This submission strongly objects to the following aspects of the proposed development:

Size: px
Start display at page:

Download "This submission strongly objects to the following aspects of the proposed development:"

Transcription

1 1 May 2017 Ms Bridget McNamara Senior Planner City of Sydney Council GPO Box 1591 Sydney NSW 2001 Dear Ms McNamara, DA/2017/349 SUBMISSION FOR STATE SIGNIFICANT DEVELOPMENT APPLICATION FOR STAGE 1 CONCEPT APPROVAL FOR THE CONSTRUCTION AND USE OF A 50 STOREY (RL198.22) MIXED USE BUILDING ELIZABETH STREET, SYDNEY (LOT 1 DP ) We refer to the State Significant Development Application (DA) DA/2017/349 made by DEXUS Funds Management Limited as Trustee for DOT Commercial Trust and Perron Investments Pty Ltd (DEXUS) seeking Development Consent for Stage 1 concept approval for the construction and use of a 50 storey (RL198.22) mixed use building providing hotel (within podium levels); lower ground, ground and mezzanine retail; tower with residential apartments; four levels of basement parking; and a pedestrian connection to Museum Station and potential connection to the future Pitt Street North Metro Station at Elizabeth Street, Sydney (the site). Milestone (AUST) Pty Limited (Milestone) lodge this submission of objection on behalf of the Owners Corporation of Victoria Tower (SP 51487) located at 197 Castlereagh Street, Sydney (Lot 1 DP ). In addition to the significant overshadowing impacts caused by proposal onto Hyde Park, Victoria Tower is, in many respects, the property most directly affected by the proposed redevelopment of Elizabeth Street, being located approximately 20m to the west. This submission strongly objects to the following aspects of the proposed development: 1. Concern with the Concept Plan. 2. Overshadowing to Hyde Park and the ANZAC Memorial. 3. The location of the proposed tower component on the northern portion of the site and the significant adverse impact of the proposal on iconic views to Sydney Harbour, North Head, Garden Island, Hyde Park and St Mary s Cathedral. 4. The building bulk and the associated environmental impacts on Castlereagh Street. 5. Lack of consideration of solar access impacts upon Victoria Tower. 6. Traffic impacts as a result of the proposed four levels of basement car parking. 7. Absence of community consultation with residents of Victoria Tower directly opposite the site. On the basis of the significant adverse environmental and significant adverse social impacts we request that the proposed development in its current form be refused. BACKGROUND Victoria Tower Victoria Tower is a 36-storey residential development and comprises commercial uses on the ground floor level along Castlereagh Street, parking from levels one to seven and a residential tower containing 258 apartments from level eight to 35. Milestone (Aust) Pty Limited 1

2 The Victoria Tower apartments have openable balconies linked to the main living rooms and bedrooms of the apartments. The eastern and northern elevation of the building have apartments which have significant views north east to Hyde Park and the St Mary s Cathedral, Sydney Harbour, Garden Island and North Head. From Level 8 upwards, east and north facing units enjoy views over Hyde Park and water views of Sydney Harbour (refer to Photos 2). The proposal will adversely impact on a minimum of 5-7 units per floor of the building with respect to view loss and a reduction of residential amenity. Park Regis Hotel Victoria Tower 197 Castlereagh Street, Sydney Church of Scientology Building Hyde Park Figure 1: Site Location Map Source: SIX Maps 2017 Proposed Development Site Elizabeth Street, Sydney Approximate separation distance of 20m Proposed Development Site Elizabeth Street, Sydney Victoria Tower 197 Castlereagh Street, Sydney Photo 1: Eastern Elevation of Victoria Tower, view from Park Street. Milestone (Aust) Pty Limited 2

3 SIGNIFICANT ADVERSE ENVIRONMENTAL IMPACTS Concern with Concept Plan We are concerned that the proposed Concept Plan will result in reduced meaningful input and safeguards being able to be provided in the planning assessment process to ensure that amenity including solar access is preserved to Hyde Park and that reasonable residential amenity is provided to the residents of Victoria Tower. The Concept Plan leaves so much detail for later in the planning process which is not considered acceptable for a significant and complex proposal which breaches both the FSR and solar access plane of LEP We request that the certainty and transparency necessary for matters relating to sunlight access, overshadowing, view analysis, streetscape impacts and design excellence requires more detail on both the Concept development drawings and within the supporting reports. Overshadowing to Hyde Park and ANZAC Memorial The proposed northern tower development exceeds the sun access plane and casts an unacceptable significant shadow on Hyde Park and the Anzac Memorial. There is no evidence in the supporting Shadow Analysis prepared by the proponent to confirm that there is a 50% reduction on the shadows in the extent of the total overshadowing within Hyde Park, which would require demonstration of the distance over Hyde Park, not the actual shadow footprint. There is also no certainty that the detailed design (to come later) with detailed elevation treatment and diversity in treatment will not result in further overshadowing. We do not support the location of the northern tower nor its overall height due to the fact that Hyde Park and the ANZAC Memorial will be significantly overshadowed by the proposal. The proposed development is therefore not in the public interest and should be refused. There is no evidence to suggest that the local community as well as residents and visitors to Sydney will benefit from the value captured by the proposed development through the proposed additional FSR (bonus) and the breach of the sun access plane when the proposed development has significant adverse overshadowing to Hyde Park. The public interest is only served by any redevelopment if there is no protusion into the sun access plane as well as significantly improved solar access to Hyde Park and no overshadowing to the ANZAC Memorial. To this end there are no planning or design merits to support the proposal with regard to the overshadowing impacts, which result in significant detrimental environmental and social impacts to the residents, workforce and visitors of Sydney. View Loss Both north and east facing apartments from levels 8 to 35 within Victoria Tower currently benefit from views of Hyde Park and St Mary s Cathedral with apartments from Level 21 and above having additional iconic views of Sydney Harbour, Garden Island and North Head. The photos below demonstrate the actual views currently enjoyed versus the view loss as a result of the development. Refer to Photos 2-4 below. Milestone (Aust) Pty Limited 3

