOR THE BALTIC SEA AREA SHIPS FUEL AND TECHNOLOGY TOOLBOX SEMINAR
SCRUBBERS FOR THE BALTIC SEA AREA SHIPS FUEL AND TECHNOLOGY TOOLBOX SEMINAR 18TH NOVEMBER 2011 IN HELSINKI B-M Kullas-Nyman, Kullas-Nyman Wärtsilä 1 / 45 Wärtsilä 8 November 2011 Doc.ID: DBAB285337 Revision:
More informationCheck burner weight and reinforce burner mounting flange or combustion chamber/furnace back wall if necessary to take complete burner weight.
-.6-6 E-i-/08 Installation instructions for KINEDIZER burners Application requirements View port A view port to observe burner flame is essential to inspect flame aspect. Locate the view port downstream
More information6275-S1 PNEUMATIC DRILL OPERATING MANUAL ORIGINAL INSTRUCTIONS. P/N November 2014 Revision 1
6275-S1 PNEUMATIC DRILL OPERATING MANUAL ORIGINAL INSTRUCTIONS P/N 80749 November 2014 Revision 1 2014 Climax Portable Machining and Welding Systems or its subsidiaries. All rights reserved. Except as
More information300 Model 870 Four Wheel Hose Cart Owner s Manual
300 Model 870 Four Wheel Hose Cart Owner s Manual IMPORTANT: READ THE OWNER S MANUAL BEFORE ASSEMBLING TOOLS REQUIRED: TWO ADJUSTABLE WRENCHES; HAND PUMP Estimated assembly time: 30 minutes PARTS LIST
More informationTradition and innovation
Wärtsilä Auxpac Tradition and innovation The Wärtsilä Auxpac generating sets are the most compact and lightweight generating sets available on the market. The compact design of the generating set simplifies
More informationINSTRUCTIONS MANUAL CAST IRON STOVE
INSTRUCTIONS MANUAL CAST IRON STOVE CA-SGB06 Warning: Use outdoors only Read the instructions before using the appliance and retain for future reference. 1 These instructions give some important information
More informationSpiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8
Contents Introduction 1 Duct & Fitting Range 2 Duct Sizes 3 Fittings 5 Round Duct Connector 7 Installation 8 Celmec International Pty Ltd ACN 005 850 546 Melbourne Tel: +61 3 8552 8200 Fax: +61 3 9555
More informationToyostove Error Code EE 2 (EE 6)
Toyostove Error Code EE 2 (EE 6) WARNING Rural Energy Enterprises, Inc. does not accept liability for the improper use of this information. Installation, service, and maintenance of heating equipment should
More informationCassette-folding arm-awning markilux 990
Cassette-folding arm-awning markilux 990 Mounting instructions 1. Overview 1 Projection profile 2 Folding arm 3 Fabric 4 Console 5 Cassette 6 Covering cap 7 Wall bracket 2. Mounting brackets 2.1 Overview
More informationWärtsilä Scrubber Retrofit
Wärtsilä Scrubber Retrofit Wärtsilä Marine Solutions / Environmental Solutions 1 Wärtsilä 4 November 2016 Wärtsilä Scrubber Retrofit 2016 RETROFITTING ALTERNATIVES EQUIPMENT ONLY SITE ADVISORY INSTALLATION
More informationDGCANO SUBJECT REFERENCE COMPLIANCE APPLICABILITY DGCA/BOEING 767/01 EMERGENCY EVACUATION SLIDES FAA AD AS IN THE AD AS IN THE AD
DGCA/BOEING 767/01 EMERGENCY EVACUATION SLIDES FAA AD 86-06-06 DGCA/BOEING 767/02 PNEUMATIC SYSTEM CHECK VALVE INSPECTION FAA AD 90-12-02 DGCA/BOEING 767/03 FLAPS CARRIAGE SPINDLES FAA AD 90-17-19 DGCA/BOEING
More informationTherme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions
Therme storage water heater Table of contents Symbols used... 8 Installation instructions Water supply... 9 Choice of location... 9 Installation of the Therme... 9 Fitting the draining and venting valve...
