1 ACT LIGHT RAIL SURVEY

2 ABOUT THE ACT LIGHT RAIL SURVEY Welcome to the findings of the Colliers International ACT Light Rail Survey. The Canberra light rail is one of the largest infrastructure projects in the ACT since self-managed Government was announced. With this in mind Colliers International set out to identify and measure the opinions of commercial property owners along the Stage 1 route CBD to Gungahlin and capture their thoughts on the likely impacts. In early 2017 it was noted there had been limited interaction or reporting from a commercial owners perspective, and given the vital role that private owners (particularly of standalone assets) will play in the long-term success of the Northbourne corridor, Colliers International has engaged with these groups. In early 2017 it was noted there had been limited interaction or reporting from a commercial owner s perspective

3 WHO PARTICIPATED IN THE SURVEY? Local developers THE PRIMARY OBJECTIVES OF THE SURVEY WERE TO UNDERSTAND THE FOLLOWING: Do property owners believe that the light rail project will ultimately benefit Canberra? Whether the major infrastructure project would benefit commercial property values and tenant retention along the corridor. Strata owners COMMERCIAL PROPERTY OWNERS Building owners Have owners of properties along the Stage 1 route considered repurposing or disposing of their properties given the ACT Government s land release program along the corridor? Is there cause for concern of an oversupply of dwellings given the significant number of mixed-use developments forecast along the corridor? What are the major concerns for commercial property owners along Stage 1? Interstate owners As identified by Colliers International s research, there are approximately 105 commercial properties (including strata) along the Northbourne Avenue corridor and Flemington Road, owned by an estimated 93 groups. In order to complete a widespread review of commercial property owner s opinions, a short 10 question survey including commentary provisions was developed and sent to 90 of these owners. Participation rate in the online survey was 36% and further telephone interviews were also conducted. Local and interstate based developers, building owners and strata owners participated in the survey.

4 ACT LIGHT RAIL OVERVIEW In February 2016 the ACT Labor Government announced the successful bidder for the ACT light rail project, Canberra Metro, to deliver an initial 12km public transport line that will link the CBD to Gungahlin, the ACT s fastest growing region. Canberra Metro delivered what was described as an innovative and costeffective tender that would deliver world-class infrastructure and design. In May 2016, prior to the ACT election the ACT Government formally announced the signing of the contract at an anticipated cost of $783 million. The Government cited commissioned studies that the project would generate an expected 500 jobs throughout the construction period and a cost benefit analysis of 1.2 to the Territory as a result of the project. ACT LIGHT RAIL IS EXPECTED TO GENERATE 500 JOBS Stage 1 Route Map: Gungahlin City Light Rail Line Stops GUNGAHLIN Manning Clark North Gungahlin Pl Manning Clark Cr Nullarbor Ave FRANKLIN HARRISON Well Station Dr Well Station Dr Well Station Drive MITCHELL Sandford St Barton Hwy Flemington Rd Randwick Rd Federal Hwy Mapleton Avenue Mapleton Ave Nullarbor Avenue Morisset Rd EPIC and Racecourse WATSON Phillip Avenue Phillip Ave DOWNER Swinden Street Swinden St Following the re-election of Labor in late 2016, works are now well advanced along Stage 1 of the corridor, with an expected operating date of early As a result of the Canberra Metro project, Northbourne Avenue has been identified as an area for significant growth through redevelopment of number of residential and commercial properties along the corridor. The Government plans to fund the project through the strategic release of land, with the most recent Government release - a 2.5ha site with 450m of frontage to Northbourne Avenue and development rights to construct 500+ dwellings - achieving $45 million via Tender in March NORTH Mouat St LYNEHAM Macarthur Ave Condamine St TURNER Northbourne Ave Gould St Rudd St Alinga St CITY Antill St DICKSON Macarthur Avenue Wakefield Ave Ipima Street Ipima St BRADDON Elouera Street Elouera St Bunda St

5 IS THE LIGHT RAIL GOOD FOR CANBERRA AND WHAT IS THE BEST TIMING? Whilst an often divisive topic in Canberra and acknowledged as a key factor in determining the most recent local election, 67% of commercial owners felt that the introduction of the light rail project would ultimately benefit Canberra. Commercial owners acknowledged that the establishment of a major infrastructure project will likely provide a significant economic boost to local businesses and employment during the construction phase, and that the wider light rail network will encourage further investment into the CBD and ACT region from interstate and offshore groups. Owners were optimistic that the project will lead to better connectivity along the Northbourne Avenue corridor and Flemington Road, and that Stage 1 will stimulate further re-development of arguably the most important gateway in the ACT. Whilst acknowledging a strong consensus of the benefits, owners did note concerns regarding the long-term viability of the project given that newer technologies may supersede light rail once construction of the entire network has been finalised. Owners remained sceptical that new technologies are likely to be available in the next decade, and that a major proportion of the Government s budget could be directed elsewhere, particularly as the projected is anticipated to take 20+ years. As evidenced by responses, 47% of owners felt that the light rail will have little to no impact on congestion along the Stage 1 route - a fundamental objective of the project. Timing of the project has been heavily debated, with varying opinions on when to introduce the next stages and which town centres should be prioritised. Fifty percent of owners were of the view that if the light rail were to be implemented, now is the correct timing for this occur. This view is shared by many owners of commercial assets who believe that the project will serve as the catalyst to reinvigorate tired gateways, despite not necessarily supporting the proposed technology. When delivered, what impact do you think light rail will have on traffic congestion along Northbourne Avenue and through Gungahlin? 17% Increased traffic congestion 36% Reduced traffic congestion Never 30% What would be the best timing for the light rail project? Now 50% 2-5 years 10% 6-10 years 10% 47% Have little or no impact 67% OF RESPONDENTS BELIEVE LIGHT RAIL WILL BENEFIT CANBERRA

