1 White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Dolly Copp Campground Rehabilitation Project Environmental Assessment Town of Martin s Location Coos County, NH Androscoggin Ranger District April 2010 For Information Contact: Thomas Moore Androscoggin Ranger District White Mountain National Forest 300 Glen Road Gorham NH Telephone (603) X226 FAX (603)

2 Cover: Youthful Campers. Back of photo reads July 1939 Around campfire at Dolly Copp camp site on a very, very cold night. Historical photos are courtesy of the Forest History Society and of Jon Chew, whose Dolly Copp web site is listed in the Literature Cited appendix. Figure 1. Postcard photo of Dolly Copp Campground. This document is available in large print. Contact the Androscoggin Ranger District Phone TTY The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, sex, religion, age, disability, political beliefs, sexual orientation, and marital or family status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA s TARGET Center at (202) (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 1400 Independence Avenue, SW, Washington, DC or call (202) (voice and TDD). USDA is an equal opportunity provider and employer. Printed on Recycled Paper

3 Dolly Copp Campground Rehabilitation Project Environmental Assessment Contents Chapter 1 Purpose of and Need for the Proposed Action Introduction Project Location and Background Proposed Action Purpose of and Need for Action Scope of this Environmental Assessment and Public Involvement Decision to be Made Chapter 2 Issues and Alternatives Including the Proposed Action Issue Central to the Decision Being Made Alternatives Chapter 3 Environmental Consequences Effects on the Physical, Biological, and Social Environments Chapter 4 List of Preparers Appendix A Literature Cited Appendix B Response to 30-Day Public Comment Report

4 White Mountain National Forest Androscoggin Ranger District Vicinity Map Map 1. (left) Project Area Vicinity. Map 2. (below) Dolly Copp Campground Vicinity. Berlin Maine Gorham Dolly Copp Campground Martins Location Miles 4

5 Dolly Copp Campground Rehabilitation Project Environmental Assessment 1.1 Introduction Chapter 1 Purpose of and Need for the Proposed Action One of the largest campgrounds in the National Forest System and one of the most popular on the White Mountain National Forest Dolly Copp Campground has long been a special place for many visitors and Forest Service staff alike. The campground has been the setting for countless foundational outdoor experiences and the backdrop for generations of fond memories for families and friends. However, major infrastructure components are falling into significant disrepair; especially the water and road systems and the existing toilet buildings (only one of which is universally accessible). Additionally, there is a question whether Dolly Copp is providing a variety of amenities that are expected and appreciated by today s campers but that still align with the traditional character of the campground. This Environmental Assessment describes our proposal to address this situation. It explains what we propose to do, why we propose to do it, what alternatives we considered, and the effects of each alternative on the social, physical, and biological environment. 1.2 Project Location and Background The Dolly Copp Campground Rehabilitation Project is located on the Androscoggin Ranger District of the White Mountain National Forest (WMNF). The project is located within Coos County, in the unincorporated Township of Martin s Location, approximately five miles south of Gorham, New Hampshire on New Hampshire Route 16 (See Map 1). Figure 2. Large fireplace ca Xeno Fontaine of the CCC stands at left. At right is Ranger Horace C. Currier ( ) for whom Currier Mountain in the Dartmouth Range was named. 5

6 White Mountain National Forest Androscoggin Ranger District 1.3 Proposed Action Figure 3. Dolly Copp Campground development, The history of the project area, summarized here, is described in greater detail in Chew (2004) and Jordan (2004). The main campground road was granted to Daniel Pinkham for the building of a road from Jackson to Randolph in 1824, and this road was a state highway until the 1950s. The area was first settled by Euro- American farmers, including the Copp family, in the 1830s, and acquired by the US Forest Service in Camping subsequently began on the east side of the Peabody River, at the current Dolly Copp picnic area. As the national trend for auto-camping spread during the late 1910s and early 1920s, camping gradually expanded across the river to the present campground, taking advantage of the abandoned fields and pastures of the Copp, Culhane, and Barnes farms. Much of the campground s infrastructure (toilets, running water, waste disposal, and a swimming pool) was developed during the 1930s by the Civilian Conservation Corps, including the construction of the large log visitor s center/administration building. The campground continued to expand throughout the twentieth century with additional campground loops and infrastructure, particularly in the 1960s when the gatehouse and lavatory buildings with electricity and flush toilets were first installed. The size, shape, and character of the campground have evolved over time as public demand for services and social and economic influences changed. The site has always catered to a variety of camping styles, including tent, trailer, and later, larger Recreational Vehicles (RVs). At one time a swimming pool with lifeguard was available, and until recently a totem pole stood alongside one loop. The site is now a mix of open, grassy areas and hardwood and softwood stands. The Peabody River flows along the east side of the site parallel to the main interior road, and Culhane Brook divides the campground roughly into northern and southern sections. The western side of the main road offers wooded, wellscreened sites very suitable for tenting. The eastern side is more open and level and is a natural location for larger trailers and RVs and a place where multiple adjacent sites may be occupied by families and friends. A detailed description of the campground facilities is provided in the Existing Condition section below. This project proposes comprehensive rehabilitation of Dolly Copp Campground. The project would: Reconstruct failing water and wastewater systems. Reconstruct and realign the paved road system including the replacement of one bridge, multiple culverts, and the widening of some areas to accommodate safe navigation of larger recreational and emergency vehicles. 6

7 Dolly Copp Campground Rehabilitation Project Environmental Assessment Install pedestal service hookups within at least three campground loops and realign and widen certain sections of these roads to allow for vehicle maneuverability. Install one sanitary dump station; repair and upgrade nine toilet buildings and convert three toilet buildings to add shower facilities. Repair and improve certain campsites and minor constructed features such as water pedestals and kiosks. Construct five to ten campsites to accommodate District volunteers. Address deferred maintenance at the seasonal quarters building. Realign the gatehouse entry area to ease congestion and improve visitor access and traffic flow. A more detailed description of the proposed action is available in Chapter Purpose of and Need for Action The purpose of the action is to provide high-quality developed camping opportunities in a scenic and historic location. The need for action is driven by the poor and failing condition of the water and wastewater systems, toilet buildings, and roads; the lack of services many visitors find desirable; and the opportunity to provide amenities to support and improve overall District operations. Existing Condition Dolly Copp Campground provides a variety of camping experiences and is popular with a wide range of users. It accommodates areas of high development while still offering rustic camping opportunities. The depth of history embodied in this landscape, both as a Forest Service managed recreation site and a predating community of White Mountain farm families, has shaped the distinguishing character of the campground and is integral to its current condition. These historic values have resulted in a sense of continuity, attachment, and lore that have defined the existing campground, and which continue to be a highly-valued part of the recreation experience unique to Dolly Copp. There are 177 sites covering about 100 acres laid out in both open field and wooded settings. One hundred and twenty-one sites are within the main artery, and three eastern loops can accommodate RVs. Larger Class A motor-homes and fifth-wheel trailers have some difficulty with tight turns in these loops. Fifty-six sites are of a design or in locations that make them more typically used for tent camping. At full capacity, the campground can hold as many as 1,400 visitors. A concessionaire currently manages the campground under a special use permit. Reservations are accepted for 100 of the sites; the rest are available on a first-come, first-served basis. Dolly Copp has 3.5 miles of paved access and interior roads. The road system has areas that have poor drainage, crumbling pavement, and is rough and heaved in some camping loops. Cold patching is required on a yearly basis. The existing alignment of the overall road system and camping spurs in certain loops can pose maneuvering difficulties for RVs of various types and sizes. Larger 7