4 Photo 2: Existing View from balcony of Apartment 2103 Victoria Tower Photo 3: View loss of the proposed development (shaded black area) Milestone (Aust) Pty Limited 4

5 Photo 4: This photo shows the actual view that will be lost as a result of the development Milestone (Aust) Pty Limited 5

6 Victoria Tower Iconic views loss of Sydney Harbour, North Head and parts of St Mary s Cathedral and Hyde Park Improved views towards Oxford Street and over Hyde Park (non-iconic) Figure 2: View loss analysis prepared by Milestone (estimate) A preliminary view analysis has been prepared by FJMT and included in the Design Report. Section of the EIS prepared by JBA outlines the potential impacts to existing views from the area and with regards to the Victoria Tower building states: Although some properties may experience a reduction in views over Hyde Park, other properties will gain additional views to the east as a result of the relocation of the tower form northward. Generally, north-east views over the intersection of Park Street and Elizabeth Street are uninterrupted by the proposed building envelope. The above statement does not take into consideration the significant iconic view loss to Sydney Harbour, Hyde Park, St Mary s Cathedral, Garden Island and North Head from units on the eastern and northern elevation of Victoria Tower from the proposed height of the podium and northern orientation of the tower on the site. Importantly the additional views gained to the east from the positioning of the tower component of the development on the northern portion of the site are not iconic and are of minimal amenity value to residents of the Victoria Tower. The Proponent has not provided sufficient information with regards to the view loss tests contained within the Tenacity Consulting v Warringah Council [2004] NSWLEC 140 Land and Environment Court judgement which requires assessment against the principles outlined within Table 1. Table 1: View Loss Planning Principles Planning Principle Court Ruling Comment Step 1. What views will be affected? The first step is the assessment of views to be affected. Water views are valued more highly than land views. Iconic views (eg. of the Opera House, the Harbour Bridge or North Head) are valued more highly than views without icons. Whole views are valued more highly than partial views, eg. a water view in which the interface between land and water is visible is more valuable than one in which it is obstructed. The views from the north and east facing residential units of Victoria Tower, from approximately Level 8 upwards, are of the iconic Hyde Park and St Mary s Cathedral, with views from Level 11 upwards of the iconic Sydney Harbour, Garden Island and North Head. The views include a land and water interface which is unobstructed. The proposed 50 storey (RL198.22) maximum height of the tower component at the north of the site will Milestone (Aust) Pty Limited 6

7 Step 2. Where views are obtained The second step is to consider from what part of the property the views are obtained. For example, the protection of views across side boundaries is more difficult than the protection of views from front and rear boundaries. In addition, whether the view is enjoyed from a standing or sitting position may also be relevant. Sitting views are more difficult to protect than standing views. obstruct this uninterrupted view. The podium and tower element will adversely affect views currently afforded by Victoria Tower residents. The view of Hyde Park, St Mary s Cathedral and Sydney Harbour from apartments on Levels 8-14 will be completely obliterated. From Level 15, 70% of the iconic view of Sydney Harbour, Hyde Park and St Mary s Cathedral will be lost. The proposed location of the tower element to the north of the site will result in the loss of significant iconic views from Victoria Tower. The views lost are exchanged for views of Hyde Park and Oxford Street that cannot be considered iconic. The iconic views are obtained from residents from Level 8 upwards of The Victoria Tower building. The views are obtained from the northern and eastern or primary façade of the building facing Castlereagh Street. The iconic views are obtained from living rooms and balconies from a standing position. Step 3. Extent of the impact Step 4. Reasonableness of the impact. The third step is to assess the extent of the impact. This should be done for the whole property, not just for the view that is affected. The impact on views from living areas is more significant than from bedrooms or service areas (though views from kitchens are highly valued because people spend so much time in them). The impact may be assessed quantitatively, but in many cases this can be meaningless. For example, it is unhelpful to say that the view loss is 20% if it includes one of the sails of the Opera House. It is usually more useful to assess the view loss qualitatively as negligible, minor, moderate, severe or devastating. The fourth step is to assess the reasonableness of the proposal that is causing the impact. A development that complies with all planning controls would be considered more than reasonable than one that breaches them. Where an impact on views arises as a result of noncompliance with one or more planning controls, even a moderate impact may be considered unreasonable. With a complying proposal, the question should be asked whether a more skilful design could provide the applicant with the same Apartments on Levels 8 to 14 are considered the worst impacted apartments. The view of Hyde Park and St Mary s Cathedral is completely lost. Apartments on Level 35 are the least impacted apartments. 30% of the view of Hyde Park is lost along with the spires of St Mary s Cathedral. At least 50% of the Sydney Harbour view is lost including land and water interface. It is acknowledged that some views will be gained of Hyde Park and Oxford Street to the south however these views are not iconic and do not provide the same amenity to Victoria Tower as existing. The proposed development is considered unreasonable in this regard. The severe and devastating loss of uninterrupted northern and eastern views for the benefit of residents of the proposed development is totally unreasonable and unnecessary. The reasonableness of the loss of iconic views has not been considered Milestone (Aust) Pty Limited 7

8 development potential and amenity and reduce the impact on the views of neighbours. If the answer to that question is no, then the view impact of a complying development would probably be considered acceptable and the view sharing reasonable. fully and the possibility for view sharing has not been captured in the proposed design of the podium and tower elements. The proposed cumulative effect to existing uninterrupted views is considered unreasonable and will result in little more than slot views to the east. It could not be said that the principle of view sharing has been applied. We request that Council consider the significant devastating view loss that will result from the proposed location of the tower component on the northern portion of the site and the 45m height of the podium component. Further, detailed analysis is required from the Proponent as the view loss has not been acknowledged or addressed within the application. We seek further detailed assessment from the proponent with regards to the View Loss Planning Principles, as outlined above, specifically for Victoria Tower apartments. The visual connection of the lower level apartments to Hyde Park provides a relief from the otherwise urban outlook. The loss of views from these apartments to the open space, whilst not iconic, will have a devastating impact on the amenity of affected residents. Photo 5: Approximate View Loss from the balcony of Level 8-14 Photo 6: Approximate View Loss from the balcony of Level 35 The below image provided by the proponent does not show the existing views afforded by the northern and eastern facing apartments on Level 21 or 32. Milestone (Aust) Pty Limited 8