More informationEaton ET Hydraulic Hose Saw INSTRUCTION MANUAL
Eaton ET9200-10-220 Hydraulic Hose Saw INSTRUCTION MANUAL INSTRUCTION MANUAL Eaton ET9200-10-220 Hydraulic Hose Saw Table of Contents Introduction... 3 Old Method... 3 New Eaton Method... 3 Operation...
More informationPROCESS BURNERS INSTALLATION, COMMISSIONING AND MAINTENANCE MANUAL HMA2A SERIES AIR HEATING BURNERS
PROCESS BURNERS INSTALLATION, COMMISSIONING AND MAINTENANCE MANUAL HMA2A SERIES AIR HEATING BURNERS The information contained in this manual is advisory and in general terms only and does not constitute
More informationYMA TRAINING CATALOG 2017
E Learning Solutions Centum VP Virtual Operator Trainer Process, Safety and basic Engineering courses Safe System of Work Range Safety Awareness range Environmental Range Process Operation and technology
More informationSaw Blade Lube Systems
Environmentally Friendly Lubrication Saw Blade Lube Systems Cutting Edge Technology Saw Blade Lube Systems Cutting Edge Technology Cutting Edge Technology Unist saw blade lubrication systems deliver all
More informationDEVELOPMENT IN ENGINE TECHNOLOGY FOR THE FUTURE MARINE MARKET. ELIAS BOLETIS Director, Programs & Technologies Propulsion WÄRTSILÄ CORPORATION
DEVELOPMENT IN ENGINE TECHNOLOGY ELIAS BOLETIS Director, Programs & Technologies Propulsion FOR THE FUTURE MARINE MARKET WÄRTSILÄ CORPORATION 1 Wärtsilä - Strategy - How we see the future - Engine development
More informationFrequently Asked Questions
Customer Service (888) 961-7727 ahsservice@watkinsmfg.com Frequently Asked Questions What makes Lifesmart Spas different from other spas? Lifesmart spas are rotationally molded. This manufacturing technique
More informationAPPENDIX TO THE INSTALLATION AND OPERATING MANUAL OF STOVEMAN SAUNA STOVE
APPENDIX TO THE INSTALLATION AND OPERATING MANUAL OF STOVEMAN SAUNA STOVE Technical data of the sauna stove Sauna stove type Stoveman 16 Model Stoveman 16 Nominal heat capacity, i.e. ability to 17 kw heat
More informationUNODOS + / FLOCDOS +
Operation manual UNODOS+ / FLOCDOS+ (01-09) page 1 of 7 UNODOS + / FLOCDOS + Table of contents page 1. Technical description... 2 1.1 The function... 2 1.2 Technical details... 2 1.3 The dosing performance...
More informationThe Wallumbilla Hub: Integrating Queensland s Pipeline Infrastructure to Meet the Changing Demands of the East Coast Gas Grid
The Wallumbilla Hub: Integrating Queensland s Pipeline Infrastructure to Meet the Changing Demands of the East Coast Gas Grid Craig Clarke, Manager Construction Engineering APGA Annual Convention, Gold
More informationBILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES
BILFINGER SE NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK FROM ENGINEERING AND TECHNOLOGY TO FABRICATION, CONSTRUCTION AND SERVICES Energy & Utilities NUCLEAR ENERGY PROJECTS: WE MAKE IT WORK We design, manufacture
More informationTC42 CHALET BURNER KIT INSTALLATION INSTRUCTIONS
INSTALLER: Leave this manual with the appliance. CONSUMER: Retain this manual for future reference. These instructions are supplementary to the Installation and Operating Instructions supplied with the
More informationOperating Instructions VETTER Medical Tents
Emergency Pneumatics. Operating Instructions VETTER Medical Tents Article No. 87043403 Vetter GmbH I 09/17 I Changes and errors excepted. Vetter Medical Tents Contents 1. Important preliminary remarks...2
More informationINSTALLATION & MAINTENANCE MANUAL SERIES 9000 MODELS 9150/9300 SERIES 9000 VALVES WITH V BALL
BRIEF INTRODUCTION Split body (2-piece) valve allows easy replacement of gasket, seal, and seats without special tools. Series 90D ball valves use floating ball design. Induced by the line pressure the
