PANAMA MARITIME AUTHORITY INVESTIGATION INTO THE CIRCUMSTANCES SURROUNDING THE ALLISION BETWEEN THE MV NAESBORG AND THE M/V VOYAGER II
|
|
- Ernest Hart
- 6 years ago
- Views:
Transcription
1 PANAMA MARITIME AUTHORITY INVESTIGATION INTO THE CIRCUMSTANCES SURROUNDING THE ALLISION BETWEEN THE MV NAESBORG AND THE M/V VOYAGER II R /DISAM ON SEPTEMBER 12 TH, 2007 IN THE APPROACHES TO GALVESTON BAY, TEXAS, USA, WITH NO INJURIES, LOSS OF LIFE, OR POLLUTION.
2 Accident Reporting and Investigation The fundamental purpose of investigating an accident under these Regulations is to determine its circumstances and the cause with the aim of improving the safety of life at sea and the avoidance of accidents in the future. It is not the purpose to apportion liability, nor, except so as is necessary to achieve the fundamental purpose, to apportion blame. 2
3 TABLE OF CONTENTS SYNOPSIS SECTION 1 FACTUAL INFORMATION 1.1 Particulars of the MV VOYAGER II 1.2 Particulars of the MV NAESBORG 1.3 Accident Details 1.4 Background (all times UTC less 5 hours, Ship s Time) 1.5 The Crew Watch Schedule 1.6 Environmental Conditions Beaufort Scale (reference) 1.7 Narrative Chart Copy (Showing positions of anchorage and allision) 1.8 Damage Sustained from the collision Damage Survey Report (RINA) Diagram of Damage Photographs of Damage SECTION 2 ANALYSIS 2.1 Aim 2.2 How the MV NAESBORG collided with the MV VOYAGER II 2.3 Attempt to Avoid the Collision SECTION 3 CONCLUSIONS 3.1 Findings 3.2 Cause Copy of Masters Correspondence to Charters SECTION 4 RECOMMENDATIONS 3
4 SYNOPSIS On September 12 th, 2007 the MV NAESBORG allided with the M/V VOYAGER II while at anchorage in the approaches to Galveston, USA. The investigation was initiated by the Panama Maritime Authority once the situation was informed, and the investigator, Eng. John Pope, was appointed to lead the investigation on behalf of the Panama Administration, who visited the vessel on September 18 th, 2007 while alongside at the Port of Galveston, USA. On September 10 th, 2007 the bulk carrier M/V VOYAGER II arrived in ballast at the Houston Fairway Anchorage, Galveston, USA, waiting to load a cargo of Pet Coke on September 17 th, 2007 in Houston, USA. At approximately 1800 h, on September 12 th, 2007 the Master came on the bridge due to the increasing bad weather of Tropical Storm / Hurricane Humberto, joining the OOW and AB, and ordered the Chief Engineer to put the main engines on standby. At 2200 h, a security call over the VHF from the M/V NAESBORG stating that due to the strong winds they were dragging their anchor and was without their main engines. At 2255 h the Master noticed that the M/V NAESBORG was drifting dangerously close to the M/V VOYAGER II. The M/V NAESBORG called once again on the VHF and reported that they had no control over their vessel. The Master of the M/V VOYAGER II began to heaving in their port anchor and to maneuver the vessel to avoid coming into full contact with the drifting M/V NAESBORG. At 2320 h the M/V NAESBORG came into contact with the portside of the VOYAGER II causing damage to both vessels. After making contact with the M/V VOYAGER II, the M/V NAESBORG also came in contact with a chemical tanker, the MT VALERIE, who was also anchored nearby. The extent of their damage is unknown. All times indicated in this report are expressed as local Central Standard Time, Twenty- four hour clock. 4
5 SECTION 1 FACTUAL INFORMATION 1.1 VESSEL PARTICULARS OF MV VOYAGER II Name : VOYAGER II Flag : Panama Classification : RINA (Registro Italiano Navale) Class No. : Class Notations : Bulk Carrier ESP, Heavy Cargo, Ice Class, Unrestricted Navigation IMO No. : Call Sign : HPDI Type of Vessel : Bulk Carrier Gross Tons: 21,531 Net Tons : 12,295 Deadweight (DWT) : 33,288 MT Length (LOA) : M Breadth (Moulded) : M Depth (Moulded) : M Date Built : 1985 Place Built : Szczecin, Poland Hull # Owner : Baltic Navigation Company SA 53 Street, Swiss Tower, 16 th Floor, Panama Operator : Svendborg Ship Management A/S Haveneggarden Jessens Mole 11, DK-5700 Svendborg, Denmark Main Engine : (1) Sulzer 6RLB 66 Horsepower : 8, rpm Master : Albert M. Centeno 5
6 M/V VOYAGER II (Alongside at the Port of Galveston) 1.2 VESSEL PARTICULARS OF MV NAESBORG Name : NAESBORG Flag : Liberia Class : RS (Russian Maritime Register of Shipping) Class ID : Assigned Class : KM*L3A2 IMO No. : Call Sign : A8IS3 Type : RORO Gross Tons : 32,173 Net Tons : 11,074 Deadweight : 22,691 MT Length (LOA) : M Breadth (Moulded) : M Depth (Moulded) : M Date Built : 1976 Place Built : Valmet, Helsinki Owner : Unknown Operator : Nordana Line Propulsion : 2 x Wartsila 8R46 VASA 2 x 7,250 KW Master : Unknown MV NAESBORG 6
7 1.3 ACCIDENT DETAILS Time and Date : Approximately 23:20 hr Ship s time on September 12 th, 2007 Location of the Allision : Persons Onboard : Injuries / Fatalities : Damage : Galveston Fairway Anchorage 27 Crew Members including Master None Port Side Shell Plating iwo # 3 Hold & # 3 DBT DBT # 3 Internals Cargo Hold # 3 Bulwark Poop Deck Poop Deck Main Deck Handrailing Port Midship Gangway 1.4 BACKGROUND The vessel Voyager II is a geared bulk carrier owned by Baltic Navigation Company, and operated by Svendborg Ship Management A/S. She was built in 1985 in Poland and registered under the Panamanian Flag; the vessel s ex name was Myrto. The vessel had completed discharging its cargo and was at anchorage in ballast prior to the incident. The vessel had just undergone Special Survey # 4, on November 3 rd, 2006 in Guangzhou, China. Class records show that the vessel had satisfactorily completed survey and that repairs were carried out; also, that it is currently free of outstanding conditions of class. All of the statutory certificates for the M/V Voyager II were valid prior to the collision, and the vessel was manned in accordance with the safe manning certificate. The ISM certification and Safety Management System was found in place. The vessel is fitted with a single 2-stroke diesel main engine for propulsion. 7
