1 Appendix D: PDS Q5 Baggage Project Definition Sheets Q5 Baggage BCT Number and Project Name as shown in Schedules 1851 : Post T5 Transfer Baggage System 3801 : T3 Integrated Baggage System 7664 : T2A (HET) Phase 2 Baggage System 8747 : Baggage Integration 8818 : Baggage Product Improvement Project 9351 : T1 Baggage Prolongation Programme 9355 : T1 Hold Baggage Screening 9399 : T4 Airline Moves - T : T4 Integrated Baggage

2 Q5 SCHEDULE FOR BAGGAGE PROJECTS BAGGAGE 1851 Transfer baggage system T5-T3 Complete tunnels civils work Tunnel baggage & IT installation T5C - 3A integration WIB Building construction WIB Baggage & IT Tunnel baggage commissioning WIB Building baggage commissioning System Integration T5-T3 Completion Confirmation (Trigger MS) 3801 T3 Integrated Baggage System Construction Decision Building Works Targets Confirmation Baggage Installation Commission & Test Complete T3 IBS (Trigger ms) Cut over from old to new Build & commission OOG and drop off 3810 T1-T4 Baggage Tunnel Refurbishment- additional works Procure Supplier Targets Confirmation Refurbishment works 9351 T1 Baggage Prolongation Brief Decision Procure Supplier Options Decision Construction Decision Manufacture Targets Confirmation Assembly 9355 T1 HBS Replacement Procure Supplier Options Decision Construction Decision Target Confirmation Replace HBS machines Remaining works 9399 T4 Airline Moves - T407 Manufacture External works & enclosure M&E and baggage system inst T4 Integrated Baggage Programme Procure Supplier Options Decision Construction Decision Manufacture baggage sorter Install baggage sorter Manufacture Targets Confirmation Install Test & Commission TBF Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 LEGEND Procure / Design Procure / Design Manufacture & Assembly Commissioning BAA Stage Milestone Trigger Milestone

3 Header Information Project Name: Name in Schedule: Post T5 Transfer Baggage System - T5 to T3 to T1/HET 1851 : Post T5 Transfer Baggage System Project Overview, Objectives and Status Overview: Description: Ref Drawings/Images: (Refer to Appendix A) Objectives: BAA: Airline: Status: BAA Lead Team: Capital & Solutions Project Delivery An automated DCV transfer baggage system (for in gauge bags) to operate as an extension to the T5 system extending to provide a transfer link through to T3 and T1. Plan Layout with key dates Passenger Service improvement (predictability of transfer baggage process including reduction in missed bag rates, reduction in minimum connection times) Business Improvements (income, health and safety and environmental efficiencies) Predictability of transfer baggage process Reduction in missed bag rates Reduction in minimum connection times Reduced overall operating costs Airline Engagement: Strategic Solution or DGS/IGS Stage Amber Civil works/tunnelling - Construction Baggage & Buildings - Construction Total Capital Budget (Outturn): 243,525,324 Refer to appendix B for cost information detail. Time: Brief Decision: Start on Site: Completion on Site: Operational Use Commences: September 2007 February 2008 August 2011 November 2011 Assumptions: The following points cover the significant delivery assumptions related to this project; The capacity of the system will be 3000 bags per hour each way with a 15 min peak of 750 bags The Western Interface Building (WIB) function will be located, as an early phase, within an extended T3 Integrated Baggage building and will provide an integrated facility and system. Construction completion T5 to T3 on defined as: The tunnel