9 Figure 3: View Analysis by FJMT Bulk and Scale/Streetscape Impact The proposed envelope consists of two elements: a podium built to the street wall alignment with a height of 45 metres and a tower form in the north with a height of 50 storeys RL The proposed podium component of the development is built to the boundary and creates a bulk and scale along Castlereagh Street that will result in a sense of enclosure of Castlereagh Street which is only 20 metres wide. No existing or proposed future streetscape analysis of Castlereagh Street has been provided with this Development Application. The average setback along Castlereagh Street is 8.8m. The proposal will result in around 15% of the building exceeding the average setbacks along Castlereagh Street with the built to boundary podium component. This results in an unacceptable sense of enclosure for pedestrians on Castlereagh Street and apartments on lower levels. Figure 4: Castlereagh Street View Source: Design Report Milestone (Aust) Pty Limited 9

10 Solar Access The proposal provides no consideration to the amenity currently afforded by the occupants of Victoria Tower in relation to solar access. The EIS prepared by JBA states that solar access analysis to neighbouring residential properties has been completed by Francis-Jones Morehen Thorp (FJMT) and is held in the Design Report. However the Design Report comprises shadow diagrams which only show the potential impact on Hyde Park. No shadow diagrams have been provided which show the impacts to solar access on the residential apartments of Victoria Tower from the 45m high podium component of the development. The proponent has provided inadequate analysis on this matter and therefore the application is incomplete. Vehicle Access Vehicle access to the proposed 4,900m² retail, 353 room hotel and 262 residential apartments is proposed from Castlereagh Street. Castlereagh Street is a four lane street which is one way in a southbound direction comprising two traffic lanes, a bus lane and a parking lane. There is an existing bus stop located directly adjacent to the site which serves as a major public transport stop along Castlereagh Street. A report entitled Transport Report for Proposed Mixed Use Development has been prepared by Colston Budd Rogers and Kafes Pty Ltd and has been submitted with the EIS by the Proponent. The Transport Report notes that a two-way driveway will be provided at the southern end of the site for vehicle access along with a separate set-down and pick-up area for the hotel component on Castlereagh Street. Point 8 of the Secretary s Environmental Assessment Requirements (SEARs) state that the EIS must provide the following: an assessment of the operation of existing and future transport networks including the light rail, ferry and bus networks and their ability to accommodate the trips generated by the development; The Proponent has not made mention of the potential impacts of the proposed access points along Castlereagh on bus services or made mention of the existing bus stop adjacent to the development or any requirement for this to be relocated. The proponent has not adequately addressed point 8 of the SEARS. At present, residents and visitors of the Victoria Tower have vehicle access to the existing undercover car parking area from Castlereagh Street from a combined driveway which is located directly opposite the subject site. The proposed setdown and pick-up area for the hotel and access arrangements to the site will result in queuing along Castlereagh Street, congestion and unnecessarily onerous travel conditions on the Victoria Tower residents. The analysis provided by the proponent of the potential traffic impacts along Castlereagh Street is inadequate and does not provide any certainty to the residents that the proposal will not result in significant disturbance and inconvenience to the Victoria Tower residents entering and leaving the existing basement car parking area. CONCERN WITH COMMUNITY CONSULTATION The Consultation Outcomes Report prepared by JBA on behalf of DEXUS notes that letters were provided to 500 surrounding landowners and residents on 25 November 2016 notifying occupants of the proposal and invited those interested to attend a community information session on the project. However, of the 83 owner occupied residential apartments in Victoria Tower, 80 residents advised that they did not receive any notification of the proposal by the Proponent. The Victoria Tower is incorrectly identified throughout the EIS as 201 Castlereagh Street, Sydney and it is understood that letters were sent to this address rather than to 197 Castlereagh Street. Hence, the proponent did not provide the Victoria Tower residents with sufficient opportunity for consultation. To this end the consultation process that was undertaken is not in accordance with the consultation requirements of the SEARS. CONCLUSION For the reasons contained in this submission the Development Application results in significant adverse environmental and social impacts. In addition, there has been inadequate analysis undertaken by the proponent in relation to overshadowing of Hyde Park and adjacent properties, view loss to Victoria Towers and other residential properties and view sharing. There is no justification on design and planning terms that would warrant the overshadowing extending beyond the sun access plane to Hyde Park and the ANZAC Memorial. Therefore there is no benefit to the community from the value captured in the proposed development which results in additional FSR and the additional height breaching the sun access plane. On this basis the proposal should be refused. Milestone (Aust) Pty Limited 10

11 Further, the community consultation process failed to include Victoria Tower, arguably the worst affected residential property. Residents were not notified and as a result were denied the opportunity to participate in the process. Furthermore the SEARS consultation requirements were not fulfilled and therefore the process did not include all key stakeholders. This process must be recommenced. We invite Council Officers to visit the apartments in Victoria Tower affected by view loss. Please contact the undersigned to arrange an inspection. We request Milestone is kept informed of the progress of this application. Should you require clarification of this matter please do not hesitate to contact the undersigned. Yours sincerely Milestone (AUST) Pty Limited Melissah Osland Senior Planner Lisa Bella Esposito Director Milestone (Aust) Pty Limited 11

APPENDIX E. Urban Design

APPENDIX E. Urban Design APPENDIX E Urban Design energy2u Alliance North Sydney Zone Substation Redevelopment September 2010 E August 2010 North Sydney Zone Substation Redevelopment Urban Design Impacts on 136-140 Walker Street

More information

Greenwich Community Association Inc Submission to the NSW Department of Planning and Environment

Greenwich Community Association Inc Submission to the NSW Department of Planning and Environment Greenwich Community Association Inc Submission to the NSW Department of Planning and Environment Concept State Significant Development Application SSD 18_9579 Sydney Metro Crows Nest Over Station Development

More information

FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES

FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES Page 2 of 28 Flinders Street Station and environs (looking west) INTRODUCTION Page 3 of 28 First built in 1854, Flinders Street Station

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

APPLICATION No. D/2016/476. Members of 2011 Residents Association object to this proposal and provide the following reasons for our objection:

APPLICATION No. D/2016/476. Members of 2011 Residents Association object to this proposal and provide the following reasons for our objection: 8 June 2016 APPLICATION No. D/2016/476 118A DARLINGHURST ROAD, DARLINGHURST NSW 2010 Members of 2011 Residents Association object to this proposal and provide the following reasons for our objection: Background:

More information

The decision on whether to take enforcement action falls outside the scope of delegated powers.