8 White Mountain National Forest Androscoggin Ranger District emergency vehicles cope with the same challenges. One bridge crossing Culhane Brook does not support larger modern RVs or commercial service vehicles and there are numerous culverts in need of replacement. Many campsites have lost gravel due to erosion over time leaving an uneven surface incapable of draining water properly. The campground has a pressurized water system with three drilled wells and a 22,000 gallon storage tank. The majority of this large, complex water system was originally installed in the early 1960s. Numerous repairs, replacements, and upgrades of the system have been made as pumps, water and electrical lines, valves, fixtures, or other components have failed. This system has required repairs at an increasing rate taking much time, effort, and money to meet the demand of campers during busy periods of visitation. Potable water is available at 37 pedestal water faucets located throughout the campground. There are 12 restrooms with flush toilets and electric lighting. The aging restroom buildings are furnished with outdated plumbing and sink and toilet fixtures; only one restroom meets universal accessibility standards. No public campsites are equipped with utility hookups. There are six host sites located throughout the campground with water and electric hookups. There is an entrance station, an administrative service area with a large garage, and a small house used for seasonal employee quarters. The graveled administrative area in front of the garage drains water poorly during spring snowmelt, causing water to run into the building. Interpretive programs are offered inside the CCC-era log cabin visitor center or outside at an amphitheater; and a nature trail is available. The Copp homestead site has interpretive panels discussing the history of the site. The log cabin, entrance station, garage, and seasonal house all have electrical service. The garage and seasonal house are served by the water system. There are pay telephones near the entrance to the campground, and firewood and ice are available for purchase from the concessionaire. The Daniel Webster-Scout and Great Gulf Link Trailheads are located within the campground. A small parking lot accommodates ten vehicles for the visitor center and access to the Great Gulf Link Trailhead. There are no parking spaces associated with the Daniel Webster-Scout Trailhead. Both trails receive low to moderate use. During the winter months the main road, Brook Loop, and End Loop serve as part of the Hayes Copp Ski Trail system. Because there is no sanitary dump station in close proximity to the campground, sanitation issues occasionally occur when visitors evacuate black and grey water directly onto the ground within or in the vicinity of the campground. Some campers have gone to such lengths as to fill and haul one bucket of waste water at a time from RVs to dump into the campground toilets. The closest commercial facility with this service is more than five miles from Dolly Copp. The Androscoggin Ranger District receives numerous inquiries each year from potential volunteers outside of commuting distance asking if campsites with utility hookups are provided. Many of these potential volunteers end up going elsewhere as the District is currently unable to provide these services. 8

9 Dolly Copp Campground Rehabilitation Project Environmental Assessment The seasonal house has four very small bunk rooms, limited common space for eating and gathering, and annual problems with rodent infestations that prevents use of some rooms. Management Direction and Desired Condition Management direction for developed campgrounds is found in the Forest Service Manual (FSM), Forest Service Handbook (FSH), and the Land and Resources Management Plan for the White Mountain National Forest (Forest Plan) and supporting documents. The Forest Service describes recreation settings on National Forest lands according to the Recreation Opportunity Spectrum (ROS), which considers physical, social, and managerial settings to describe the range of opportunities available to visitors for different kinds of recreation experiences. Settings are grouped into five classes: Primitive, Semi-Primitive Non-motorized, Semi-Primitive Motorized, Roaded Natural, and Rural (Forest Plan, p 1-10, and Map 1-11; FEIS, p and Appendix H). The lands within the project area fall into Management Area (MA) 2.1, General Forest Management. The ROS goal for MA 2.1 is to offer a full mix of ROS objectives. The lands in and around Dolly Copp Campground are identified as Rural ROS class. Agency-wide policy on site development found at FSM Publicly Managed Recreation Opportunities discusses level of site modification as related to ROS class. The Rural ROS class allows for heavily modified sites, including: facilities designed strictly for comfort and convenience of users, extensive use of artificial surfacing of road and trails, obvious traffic control devices, and formal or structured interpretive services. Luxury services are not appropriate within the Rural ROS class. The FSM also provides direction for provision of services such as electric hookups and dump stations. The Forest Plan provides locally determined recreation goals and objectives, as well as standards and guidelines that shape management of developed campgrounds on the White Mountain National Forest. Pertinent direction includes the goal of providing a variety of quality campground opportunities where the natural forest setting is an important part of the visitor experience while ensuring balanced protection of social and natural resources. Standards and guidelines seek to maintain a range of developed recreation opportunities by ensuring that construction, reconstruction, or rehabilitation projects are evaluated in terms of their effects on both the individual site and on Forest-wide development levels. Toward that end, the Forest Plan directed determination of appropriate development levels for campgrounds and certain other sites. To meet that direction, Forest recreation staff completed a draft document dated March, 2007, to describe the existing and desired levels of development for each of the 20 campgrounds on the Forest. Though not finalized pending certain edits and acceptance by the Forest Supervisor, the document does provide a framework to examine appropriate development changes within Dolly Copp. Under this draft document, the current development level of Dolly Copp Campground is High, and all but three of the 13 amenities used to describe the most highly-developed sites (road design, showers, and pedestal service hookups) are present. 9

10 White Mountain National Forest Androscoggin Ranger District Finally, the WMNF completed the Recreation Facility Analysis (RFA) in June, RFA required an examination of all recreation facilities on the Forest and outlined a 5-year program of work to implement site-specific recommendations to address deferred maintenance and improve recreation opportunities. As part of that national effort, repairs and changes very similar to the proposed action described herein were described for the facilities at Dolly Copp Campground. The process also included a formal public involvement effort. In combination with the existing condition of the campground, these documents were collectively used by District recreation managers and the District Ranger to develop the project goals, proposed action, and design criteria. These are described in detail in Chapter Scope of this Environmental Assessment and Public Involvement Analysis was conducted by the District Interdisciplinary Team (IDT) to determine the scope of the environmental assessment and to identify issues or concerns related to the proposed actions. Opportunities for public input concerning improvements to the Dolly Copp Campground have included: The Recreation Facility Analysis 5-year program of work dated March, 2008, described the proposed action; as part of the RFA process, a formal public comment period occurred between April 7 and May 16, The 5-year program of work was finalized by the Regional Forester on June 10, No comments specific to the Dolly Copp Campground were received during the Recreation Facility Analysis. Public notification of the site-specific environmental analysis began when the project was announced in the White Mountain National Forest Quarterly Schedule of Proposed Actions (SOPA) dated 1/1/2008. The project has remained on the SOPA through the present. A 30-Day Comment Package that described the purpose and need and the proposed action, and invited public input to help identify issues and concerns, was mailed to 210 interested and affected organizations, agencies, private companies, and individuals. The letters were mailed on March 9, 2008 and formal comments were received until April 20, The 30-Day Comment Package was posted on the White Mountain National Forest website on March 9, Issues and concerns were also solicited through legal notices published in the New Hampshire Union Leader and the Lewiston Daily Sun newspapers. Internal meetings of the Dolly Copp Campground IDT occurred on May 11, August 4, October 7, and October 11, 2009; and on January 26, As part of these meetings, the ID Team reviewed and analyzed public comments to identify issues, concerns, and suggestions for consideration in project design and development. Specific information on these meetings is available as part of the project record. 10

11 Dolly Copp Campground Rehabilitation Project Environmental Assessment 1.6 Decision to be Made The scope of this environmental assessment focuses around a conceptual proposal to repair infrastructure and add amenities to the Dolly Copp Campground. Site-specific decisions on the final locations, shapes, and styles of any repairs or additions stemming from any decision to implement such a conceptual action would be made by the District Ranger in concert with recreation managers and a professional technical design team within the scope of the final decision. The Androscoggin District Ranger, as the Responsible Official, must decide: Whether to select an alternative that comprehensively rehabilitates the Dolly Copp Campground both by addressing deferred maintenance and adding certain additional amenities Whether the alternative selected would result in significant environmental impacts to the quality of the human environment and whether preparation of an Environmental Impact Statement (EIS) or a Finding of No Significant Impact (FONSI) is warranted Whether the decision and alternatives considered meet all applicable federal, state and local laws and policies, including consistency with the Forest Service Manual and WMNF Forest Plan. Figure 4. Dolly Copp Forest Camp and Imp Face, 1920s. 11