4 completed and fully equipped with M&E services with the cart tracks installed and fully tested to meet the bag through put and 'in system time' trials (using test bags). Operational readiness will proceed after this completion date. At the T5 to T3 milestone completion date discharge from the tunnel at T3 will be onto docks at the WIB for onward transport of transfer bags to the T3 baggage system, as the new system will not be fully integrated until Docks will also be used at the WIB to load/unload bags transferring to and from T5 by tunnel. Operational readiness will be carried out from for the fully integrated system at T5C and the dock arrangement at WIB. Operational readiness will then be carried out again when the new T3 Baggage system is complete. Due to change in strategy reflected in Eastern Campus Master Plan Option 6 it is no longer possible to have an above ground Eastern Interface Building (EIB). It was therefore agreed with the airline community (by CCRS in May 09) to delete the EIB building and defer fit out of T1 to T3 Tunnel until Eastern Campus T2A Phase 2 is completed and full connectivity can be achieved c It was further agreed by the airline community (by CCRS) that the Trigger for T1 to T3 Connectivity in March 2012 is omitted and replaced with a new trigger for handover of Stand 117 for operational use in December This is to be ratified by the CAA following the agreed process. Balance of funding of 35.5m resulting from these changes will be transferred to other projects to be identified by CIP Working Group and JST for expenditure in Q5 with proportional trigger amount. Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive. Operational Issues Financial Revenue and Operational Cost (Opex) Impact: Revenue / Opex Cost Area: Revenue (+) / Cost (-) Impact per Commentary: Baggage Opex Annum: Neutral in Q5 Potential 3m pa saving on the current Inter Terminal Operation (ITO) van based baggage service, after estimated tunnel opex costs taken into account, achieved when full T5 to T1 system complete. Interim T5 to T3 tunnel and ITO service T3 to T1 is opex neutral. Both would be reflected in the cost per bag charge Assumptions: The following points cover the significant operational assumptions related to this project; Overall saving in transfer baggage operation will be achieved but details of system down time contingency utilising ITO van operation still to be confirmed. Out of gauge transfer baggage ITO van service will remain between terminals

5 and will be utilised in tunnel system down time contingency. Areas of Disagreement The following points cover any significant areas of disagreement between BAA and the Airline Community regarding this project. Airlines had requested a 15 min peak of 1000 bags (against 750 bag agreed design capacity) for robustness in peak periods but all subject to simulation during design. Capacity model that was issued and agreed by the Connectivity Airline Working Group (appointed by JST) in August 2007, based on a statistical approach resulted in a 15 min demand result of 750 bags max which was expressed as a 3000 bag per hour capacity. The tunnel diameter and baggage system is sized on this capacity. The OneWorld audit dated October 2008 stated that this approach is sound thus closing this issue. CAA Trigger Definition Sheet for T5 to T1 tunnel system incorrectly still refers to this 1000 bag peak and is to be changed using the Trigger CCRS process Note: Any disagreement noted must be read in the context of the airline engagement status shown above

6 Appendix A: Overview: Plan Layout with key dates T5C TBM Launch Chamber from April 2008 T3 WIB Shaft from June 2008 T1 EIB Shaft from September 2008 Tunnel Drive Commence February 2009 Open-face TBM Delivery December 2008 T5 T3 Operational August 2011 Commence Baggage Installation February

7 Appendix B: Project Delivery: Cost Information: Project Information Project Name: Post T5 Transfer Baggage System (Q5) BCT No.: 1851 Cost Information All information extracted from February 2010 month end process Base Costs: 198,505, % On-Cost: 32,928, % Opportunity 0 0 % Risk (R1 Allowance Only) 12,091,470 5 % Total (As entered into Artemis for Feb 2010 month end) 243,525, % Commentary: On-costs include a project specific insurance policy which is greater than usual for BAA Capital Projects (circa 3m)

8 Header Information Project Name: Name in Schedule: T3 Integrated Baggage System 3801 : T3 Integrated Baggage System Project Overview, Objectives and Status Overview: Description: Ref Drawings/Images: (Refer to Appendix A) Objectives: BAA: Airline: Status: BAA Lead Team: Capital & Solutions Project Delivery Provide a single modern facility to process all T3 transfers and departure baggage. Service quality equivalence. Improved system performance Improved operational safety. As BAA s Airline Engagement: Strategic Solution or DGS/IGS Stage Green Construction Decision Cost: Total Capital Budget (Outturn): 224,220,000 Refer to appendix B for cost information detail. Time: Brief Start on Completion on Operational Use Decision: May 2007 Site: Enabling ~August 2008 Site: Commences: August 2012 June 2013 Assumptions: The following points cover the significant delivery assumptions related to this project:- The project shall provide a replacement T3 baggage handling facility which has; A capacity aligned to 2026 forecasts; Provides a new single departures and transfers baggage system at Terminal 3 which incorporates like for like system functionality across the Heathrow campus; Provide screening and processing of baggage in line with United Kingdom (DfT), European EU300 (ECAC Document 30) and United States of America (TSA) legislative requirements; Provides a safe and very efficient operating environment; The project proposes to use new ULD management and ULD baggage loading technology automation and proposes to phase the implementation of this technology into operation such that risk is limited to a practical minimum. This automation technology requires a new operating model which has been developed in partnership with the internal and external stakeholders which is