8 1.5 THE CREW Captain Albert M. Centeno Master M/V Voyager II Captain is licensed by the governments of Philippines and Panama as a Master (F.G), the designation F.G. means foreign-going unlimited. He also holds a Panamanian GMDSS endorsement. Panamanian licenses expire every five years. Captain currently holds a Provisional Panamanian Master s and G.M.D.S.S. licenses which are valid until October 24 th, Captain has been sailing as a Master since 2001 with a total sea time of (44) months on board bulk carriers of Pamamax size, where (8) months of his time was as Master of the Voyager II. All remaining officers Panamanian Certificates and National Certificate of Competency were found in valid and in order form. It should be noted that none of the ratings held the required Panamanian Certificate of Competency, WATCH SCHEDULE The watch schedule maintained on board for the month of September (see attached) was being followed by the crew on board, with the OS and AB on the bridge at the time of the incident ( watch). The Master came on the bridge at 1800 hrs due to the deteriorating weather, and was also standing watch at the time of the incident at 2320 hrs. No signs of crew fatigue were observed or contributed to this incident. 1.6 ENVIRONMENTAL CONDITIONS Weather data gathered from log entries and interviews of the watch from the VOYAGER II. The weather was reportedly deteriorating rapidly with the presence of Tropical Depression Humberto in the Gulf of Mexico. The wind speed and sea state were recorded by the OOW (3 rd Mate) of the MV Voyager II during the day of September 12 th, 2007 as follows: Watch Wind Force Sea Barometer ESE 3/ SSE 4/ ESE 4/ E 5/ ENE 5/ ENE 5/ Visibility 0-5 miles, according to the lookout (AB) and the OOW (3 rd Mate), at times the bow was not visible from the bridge during periods of heavy rain showers. The Master stated that at times the rain was coming in horizontally, and that during intermittent rain periods the wind force was at 7/8. 8
9 1.6.1 BEAUFORT SCALE (for reference) Force Mean Speed(knots) Description State of sea Ashore Probable Wave Height (m) Probable Max Wave Height Calm Flat Smoke rises vertically Light air Ripples Smoke shows wind direction Light breeze Small wavelets, non breaking Leaves rustle Gentle breeze Large wavelets, crests breaking Wind extends small flag, leaves in motion Moderate breeze Fairly frequent white horses Small branches begin to move Fresh breeze Strong breeze Moderate waves, many white horses, some spray Large waves, white foam crests, some spray Near gale White foam blows from crests Branches move, difficult to walk against the wind Gale Mod high waves, foam in streaks along surface Strong gale Storm Violent storm Hurricane High waves, tumbling crests, dense streaks of foam, much spray Very high waves with long overhanging crests, heavy tumbling sea Sea completely covered with long white foam patches Air filled with foam and driving spray. Visibility very seriously affected Small trees begin to sway Large branches move Twigs break off trees Slates, chimneys begin to be moved 7 10 Trees uprooted, structural damage to buildings Wide spread damage to buildings etc As above 14 Above NARRATIVE (All times UTC less 5) September 10 th, 2007 At 0822 hrs, the M/V VOYAGER II arrived in ballast at Galveston Fairway Anchorage, Texas USA. At 1640 hrs, the M/V VOYAGER II was anchored at Lat 29 deg 18.8 N Long 94 deg 33.5 W. At 1648 hrs the M/V VOYAGER II was finished with Engine. September 12 th, 2007 At 0400 hrs, Anchor watch was being maintained, no signs of dragging observed, VHF watch on Channels 14 & 16. At 0800 hrs, Anchor watch was being maintained, VHF watch on Channels 14 & 16, weather overcast with rain. At 1200 hrs, Anchor watch was being maintained, no signs of dragging observed, VHF watch on Channels 14 & 16. 9
10 At 1600 hrs, Anchor watch was being maintained, no signs of dragging observed, VHF watch on Channels 14 & 16. The closest vessel was approximately 1 mile and the anchor was holding well. At 1800 hrs, Master came on the bridge due to the deteriorating weather, and ordered the Engineers to put the Main Engine on standby. At this time the M/V NAESBORG was not on the 1.5 mile radar. At 1900 hrs, the Master walked out the starboard anchor from 5 shackles to 8 shackles. At 2000 hrs, Anchor watch maintained, Master walked out the starboard anchor to 8 shackles on the deck, the weather overcast was with intermittent rain wind force observed at 7/8. At 2215 hrs, The Master informed the engine room that he would heave in the anchor due to a slight sign of dragging. At this time the M/V NAESBORG was approximately 1.2 NM NE of the M/V VOYAGER II. At 2230 hrs, Crew at anchor stations. At 2255 hrs, the Master ordered to start heaving in the starboard anchor 3 shackles due to the M/V M/V NAESBORG approaching without power from the SW toward its port stern. The Master called the M/V NAESBORG on the VHF and the M/V NAESBORG said that they could not control the vessel. It is unknown at what time the M/V NAESBORG actually began dragging its anchor due to the strong winds and seas created by Tropical Storm / Hurricane Humberto in the Gulf of Mexico. At 2320 hrs, the M/V NAESBORG came into contact with the M/V VOYAGER II on the portside adjacent to the No. 4 & 5 Hatch against the starboard side of the M/V NAESBORG, somewhere from midship s forward. September 13 th, 2007 At 0145 hrs, the M/V VOYAGER II was re-anchored at location 29 o N & 94 o W, approximately 0.8 NM from it s original anchorage. 10
11 1.7.1 CHART OF ANCHORAGE Scanned copy of the BA chart 374, showing where the M/V Voyager II was anchored prior to the allision. 11