More informationTHE WARMTH OF WOOD, THE ECONOMY OF PELLETS INNOVATION, TECHNOLOGY, SAVINGS FAIR SRL ITALIAN MADE PELLET STOVES BIO STOVE ADVANTAGES THE PELLET
THE WARMTH OF WOOD, THE ECONOMY OF PELLETS INNOVATION, TECHNOLOGY, SAVINGS FAIR SRL ITALIAN MADE PELLET STOVES With its long-lasting history and many year of experience in the business, today Fair Srl
More informationEaton ET Hydraulic Hose Saw INSTRUCTION MANUAL
Eaton ET9100-07-110 Hydraulic Saw INSTRUCTION MANUAL INSTRUCTION MANUAL Eaton ET9100-07-110 Hydraulic Saw Table of Contents Introduction... 3 Old Method... 3 New Eaton Method... 3 Operation... 4 Operation
More informationA few days before you set off. 1. Clean
The summer soon comes around! Now the weather s getting a bit warmer many of us are planning to take our caravan or motorhome out of storage, and hit the road for our first getaway of the year. If your
More informationINSTRUCTION MANUAL HYDM140
INSTRUCTION MANUAL HYDM140 INSTRUCTION MANUAL Clean-Cuts HYDM140 Hydraulic Hose Saw Table of Contents Introduction... 3 Old Method... 3 New Clean-Cuts Method... 3 Operation... 4 Operation Procedure...
More informationPower Plants 2010 Turbine Retrofit Solutions Vrnjačka Banja, 26-29/10/2010
Power Plants 2010 Turbine Retrofit Solutions Piotr Czerwiński Vrnjačka Banja, 26-29/10/2010 Agenda Introduction to retrofitting Alstom s advanced retrofit technology Retrofit solutions Key references Financial
More informationMahavir Enterprises.
+91-8071801335 Mahavir Enterprises https://www.indiamart.com/mahavir-ent/ We are a distinguished manufacturer and supplier of an immaculate array of Electrical,Rubber, PVC and Industrial Products. Our
More informationCCI Nuclear Flow Control Products and Services
CCI Nuclear Flow Control Products and Services 2 We solve flow control problems CCI Worldwide Nuclear Capabilities CCI World Headquarters, California USA CCI is a recognized world leader in supply of specialized
More informationItem # BJ2PC With 8 Leg Frame, Cover, and Enclosure Kit with Windows Size: 10 8 Wide x 20 Long (Side Height 6 8 ) (Center Peak Height 9 9 )
Item # BJ2PC With 8 Leg Frame, Cover, and Enclosure Kit with Windows Size: 10 8 Wide x 20 Long (Side Height 6 8 ) (Center Peak Height 9 9 ) Powell & Powell Supply Company, L.L.C. Manufactured by: 1730
More informationNOBODY READS MANUALS
Compressors for Dummies (Updated 2-20-14) NOBODY READS MANUALS Make this one the exception - - - you will be glad you did This book is frequently updated - If you would like free updates Just email jstark@starkindustries.com
More information1946 READ AND SAVE THESE INSTRUCTIONS!
EasyAwn Installation, Care and Maintenance Manual EasyAwn Quality, Since 1946 EasyAwn, LLC Toll Free: 877-EasyAwn http://www.easyawn.com READ AND SAVE THESE INSTRUCTIONS! EasyAwn Quarter Round Awning Installation
More informationWÄRTSILÄ PROVIDER OF ENVIRONMENTAL SOLUTIONS
WÄRTSILÄ PROVIDER OF ENVIRONMENTAL SOLUTIONS ASLAK SUOPANKI, WÄRTSILÄ FINLAND, ENVIRONMENTAL SERVICES SUSTAINABLE SHIPPING FORUM 2010, MIAMI 1 / 24 Wärtsilä 22 October 2010 Doc.ID: Revision: Status: Finalised
More informationInflatable Tent. Medical, Decontamination, Activity
Inflatable Tent Medical, Decontamination, Activity Inflatable Tent U-Project tent systems offer solutions for different purposes in different sectors. It is specifically designed and manufactured spesifically
More informationProject Purpose: Project History and Status:
Plant Unit Substation Improvements Project Purpose: The purpose of this project is to ensure that the portions of the Nine Springs Wastewater Treatment Plant powered by Unit Substations U11, U12, and U13
More informationThomas Scientific Swedesboro, NJ U.S.A.