9 now fully endorsed; The BAA bag charge associated with the existing T3 baggage system is low because of the limited functionality; The new T3 Integrated Baggage System design has been developed with a full understanding of the baggage operating costs. This knowledge has influenced the design and ensured that the bag charge remains competitively low. The project team is aware of the challenges surrounding the potential long term use of the apron area that surrounds the location of the T3 Integrated baggage development site. With the new Terminal 3 Integrated baggage system it will be possible to:- Provide an integrated baggage system which provides integrated make-up facilities for direct and transfer in/out-bound baggage; Provide a solution which has a modular expandable design construction philosophy in line with the phasing strategy; Provide a baggage system with an appropriately sized Early Bag Store; Provide any input to any output functionality; Meet the H&S requirements for a safe environment that meets BAA standards including manual handling; Provide a HBS operation that is equivalent to those in other HAL terminals; Provide secure and reliable Sort Allocation Computer & SCADA systems, comparable to those in other Heathrow Terminals; Meet Heathrow s intra-terminal and inter transfer target as defined in the Heathrow Baggage Product Service Level Agreement; Provide expedite facilities. Provide tug charging facilities in a suitable orientation and location to be agreed with the airlines Provide airline office accommodation and appropriate levels of handling staff accommodation giving due consideration to the impact of automation. Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive. Operational Issues Financial Revenue and Operational Cost (Opex) Impact: Revenue / Opex Cost Area: Revenue (+) / Cost (-) Impact per Commentary: The bag charge Opex of 17.77mPA assumes that the new system is used by multi-handlers. ( 17.77m/PA) Less Risk Opex Annum: 0.25m/PA Possible retail income (signage) As concluded following completion of the Scheme Design stage of work Assumptions: The following points cover the significant operational assumptions related to this project; Automation will be accepted by the airline/handler unions. The baggage system has been designed to operate with a single handler or with multiple handlers. In all instances Service Level Agreements are required to ensure that the system operatives use the system within operationally acceptable tolerances or Service Level Agreements (SLA s)

10 Areas of Disagreement The following points cover any significant areas of disagreement between BAA and the Airline Community regarding this project. Although confidence in the use of automation has been gained through the use of proven system suppliers, baggage, ULD and vehicle simulation tools, further confidence in the automation of ULD management and loading of baggage into ULD s needs to be provided using fully more simulation modelling and system emulation training. Staff training and staffing level changes need to be managed carefully. Note: Any disagreement noted must be read in the context of the airline engagement status shown above

11 Appendix A: Overview: Reference Drawing / Image: New T3IB Baggage Hall Level 100% Conventional Laterals

12 10 HBS - Link bridge and Tunnel Systems Interface (post November 09 load file update) Level 20 Robotic Build Area and Early Bag Store

13 Appendix B: Project Delivery: Cost Information: Project Information Project Name: T3 Integrated Baggage BCT No.: 3801 Cost Information All information extracted from February 2010 month end process Base Costs: 176,120, % On-Cost: 30,320, % Opportunity -1,870,000-1 % Risk (R1 Allowance Only) 19,650,000 9 % Total (As entered into Artemis for Feb 2010 month end) 224,220, % Commentary: Figures based on DL Cost Model Nr 6.1. Percentages are individually rounded up to 2 significant figures