12 1.8 DAMAGE SUSTAINED FROM ALLISION The damage to the VOYAGER II was inspected by the following organizations and reported by the Master, which are as follows: 1) Port Side Shell Plating iwo # 3 Hold & # 3 DBT 2) DBT # 3 Internals 3) Cargo Hold # 3 4) Bulwark Poop Deck 5) Poop Deck 6) Main Deck Handrailing 7) Port Midship Gangway On September 14 th, 2007 a joint survey was carried out by BMT (Salvage Association) on behalf of the owners P & I Club and Hull Underwriters (see attached survey report). On September 14 th, 2007 an underwater survey was carried out by T & T Marine Salvage on behalf of the P & I Club and Hull Underwriters (see attached survey report). Divers inspected the damage made by the bulbous bow of the M/V NAESBORG coming into contact with the portside No. 3 WBT below the waterline. A video was taken of the inspection during this time. On September 14 th, 2007 the surveyor for the Classification Society (RINA) attended the vessel and inspected the damage. The class made an endorsement to the certificate of class Class confirmed until (?)for a single voyage Galveston Anchorage area to a suitable repair facility to be carried out in a ballasted condition not later than October 14 th, The owners decided to carry out temporary repairs in Mobile, Alabama USA, and were awaiting the development of another Tropical Depression forming in the Gulf of Mexico prior to departing Galveston. It was reported that the estimated cost for the repairs would be approximately $400,000 (four hundred thousand dollars). 12
13 1.8.2 REFERENCE DIAGRAM SHOWING LOCATION OF DAMAGE Damage shown is on opposite side (portside) PHOTOGRAPHS OF DAMAGE TO M/V VOYAGER II Damage to Portside Hand Railing Damage to Midship Gangway 13
14 1.8.3 PHOTOGRAPHS OF DAMAGE TO M/V VOYAGER II Damage to Roller Fairlead Main Deck Damage looking Aft Damage to Port Stern Corner Damage in DBT # 3 Damage in DBT # 3 Damage in DBT # 3 14
15 SECTION 2 - ANALYSIS 2.1 AIM The purpose of the analysis is to determine the contributory causes and circumstances of the accident as a basis for making recommendations to prevent similar accidents from occurring in the future. 2.2 HOW THE M/V NAESBORG ALLIDED WITH THE M/V VOYAGER II In this case, the M/V NAESBORG allided with the stationary anchored M/V VOYAGER II, without any loss of life, injuries or pollution. The M/V NAESBORG was adrift, without main engines and dragging anchor towards the M/V VOYAGER II which was anchored at the Galveston anchorage, riding out the Tropical Storm / Hurricane Humberto. The M/V NAESBORG first came into contact with the VOYAGER II on the portside midship, and swung around making contact a second time at the portside stern corner. It should be noted that both the M/V NAESBORG and M/V VOYAGER II were in ballast, giving both vessels a large sail area towards the bow. 2.3 THE ATTEMPT TO AVOID CONTACT WITH THE M/V NAESBORG. The Master began to heave in the starboard anchor 3 cables, while going slow ahead to make some space from the M/V NAESBORG, which was drifting (South West) towards the M/V VOYAGER II s port stern. The wind suddenly shifted to the (West) pushing the M/V NAESBORG into the VOYAGER II s port mid-ship side. 15
16 SECTION 3 - CONCLUSIONS 3.1 FINDINGS 1. The M/V VOYAGER II was properly manned and the vessel was fully certified by class, with no outstanding recommendations prior to the allision. 2. The weather at the time of the allision was deteriorated rapidly with reportedly intermittent tropical storm / hurricane force winds from the ENE, with seas ranging from 5 to 7 meters. The adverse weather directly contributed to this accident. 3. The M/V NAESBORG was reportedly adrift, dragging anchor and was without its main engines. The vessel was also in ballast creating a large sail area for the gale force winds created by tropical storm / hurricane Humberto. 4. The propulsion, steering, and navigation equipment on the Voyager II operated properly. There were no mechanical failures that contributed to this collision. 5. The Master of the M/V VOYAGER II followed company procedures for Emergency Situations and Response Actions for a Collision at Sea. 3.2 CAUSE The incident was caused by the rapidly deteriorating weather, caused by tropical storm / hurricane Humberto, and the inability of the M/V NAESBORG to maneuver once she began to drag her anchor. 16
17 3.2.1 MASTER S CORRESPONDENCE TO OPERATORS 17
18 SECTION 4 - RECOMMENDATIONS To the Crew of the M/V Voyager II: 1. We are at the opinion that due to the circumstances surrounding the Captain of the M/V Voyager II, (at anchor, in ballast and the presence of a forming Tropical Storm / Hurricane Humberto), that he followed the companies procedures for heavy weather, and No Recommendations Noted. 2. The engines were made ready approximately 5 hours 20 minutes prior to the allision. The Captain recognized the possibility of dragging anchor and acted accordingly. 18
ATLANTIC / ARNGAST Collision in the DW route east of Langeland, Denmark, 4 August 2005
Review from the Division for Investigation of Maritime Accidents ATLANTIC / ARNGAST Collision in the DW route east of Langeland, Denmark, 4 August 2005 Ship s data ATLANTIC, IMO No. 9135676, is a 39017
More informationMARINE ACCIDENT INVESTIGATION REPORT
MA2012-7 MARINE ACCIDENT INVESTIGATION REPORT July 27, 2012 Japan Transport Safety Board The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for
More informationFPMC INMARSAT number (Bridge), (Cabin) 1.16 Ship's address
FPMC 18 GENERAL INFORMATION 1.3 IMO Number 9430179 1.8 Flag Liberia 1.9 Port of Registry MONROVIA 1.11 Call sign A8RE7 1.12 INMARSAT number 764903696(Bridge),764903697(Cabin) 1.13 Ship's fax number 764903698
More informationBulk Singapore (all details are about)
Bulk Singapore (all details are about) GENERAL INFORMATION Compiling date 29/10/2012 (Last updated date 30/10/2012) Head Owner s full style Disponent Owner full style Managing company MAIN PARTICULAR Name
More informationRed Lilly (all details are about)
Red Lilly (all details are about) GENERAL INFORMATION Compiling date (Last updated date 30/10/2012) Head Owner s full style Disponent Owner full style Managing company MAIN PARTICULAR Name Red Lilly Ex-names
More informationThe collision between BLUE BIRD and HAGLAND BONA on 1st December 2008 in Randers Fjord.