12 White Mountain National Forest Androscoggin Ranger District Chapter 2 Issues and Alternatives Including the Proposed Action This section of the environmental analysis identifies and discusses the central issue that was raised both internally and externally during the scoping process, and it provides a detailed description of the proposed action and the alternative that was developed to address the central issue. The effects analysis in Chapter 3 examines how each element of the alternatives relates to this central issue. Other effects of each alternative on social, physical, and biological resources of the analysis area are also described in Chapter 3. More detailed specialist reports are contained in the project record. 2.1 Issue Central to the Decision Being Made Forest Service managers have long been aware of the strong generational connection with Dolly Copp and the importance of continuity with tradition and a certain developmental level and type of use that contributes to a particular character of the area. This awareness led the District Ranger to identify development level and the character of the campground as a preliminary issue for consideration by the IDT at the project s initiation. This awareness also shaped the development of the proposed action and the design criteria that were provided to the design team. Though the majority of individuals who responded to the 30-Day Public Comment Package supported the proposed action entirely, the IDT analysis of comments confirmed that for some visitors a natural tension existed between improving the campground and simply repairing the campground. This is perhaps best exemplified by the following comment: Part of me feels like: Dolly Copp is special let s leave it alone But I don t want to sound like I m against change. I just hope it is done carefully and respectfully, and won t change the character of the campground. While most respondents were supportive of general repairs to the water and wastewater systems, some respondents felt that just by the fact of adding electricity and improving the roads the character of the campground their experience of the area would change. Other respondents expressed the idea that road repairs and additional amenities would increase use of the area by larger RVs and that itself would change the character of the campground. Still others suggested that electric service pedestals would reduce the noise of portable generators currently being used by some campers, but feared that use of air conditioners, TVs, stereos, and other items would otherwise increase noise and change the character of the experience within the campground. These concerns were distilled into the central issue: Adding electric service pedestals within several campground loops will change the character and the recreation experience available at Dolly Copp Campground. Other suggestions or concerns not central to the decision being made were, and will continue to be, considered during development of the design details for the proposed action. Please see Appendix B for our responses to these comments. 12

13 Dolly Copp Campground Rehabilitation Project Environmental Assessment 2.2 Alternatives Alternative 1: No Action This alternative proposes no comprehensive repairs or improvements to the Dolly Copp Campground at this time. However, ongoing maintenance of the existing facilities at this site would continue, and a piecemeal approach to repairs of water and wastewater systems and buildings would occur over time. Alternative 2: Proposed Action Consistent with Forest Plan direction, the Recreation Facility Analysis Final Program of Work, and the draft WMNF Campground Development Levels document, the proposed action is designed to: Provide for the health and safety of visitors and employees. Protect natural resources. Accommodate visitor expectations by offering modern waste management facilities. Design improvements to maximize energy conservation and environmental sustainability. Maintain the traditional character of the campground and protect cultural resources. Eliminate deferred maintenance and improve financial sustainability. Provide for an appropriate range of development levels and camping experiences within the campground. Accommodate changing demographics and trends by providing services desirable for modern RV camping. Maintain opportunities for lower-development camping experiences for tent campers. Within the constraints of the items listed above, increase occupancy by providing improved services for all campers. Meet visitor expectations for high-quality restroom, shower, and campsite conditions. Construct new facilities to meet universal accessibility standards. Improve transportation system to accommodate modern vehicle sizes. Maximize operational efficiency and simplicity over the long-term. The proposed action is to: Reconstruct failing water and wastewater systems. Realign and reconstruct degraded paved road system, including: Replace one bridge and multiple culverts to better accommodate modern vehicle weights and sizes and improve stream function. Widen some areas to accommodate safe navigation of larger recreational and emergency vehicles. 13

14 White Mountain National Forest Androscoggin Ranger District Install pedestal service hookups for electricity and water within at least two campground loops on the eastern side of the campground, but not within the interior of Hayes field. Widen certain sections of these loop roads to allow for vehicle maneuverability. Install one sanitary dump station. Repair and upgrade nine toilet buildings and convert three remaining toilet buildings to add shower facilities. Repair and improve certain campsites and minor constructed features such as water pedestals and kiosks. Construct five to ten campsites with hookups to accommodate District volunteers. Address deferred maintenance and improve living conditions at the seasonal quarters building. Realign the gatehouse entry area to ease congestion and improve visitor access and traffic flow. Re-grade the area in front of the shop administration building to enable water to drain away from the facility. To further clarify the proposal, the following design criteria were provided to the team crafting the conceptual design documents: Retain the basic layout of the campground. Addition/removal of loops or general redesign of the existing layout is not viewed as necessary at this time. Some adjustment of camping loop alignments or re-organization of sites within the loops may be appropriate. Retain mix of open, grass fields and wooded areas. Retain a number of water-side and walk-in sites. Retain log visitor center building and protect Copp homestead site. Retain site style and density within High Woods, Brook Loop, and Spruce Woods. The majority of sites should retain their current size, though some smaller sites may be appropriate for expansion. Consider possible locations for volunteer sites that could include the vicinity of the seasonal quarters, behind the garage/administrative site with access from FR 72, or in the vicinity of the nature trail east of the main entrance road. Consider what number of toilet and proposed shower facilities best serve the campground, especially given the changed condition of added service pedestals in certain loops. Consideration of alternative waste treatment systems may be appropriate. Locate the dump station near the entry/administrative service area (desirable). Install a fence or improved natural screening between main entry road and the administrative service area (desirable). Renovate or relocate nature trail and include historical interpretation of the Dolly Copp historical site. 14

15 Dolly Copp Campground Rehabilitation Project Environmental Assessment Consider potential for limited parking to serve the Daniel Webster-Scout Trailhead, possibly on the east side of the main road. Alternative 3: Modified Proposal This alternative was designed to respond to the central issue. It is the same as the proposed action with one exception: it would not include installation of utility service pedestals. Figure 5. Dolly Copp Campground Site Map. 15

16 White Mountain National Forest Androscoggin Ranger District Figure 6. Dolly Copp Forest Camp 1930s entrance sign. Figure 7. Dolly Copp campers; Imp Face in background. Photo from The New Hampshire Troubadour, August

17 Dolly Copp Campground Rehabilitation Project Environmental Assessment Chapter 3 Environmental Consequences Campground Development Level and Character This section of the environmental assessment analyzes how the central issue identified in Chapter 2 is affected by each element of the alternatives. A description of how other resource areas are affected by each alternative follows. The central issue identified by the IDT based on internal and public comment is: Adding electric service pedestals within several campground loops will change the character and the recreation experience available at Dolly Copp Campground. To focus the analysis around this issue, the general format of the March, 2007, draft Campground Development Levels document was used. This document, which was based on other management direction from the Forest Service Manual and the Forest Plan, identified criteria with which to rate campgrounds into High, Moderate, or Rustic development levels. Consequently, it provides a tool to display how proposed changes under each alternative would affect the development level and consequently the overall character of the campground. Because none of the proposed activities would result in a change in the ROS class of the area, that criterion from the Campground Development Level document was not used in this project-level analysis. The rating criteria and corresponding development levels used for this analysis are displayed in Table 3-1. The analysis area for direct, indirect, and cumulative effects related to development level and character is the Dolly Copp Campground. This area was selected because the effects are related to the condition and character of the campground itself and do not extend into any other area or developed recreation site. The timeframe for the analysis is the period of actual project implementation and five years immediately following implementation. This timeframe was selected because the period of change in condition and character would be most evident to visitors during and following implementation, and any change in use patterns as a result of the project would be expected to be established within five years. Alternative 1 Direct and Indirect Effects of Alternative 1 on the development level of Dolly Copp Campground With selection of this alternative, the development level of Dolly Copp Campground would remain High. Areas of high development which accommodate larger RVs would continue to coexist with less-developed, secluded tent sites. The road, water, and wastewater systems would be patched or repaired on an ongoing basis as they continue to age and fail. Restroom facilities would remain outdated and not universally accessible. The alignment of roads and camping spurs would make it difficult for RVs or vehicles towing trailers to navigate safely. Services such as a dump station, showers, or hookups would not be available and visitors seeking these amenities would choose alternative camping locations. Volunteer sites with hookups would remain unavailable. 17