14 Header Information Project Name: Name in Schedule: T2A Phase 2 Baggage System 7664 : T2A (HET) Phase 2 Baggage System Project Overview, Objectives and Status Overview: Description: Ref Drawings/Images: (Refer to Appendix A) Objectives: BAA: Airline: Q5 funding of early management and design resources for Eastern Campus Phase 2 baggage Overview Plan for Eastern Campus Baggage Masterplan 6 Alliance collocation Service quality improvement Operational efficiencies Alliance collocation Service quality improvement Operational efficiencies Status: BAA Lead Team: Capital & Solutions Airline Engagement: Strategic Solution or DGS/IGS Stage Amber Explore Project Delivery Total Capital Budget (Outturn): 20,963,694 Q5: 3, Q6: 17,463,694 Refer to appendix B for cost information detail. Time: Brief Decision: Start on Completion on Operational Use Site: Site: Commences: August 2010 To be agreed To be agreed To be agreed Assumptions: The following points cover the significant delivery assumptions related to this project; The need for a Phase 2 of the Eastern Campus is driven by passenger growth and asset life expectancy. Current forecasts excluding Mixed Mode effects suggest T2A Phase 1 will reach its design capacity by 2020, along with this Pier Service demands in Terminal 3 and the Eastern Campus would suggest the construction of additional infrastructure. Other key drivers are the life expectancy of Terminal 1 and the removal of T2A reliance on the Terminal 1 Baggage System. Enablers to the commencement of this project are: Completion of Eastern Campus Phase

15 Relocation of the Terminal 1 Non Aligned Airlines Reprovision of the British Airways Cathedral Hanger T2C/D safeguarding completed during Q5 BCT 7664 will be used during Q5 to fund early management and design resources for EC Phase 2 baggage Key scope and new infrastructure assumptions as stated in PDS 7720 T2A Phase 2 with the following baggage specific items highlighted Civil Construction of the TTS and Baggage tunnels between T2A, B and the remaining sections connecting T2B to T2C Baggage System fitout of T2A, B and C based on Masterplan Option 6 Baggage civils zones & basements in the extension of the T2A Terminal based on Baggage Masterplan Option 6 Retrofit and integration works required inside T2A Phase 1 Eastern Campus Phase 2 Operational Readiness Key scope assumptions for this project are: Early feasibility assessments Early constructability assessments Early optioneering assessments Early design cost advice Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive. Operational Issues Financial Revenue and Operational Cost (Opex) Impact: Revenue / Revenue (+) / Commentary: Opex Cost Area: Cost (-) Impact per Annum: Baggage To be advised Opex Assumptions: The following points cover the significant operational assumptions related to this project; Baggage design will take full account of operational issues with a view to reducing end to end operating costs. Areas of Disagreement The following points cover any significant areas of disagreement between BAA and the Airline Community regarding this project. Terminal 1 Airline occupancy post the opening of Eastern Campus Phase 1 has yet to be agreed. The Airline occupancy of Eastern Campus Phase 2 has yet to be agreed which affects the ultimate design and construction delivery program. Note: Any disagreement noted must be read in the context of the airline engagement status shown above

16 Appendix A: Overview: Baggage Masterplan 6 EASTERN APRON BAGGAGE MASTERPLAN T2C T2B T2A PT5TBS LI NK TO T 1-T4 T UNNEL HEADSHUNT OPT I ON B BELOW GROUND TRANSFER + DEPS BUILD AT PIERS OPTION 6 T2D PT5TBS EI B CURRENT L OCATION CUT & COVER RAW BAGGAGE TUNNEL LVL TRANSFER INPUT EXPEDITEHBS NOTIONAL EXTENSION TO ACCOMODATE 40MPPA I/O DOCKS 2500m2 BAGGAGE BASEMENT BASEMENT BAGGAGE TUNNEL LVL BAGGAGE TUNNEL LVL ITTTS SAFEGUARDED BAGGAGE BASEMENT TTS PHASE 1 BAGGAGE LINK BRIDGE TTS TUNNEL PASSENGER EXPEDITE OUTPUT DEPARTURES BUILD ARRIVALS SYSTEM DEPARTURES SYSTEM 30MPPA. SAFEGUARD FOR 40MPPA XX-GA-XXX

17 Appendix B: Project Delivery: Cost Information: Project Information Project Name: T2A Phase 2 Baggage System BCT No.: 7664 Cost Information All information extracted from February 2010 month end process Base Costs: 3,500, % On-Cost: 0 0 % Opportunity 0 0 % Risk (R1 Allowance Only) 0 0 % Total (As entered into Artemis for Feb 2010 month end) 3,500, %