Report from the Division for Investigation of Maritime Accidents The collision between BLUE BIRD and HAGLAND BONA on 1st December 2008 in Randers Fjord. Factual information Name BLUE BIRD Port of registry
More informationNational Transportation Safety Board
National Transportation Safety Board Marine Accident Brief Fire on board Vehicle Carrier Honor Accident no. Vessel names Accident type Location DCA17RM007 Honor Fire Date February 24, 2017 Time Injuries
More informationMV Vemaoil XXIII (IMO ) into the anchored vessel MV Duzgit Integrity (IMO )
Report on the investigation of the collision of the MV Vemaoil XXIII (IMO 9078098) into the anchored vessel MV Duzgit Integrity (IMO 9380415) 21 st August 2016 This report is subject to The Gibraltar Shipping
More informationMARINE ACCIDENT INVESTIGATION REPORT
MARINE ACCIDENT INVESTIGATION REPORT July 9, 2015 Adopted by the Japan Transport Safety Board Member Kuniaki Shoji Member Satoshi Kosuda Member Mina Nemoto ACCIDENT TYPE DATE AND TIME LOCATION PROCESS
More informationREPORT OF INVESTIGATION INTO THE GROUNDING OF MV "PANTANAL" AT CASHLA BAY, ROSSAVEAL ON 31st MARCH 2011
Leeson Lane, Dublin 2. Telephone: 01-678 3485/86. Fax: 01-678 3493. email: info@mcib.ie www.mcib.ie REPORT OF INVESTIGATION INTO THE GROUNDING OF MV "PANTANAL" AT CASHLA BAY, ROSSAVEAL ON 31st MARCH 2011
More informationREPORT OF INVESTIGATION INTO THE COLLISION OF M/V STENA EUROPE AND M/V OSCAR WILDE AT ROSSLARE HARBOUR ON 26th OCTOBER 2012
Leeson Lane, Dublin 2. Telephone: 01-678 3485/86. Fax: 01-678 3493. email: info@mcib.ie www.mcib.ie REPORT OF INVESTIGATION INTO THE COLLISION OF M/V STENA EUROPE AND M/V OSCAR WILDE AT ROSSLARE HARBOUR
More informationREPORT OF THE INVESTIGATION INTO THE BOTTOM CONTACT OF THE M.V. CIELO DI MONACO AT GREENORE PORT ON 28th SEPTEMBER 2015
REPORT OF THE INVESTIGATION INTO THE BOTTOM CONTACT OF THE M.V. CIELO DI MONACO AT GREENORE PORT ON 28th SEPTEMBER 2015 REPORT NO. MCIB/250 (No.8 OF 2016) The Marine Casualty Investigation Board (MCIB)
More informationREPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV "PATRIARCH" ON 1ST SEPTEMBER, 2004
REPORT INTO THE FIRE AND SUBSEQUENT GROUNDING OF THE MV "PATRIARCH" ON 1ST SEPTEMBER, 2004 The Marine Casualty Investigation Board was established on the 25 th March, 2003 under The Merchant Shipping (Investigation
More informationREPORT OF THE INVESTIGATION INTO THE GROUNDING OF THE M.F.V. "ELSINOR" AT FOILNABOE, IRELAND ON THE 15TH SEPTEMBER, 2001.
REPORT OF THE INVESTIGATION INTO THE GROUNDING OF THE M.F.V. "ELSINOR" AT FOILNABOE, IRELAND ON THE 15TH SEPTEMBER, The Marine Casualty Investigation Board was established on the 5 th, June 2002 under
More informationCasualty Incident Report
Casualty Incident Report Safety investigation into the collision involving the St Kitts & Nevis registered high speed craft LOVELY 1 and the Antigua & Barbuda registered passenger catamaran ONE LOVE, in
More informationAllision between the MSC BENEDETTA and pier in Zeebrugge on 16 May 2014
Federal Bureau of Maritime Casualty Investigation Federal Higher Authority subordinated to the Ministry of Transport and Digital Infrastructure Investigation Report 128/14 Serious Marine Casualty Allision
More informationGrounding of Maersk Garonne. Fremantle, Western Australia, 28 February 2015
Grounding of Maersk Garonne Fremantle, Western Australia, 28 February 2015 ATSB Transport Safety Report Marine Occurrence Investigation 319-MO-2015-002 Preliminary 21 May 2015 Released in accordance with
More informationMARINE ACCIDENT REPORT April 2012
MARINE ACCIDENT REPORT April 2012 ORANESS Accident to seafarer on 10 November 2011 The Danish Maritime Accident Investigation Board Vermundsgade 38 A DK-2100 Copenhagen O Tel. +45 39 17 44 40 E-mail: dmaib@dmaib.dk
More informationREPORT Bulk Carrier POLO M -C6OL1- Grounding on 23 November 2004
REPORT Bulk Carrier POLO M -C6OL1- Grounding on 23 November 2004 2005-02-14 REPORT BULK CARRIER POLO M -C6OL1- GROUNDING ON 23 NOVEMBER 2004 Our reference: 080202-04-17548 Maritime Casualty Björn Molin,
More informationPANAMA MARITIME AUTHORITY INVESTIGATION INTO THE CIRCUMSTANCES SURROUNDING THE COLLISION OF M.V. LEONIS AT HUMBER PILOT STATION U.K.