Thomas Scientific Swedesboro, NJ 08085-0099 U.S.A. Wiley Laboratory Mill, Model 4 3375-E10 (115 V, 50/60 HZ) USE AND CARE OF CATALOG NUMBER: 3375-E10 Wiley Laboratory Mill, Model 4 (115 V, 50/60 HZ) UNPACKING
More informationTC36 CHALET BURNER KIT INSTALLATION INSTRUCTIONS
INSTALLER: Leave this manual with the appliance. CONSUMER: Retain this manual for future reference. These instructions are supplementary to the Installation and Operating Instructions supplied with the
More informationStrategic road map. President & CEO Ole Johansson
Strategic road map President & CEO Ole Johansson Capital Markets Day, 16 June 2006 Order intake growth continued, April - May 2006 Order intake up by 39% to MEUR 647 (464) Ship Power MEUR 381 (218) Power
More informationValidity: indefinitely
1 (36) Date of issue: 20 June 2017 Entry into force: 1 July 2017 Validity: indefinitely Legal basis: Act on the Technical Safety and Safe Operation of Ships (1686/2009), sections 43(4), 46(2), 47(2), 48(3),
More informationGraphite Ribbon/Filament Packing for Fisher Sliding Stem Valves
Instruction Manual Graphite Packing for Sliding-Stem Graphite Ribbon/Filament Packing for Fisher Sliding Stem Valves Contents Introduction... 1 Scope of Manual... 1 Description... 1 Storage and Startup...
More informationSub-Standard vessels in German ports 2016
Sub-Standard vessels in German ports 2016 Ship name: UNITED OCEAN IMO no.: 9071052 Flag: Bolivia Ship type: General Cargo MMSI: 720927000 Call sign: CPB3038 Gross tonnage: 3806 Keel laying date: 03.02.1993
More informationXPO. Ultra low NOx indirect burner
XPO Ultra low NOx indirect burner Low temperature burners - XPO burner -.- Low temperature burner for use with clean fuel gases Single digit NOx emissions at 0% High efficiency with low requirements Capacities
More informationFeasible SOx solutions
Feasible SOx solutions Wärtsilä s Environmental seminar in Helsinki at June 22 nd, 2010 Vesa Marttinen, Director, Environmental Services Wärtsilä 1 Wärtsilä 30 April 2010 Decreased fuel cost / Vesa Marttinen
More informationSPEDESTER Series QUICK REFERENCE GUIDE
Spedester series Digital DC Drives come with an extensive range of standard software blocks, it can take control of the most demanding motion control tasks. Designed for industrial applications, Spedester
More informationAzipod XO2100 Product Introduction
Azipod XO2100 Product Introduction Preface This Product Introduction provides system data and information for preliminary project planning of an Azipod podded propulsion and steering system outfit. Furthermore,
More informationIntegrating Life-Cycle Solutions for Maximum Return on Investment
Integrating Life-Cycle Solutions for Maximum Return on Investment NDIA E2S2 New Orleans, LA May 9-12, 2011 Kevin Pleiss Wärtsilä 1 Wärtsilä Kevin Pleiss NDIA E2S2 May 2011 Ship efficiency Utilized energy
More informationS E L E C T I O N. Abdominal Crunch. User manual
and S E L E C T I O N T H E S T R E N G T H E V O L U T I O N User manual and and The identification plate of the and manufacturer, affixed along side the seat on the frame of the weight stack, gives the
More informationMinibar User Manual MBA 4000 W
Minibar User Manual MBA 4000 W Read this manual prior to initial operation of the product! Dear Customer, We hope that your product, which has been manufactured in modern facilities and passed through
More informationEni Field Trip Libya. October, 2004