18 Header Information Project Name: Name in Schedule: Baggage Integration 8747 : Baggage Integration Project Overview, Objectives and Status Overview: Description: Ref Drawings/Images: (Refer to Appendix A) Objectives: BAA: Airline: Status: BAA Lead Team: Capital & Solutions Project Delivery Integration of the baggage product & assurance across the programme where not already included within individual projects scopes None Provide a robust & reliable baggage operation across the baggage portfolio that aligns with the functionality agreed under airline constructive engagement: Integration of discrete baggage projects to provide a single baggage product for Heathrow Provide greater baggage operational reliability, flexibility & maintainability Fit with future terminal occupancy strategy Standard baggage product solutions across the portfolio Service quality equivalence Standard baggage product solutions across the portfolio Airline Engagement: Strategic Solution or DGS/IGS Stage Green Various Cost: Total Capital Budget (Outturn): 3,413,443 Refer to appendix B for cost information detail. Time: Brief Decision: Start on Site: Completion on Site: Operational Use Commences: TBD TBD TBD Assumptions: The following points cover the significant delivery assumptions related to this project; When the baggage programme was created there was recognition that not all projects included all required costs for assurance and integration. This project was created to provide budget to cover baggage product integration costs that are not already included within specific project cost plans. It is proposed to maintain this project as a centrally managed integration activity

19 rather than to allocate it across several projects currently in delivery (as was proposed in CIP 2009). Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive. Operational Issues Financial Revenue and Operational Cost (Opex) Impact: Revenue / Opex Cost Area: Revenue (+) / Cost (-) : Commentary: The detailed scoping for this project is yet to be completed. This is a 2010 activity. Assumptions: The following points cover the significant operational assumptions related to this project; None Areas of Disagreement The following points cover any significant areas of disagreement between BAA and the Airline Community regarding this project. None Note: Any disagreement noted must be read in the context of the airline engagement status shown above

20 Appendix B: Project Delivery: Cost Information: Project Information Project Name: Baggage Integration BCT No.: 8747 Cost Information All information extracted from February 2010 month end process Base Costs: 0 0 % On-Cost: 3,413, % Opportunity 0 0 % Risk (R1 Allowance Only) 0 0 % Total (As entered into Artemis for Feb 2010 month end) 3,413, % Commentary: Holding account to cover baggage integration costs that are not already provisioned for in specific cost plans for individual projects

21 Header Information Project Name: Name in Schedule: Baggage Product Improvement Project 8818 : Baggage Transition (NB. This project has been renamed as the Baggage Product Improvement Project) Project Overview, Objectives and Status Overview: Description: Ref Drawings/Images: (Refer to Appendix A) Objectives: BAA: Airline: Status: BAA Lead Team: Capital & Solutions Project Delivery Minor projects fund for baggage system improvements during Q5 to maintain performance, reduce opex or improve safety. None Provide a robust & reliable baggage operation across the baggage portfolio that aligns with the functionality agreed under airline constructive engagement: Provide greater baggage operational reliability, flexibility & maintainability Fit with future terminal occupancy strategy Standardise baggage product solutions across the portfolio Service quality equivalence Standard baggage product solutions across the portfolio Airline Engagement: Strategic Solution or DGS/IGS Stage Green Various Cost: Total Capital Expenditure (Outturn): 10,645,856 Refer to appendix B for cost information detail. Time: Brief Decision: Start on Site: Completion on Site: Operational Use Commences: TBD TBD TBD Assumptions: The following points cover the significant delivery assumptions related to this project; The Baggage & Flight Connections Programme was created after the Q5 CIP was set. To create the Programme, scope was transferred from other Programmes and from within existing projects. This project is a holding account in recognition that the projects created from this exercise may not include all user requirements. This fund is used to provide budget for additional minor projects identified by the airlines and other users which were not known about at the

22 time of the creation of the Baggage Programme. As the required scope is identified, a new BCT project is created to execute the works and the funds transferred to it from this holding fund. Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive. Operational Issues Financial Revenue and Operational Cost (Opex) Impact per annum: Revenue / Opex Cost Area: Revenue (+) / Cost (-) : Commentary: To be developed on a project by project basis. Assumptions: The following points cover the significant operational assumptions related to this project; None Areas of Disagreement The following points cover any significant areas of disagreement between BAA and the Airline Community regarding this project. None Note: Any disagreement noted must be read in the context of the airline engagement status shown above

