5 Investment Strategy

Size: px
Start display at page:

Download "5 Investment Strategy"

Transcription

1 5 Investment Strategy This chapter starts by considering the investment strategies that address congestion management and mobility. It then looks at how these work alongside capacity expansion in the various parts of the Valley. The chapter concludes with project lists and maps that define the regional strategic investments included in the RTP. It must be noted that the regionally significant investments are supported be a whole range of other investments in the local roadway system that are important to local movement and provide essential connections for accessing major roads and highways. The Local System The Las Vegas region is fortunate in having a strong local commitment to transportation funding which, while it falls short of what is needed, it is able to support considerable improvement to the local transportation network. These local investments include improvements to the local street network funded under the Clark County Gas Tax. This gas tax is supplemented by funding under the High-Speed Lane-Mile program established under the 2002 Question 10 Sales Tax initiative. The priority with these funds is to complete the basic grid system to a standard fouror six-lane roadway configuration. These tax-based funds are supplemented by a very substantial investment of private developer funding for the completion of the basic street network as an adjunct to residential and commercial development. Total investment in these locally funded street improvements over the RTP period is expected to be around $ 2.3 billion. Locally funded projects are listed in the overall Transportation Capital Program as set out in Appendix 1. Investment Strategy Meets Objectives: 5.1, 5.2, 5.3, 5.4, 5.5, & 5.6 System Maintenance In the discussion of maintenance needs in Chapter 3, it was noted that the system is mostly in good repair and that current revenues are adequate to enable NDOT and the local jurisdictions to keep pace with maintenance needs. There are places where it is evident that roadways will need major repairs or even reconstruction. Wherever possible, this is being folded into other projects that are planned. An example of this is I-15 north. NDOT recognized several years ago that the older part of this road north of downtown was deteriorating and would need to be rebuilt. Recognizing that the road also needed widening, NDOT decided to give high priority to a project that would both reconstruct the roadway and add badly needed capacity. Similarly it is intended to undertake major reconstuction of parts of I-15 south and I-515 as part of future expansion plans identified in the RTP. Two major bridge projects are similarly justified by the need to replace old and deteriorating facilities and to add capacity. The Hoover Dam bypass addresses maintenance issues as well capacity limitations and security concerns on the old, winding route across the dam itself. In the south of Clark County, the Davis Dam road was closed, again for a mix of maintenance and security reasons, and a funding for a new river crossing is identified in the RTP. Apart from these routes, bridge maintenance is not a major issue in the area, although the need to provide adequately for infrequent but serious flash flooding is a significant issue in the design of many projects. This is not so much a maintenance issue as it is a question of design, with the potential for emergency reconstruction if existing structures fail under extreme conditions. Most other major routes are still fairly new and therefore specific maintenance activities have not been identified. If unanticipated problems emerge, the RTC, NDOT, and the local agencies will work to adjust priorities accordingly. In some cases, such as the Las Vegas Beltway program, long-term funding is not being fully committed to capital improvements in recognition of the potential need to allocate additional funding to maintenance needs. REGIONAL TRANSPORTATION PLAN

2 Major investment in the FAST system will focus on the regional freeway network, supplemented by the interconnection of signals on major arterial streets. In addition, NDOT will maintain its commitment to freeway operations management and the Motorist Assist freeway service patrol. The first major investment in FAST technology has been on I-15 through the resort corridor. The interstate FAST system is being extended along US 95 north to the beltway and on I-15 north to Craig Rd, now under construction. The next priorities for the FAST program are: w I-215 and Lake Mead Pkwy from Green Valley Pkwy. to Boulder Hwy. w Rancho Dr. from Sahara Ave. to Rainbow Blvd. w Durango Dr. from CC 215 to Desert Inn Rd. w Tropicana Ave. from Rainbow Blvd. to Las Vegas Blvd. w I-515 from I-215 to Charleston Blvd. FAST infrastructure may also be installed as part of other funded roadway improvements, such as those on the CC 215 Beltway. Longer term priorities for the FAST program include: Figure 5-1 : FAST Projects As discussed in the next chapter, routine maintenance is generally funded through specific sources or as definded set-asides within other programs. These commitments and set-asides have been allowed for in determining how much funding is available to support the capital improvement program. Managing Congestion The Freeway and Arterial System of Transportation (FAST) System The most effective way of increasing the capacity of the system in congested areas is through the optimization of traffic signals. FAST will continue to develop and improve the technology of signal timing and other ITS operations on the established arterial roadway system. w I-15 from St. Rose Pkwy. to I-215 w US 93 from Boulder City to I-515 w I-15 from the California State Line to St. Rose Pkwy. w US 95 from Durango Dr. to Kyle Canyon Rd. w I-15 from Craig Rd. to Apex These projects are consistent with the available funding but longer term projects are included in the plan in general terms rather than as specific line items. This allows for flexibility in subsequent prioritization and project development. Investments in these corridors include new or upgraded fiber optic communications, traffic monitoring cameras, dynamic message signs, ramp metering at selected locations, and electronic vehicle counting. FAST also plans an expansion in the coverage of traffic monitoring cameras on the (See Figure 5-1.) 78 REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

3 Managing Congestion Carpool Lanes, Park and Ride, and Express Transit Carpool lanes, park and ride lots, and express transit services are important tools to encourage drivers to carpool or use transit, by providing a faster, more reliable alternative to being slowed down and inconvenienced by worsening congestion. NDOT has developed a Regional High-Occupancy Vehicle Lane (HOV) Plan which provides a framework for the development of a long-term regionwide system of carpool and managed lanes. This Regional HOV Plan is included for information as one of the supporting documents for the RTP. Many elements of this system are to be built as part of funded roadway projects. RTC is supporting this system with a network of Park and ride lots. (See Figure 5-2) RTC also promotes carpooling and corporate vanpooling through its Club Ride program and other Transportation Demand Management activities. Express transit service is being planned to utilize the carpool lanes to improve travel times and transit reliability. The northwest portion of the Las Vegas Valley first experienced substantial suburban growth during the 1980 s and 1990 s. Development in this portion now extends over 12 miles outward from downtown Las Vegas. A commute from the suburbs to the Las Vegas Strip via US 95 and I-15 is approximately 20 miles. This corridor will see additional growth in future. These factors make US 95 an attractive corridor for carpool lanes and express transit. The first investment in carpool lanes in this region has been made as part of the recently completed improvements on US 95 west of downtown Las Vegas. The next priorities are to build upon this investment to establish a carpool lane network connecting the northwest suburban areas to downtown Las Vegas and the northern end of the Las Vegas Strip via I-15. This network includes dedicated HOV ramps between major routes, as well as direct access ramps to allow HOV traffic to by-pass congested freeway intersections. The northwest HOV network will be supported by park and ride lots at key locations. Figure 5-2 : Park and Ride/HOV Projects Funded HOV and related investments in the northwest corridor are: w US 95 from Rainbow Blvd. to Durango Dr. w Summerlin Pkwy.from Rampart Blvd. to US 95 w Direct HOV ramps between Summerlin Pkwy. and US 95 w Direct HOV ramps between US 95 and I-15 w HOV-only access on US 95 at Elkhorn Rd. w HOV-only access on I-15 at Oakey Blvd. w Park and ride lots at: US 95 and Durango Dr. w Westcliff near Summerlin Pkwy. w US 95/Kyle Canyon area (site to be determined) RTC Transit is planning to introduce express transit service in the US 95 corridor after the first park and ride is open in REGIONAL TRANSPORTATION PLAN

4 Another corridor with high long-term potential for HOV is I-15 South. The area south of the Clark County Beltway did not develop as early on as the northwest suburbs, and much of the growth that has occurred feeds into routes such as Blue Diamond Road and the southern part of the Clark County Beltway. Current commuting distances on I-15 itself are too short for drivers or transit vehicles to derive much benefit from carpool lanes. In the future, that is expected to change. Carpool lanes are also envisaged as part of long-term widening of I-515 between Henderson and downtown Las Vegas. NDOT has recently committed to adding express lanes to I-15 in the Resort Corridor so that through traffic can by-pass the congested weaving segments adjacent to the Strip. The Regional HOV Plan envisions that these express lanes could be converted into carpool operations as part of long term expansion of I-15. NDOT s Regional HOV Plan also identified longterm needs for carpool lanes along segments of the Beltway, but these are both dependent upon major road improvements for which funding cannot be identified at this time. HOV lanes are not included in the current design for the widening of I-15 north from the Spaghetti Bowl to Craig Road. It is possible additional lanes could be added later to provide HOV facilities if demand justifies this. Planning and site identification for park and ride facilities to serve additional transportation corridors is under way. Priority locations, not all of which have sites identified, include: w Near I-15 and Sloan Rd. (site to be determined) w I-15 and St. Rose Pkwy. w Las Vegas Blvd. and Bruner Ave. w I-15 and Silverado Ranch Blvd. w Sites to be identified along Blue Diamond Rd. w I-15 and Speedway Blvd. w US 93/95 in the Railroad Pass area (site to be determined) The park and ride program is consistent with the available funding but longer term projects are included in the RTP in general terms rather than as specific line items. This allows for flexibility in subsequent prioritization and project development. Additional express transit routes will be added as the HOV system is implemented and the supporting park and rides are developed. Making Transit Faster and More Convenient The long term vision of transit in the Las Vegas Valley involves overlaying the current RTC bus route grid with a complementary system of BRT and express routes. These innovations will provide faster and more reliable travel alternatives while exploiting the flexibility of transit-based systems to provide maximum accessibility, connectivity, and convenience. Short-term improvements and service revisions will be designed to move the transit system toward this long-term vision. 80 REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

5 Maintaining the Transit System Projected resources allow for the maintenance of the existing transit system as well as limited expansion of service where this is a cost-effective way of meeting demand. The RTP includes several capital expenditures related to the basic transit system: w A new transit center to serve downtown Las Vegas; w Completion of the Sunset Maintenance Facility; w Replacement of buses as they reach the end of their service life; and w Allowance for future rehabilitation of transit centers and maintenance facilities. RTC has to maintain the ADA Paratransit system. With a large and growing population of retirees, the demand on this system has been increasing and is expected to increase at a faster rate in the future. To keep to federally mandated standards of service, the fleet of paratransit vans will have to be increased. The RTP includes: w Replacement of paratransit vans as they reach the end of their service life; w Expansion of the paratransit fleet; and w Addition of vehicles designed to meet the special needs of the senior population. Bus Rapid Transit RTC intends to build upon the success of its initial BRT line by adding bus lanes in several key corridors and by constructing stations and other amenities to extend BRT in mixed traffic operations where dedicated lanes cannot be created. Funded investments include: w Downtown Connector in Downtown Las Vegas w Enhancements to shelters on the Las Vegas Blvd. Strip. w BRT on Boulder Hwy., partially in dedicated lanes and partly in mixed traffic. w Creation of dedicated lanes as part of the North 5th St. project. w Provision of BRT stations on North 5th St. and on Las Vegas Blvd. South between SR 146 and the Strip. Recent studies have recommended BRT in several additional corridors. Since funding is not currently identified, they are shown in the RTP as unfunded needs: w Rancho Dr. w Maryland Pkwy. w Sahara Ave. w Flamingo Rd. w Las Vegas Blvd. South between Sloan and SR 146, as well as a loop to serve proposed developments in the western part of Henderson. Other corridors may be considered, and the RTC is currently considering the optimal balance between BRT operations and the development of the express network. REGIONAL TRANSPORTATION PLAN

6 Express Transit RTC has recently decided that express transit offers the most practicable and cost-effective way of making transit more competitive with auto travel in the Las Vegas area. The key element for a successful express operation is to be able to operate in fast and uncongested right-of-way. Until the concept has proved itself, RTC will develop routes that can take advantage of the investment that NDOT is making in creating a regional network of carpool lanes. The first express service will be introduced in 2009 in the US 95 corridor into downtown Las Vegas. Other services may be introduced as carpool lanes and associated park and ride lots are developed: w Summerlin Parkway to downtown Las Vegas w Through operations to the north end of the Las Vegas Strip via the carpool connector to I-15 and the direct access ramps at Alta Dr. w Through operations to the City Center development and the south end of the Las Vegas Strip via the carpool connector to I-15 and the direct access ramps at Harmon Ave. w Operations along I-15 south to the Las Vegas Strip via the direct access ramps at Hacienda Dr. It may be that viable express service can be developed on the arterial road network using a mix of dedicated lanes and operational and ITS improvements. However, these ideas are still being looked at and no decisions have been made at this time. In addition to the development of express service within the valley, there is a need for improved transit links between Las Vegas and some of the outlying communities. The RTP, in cooperation with SNTC, envisions development of express services that link the following jurisdictions: w Laughlin and Searchlight with the Las Vegas Valley w Mesquite and the Glendale/Logandale area with the Las Vegas Valley Additional service between Pahrump and Las Vegas is under consideration, but is subject to funding by NDOT and/or Nye County. Improving the Quality of the System Transit shelters/stations are important to transit customers. Recognizing existing deficiencies, RTC proposes funding for system-wide improvements, including: w Replacement and upgrading of transit shelters, w Improvements to passenger amenities and security, w Upgrading adjoining sidewalks and pedestrian crosswalks, and w Landscaping or amenity barriers as appropriate. Bicycle and Pedestrian Modal Alternatives Many of the investments needed to improve the bicycle and pedestrian environment will be undertaken as part of local roadway projects and developments, in accordance with the principles discussed in Chapter 3. A particular emphasis is placed on pedestrian and bicycle network improvements, access management to and from arterial roads, and improved access to transit shelters, schools, parks/trails, and neighborhood/commercial areas. Any safety planning and improvements includes emphasis on bicycle and pedestrian elements. Some needed improvements will require supplemental funding under local or federal programs, and these are identified in the RTP: w Development of on-street bicycle facilities. w Bicycle and pedestrian trail maintenance. w Pedestrian realm improvements to be determined through local inter-agency prioritization. 82 REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