6 WHICH AREA SHOULD LIGHT RAIL EXPAND TO NEXT AND WILL CANBERRANS USE IT TO COMMUTE TO AND FROM WORK? Owners demonstrated varying opinions on the proposed Stage 2 route, with preferences for CBD to Airport (30%), CBD to Woden (33%), Other (20%) and CBD to Tuggeranong (10%) being the most popular responses, suggesting that the ACT Government may need to expedite the timing of alternative routes. Overwhelmingly commercial property owners believe that Canberrans will use the Stage 1 route to commute to and from work, assuming that stops were within close proximity to office locations and viable Park and Ride solutions were provided by the ACT Government. Eighty seven percent of owners responded with a positive view suggesting that owner-occupiers and tenants along the Northbourne Avenue and Flemington Road corridor are likely to utilise the light rail, an outcome which would imply flow-on effects for commercial owners. IF THE LIGHT RAIL NETWORK EXPANDS ACROSS THE CANBERRA REGION, WHICH AREA SHOULD BE THE NEXT LIGHT RAIL ROUTE COVER? 7% CBD to Belconnen 10% CBD to Tuggeranong 20% Other 30% CBD to Canberra Airport 33% CBD to Woden

7 ACT LIGHT RAIL MASTER PLAN & 25 YEAR GROWTH FORECASTS +33% +63% +47% +58% BELCONNEN +159% +108% Barton Highway Drive STAGE 1 GUNGAHLIN Federal NORTH CANBERRA Hi ghway Parkway +44% NORTH +90% +67% Whilst owners suggested it could take many years for Canberrans to fully adopt to the light rail mode of transport, they felt businesses along Stage 1 will ultimately benefit from higher volumes of workers and traffic passing along the corridor. Additionally, owners were optimistic that accessibility to current office and retail locations will be substantially improved, particularly given the lack of existing parking and transport infrastructure at present. Respondents felt this improved accessibility could encourage long-term retention of tenants and increase property values through higher demand. MOLONGLO VALLEY Gun g ahlin Parkes Adelaide Avenue Way Majura PARLIAMENTARY TRIANGLE AIRPORT +51% +98% +0% +26% +46% +19% Cotter Road PROPOSED STAGE 2 WODEN VALLEY SOUTH CANBERRA Canberra +24% +34% +8% Tuggeranong Parkway Hindm a TUGGERANONG Tharw a Drive rsh Drive +26% +44% +43% Monaro Highway Avenue Legend Future Light Rail Corridors Major road Arterial road Jobs Retail m 2 Dwellings Owners were optimistic that accessibility to current office and retail locations will be substantially improved

8 As anticipated, however, owners noted that given the dispersed nature of office locations in Canberra, Stage 1 will only benefit a small portion of the population in a door-to-door service. Owners expressed concerns that a slow service and the possibility of interchanging to other travel modes in order to reach final destinations may also become impractical for most, again undermining the ACT Government s strategy to minimise car dependency. Furthermore, the lack of details surrounding transit times and fares has been a concern of owners who note that tenants may ultimately find driving to be a cheaper and more direct alternative despite traffic congestion POPULATION Current: 390,000 Future: 553, % 2041 CARS Current: 225,000 Future: 367,000 Owners expressed concerns that a slow service and the possibility of interchanging to other travel modes in order to reach final destinations may also become impractical for most % 2041

9 WHAT ARE IMPLICATIONS FOR PROPERTY OWNERS? 53% believe the Light Rail Project would ultimately improve the value of their commercial property A critical component of the Light Rail Survey was to understand owners views on whether the light rail would likely provide a positive impact on commercial property values. Fifty-three percent of owners surveyed believed that the project would ultimately improve the value of their asset, with 37% saying it would have little to no impact and only 10% indicated that it would be detrimental to values. These responses seemingly support the notion that further amenity and infrastructure along the corridor will have a positive benefit for owners along Flemington Road and Northbourne Avenue through improved tenant retention, increased accessibility for owners and tenants and provide a solution to the current parking issues, particularly in areas such as Braddon.