The decision on whether to take enforcement action falls outside the scope of delegated powers. 5k 16/0031 Reg d: 19.01.2016 Expires: 15.03.201 6 Ward: Nei. 24.02.201 BVPI Full Number of 11/8 On Con. 6 Target Weeks on Target? Exp: Cttee Day: GE No LOCATION: PROPOSAL: TYPE: Phillips Court, 32 Goldsworth

More information

27 January Stayover by Ausco 44 Formation Street Wacol QLD Dear Myke,

27 January Stayover by Ausco 44 Formation Street Wacol QLD Dear Myke, Our Ref: L01316/PAK/15-184 27 January 2016 Stayover by Ausco 44 Formation Street Wacol QLD 4076 Attention: Mr Myke Cavanagh Dear Myke, Re: Stayover on Zeller Chinchilla Workers Accommodation Facility Development

More information

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON March 2017 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 THE SUBJECT SITE 4 3.0 STRATEGIC PLANNING CONTEXT 6 4.0 SUMMARY AND CONCLUSIONS

More information

Bridge School, Longmoor Campus, Coppice View Road, Sutton Coldfield, Birmingham, B73 6UE

Bridge School, Longmoor Campus, Coppice View Road, Sutton Coldfield, Birmingham, B73 6UE Committee Date: 22/01/2015 Application Number: 2014/05949/PA Accepted: 08/12/2014 Application Type: Full Planning Target Date: 02/02/2015 Ward: Sutton Vesey Bridge School, Longmoor Campus, Coppice View

More information

Spadina Avenue Built Form Study Preliminary Report

Spadina Avenue Built Form Study Preliminary Report STAFF REPORT ACTION REQUIRED Spadina Avenue Built Form Study Preliminary Report Date: July 9, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,

More information

Concept Curtin Precinct Map and Code

Concept Curtin Precinct Map and Code Concept Curtin Precinct Map and Code Proposed changes from the revised Curtin Group Centre Draft Master Plan recommendations Disclaimer: This document is intended to show the proposed changes to the existing

More information

F6. Coastal Ferry Terminal Zone

F6. Coastal Ferry Terminal Zone F6. Coastal Ferry Terminal Zone F6.1. Zone description The purpose of the Coastal Ferry Terminal Zone is to provide for the integrated and efficient operation and development of ferry terminal facilities.

More information

Draft Western District Plan

Draft Western District Plan Powered by TCPDF (www.tcpdf.org) Draft Western District Plan Submission_id: 31732 Date of Lodgment: 15 Dec 2017 Origin of Submission: Online Organisation name: APP Corporation Pty Ltd Organisation type:

More information

I508. Devonport Peninsula Precinct

I508. Devonport Peninsula Precinct I508. Devonport Peninsula Precinct I508.1. Precinct description The purpose of the Devonport Peninsula precinct is to provide for the comprehensive residential development of the former Navy housing land

More information

GUNGAHLIN TOWN CENTRE

GUNGAHLIN TOWN CENTRE GUNGAHLIN TOWN CENTRE PLANNING REFRESH SNAPSHOT NOVEMBER 2018 CONTENTS INTRODUCTION....1 Australian Capital Territory, Canberra 2018 This work is copyright. Apart from any use as permitted under the Copyright

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

Request for Secretary s Environmental Assessment Requirements Sydney Metro City & Southwest Crows Nest Over Station Development

Request for Secretary s Environmental Assessment Requirements Sydney Metro City & Southwest Crows Nest Over Station Development 29 August 2018 Sydney Metro City & Southwest Crows Nest Over Station Development Table of Contents 1. Introduction... 6 1.1. Sydney Metro and over station development... 6 1.2. Crows Nest over station

More information

Planning application for minor changes to extension, internal modifications and 1 off-street disabled parking space to Dublin City Council

Planning application for minor changes to extension, internal modifications and 1 off-street disabled parking space to Dublin City Council Senior Executive Officer, Planning Department, Dublin City Council, Civic Offices, Wood Quay, Dublin 8. 25 th February 2016 BY HAND Re: No 6 St. Mary s Road, Ballsbridge Dublin 4 Planning application for

More information

Nov. 29, 2007 PL Ontario Municipal Board Commission des affaires municipales de l Ontario. Judith Sellens and Claire Sellens

Nov. 29, 2007 PL Ontario Municipal Board Commission des affaires municipales de l Ontario. Judith Sellens and Claire Sellens ISSUE DATE: Nov. 29, 2007 PL060515 Ontario Municipal Board Commission des affaires municipales de l Ontario Judith & Claire Sellens have appealed to the Ontario Municipal under subsection 42(6) of the

More information

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 401, 407-409 and 415 King Street West - Zoning Amendment Application - Preliminary Report Date: January 27, 2011 To: From: Wards: Reference Number: Toronto and East York Community

More information

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche: 5. REDCLIFFS/SUMNER COMMUNITY CRÈCHE RELOCATION Officer responsible Author Property Manager Kevin Mara, DDI 941 6401 The purpose of this report is to update the Council on the status of this project, in

More information

I507 Devonport Naval Base Precinct

I507 Devonport Naval Base Precinct I507. Devonport Naval Base I507.1. Precinct Description The Devonport Naval Base precinct covers most of the land held by the Crown for the HMNZ Naval Base (south yard) in Devonport. It incorporates the

More information

The amended planning controls will enable significant renewal to the Lend Lease Circular Quay site, consisting of the following key components:

The amended planning controls will enable significant renewal to the Lend Lease Circular Quay site, consisting of the following key components: ITEM 12. FILE NO: PLANNING PROPOSAL: ALFRED - PITT - DALLEY AND GEORGE STREETS BLOCK - LEND LEASE CIRCULAR QUAY SITE - LOCAL ENVIRONMENTAL PLAN AND DEVELOPMENT CONTROL PLAN AMENDMENT - PLANNING AGREEMENT

More information

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South.