7 I-15 A Corridor of the Future I-15 between southern California and Salt Lake City has been designated a Corridor of the Future under a U.S. Department of Transportation initiative to promote innovative national and regional approaches to congestion mitigation on a selected number of multi-state transportation corridors. Among the proposals by NDOT, the RTC and their partner agencies in Southern Nevada under the Corridors of the Future initiative for I-15 are: w Construction of express lanes through the resort corridor as a high priority relief to congestion for through traffic. w Further development of the FAST freeway ITS and operations management system through the Las Vegas urban area. w Inclusion of HOV / managed lanes as part of the concept for future phases of the widening of I-15 between the California state line and the Resort Corridor. w Creation of park and ride lots along the highway both north and south of the urban core. w Development of express commuter transit along the northern leg of I-15 between Mesquite and Las Vegas. The Corridors of the Future initiative encourages agencies to look at new types of solutions to the problem of urban area congestion. NDOT has started to study a number of other projects and funding and policy mechanisms: w A pilot program for roadway reconstruction and rehabilitation to find better ways of reducing the impact on traffic of needed road work. w Upgrades to truck parking and freight transfer facilities. w Enhanced use of ITS and related technologies. w Studies into the applicability of tolling and pricing mechanisms. w Studies of other private sector funding mechanisms. The Eastern Commerce Bypass NDOT is starting to study the feasibility of constructing a commercial by-pass route to the east of the Las Vegas Valley. This proposal faces substantial challenges. A route within the Las Vegas Valley would run the risk of having a negative impact on established neighborhoods. A by-pass further east would impinge upon the western boundary of the Lake Mead National Recreation Area and other environmentally sensitive lands. If these challenges can be avoided or mitigated, then this concept of an eastern by-pass to the valley has great promise as a means of improving inter-state commerce and reducing conflicts between commercial, tourist and residential travel within the urban area. Regional Strategies: The Resort Corridor The Resort Corridor is the 30-square mile area that is centered on the Las Vegas Strip and extends from downtown Las Vegas to the new resorts and commercial developments being built south of the beltway. It includes the Las Vegas Convention Center, several near-strip resorts, McCarran International Airport, and University of Nevada, Las Vegas campus. It is also the site of where most of the severe and persistent congestion in the Las Vegas Valley exists. Except for I-15, the scope to add new roadway capacity anywhere in this area is limited by the density of development and the cost of land. On I-15, there is scope to widen the road within existing right-of-way, although NDOT estimates it will cost well over $2 billion to accomplish what is needed. Even with the enhanced revenues assumed by NDOT, it will be late in the plan period before many of the projects on I-15 can be implemented. REGIONAL TRANSPORTATION PLAN

8 A key element of the strategy for I-15 is the creation of carpool lanes and access ramps throughout the corridor: w Carpool lane connector with US 95 and direct access ramps at Oakey Blvd. w I -15 Express Lanes from Russell to Sahara, to be subsequently converted into carpool lanes with direct access ramps at Harmon Ave. and Hacienda Ave. w Carpool lanes to/from I-15 South w Carpool lane connector with I-215 These are part of a larger program of improvements that includes: w I-15 Project Neon widening of I-15 between Sahara and the Spaghetti Bowl; addition of collector-distributor roads and extended ramps. This includes reconstruction of the Charleston Blvd. interchange and new ramps to Alta Dr. w Further widening of I-15 between I-215 and Sahara to approximately 14 lanes, including collector-distributor roads and braided ramps. This latter is currently under study to determine the optimal ultimate lane configuration for I-15 in the resort corridor, including the role of adjacent roadways and the need to make provision for transit operations. Certain associated road projects are included in the RTP; others will be added once the study is complete and funding identified. The resort corridor contains two of the most intensively used routes in the RTC transit system. Over 30,000 riders a day use the Deuce along the Las Vegas Strip and 13,000 riders use the Maryland Pkwy RTC Transit line. RTC is constructing a BRT line through downtown Las Vegas to the Monorail terminal at Sahara Ave. RTC plans to upgrade bus shelters and to make operational improvements along the Strip. Many of the planned regional express transit routes will utilize the I-15 carpool lanes and direct connector ramps to provide access to key points along the Strip. The Las Vegas Monorail, which is owned and operated by a private company but is open for use by the general public. It provides connections between various resorts on the east side of the Strip and the Convention Center. RTC Transit intends to improve connections to the northern end on the Monorail at Sahara Ave. as part of its BRT and express bus systems. The Monorail Company plans to extend the Monorail to McCarran Airport, which will provide a valuable addition to the route. Major resorts generate high volumes of pedestrian movement along the Strip. Clark County works with the resorts to maintain a high quality pedestrian realm. Starting in the 1990 s, pedestrian over-bridges have been built at many of the major intersections, and more are planned, often in association with new resort and hotel developments. The pedestrian realm concept is now being broadened in include the near Strip resorts as well. Car parking on the Strip is free for both hotel patrons and employees. Meanwhile, employee parking is using up high-value land. The RTC recently worked with the resorts to study the feasibility of providing employee parking at selected off-strip locations, linked to the resorts be either public transit or resort-owned shuttles. This study showed the value of the concept, but as yet the public planning process does not include any specific proposals of this nature. The RTC park and ride program may serve to meet some of these needs and RTC is looking at ways of ensuring that future express transit routes provide good access for employees working on at the Strip properties. A study is under way into the potential for BRT service on Maryland Pkwy., but that project has yet to be defined and is currently unfunded. 84 REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

9 In addition to the I-15 projects, funded resort corridor projects are: w Grade separation of Oakey Blvd. at the UPRR w I-215 improvements at the McCarran Airport connector interchange w RTC Rapid Transit Downtown Connector w LVMC Monorail extension to McCarran Airport w A new downtown transit terminal at Bonneville and Casino Center Dr. w Express bus system development w New Pedestrian bridges over Las Vegas Blvd. at Sahara, Echelon, and City Center and over the UPRR in downtown Las Vegas* w Extension of M.L. King Blvd. across I-15 to connect with Industrial Rd. and widening of Industrial south to Sahara Ave. w Grade separation of Valley View Blvd. to the UPRR and roadway improvements to Harmon Ave. from Valley View Blvd. to UNLV* w Grade separation of Tropicana Ave. at Dean Martin Dr. and widening from Decatur Blvd. to I-15 w Construction of Sunset Rd. across I-15 w Construction of City Pkwy. to connect Grand Central Pkwy. with I-15 at D St.* w Transit center to serve UNLV campus (site to be determined) This list includes some projects - marked (*) - that are not regarded as regionally significant but are included here to give a more comprehensive overview of proposed improvements to be funded by RTC and the local entities. Unfunded needs in the area include: w BRT on Maryland Pkwy. w Valley View Blvd. roadway improvements w Roadway and/or transit improvements on eastwest routes across the Strip, such as Flamingo Rd. and Sahara Ave. Figure 5-3 displays the funded projects listed above. Figure 5-3: Investment Strategy - Resort Corridor REGIONAL TRANSPORTATION PLAN

10 Regional Strategies: US 95 and the northwest US 95 has the first carpool lanes in the region and will see the initial development of express bus service anchored on the new park and ride facility at Durango Dr. Subsequent development of carpool lanes, park and ride and express transit is planned for Summerlin Parkway. The creation of a carpool direct connection to I-15 and the Strip will greatly improve the convenience of the carpool lanes, resulting in higher vehicle occupancy and increased use of transit. In summary, the strategy for the northwest involves: w Widening of US 95 between Washington and SR 157 and the extension of carpool lanes from Washington to Durango Dr. w Widening of Summerlin Pkwy. between the Beltway and US 95 and the addition of carpool lanes from Rampart to US 95 w Carpool lane connectors between US 95 and I-15 at the Spaghetti Bowl and between Summerlin Pkwy. and US 95 w Direct access ramps at Elkhorn Rd. w Park and rides with transit facilities at US 95 and Durango and at Durango and Westcliffe w Express bus service on both US 95 and Summerlin Pkwy., initially to downtown and subsequently to the Las Vegas Strip via I-15 Other plan projects in the northwest include: w New interchange at US 95 and Horse Dr. w Transit facility at Summerlin Town Center A Demonstration Public- Private Partnership for US 95 and the Resort Corridor Although the revenue enhancements assumed by NDOT will allow all of the proposed US 95 and I-15 projects to be implemented, those revenue streams will not come available until at least 2014 and many of these projects will not get built before the end of the plan period. Therefore, NDOT is considering using US 95 and I-15 through the Resort Corridor to demonstrate the potential of public-private partnerships to help meet the challenge of funding transportation improvements. Under this demonstration project, it is envisaged that the planned carpool lanes on US 95 and I-15 would be converted to toll facilities that would be managed as a public-private partnership. Variable pricing would be used to balance demand to the capacity of the lane(s), thus maintaining uncongested travel conditions. Carpool vehicles and transit services would be able to use the lane free of charge. This concept has some legislative support and is consistent with current initiatives at the Federal level. However, both tolling and the necessary electronic fee collection technology would require changes in state law. For these reasons, NDOT has decided it would be premature to include this concept as part of the RTP at this time (summer 2008). The basic infrastructure of the public-private partnership project would essentially be the same as is envisaged in the plan. However, there are differences and the whole idea is to get the projects implemented much sooner than is shown in the plan. If the necessary enabling legislation is passed, RTC will revise the RTP and its air quality conformity finding to reflect the revised operating plan and project schedule. 86 REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

11 Regional Strategies: I-15 South - Gateway to the Las Vegas Valley I-15 between southern California and the Las Vegas Strip is the main route for tourists driving into the Las Vegas Area. The section of interstate from the State Line to the Beltway acts as a gateway to the entire resort and convention industry. The present roadway has three lanes in each direction. South of the urban area is adequate most weekdays, but congestion routinely occurs on holidays and weekends and becomes severe on the southbound lanes on Sunday afternoons. As I-15 enters the urban area, residential commuter traffic is growing rapidly as a result of development in the south part of the valley. In response to these pressures, the RTP envisages a phased approach to adding capacity to the interstate and to promote commuter alternatives. Short term priorities are: w I -15 widening from SR 160 to Tropicana Ave. including collector-distributor roads and new ramps to reduce weaving movements w New interchange at I-15 and Cactus Ave. w Las Vegas Blvd. South widening from St. Rose Pkwy. to Sunset Rd. Longer term funded projects include: w I -15 widening from the California state line to SR 160 w Reconstruction of I -15 from SR 160 to Tropicana Ave. and addition of carpool lanes w FAST deployment on I-15 from the California state line to the Clark County 215 Beltway w Several new or reconstructed interchanges w BRT along Las Vegas Blvd. from St. Rose Pkwy. to the Strip w Park and rides at Sloan, St. Rose Pkwy., and at Bruner The unfunded part of the strategy includes: w Rainbow south extension from Starr Ave. to I-15 w Overpasses across I-15 at intermediate locations REGIONAL TRANSPORTATION PLAN

12 Proposed Ivanpah Airport McCarran International Airport is rapidly approaching capacity, and the Clark County Department of Aviation is proposing to establish a supplemental airport in the Ivanapah Valley, east of I-15 a few miles north of the state line. That proposal is currently in the environmental review process under the National Environment Policy Act (NEPA), and it is hoped the airport will be operational by As part of this, it is proposed to create a new road, parallel to I-15, which would merge with the interstate near Sloan. Funded surface transportation projects associated with the proposed airport are: w New Ivanpah expressway w Service interchange on I-15, primarily for airport employees w Las Vegas Blvd. extension from Jean to the Ivanpah Airport It is anticipated that Ivanpah Airport will use shuttles to connect the airport with high-occupancy service to and from the Las Vegas Strip and other areas. It is recognized that high-capacity transit service will likely be needed at some point as airport traffic grows beyond the initial phase of development. Options are under study, but no transit project is funded in the RTP. Figure 5-4 display the funded projects listed above. Figure 5-4: Investment Strategy - I-15 South 88 REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