Eni Field Trip Libya October, 2004 Wafa Coastal Plant Maremi Kashim Mellitah Complex Manager October 28 th, 2004 Western Libya Gas Project Overview Sabratha Platform Mediterranean Sea C1 C2 Gas Export
More informationVFR Parallel Flow, Fan-Powered, VAV Terminals
VFR Parallel Flow, Fan-Powered, VAV Terminals Model VFR construction features Galvanized-steel casing withstands 125-hour, salt-spray test per ASTM B-117 All unit configurations listed with ETL for safety
More informationSpecifications of KINEDIZER burners
3-.6-8 Specifications of KINEDIZER burners Typical burner data Fuel : natural gas at 5 C with 0.9 kwh/nm³ (HHV) - sg = 0.6 [] Combustion air : 5 C - % O - 50 % Humidity - sg =.0 [] Stated pressures are
More informationKontrol Kube Advanced Owners Manual
Mobile Containment. Simplified. TM Kontrol Kube Advanced Owners Manual KONTROL KUBE www.kontrolkube.com 800.343755 1 IMPORTANT SAFETY INFORMATION SAVE THESE INSTRUCTIONS. CAREFULLY READ AND FOLLOW THESE
More informationTeflon Liner for Aging Cells
Teflon Liner for Aging Cells DRILLING FLUIDS EQUIPMENT For over 30 years OFI Testing Equipment (OFITE) has provided instruments and reagents for testing drilling fluids, well cements, completion fluids,
More informationTECHNICAL SUPPORT HOT LINE HOURS: 7:30-3:30
TECHNICAL SUPPORT HOT LINE 1-800-526-0725 HOURS: 7:30-3:30 TO: Service Providers BULLETIN No: 0102-1 FROM: SUBJECT: BOB VAN WYCK Technical Support Manager Burner Pilot Tube Replacement DATE: Feb 1, 2001
More informationContents. Introduction...3 Description...3. Pack Contents...4. Rada Heavy Duty EV Shower Fittings Right Angled Connector (RAC)...
SHOWER FITTINGS PRODUCT MANUAL IMPORTANT Installer: This manual is the property of the customer and must be retained with the product for maintenance and operational purposes. Contents Introduction...3
More informationWÄRTSILÄ CORPORATION
WÄRTSILÄ CORPORATION 26 RESULT PRESENTATION OLE JOHANSSON, PRESIDENT & CEO 6 FEBRUARY 27 1 Wärtsilä Highlights 26 Order intake +32.4% Order book +52.8% Net sales +26.6% Operating income +29.2% Profitability
More informationOWNER'S MANUAL FREEDOM AWNINGS
OWNER'S MANUAL FREEDOM AWNINGS RV PATIO, WINDOW AND OTD AWNINGS Freedom Patio Awning Freedom Window and OtD Awnings Special Note: This manual provides a basic description of the product and the standard
More informationCrusader Training updated 11/1/16
Crusader Training updated 11/1/16 High Gloss Exterior Whether your customer takes the time to wax their camper, or not, the high gloss gel coat is going to look great for years to come Crusader is equipped
More informationblac inc. : 04 : 15 HIGH PERFORMANCE HEAVY DUTY ACTUATOR DRS
blac inc. : 04 : 15 HIGH PERFORMANCE HEAVY DUTY ACTUATOR DRS RANGE OF BLAC INC. ACTUATORS Only BLAC INC. brings to its customers, a comprehensive range of products manufactured under an undivided roof
More informationCase examples: CEF -fundings for Innovations
Case examples: CEF -fundings for Innovations ILKKA RYTKÖLÄ Wärtsilä 1 / 31 Wärtsilä 23 November 2016 Ilkka Rytkölä Doc.ID: Revision: Status: Contents 1. Baltic SO 2 lution 2. Methanol; The Marine Fuel
More informationThe Truma Primer Daniel Senie October 15, 2017 Revision 2
The Truma Primer Daniel Senie dan@danandfaith.com October 15, 2017 Revision 2 Welcome. So you ve bought a Winnebago Travato with the Truma Combi. Want a cold shower? No? Then you re in the right place.