18 White Mountain National Forest Androscoggin Ranger District Table 3-1. Rating Criteria and Corresponding Development Levels. Development Level Rating Criteria High Moderate Rustic Natural appearing Natural appearing designed Natural appearing Landscape designed and modified landscape landscape Miles to Primary Road miles miles miles Access Road Surface/ Asphalt Asphalt Gravel Interior Road Surface Road Design Greater than or equal to 50% of Access and Interior Roads meet the minimum road design required for a full-size recreational vehicle (RV) to operate % of access and interior roads meet the minimum road design required for a full-size recreational vehicle (RV) to operate. 0% of access and interior roads meet the minimum road design required for a full-size recreational vehicle (RV) to operate. Total Sites (Campsites) 50 + Campsites Campsites 1 20 Campsites Percent of RV 50% or Greater/ Accept 1 49% Accept RVs 0% Accept RVs Campsites RVs Showers Yes Showers available No Showers not available No Showers not available Water System Pressurized Hand Pump Hand Pump Toilet System Flush Vault Vault Host (Within Host(s) on site Host(s) on site No Host on site Campground) Multiple possible Programs Programs on site None available on site None Available on site Electric Hookups Acceptable and available for public use Acceptable and available for public use per FSM direction Acceptable for administrative us only Acceptable for administrative use only (includes Hosts) Not acceptable Not acceptable Selection of this alternative would not fulfill the stated purpose of and need for action. It would address concerns that the proposed action would result in a change in the character of the campground. Alternative 2 Direct and Indirect Effects of Alternative 2 on the development level of Dolly Copp Campground Because the proposed action seeks to replace existing systems and add services to a limited area that can better accommodate existing RV use in a manner consistent with direction in the Forest Service Manual and the Forest Plan, the effects of the actions at Dolly Copp are considered a modification rather than an increase in the overall development level. As shown in Table 3-2, the addition of showers and pedestal hookups constitutes moving two criteria from Moderate/ Rustic to High levels. However, when looked at within the context of the total 18

19 Dolly Copp Campground Rehabilitation Project Environmental Assessment Rating Criteria campground rating, the development level remains at the upper level of the development spectrum. The reconstruction of the water and wastewater systems would entail replacing existing infrastructure that is currently rated High on the development scale. The bulk of these system components are subsurface or otherwise not readily apparent to visitors and would remain so following implementation. Restroom buildings would be built to meet accessibility standards, with a character compatible with architectural styles typical of New England national forests. The installation of showers in up to three of the 12 restroom buildings would be incorporated into the structures so as not to create a substantial difference in design from other facilities and would afford campers this opportunity in the campground rather than having to travel elsewhere. Table 3-2 shows a change from Moderate/Rustic to High development level when showers are present, but the total rating of High for the campground as a whole does not change. Table 3-2. Comparison of Alternatives. Existing Development Level Proposed Action Development Level Alternative 3 Development Level Landscape High High High Miles to Primary Road High High High Access Road Surface / High High High Interior Road Surface Road Design Moderate High High Total Sites (Campsites) High High High Percent of RV Campsites High High High Showers Moderate High High Water System High High High Toilet System Host (Within Campground) Interpretive Programs Electric High High High High High High High High High High High High Hookups Moderate High Moderate Total Rating High High High The paved road system is currently rated High and would remain so following implementation of this alternative. Reconstruction of the road system will provide smoother surface conditions and improve drainage features in all sections of the campground. Replacing the bridge over Culhane Brook would ensure that vehicles, including service and emergency vehicles, would have access to the length of the campground over the long term; the presence or absence of bridges does not affect the development level of the campground. The road design of the campground is currently rated Moderate, because while 121 sites can accommodate RVs, sections that are popularly used especially along the main artery road, in Big Meadow and in Hayes Field do not have adequate widths and turning radii to safely accommodate these vehicles. Realignment and widening in areas such as these would allow for these vehicles to navigate safely in areas where they currently travel and camp. Roads in loops that 19

20 White Mountain National Forest Androscoggin Ranger District adequately accommodate RV use on the eastern side of the campground would not require realignment. Likewise, roads in loops that do not currently accommodate RV use on the western side of the campground will remain essentially the same. Any realignment would involve widening to accommodate two-way traffic, softening some corners, modification of some intersections, and adjustment of some loops and camping spurs to improve the ease of navigation and the safety of turning and backing vehicles. The physical location of roads on the ground does not have an effect on development level and is not considered in the campground development level rating. However, providing adequate access to more than 50 percent of the campground to larger RVs would change this criterion from Moderate to High. The installation of water and electrical pedestal hookups would be a change from Moderate to High development level for this criterion. All service lines would be run underground, and the pedestals would be designed to minimize visual effects by choice of material, height, and location in the campsites. Use of service pedestals is expected to reduce the noise of generators, which are commonly used by many visitors. It is expected that the number of RVs using the campground would not change appreciably, as these vehicles currently use the campground in sizeable numbers. However, they are likely to concentrate in areas with hookups. Areas of the campground not identified for hookups will not be affected by installation. The addition of dump station service in the vicinity of the entrance station would eliminate the environmental and health concern of illegal dumping of waste in or adjacent to the campground, which has occurred at Dolly Copp over the years. The presence or absence of dump stations was not considered in the campground development level rating criteria; however, the construction of this facility would obviously be considered an additional development within the campground. The dump station would be located far enough away from public campsites to avoid any visual or odor impacts to those areas from use of this facility. Construction of campsites for District volunteers and refurbishing of the seasonal quarters would have little effect on the development level of the campground. The campsites would be of similar type to those within the public areas of the campground, and the seasonal quarters building would be of similar shape and size following reconstruction. Closing sections of the campground during construction would have an effect on campsite availability and would create noise, dust, and visual impacts to visitor experiences; however, the activity itself would not affect the development level of the campground. In summary, repairs of existing systems would not change the development level of the campground. Installation of showers and public utility hookups represent an increase in individual development level criteria; however, because of the highly-modified, highly-developed character of Dolly Copp Campground, the overall development rating would not change. Because the campground would continue to offer a variety of camping experiences, use patterns are likely to remain similar to the current condition in terms of the mix of tents, trailers, and larger RVs; however, it is likely that improved services and condition of 20

21 Dolly Copp Campground Rehabilitation Project Environmental Assessment facilities would increase overall occupancy within the capacity of the campground. Selection of this alternative would not affect any other campground, so the effect on Forest-wide development levels would be the same as the direct and indirect effects described herein. Alternative 3 Direct and Indirect Effects of Alternative 3 on the development level of Dolly Copp Campground This alternative was developed in response to the central issue identified by the ID Team. Reconstruction of the water/waste water systems, toilet buildings, and roads, and installation of showers and dump station services, would have the same effect on development level as in Alternative 2. Because the installation of water and electrical hookups would not occur, campers desiring electrical power would continue to use generators or would choose a state or private campground for their stay. This alternative meets the purpose of and need for action in the area more than Alternative 1, but not as fully as the Proposed Action, Alternative 2. Installation of showers and public utility hookups represent an increase in individual development level criteria; however, as with Alternative 2, there would be no change in the development level rating for the campground as a whole. Cumulative Effects of Alternatives 2 and 3 on the development level of Dolly Copp Campground Past, present, and future projects include: ongoing campground maintenance; Settler s stewardship project and removal of hazard trees (completed in 2009); installation of interpretive panels at the Copp Homestead site in 2007; ongoing Visitor Center maintenance and past projects repairing the roof, chimney, and steps; and creation of a campground manager s site in an administrative area. In the context of the development rating criteria, these projects had no effect on the development level of Dolly Copp; therefore, the cumulative effects of either Alternative 2 or 3 would be the same as the direct and indirect effects. 3.1 Effects on the Physical, Biological, and Social Environments As part of the interdisciplinary analysis for this project, specialists developed reports describing the existing condition and evaluating the potential for effects for their resource. These detailed specialist reports are found in the project record. No issues were identified by the ID Team related to these resources, and no concerns were identified by the public. This section of the environmental assessment summarizes the effects to physical, biological, and social resources based on specialist reports. 21