13 Rail alternatives Given the density of demand in the I-15 corridor, several studies have identified the value of establishing some form of rail service in the corridor. The most innovative idea is to use this corridor as a US demonstration of magnetic levitation (Maglev) technology. This concept is being advocated by the California-Nevada Super Speed Train Commission, and would involve an entirely new, mostly elevated, route that would provide frequent high-capacity service at speeds of 300 kph (187 miles per hour) or more. The Super Speed Train Commission has received Congressional funding to initiate the NEPA environmental process. An initial segment of such a system could serve to move airline passengers between Ivanpah Airport and the Strip, similar to the system currently in operation in Shanghai. RTC is currently studying this as one of a number of high-capacity transit options that may be needed to serve the Ivanpah airport as the number of airline passengers continues to grow over the next 25 years. Maglev offers high capacity and high performance, and would likely provide a major alternative to both road and short-haul air travel, but involves very high construction costs. To provide an interim alternative to auto travel from southern California, RTC has looked at the potential to develop more conventional highspeed rail service by adding capacity to the existing rail line between Los Angeles and Las Vegas. This could offer a practical and relatively inexpensive option that would provide a useful alternative to travel on I-15, particularly at times of congestion. After some study, it has been concluded that the most effective way to establish the service is to purchase passenger trains and offer the host railroads a premium for accommodating the service that would be partially withheld, if passenger trains are delayed. Federal Railroad Administration funding is expected to be available for the equipment and this is reflected in the RTP: The RTP does not include any funding for construction related to rail alternatives. A private sector group, called Desert Express, is also promoting conventional high speed rail, but their idea is to create a new route, independent of the existing rail line. This would rely on private funding and would provide faster service than possible on the existing rail alignment, although slower than Maglev. Regional Strategies: The Beltway and Beyond The Las Vegas Beltway is being built in three stages. The first, completed in 2003, saw the construction of I-215 between Green Valley and the I-15, with the remainder of the beltway being built as a four-lane, at-grade divided arterial. The second stage involves extending I-215 east to I-515 and the upgrade of the remaining segments to full freeway standards. This stage includes full directional interchanges at I-515, I-15 south, US 95 and I-15 north. This work is progressing well and is expected to be complete by The remaining elements funded in the RTP includes: w Improvements to the I-215 interchange with the Airport Connector w Widening of I-215 between Eastern Ave and I-15 w Widening of CC 215 between I-15 and Charleston Blvd. w Upgrade of CC 215 to freeway between Charleston Blvd. and US 95 w New interchanges at Far Hills Ave. / Summerlin Pkwy., Lake Mead Blvd., Lone Mountain Rd. and Ann Rd. w Upgrade of CC 215 to freeway between US 95 and I-15 w Full directional interchanges at US 95 and I-15 w New interchanges at Jones Blvd., Decatur Blvd., Aliante Pkwy., Revere St., North 5th St., Losee Rd., Pecos Rd., Lamb Blvd. and Range Rd. REGIONAL TRANSPORTATION PLAN

14 The Las Vegas Beltway was designed to allow for eight to ten travel lanes. Four were built as part of the first stage and much of the road will be widened to six main lanes as part of the second stage, with auxiliary lanes and frontage roads in several places as well. The third stage of work would involve widening to the full capacity of the right-of-way, including the potential addition of carpool lanes. Clark County is funding the completion of the second stage by bonding against proceeds from a dedicated development tax. The subsequent repayment schedule will limit the amount of funding available for further improvements for a number of years. Although traffic on the first stage grew much faster than originally anticipated, it is not clear when and in what locations additional widening will become needed. For these reasons, further expansion of the Las Vegas Beltway is not prioritized for funding in the RTP at this time. In the last decade, development has proceeded rapidly in areas adjacent to and beyond the Las Vegas Beltway. The road itself has become the focus for several major commercial and retail developments. One consequence of this is a potential need for more crossing points. Although, the Las Vegas Beltway includes interchanges roughly every mile, experience has shown that congestion can be relieved and accessibility improved if intermediate streets can be connected across the facility. But with a few exceptions, additional overpasses across CC 215 at intermediate locations remain as unfunded needs. Beyond the Beltway the southwest The main concern here is the lack of high-standard connections between CC 215 and the rapidly growing residential areas north and south of SR 160 Blue Diamond Road. A recent study recommended a number of options, of which the most feasible appears to be the improvement of the Fort Apache alignment between SR 160 and the CC 215. (See Figure 5-5.) Most of the other arterial roads in the area are being constructed to the limits of available right of way and the density of development means that it is impracticable to expand the roadways beyond their present limits. In any event, no funding is available for any major improvements beyond those now in progress. The RTP recognizes the connection between SR 160 and the Beltway, potentially on the Fort Apache Rd. alignment, as an unfunded need. Until a few years ago, SR 160 was an unimproved two-lane road that was seeing a significant increase in traffic, with a corresponding increase in serious accidents. Widening this road has been an NDOT priority, and the RTP includes funding for the remaining sections: w Widen SR 160 Blue Diamond Rd to 8 lanes between Decatur Blvd and Rainbow Blvd, including overpass at the UPRR w Widen SR 160 Blue Diamond Rd / Pahrump Valley Rd to 4 lanes between Rainbow Blvd and Mountain Springs One of the consequences arising from these developments is a need to improve connectivity to and from the Las Vegas Beltway. These needs are most pressing in the southwest and northwest segments. 90 REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

15 Figure 5-5: Investment Strategy - Southwest Las Vegas Valley Beyond the Beltway the northwest Major residential development is planned north of the beltway along its entire length, but it is in the northwest that growth is already occurring. The City of Las Vegas has recognized a need to provide additional capacity to serve these new residential developments and has proposed a new multi-lane facility to link the western beltway with US 95 and the extend that east to I-15. The initial development of this road known as the Sheep Mountain Parkway is included in the plan: w Construct the initial phase of Sheep Mountain Parkway between CC 215 near Ann Rd. and Fort Apache Rd. w Construct new interchange at US 95 and Sheep Mountain Pkwy. The proposed extension of Sheep Mountain Pkwy. east to I-15 is unfunded. The section of alignment between Fort Apache Rd. and Decatur Blvd. would cross environmentally sensitive parts of the upper Las Vegas wash. Because of potential long-term needs, RTC supports the reservation of right-of way so that the roadway could be build at such time as the demand justifies construction, funding becomes available and the environmental issues are resolved. Regional Strategies: The North Las Vegas Valley The V shaped area between US 95 and I-15 north of Las Vegas has experienced, and is expected to continue to experience, rapid residential growth. Major employment centers are emerging around US 95 and the Beltway. Future commercial and industrial land uses are proposed along I-15 in the northeast. In addition to the beltway, several other projects will improve east-west movement across the area, including: w Reconstruction of the Craig Rd. interchange with I-15, including widening of Craig Rd. and grade separation at the UPRR w Widening of Cheyenne Ave. across the valley w Widening of sections of Lake Mead Blvd. w New overpass at Washburn Rd. across I-15 The area lacks north-south roadway capacity. I-15 is being widened to Craig Rd. but further improvements are unfunded. Several other potential routes are discontinuous. To address the problem, the City of North Las Vegas is developing a major roadway along the North 5th St. alignment from Owens Ave. in the south all the way to the Las Vegas Beltway. REGIONAL TRANSPORTATION PLAN

16 Figure 5-6: Investment Strategy - North Las Vegas Valley The funded part of the North 5th St. project comprises: w Construction / widening of North 5th St. between Owens Ave. and CC 215 as an 8-lane divided roadway w New overpass at North 5th St. across I-15 w Grade separated interchanges at North 5th and Cheyenne Ave. and Craig Rd. Other RTP projects in the northern part of the valley include: w BRT between downtown Las Vegas and CC 215 w New overpass at Washburn Rd., across I-15 w Restriping of Cheyenne Ave. to create 6 lanes from US 95 to Nellis Blvd. w Widening of Lake Mead Dr. between Losee Rd. and Las Vegas Blvd. Unfunded needs in the north of the Valley include: w Widening of I-15 from Craig Rd. to US 93 w Addition of carpool lanes on I-15 between the resort corridor and Lamb Blvd. w Interchange improvements at I-15 and US 93 w Additional overpasses across I-15 at intermediate locations w Bus Rapid Transit on Rancho Dr. between downtown Las Vegas and Ann Rd. Figure 5-6 displays the funded projects listed above. 92 REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

17 Regional Strategies: I-515 and the Southeast Las Vegas Valley I-515 is the main route into downtown from the southeast Las Vegas Valley. It carries heavy commuter traffic in both directions during the peak hours. It is also one of the older sections of the interstate system in the region and has a sub-standard horizontal and vertical alignment between I-15 and Eastern Ave. It is intended to rebuild the freeway with the following components: w Reconstruct I-515 between Charleston Blvd. and I-15 w Widen I-515 to 10 lanes with auxiliary lanes and/or braided ramps w Reconfigure downtown interchanges and add new interchanges at Pecos Rd. and Sahara Ave. This is a major project and funding is not expected until after The reconstruction of the substandard parts of this road warrants attention sooner than this. It is hoped the downtown segment can be advanced, if funding becomes available. Boulder Hwy. is a major transit route and RTC Transit plans to create a bus rapid transit route using side-running bus lanes between downtown and Tropicana Ave with continuing BRT operations to Henderson. US 93 is the main approach to Las Vegas from I-40 and Arizona, and US 95 links the valley with the far south of the county. The two roads join west of Boulder City and continue into downtown as I-515. One of the biggest recent projects in the region and certainly the most impressive is the construction of a new bridge over the Colorado River just south of Hoover Dam. This bridge should be open in 2011 and will then provide much needed relief both to the existing road across the dam itself and to the alternate route through Laughlin. West of this project, US 93 runs through Boulder City. The first phase of a planned by-pass will extend I-515 to the junction of US 93 and US 95, but the major part of the route around Boulder City itself is currently unfunded. I-515 itself is funded for widening from Henderson into downtown, but not until after In the short term, the other major project in this are is the widening of SR 546 Lake Mead Pkwy. between Boulder Hwy. and Lake Las Vegas. Funded projects in the southeast include: w Completion of the US 93 bridge across the Colorado River w Extend I-515 over Railroad Pass to US 93/95 Widen I-515 to 10 lanes between Henderson and Charleston Blvd., including carpool lanes. w Park and Ride in the Railroad Pass area (site to be determined) w Widen SR 546 Lake Mead Pkwy. between Boulder Hwy. and Lake Las Vegas Other funded projects further out include: w A new bridge across the Colorado River in Laughlin w Complete the widening of US 95 to 4 lanes all the way to the California state line Unfunded needs include: w US 93 Boulder City by-pass Projects are shown in Figures 5-7 and 5-8. REGIONAL TRANSPORTATION PLAN

18 Figure 5-7: Investment Strategy - Southeast Las Vegas Valley Figure 5-8: Investment Strategy - Southeast Las Vegas Valley 94 REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

19 Summary of Regional Strategic Investments The following pages list the regional strategic investments that can be funded for construction between 2009 and 2030 with the resources expected to be available over that period. These comprise the Regionally Significant and Federally Funded projects identified in accordance with federal regulations. (See box on page 74) The lists give a brief description of each project, its estimated cost and the year of completion. Appendix 1 contains additional details of funding sources and phasing of these projects. Details of projects proposed for funding in the first four years of the plan (2009 to 2012) are set out in the accompanying Transportation Improvement Program. The regional strategic investments are supported by many other smaller projects. These are also listed in Appendix 1. Some of the more important of these have been mentioned in the preceding discussions of specific strategies and corridors. This has been done to give the reader a fuller picture of what the RTC and its partner agencies expect to see implemented. Where such projects are locally funded and are not otherwise regionally significant they do not appear in the lists on the following pages. This section concludes with a listing of the more significant of the many unfunded needs. These are projects that are likely to be needed in response to the growth of the region but which cannot be implemented with anticipated resources. Also included in the following pages are maps that illustrate the locations of regional strategic investments. See Figures 5-9 through REGIONAL TRANSPORTATION PLAN