More informationREAD AND SAVE THESE INSTRUCTIONS! EasyAwn Dome Awning Installation
EasyAwn Installation, Care and Maintenance Manual EasyAwn Quality, Since 1946 EasyAwn, LLC Toll Free: 877-EasyAwn http://www.easyawn.com READ AND SAVE THESE INSTRUCTIONS! EasyAwn Dome Awning Installation
More informationWärtsilä. Oil to Water Lubricated Hydro Turbine Bearing Conversions 2018 CONTENTS. Introduction Function of the turbine guide bearing...
Wärtsilä Oil to Water Lubricated Hydro Turbine Bearing Conversions B U S I N E S S W H I T E PA P E R CONTENTS Introduction... 2 Function of the turbine guide bearing... 3 Advantages of water lubrication...
More information1224 Splitter and CTO combo, setup instructions using the Panelview HMI
Knowledge Base Article Type: Instructions 1224 Splitter and CTO combo, setup instructions using the Panelview 1000+ HMI Description: Instructions on How to properly setup the 1224 Splitter and CTO/Clamp
More information1. Product Name INSULTECH Thermal Blanket Design LT450SS. 2. Manufacturer. 3. Product Description THERMAL INSULATION
1. Product Name INSULTECH Thermal Blanket Design LT450SS 2. Manufacturer 75 Main Street North Tonawanda, NY 14120 Phone: 716-693-7954 Fax: 716-693-1647 E-mail: info@shannonent.com Web: www.blanket-insulation.com
More informationModel 698/ and Model in 1 Hose Reel Owner s Manual
Model 698/694 200 and Model 706 100 4 in 1 Hose Reel Owner s Manual 698/694 706 VISIT OUR WEBSITE: WWW.LIBERTYGARDENPRODUCTS.COM OR CALL US TOLL FREE AT 1-866-820-5805 LIBERTY GARDEN PRODUCTS, INC. 500
More information2005 Eni Field Trip - Libya
2005 Eni Field Trip - Libya Giorgio Moscatelli Projects Director Faisal Shita Senior Offshore Project Manager September 23 rd, 2005 Western Libya Gas Project: overall scheme Production start-up on schedule
More informationWÄRTSILÄ MARINE REDUCTION GEARS
WÄRTSILÄ MARINE REDUCTION GEARS The cruise ferry Finnmarken is equipped with two Wärtsilä TCH 150V85-S50 gears. The anchor handling tug supply vessels Fairmount Sherpa and Fairmount Summit are both equipped
More informationAssembly Instructions & User s Manual Academy USA Flag 10x10 Straight Canopy
Assembly Instructions & User s Manual Academy USA Flag 10x10 Straight Canopy FSAAPT0301 Please keep this instruction manual for future reference Customer Service: (888) 922-2336, 7:00am to 12:00am Everyday
More informationFire's Edge Fire Pit/Fire Pit Inserts For (Automated) Model 100-A
Fire's Edge Fire Pit/Fire Pit Inserts For (Automated) Model 100-A OWNER S MANUAL / OPERATING AND MAINTENANCE INSTRUCTIONS For your safety: If you smell gas: 1. Shut off gas to the appliance 2. Extinguish
More informationAB KNOCK-DOWN WATER BOILER
FORM 2344 3/25/2004 AB KNOCK-DOWN WATER BOILER TABLE OF CONTENTS Description Page KNOCK-DOWN TYPES AND DEFINITIONS 1 BOILER FOUNDATION 1 BOILER FRAME & TUBE INSTALLATION 2 BASE PAN INSULATION 4 TUBE BAFFLE
More informationCross Folder AF-76 series. AF-76 series. Cross Folder AF-764AKLL/764AKL/762KLL/762KL. Accurate Cross Folding with Easy Operation
Cross Folder AF-76 series AF-76 series Cross Folder AF-764AKLL/764AKL/762KLL/762KL Accurate Cross Folding with Easy Operation 8-page, 16-page, and 32-page cross folding The AF-76 series folders are specially
More informationTo Begin Your Extreme Campus Makeover and Increase Revenue Please Contact: Phone Fax Enclosure Models