10 Additionally, owners of standalone properties were optimistic the strong focus on urban renewal along the corridor and development of mixed-use buildings would lead to stronger demand from developers looking to acquire redevelopment opportunities. Respondents that indicated Stage 1 would have little to no impact on pricing (37%) generally felt that there may be short price growth due to the project, however property values would quickly return to current market levels once numerous developments are completed. Whilst mostly positive, after reviewing detailed feedback of respondents Colliers International noted that there are some strong concerns relating to improved land values along the corridor and the subsequently higher rates charges that will likely ensue for property owners. Participants expressed apprehension that the ACT Government s plan to raise rates in the latest budget will lead to proportionally higher outgoings charges, and that their net position could be negatively impacted, given a lack of movement in leasing rates. It was conveyed by a portion of owners along the Stage 1 route that the proposed increased outgoings to fund the project could potentially leave owners with artificial price growth and ultimately lower returns. Do you think light rail will have an impact on your property s overall value? 10% Yes it will have a negative impact 37% It will have little to no impact 53% Yes it will have a positive impact There are some strong concerns about land value along the corridor

11 ARE BUILDING OWNERS EXPLORING ALTERNATIVE USES FOR THEIR BUILDINGS? Whilst not applicable to all property owners along Northbourne Avenue and Flemington Road, an unexpected 50% of owners had considered developing or selling their building for residential redevelopment purposes. Given the strategic land release programme of the ACT Government along Northbourne Avenue and Flemington Road, many private owners noted the likely demand from developers for these opportunities and had investigated possible options. However despite this, numerous owners are of the opinion that there are many obstacles that affected the viability of residential redevelopment including heritage and planning restrictions, parking requirements and most notably the recently revised Lease Variation Charge (LVC) which incorporates a vastly greater development tax for residential land being redeveloped for unit and townhouse purposes. A host of standalone owners cited LVC as the major deterrent for redevelopment of privately owned buildings/land along Stage 1 and somewhat contradictory and inconsistent with the ACT Government s aim to stimulate the redevelopment of the Northbourne Avenue corridor into a highly densified world class gateway. 50% Of owners have considered developing or selling their building for residential redevelopment purposes

12 WILL NORTHBOURNE AVENUE EXPERIENCE AN OVERSUPPLY OF RESIDENTIAL DWELLINGS? As outlined by the ACT Government, the Territory is currently growing at approximately 1.5% annually, suggesting growth rates of approximately 6,500 residents per year. Initial research by Colliers International indicates there is an estimated 2,000+ residential dwellings to be constructed directly along the Stage 1 route over the next five years. Impending projects and recent land releases such as Midnight, Midtown, Dickson on Northbourne, Lyneham on Northbourne and the Dickson Motor registry are examples of major urban renewal projects slated for the Stage 1 corridor. Further, the ACT Government has recently released a revised land release programme to coincide with the 2017 budget that identifies further sites such as Macarthur House and Northbourne Flats in Turner to be sold for redevelopment purposes both of which will lead to further residential infill. The ACT Government has recently released a revised land release programme to coincide with the 2017 budget

13 Despite the significant pipeline of residential projects, including neighbouring areas such as Braddon and Dickson commercial property owners were generally optimistic (57%) that the ACT Government s land release programme would not lead to an over-supply of residential dwellings nor a negative impact on their commercial property values long-term. Feedback suggested that an oversupply, if any, is likely to occur in outlying locations rather than along the rejuvenated Northbourne Avenue corridor, particularly given the major infrastructure to support these new dwellings and higher residential volume. Whilst some owners did express views that the rushed land release may create an initial oversupply (43% agreeing), the ongoing population growth of the Territory and high-profile location would ultimately ensure long-term viability of these developments. Therefore commercial property owners seemingly believe that there will be continued demand from owner occupiers, investors and developers for opportunities along the corridor, particularly for assets showing future redevelopment potential. Despite high levels of upcoming supply, this is not expected to impact commercial property owners, and in fact may prove to be a positive outcome, as increased dwellings, population and activity at street level will arguably support tenant retention and amenity for businesses making Northbourne a more desirable location. Do you think the re-purposing of land on the Northbourne Corridor will lead to an over supply of residential dwellings? Yes 43% No 57%

14 SURVEY INSIGHTS The ACT Light Rail Survey has revealed a number of contrasting views by commercial property owners regarding the viability, timing and impact of the ACT s largest infrastructure project. Overall, commercial owners appear to hold a marginally positive view that the introduction of the light rail will create increased activity, better amenity and ultimately lead to better tenant retention in the long-term. Commercial owners are somewhat undecided whether congestion traffic will be alleviated and whether the rapid infill of the corridor will lead to a long-term oversupply of residential dwellings. Whilst opinions suggest that there are a number of associated benefits to commercial owners, many have also noted policies which they believe contradict the vision of light rail and adaptive reuse, namely the revised Lease Variation Charge (LVC), increased commercial rates charges and timing of land releases. With Stage 1 currently under construction and the proposed Stage 2 route to Woden currently open for public consultation there will be continued debate surrounding the wider Canberra Metro project and the long-term success of the infrastructure. The overwhelming consensus from owners is that it will take many years for Canberrans to adopt light rail technology and realise the ACT Government s vision for an integrated transport network that delivers economic and social benefits. Colliers International will continue to monitor the progress of light rail in Canberra and ascertain whether the current forecasts and predictions of owners have materialised and convey the impacts on commercial property owners. The overwhelming consensus from owners is that it will take many years for Canberrans to adopt light rail technology

15 TOP 7 TAKEAWAYS Whilst divided on the technology, project timing and future routes, 67% of commercial owners felt that the light rail would ultimately provide wider benefits to the Territory and act as a catalyst for the renewal of one of Canberra s key gateways. The majority of commercial property owners were of the opinion that light rail would lead to price growth for their asset, however noted concerns their net position may be negatively impacted by increasing annual charges. Following the announcement of Stage 1, 50% of owners along the Northbourne Avenue and Flemington Road corridor have investigated alternative options for their commercial asset. Commercial owners were generally optimistic that there will not be an oversupply of residential dwellings along the Northbourne Avenue corridor despite significant recent land releases and a forecast 2,000+ units over the next five years. Light rail will act as a catalyst for the renewal of one of Canberra s key gateways 05 Owners anticipate that further densification and increased amenity as a result of Stage 1 will have a positive impact on tenant retention % of commercial owners felt the light rail would have little to no impact on traffic congestion, a fundamental objective of the infrastructure. 07 Overwhelmingly, commercial property owners believe that Canberrans will use the Stage 1 project to commute to and from work, assuming that stops were within close proximity to office locations and viable park and ride solutions were provided by the ACT Government.