20 Summary of Regional Strategic Investments included in the Regional Transportation Plan Street and Highway improvements Project costs include all funded phases including planning, preliminary engineering (PE), right-of-way acquisition (RoW) and construction. Project costs over $5 million are rounded to the nearest million. Items in brown include construction of carpool lanes or ramps. Items in grey involve only planning, PE and right-of-way. Some projects are not funded for construction in the RTP. Cost in $ million in year Date in of expenditure operation I-15 in Southern Nevada: Corridor Study I-15 in the Las Vegas Valley: PE and right-of-way for interchange and widening improvements I-15 from the California state line to Sloan: widen to 8 lanes I-15 north of Primm: Construct service interchange for Ivanpah Airport 23 (A) 2011 I-15 at Sloan Rd.: Reconstruct interchange I-15 from Sloan Rd. to SR 160: Widen to 8 lanes I-15 from Sloan Rd. to SR 160: Widen to 10 lanes I-15 at Bermuda Rd.: Construct interchange I-15 at Starr Ave.: Construct Interchange I-15 at Cactus Ave.: Construct interchange I-15 at SR 160: add directional northbound ramp I-15 from SR 160 to Tropicana Ave.: Add collector-distributor roads and braided ramps I-15 at Sunset Rd.: Construct overpass cost included above 2012 I-15 from SR 160 to Tropicana Ave.: Reconstruct freeway; and revise ramps; add carpool lanes I-15 from SR 160 to Tropicana Ave.: Widening includes 2 carpool lanes cost included above 2030 I-15 at I-215: Construct carpool lane connector ramps I-15 from Russell Rd. to Sahara Ave.: Widen to 10 lanes, incl 4 express lanes ( ) 2010 I-15 from I-215 to north of Sahara Ave.: Widen to 14 lanes, plus auxiliary lanes and/or braided ramps I-15 from I-215 to north of Sahara Ave.: Widening includes carpool lanes cost included above 2030 and addition of carpool lane access ramps I-15 Project Neon Phase 1: Construct carpool lane direct connection between US 95 and I-15 and carpool ramps at Oakey Blvd./Wyoming Ave. I-15 Project Neon Phase 3: Reconstruct SB lanes, including braided ramps I-15 Project Neon Phase 4: Reconstruct NB lanes, including braided ramps I-15 at Charleston Blvd: Reconstruct interchange cost included above 2030 I-15 from I-515/US 95 to Craig Rd.: widen to 8/10 lanes 7 ( ) 2012 I-15 from Craig Rd. to Speedway Blvd.: PE for roadway widening I-15 at US 93:: PE for upgrade of interchange I-15 at MP.108: PE for construction of an interchange to serve new Mesquite airport I-15 at MP.118 Pioneer Blvd. extension: PE for construction of an interchange I-215 from Windmill Ln. to I-15: Widen freeway and upgrade at Airport Interchange I-215 from Eastern Ave. to Windmill Ln.: Widen freeway I-215 from I-15 to west of Decatur Blvd.: Widen freeway ( ) 2009 I-515 from College Dr. to Charleston Blvd.: Widen freeway to 10 lanes REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

21 I-515 from College Dr. to Charleston Blvd.: Widening includes 2 carpool lanes cost included above 2030 I-515 at Sahara Ave.: Construct interchange cost included above 2030 I-515 at Galleria Dr.: Construct interchange I-515 from Charleston Blvd. to I-15: Reconstruct and widen freeway to 10 lanes; reconfigure downtown ramps I-515 from Charleston Blvd. to I-15: Widening includes 2 carpool lanes cost included above 2030 I-515 at Pecos Rd., F St.: Construct interchanges cost included above 2030 US 93 Hoover Dam by-pass: Surfacing, signing and guardrails 15 ( ) 2011 US 93 Boulder City by-pass from Hoover Dam by-pass to I-515 at Foothills: PE for new freeway US 93/US 95 from US 95 interchange to I-515 at Foothills: Construct 4-lane freeway US 95 from the California state line to SR 163: Widen to 4-lane divided highway US 95 from Rainbow Blvd. to Ann Rd.: Widen to 8 lanes plus auxiliary lanes US 95 from Rainbow Blvd. to Ann Rd.: Widening includes 2 carpool lanes cost included above 2012 US 95 at Rancho Dr./ Ann Rd.: Construct braided ramps cost included above 2013 US 95 from Ann Rd. to SR 157: Widen to 6/8 lanes, plus auxiliary lanes (*) US 95 from Ann Rd. to Durango Dr.: Widening includes 2 carpool lanes cost included above 2025 US 95 at Elkhorn Rd.: Construct carpool lane connector ramps US 95 at Horse Dr.: Construct interchange 42 ( ) 2010 US 95 at SR 157 Kyle Canyon Rd.: Construct interchange SR 146 St. Rose Pkwy. from I-15 to I-215: Complete widening to 8 lanes ( ) 2009 SR 160 Blue Diamond Rd. from Decatur Blvd. to Rainbow Blvd.: Widen to 8 lanes ( ) 2010 SR 160 from Rainbow Blvd. to Durango Dr.: Widen to 4 lanes 4 ( ) 2011 SR 160 from Durango Dr. to SR 159: Widen to 4 lanes 13 ( ) 2012 SR 160 Pahrump Valley Rd. from SR 159.to Mountain Springs: Widen to 4 lanes SR 564 Lake Mead Pkwy. from Boulder Hwy. to Lake Las Vegas: Widen to 6 lanes SR 573 Craig Rd. from Berg St. to Pecos Rd.: Widen to 6 lanes and construct 21 ( ) 2010 overpass at UPRR SR 573 Craig Rd. at I-15: Reconstruct interchange ( ) 2010 CC 215: PE for beltway interchanges CC 215 at Summerlin Pkwy. / Far Hills Ave.: Construct interchange CC 215 Western Beltway from Craig Rd. to Hualapai Way: Complete upgrade to 6-lane freeway CC 215 at Lone Mountain Rd., Ann Rd.: Construct interchanges cost included above 2012 CC 215 Northern Beltway from Hualapai Way to Tenaya Way: Widen to 6 lanes and construct system interchange at US 95 CC 215 from Tenaya Way to east of Decatur Blvd.: Complete upgrade to freeway CC 215 at Jones Blvd., Decatur Blvd.: Construct interchanges cost included above 2012 CC 215 at Aliante Pkwy.: Construct interchange ( ) 2009 CC 215 from east of Decatur Blvd. to east of North 5th St: Complete upgrade to freeway CC 215 at Revere St., North 5th St.: Construct interchanges cost included above 2011 CC 215 from east of North 5th St.: to Range Rd.: Complete upgrade to freeway CC 215 at Losee Rd., Pecos Rd., Lamb Blvd., Range Rd.: Construct interchanges cost included above 2012 CC 215 at I-15: Construct system interchange Bonneville Ave./Clark Ave. from Main St. to Charleston Blvd:Construct one-way couplet ( ) 2010 Cheyenne Ave. from Rancho Dr. to Pecos Rd.: Widen to 6 lanes Continued on next page REGIONAL TRANSPORTATION PLAN

22 Ivanpah Expressway from Ivanpah Airport to I-15 south of Sloan: 353 (A) 2018 Construct 4-lane expressway with interchange at I-15 south South of Sloan Kyle Canyon Rd.: Replace bridge at FH Lake Mead Blvd. from Losee Rd. to Las Vegas Blvd.: Widen to 5 lanes Las Vegas Blvd. from Ivanpah Airport to Jean: Construct 2-lane road 4.9 (A) 2012 Las Vegas Blvd. from SR 146 to Sunset Rd.: Widen to 6 lanes (#) Laughlin: Construct new 4-lane bridge across the Colorado River Martin Luther King Blvd. from Industrial Rd. south of Oakey to north of Alta: Construct 6-lane roadway overpass across I-15 North 5th St. from Owens Ave. to Cheyenne Ave.: Construct 8-lane road with bridge over I-15 (#) North 5th St. at Cheyenne Ave.: Construct interchange cost included above 2013 North 5th St. from Cheyenne Ave. to Craig Rd.: Construct 8-lane road (#) North 5th St. at Craig Rd.: Construct interchange North 5th St. from Craig Rd. to CC 215: Construct 8-lane road (#) Northshore Rd. / Echo Bay Access (Lake Mead NRA): Rehabilitate road Oakey Blvd. / Wyoming Ave.: Construct grade separation at UPRR Rainbow Blvd. from CC 215 to Tropicana Ave.: Widen to 6 lanes Sheep Mtn Pkwy. from CC 215 south of Ann Rd. to US 95: Construct 4-lane road Sheep Mtn Pkwy. at CC 215 south of Ann Rd. and at US 95: Construct interchanges Sheep Mtn Pkwy. from Fort Apache Rd. to I-15 (N): BLM reservation to safeguard right-of-way Summerlin Pkwy. from CC 215 to US 95: Widen to 8 lanes Summerlin Pkwy. from Rampart Blvd. to US 95: Widening includes 2 carpool lanes cost included above 2015 Summerlin Pkwy. at US 95: Construct carpool lane connector Tropicana Ave. from Decatur Blvd. to Polaris Ave.: Widen to 8 lanes Tropicana Ave. from Polaris Ave. to I-15: Widen to 8 lanes and grade separate at Dean Martin Dr Tropicana Ave. from Swenson St. to Maryland Pkwy.: Widen to 8 lanes Warm Springs Rd. from Dean Martin Dr. to Las Vegas Blvd.: Reconstruct as 6-lane roadway over I-15 Washburn Ave. at I-15: Construct 4-lane overpass Notes to list of Street and Highway projects: (A) Funded by the Clark County Department of Aviation (#) Project includes transit facility ( ) Project includes landscaping ( ) Funded in prior years ( ) Also funded in prior years See map on the opposite page for the location of the street and highway projects listed above. Projects that cannot be given a specific location are not shown on the map. Projects in the outlying areas of Boulder City, Laughlin, and Mesquite are shown on Figure REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

23 Figure 5-9: RTP Projects - Street and Highway Projects REGIONAL TRANSPORTATION PLAN

24 ITS deployment and operational improvements Project costs over $5 million are rounded to the nearest million. For additional information and details of fund sources, see Table 2 in Appendix 1 to the RTP. Notes to list of ITS projects: ( ) Funded in prior years Cost in $ million in year Date in of expenditure operation I-215 / SR 564 from Green Valley Pkwy. to Boulder Hwy: FAST ITS deployment I-515 from I-215 to Charleston Blvd.: FAST ITS deployment US 93 in Boulder City: Intersection improvements ( ) 2011 Cheyenne Ave at Commerce St: Signal modifications Craig Rd from Tenaya Way to Decatur Blvd; ITS and signal improvements Cheyenne Ave at Commerce St: Signal modifications Craig Rd from Tenaya Way to Decatur Blvd: ITS and signal improvements Eastern Ave from Sunridge Pkwy to Flamingo Rd: ITS and signal improvements NDOT freeway service patrol and incident management 49 ongoing NDOT FAST system operations 125 ongoing North Las Vegas: Intersection improvements at Las Vegas Blvd./Civic Center Dr./Carey Ave Rainbow Blvd. at Sahara Ave.: Intersection improvement Rainbow Blvd. from Sahara Ave. to US 95: Intersection improvements Rancho Dr. from Sahara Ave. to Rainbow Blvd.: Signal interconnect Durango Dr. from CC 215 to Desert Inn Rd.: Signal interconnect Regional freeway and arterial ITS system development ( ) 139 ongoing Regional intersection and signal improvement program 21 ongoing Tropicana Ave from Rainbow Blvd to Wynn Rd: ITS and signal improvements See map on the opposite page for the location of the ITS and operational improvement projects listed above. Projects that cannot be given a specific location are not shown on the map. The map shows certain projects that are consistent with the funding available ( ) but have not been prioritized for inclusion in the RTP at this time. Projects in the outlying areas of Boulder City, Laughlin, and Mesquite are shown on Figure REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

25 Figure 5-10: RTP Projects - ITS Projects, and Operational Improvements REGIONAL TRANSPORTATION PLAN

26 Transit capital improvements, including Park and Ride Notes to list Transit project list: (M) Funded by the Las Vegas Monorail Company ( ) Funded in prior years ( ) Mainly funded in prior years Cost in $ million in year Date in of expenditure operation US 95 at Durango Dr.: Construct Park and Ride and transit facility 4 ( ) 2009 US 95 corridor: Express transit service development SR 160: from Pahrump to the Las Vegas area: Express transit service development Bonneville Ave. and 1st St.: Construct new transit center to serve downtown Las Vegas 6( ) 2009 Boulder Hwy. from Henderson to downtown Las Vegas: Construct Bus Rapid Transit Downtown Las Vegas - Grand Central Pkwy. to Sahara Ave.: Construct downtown ( ) 2009 connector Bus Rapid Transit Durango Dr. at Westcliff Dr.: Construct Park and Ride and transit facility Inter-city passenger rail service: Acquisition of conventional passenger rail equipment Laughlin: Construct maintenance facility for Southern Nevada Transit 1.2 ( ) 2009 Coalition operations Laughlin / Mesquite: Support for transit operations in Laughlin and Mesquite Las Vegas Blvd. from SR 146 to Sunset: Construct stations and facilities to support Bus Rapid Transit operations Las Vegas Blvd. from Sunset to downtown Las Vegas: transit stop and shelter improvements Las Vegas Monorail from McCarran Airport to MGM Grand: Extend Monorail 450 (M) 2012 Mesquite: Support for transit operations see Laughlin / Mesquite above North 5th St. from Owens Ave. to Craig Rd. Construct stations and facilities to support Bus Rapid Transit operations RTC Transit system: bus fleet replacement program 420 on-going RTC Transit system: bus rapid transit fleet expansion RTC Transit system: bus rapid transit fleet replacement RTC Transit system: express route development RTC Transit system: paratransit fleet expansion 33 on-going RTC Transit system: paratransit fleet replacement 234 on-going RTC Transit system: security system upgrades 9 on-going RTC Transit system: enhancements 9 on-going RTC Transit system: system development Regional coordinated human services transportation Regional Park-and-Ride program Silverado Ranch Blvd. at Dean Martin Dr.: Construct Park-and-Ride Summerlin Town Center: Install shelters at transit center Sunset Rd. at Decatur Blvd.: Construct new transit maintenance facility 10 ( ) 2009 Transit maintenance facility rehabilitation University of Nevada, Las Vegas: Construct bus transfer center See map on the opposite page for the location of the transit and park and ride projects listed above. Projects that cannot be given a specific location are not shown on the map. Projects in the outlying areas of Boulder City, Laughlin, and Mesquite are shown on Figure REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