PANAMA MARITIME AUTHORITY INVESTIGATION INTO THE CIRCUMSTANCES SURROUNDING THE COLLISION OF M.V. LEONIS AT HUMBER PILOT STATION U.K. Accident Reporting and Investigation The fundamental purpose of investigating
More informationMINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LITHUANIA MARINE ACCIDENTS AND INCIDENTS INVESTIGATION MANAGER
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LITHUANIA MARINE ACCIDENTS AND INCIDENTS INVESTIGATION MANAGER SHIP ACCIDENT INVESTIGATION FINAL REPORT 25 February 2015 No. TA-5 This report
More informationREPORT OF THE INVESTIGATION INTO THE GROUNDING OF THE MV "LOCATOR" OFF SAINT MACDARA S ISLAND, OFF THE COAST OF GALWAY ON 31st MARCH 2007
Leeson Lane, Dublin 2. Telephone: 01-6782460. Fax: 01-6783129. email: info@mcib.ie www.mcib.ie REPORT OF THE INVESTIGATION INTO THE GROUNDING OF THE MV "LOCATOR" OFF SAINT MACDARA S ISLAND, OFF THE COAST
More informationSOLD - 404mt dwt Cargo Vessel Listing ID:
Australia - Chile - Indonesia - Great Britain - New Zealand - Panama - Philippines - South Korea - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) SOLD - 404mt dwt Cargo
More informationMaritime Administration of Latvia Division for Investigation of Marine Accidents Summary of Marine accidents and incidents in 2010
Maritime Administration of Latvia Division for Investigation of Marine Accidents Summary of Marine accidents and incidents in 00 Division for Investigation of Marine Accidents of Maritime Administration
More informationExtensive doubler plate repair in Ivory Coast allows bulker to sail after collision
Extensive doubler plate repair in Ivory Coast allows bulker to sail after collision A190-meter bulker suffered severe collision damage in Lagos, Nigeria. A large hole in the hull plating prevented the
More informationQUESTIONNAIRE 88 (Version 2)
QUESTIONNAIRE 88 (Version 2) INTERTANKO S STANDARD TANKER VOYAGE CHARTERING QUESTIONNAIRE 1988 (Version 2) (Metric system to be applied, HVPQ reference specified where applicable) GENERAL INFORMATION HVPQ
More informationCase Study 9 MSC CARLA Complete Hull Failure in a Lengthened Container Vessel
Case Study 9 MSC CARLA Complete Hull Failure in a Lengthened Container Vessel Vessel Particulars LOA: 289.5 m Breadth: 32.21 m Depth: 23.9 m Draft: 11.9 m Gross Tonnage: 55,241 Deadweight: 40,912 tonnes
More informationCASUALTY-RELATED MATTERS 1 REPORTS ON MARINE CASUALTIES AND INCIDENTS
INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7587 3152 Fax: 020 7587 3210 Ref. T1/12.01 IMO E MSC-MEPC.3/Circ.1 26 September 2005 CASUALTY-RELATED MATTERS 1 REPORTS
More informationReport on the Investigation of the collision between M/V M.KIMITSU and JINTANG Bridge on Nov
Report on the Investigation of the collision between M/V M.KIMITSU and JINTANG Bridge on Nov. 16 2009 Maritime Safety Administration of People s Republic of China June 12 2010 NOTE This report is written
More informationSummary Report. Contact with Wharf General Villa. 5 March 2006
Summary Report Contact with Wharf 5 March 2006 NARRATIVE arrived at Napier pilot station at 0442 hours on 5 March 2006, having sailed from Bluff two days earlier The Pilot boarded at 0457 hours The Master
More informationTRINIDAD OFFSHORE CALLING INSTRUCTIONS
TRINIDAD OFFSHORE CALLING INSTRUCTIONS A. SUPPLIER FULL STYLE & CONTACT DETAILS AEGEAN BUNKERING (TRINIDAD) LTD Tel: +1 868 627 3005 Fax: +1 868 627 3007 E-mail: operations@aegean.tt #3 French Street Woodbrook,
More informationUnderwater hull repairs save time and money
Underwater hull repairs save time and money Our teams fly all over the world to perform a wide range of hull repairs on any type of vessel. In this article we give you a summary of the more recent operations.
More information56m Multipurpose Vessel / Icebreaker Listing ID:
Australia - Chile - Indonesia - Great Britain - New Zealand - Panama - Philippines - South Korea - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) 56m Multipurpose Vessel
More informationUNO Marine Accident Report. A c c i d e n t t o s e a f a r e r 2 2 M a r c h y w h i l e u s i n g g r i n d e r
MARINE ACCIDENT REPORT DIVISION FOR INVESTIGATION OF MARITIME ACCIDENTS UNO A c c i d e n t t o s e a f a r e r 2 2 M a r c h 2 0 1 0 I n Page j u r1 y w h i l e u s i n g g r i n d e r Danish Maritime
More informationAnnual Summary of Marine Safety Reports
14 th February 2014 Page 1 Annual Summary of Marine Safety Reports Notes 1. Incident categories are consistent with the requirements of the MAIB and the British Port s Association s National Reporting
More informationClass Entry for Existing Ships
Class Entry for Existing Ships For World Class Technical Service A world leader in ship classification Class Entry for Existing Ships Class Entry for Existing Ships Transfer of Class (TOC) Transfer of
More informationFINAL REPORT MARINE INCIDENT Keszthely 13 th August 2006 MS Almádi 01297
FINAL REPORT MARINE INCIDENT Keszthely 13 th August 2006 MS Almádi 01297 The sole objective of the technical investigation is to reveal the causes and circumstances of marine casualties, serious and very
More informationMARINE SAFETY INVESTIGATION REPORT
Marine Safety Investigation Unit MARINE SAFETY INVESTIGATION REPORT Investigation into the partial flooding of the engine-room on board the Bulk Carrier CAPRI whilst alongside at Dampier, Australia on