16 FOR MORE INFORMATION ABOUT THE ACT LIGHT RAIL SURVEY, OR TO PARTICIPATE IN FUTURE SURVEYS PLEASE CONTACT: Matthew Winter Manager, Investment Services Colliers International does not give any warranty in relation to the accuracy of the information contained in this report. If you intend to rely upon the information contained herein, you must take note that the information, figures and projections have been provided by various sources and have not been verified by us. We have no belief one way or the other in relation to the accuracy of such information, figures and projections. Colliers International will not be liable for any loss or damage resulting from any statement, figure, calculation or any other information that you rely upon that is contained in the material. COPYRIGHT 2017.

TRANSPORT CANBERRA. LIGHT RAIL NETWORK Delivering a modern transport system for a growing city

TRANSPORT CANBERRA. LIGHT RAIL NETWORK Delivering a modern transport system for a growing city TRANSPORT CANBERRA LIGHT RAIL NETWORK Delivering a modern transport system for a growing city LIGHT RAIL NETWORK A modern transport system for a growing city INTRODUCTION Minister Mick Gentleman The ACT

More information

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.

Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov. Artist impression Nullabor Avenue Harrison Business Case overview Capital Metro is the first stage of a light rail network that will have a transformative effect on Canberra. capitalmetro.act.gov.au Why

More information

SYDNEY S SECOND AIRPORT

SYDNEY S SECOND AIRPORT COLLIERS RADAR SYDNEY S SECOND AIRPORT The Catalytic Effect of Transport Infrastructure By Sass J-Baleh Manager Research sass.jbaleh@colliers.com Summary Industrial land values across the Sydney markets

More information

SEQ Catalyst Projects

SEQ Catalyst Projects m3property Update SEQ Catalyst Projects Winter 2018 Since our Autumn Catalyst Projects report, several projects in South East Queensland s pipeline of major projects have progressed and several new projects

More information

The Canberra Business Chamber thanks the ACT Government for this opportunity to contribute to the budget priorities.

The Canberra Business Chamber thanks the ACT Government for this opportunity to contribute to the budget priorities. FORWARD The Canberra Business Chamber thanks the ACT Government for this opportunity to contribute to the 2018 19 budget priorities. Critically, the 2018 19 budget must prioritise and resource the foundational

More information

GUNGAHLIN TOWN CENTRE

GUNGAHLIN TOWN CENTRE GUNGAHLIN TOWN CENTRE PLANNING REFRESH SNAPSHOT NOVEMBER 2018 CONTENTS INTRODUCTION....1 Australian Capital Territory, Canberra 2018 This work is copyright. Apart from any use as permitted under the Copyright

More information

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON March 2017 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 THE SUBJECT SITE 4 3.0 STRATEGIC PLANNING CONTEXT 6 4.0 SUMMARY AND CONCLUSIONS

More information

A NEW BUS NETWORK FOR CANBERRA

A NEW BUS NETWORK FOR CANBERRA A NEW BUS NETWORK FOR More buses, more often, 7 days a week What s happening? Canberra is Australia s fastest growing city. In less than 15 years the population is expected to reach more than 500 000.

More information

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017 Contact: Chris Wood, Airport General Manager cwood@regionofwaterloo.ca (519) 648-2256 ext. 8502 Airport Master

More information

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN Western Parkland City 2 Transport for NSW Future Transport Strategy and Greater Sydney Services and Infrastructure Plan Western

More information

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY EXECUTIVE SUMMARY The 2030 Northwest Arkansas Regional Transportation Plan developed by the Northwest Arkansas Regional Planning Commission (NWARPC)

More information

T H E N E W E S T A B L I S H E D

T H E N E W E S T A B L I S H E D THE NEW ESTABLISHED INNER CITY LIVING, NESTLED IN TRANQUILLITY. THE NEW ESTABLISHED Embrace the qualities of living close to the city whilst enjoying a peaceful and sort-after suburban lifestyle. The Bradfield

More information

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS 2017-18 NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS Executive Summary The 2017-18 NSW State Budget presents an opportunity for the NSW Government to future-proof the tourism and transport sectors.