27 Figure 5-11: RTP Projects - Transit Projects and Park and Ride Projects REGIONAL TRANSPORTATION PLAN

28 Alternate mode, environmental and air quality improvements Project costs over $5 million are rounded to the nearest million. For additional information and details of fund sources, see Table 2 in Appendix 1 to the RTP. Notes to Alt. Mode project list: ( ) Mainly funded in prior years Cost in $ million in year Date in of expenditure operation I-215 at Eastern Ave.: Landscaping US 95 from M.L.King Blvd. to Rainbow Blvd.: Landscaping US.95 from M.L.King Blvd. to Rainbow Blvd.: Emissions mitigation and MSAT studies 0.7 ( ) 2010 Bonneville Ave. / Clark Ave. from Casino Center Dr. to Las Vegas Blvd.: Landscaping Stewart Ave. from Main St. to Maryland Pkwy.: Landscaping and roadway rehabilitation Craig Rd. from Revere St. to North 5th St.: Median landscaping Downtown Las Vegas: Construct pedestrian overbridge across UPRR Downtown Las Vegas: Demonstration electric bike project Regional bicycle facilities and pedestrian realm improvements 47 on-going Regional bicycle lockers Regional transit fleet: install triple bike racks Regional off-road diesel engine retrofit program Regional on-street bike lane program Regional Ozone emissions reduction program Regional truck stop electrification program RTC Club Ride Travel Demand Management program 42 on-going Sunset Rd. at I-515: Landscaping University of Nevada Las Vegas: Bike lockers Totals for the Regional Strategic Investments Street and Highway improvements ITS deployment and operational improvements Transit capital improvements, including Park-and-Ride Alternate mode, environmental and air quality improvements Total Regional Strategic Investments billion 387 million billion 118 million billion 104 REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

29 Figure 5-12: RTP Projects in Boulder City, Laughlin, and Mesquite REGIONAL TRANSPORTATION PLAN

30 Summary of Regional Strategic Investments: Unfunded Needs Many more projects are needed than can be funded under a reasonable projection of available revenues. The more important of these are listed below. Many of these are the subject of planning studies to determine the preferred scope and likely cost. Once these studies have been completed, these projects will be considered for inclusion in future updates of the Plan, subject to the availability of funding. Costs are expressed in ranges, to give an approximate indication of the funding that may be needed. Since potential dates of implementation are unknown and may vary from project to project, costs are expressed in constant, current year dollars this is an exception to the year-of expenditure basis for all other costs in this RTP. Unfunded needs Cost range in $million in constant 2008$ I-15 from SR 146 to CC 215: Construct overpasses at selected cross-streets $60 to $140m I-15 from Craig Rd. to Speedway Blvd.: Widen to 6 lanes $105 to $140m I-15 from Speedway Blvd. to US 93: Widen to 6 lanes $208 to $326m I-15 at US 93: Reconstruct interchange $40 to $75m I-15 at MP 108: Construct interchange to serve Mesquite airport $30 to $45m I-15 at MP 118 Pioneer Blvd.: Construct interchange $35 to $50m I-215 from Eastern Ave. to I-15: Widen to 10 lanes, including 2 carpool lanes $125 to $200m I-515/US 95 at I-15 (Spaghetti Bowl): Partially reconstruct interchange and to widen to 6 lanes EB $100 to $300m US 93 Boulder City by-pass: Construct new 4-lane freeway $352 to $850m CC 215 Southern Beltway from I-15 to Russell: Widen to 10 lanes, including carpool lanes $125 to $200m CC 215 Southern Beltway from Decatur to Russell: Construct overpasses at selected cross-streets $40 to $105m CC 215 Western Beltway from Russell to Charleston: Widen to 10 lanes, including carpool lanes $120 to $180m CC 215 Western Beltway from Charleston to Sheep Mountain Pkwy.: Widen to 8 lanes, including carpool lanes $105 to $175m CC 215 Northern Beltway from Aliante to Range: Construct overpasses at selected cross-streets $60 to $140m SR 146 St. Rose Pkwy.: Construct grade separated interchanges at selected locations $120 to $180m SR 546 Lake Mead Pkwy. at Boulder Hwy. & Lake Las Vegas: Construct grade separated interchanges $90 to $130m Alexander Rd. at US.95: Widen overpass $15 to $25m Alexander Rd. / Civic Center Dr.: Construct overpass across I-15 $15 to $40m Eastern Transportation Corridor between I-15 near Jean and I-15 near Apex: $500m to $1.5bn Construct new truck route to by-pass the Las Vegas urban area Flamingo Rd. from CC 215 to Boulder Hwy.: Improve traffic flow and implement transit improvements $140 to $175m Fort Apache Rd. from SR 160 to CC 215 at Sunset Rd.: Upgrade to high standard arterial $30 to $80m Inter-city rail service: Terminal station and other infrastructure to support re-establishment $30 to $100m of conventional high-speed rail service between Los Angeles and Las Vegas Las Vegas Blvd. South from Sloan Rd. to SR 146: Implement Bus Rapid Transit $10 to $60m Maryland Pkwy. from Russell to Charleston: Improve traffic flow and implement Bus Rapid Transit $25 to $125m North 5th St. from Grand Teton Dr. to Sheep Mountain Pkwy.: Construct new roadway $10 to $30m Pecos Rd. from Alexander to Washburn: Construct new roadway across I-15 $150 to $200m Pecos Rd. from Grand Teton Dr. to Sheep Mountain Pkwy.: Construct new roadway $10 to $30m Rainbow Blvd. from I-15 near Sloan Rd. to Starr Ave.: Construct new 4-lane roadway $110 to $240m Rainbow Blvd. from Sahara Ave to US.95: Upgrade to super-arterial $60 to $150m Rancho Dr. from US 95 to Ann Rd.: Convert to super-arterial and implement Bus Rapid Transit $150 to $300m Sahara Ave. from CC 215 to Boulder Hwy.: Improve traffic flow and implement Bus Rapid Transit $250 to $400m Sheep Mountain Pkwy. from Fort Apache Rd. to I-15(N): Construct 4-lane roadway and I-15 interchange $300 to $1 bn Sheep Mountain Pkwy. from Fort Apache Rd. to I-15(N): Construct connecting roadways $40 to $80m at Jones Blvd., Revere St., Losee Rd., and Lamb Blvd. Valley View Blvd. from Tropicana to US 95: Widen roadway and improve traffic flow $30 to $50m West Henderson loop: Implement Bus Rapid Transit $10 to $25m Western Ave. from Sahara Ave. to Charleston Blvd.: Widen roadway and improve traffic flow $10 to $20m 106 REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA

31 Figure 5-13: Unfunded needs REGIONAL TRANSPORTATION PLAN

32

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA CAPITAL IMPROVEMENTS PROGRAM MOTOR VEHICLE FUEL TAX FUNDING APPROVED BY RTC 6/8/17

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA CAPITAL IMPROVEMENTS PROGRAM MOTOR VEHICLE FUEL TAX FUNDING APPROVED BY RTC 6/8/17 CLARK COUNTY (UNINCORPORATED) EXPENDITURES 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 ARTERIAL AND COLLECTOR CAPACITY IMPROVEMENTS $100,209,000 $0 $0 $1,764,000 $8,494,000

More information

Nevada Transportation Conference

Nevada Transportation Conference Nevada Transportation Conference Transportation Funding Jacob Snow, General Manager Regional Transportation Commission of Southern Nevada Steven Horsford, Senator Kelvin Atkinson, Assembly Transportation

More information

FOR SALE > ±0.88 ACRES

FOR SALE > ±0.88 ACRES PRICE REDUCED BY $200,000! STRIP FOR SALE > ±0.88 ACRES 7910 S. Dean Martin Drive Las Vegas, Nevada 89139 DEAN MARTIN DRIVE SAFARI BUSINESS CENTER MESA VERDE LANE BLUE DIAMOND BUSINESS CENTER NDOT PUBLIC

More information

PARTELL MEDICAL CENTER

PARTELL MEDICAL CENTER FOR SALE FOR LEASE East Las Vegas Medical District 98 E. LAKE MEAD PARKWAY :: HENDERSON, NV 890 PARTELL MEDICAL CENTER 2870 S. MARYLAND PARKWAY ::, NV 89109 3 STORY MEDICAL OFFICE BUILDING FOR MORE INFORMATION:

More information

SINGLE STORY MEDICAL OFFICE BUILDING AVAILABLE FOR LEASE SUITES FROM ±1,379 - ±18,300 SF

SINGLE STORY MEDICAL OFFICE BUILDING AVAILABLE FOR LEASE SUITES FROM ±1,379 - ±18,300 SF 600 SOUTH O DRIVE,, NV 89113 AVAILABLE SUITES FROM ±1,379 - ±18,300 SF 600 SOUTH O DRIVE,, NV 89113 3960 Howard Hughes Parkway, Suite 0 3960 Howard Hughes Parkway, Suite 0 HUALAPAI WAY FORT APACHE ROAD

More information

SAHARA RANCHO CORPORATE CENTER SOUTH RANCHO DRIVE, LAS VEGAS, NV 89102

SAHARA RANCHO CORPORATE CENTER SOUTH RANCHO DRIVE, LAS VEGAS, NV 89102 SAHARA O 2200-2250 SOUTH O DRIVE,, NV 89102 HIGH END PROFESSIONAL OFFICE BUILDING FOR LEASE 3960 Howard Hughes Parkway, Suite 0 FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N JONES BLVD N DECATUR BLVD

More information

SHADOW PROFESSIONAL CENTER

SHADOW PROFESSIONAL CENTER HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N DECATUR BLVD S DECATUR BLVD VALLEY VIEW ROAD SIMMONS STREET MARTIN LUTHER KING JR BLVD MARYLAND PARKWAY N 5TH STREET LOSSE ROAD N EASTERN

More information

SAHARA RANCHO CORPORATE CENTER SOUTH RANCHO DRIVE LAS VEGAS, NV 89102

SAHARA RANCHO CORPORATE CENTER SOUTH RANCHO DRIVE LAS VEGAS, NV 89102 HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N JONES BLVD S N DECATUR BLVD S DECATUR BLVD SIMMONS STREET MARTIN LUTHER KING JR BLVD N 5TH STREET LOSSE ROAD N EASTERN AVE S PECOS ROAD N

More information

POST INDUSTRIAL PARK INDUSTRIAL UNITS FOR SALE 4717 WEST POST ROAD, #110 & 4731 WEST POST ROAD, #130, LAS VEGAS, NV 89118

POST INDUSTRIAL PARK INDUSTRIAL UNITS FOR SALE 4717 WEST POST ROAD, #110 & 4731 WEST POST ROAD, #130, LAS VEGAS, NV 89118 4717 WEST POST ROAD, #110 & 4731 WEST POST ROAD, #130,, NV 89118 FOR MORE INFORMATION, PLEASE CONTACT: HUALAPAI WAY FORT APACHE ROAD S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR BLVD EET MARTIN

More information

±3,200 SF RETAIL SPACE AVAILABLE 280 EAST FLAMINGO ROAD, LAS VEGAS, NEVADA 89109

±3,200 SF RETAIL SPACE AVAILABLE 280 EAST FLAMINGO ROAD, LAS VEGAS, NEVADA 89109 FOR LEASE :: RESORT CORRIDOR ±3,200 SF RETAIL SPACE AVAILABLE 280 EAST,, NEVADA 89109 KOVAL LANE HOWARD HUGHES PARKWAY HUALAPAI WAY FORT APACHE ROAD S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR

More information

SAHARA COMMERCIAL CENTER 8701 W Sahara, Las Vegas, NV 89117

SAHARA COMMERCIAL CENTER 8701 W Sahara, Las Vegas, NV 89117 SAHARA COMMERCIAL CENTER 8701 W Sahara, Las Vegas, NV 89117 OFFERING MEMORANDUM JOSEPH BONIFATTO T: 702 242 56 C: 702 491 0472 joeb@bphold.com TABLE OF CONTENTS EXECUTIVE SUMMARY 3 LOCATION OVERVIEW 5

More information

ELDORADO BUSINESS PARK

ELDORADO BUSINESS PARK 7445-7485 DEAN MARTIN DRIVE,, NEVADA 89139 WEST ELDORADO LANE DEAN MARTIN DRIVE Eldorado Business Park is located less than 5 minutes from the I-15 Freeway, McCarran International Airport, the Las Vegas

More information

ELDORADO BUSINESS PARK

ELDORADO BUSINESS PARK Eldorado Business Park is located less than 5 minutes from the I- Freeway, McCarran International Airport, the Las Vegas Strip and UNLV and is conveniently located near multiple retail amenities, including

More information

FLAMINGO PROMENADE W FLAMINGO ROAD, LAS VEGAS, NV 89147

FLAMINGO PROMENADE W FLAMINGO ROAD, LAS VEGAS, NV 89147 FLAMINGO PROMENADE 10198 W,, NV 89147 HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE CHARLESTON CAMPUS S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR BLVD SIMMONS STREET MARTIN LUTHER KING JR BLVD