More informationWorld s Premier Marine Specialist. Page 1
Page 1 INTERTEK GROUP S.A. Intertek Group S.A is a Panamanian / Canadian Maritime Incorporation established in Panama City, Republic of Panama and Ontario, Canada, specialized in various Marine Surveys,
More informationDalian VTS Guide for Users
Dalian VTS Guide for Users 3 rd Edition DALIAN MARITIME SAFETY ADMINISTRATION OF P.R.CHINA DALIAN VESSEL TRAFFIC SERVICE CENTER Introduction The aim of this Guide is to provide vessel traffic service users
More informationREPORT INTO THE FATAL INCIDENT ON BOARD THE ANTIGUAN AND BARBUDAN REGISTERED VESSEL THE MSC "SUFFOLK" DURING BERTHING OPERATIONS AT DUBLIN PORT
REPORT INTO THE FATAL INCIDENT ON BOARD THE ANTIGUAN AND BARBUDAN REGISTERED VESSEL THE MSC "SUFFOLK" DURING BERTHING OPERATIONS The Marine Casualty Investigation Board was established on the 25 th March,
More informationMARINE SAFETY INVESTIGATION REPORT
Marine Safety Investigation Unit MARINE SAFETY INVESTIGATION REPORT Safety investigation into a fatality of a crew member on board the Maltese registered container ship SYDNEY TRADER Off Port Limits Anchorage,
More informationAPPLICATION FOR REVALIDATION OF A CERTIFICATE OF COMPETENCY
APPLICATION FOR REVALIDATION OF A CERTIFICATE OF COMPETENCY A. PERSONAL PARTICULARS OF APPLICANT SURNAME:... FIRST NAMES:... DATE OF BIRTH:... COUNTRY OF BIRTH:... NATIONALITY:... ID/PASSPORT NO.: HEIGHT:...EYE
More informationVessel s name: MV TANAIS DREAM
Vessel s name: MV TANAIS DREAM Main Details Place and Date of built 23.01.2013 IMARBI SHIPBUILDING CO.,LTD / IMARBI, JAPAN Flag: BELIZE Port of Registry and Official N.: BELIZE CITY 371330076 IMO N.: 9283899
More informationBahamas (BMA) Flag. Eagle Shipping Ltd
M/V Eagle Fjord Bahamas (BMA) Flag Eagle Shipping Ltd Palm Grove House PO Box 438 Road Town, Tortola British Virgin Island www.eagleshippingltd.com www.shipsforcharter.com E-Mail 1: cskesloffice@esltd.biz
More informationMV EUGENIA B Fatal fall of a stevedore inside cargo hold no. 2 in the port of Iskenderun 30 November 2017
Marine Safety Investigation Unit SAFETY INVESTIGATION REPORT REPORT NO.: 23/2018 November 2018 The Merchant Shipping (Accident and Incident Safety Investigation) Regulations, 2011 prescribe that the sole
More informationMARITIME AND PORT AUTHORITY OF SINGAPORE SHIPPING CIRCULAR NO. 3 OF 2014
MARITIME AND PORT AUTHORITY OF SINGAPORE SHIPPING CIRCULAR NO. 3 OF 2014 MPA Shipping Division 460 Alexandra Road 21 st Storey PSA Building Singapore 119963 Fax: 63756231 http://www.mpa.gov.sg 21 January
More information352ft RORO Passenger/Car Ferry Listing ID: 4156
Australia - Chile - Indonesia - Great Britain - New Zealand - Panama - Philippines - South Korea - Thailand - USA E: sales@seaboats.net (sales) - E: admin@seaboats.net (accounts) 352ft RORO Passenger/Car
More informationCPP failure caused heavy contact with lock
December 2016 CPP failure caused heavy contact with lock The vessel was berthed alongside a quay, waiting to proceed through a lock to another berth. The pilot called on the radio and informed the master
More informationNotice To Mariner No. 80/2004. SUBJECT : ISPS Code VESSELS CALLING AT PORT OF FUJAIRAH & FUJAIRAH OFFSHORE ANCHORAGE AREA
Notice To Mariner No. 80/2004 SUBJECT : ISPS Code VESSELS CALLING AT PORT OF FUJAIRAH & FUJAIRAH OFFSHORE ANCHORAGE AREA As you are aware ISPS Code will be implemented and mandatory from 1 st July 2004.
More informationREPORT OF THE INVESTIGATION INTO THE GROUNDING OF MV HUELIN DISPATCH ON PIERRE AU VRAIC 21st SEPTEMBER 2012
Leeson Lane, Dublin 2. Telephone: 01-678 3485/86. Fax: 01-678 3493. email: info@mcib.ie www.mcib.ie REPORT OF THE INVESTIGATION INTO THE GROUNDING OF MV HUELIN DISPATCH ON PIERRE AU VRAIC 21st SEPTEMBER
More informationMARINE SAFETY INVESTIGATION REPORT
Marine Safety Investigation Unit MARINE SAFETY INVESTIGATION REPORT Safety investigation into the allision involving the Maltese registered bulk carrier CAPRI in the Eastern Special Purpose A Anchorage,
More informationFINAL REPORT MARINE INCIDENT 20 th September 2006 Collision of passenger ships MS Mozart and MS Csárdás A / 01290
FINAL REPORT 2006-028-6 MARINE INCIDENT 20 th September 2006 Collision of passenger ships MS Mozart and MS Csárdás A-40158 / 01290 The sole objective of the technical investigation is to reveal the causes
More informationMARINE SAFETY INVESTIGATION REPORT
Marine Safety Investigation Unit MARINE SAFETY INVESTIGATION REPORT Safety investigation into the fatal occupational accident on board the Maltese registered bulk carrier ELENI M in position 45 10.5 N
More informationCase Study. Korea Destiny and Pakistan Destiny
Change of Command When? and Where? Case Study Name of Ship :Korea Destiny Registry :Panama Registry Built :1997 Japan GRT 5,342 NRT 2,635 Dwt 8,765 Type of Ship: Chemical Tanker Akasaka Diesel Engine 4,900
More informationMINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 97/2017
MINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 97/2017 The Head of the Maritime Compartment and Harbour Master of the Port of Ravenna: the Regulation for the towing
More informationReport on shipping accidents in the Baltic Sea area during 2010
HELSINKI COMMISSION Baltic Marine Environment Protection Commission Report on shipping accidents in the Baltic Sea area during 2010 Photo by Maritime office in Gdynia Table of contents 1 Introduction...