More information

UNLOCKING THE BRIGHTON MAINLINE

UNLOCKING THE BRIGHTON MAINLINE UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to

More information

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017 Connecting Sydney Olympic Park and GPOP with Greater Sydney Final Summary Report 29 May 2017 GPOP sits at the core of the emerging Central City. East Sydney is at the centre of the established Eastern

More information

Strategic Transport Forum 21 st September 2018

Strategic Transport Forum 21 st September 2018 Strategic Transport Forum 21 st September 2018 Agenda Item 4: Heathrow Airport Expansion: Surface Access Strategy Update Recommendation: It is recommended that the Forum consider the update provided by

More information

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers)

East Lancashire Highways and Transport Masterplan East Lancashire Rail Connectivity Study Conditional Output Statement (Appendix 'A' refers) Report to the Cabinet Member for Highways and Transport Report submitted by: Director of Corporate Commissioning Date: 1 June 2015 Part I Electoral Divisions affected: All East Lancashire Highways and

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,

More information

Public Transport for Perth in 2031

Public Transport for Perth in 2031 South West Group Submission Public Transport for Perth in 2031 October 2011 South West Group Vision and Mission Local Governments in South Metropolitan Perth, through cooperation with industry, community

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

Draft City Centre Transport Proposals

Draft City Centre Transport Proposals Draft City Centre Transport Proposals Introduction This draft position paper provides an overview of the current City Centre transport issues, including concepts of the possible future City Centre transport

More information

Draft Western District Plan

Draft Western District Plan Powered by TCPDF (www.tcpdf.org) Draft Western District Plan Submission_id: 31732 Date of Lodgment: 15 Dec 2017 Origin of Submission: Online Organisation name: APP Corporation Pty Ltd Organisation type:

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

Growing Regional Victoria 2018 Victorian Election Priorities GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES

Growing Regional Victoria 2018 Victorian Election Priorities GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES Message from the Chair, Cr Margaret O Rourke Regional Cities Victoria Growing Regional Victoria Regional Cities Victoria (RCV) is uniquely positioned

More information

The Coalition s Policy

The Coalition s Policy The Coalition s Policy Key Commitments Townsville is a city with immense potential. With a population of around 170,000, some 16,000 regional businesses, and regional product of over $11 billion, Townsville

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124 31 March 2017 Sean O Toole Sheridan Dudley District Commissioner - West District Commissioner - South West Greater Sydney Commission Greater Sydney Commission PO Box 257 PO Box 257 PARRAMATTA NSW 2124

More information

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY

Wellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is

More information

The Government s Aviation Strategy Transport for the North (TfN) response

The Government s Aviation Strategy Transport for the North (TfN) response The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering

More information

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY Revitalising Passenger Transport Increasing traffic congestion in our cities and a lack of transport services in our regional towns is frustrating

More information

TARLO-WODEN.COM.AU EASTY STREET, WODEN. Developed by

TARLO-WODEN.COM.AU EASTY STREET, WODEN. Developed by TARLO-WODEN.COM.AU EASTY STREET, WODEN Developed by A TOWNHOUSE LIFESTYLE IN THE HEART OF WODEN Form, Function, Proximity. Tarlo ticks all the boxes, providing a townhouse lifestyle in the heart of the

More information

The Coalition s Policy

The Coalition s Policy The Coalition s Policy Key Commitments The Coalition s plan for a strong new economy will provide jobs and growth and secure the future for Australian families through smart investment in infrastructure.

More information

Memorandum of Understanding with ACT Government

Memorandum of Understanding with ACT Government MEDIA RELEASE 8 April 2015 Memorandum of Understanding with ACT Government The ACT Government and Canberra Airport today entered into a new Memorandum of Understanding (MoU) on key areas of common interest

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown 0 5 10 15 20 Kilometres Penrith Blacktown Parramatta Liverpool Bankstown Campbelltown accessibility outcomes Legend Outcomes targeted in Western Sydney are: public transport that is accessible throughout

More information

The Challenges for the European Tourism Sustainable

The Challenges for the European Tourism Sustainable The Challenges for the European Tourism Sustainable Denada Olli Lecturer at Fan S. Noli University, Faculty of Economy, Department of Marketing, Branch Korça, Albania. Doi:10.5901/mjss.2013.v4n9p464 Abstract

More information

Q: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements.

Q: How many flights arrived and departed in 2017? A: In 2017 the airport saw 39,300 air transport movements. Southampton Airport Masterplan FAQ 4 October 2018 Background Southampton Airport Today Q: How many passengers currently use Southampton Airport and how has this changed over the last 5 years? A: Over the

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy 1. Introduction This submission is a response to Infrastructure Victoria s assessment of the need to construct a heavy rail

More information

VICTORIA IN FUTURE Population 5.5 million Population 10 million. Deaths 2 million. Births 3.8 million. Natural increase 1.

VICTORIA IN FUTURE Population 5.5 million Population 10 million. Deaths 2 million. Births 3.8 million. Natural increase 1. VICTORIA IN FUTURE Births 3.8 million Deaths 2 million 2011 Population 5.5 million Natural increase 1.8 million Net migration 2.7 million 2051 Population 10 million Net overseas migration 2.7 million Net

More information

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures

A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures West Belfast Partnership 218-226 Falls Road Belfast BT12 6AH T: 02890809202 A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures Issued

More information

INQUIRY INTO THE OPERATION, REGULATION AND FUNDING OF AIR ROUTE SERVICE DELIVERY TO RURAL, REGIONAL AND REMOTE COMMUNITIES