More information

WHITNEY MESA BUSINESS PARK II 1850 Whitney Mesa Drive Henderson, Nevada 89014

WHITNEY MESA BUSINESS PARK II 1850 Whitney Mesa Drive Henderson, Nevada 89014 PROPERTY HIGHLIGHTS ±14,013 SF building Fully built-out and move-in ready Former pharmaceutical processing facility Part of a 5,000 SF master-planned business park Four (4) 12 x 14 grade level truck doors

More information

CROSSROADS. AT SUNSET West Sunset Road Henderson, Nevada RETAIL SPACE AVAILABLE FOR LEASE ±2,040 SF - ±42,470 SF

CROSSROADS. AT SUNSET West Sunset Road Henderson, Nevada RETAIL SPACE AVAILABLE FOR LEASE ±2,040 SF - ±42,470 SF CROSSROADS 1419-1445 West Sunset Road Henderson, Nevada 89014 RETAIL SPACE AVAILABLE FOR LEASE ±2,040 SF - ±42,470 SF $1.00 $2.25 PSF (NNN $0.34 PSF) JOIN OUR NEWEST TENANTS FOR MORE INFORMATION, PLEASE

More information

FOR LEASE SPENCER AIRPORT PLAZA II 2057 EAST MAULE AVENUE, LAS VEGAS, NEVADA 89119

FOR LEASE SPENCER AIRPORT PLAZA II 2057 EAST MAULE AVENUE, LAS VEGAS, NEVADA 89119 2057 EAST MAULE AVENUE,, NEVADA 89119 KYLE CANYON GATEWAY HUALAPAI WAY FORT APACHE ROAD SPRING MOUNTAIN SILVERSTONE S RAINBOW BLVD IRON MOUNTAIN N JONES BLVD N DECATUR BLVD S DECATUR BLVD MARTIN LUTHER

More information

SPENCER AIRPORT INDUSTRIAL

SPENCER AIRPORT INDUSTRIAL FOR SALE OR LEASE SPENCER INDUSTRIAL 6560 SPENCER STREET, SUITE A-4, NV 89119 ±5,057 TOTAL SF LOCATED SOUTH OF MCCARRAN INTERNATIONAL HUALAPAI WAY FORT APACHE ROAD S RAINBOW BLVD N JONES BLVD N DECATUR

More information

SAHARA RANCHO CORPORATE CENTER SOUTH RANCHO DRIVE LAS VEGAS, NV 89102

SAHARA RANCHO CORPORATE CENTER SOUTH RANCHO DRIVE LAS VEGAS, NV 89102 Sahara Rancho Corporate Center is adjacent to I-5 located at the intersection of Sahara Avenue and Rancho Drive with close proximity to the Las Vegas Strip, McCarran International Airport and Downtown.

More information

Emerald Business Plaza

Emerald Business Plaza 8989 WEST FLAMINGO ROAD,, NEVADA 89147 HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N DECATUR BLVD S DECATUR BLVD VALLEY VIEW ROAD SIMMONS STREET MARTIN LUTHER KING JR BLVD MARYLAND PARKWAY

More information

All Fund Expense Tracking Through: 3/31/2019

All Fund Expense Tracking Through: 3/31/2019 City of Boulder City City of Boulder City - FRI 1 City of Boulder City 060AV-FTI City of Boulder City 060AY-FTI I-11 Boulder City Bypass Utility Crossings $1,200,000.00 $1,067,349.67 $132,650.33 2016-2017

More information

MIDDLEFORK INDUSTRIAL

MIDDLEFORK INDUSTRIAL tv MIDDLEFORK INDUSTRIAL 3960 Howard Hughes Parkway, Suite 0 Las Vegas, NV 89169 T +1 702 735 5700 www.colliers.com/lasvegas FOR SALE ±.49 ACRES 4251 WEST OQUENDO ROAD, NEVADA 89118 W CHEYENNE AVENUE HUALAPAI

More information

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018

DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 DIRECTOR S REPORT TRANSPORTATION BOARD OCTOBER 8, 2018 1 US EPA CONSENT DECREE NDOT HAS MET OR EXCEEDED ALL DEADLINES FOR REQUIREMENTS CONTAINED IN THE CONSENT DECREE WITH THE US EPA NO STIPULATED PENALTIES

More information

MORE TIME PLACEMENT HIGH TRAFFIC LOCATIONS 10-SECOND AD SPOTS

MORE TIME PLACEMENT HIGH TRAFFIC LOCATIONS 10-SECOND AD SPOTS STATE OF THE ART BETTER TECHNOLOGY MORE TIME PLACEMENT HIGH TRAFFIC LOCATIONS 10-SECOND AD SPOTS REACH & FREQUENCY Las Vegas Billboards is dedicated to giving the reach and frequency needed for a successful

More information

NEC OF DEER SPRINGS WAY & HUALAPAI WAY

NEC OF DEER SPRINGS WAY & HUALAPAI WAY NEC OF & Las Vegas, NV 89166 FOR LEASE - 2 SPACES REMAINING JOSEPH BONIFATTO T: 702 242 56 C: 702 491 0472 FORT APACHE ROAD N DURANGO DRIVE CHARLESTON CAMPUS S RAINBOW BLVD N JONES BLVD N DECATUR BLVD

More information

GOLDEN HORIZON CENTER

GOLDEN HORIZON CENTER FOR LEASE > > RETAIL/OFFICE SPACE SPACE AVAILABLE AVAILABLE E HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE CHARLESTON CAMPUS S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR BLVD SIMMONS STREET MARTIN

More information

UNIVERSITY GATEWAY 4730 SOUTH MARYLAND PARKWAY LAS VEGAS, NEVADA FOR LEASE. FRANK MARRETTI Owner/Licensee

UNIVERSITY GATEWAY 4730 SOUTH MARYLAND PARKWAY LAS VEGAS, NEVADA FOR LEASE. FRANK MARRETTI Owner/Licensee FOR LEASE 4730 SOUTH, NEVADA 89119 HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE CHARLESTON CAMPUS SAN MARTIN S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR BLVD SIMMONS STREET MARTIN LUTHER KING

More information

LAKE MEAD MEDICAL ARTS PAVILION

LAKE MEAD MEDICAL ARTS PAVILION 5% CO-OP! FOR LEASE > NORTH VISTA CAMPUS LAKE MEAD MEDICAL ARTS PAVILION PAIUTE GOLF RESORT FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR BLVD SIMMONS STREET MARTIN

More information

CRAIG DISTRIBUTION CENTER

CRAIG DISTRIBUTION CENTER FOR LEASE JEY DOTY HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE CHARLESTON CAMPUS SAN MARTIN S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR BLVD SIMMONS STREET MARTIN LUTHER KING JR BLVD MARYLAND

More information

CROSSROADS AT SUNSET WEST SUNSET ROAD, HENDERSON, NV 89014

CROSSROADS AT SUNSET WEST SUNSET ROAD, HENDERSON, NV 89014 AVAILABLE FOR LEASE > ±2,040 SF ±42,470 SF // $1.00 $1.75 PSF NNN CROSSROADS AT SUNSET 1419-1445 WEST SUNSET ROAD, HENDERSON, NV 89014 FORT APACHE ROAD VE S RAINBOW BLVD N DECATUR BLVD S DECATUR BLVD VALLEY

More information

4870 WEST OQUENDO ROAD

4870 WEST OQUENDO ROAD FOR SALE ±10,000 SF FREESTANDING SHOWROOM / WAREHOUSE BUILDING HUALAPAI WAY FORT APACHE ROAD S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR BLVD LUTHER KING JR BLVD PARK HIGHLANDS N EASTERN AVE S

More information

CROSSROADS AT SUNSET WEST SUNSET ROAD, HENDERSON, NV 89014

CROSSROADS AT SUNSET WEST SUNSET ROAD, HENDERSON, NV 89014 AVAILABLE AVAILABLE AVAILABLE FOR LEASE > ±2,040 SF ±87,470 SF // $1.00 $2.25 PSF NNN CROSSROADS AT SUNSET 1419-1445 WEST SUNSET ROAD, HENDERSON, NV 89014 UP TO ±3,000 SF BUILDING WITH FORT APACHE ROAD

More information

CIAB Report to Legislature September 30, 2014 Highlights of key recommendations/findings.

CIAB Report to Legislature September 30, 2014 Highlights of key recommendations/findings. CIAB Report to Legislature September 30, 2014 Highlights of key recommendations/findings. *There is a clearly established need for a new stadium on the UNLV campus, or as an extension of the campus, and

More information

HARSCH INVESTMENT PROPERTIES

HARSCH INVESTMENT PROPERTIES UNDER CONSTRUCTION COMPLETION WINTER 2016 Site Plan SUITE 5 50 Typ. 50 SUITE 0 SUITE 145 SUITE 140 SUITE 135 SUITE 130 16,124 SF SUITE 125 23,559 SF SUITE 120 SUITE 1 SUITE 110 SUITE 105 SUITE 100 140

More information

FOR SALE > ±2.39 ACRES FENCED M-I INDUSTRIAL YARD

FOR SALE > ±2.39 ACRES FENCED M-I INDUSTRIAL YARD STRIP FOR SALE > ±2.39 ACRES NELLIS BOULEVARD BETTY LANE +1 702 836 3736 HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N DECATUR BLVD S DECATUR BLVD VIEW ROAD SIMMONS STREET MARTIN LUTHER

More information

This page intentionally left blank

This page intentionally left blank This page intentionally left blank Prepared for: Nevada Department of Transportation Prepared by: July 2015 This page intentionally left blank Table of Contents Executive Summary... ES-1 ES.1. HOV System

More information

FOR LEASE ±2,000 - ±20,000 SF OFFICE AND MEDICAL SUITES

FOR LEASE ±2,000 - ±20,000 SF OFFICE AND MEDICAL SUITES FOR LEASE ±2,000 - ±20,000 SF OFFICE AND MEDICAL SUITES 2850 HORIZON RIDGE PARKWAY 861 CORONADO CENTER DRIVE HENDERSON, NEVADA 3960 Howard Hughes Parkway, Suite 150 Las Vegas, NV 89169 T +1 702 735 5700

More information

LOCATION NEAR MCCARRAN AIRPORT!

LOCATION NEAR MCCARRAN AIRPORT! tv CENTRAL CITY LOCATION NEAR MCCARRAN AIRPORT! AIRPORT LIGHT INDUSTRIAL SPACE FOR LEASE UNITS FROM ±1,873-±5,600 SF 2700 & 2710 E. 6012 & 6038 TOPAZ STREET 6035 & 6045 HARRISON DRIVE, NEVADA 89120 HUALAPAI

More information

PARTELL MEDICAL CENTER

PARTELL MEDICAL CENTER FOR SALE FOR LEASE East Las Vegas Medical District 98 E. LAKE MEAD PARKWAY :: HENDERSON, NV 890 PARTELL MEDICAL CENTER 3 STORY MEDICAL OFFICE BUILDING 5% CO-OP! LEASE RATE: $0.99, NNN FOR MORE INFORMATION:

More information

HUGHES AIRPORT CENTER 6685 Amelia Earhart Las Vegas, Nevada 89119

HUGHES AIRPORT CENTER 6685 Amelia Earhart Las Vegas, Nevada 89119 PROPERTY HIGHLIGHTS ±26,977 SF on 1. acres Located near Sunset Road and Gilespie Street, in the Hughes Airport Center Contemporary design with covered entry/walkways 1200 amps of 120/208 Volt, 3-phase

More information

STONE CANYON PROFESSIONAL PARK

STONE CANYON PROFESSIONAL PARK FOR LEASE > $1.50 PSF NNN STONE PROFESSIONAL PARK 72 WEST SAHARA AVENUE, NEVADA 89117 HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE WESTCLIFF DRIVE WINDMILL LN GOMER ROAD S EDGE PKWY W CACTUS AVE S RAINBOW

More information

THE SHOPPES ON RAINBOW

THE SHOPPES ON RAINBOW SPACE FOR LEASE > ±1,800 SF :: 1200-1250 SOUTH RAINBOW BOULEVARD, NEVADA 89146 LAST SPACE REMAINING 5% CO-OP TO OUTSIDE BROKER! HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N DECATUR BLVD

More information

CLARK COUNTY (UNINCORPORATED) RECORD

CLARK COUNTY (UNINCORPORATED) RECORD CAPITAL S PROGRAM - FUEL REVENUE INDEXING 1 CLARK COUNTY (UNINCORPORATED) NUMBER PHASE 289 076Y-FTI C CC-215, AIRPORT CONNECTOR PHASE II 29,500,000 2,794,000 19,038,000 7,668,000 286 076V-FTI C CC-215

More information

FOR LEASE WESTECH BUSINESS CENTER SOUTH DECATUR BOULEVARD LAS VEGAS, NEVADA 89118

FOR LEASE WESTECH BUSINESS CENTER SOUTH DECATUR BOULEVARD LAS VEGAS, NEVADA 89118 WESTECH BUSINESS CENTER MICHAEL DE LEW, SIOR +1 702 836 3784 mike.delew@colliers.com GREG PANCIROV, SIOR +1 702 836 3734 greg.pancirov@colliers.com 3960 Howard Hughes Parkway, Suite 0 Las Vegas, NV 89169