Welcome. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium development, at Lionel Road South. Welcome Recent aerial view of the site with Griffin Park, the existing stadium, in the background. Welcome to our public exhibition which explains our proposed changes to the Brentford Community Stadium

More information

Planning Approval Consistency Assessment Form

Planning Approval Consistency Assessment Form Integrated Management System Planning Approval Consistency Assessment Form SM ES-FT-414 Sydney Metro Integrated Management System (IMS) Applicable to: Document Owner: System Owner: Status: Sydney Metro

More information

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report Date: July 22, 2014 To: From: Wards: Reference Number: North York Community Council Director,

More information

Draft Greater Sydney Region Plan

Draft Greater Sydney Region Plan Powered by TCPDF (www.tcpdf.org) Draft Greater Sydney Region Plan Submission_id: 31119 Date of Lodgment: 12 Dec 2017 Origin of Submission: Online Organisation name: Serapark Pty Ltd Organisation type:

More information

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering

More information

Ms P Goldfinger Date: 18 September 2017 Head of Programme The Architecture Centre Our Ref: M15/

Ms P Goldfinger Date: 18 September 2017 Head of Programme The Architecture Centre Our Ref: M15/ Unit 2 Eclipse Office Park High Street Staple Hill Bristol BS16 5EL T: 0117 956 1916 E: all@tetlow-king.co.uk F: 0117 970 1293 W: www.tetlow-king.co.uk Ms P Goldfinger Date: 18 September 2017 Head of Programme

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS APPENDIX 15.1-3 LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN Purpose of the Structure Plan Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS LSP-P1 The District

More information

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA Boston Redevelopment Authority 2/26/2014 Cassidy Playground Waterworks Design revisions made since the DPIR submission March 2013 Massing - Reduced project 16,030 SF, for a total project area of 218,520

More information

E08. Kaufland Stores in Victoria Advisory Committee Epping. Request to be heard?:

E08. Kaufland Stores in Victoria Advisory Committee Epping. Request to be heard?: Kaufland Stores in Victoria Advisory Committee Epping E08 Request to be heard?: Yes Full Name: Organisation: Affected property: Attachment 1: Attachment 2: Attachment 3: Comments: Bernard McNamara BMDA

More information

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager

Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager Perth and Kinross Council Development Control Committee 27 August 2008 Recommendation by Development Quality Manager 5(7) 08/414 Erection of kennels and cattery at Baltree Farm, Hatchbank, Kinross, KY13

More information

LHNCC 144/9 Commercial Street Edinburgh EH6 6LB. Mob: March 2018

LHNCC 144/9 Commercial Street Edinburgh EH6 6LB. Mob: March 2018 LHNCC 144/9 Commercial Street Edinburgh EH6 6LB Mob: 07810735518 e-mail: secretary@lhncc.org.uk 28 March 2018 David Leslie Head of Planning and Transport, PLACE, Waverley Court, 4 East Market Street, Edinburgh,

More information

City of Sydney Convenience Store Development Control Plan 2004

City of Sydney Convenience Store Development Control Plan 2004 City of Sydney Convenience Store Development Control Plan 2004 Table of Contents 1 Introduction 1 1.1 Citation 1 1.2 Area to which the plan applies 2 1.3 Commencement 1 1.4 Relationship to other environmental

More information

E40. Temporary activities

E40. Temporary activities E40. Temporary activities E40.1. Background Temporary activities contribute to Auckland's vibrancy and to the social, cultural and economic well-being of communities. Temporary activities also enable filming

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 20 February 2013 Report of Handling by Development Quality Manager 4(4)(ii) 13/80 Replacement and re-positioning of street furniture, The Birks,

More information

Welcome WINSTON GROUP. Welcome to our public exhibition on the Winston Group s proposals to redevelop 110 Walm Lane, Willesden Green.

Welcome WINSTON GROUP. Welcome to our public exhibition on the Winston Group s proposals to redevelop 110 Walm Lane, Willesden Green. Welcome Our proposed scheme (image for illustrative purposes only) Welcome to our public exhibition on the Winston Group s proposals to redevelop 110 Walm Lane, Willesden Green. The purpose of our exhibition

More information

BEST & FINAL OFFERS INVITED BY FRIDAY 10th JUNE 2016

BEST & FINAL OFFERS INVITED BY FRIDAY 10th JUNE 2016 KINGSTONWHARF SHOREHAM RESIDENTIAL/MIXED USE OR COMMERCIAL 3.96 Acres (1.605 ha) Freehold For Sale Shoreham KINGSTON WHARF Shoreham Port Shoreham Beach Kingston Wharf, Brighton Road, Shoreham By Sea, West

More information

Shadow Impact Assessment & 2323 Lake Shore Boulevard West. Etobicoke, Ontario

Shadow Impact Assessment & 2323 Lake Shore Boulevard West. Etobicoke, Ontario Shadow Impact Assessment 2313 & 2323 Lake Shore Boulevard West Etobicoke, Ontario REPORT: GWE12-099-SHADOWS-2014 Prepared For: Peter Swinton, B.Arch., MCIP, RPP PMG Planning Consultants 227 Bridgeland

More information

Green Fields Leppington

Green Fields Leppington Green Fields Leppington CONNTENTS 1.0 URBAN GROWTH - SYDNEY 2.0 MACRO CONTEXT 3.0 LOCAL ENVIRONMENTAL PLAN - LEPPINGTON 4.0 CONCEPT 5.0 GREEN ROOFS 6.0 APARTMENT REALISATION SCHEDULE 7.0 INFRASTRUCTURE