More informationReport on the investigation of the Boiler flashback on M.V. Shirane April 2007
Report on the investigation of the Boiler flashback on M.V. Shirane April 2007 1 Accident Reporting and Investigation The fundamental purpose of investigating an accident under these Regulations is to
More informationReport on shipping accidents in the Baltic Sea area during Introduction
HELSINKI COMMISSION Baltic Marine Environment Protection Commission Report on shipping accidents in the Baltic Sea area during 2009 Introduction Reports on shipping accidents in the Baltic Sea area have
More informationREPORT General Cargo Vessel MEG - UBFH - Grounding on October 15th, 2002
REPORT General Cargo Vessel MEG - UBFH - Grounding on October 15th, 2002 2003-01-15 REPORT General Cargo Vessel MEG - UBFH - Grounding on October 15th, 2002 Our reference: 080202-02-17572 Maritime Casualty
More informationFatal accident on board the MV SILVER PEGASUS in the port of Brake on 20 September 2014
Federal Higher Authority subordinated to the Ministry of Transport and Digital Infrastructure Investigation Report 337/14 Very Serious Marine Casualty Fatal accident on board the MV SILVER PEGASUS in the
More informationAmong others, the following relevant deficiencies were listed in that day in the inspection report:
SUAT BEY IMO9070515 F l a g : P a n a ma K eel Dat e: 01. 01. 1992 Type: General cargo Class: RMRS RO : US B / P HRS Gross Tonnage: 2608 M/V Suat Bey arrived in Catania (Italy) on 09nov2013, with a standard
More informationNational Transportation Safety Board
Accident no. Vessel names Accident type Location DCA15RM024 Courage Fire Date June 2, 2015 National Transportation Safety Board Marine Accident Brief Fire aboard Vehicle Carrier Courage North Sea in the
More informationU.S. Coast Guard - American Waterways Operators Annual Safety Report
American Waterways Operators U.S. Coast Guard - American Waterways Operators Annual Safety Report National Quality Steering Committee Meeting December 12, 2017 Established Safety Metrics For 17 years,
More informationMarine Transportation Safety Investigation Report M17P0406
Marine Transportation Safety Investigation Report M17P0406 COLLISION Dredger FRPD 309 Fraser River, British Columbia 05 December 2017 About the investigation The Transportation Safety Board of Canada (TSB)
More informationCertificate for international voyage application form
Certificate for international voyage application form Last updated: July 2017. This document is uncontrolled if printed, please refer to the Maritime New Zealand website for the latest version. About this
More informationChemical Tanker MARIA M IMO No IBSK Grounding on 14 July, 2009
Chemical Tanker MARIA M IMO No. 9301885 IBSK Grounding on 14 July, 2009 sss REPORT Chemical Tanker MARIA M - IMO No. 9301885 IBSK - Grounding on 14 July, 2009 MARITIME DEPARTMENT Maritime Investigation
More information748 Ramirez Avenue Phone: Florida 32159
Terry R. Upson 748 Ramirez Avenue Phone: 352 259 7699 Lady Lake E-mail: terry_upson@yahoo.com Florida 32159 QUALIFICATIONS AND COURSES ATTENDED Unlimited British Masters license with dangerous cargo endorsement
More informationCAPTAIN NICHOLAS J. LEWIS Marine Expert
PROFESSIONAL EXPERIENCE 2009 to Robson Forensic, Inc. present Associate Provide technical investigations, analysis, reports, and testimony towards the resolution of commercial and personal injury litigation
More informationGREEK CONTROLLED SHIPPING. March An information paper, based on data provided to the GSCC by IHS Markit
GREEK SHIPPING CO-OPERATION COMMITTEE GREEK CONTROLLED SHIPPING March 2017 An information paper, based on data provided to the GSCC by IHS Markit GREEK CONTROLLED FLEET 1988 2017 1 1988 1989 1990 1991
More informationMaritime New Zealand 2018/19 Funding Review
Maritime New Zealand 2018/19 Funding Review Proposed amendments to fees under the: Shipping (Charges) Regulations 2014 Schedule 1 Charges payable for work and services subject to hourly rate Ship Registration
More informationOCIMF Report Template OVID OVPQ
OCIMF Report Template 7120 1.0.00 General Information General 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 1.1.7 Date this OVPQ document completed Name of vessel/unit Vessel Identification IMO Number VIN Number
More informationHATCH OPENINGS AND ALLOWABLE LOADS HATCH OPENINGS
KEY IN HEAVY LIFT JIB LENGTH 34 m 01 INTRODUCTION 02 HAPPY SKY 03 HAPPY STAR HAPPY SKY Happy Sky has excellent lifting and handling capabilities and is a well-tuned heavy lift vessel offering efficient
More informationCollision between the tug Arafura
Collision between the tug Arafura Sea Insert Delta document and general title cargo ship Thorco Crystal Weipa Location Harbour, Date Queensland 24 June 2017 Investigation ATSB Transport Safety Report [Insert
More informationMARITIME DIRECTORATE OF RAVENNA. DECREE no. 13/2014
MARITIME DIRECTORATE OF RAVENNA DECREE no. 13/2014 The Maritime Director of Emilia Romagna, HAVING REGARD TO his Decree no. 44/2014 dated 31 March 2014, regarding pilotage rates in the Port of Ravenna
More informationAccident Report. Crane Failure Global Wind. 16-November-2006 Class B
Accident Report Crane Failure Global Wind 16-November-2006 Class B NARRATIVE On 15 November 2006 at 2209 hours NZDT (New Zealand Daylight Saving Time), Global Wind berthed port side to at No. 9 berth Mount
More informationREPORT INTO THE DROWNING OF MR MATTHEW ARMSTONG FROM THE M.V. MOON RIVER. ON THE 18th DECEMBER 2005.
REPORT INTO THE DROWNING OF MR MATTHEW ARMSTONG FROM THE M.V. MOON RIVER The Marine Casualty Investigation Board was established on the 25 th March, 2003 under The Merchant Shipping (Investigation of Marine
More informationPRESS RELEASE WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE
PRESS RELEASE September 28, 2015 WRECK REMOVAL OPERATION OF M/V GOODFAITH, ANDROS ISL. GREECE On February 10 th, M/V GOODFAITH amid severe weather run aground on the north coast of Andros. Bulk Carrier
More informationGrounding of the Crude Oil Tanker. Kyeema Spirit. East of Isle Aegna. on 24 September Serious Maritime Casualty Tallinn, September 2012
Grounding of the Crude Oil Tanker Kyeema Spirit East of Isle Aegna on 24 September 2012 Serious Maritime Casualty Tallinn, September 2012 EMCIP No 1893/2012 The accident was investigated by Estonian Safety
More informationValidity: indefinitely
1 (36) Date of issue: 20 June 2017 Entry into force: 1 July 2017 Validity: indefinitely Legal basis: Act on the Technical Safety and Safe Operation of Ships (1686/2009), sections 43(4), 46(2), 47(2), 48(3),
More informationSAFETY INVESTIGATION REPORT
Marine Safety Investigation Unit SAFETY INVESTIGATION REPORT REPORT NO.: 08/2016 May 2016 The Merchant Shipping (Accident and Incident Safety Investigation) Regulations, 2011 prescribe that the sole objective
More informationA Routine Inspection of the Fixed CO 2 Fire Extinguishing System that led to the Death of Four Officers!