More information

FOR LEASE RETAIL & OFFICE SUITES AVAILABLE

FOR LEASE RETAIL & OFFICE SUITES AVAILABLE 3960 Howard Hughes Parkway, Suite 150 Las JEFF Vegas, NASEEF NV 89169 +1 702 +1 836 7023766 836 3731 +1 T +1 702 702836 7353731 5700 www.colliers.com/lasvegas FOR LEASE RETAIL & OFFICE SUITES AVAILABLE

More information

VRD INDUSTRIAL FOR SALE ±7,160 SF ON ±1.01 ACRES 4245 PRODUCTION COURT NORTH LAS VEGAS, NEVADA 89115

VRD INDUSTRIAL FOR SALE ±7,160 SF ON ±1.01 ACRES 4245 PRODUCTION COURT NORTH LAS VEGAS, NEVADA 89115 VRD INDUSTRIAL FOR SALE ±7,160 ON ±1.01 ACRES 4245 PRODUCTION COURT NORTH, NEVADA 891 3960 Howard Hughes Parkway, Suite 0 Las Vegas, NV 89169 T +1 702 735 5700 www.colliers.com/lasvegas W CHEYENNE AVENUE

More information

Regional Transportation Commision of Southern Nevada Indexed Fuel Revenues Project List

Regional Transportation Commision of Southern Nevada Indexed Fuel Revenues Project List Regional Transportation Commision of Southern Nevada Indexed Fuel Revenues Project List Entity Phase Project Notes Project Cost Boulder City Construction Interstate 11, US-95 to Hoover Dam Bridge Phase

More information

FOR LEASE ±53,200 SF INDUSTRIAL BUILDING ON ±2.57 ACRES 2020 MENDENHALL DRIVE NORTH LAS VEGAS, NEVADA 89081

FOR LEASE ±53,200 SF INDUSTRIAL BUILDING ON ±2.57 ACRES 2020 MENDENHALL DRIVE NORTH LAS VEGAS, NEVADA 89081 FOR LEASE ±53,200 SF INDUSTRIAL BUILDING ON ±2.57 ACRES HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N JONES BLVD N DECATUR BLVD SIMMONS STREET MARTIN LUTHER KING JR BLVD N 5TH STREET LOSSE

More information

FOR SALE 4700 DECKOW LANE, LAS VEGAS, NV LAND 4700 DECKOW LANE LAS VEGAS, NEVADA AL TWAINY, CCIM

FOR SALE 4700 DECKOW LANE, LAS VEGAS, NV LAND 4700 DECKOW LANE LAS VEGAS, NEVADA AL TWAINY, CCIM 4700 DECKOW LANE,, NV 89169 3960 Howard Hughes Parkway, Suite 0 Las Vegas, NV 89169 T +1 702 735 5700 www.colliers.com/lasvegas FOR SALE LAND 4700 DECKOW LANE, NEVADA 89169 PROPERTY PROFILE 4700 DECKOW

More information

McCARRAN COMMERCE CENTER

McCARRAN COMMERCE CENTER PLACID STREET MULTI-TENANT INDUSTRIAL INVESTMENT OPPORTUNITY BERMUDA ROAD PILOT ROAD ±85,027 Square Feet Las Vegas Airport Sub-Market Exclusive Investment Advisors: 3960 Howard Hughes Parkway, Suite 0

More information

WINDMILL PARKWAY Henderson, Nevada 89074

WINDMILL PARKWAY Henderson, Nevada 89074 Close proximity to the rapidly expanding Henderson medical corridor FOR MORE INFORMATION: ANDREW PREPARED KILDUFF BY: +1 STACY 702 836 SCHEER, 3718 CCIM +1 702 836 3762 stacy.scheer@colliers.com ALEXIA

More information

TURNKEY CALL CENTER FOR LEASE CENTRALLY LOCATED AESTHTICALLY PLEASING 42,412 SF AVAILABLE MOVE-IN READY 6320 SOUTH PECOS RD :: LAS VEGAS, NEVADA 89120

TURNKEY CALL CENTER FOR LEASE CENTRALLY LOCATED AESTHTICALLY PLEASING 42,412 SF AVAILABLE MOVE-IN READY 6320 SOUTH PECOS RD :: LAS VEGAS, NEVADA 89120 AESTHTICALLY PLEASING TURNKEY CALL CENTER 6320 SOUTH PECOS RD ::, NEVADA 89120 42,412 SF AVAILABLE MOVE-IN READY FOR PREPARED MORE INFORMATION: BY: STACY SCHEER, CCIM +1 +1 702 8363762 3718 stacy.scheer@colliers.com

More information

FOR LEASE RETAIL SPACE +/- 2,400-4,565 SF

FOR LEASE RETAIL SPACE +/- 2,400-4,565 SF MANDALAY BAY DELANO MGM NEW YORK NEW YORK PLANET HOLLYWOOD PARIS CITY CENTER BALLYS BELLAGIO THE HUGHES CENER PARADISE ROAD FOR LEASE RETAIL SPACE +/- 2,400-4,565 SF PALOS VERDES STREET SUBJECT TWAIN AVENUE

More information

UNIVERSITY GATEWAY 4700 SOUTH MARYLAND PKWY LAS VEGAS, NEVADA 89119

UNIVERSITY GATEWAY 4700 SOUTH MARYLAND PKWY LAS VEGAS, NEVADA 89119 WE ARE THE CENTER OF RETAIL CUSHWAKERETAIL.COM Cushman & Wakefield Copyright 2015. No warranty or representation, express herein, and same is submitted subject to errors, omissions, change of price, conditions

More information

Sterling Park FOR SALE OR LEASE OWNER-USER OPPORTUNITY! 7432 WEST SAHARA AVENUE LAS VEGAS, NEVADA 89117

Sterling Park FOR SALE OR LEASE OWNER-USER OPPORTUNITY! 7432 WEST SAHARA AVENUE LAS VEGAS, NEVADA 89117 FOR SALE OR LEASE OWNER-USER OPPORTUNITY! 7432 WEST SAHARA AVENUE, NEVADA 89117 3960 Howard Hughes Parkway, Suite 0 Las Vegas, NV 89169 T +1 702 735 5700 www.colliers.com/lasvegas W CHEYENNE AVENUE HUALAPAI

More information

NORTHWEST MEDICAL CENTER

NORTHWEST MEDICAL CENTER 2901-21 NORTH TENAYA WAY 3960 Howard Hughes Parkway, Suite 0 Las Vegas, NV 89169 T +1 702 735 5700 www.colliers.com/lasvegas FOR LEASE TURN-KEY MEDICAL & OFFICE SUITES, NEVADA W CHEYENNE AVENUE HUALAPAI

More information

UNIVERSITY GATEWAY 4700 SOUTH MARYLAND PKWY LAS VEGAS, NEVADA 89119

UNIVERSITY GATEWAY 4700 SOUTH MARYLAND PKWY LAS VEGAS, NEVADA 89119 WE ARE THE CENTER OF RETAIL CUSHWAKERETAIL.COM Cushman & Wakefield Copyright 2015. No warranty or representation, express herein, and same is submitted subject to errors, omissions, change of price, conditions

More information

CAMERON RENO BUSINESS PARK

CAMERON RENO BUSINESS PARK FOR LEASE CAMERON RENO BUSINESS PARK INDUSTRIAL SPACE FOR LEASE Dock High & Grade Loading from 3,358 SF 3960 Howard Hughes Parkway, Suite 0 T+1 702 735 5700 F +1 702 731 5709 INDUSTRIAL SPACE FOR LEASE

More information

WAGON TRAIL SOUTH INDUSTRIAL PARK

WAGON TRAIL SOUTH INDUSTRIAL PARK FOR LEASE WAGON TRAIL SOUTH INDUSTRIAL PARK ±6,238 TOTAL SF IMMEDIATE ACCESS TO I-215 VIA SUNSET AND DECATUR BOULEVARD HUALAPAI WAY FORT APACHE ROAD S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR

More information

FOR SALE > ±13,090 SF WAREHOUSE/DISTRIBUTION BUILDING

FOR SALE > ±13,090 SF WAREHOUSE/DISTRIBUTION BUILDING STRIP DOWNTOWN FOR SALE > ±13,090 SF LAMB BOULEVARD EAST CHEYENNE AVENUE +1 702 836 3736 HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N DECATUR BLVD S DECATUR BLVD VIEW ROAD SIMMONS STREET

More information

APPENDIX A2 PROJECT LISTINGS

APPENDIX A2 PROJECT LISTINGS APPENDIX A2 PROJECT LISTINGS Table 1: High Priority Investment Program (HPP) Projects Investments over next 4 years Table 2: Primary Strategies Addressed by Projects (HPP and Long-Term Projects) Table

More information

NWC OF LONE MOUNTAIN & EL CAPITAN LAS VEGAS, NV >> ±2.11 ACRES OF LAND FOR SALE

NWC OF LONE MOUNTAIN & EL CAPITAN LAS VEGAS, NV >> ±2.11 ACRES OF LAND FOR SALE NWC OF LONE MOUNTAIN & EL CAPITAN, NV 89129 >> ±2.11 ACRES OF LAND FOR SALE LONE MOUNTAIN ROAD EL CAPITAN WAY PROPERTY DESCRIPTION Encompassing approximately 2.11 acres of vacant land, this RE zoned parcel

More information

HENDERSON FREEWAYS CROSSING

HENDERSON FREEWAYS CROSSING Henderson, Nevada PAT MARSH, SIOR +1 702 836 3741 pat.marsh@colliers.com SAM NEWMAN +1 702 836 3724 sam.newman@colliers.com 3960 Howard Hughes Parkway Suite 150 Las Vegas, NV 89169 www.colliers.com/lasvegas

More information

FOR LEASE OFFICE/WAREHOUSE FLEX SPACE HIGHLAND INDUSTRIAL CENTER

FOR LEASE OFFICE/WAREHOUSE FLEX SPACE HIGHLAND INDUSTRIAL CENTER FORT APACHE ROAD S RAINBOW BLVD N DECATUR BLVD VIEW ROAD D N EASTERN AVE S PECOS ROAD N HOLLYWOOD BLVD LOS Highland Industrial Center is comprised of five separate industrial buildings that offer a wide

More information

INDUSTRIAL/AUTOMOTIVE SPACE WITH FENCED YARDS

INDUSTRIAL/AUTOMOTIVE SPACE WITH FENCED YARDS FOR LEASE INDUSTRIAL/AUTOMOTIVE SPACE WITH FENCED YARDS 4360 & 4364 EAST CRAIG ROAD,, NV 891 ±5,350 SF UNIT AVAILABLE LOCATED AT CRAIG ROAD AND LAMB BOULEVARD dean.willmore@colliers.com N DURANGO DRIVE

More information

DECATUR BELL COMMERCE CENTER

DECATUR BELL COMMERCE CENTER PROPERTY HIGHLIGHTS ± Suites Available Fully built-out and move-in ready Decatur Frontage Grade Level Truck Loading 120/208v, 3-Phase power 16 minimum clear height One floor open office areas Fluorescent

More information

±12.50 ACRES. Dean Martin Drive and Pyle Avenue Las Vegas, Nevada FOR SALE LAS VEGAS STRIP SUBJECT PROPERTY

±12.50 ACRES. Dean Martin Drive and Pyle Avenue Las Vegas, Nevada FOR SALE LAS VEGAS STRIP SUBJECT PROPERTY FOR SALE ±12.50 ACRES Dean Martin Drive and Pyle Avenue Las Vegas, Nevada STRIP BLUE DIAMOND ROAD SILVERADO BOULEVARD SUBJECT PROPERTY VIEW BOULEVARD american west dr horton DEAN MARTIN DRIVE BOULEVARD

More information

HENDERSON FREEWAYS CROSSING

HENDERSON FREEWAYS CROSSING FREEWAYS CROSSING 8390 & 83 EASTGATE ROAD ::, NEVADA 890 Buildings For Sale ±89,260 SF FREEWAYS CROSSING FOR LEASE FOR SALE BUILDING A ±163,000 SF BUILDING F ±14,320 SF BUILDING B ±200,450 SF BUILDING

More information

DECATUR BELL COMMERCE CENTER

DECATUR BELL COMMERCE CENTER PROPERTY HIGHLIGHTS ± Suite Available Fully built-out and move-in ready Decatur Frontage Grade Level Truck Loading 120/208v, 3-Phase power 16 minimum clear height One floor open office areas Fluorescent

More information

DECATUR BELL COMMERCE CENTER

DECATUR BELL COMMERCE CENTER PROPERTY HIGHLIGHTS ±6,352 SF Suite Available Fully built-out and move-in ready Decatur Frontage Grade Level Truck Loading 120/208v, 3-Phase power 16 minimum clear height One floor open office areas Fluorescent

More information

RAINBOW PAVILION 6070 SOUTH RAINBOW BOULEVARD LAS VEGAS, NEVADA LEASE RATE: $1.50 PSF - $1.75 PSF (NNN $0.35)