INQUIRY INTO THE OPERATION, REGULATION AND FUNDING OF AIR ROUTE SERVICE DELIVERY TO RURAL, REGIONAL AND REMOTE COMMUNITIES INQUIRY INTO THE OPERATION, REGULATION AND FUNDING OF AIR ROUTE SERVICE DELIVERY TO RURAL, REGIONAL AND REMOTE COMMUNITIES SENATE STANDING COMMITTEES ON RURAL AND REGIONAL AFFAIRS AND TRANSPORT OVERVIEW

More information

3 The growth of Western Sydney

3 The growth of Western Sydney 3 The growth of Western Sydney About this chapter This chapter provides an overview of Western Sydney s growing population and economy, and the benefit of the proposed Western Sydney Airport. Population

More information

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY Matter 3C Easton/Costessey Representor No. 8826 JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY SUBMISSION ON BEHALF OF TAYLOR WIMPEY DEVELOPMENTS AND

More information

AUSTRALIAN TRAVEL TIME METRIC 2017 EDITION

AUSTRALIAN TRAVEL TIME METRIC 2017 EDITION AUSTRALIAN TRAVEL TIME METRIC 217 EDITION For more information please contact: Brendan Lyon Chief Executive Officer Infrastructure Partnerships Australia Suite 3.3, Level 3, 9 Pitt Street Sydney NSW 2

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

CAA consultation on its Environmental Programme

CAA consultation on its Environmental Programme CAA consultation on its Environmental Programme Response from the Aviation Environment Federation 15.4.14 The Aviation Environment Federation (AEF) is the principal UK NGO concerned exclusively with the

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Our Future City. Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton

Our Future City. Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton Our Future City Tuesday 5 th July, 4pm-6pm Suite 1, Jurys Inn Brighton Brighton & Hove the connected city. Creative, dynamic, inclusive and caring. A fantastic place to live, work and visit Objective To

More information

*Artist Impression. *Artist Impression

*Artist Impression. *Artist Impression Your Urban Oasis Urban Ingenuity It s not hard to feel renewed and inspired at Forest Ridge Estate, where you can experience beautiful countryside, wide-open spaces, and retain all the advantages of City

More information

Union Square. & Park Place. Project Summary Submitted by DeHoff Development Company

Union Square. & Park Place. Project Summary Submitted by DeHoff Development Company Union Square & Park Place Submitted by DeHoff Development Company December 18, 2012 encompass a 250-acre, mixed-use corporate campus that includes office, hotel, retail and residential components. The

More information

Strategic Transport Forum 7 th December 2018

Strategic Transport Forum 7 th December 2018 Strategic Transport Forum 7 th December 2018 Agenda Item 7: East West Rail Recommendation: It is recommended that the Forum: a) Endorse the East West Rail Consortium s position in relation to the draft

More information

Creating a High Quality Business District

Creating a High Quality Business District Date Month Date Month Friday 7 November 2014 Nine Elms on the South Bank A Bilfinger Real Estate company Creating a High Quality Business District New London Architecture Introduction Nine Elms Vauxhall

More information

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise

Rail Delivery Group. Consultation on the future of the East Midlands rail franchise Rail Delivery Group Response to: Department for Transport Consultation on the future of the East Midlands rail franchise Date: 11 October 2017 Rail Delivery Group Limited Registered Office, 2nd Floor,

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

Mirvac have prepared a vision statement for 39 Herbert Street (the site) which is attached as an appendix to this letter.

Mirvac have prepared a vision statement for 39 Herbert Street (the site) which is attached as an appendix to this letter. 31 March 2017 Deborah Dearing North District Commissioner Greater Sydney Commission PO BOX 257 PARRAMATTA NSW 2124 Dear Deborah, RE: 39 HERBERT ST, ST LEONARDS SUBMISSION ON THE DRAFT NORTH DISTRICT PLAN

More information

Bartlett Square Welcome. Investment Framework. London Airport Ltd

Bartlett Square Welcome. Investment Framework. London Airport Ltd 1 Welcome Welcome to Luton s public exhibition on proposals for the (formerly known as Stirling Place) project which will comprise 2.5 acres of commercial development, providing up to 2,000 jobs for local

More information

Paul Fletcher Minister for Urban Infrastructure and Cities Launch of Infrastructure Australia Future Cities Paper. Fri 23 February 2018

Paul Fletcher Minister for Urban Infrastructure and Cities Launch of Infrastructure Australia Future Cities Paper. Fri 23 February 2018 Paul Fletcher Minister for Urban Infrastructure and Cities Launch of Infrastructure Australia Future Cities Paper Fri 23 February 2018 Introduction I am pleased to have the opportunity to speak at the

More information

GOLD COAST OFFICE OVERVIEW

GOLD COAST OFFICE OVERVIEW GOLD COAST OFFICE OVERVIEW JANUARY 2014 Gold Coast OVERVIEW Gold Coast office stock at January 2014 totalled 459,890 sqm, down by almost 4,000 sqm on the mid-year stock level. Around 2,000 sqm of refurbished

More information

Toga has appointed Urbis to assist in developing a Toga response to the draft District Plans. Urbis has

Toga has appointed Urbis to assist in developing a Toga response to the draft District Plans. Urbis has DRAF 31 March 2017 Greater Sydney Commission Draft District Plans PO Box 257 Parramatta NSW 2124 By email: engagement@gsc.nsw.gov.au Dear Sir/Madam We write on behalf of our client, Toga Property Group,

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

Sunshine Coast: Kawana Health Campus. December 2013

Sunshine Coast: Kawana Health Campus. December 2013 Sunshine Coast: Kawana Health Campus December 2013 Kawana Health Campus Residential development at Birtinya* Overview The Kawana Health Campus will comprise state-of-the-art public and private hospital

More information

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Agenda Item 5: Rail East Midlands Rail Franchise Consultation Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by

More information

The decision on whether to take enforcement action falls outside the scope of delegated powers.