22 White Mountain National Forest Androscoggin Ranger District Cultural Resources Known historic properties include an historic building, two archaeological sites, and one feature potentially eligible for listing on the National Register of Historic Places. Potential eligibility of the archaeological sites is based on their ability to contribute information important to the study of history under the themes of European settlement and agriculture, and early recreation and tourism. The log visitor center is potentially eligible based on its distinctive character. Under Alternative 1, no direct or indirect effects would occur. Under Alternatives 2 and 3, known archaeological sites and the log visitor center would be avoided and protected. All recorded sites can be avoided by project activities; hence no direct or indirect effects from the project activity are anticipated. Since there are no direct or indirect effects from the project, there would be no cumulative effects. Consequently, Cultural Resources Reconnaissance Report (CRRR) Number with a determination of No Effect was submitted to the New Hampshire State Historic Preservation Office (SHPO), who concurred with the determination by letter dated September 11, Additional project activities that result from the final design that were not included in the original submission to the SHPO will be submitted as an addendum to CRRR , and SHPO concurrence will be obtained prior to project implementation. Federally Threatened, Endangered, and Proposed Species (TES), and Regional Forester Sensitive Species (RFSS) A Biological Evaluation (BE) for Federally Threatened, Endangered, and Proposed Species and Regional Forester Sensitive Species was completed on July 30, 2009, for the Proposed Action and its alternatives (BE, Project Planning Record). The process used and the sources examined to determine potential occurrence of TES or RFSS presence are listed in the BE. During Forest Plan revision, best available science was used to evaluate TES/RFSS species and species viability. Based on a review of all available information, it was the Forest Service Biologist s and Botanist s determination that potential habitat may occur within the project area for six Regional Forester Sensitive Species: Eastern small-footed myotis (Myotis leibii) Regional Forester Sensitive Species Northern bog lemming (Synaptomys borealis sphagnicola) Regional Forester Sensitive Species Brown s Ameletus Mayfly (Ameletus browni) Regional Forester Sensitive Species Third Ameletus Mayfly (Ameletus tertius) Regional Forester Sensitive Species Bailey s sedge (Carex baileyi) Regional Forester Sensitive Species Autumn coralroot (Corallorhiza odontorhiza) Regional Forester Sensitive Species The BE details effects to these species. Under both action alternatives, eastern small-footed myotis could be displaced if they are roosting in buildings being 22

23 Dolly Copp Campground Rehabilitation Project Environmental Assessment altered or replaced, or in trees being cut during campground re-construction. Displaced individuals would likely move to alternate roost sites in surrounding forested habitat. The likelihood of tree removal affecting an individual eastern small-footed myotis is low because the literature indicates that this species prefers to roost in rocky outcrops or buildings. The maintenance of the existing roads, trails, and openings in and adjacent the project area would continue to provide potential foraging habitat for bats. There is a slight potential for both action alternatives to displace northern bog lemming, although the potential for presence of this species in the project area is low. The duration of disturbance would be short and the amount of riparian habitat that might be impacted would be minimal. Therefore, the potential for the proposed action to displace individual northern bog lemmings is low. Rehabilitation in the campground should not reduce the amount or quality of existing suitable habitat. There may be some minimal direct effects during campground re-construction to Brown s and third ameletus mayfly habitat from sedimentation into streams. Implementation of best management practices and Forest-wide standards and guidelines should minimize impacts to these species. The potential for presence of Bailey s sedge and Autumn coralroot is low; botanical surveys did not locate any of these species in the project area. Rehabilitation efforts in the campground would likely occur during the snow-free season when Bailey s sedge and Autumn coralroot may be above ground. Therefore this project could impact individuals if they are present, but is not likely to eliminate a population. In the long term, habitat suitability would be maintained for both plant species, so long-term persistence of the species should not be affected. Non-Native Invasive Species (NNIS) The analysis area for this resource is Dolly Copp Campground. Two NNIS infestations were mapped in the campground in 2005 (2005 unpublished report). Berberis thunbergii (Japanese Barberry) Japanese barberry was located but has since been eradicated in the campground and is no longer present. Elaeagnus umbellata (Autumn Olive) will be eliminated in the campground prior to any rehabilitation work occurring in the project area. Under Alternative 1, there would be no effects to NNIS because existing conditions would not change in the campground. Under Alternatives 2 or 3, the overall risk rating assigned for the Dolly Copp Campground Rehabilitation Project is Low. Post project monitoring of the area disturbed by this project should be implemented to detect colonization of the site by NNIS. There is a risk of introducing NNIS from past, present, and future activities. Post project monitoring, as well as incorporating Forest Plan standards and guidelines, reduces this potential for cumulative effects from action alternatives. Recreation The analysis area for this resource is Dolly Copp Campground. Effects on the campground itself are described in the analysis of the central issue above. Other recreation uses of the site include hiking on the Great Gulf Link and Daniel Webster-Scout Trails, cross-country skiing on the Hayes Copp Ski Trail, and informal off-season use for strolling and dog-walking. 23

24 White Mountain National Forest Androscoggin Ranger District Access to the hiking trailheads may be affected during project implementation. Likewise, informal uses during the off-season may be affected by implementation activities that would be scheduled to avoid the peak-use camping season. No effects are anticipated to the ski trail, nor are any long-term effects anticipated for any recreation use because the campground will remain in essentially the same layout following selection of any alternative. Soil Resources The analysis area for this resource is Dolly Copp Campground and the analysis focuses on soil productivity. Under Alternative 1, impacts to soil productivity would not extend beyond those that occur in nature. Under Alternatives 2 and 3, soils disturbance would occur during implementation of each element of the project. Soils permanently compacted under roads or other features would lose productivity, and soils reclaimed by relocation would regain productivity over time. The effects of Alternative 3 would be less than Alternative 2 because fewer activities would occur. Water Resources The analysis area for water resources includes the watersheds of first and second order streams draining into the Upper Peabody River Watershed, and portions of the project area draining directly into the Peabody River. The analysis focuses on water quantity, quality, and stream stability. Summary of water quantity and stream stability effects The addition of pedestal hookups for water and up to three shower facilities in Alternative 2 would increase water use to some extent. Because of factors limiting this use, the withdrawal is not expected to have a significant effect on the availability of water for humans and ecosystems. Reconstruction of water and wastewater systems may reduce use by an unknown amount by preventing pipe leakage. Culvert replacements and infrastructure relocation will improve the stability of streams by enabling them to accommodate high flows. Alternative 3 would result in a smaller increase in water use, since no pedestal hookups are proposed. All other effects of this alternative are identical to Alternative 2. A cumulative effect on water quantity would not be expected under either action alternative, and stream stability would be expected to improve due to improved culverts and reducing campsite encroachment on riparian areas. Summary of water quality effects Under Alternative 2, existing threats to water quality would be mitigated by improvement of failing water and wastewater systems and provision of a dump station. Reconstruction and maintenance of roads, campsites, and other constructed features may result in a short-term, localized increase in sedimentation due to ground disturbance, but best management practices would minimize the amount of sediment reaching streams. These activities would be expected to reduce sedimentation into streams in the long term. The water hookups in the proposed action could potentially have an indirect effect on water quality due 24

White Mountain National Forest Androscoggin and Evans Notch Ranger Districts

White Mountain National Forest Androscoggin and Evans Notch Ranger Districts United States Department of Agriculture Forest Service White Mountain National Forest Androscoggin and Evans Notch Ranger Districts 300 Glen Road Gorham, NH 03581-1399 Comm: (603) 466-2713 TTD: (603) 466-2856

More information

White Mountain National Forest

White Mountain National Forest White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Boles Brook Snowmobile Bridge Decision Memo Boles Brook Snowmobile Bridge Project Town of Woodstock

More information

White Mountain National Forest. Pond of Safety Accessible Trail & Shoreline Access Project. Scoping Report. Township of Randolph Coos County, NH

White Mountain National Forest. Pond of Safety Accessible Trail & Shoreline Access Project. Scoping Report. Township of Randolph Coos County, NH White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Pond of Safety Accessible Trail & Shoreline Access Project Township of Randolph Coos County, NH Scoping

More information

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service Bradley Brook Relocation Project United States Department of Agriculture Forest Service Scoping Notice White Mountain National Forest February 2011 For Information Contact: Jenny Burnett White Mountain