The light weight, functional and efficient design offers all the features needed for your staff or student aids to dispense reimbursable meals or a la carte items as quickly as possible. Quick Cart Salad
More informationWÄRTSILÄ CORPORATIONO O
WÄRTSILÄ CORPORATIONO O Handelsbanken Nordic Large Cap Seminar 12 September 2011 CHRISTOPH VITZTHUM GROUP VICE PRESIDENT, SERVICES 1 Wärtsilä This is Wärtsilä SHIP POWER POWER PLANTS SERVICES 2 Wärtsilä
More informationINSTRUCTION MANUAL ALEKO RETRACTABLE AWNING
INSTRUCTION MANUAL for ALEKO RETRACTABLE AWNING www.alekoproducts.com FAILURE TO FOLLOW THESE INSTRUCTIONS MAY RESULT IN PERSONAL INJURY! 1 Important Safety Precautions WARNING NOTE: FOR PERSONAL SAFETY,
More informationOWNER'S MANUAL AWNING EXTEND R TABLE OF CONTENTS
OWNER'S MANUAL AWNING EXTEND R RV Before operating the awning, carefully review the Owner's Manual. The manual contains important safety information, detailed operating instructions, common maintenance
More informationTroubleshooting Guide
Troubleshooting Guide XS-2000/3000/4000 Series A user reference guide to better help understand and overcome error conditions experienced with your spa pool. TM This page is intentionally left blank for
More informationBilfinger IS Czech s.r.o.
Bilfinger Industrial Services Czech s.r.o. Bilfinger IS Czech s.r.o. Company presentation 2018 AGENDA 1. 2. 3. 4. 5. 6. 7. 8. Bilfinger Group Bilfinger IS Czech Member of Bilfinger Group History Core Activities
More informationFlight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach
Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129
More informationAxiom Surface Mounted Headwalls
www.hsiheadwalls.com Axiom Surface Mounted Headwalls Installation Instructions Tel: 925.427.7800 Fax: 925.427.0800 support@hsiheadwalls.com Hospital Systems Inc. 750 Garcia Avenue Pittsburg CA 94565 USA
More informationCONVEX Awning Instructions
CONVEX Awning Instructions IMPORTANT NOTE: Please take a few minutes to become familiar with this entire document BEFORE beginning your installation. The time you spend doing this is well spent and will
More informationNORTHFIELD CORPORATION 1870 COMMERCE DR. DE PERE, WI UNITED STATES
1 MANUFACTURER: MODEL: NORTHFIELD CORPORATION 1870 COMMERCE DR. DE PERE, WI 54115 UNITED STATES NORTHFIELD CLS SPECIFICATIONS: VOLTAGE: FREQUENCY: CURRENT: AIR: 115VAC-230VAC 50/60Hz 5 AMP 80 PSI (for
More informationINSTALLATION & MAINTENANCE MANUAL FOR FLUE RENOVATION SYSTEM - FitFire & Fitfireplus
INSTALLATION & MAINTENANCE MANUAL FOR FLUE RENOVATION SYSTEM - FitFire & Fitfireplus Edition Revision Approved by Written by 1 1.2 C. Lezzi C. Lezzi Date 14/02/2011 Page 12 Code 01_01 Manuale_inst_Fitfire-plus
More informationEDM4X, EDM2X. Product Specifications EXPANSION VALVE COILS ALL MODELS
EDM4X, EDM2X Product Specifications EXPANSION VALVE COILS ALL MODELS 1 1/2 thru 5 Tons Multiposition installation upflow, downflow, or horizontal Available for R 410A or R 22 Bolt on TXV metering device
More informationFor draining expansion tanks, other liquid storage vessels.
Plumbing Specialties 26-100 & 26-300 SERIES COMPRESSION GAUGE COCKS For draining expansion tanks, other liquid storage vessels. 26-100: rated up to 125 psig 26-300: soft metal seat/stuffing box rated up
More information