RAINBOW PAVILION 6070 SOUTH RAINBOW BOULEVARD LAS VEGAS, NEVADA LEASE RATE: $1.50 PSF - $1.75 PSF (NNN $0.35) 6070 SOUTH RAINBOW BOULEVARD, NEVADA 89118 LEASE RATE: $1.50 PSF - $1.75 PSF (NNN $0.35) HUALAPAI WAY FORT APACHE ROAD ANGO DRIVE SPRINGS S RAINBOW BLVD N DECATUR BLVD S DECATUR BLVD VIEW ROAD MMONS STREET

More information

DEALERSHIP OPPORTUNITY VALLEY AUTO MALL

DEALERSHIP OPPORTUNITY VALLEY AUTO MALL FOR SALE DEALERSHIP OPPORTUNITY VALLEY AUTO MALL ON ±4.05 ACRES 103,000 CARS PER DAY (CPD) 73 Front Line Parking spaces AUTO SHOW DRIVE S RAINBOW BLVD N DECATUR BLVD S DECATUR BLVD VALLEY VIEW ROAD MARTIN

More information

4840 SOUTH EASTERN AVENUE LAS VEGAS, NEVADA 89121

4840 SOUTH EASTERN AVENUE LAS VEGAS, NEVADA 89121 FOR LEASE > $1.00-$1.50 PSF NNN TROPICANA EAST SHOPPING CENTER 4840 SOUTH EASTERN AVENUE, NEVADA 89121 HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE WESTCLIFF DRIVE WINDMILL LN GOMER ROAD S EDGE PKWY W

More information

INDUSTRIAL/AUTOMOTIVE SPACE WITH FENCED YARDS

INDUSTRIAL/AUTOMOTIVE SPACE WITH FENCED YARDS FOR LEASE INDUSTRIAL/AUTOMOTIVE SPACE WITH FENCED YARDS 4360 & 4364 EAST CRAIG ROAD,, NV 891 ±5,350 SF UNIT AVAILABLE LOCATED AT CRAIG ROAD AND LAMB BOULEVARD dean.willmore@colliers.com N DURANGO DRIVE

More information

FOR SALE. Maryland Eastern Center PRICED REDUCED, MOTIVATED SELLER, SUBMIT ALL OFFERS SOUTH EASTERN AVENUE HENDERSON, NEVADA PROPERTY HIGHLIGHTS

FOR SALE. Maryland Eastern Center PRICED REDUCED, MOTIVATED SELLER, SUBMIT ALL OFFERS SOUTH EASTERN AVENUE HENDERSON, NEVADA PROPERTY HIGHLIGHTS PRICED REDUCED, MOTIVATED SELLER, SUBMIT ALL OFFERS PROPERTY HIGHLIGHTS 39 Howard Hughes Parkway, Suite 0 Las Vegas, NV 89169 T +1 02 00 www.colliers.com/lasvegas FOR SALE 1 SOUTH EASTERN AVENUE HENDERSON,

More information

FOR LEASE: OFFICE/WAREHOUSE FLEX SPACE SUNSET BUSINESS CENTER 12 SUNSET WAY, HENDERSON, NV 89014

FOR LEASE: OFFICE/WAREHOUSE FLEX SPACE SUNSET BUSINESS CENTER 12 SUNSET WAY, HENDERSON, NV 89014 S RAINBOW BLVD N DECATUR BLVD S DECATUR BLVD VALLEY VIEW ROAD N EASTERN AVE S PECOS ROAD N HOLLYWOOD BLVD W PACIFIC AVE FOR LEASE: OFFICE/WAREHOUSE FLEX SPACE LOS TPC AT TWO OFFICE/WAREHOUSE INDUSTRIAL

More information

DECATUR BELL COMMERCE CENTER

DECATUR BELL COMMERCE CENTER PROPERTY HIGHLIGHTS Units available from ±3,710 to ±6,352 SF Fully built-out and move-in ready Decatur Frontage Grade Level Truck Loading 120/208v, 3-Phase power 16 minimum clear height One floor open

More information

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT

NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT NDOT MAJOR PROJECTS AND INNOVATIVE DELIVERY 2017 NEVADA TRANSPORTATION CONFERENCE COLE MORTENSEN, PE ASST. CHIEF OF PROJECT MANAGEMENT PM DIVISION RESPONSIBILITIES FHWA MAJOR PROJECTS TOTAL PROJECT COST

More information

AABACUS INDUSTRIAL PARK

AABACUS INDUSTRIAL PARK 3200 WEST SUNSET ROAD,, NV 89118 HUALAPAI WAY FORT APACHE ROAD S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR BLVD G JR BLVD N EASTERN AVE S PECOS ROAD N HOLLYWOOD BLVD MMERLIN RED ROCK BEAR S BEST

More information

Southern Nevada 10 - Year Unfunded Project List - DRAFT

Southern Nevada 10 - Year Unfunded Project List - DRAFT 017-06 Clark County Alexander Rd, Pecos Rd to Puebla St $1,400,000 Alto Ave, Pecos Rd to Nellis Blvd $,000,000 Ann Rd, CC-15 to Durango Dr $10,680,000 Arnona Rd, Lake Mead Blvd to Alto Ave $5,000,000 Bonanza

More information

INSPIRADA MASTER PLAN

INSPIRADA MASTER PLAN FOR SALE 66 TENTATIVE MAPPED LOTS INSPIRADA MASTER PLAN Henderson, Nevada HENDERSON EXECUTIVE STRIP BICENTENNIAL PARKWAY AVENTURA PARK VIA FIRENZE PINECREST INSPIRADA For More Information: VIA CONTESSA

More information

JENNIFER PARK. 530 & 555 E. Pamalyn Ave. Las Vegas, Nevada WAREHOUSE/DISTRIBUTION BUILDINGS FOR LEASE

JENNIFER PARK. 530 & 555 E. Pamalyn Ave. Las Vegas, Nevada WAREHOUSE/DISTRIBUTION BUILDINGS FOR LEASE FORT APACHE ROAD S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR BLVD S PECOS ROAD WAREHOUSE/DISTRIBUTION BUILDINGS FOR LEASE EAGLE CREST > Located at I-215 Freeway and Bermuda Road > Just West of

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

JENNIFER PARK. 530 & 555 E. Pamalyn Ave. Las Vegas, Nevada WAREHOUSE/DISTRIBUTION BUILDINGS FOR LEASE

JENNIFER PARK. 530 & 555 E. Pamalyn Ave. Las Vegas, Nevada WAREHOUSE/DISTRIBUTION BUILDINGS FOR LEASE FORT APACHE ROAD S RAINBOW BLVD N JONES BLVD N DECATUR BLVD S DECATUR BLVD S PECOS ROAD WAREHOUSE/DISTRIBUTION BUILDINGS FOR LEASE EAGLE CREST > Located at I-215 Freeway and Bermuda Road > Just West of

More information

FOR LEASE 1710 Whitney Mesa Dr. Henderson, NV 89014

FOR LEASE 1710 Whitney Mesa Dr. Henderson, NV 89014 Whitney Mesa is a high-end concrete-tilt up office/warehouse building, approximately 33,625 SF. The facility has a FDA approval for drug assembly and R&D or is well-suited for MD use. PROPERTY HIGHLIGHTS

More information

TROPICANA EAST SHOPPING CENTER

TROPICANA EAST SHOPPING CENTER FOR LEASE > $0.75-$1.25 PSF (NNN $0.32 PSF) TROPICANA EAST SHOPPING CENTER 4840 SOUTH EASTERN AVENUE ::, NEVADA 89121 HUALAPAI WAY FORT APACHE ROAD S RAINBOW BLVD N DECATUR BLVD S DECATUR BLVD VIEW ROAD

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

BRETTRATHER.

BRETTRATHER. PRICING: $0.55$0.55 $1.00 PSF (NNN) PRICING: - $1.00 PSF (NNN) FORLEASE FOR LEASE PLAZA PLAZA 524 SOUTH BOULDER HIGHWAY,, NV 890 524 SOUTH BOULDER HIGHWAY,, NV 890 BRETTRATHER RATHER BRETT +1702 702575

More information

BERMUDA SPRINGS OFFICE PARK 340 EAST WARM SPRINGS ROAD :: LAS VEGAS, NEVADA 89119

BERMUDA SPRINGS OFFICE PARK 340 EAST WARM SPRINGS ROAD :: LAS VEGAS, NEVADA 89119 GARDEN STYLE SPACE BERMUDA S 340 EAST WARM S ROAD ::, NEVADA 89119 FOR MORE INFORMATION: 3960 Howard Hughes Parkway, Suite 0 HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE CHARLESTON CAMPUS S RAINBOW BLVD

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

FOR SALE > ±5,800 SF FREESTANDING INDUSTRIAL BUILDING WITH FENCED YARD ON

FOR SALE > ±5,800 SF FREESTANDING INDUSTRIAL BUILDING WITH FENCED YARD ON PROPERTY HIGHLIGHTS Move-in ready! Located just west of the I- and north of Tropicana Avenue Concrete block construction Grade level truck roll-up doors Two story office/warehouse building Fluorescent

More information

ONE SPACE LEFT LYNDEN SQUARE 6105 SOUTH FORT APACHE ROAD, LAS VEGAS, NV MULTI-TENANT RETAIL CENTER

ONE SPACE LEFT LYNDEN SQUARE 6105 SOUTH FORT APACHE ROAD, LAS VEGAS, NV MULTI-TENANT RETAIL CENTER ONE SPACE LEFT MULTI-TENANT RETAIL CENTER HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N JONES BLVD N DECATUR BLVD SIMMONS STREET MARTIN LUTHER KING JR BLVD N 5TH STREET LOSSE ROAD N EASTERN

More information

Valley Vista Masterplan Decatur Boulevard & Elkhorn Road North Las Vegas, Nevada

Valley Vista Masterplan Decatur Boulevard & Elkhorn Road North Las Vegas, Nevada DECATUR BOULEVARD FOR SALE > ±346 ACRES OFFERING MEMORANDUM Valley Vista Masterplan Decatur Boulevard & Elkhorn Road North Las Vegas, Nevada 95 SUMMERLIN RED ROCK 215 CENTENNIAL BOWL 95 215 ELKHORN ROAD

More information

FOR LEASE MEDICAL & PROFESSIONAL SPACE

FOR LEASE MEDICAL & PROFESSIONAL SPACE 3960 Howard Hughes Parkway, Suite 0 Las Vegas, NV 89169 T +1 702 735 5700 www.colliers.com/lasvegas FOR LEASE MEDICAL & PROFESSIONAL SPACE 3007 HORIZON RIDGE PARKWAY, NEVADA W CHEYENNE AVENUE HUALAPAI

More information

CAP INDUSTRIAL 3108 LOSEE ROAD LAS VEGAS, NEVADA FOR LEASE - INDUSTRIAL BUILDING SITUATED ON ±3.31 ACRES

CAP INDUSTRIAL 3108 LOSEE ROAD LAS VEGAS, NEVADA FOR LEASE - INDUSTRIAL BUILDING SITUATED ON ±3.31 ACRES 3108 LOSEE ROAD, NEVADA 89030 N DURANGO DRIVE S RAINBOW BLVD N DECATUR BLVD S DECATUR BLVD VIEW ROAD SIMMONS STREET MARTIN LUTHER KING JR BLVD N 5TH STREET N EASTERN AVE S PECOS ROAD N HOLLYWOOD BLVD W

More information

TROPICANA EAST SHOPPING CENTER

TROPICANA EAST SHOPPING CENTER FOR LEASE > $0.75-$1.25 PSF (NNN $0.32 PSF) TROPICANA EAST SHOPPING CENTER 4840 SOUTH EASTERN AVENUE ::, NEVADA 89121 HUALAPAI WAY FORT APACHE ROAD S RAINBOW BLVD N DECATUR BLVD S DECATUR BLVD VIEW ROAD

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

MULTI-TENANT RETAIL CENTER LYNDEN SQUARE 6105 SOUTH FORT APACHE ROAD, LAS VEGAS, NV 89148

MULTI-TENANT RETAIL CENTER LYNDEN SQUARE 6105 SOUTH FORT APACHE ROAD, LAS VEGAS, NV 89148 MULTI-TENANT RETAIL CENTER HUALAPAI WAY FORT APACHE ROAD N DURANGO DRIVE S RAINBOW BLVD N JONES BLVD N DECATUR BLVD SIMMONS STREET MARTIN LUTHER KING JR BLVD N 5TH STREET LOSSE ROAD N EASTERN AVE S PECOS

More information

HENDERSON FREEWAYS CROSSING

HENDERSON FREEWAYS CROSSING NOW COMPLETED AND READY FOR OCCUPANCY HENDERSON FREEWAYS CROSSING 8390 & 8385 EASTGATE ROAD :: HENDERSON, NEVADA 8905 Buildings For Lease ±20,000 SF - ±200,450 SF Units Available + 702 836 374 + 702 836

More information

Las Vegas Blvd Industrial

Las Vegas Blvd Industrial tv GOLDEN TRIANGLE TJ MAXX /LOWES RAIG MERCE LONE CIVIC CORP DRIVE UNIVERSITY OF SOUTHERN NEVADA WESTLAND COLLINS II GOWAN N PECOS ROAD GLP SILVERADO ENTERPRISE NELLIS E. CRAIG ROAD E. ALEXANDER ROAD DERMODY

More information