More information

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture

Proposed Action. Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties. United States Department of Agriculture United States Department of Agriculture Forest Service January 2012 Proposed Action Payette National Forest Over-Snow Grooming in Valley, Adams and Idaho Counties Payette National Forest Valley, Adams

More information

White Mountain National Forest. Rumney Rocks Project Supplemental Environmental Assessment. 30-day Comment Report

White Mountain National Forest. Rumney Rocks Project Supplemental Environmental Assessment. 30-day Comment Report White Mountain National Forest United States Department of Agriculture Forest Service Rumney Rocks Project Supplemental Environmental Assessment Eastern Region Town of Rumney, Grafton County, NH 30-day

More information

White Mountain National Forest. Campton Day Use Area Development Project. Scoping Report. Prepared by the Pemigewasset Ranger District May 2013

White Mountain National Forest. Campton Day Use Area Development Project. Scoping Report. Prepared by the Pemigewasset Ranger District May 2013 White Mountain National Forest Campton Day Use Area Development Project United States Department of Agriculture Forest Service Eastern Region Towns of Thornton and Campton, Grafton County, NH Scoping Report

More information

Decision Memo Ice Age Trail Improvement (CRAC 37)

Decision Memo Ice Age Trail Improvement (CRAC 37) Decision Memo Ice Age Trail Improvement (CRAC 37) U.S. Forest Service Chequamegon-Nicolet National Forest, Medford-Park Falls Ranger District Taylor County, Wisconsin T32N, R2W, Town of Grover, Section

More information

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation for Salt Lake County, Utah Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 1. Background The present location of the Desolation Trail (#1159) between Mill D and Desolation Lake follows old

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950 Date: February 26,

More information

Tracy Ridge Shared Use Trails and Plan Amendment Project

Tracy Ridge Shared Use Trails and Plan Amendment Project Tracy Ridge Shared Use Trails and Plan Amendment Project Scoping Document Forest Service Allegheny National Forest Bradford Ranger District McKean, County, Pennsylvania In accordance with Federal civil

More information

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit USDA Forest Service Mississippi Bluffs Ranger District, Shawnee National Forest Jackson and Union Counties, Illinois Proposed Action

More information

Buford / New Castle Motorized Trail

Buford / New Castle Motorized Trail Buford / New Castle Motorized Trail Rifle Ranger District, White River National Forest Garfield County, Colorado Comments Welcome The Rifle Ranger District of the White River National Forest welcomes your

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950

More information

BACKGROUND DECISION. Decision Memo Page 1 of 6

BACKGROUND DECISION. Decision Memo Page 1 of 6 DECISION MEMO DEVIL S ELBOW BY-PASS, BOUNDARY TRAIL NO.1 U.S. FOREST SERVICE T9N, R7E, SECTION 9 RANGE 5E COWLITZ COUNTY WA MOUNT ST. HELENS NATIONAL VOLCANIC MONUMENT, GIFFORD PINCHOT NATIONAL FOREST

More information

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture United States Department of Agriculture Forest Service Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 6944 South 3000 East Salt Lake City, UT 84121 801-733-2660 File Code: 1950/2300 Date:

More information

Sawtooth National Forest Fairfield Ranger District

Sawtooth National Forest Fairfield Ranger District United States Department of Agriculture Forest Service Sawtooth National Forest Fairfield Ranger District P.O. Box 189 Fairfield, ID. 83327 208-764-3202 Fax: 208-764-3211 File Code: 1950/7700 Date: December

More information

Crystal Lake Area Trails

Crystal Lake Area Trails Lake Area Trails Welcome to the Lake area of the Big Snowy Mountains! This island mountain range in central Montana features peaks reaching to 8,600 feet and long, high ridges from which vistas of the

More information

White Mountain National Forest Androscoggin and Evans Notch Ranger Districts

White Mountain National Forest Androscoggin and Evans Notch Ranger Districts United States Department of Agriculture Forest Service White Mountain National Forest Androscoggin and Evans Notch Ranger Districts 300 Glen Road Gorham, NH 03581-1399 Comm: (603) 466-2713 TTD: (603) 466-2856

More information

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**:

Theme: Predominately natural/natural appearing; rustic improvements to protect resources. Size*: 2,500 + acres Infrastructure**: Recreation Opportunity Spectrum (ROS) Classes The Recreation Opportunity Spectrum (ROS) provides a way to describe the variations in the degree of isolation from the sounds and influences of people, and

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

Buffalo Pass Trails Project

Buffalo Pass Trails Project Buffalo Pass Trails Project Hahns Peak/Bears Ears Ranger District, Medicine Bow-Routt National Forests and Thunder Basin National Grassland Routt County, Colorado T6N 83W Sections 3-5, 8; T6N 84W Sections

More information

Resolution Shelter Removal and Site Plan Sargents Purchase Coos County, New Hampshire

Resolution Shelter Removal and Site Plan Sargents Purchase Coos County, New Hampshire United States Department of Agriculture Forest Service April 2011 Resolution Shelter Removal and Site Plan Sargents Purchase Coos County, New Hampshire Scoping Report Prepared By Saco Ranger District,

More information

Hiawatha National Forest St. Ignace Ranger District. File Code: 1950 Date: August 5, 2011

Hiawatha National Forest St. Ignace Ranger District. File Code: 1950 Date: August 5, 2011 United States Department of Agriculture Forest Service Hiawatha National Forest St. Ignace Ranger District W1900 West US-2 St. Ignace, MI 49781 906-643-7900 File Code: 1950 Date: August 5, 2011 Dear National

More information

White Mountain National Forest

White Mountain National Forest White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Batchelder Brook and Guinea Pond Snowmobile Bridges Decision Memo Batchelder Brook/Guinea Pond Snowmobile

More information

Alternative 3 Prohibit Road Construction, Reconstruction, and Timber Harvest Except for Stewardship Purposes B Within Inventoried Roadless Areas

Alternative 3 Prohibit Road Construction, Reconstruction, and Timber Harvest Except for Stewardship Purposes B Within Inventoried Roadless Areas Roadless Area Conservation FEIS Summary Table S-1. Comparison of Key Characteristics and Effects by Prohibition Alternative. The effects summarized in this table A would occur in inventoried roadless areas

More information

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event Decision Memo 2015 Sun Valley Super Enduro & Cross-Country Mountain Bike Race Recreation Event USDA Forest Service Ketchum Ranger District, Sawtooth National Forest Blaine County, Idaho Background The

More information

Fremont Point Cabin Reconstruction and Expansion Project Project Proposal & Public Scoping Documentation

Fremont Point Cabin Reconstruction and Expansion Project Project Proposal & Public Scoping Documentation Fremont Point Cabin Reconstruction and Expansion Project Fremont-Winema National Forests Silver Lake Ranger District The Silver Lake Ranger District of the Fremont-Winema National Forests is proposing

More information

WORKSHEET 1 Wilderness Qualities or Attributes Evaluating the Effects of Project Activities on Wilderness Attributes

WORKSHEET 1 Wilderness Qualities or Attributes Evaluating the Effects of Project Activities on Wilderness Attributes WORKSHEET 1 Wilderness Qualities or Attributes Evaluating the Effects of Project Activities on Wilderness Attributes Date: 3/7/2017 Roadless Area: Ruby South Description of Project Activity or Impact to

More information

Cascade River State Park Management Plan Amendment

Cascade River State Park Management Plan Amendment This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Cascade River State

More information

Proposed Action Kaibab Campground Capital Improvement Project September 2008

Proposed Action Kaibab Campground Capital Improvement Project September 2008 Background Kaibab Campground Capital Improvement Project September 2008 The Williams Ranger District of the Kaibab National Forest is proposing to improve the Kaibab Lake Campground. Kaibab Lake Campground

More information

Kelly Motorized Trails Project Proposed Action

Kelly Motorized Trails Project Proposed Action Kelly Motorized Trails Project Proposed Action November 28, 2011 The Flagstaff Ranger District of the Coconino National Forest is seeking public input on the proposed Kelly Motorized Trails Project (formerly