More information

The District of North Vancouver FACT SHEET

The District of North Vancouver FACT SHEET The District of North Vancouver Community Planning Dept. 355 West Queens Road North Vancouver British Columbia, V7N 4N5 COMMUNITY PLANNING FACT SHEET APPLICANT: THE SITE: Musson Cattell Mackey Partnership

More information

FREEHOLD FOR SALE Residential Development Opportunity. Manor and Tindal Sites, Bierton Road, Aylesbury, HP20 1HU

FREEHOLD FOR SALE Residential Development Opportunity. Manor and Tindal Sites, Bierton Road, Aylesbury, HP20 1HU BNP Paribas Real Estate 5 Aldermanbury Square London EC2V 7BP FREEHOLD FOR SALE Residential Development Opportunity Manor and Tindal Sites, Bierton Road, Aylesbury, HP20 1HU Tindal Centre Manor House Hospital

More information

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director 1. Expanding Heathrow The expansion of Heathrow will be one of the largest infrastructure projects in

More information

draft planning controls

draft planning controls Introduction The South precinct is bounded by Danks, Bourke, McEvoy and Morehead streets. Current land uses include Sydney Water s heritage listed Waterloo Pumping Station and Valve ouse, warehouses, commercial

More information

PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY

PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY PLANNING STATEMENT FORMER HSBC BANK, 18 HIGH STREET, AMESBURY 21 Dec 17 Introduction Amesbury has a vibrant nightlife with three public houses, two hotel bars and a nightclub within the town centre as

More information

RETAIL AND COMMERCIAL OFFICE STRATEGY

RETAIL AND COMMERCIAL OFFICE STRATEGY RETAIL AND COMMERCIAL OFFICE STRATEGY APPENDIX DD Appendix DD Sydney Metro City & South West Victoria Cross Over Station Development: Retail and commercial office strategy report Applicable to: Author:

More information

Sydney Football Stadium Redevelopment

Sydney Football Stadium Redevelopment 5 July 2018 The Hon. Anthony Roberts MP Minister for Planning GPO Box 5341 Sydney NSW 2001 Dear Minister Sydney Football Stadium Redevelopment I write to strongly object to the redevelopment proposal for

More information

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces.

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces. A trusted partner Multiplex is a trusted partner for all types of retail projects from Greenfield developments to refurbishments and vibrant mixed-use precincts, in both cities and regional locations.

More information

Stechford Masonic Hall, Richmond Road, Stechford, Birmingham, B33 8TN

Stechford Masonic Hall, Richmond Road, Stechford, Birmingham, B33 8TN Committee Date: 26/06/2014 Application Number: 2014/02213/PA Accepted: 01/04/2014 Application Type: Full Planning Target Date: 01/07/2014 Ward: Stechford and Yardley North Stechford Masonic Hall, Richmond

More information

Director, Community Planning, Toronto and East York District

Director, Community Planning, Toronto and East York District STAFF REPORT October 25, 2005 To: From: : Subject: Toronto and East York Community Council Director, Community Planning, Toronto and East York District Status Report OPA & Rezoning Application 05 117524

More information

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT

Old Limberlost Sports Club, Butlers Road, Handsworth Wood, Birmingham, B20 2NT Committee Date: 07/03/2013 Application Number: 2012/07986/PA Accepted: 29/11/2012 Application Type: Variation of Condition Target Date: 24/01/2013 Ward: Handsworth Wood Old Limberlost Sports Club, Butlers

More information

PARTNERING FOR SUCCESS

PARTNERING FOR SUCCESS PARTNERING FOR SUCCESS PARTNERING FOR SUCCESS WE HELP SHAPE THE WORLD AROUND US TO BECOME A BETTER PLACE. W e are the leading design and consultancy firm for natural and built assets. With a global network

More information

Appendix F Public authorities responses

Appendix F Public authorities responses Planning Proposal under sec 55 of the EP&A Act LEP Refinements Appendix F Public authorities responses Appendix F Public authorities responses Prior to public exhibition, consultation was made with the

More information

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS.

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. NATIONAL AIRPORTS SAFEGUARDING FRAMEWORK GUIDELINE D MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS. REVISION DATE VERSION NUMBER CHANGES MADE APPROVED

More information

CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206)

CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA (206) CITY MANAGER S OFFICE CITY OF MERCER ISLAND, WASHINGTON 9611 SE 36 th Street Mercer Island, WA 98040-3732 (206) 275-7600 www.mercergov.org August 18, 2016 Mr. Daniel M. Mathis Division Administrator Federal

More information

DRAFT PLAN OF MANAGEMENT MASSY GREENE

DRAFT PLAN OF MANAGEMENT MASSY GREENE DRAFT PLAN OF MANAGEMENT MASSY GREENE The draft Plan of Management for the Reflections Holiday Parks Massy Greene is on public exhibition from Monday, 19 November 2018 to Sunday, 6 January 2019. The plans

More information

PARTNERING FOR SUCCESS

PARTNERING FOR SUCCESS PARTNERING FOR SUCCESS PARTNERING FOR SUCCESS WE HELP SHAPE THE WORLD AROUND US TO BECOME A BETTER PLACE. W e are the leading design and consultancy firm for natural and built assets. With a global network

More information

Tesco Express, Alcester Road South, Kings Heath, Birmingham, B14 6EB

Tesco Express, Alcester Road South, Kings Heath, Birmingham, B14 6EB Committee Date: 27/11/2014 Application Number: 2014/06477/PA Accepted: 09/09/2014 Application Type: Variation of Condition Target Date: 09/12/2014 Ward: Brandwood Tesco Express, 281-289 Alcester Road South,

More information

Reimagining Central Station Precinct

Reimagining Central Station Precinct Reimagining Central Station Precinct Submission by BusNSW 1. Introduction BusNSW members provide bus and coach transport services throughout NSW under various contractual and regulatory environments. This

More information

SUMMARY OF MEETING 1. Curtin Group Centre Master Plan. Community Panel - 25 July Attendees. Tuesday 25 July 2017, 6.30pm 8:30pm.