The decision on whether to take enforcement action falls outside the scope of delegated powers. 5k 16/0031 Reg d: 19.01.2016 Expires: 15.03.201 6 Ward: Nei. 24.02.201 BVPI Full Number of 11/8 On Con. 6 Target Weeks on Target? Exp: Cttee Day: GE No LOCATION: PROPOSAL: TYPE: Phillips Court, 32 Goldsworth

More information

New free City connector bus service

New free City connector bus service The Adelaide City Council invites engagement from the community about New free City connector bus service 99C City Loop and Adelaide Connector free bus services to merge: Project Summary Adelaide City

More information

Canada s Airports: Enabling Connectivity, Growth and Productivity for Canada

Canada s Airports: Enabling Connectivity, Growth and Productivity for Canada Canada s Airports: Enabling Connectivity, Growth and Productivity for Canada 2018 Federal Budget Submission House of Commons Standing Committee on Finance Introduction The Canadian Airports Council is

More information

Sustainable Urban Development. Presentation to WVCC 1 December 2010

Sustainable Urban Development. Presentation to WVCC 1 December 2010 Sustainable Urban Development Presentation to WVCC 1 December 2010 Introduction Paul Carmody Hindmarsh (Consultation Manager) Tony Adams CB Richard Ellis (Planners) Simon Parsons PTW (Architects) Brett

More information

Infrastructure for Growth

Infrastructure for Growth A passion to deliver a prosperous future Connecting North Cambridgeshire Infrastructure for Growth Infrastructure for growth Wisbech is the largest settlement in Fenland. The town and its hinterland has

More information

SUSTAINABLE DEVELOPMENT PLAN 2015

SUSTAINABLE DEVELOPMENT PLAN 2015 LAND USE SUSTAINABLE DEVELOPMENT PLAN 2015 EAST MINILANDS EAST MINILANDS SUSTAINABLE DEVELOPMENT SUSTAINABLE DEVELOPMENT DHL eastmidlandsairport.com OUR AIRPORT FOREWORD by Andy Cliffe Managing Director

More information

Corporate Report Format 28 February 2017

Corporate Report Format 28 February 2017 Corporate Report Format 28 February 2017 To the Chair and Members of CABINET APPROVAL TO ENTER INTO FUNDING AGREEMENT WITH SHEFFIELD CITY REGION TO BE ABLE TO DRAW DOWN SCRIF APPROVED FUNDING FOR THE DELIVERY

More information

https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf

https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf GSC Sydney East Rev Draft -references Port Botany - 30 https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf Pages 6. The District s freight routes, particularly

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011 Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA

More information

PLANNING THE SUNBURY GROWTH CORRIDOR

PLANNING THE SUNBURY GROWTH CORRIDOR SUNBURY GROWTH CORRIDOR NOVEMBER 2016 PLANNING THE SUNBURY GROWTH CORRIDOR Sunbury Planning Background The Victorian Planning Authority, in consultation with Hume City Council, is undertaking a number

More information

EAST WEST RAIL EASTERN SECTION. prospectus for growth

EAST WEST RAIL EASTERN SECTION. prospectus for growth EAST WEST RAIL EASTERN SECTION prospectus for growth September 2018 executive summary The East West Rail Consortium, a partnership of local authorities, rail operators and Network Rail, continues to promote

More information

North District Plan OVERVIEW

North District Plan OVERVIEW OUR GREATER SYDNEY 2056 Revised Draft North District Plan OVERVIEW Hornsby Hunter's Hill Ku-ring-gai Lane Cove Mosman Northern Beaches North Sydney Ryde Willoughby Snapshot of the North District today

More information

3. Coach Supporting Statement

3. Coach Supporting Statement 3. Coach Supporting Statement Content 1. Setting the Scene 2. Vision 3. Coaches and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7. Strategy

More information

The Belfast Manifesto

The Belfast Manifesto TheBelfast Manifesto NIIRTA The Northern Ireland Independent Retail Trade Association (NIIRTA) strongly supports The Belfast Manifesto. This should be required reading for election candidates to both Belfast

More information

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway 1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway August

More information

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment. 3.2 Strategic intent 3.2.1 Shaping growth an overview In 2031, the Sunshine Coast is renowned for its vibrant economy, ecological values, unique character and strong sense of community. It is Australia

More information

MARKETBEAT. Queenstown Regional. Residential

MARKETBEAT. Queenstown Regional. Residential Winter 2016 MARKETBEAT RESEARCH NEWSLETTER Queenstown Regional Queenstown is booming. A surging tourism sector drawing in more workers, coupled with an increasing wave of lifestylers and rising investor

More information

ACT GREENS 2012 ELECTION INITIATIVE REDUCE WASTE TO LANDFILL THE ACT GREENS WILL... ACT.GREENS.ORG.AU printed on recycled paper