23 Appendix B: Project Delivery: Cost Information: Project Information Project Name: Baggage Transition BCT No.: 8818 Cost Information All information extracted from February 2010 month end process Base Costs: 10,645, % On-Cost: 0 0 % Opportunity 0 0 % Risk (R1 Allowance Only) 0 0 % Total (As entered into Artemis for Feb 2010 month end) 10,645, % Commentary: BCT8818 is set up to hold budget which will eventually be transferred to a dedicated new BCT for project execution. Risk and on-cost allowances will be assigned in each project once the scope is defined

24 Header Information Project Name: Name in Schedule: T1 Baggage Prolongation 9351 : T1 Baggage Prolongation Programme Project Overview, Objectives and Status Overview: Description: Ref Drawings/Images: (Refer to Appendix A) Objectives: BAA: The T1 Prolongation projects are required in order to maintain the current T1 operation and meet future demands including the operation of the direct and transfer baggage system for T2A phase 1. Scope captured in BCT 9351 relates to: Domestic & International Reclaim units & feeder conveyors Emergency Stop Zoning Improvements Remote Flight Systems Monitors upgrade SCADA upgrade Low Level Controls upgrade (PLC s) Options being developed. These work-streams form part of the T1 Baggage Programme and respond to both the agreed document Heathrow Baggage 2018 Product and Operating Strategy and to the Eastern Campus Baggage Masterplan 6. Each work-stream has its own objectives, detailed in both the Statement of Need documents and the Brief Decision funding papers submitted to and approved at the Baggage Programme Boards in Nov 2009 and January General objectives across the scope include:- to improve system reliability to ensure the T1 PLCs remain supportable and resilient up to 2019 to ensure the T1 infrastructure has the capacity to meet the demand of the baggage system for T2A Phase 1 to bring the T1 PLCs & SCADA onto a common platform to facilitate the BAA IT Support Strategy. to reduce downtime through quicker response times and simpler fault identification, to improve speed of fault identification and rectification to reduce opex to reduce rebate payments to airlines to ensure compliance with BAA standards and

25 Airline: Status: BAA Lead Team: Capital & Solutions appropriate BS standards to reduce opex to improve manual handling where possible Airline Engagement: Strategic Solution or DGS/IGS Stage Amber Brief Decision Nov 2009/ Jan 2010 Options/ Construction Decision for SCADA Feb 2010 Options Decision March 2010 for all other Prolongation workstreams (& HBS) Construction Decision - September 2010 (BAA Bd, August 2010 Baggage Programme & Stakeholder Boards) Project Delivery Cost: Total Capital Budget (Outturn): 20,100,000 Refer to appendix B for cost information detail. Time: Brief Start on Completion on Operational Use Decision: November 2009 & January 2010 Site: Site: March 2010 March SCADA November other workstreams Commences: April 2013 Assumptions: An Assumptions register is being developed for these projects and will be available at the Options Decision gateway. Initial assumptions include:- The baggage operation will need to be maintained throughout, hence disruption to be minimised Passenger experience to be maintained to an agreed acceptable level Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive. Operational Issues Financial Revenue and Operational Cost (Opex) Impact: Revenue / Opex Cost Area: Revenue (+) / Cost (-) Impact per Commentary: Baggage Opex Annum: Not known at this stage An understanding of the opex implications forms part of the Options development process. The governance gateways are targeted for March

26 Assumptions: The following points cover the significant operational assumptions related to this project; Baggage operation to be maintained during the programme of works. A detailed phasing plan is being developed to share with stakeholders. Areas of Disagreement The following points cover any significant areas of disagreement between BAA and the Airline Community regarding this project. None at this stage Note: Any disagreement noted must be read in the context of the airline engagement status shown above

27 Appendix B: Project Delivery: Cost Information: Project Information Project Name: T1 Baggage Prolongation Programme BCT No.: 9351 Cost Information All information extracted from February 2010 month end process Base Costs: 20,100, % On-Cost: 0 0 % Opportunity 0 0 % Risk (R1 Allowance Only) 0 0 % Total (As entered into Artemis for Feb 2010 month end) 20,100, %