SUMMARY OF MEETING 1. Curtin Group Centre Master Plan. Community Panel - 25 July Attendees. Tuesday 25 July 2017, 6.30pm 8:30pm. SUMMARY OF MEETING 1 Curtin Group Centre Master Plan Community Panel - 25 July 2017 Attendees Date Location Tuesday 25 July 2017, 6.30pm 8:30pm St James Uniting Church, 40 Gillies Street, Curtin Attendees

More information

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1.

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1. 54 PLANNING AND ECONOMIC COMMITTEE 8 JULY 2015 3 SUSTAINABLE PORTS DEVELOPMENT BILL Neil Quinn 1/58/14 #4771706 RECOMMENDATION: That Council endorses the Submission made to the Infrastructure, Planning

More information

Toga has appointed Urbis to assist in developing a Toga response to the draft District Plans. Urbis has

Toga has appointed Urbis to assist in developing a Toga response to the draft District Plans. Urbis has DRAF 31 March 2017 Greater Sydney Commission Draft District Plans PO Box 257 Parramatta NSW 2124 By email: engagement@gsc.nsw.gov.au Dear Sir/Madam We write on behalf of our client, Toga Property Group,

More information

AIDA COMMITTEE MEETING FRIDAY 2 AUGUST 2013 CORRESPONDENCE REPORT

AIDA COMMITTEE MEETING FRIDAY 2 AUGUST 2013 CORRESPONDENCE REPORT AIDA COMMITTEE MEETING FRIDAY 2 AUGUST 2013 CORRESPONDENCE REPORT CORRESPONDENCE IN NO DATE SOURCE DESCRIPTION ACTION RECEIVED 1 7/5/13 Susan Lewis Amendment C78 Advice that the Panel report on C78 has

More information

Supporting information to an application for preapplication 3 rd February 2017

Supporting information to an application for preapplication 3 rd February 2017 Development Services, West Lindsey District Council, Guildhall, Marshall s Yard, Gainsborough DN21 2NA Supporting information to an application for preapplication advice. 3 rd February 2017 Proposal for

More information

Perth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager Perth and Kinross Council Development Management Committee 27 March 2013 Report of Handling by Development Quality Manager 4(3)(ii) 13/138 Erection of a Structure for Floral Display in the Public Park,

More information

STAKEHOLDER AND COMMUNITY ENGAGEMENT

STAKEHOLDER AND COMMUNITY ENGAGEMENT STAKEHOLDER AND COMMUNITY ENGAGEMENT CHAPTER FIVE 5 Stakeholder and community engagement This chapter provides an outline of the consultation carried out on the project, and how this has influenced the

More information

Amendments C207 & C208

Amendments C207 & C208 Amendments C207 & C208 Hume Planning Scheme Julia Bell August 2017 Instructed by KING&WOOD MALLESONS On behalf of Hume City Council Amendments C207 & C208 Hume Planning Scheme Contents 1.0 Introduction...

More information

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW

THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 2015 THE LONDON BOROUGH OF HOUNSLOW THE LONDON BOROUGH OF HOUNSLOW (HOUNSLOW HIGH STREET QUARTER) COMPULSORY PURCHASE ORDER 201 THE LONDON BOROUGH OF HOUNSLOW RESPONSE TO WRITTEN REPRESENTATIONS BY LEGAL AND GENERAL ASSURANCE SOCIETY LIMITED

More information

PERTH AND KINROSS LOCAL REVIEW BODY

PERTH AND KINROSS LOCAL REVIEW BODY PERTH AND KINROSS Minute of Meeting of the Perth and Kinross Local Review Body held in the Hay Room, Dewar s Centre, Glover Street, Perth on Tuesday 23 August 2016 at 10.45am. Present: Councillors M Lyle,

More information

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

COLLEGE STREET STUDY Community Consultation Meeting. December 2015 COLLEGE STREET STUDY Community Consultation Meeting December 2015 2 Agenda 6:30 pm Introductions, Agenda Review and Welcome 6:40 pm Presentation Planning Recommendations 7:30 pm Questions and Discussion

More information

SOUTH WORCESTERSHIRE DEVELOPMENT PLAN - PREFERRED OPTIONS 2011: SCHEDULE OF ISSUES AND RECOMMENDED RESPONSES Row No.

SOUTH WORCESTERSHIRE DEVELOPMENT PLAN - PREFERRED OPTIONS 2011: SCHEDULE OF ISSUES AND RECOMMENDED RESPONSES Row No. 1. Inadequate justification Existing retail floor space is underused so no point in extending retail floor space. Instead, would prefer to have sympathetic housing development in the City Centre to attract

More information

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study STAFF REPORT ACTION REQUIRED Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study Date: August 14, 2009 To: From: Wards: Reference Number: North York Community Council

More information

Provincial Railway Guides Section:

Provincial Railway Guides Section: This guide deals with the maintenance roles and responsibilities of provincial railways and road authorities regarding public grade crossing maintenance; development of public grade crossing maintenance

More information

Updated Revalidation FAQs (October 2012)

Updated Revalidation FAQs (October 2012) West Midlands Strategic Health Authority Updated Revalidation FAQs (October 2012) Q1 What is the purpose of revalidation? The purpose of revalidation of a Doctors Licence to Practice is to give patients

More information

Front Carport Design Standards, Requirements & Application

Front Carport Design Standards, Requirements & Application Front Carport Design Standards, Requirements & Application THIS PAGE INTENTIONALLY LEFT BLANK. Carport: A structure designed or used to shelter vehicles that is open on at least two sides. Carport shall

More information

Newcastle Transport Program Newcastle Light Rail Determination Report

Newcastle Transport Program Newcastle Light Rail Determination Report Newcastle Transport Program Newcastle Light Rail Determination Report Date Author 25 July 2016 TfNSW Ref 5276649 Status Final TfNSW 2014 UNCONTROLLED WHEN PRINTED Page 1 of 19 Table of contents 1 Introduction

More information

GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED

GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED 1601214 Table of Contents 1. Introduction... 1 2. Observation 1: How has the GSC Draft