More information

Chattahoochee- Oconee National Forests. Decision Memo

Chattahoochee- Oconee National Forests. Decision Memo Page 1 of 6 USDA Forest Service Chattahoochee- Oconee National Forests Decision Memo Chattahoochee-Oconee National Forests Home Page Recreation Information Forest History Forest Facts Forest Management

More information

Silver Creek Plunge Campground Reconstruction

Silver Creek Plunge Campground Reconstruction Silver Creek Plunge Campground Reconstruction PROPOSED ACTION REPORT Emmett Ranger District Boise National Forest 1805 Highway 16, Room 5 Emmett, Idaho 83617 November 2009 Silver Creek Plunge Campground

More information

Recreation Opportunity Spectrum for River Management v

Recreation Opportunity Spectrum for River Management v Recreation Opportunity Spectrum for Management v. 120803 Introduction The following Recreation Opportunity Spectrum (ROS) characterizations and matrices mirror the presentation in the ROS Primer and Field

More information

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended

APPLICATION FOR SITE DEVELOPMENT PLAN LETTER OF INTENT Amended Est. 1982 Est. 1982 Urban Planning Community Design Landscape Architecture 731 North Weber Street, Suite 10, Colorado Springs, CO 80903, 719 633-9700 http://www.gumanltd.com/ Members American society of

More information

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts September 30, 2016 Superintendent Yosemite National Park Attn: Wilderness Stewardship Plan P.O. Box 577 Yosemite, CA 95389 RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan,

More information

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) Part 7 General Regulations Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10) 61.1 A comprehensive site plan shall be provided to the satisfaction of the Development Authority that shows

More information

Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011

Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011 Fossil Creek Wild & Scenic River Comprehensive River Management Plan Forest Service Proposed Action - details March 28, 2011 Primary Goals of the Proposed Action 1. Maintain or enhance ORVs primarily by

More information

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa This document is scheduled to be published in the Federal Register on 02/26/2014 and available online at http://federalregister.gov/a/2014-04061, and on FDsys.gov DEPARTMENT OF THE INTERIOR 4312-FF NATIONAL

More information

Planning Grazing. Pasture Planning. Fencing for Grazing Systems. High Tensile. High Tensile. High Tensile 3/31/2014. water, and paddocks

Planning Grazing. Pasture Planning. Fencing for Grazing Systems. High Tensile. High Tensile. High Tensile 3/31/2014. water, and paddocks Planning Grazing Systemsfencing, water, and paddocks Dan Ludwig NRCS Grazing Specialist- SE PA Natural Resources Conservation Service Berks County Grazing School Fencing Perimeter Paddock Alleyway Water

More information

RECREATION. Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area.

RECREATION. Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area. RECREATION Seven issues were identified that pertain to the effects of travel management on outdoor recreation within portions of the project area. OPPORTUNITIES FOR SOLITUDE / QUIET TRAILS. One attraction

More information

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project

Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project Description of the Proposed Action for the Big Creek / Yellow Pine Travel Plan (Snow-free Season) and Big Creek Ford Project Payette National Forest Krassel Ranger District Valley and Idaho Counties, Idaho

More information

Continental Divide National Scenic Trail Legislative History and Planning Guidance

Continental Divide National Scenic Trail Legislative History and Planning Guidance Continental Divide National Scenic Trail Legislative History and Planning Guidance Legislation, Policy, and Direction Regarding National Scenic Trails The National Trails System Act, P.L. 90-543, was passed

More information

Daisy Dean Trail 628/619 ATV Trail Construction

Daisy Dean Trail 628/619 ATV Trail Construction Background and Purpose and Need The Daisy Dean ATV Trail Construction Project is located in the Little Belt Mountains, Musselshell Ranger District, Lewis and Clark National Forest approximately 32 miles

More information

DECISION MEMO For Bullis Hollow Trail

DECISION MEMO For Bullis Hollow Trail I. DECISION TO BE IMPLEMENTED A. Description of Decision DECISION MEMO For Bullis Hollow Trail USDA Forest Service, Eastern Region 9 Allegheny National Forest Bradford Ranger District Corydon Township

More information

USDA Forest Service Deschutes National Forest DECISION MEMO. Round Lake Christian Camp Master Plan for Reconstruction and New Facilities

USDA Forest Service Deschutes National Forest DECISION MEMO. Round Lake Christian Camp Master Plan for Reconstruction and New Facilities USDA Forest Service Deschutes National Forest DECISION MEMO Round Lake Christian Camp Master Plan for Reconstruction and New Facilities Jefferson County, Oregon T. 13 S., R. 8 E., Section 16, W.M. Background:

More information

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction Page 1 of 6 Background DECISION MEMO USDA Forest Service Jefferson Ranger District Jefferson County, Montana Rawhide Trail #7073 is located in the Elkhorn Mountain Range approximately 10 miles east of

More information

National Forests and Grasslands in Texas

National Forests and Grasslands in Texas United States Department of Agriculture Forest Service National Forests and Grasslands in Texas Sam Houston NF 394 FM 1375 West New Waverly, Texas 77358 Phone 936-344-6205 Dear Friends, File Code: 1950

More information

GREENWOOD VEGETATION MANAGEMENT

GREENWOOD VEGETATION MANAGEMENT APPENDIX G GREENWOOD VEGETATION MANAGEMENT PROJECT RECREATION RESOURCE REPORT Prepared by: Laurie A. Smith Supervisory Forester Stearns Ranger District Daniel Boone National Forest August 4, 2016 The

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

Camper Cabins in National Forest Campgrounds. Jon Benson Recreation Specialist USDA Forest Service Superior National Forest

Camper Cabins in National Forest Campgrounds. Jon Benson Recreation Specialist USDA Forest Service Superior National Forest Camper Cabins in National Forest Campgrounds Jon Benson Recreation Specialist USDA Forest Service Superior National Forest Superior National Forest The Superior National Forest is known locally, regionally,

More information

b. Minimum Site Area. Recreational vehicle parks shall be located on a parcel of land not less than 3 acres in area.

b. Minimum Site Area. Recreational vehicle parks shall be located on a parcel of land not less than 3 acres in area. 6450 RECREATIONAL VEHICLE PARK REGULATIONS 6450 TITLE AND PURPOSE. The provisions of Section 6450 through 6499, inclusive, shall be known as the Recreational Vehicle Park Regulations. The purpose of these

More information

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS CHAPTER III Trail Design Standards, Specifications & Permits This chapter discusses trail standards, preferred surface types for different activities, permits, and other requirements one must consider

More information

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM Backcountry Trail Flood Rehabilitation A June 2013 Flood Recovery Program Summary In June 2013, parts of Southern Alberta were devastated from significant

More information

Memo. Board of County Commissioners. FROM: Tamra Allen, Planner. Buford/New Castle Motorized Trail. Date: February 13, 2012

Memo. Board of County Commissioners. FROM: Tamra Allen, Planner. Buford/New Castle Motorized Trail. Date: February 13, 2012 Memo TO: Board of County Commissioners FROM: Tamra Allen, Planner RE: Buford/New Castle Motorized Trail Date: February 13, 2012 Overview The White River National Forest Rifle District Office ( RDO ) issued

More information

Accessibility Guidelines for Outdoor Recreation and Trails

Accessibility Guidelines for Outdoor Recreation and Trails Accessibility Guidelines for Outdoor Recreation and Trails Association of Conservation Engineers September 17, 2007 Accessibility Guidelines for Outdoor Recreation and Trails Access Board is the independent

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through

Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through Understanding the caring capacity of the visitor experience Provide facilities to support a high level user experience Address visual quality through recreation ecological restoration opportunities Collaboration

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project

DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project USDA FOREST SERVICE Rocky Mountain Region (R2) Shoshone National Forest Wapiti and Greybull Ranger District Park County, Wyoming Background

More information

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan SUMMER VILLAGE OF SILVER SANDS Municipal Development Plan Bylaw 253-2014 Adopted August 22, 2014 Summer Village of Silver Sands Municipal Development Plan Bylaw No. 253-2014 Page 2 1 INTRODUCTION 1.1 SETTING