A Routine Inspection of the Fixed CO 2 Fire Extinguishing System that led to the Death of Four Officers! by Mr. H.K. Leung Marine Department, Hong Kong Special Administrative Region Synopsis On preparing
More informationM/V "Natalie" Antigua and Barbuda Flag
M/V Natalie Antigua and Barbuda Flag Eagle Shipping Ltd Palm Grove House PO Box 438 Road Town, Tortola British Virgin Island www.eagleshippingltd.com www.shipsforcharter.com E-Mail 1: cskesloffice@esltd.biz
More informationAOM Elena (all details are about)
AOM Elena (all details are about) GENERAL INFORMATION Compiling date 23/10/2012 (Last updated date 30/10/2012) Head Owner s full style Compania Flor de Vapores S.A. Panama, 31st Street 3-80, P.O. Box 7412
More informationServing the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service
Serving the Tampa Bay Maritime Community Since 1886 Celebrating over 125 Years of Service Tampa Bay Pilots Association Piloting is an essential service of such paramount importance that its continued existence
More informationAPPENDIX 1 OPERATIONAL/SAFETY CHECK LISTS
APPENDIX 1 OPERATIONAL/SAFETY CHECK LISTS 47 CHECK LIST 1 - PRE-FIXTURE INFORMATION (FOR EACH SHIP) (BETWEEN SHIP OPERATOR/CHARTERER AND ORGANISER) Ship s Preferred Contact No. (e.g. INMARSAT). Ship s
More informationDesign: MT 6009-FSV Build: 2003 IMO No: Foto: Fotograf Harald M Valderhaug
Design: MT 6009-FSV Build: 2003 IMO No: 9284324 Foto: Fotograf Harald M Valderhaug IMO No 9284324 Tank capacites Cargo Cement Mud Fuel Oil Fresh water Base Oil Brine Drill Water Metanol Tank ID Contents
More informationCommonwealth of Dominica. Office of the Maritime Administrator
Commonwealth of Dominica Office of the Maritime Administrator TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, MOBILE OFFSHORE DRILLING UNITS AND RECOGNIZED ORGANIZATIONS
More informationAn Introduction to the M. V. Marine Svetaeva
An Introduction to the M. V. Marine Svetaeva Contents ABOUT MARINA SVETAEVA... 3 General... 3 Passenger Cabins... 3 Suite... 3 Mini Suite... 4 Twin Private... 4 Twin Public... 4 Quad... 4 Restaurants...
More informationHERMAN EIJKELENBOOM. Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, P.R. China
Marine Engineer Office Location Brookes Bell LLP Brookes Bell Shanghai Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, 200122 P.R. China Telephone +86 21 5860 2868 E-mail he@brookesbell.com
More informationCollision of MV FINNRUNNER with pier
Bundesoberbehörde im Geschäftsbereich des Bundesministeriums für Verkehr, Bau- und Wohnungswesen Investigation Report 166/03 1 December 2003 Serious marine casualty: Collision of MV FINNRUNNER with pier
More informationMV ESTONIA Accident Summary
MV ESTONIA Accident 28.9.1994 Summary MV ESTONIA was on scheduled voyage from Tallinn to Stockholm, carrying 803 passengers and a crew of 186 people. The ship capsized and sank within about 40 minutes
More informationLIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT
LIFTing HEAVY CARGO FOR WORLDWIDE TRANSPORT Happy River, Happy Rover, Happy Ranger, Enchanter HATCH OPENINGS AND ALLOWABLE LOADS CRANES PRINCIPAL DIMENSIONS REGISTRATION Hatch openings weather deck tween
More informationMEMORANDUM Thomas J. Kaminski
Commander U. S. Coast Guard Eighth Coast Guard District 500 Poydras Street New Orleans, LA 70130-3310 Staff Symbol: (dpi) Phone: (504) 671-2105 Fax: (504) 671-2169 MEMORANDUM From: Thomas J. Kaminski T.
More informationCorroded pipe causing oil spill
June 2013 Corroded pipe causing oil spill The 15 year-old bulk carrier was having its third special survey completed in dry-dock. As usual there were also many other jobs being carried out at the time.
More informationProject MYWREMS (MalaYsian WREckManagement System) 6 th Cooperative Forum Project 1: Wreck Removal 7 th 8 th October 2013 Bali, Indonesia
CF6-6.3 the 6 th Co-Operation Forum 7-8 October 2013, Bali, Indonesia Project MYWREMS (MalaYsian WREckManagement System) 6 th Cooperative Forum Project 1: Wreck Removal 7 th 8 th October 2013 Bali, Indonesia
More informationCommander U. S. Coast Guard Eighth Coast Guard District
Commander U. S. Coast Guard Eighth Coast Guard District 500 Poydras Street New Orleans, LA 70130-3310 Staff Symbol: (dpi) Phone: (504) 671-2105 Fax: (504) 671-2169 MEMORANDUM 16711 From: To: Subj: Ref:
More information16 March 2004 HELCOM RECOMMENDATION 25/7 on the SAFETY OF WINTER NAVIGATION IN THE BALTIC SEA AREA having regard to Article 13, Paragraph b) of the Helsinki Convention was adopted on 2 March 2004 in Helsinki
More informationTuesday, September 25, 2018 BOARD OF PILOT COMMISSIONERS FOR HARRIS COUNTY PORTS
Tuesday, September 25, 2018 BOARD OF PILOT COMMISSIONERS FOR HARRIS COUNTY PORTS 9:15 a.m. 111 East Loop North Houston, TX 77029 Fourth Floor Boardroom A. CALL TO ORDER B. CHAIRMAN'S REMARKS C. APPROVAL
More informationCraig Trans /IMO#
Craig Trans /IMO#8424551 The Bolivian-flag tug Craig Trans arrived at Halifax, Nova Scotia on 2012-12-18, with engine and generator problems, during a voyage from the Panama Canal to Montreal, Canada.
More information