More information

CUMULATIVE IMPACTS CHAPTER TWENTY-SIX

CUMULATIVE IMPACTS CHAPTER TWENTY-SIX CUMULATIVE IMPACTS CHAPTER TWENTY-SIX 26 Cumulative impacts This chapter provides an assessment of the potential cumulative impacts as a result of the project, and identifies mitigation measures to minimise

More information

Revision of the Hunters Hill Development Control Plan (DCP) Chapter 4

Revision of the Hunters Hill Development Control Plan (DCP) Chapter 4 P R E S E R V I N G A U S T R A L I A ' S O L D E S T G A R D E N S U B U R B 5 August 2015 General Manager Hunters Hill Council NSW 2111 P.O. BOX 85, HUNTERS HILL, N.S.W. 2110 Cc: Clr Richard Quinn, Clr

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

Construction Staging Adelaide Street West

Construction Staging Adelaide Street West REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

DECISION/DIRECTION NOTE

DECISION/DIRECTION NOTE DECISION/DIRECTION NOTE Title: St. John s Municipal Plan Amendment Number 134, 2017 and St. John s Development Regulations Amendment Number 617, 2017 Proposed Rezoning to the Commercial Neighbourhood (CN)

More information

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

1803 West Hwy 160 Monte Vista, CO (719) TTY (719) USDA Forest Service Rio Grande National Forest http://www.fs.fed.us/r2/riogrande 1803 West Hwy 160 Monte Vista, CO 81144 (719)852-5941 TTY (719)852-6271 USDI Bureau of Land Management San Luis Valley Center

More information

Office of Utility Regulation

Office of Utility Regulation Office of Utility Regulation Competition for 3G Mobile Telecommunications Licence Report on the Consultation Document No: OUR 06/03 February 2006 Office of Utility Regulation Suites B1 & B2, Hirzel Court,

More information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District

More information

AIRSPACE ASSESSMENT REPORT

AIRSPACE ASSESSMENT REPORT AIRSPACE ASSESSMENT REPORT APPENDIX R Appendix R Sydney Metro City & South West Victoria Cross Over Station Development: Airspace Assessment report Applicable to: Author: Owner Status: Version: Date of

More information

A summary report on what the community told us

A summary report on what the community told us DECEMBER 2015 A summary report on what the community told us During August and September 2015, UrbanGrowth NSW in partnership with Newcastle City Council ran the Revitalising Newcastle community engagement

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

TALLAWONG STATION PRECINCT SOUTH CONCEPT PROPOSAL STATE SIGNIFICANT DEVELOPMENT APPLICATION

TALLAWONG STATION PRECINCT SOUTH CONCEPT PROPOSAL STATE SIGNIFICANT DEVELOPMENT APPLICATION TALLAWONG STATION PRECINCT SOUTH CONCEPT PROPOSAL STATE SIGNIFICANT DEVELOPMENT APPLICATION ENVIRONMENTAL IMPACT STATEMENT OVERVIEW Through great partnerships, great things can happen. That s why we re

More information

UNDER the Resource Mangement Act 1991 PANUKU DEVELOPMENT AUCKLAND. Applicant AUCKLAND COUNCIL. Regulatory Authority

UNDER the Resource Mangement Act 1991 PANUKU DEVELOPMENT AUCKLAND. Applicant AUCKLAND COUNCIL. Regulatory Authority 2002 BEFORE THE ENVIRONMENT COURT AT AUCKLAND ENV-2018-AKL-000078 UNDER the Resource Mangement Act 1991 IN THE MATTER BETWEEN of the direct referral of applications for resource consent for the necessary

More information

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager

Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager Perth and Kinross Council Development Control Committee 12 December 2012 Report of Handling by Development Quality Manager 4(3)(i) 12/570 Alterations and replacement windows at Milnathort Town Hall, 1

More information

ACCOMMODATION RULES. IČO: DIČ: CZ with registered office / place of business on Ostrovní 32, Prague 1

ACCOMMODATION RULES. IČO: DIČ: CZ with registered office / place of business on Ostrovní 32, Prague 1 ACCOMMODATION RULES Grandior Hotel Prague Na Poříčí 42 110 00 Prague 1 (hereinafter referred to as the Hotel or the Lodging Provider ) run by: Le-Investment, spol. s r.o. Ostrovní 32 110 00 Prague 1 IČO:

More information

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England

Consultation on Draft Airports National Policy Statement: new runway capacity and infrastructure at airports in the South East of England Tony Kershaw Honorary Secretary County Hall Chichester West Sussex PO19 1RQ Telephone 033022 22543 Website: www.gatcom.org.uk If calling ask for Mrs. Paula Street e-mail: secretary@gatcom.org.uk 22 May

More information

DC/18/ Demolition of existing public house with bed & breakfast at the Forresters Arms 53 Perry Vale SE23 2NE

DC/18/ Demolition of existing public house with bed & breakfast at the Forresters Arms 53 Perry Vale SE23 2NE DC/18/109536 Demolition of existing public house with bed & breakfast at the Forresters Arms 53 Perry Vale SE23 2NE While we have no objection to the principle of a hotel, in addition to a pub, operating

More information

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report STAFF REPORT ACTION REQUIRED 377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report Date: September 14, 2016 To: From: Wards: Reference Number: Toronto and East York Community Council

More information

This economic statement provides analysis with respect to land at Tarneit North, and has been prepared on behalf of Amex Corporation.

This economic statement provides analysis with respect to land at Tarneit North, and has been prepared on behalf of Amex Corporation. Memorandum To: From: Amex Corporation c/- Greg Wood, Tract Consultants Matthew Lee Cc: Date: 12 June 2013 Subject: Economic Statement for Amex site Tarneit North PSP Dear Greg, This economic statement

More information

Alternative Highest & Best Use Analysis Boutique Hotel

Alternative Highest & Best Use Analysis Boutique Hotel Alternative Highest & Best Use Analysis In response to numerous comments received from the public, as well as issues raised by the CCC in the Appeal Staff Report Substantial Issue Determination, the following

More information