ACT GREENS 2012 ELECTION INITIATIVE REDUCE WASTE TO LANDFILL THE ACT GREENS WILL... ACT.GREENS.ORG.AU printed on recycled paper ACT GREENS 2012 ELECTION INITIATIVE REDUCE WASTE TO LANDFILL THE ACT GREENS WILL... Commit $2 million for a comprehensive education program, including free composting equipment for up to 21,000 households;

More information

LEASING OPPORTUNITIES AUSTRALIAFAIR.COM.AU

LEASING OPPORTUNITIES AUSTRALIAFAIR.COM.AU YOUR OPPORTUNITY IS NOW LEASING OPPORTUNITIES AUSTRALIAFAIR.COM.AU AUSTRALIA FAIR EVOLUTION With the evolution of the official Southport CBD and an associated boost in local economic indicators, Australia

More information

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Project Deliverable 4.1.3d Individual City Report - City of La Verne Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 Cairns Regional Council September 2011 Coffey

More information

The Coalition s Policy to Build Melbourne s East West Link

The Coalition s Policy to Build Melbourne s East West Link 1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build Melbourne s East West Link August 2013 Our Plan

More information

A NEW BUS NETWORK FOR CANBERRA

A NEW BUS NETWORK FOR CANBERRA A NEW BUS NETWORK FOR More buses, more often, 7 days a week What s happening? Canberra is Australia s fastest growing city. In less than 15 years the population is expected to reach more than 500 000.

More information

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1

More information

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada

(Also known as the Den-Ice Agreements Program) Evaluation & Advisory Services. Transport Canada Evaluation of Transport Canada s Program of Payments to Other Government or International Agencies for the Operation and Maintenance of Airports, Air Navigation, and Airways Facilities (Also known as the

More information

LA Waterfront Public Sites Opportunity Analysis IGTCT Committee Meeting

LA Waterfront Public Sites Opportunity Analysis IGTCT Committee Meeting LA Waterfront Public Sites Opportunity Analysis IGTCT Committee Meeting Economic & Planning Systems, Inc. (EPS) Oakland Denver Los Angeles Sacramento February 21, 2017 Economic & Planning Systems, Inc.

More information

Euroz Rottnest Investor Briefing

Euroz Rottnest Investor Briefing Cedar Woods Properties Limited Euroz Rottnest Investor Briefing 15 March 2016 Cedar Woods Presentation 2 Snapshot of Achievements in FY2016 Extensive portfolio of residential estates in Perth and WA regions,

More information

Capital Metro. Capital Metro 30/04/2015. Gungahlin to the City (Flemington Road & Northbourne Avenue) Route:

Capital Metro. Capital Metro 30/04/2015. Gungahlin to the City (Flemington Road & Northbourne Avenue) Route: Alistair Coe MLA Route: Length: Gungahlin to the City (Flemington Road & Northbourne Avenue) 12km Construction Cost: $783,000,000 ($783 million) Operational Cost: Procurement: Annual Payment: Revenue (2021):

More information

OBJECTION TO AMENDMENT TO PLANNING SCHEME AND GRANTING OF PLANNING PERMIT

OBJECTION TO AMENDMENT TO PLANNING SCHEME AND GRANTING OF PLANNING PERMIT PLANNING AND ENVIRONMENT ACT 1987 OBJECTION TO AMENDMENT TO PLANNING SCHEME AND GRANTING OF PLANNING PERMIT AMENDMENT C32 APPLICATION 0873/02 Public Transport Users Association Inc. 247-249 Flinders Lane

More information

Caloundra South overview Ben Allen, General Manager Sustainable Communities

Caloundra South overview Ben Allen, General Manager Sustainable Communities CONTENT Caloundra South overview Ben Allen, General Manager Sustainable Communities Planning and Approvals status update Marc Wilkinson, QLD Planning and Approvals Manager Masterplanning and delivery Ben

More information

EPPERSON INDUSTRIAL PARK

EPPERSON INDUSTRIAL PARK EXCLUSIVE LISTING FUTURE INDUSTRIAL SITE ±680 ACRES SALT LAKE CITY, UTAH 3300 N Subject 40.54 acres 3200 W 550.46 acres 40.17 acres 2100 N 40.09 acres Sold Future State Prison Site ± 325 Acres Haul Road

More information

RIVERLINESTAGEONE ATASMANIANGRENS POLICYINITIATIVE. LaunchedbyNickMcKimMP March2014. AuthorisedbyNickMcKimMP,ParliamentHouse,Hobart

RIVERLINESTAGEONE ATASMANIANGRENS POLICYINITIATIVE. LaunchedbyNickMcKimMP March2014. AuthorisedbyNickMcKimMP,ParliamentHouse,Hobart RIVERLINESTAGEONE ATASMANIANGRENS POLICYINITIATIVE LaunchedbyNickMcKimMP March2014 AuthorisedbyNickMcKimMP,ParliamentHouse,Hobart ` > YOUR TEAM IN STATE PARLIAMENT > WANT MORE INFO? State Parliamentary

More information

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition

More information

East West Rail Consortium

East West Rail Consortium East West Rail Consortium EWR Wider Economic Case: Refresh 18 th November 2015 Rupert Dyer Rail Expertise Ltd Rail Expertise Ltd. Tel: 01543 493533 Email: info@railexpertise.co.uk 1 Introduction 1.1 The

More information