More information

482 :fi6 D34 --' v.i9 ~

482 :fi6 D34 --' v.i9 ~ '- SB 482 :fi6 D34 --' v.i9 ~ This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp

More information

Dungeness Recreation Area County Park Master Plan

Dungeness Recreation Area County Park Master Plan Dungeness Recreation Area County Park Public Outreach Meeting October 10, 2007 Project Overview USFWS Site Dungeness Recreation Area County Park Meeting Objectives: Re-Introduce project; provide status

More information

Tahoe National Forest Over-Snow Vehicle Use Designation

Tahoe National Forest Over-Snow Vehicle Use Designation Tahoe National Forest Over-Snow Vehicle Use Designation USDA Forest Service Tahoe National Forest February 20, 2015 Introduction The Forest Service, U.S. Department of Agriculture will prepare an Environmental

More information

Coronado National Forest Santa Catalina Ranger District

Coronado National Forest Santa Catalina Ranger District United States Department of Agriculture Forest Service Coronado National Forest Santa Catalina Ranger District File Code: 1950 Date: October 14, 2015 Dear Interested Party: The Santa Catalina Ranger District

More information

Appalachian Mountain Club

Appalachian Mountain Club Appalachian Mountain Club June 3, 2013 Town of Alexandria Board of Selectmen 47 Washburn Road Alexandria, NH 03222 Re: Appalachian Mountain Club s comments on EDP Renewables building permit application

More information

PURPOSE AND NEED. Introduction

PURPOSE AND NEED. Introduction Public Scoping: Allocation of Recreation Capacity for Commercial Outfitter Guide Services on North Kruzof Island Trails (Kruzof Island Outfitter Guide) PURPOSE AND NEED Introduction The U.S. Department

More information

PROPOSED PARK ALTERNATIVES

PROPOSED PARK ALTERNATIVES 8 Chimne y Rock State Park M a ster Pl an 2011 PROPOSED PARK ALTERNATIVES Introduction Three different park development concepts were prepared and presented to the citizens of North Carolina through a

More information

West Zone Campground Development

West Zone Campground Development CHAPTER 1 PURPOSE AND NEED 1.1 Introduction Chapter 1 describes the purpose and need for the proposed recreation enhancements at Whiteface, Cadotte, Pfeiffer, and Birch Lake Campgrounds. Chapter 1 also

More information

DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS

DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS Date: October 19, 2009 DRAFT FINAL ACCESSIBILITY GUIDELINES FOR OUTDOOR DEVELOPED AREAS Introduction Background Whom Guidelines Apply To How to Submit Comments Contact for Further Information General Issues:

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township:

2. Goals and Policies. The following are the adopted Parks and Trails Goals for Stillwater Township: D. PARKS AND TRAILS 1. Introduction Stillwater Township s population is relatively low, with most residents living on rural residences on large lots. The need for active park space has been minimal in

More information

Ottawa National Forest Supervisor s Office

Ottawa National Forest Supervisor s Office United States Department of Agriculture Forest Service Supervisor s Office E6248 US2 Ironwood, MI 49938 (906) 932-1330 (906) 932-0122 (FAX) File Code: 1950/2350 Date: April 11, 2012 Dear Friends of the,

More information

Decision Memo for Philmont Scout Ranch Bike Trail and Access Reroute Project

Decision Memo for Philmont Scout Ranch Bike Trail and Access Reroute Project Decision Memo Philmont Scout Ranch Bike Trail and Access Reroute Project USDA Forest Service, Southwestern Region Questa Ranger District, Carson National Forest Colfax County, New Mexico (T. 30N, R. 17E,

More information

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement.

Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS. Notice of intent to prepare an Environmental Impact Statement. [3411-15-P] DEPARTMENT OF AGRICULTURE Forest Service Angeles National Forest; Los Angeles County, CA Williamson Rock/Pacific Crest National Scenic Trail (PCT) Project EIS AGENCY: ACTION: Forest Service,

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

Glacial Lakes State Park Management Plan Amendment Camper Cabin Development

Glacial Lakes State Park Management Plan Amendment Camper Cabin Development Glacial Lakes State Park Management Plan Amendment Camper Cabin Development Minnesota Department of Natural Resources Division of Parks and Recreation November 2006 Glacial Lakes State Park Management

More information

Sibley LUPA. Board Executive Committee Meeting December 7, 2017

Sibley LUPA. Board Executive Committee Meeting December 7, 2017 Sibley LUPA Board Executive Committee Meeting December 7, 2017 Project Location & Project Area 1,318-acre Robert Sibley Volcanic Regional Preserve Project Area Purpose Project Purpose & Goals Append the

More information

Wilderness Stewardship Plan Scoping Newsletter Winter 2013

Wilderness Stewardship Plan Scoping Newsletter Winter 2013 Olympic National Park National Park Service U.S. Department of the Interior Wilderness Stewardship Plan Scoping Newsletter Winter 2013 Dear Friends and Neighbors, The Olympic Wilderness was established

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions Proposal to Redevelop Lower Kananaskis River-Barrier Lake Bow Valley Provincial Park Frequently Asked Questions What is being proposed? What are the details of the proposal? Where is the project area located?

More information

DECISION MEMO Whetstone Ridge Trail #8020 Relocation

DECISION MEMO Whetstone Ridge Trail #8020 Relocation Page 1 of 7 Background DECISION MEMO Whetstone Ridge Trail #8020 Relocation USDA Forest Service Pintler Ranger District Granite County T4N, R16W, Sections 4,9,29 and T4N, R17W, Section 36 Whetstone Ridge

More information

Understanding user expectations And planning for long term sustainability 1

Understanding user expectations And planning for long term sustainability 1 Understanding user expectations And planning for long term sustainability 1 What is a natural surface trail? It can be as simple has a mineral soil, mulched or graveled pathway, or as developed as elevated

More information

White Mountain National Forest

White Mountain National Forest White Mountain National Forest United States Department of Agriculture Forest Service Eastern Region Moat Mountain Trail System Project Environmental Assessment Saco Ranger District September 2010 For

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David David Johnson From: Sent: To: Cc: Subject: Attachments: David Johnson Tuesday, April 12, 2011 4:33 PM Thomas Malecek Dave Dyer; Jason Marks (jmarks@segroup.com) VWC Scoping Letter

More information

Non-motorized Trail Plan & Proposal. August 8, 2014

Non-motorized Trail Plan & Proposal. August 8, 2014 Town of Star Valley Ranch, Wyoming and the Star Valley Ranch Association in partnership with the USDA Forest Service, Bridger-Teton National Forest, Greys River Ranger District Non-motorized Trail Plan

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

Connie Rudd Superintendent, Black Canyon of the Gunnison National Park

Connie Rudd Superintendent, Black Canyon of the Gunnison National Park National Park Service U.S. Department of the Interior Black Canyon of the Gunnison National Park and Curecanti National Recreation Area Information Brochure #1 Wilderness and Backcountry Management Plan

More information

Thank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan.

Thank you for this third opportunity to comment on the proposed revisions to the Coconino National Forest Management plan. March 19, 2014 Flagstaff Biking Organization PO Box 23851 Flagstaff, AZ 86002 Vern Keller Coconino National Forest Attn: Plan Revision 1824 South Thompson Street Flagstaff, Arizona 86001 coconino_national_forest_plan_revision_team@fs.fed.us

More information

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

1803 West Hwy 160 Monte Vista, CO (719) TTY (719) USDA Forest Service Rio Grande National Forest http://www.fs.fed.us/r2/riogrande 1803 West Hwy 160 Monte Vista, CO 81144 (719)852-5941 TTY (719)852-6271 USDI Bureau of Land Management San Luis Valley Center

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R

Cultural Resource Management Report Deer Valley 4wd Restoration and Blue Lakes Road Maintenance Project R Cultural Resource Management Report R2015-05-03-10005 Undertaking Description: The proposes to perform road maintenance and meadow restoration on the Deer Valley 4wd trail and road maintenance on the Blue

More information

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012 Background As part of Mass Audubon s mission to preserve the nature of Massachusetts for people and

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information