28 Header Information Project Name: Name in Schedule: T1 Hold Baggage Screening (HBS) Replacement 9355 : T1 HBS Project Overview, Objectives and Status Overview: Description: Ref Drawings/Images: (Refer to Appendix A) Objectives: BAA: Airline: To replace all necessary HBS machines in T1 to achieve EU compliance by September 2012 Options being developed. a) Meet EC/ DfT requirements for all baggage, both direct and transfers baggage by 1 st September 2012 b) To complete all works on site and hand back a fully operational baggage system in time for the Olympics ie by June 2012 c) Meet TSA requirements for US Carriers for both direct and transfers baggage d) The current HBS warranties end in March 2007 at which time the supplier has stated that they are unable to provide further guaranteed support. This replacement project resolves this issue e) The existing machines require replacement to safeguard the baggage operational performance from HBS failures f) To extend the life of the T1 baggage system to support the T2A Phase1 requirement to use the T1 outbound baggage system until T2A Phase 2 opening circ 2019 g) To comply with the Eastern Campus Masterplan 6, the Heathrow Baggage 2018 Product and Operating Strategy and the transition plans being developed. a) To combine the existing two screening control rooms into one + standby to generate Opex savings b) To configure the HBS equipment to minimise operational costs and manual handling Status: BAA Lead Team: Capital & Solutions Airline Engagement: Strategic Solution or DGS/IGS Stage Amber Brief Decision 15 Dec 2009 Options Decision 16 March

29 Project Delivery Cost: Total Capital Budget (Outturn): 23,057,710 Refer to appendix B for cost information detail. Time: Brief Start on Completion on Operational Use Decision: Site: December 2009 April enabling works September HBS strip out Site: Commences: September 2012 September 2012 Assumptions: An Assumptions register is being developed for this project and will be available at the Options Decision gateway. Initial assumptions include:- a) Demand forecast is based on the Crimson Line 2018 Schedule b) The Conan model has been applied to produce Bph assumptions c) Aer Lingus & Icelandair remain in T1 d) The baggage operation will need to be maintained throughout. e) T1 will support T2A Phase 1 operations for all HBS requirements from Phase 1 opening to Phase 2 opening. f) The bag demand flows up to 2018 are within the limits of the T1 system g) The HBS system layout to be configured to optimise level 1,2,3 & 4 operations Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive. Operational Issues Financial Revenue and Operational Cost (Opex) Impact: Revenue / Opex Cost Area: Revenue (+) / Cost (-) Impact per Commentary: Baggage Opex Annum: Not known at this stage 442k incremental opex assumed at Options Decision for third party contract support for new Examiner machines (provided by John Briggs). Opex savings associated with integrating TSA requirements and consolidating some/ all of the T1 screening rooms will be explored during scheme design when the future operation will be better understood. Assumptions: The following points cover the significant operational assumptions related to this project; Baggage operation to be maintained during the programme of works. A detailed phasing plan is being developed to share with stakeholders. A 'show & tell' is scheduled for 24th March 2010 for an initial roll out

30 Areas of Disagreement The following points cover any significant areas of disagreement between BAA and the Airline Community regarding this project. None at this stage Note: Any disagreement noted must be read in the context of the airline engagement status shown above

31 Appendix B: Project Delivery: Cost Information: Project Information Project Name: T1 HBS Replacement BCT No.: 9355 Cost Information All information extracted from February 2010 month end process Base Costs: 23,057, % On-Cost: 0 0 % Opportunity 0 0 % Risk (R1 Allowance Only) 0 0 % Total (As entered into Artemis for Feb 2010 month end) 23,057, %

32 Header Information Project Name: Name in Schedule: T4 Airline Moves - T : T4 Airline Moves - T407 Project Overview, Objectives and Status Overview: Description: Ref Drawings/Images: (Refer to Appendix A) Objectives: BAA: Airline: The T4 Airline Moves - T407 Project provides transfer out-of-gauge baggage screening facilities for Terminal 4. In production design stage The purposes of this project are: To provide transfer out-of-gauge screening facilities at Terminal 4 to meet the needs of the new handlers at T4 post-airline moves To provide these facilities in close-proximity to the main baggage hall and avoid the need to transport OOG baggage the temporary facility in the T4 EBS area To reduce mis-handled bags To improve end-to-end performance times for OOG transfer bags To reduce handler driving distances Status: BAA Lead Team: Capital & Solutions Airline Engagement: Strategic Solution or DGS/IGS Stage Green Production Design Project Delivery Cost: Total Capital Budget (Outturn): 5,638,181 Refer to appendix B for cost information detail. Time: Brief Decision: Start on Site: Completion on Site: Operational Use Commences: June 2009 April 2010 August 2010 August 2010 Assumptions: Transfer OOG baggage screening will continue in the T4 EBS area until the completion of the T407 project Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive

33 Operational Issues Financial Revenue and Operational Cost (Opex) Impact: Revenue / Commentary: Opex Cost Area: Revenue (+) / Cost (-) Impact per Annum: Baggage Opex Assumptions: The following points cover the significant operational assumptions related to this project; Transfer OOG baggage screening will continue in the T4 EBS area until the completion of the T407 project Areas of Disagreement The following points cover any significant areas of disagreement between BAA and the Airline Community regarding this project. None at this stage Note: Any disagreement noted must be read in the context of the airline engagement status shown above

34 Appendix B: Project Delivery: Cost Information: Project Information Project Name: T4 Airline Moves - T407 BCT No.: 9399 Cost Information All information extracted from February 2010 month end process Base Costs: 5,302, % On-Cost: included 0 % Opportunity 0 0 % Risk (R1 Allowance Only) 335,221 6 % Total (As entered into Artemis for Feb 2010 month end) 5,638, %

35 Header Information Project Name: Name in Schedule: T4 Integrated Baggage Programme 9516: T4 Integrated Baggage Project Overview, Objectives and Status Overview: Description: The T4 Integrated Baggage Project is required in order to maintain the current T4 operation and meet future demands, including future airline moves. The scope includes: HBS machine replacement (LHS and transfer) Front sorter maintenance platform Additional arrivals belts Additional flight make-up positions ULD stillage Ref Drawings/Images: (Refer to Appendix A) Objectives: BAA: Options being developed. The purposes of this project are: To provide sufficient arrivals and departures capacity to enable airline move steps 9.2 and 9.3 in 2010 and 2011 To achieve EC/DfT security compliance through the replacement of the remaining standard 1 HBS machines (check-in LHS and transfer) by 1 st September 2012 The current HBS warranties end in March 2007 at which time the supplier has stated that they are unable to provide further guaranteed support. This replacement project resolves this issue To enable the further development of the T4 baggage system (under a future project) to comply with the Heathrow 2018 Baggage Product and Operating Strategy document and where necessary to support growth in demand. To complete the front sorter replacement project (maintenance platform) Airline: To enable airline moves 9.2 and 9.3 To reduce mis-handled bags To improve manual handling

36 Status: BAA Lead Team: Capital & Solutions Airline Engagement: Strategic Solution or DGS/IGS Stage Amber Options Decision - March 2010 Project Delivery Cost: Total Capital Budget (Outturn): 53,090,000 Refer to appendix B for cost information detail. Time: Brief Decision: Start on Site: Completion on Site: Operational Use Commences: August 2009 April 2010 May 2011 Various Assumptions: An Assumptions register is being developed for these projects and will be available at the Options Decision gateway. Initial assumptions include:- Airline move sequence takes place as planned in January 2010 The baggage operation will need to be maintained throughout, hence disruption to be minimised Passenger experience to be maintained to an agreed acceptable level Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive. Operational Issues Financial Revenue and Operational Cost (Opex) Impact: Revenue / Opex Cost Area: Revenue (+) / Cost (-) Impact per Commentary: Baggage Opex Annum: Not known at this stage The very recent creation of the T4IB programme means that Opex information has not yet been generated. Assumptions: The following points cover the significant operational assumptions related to this project; Baggage operation to be maintained during the programme of works. A detailed phasing plan is being developed to share with stakeholders Areas of Disagreement The following points cover any significant areas of disagreement between BAA and the Airline Community regarding this project. None at this stage Note: Any disagreement noted must be read in the context of the airline engagement status shown above

37 Appendix B: Project Delivery: Cost Information: Project Information Project Name: T4 Integrated Baggage Programme BCT No.: 9516 Cost Information All information extracted from February 2010 month end process Base Costs: 53,089, % On-Cost: 0 0 % Opportunity 0 0 % Risk (R1 Allowance Only) 0 0 % Total (As entered into Artemis for Feb 2010 month end) 53,089, %

Performance monitoring report for 2014/15

Performance monitoring report for 2014/15 Performance monitoring report for 20/15 Date of issue: August 2015 Gatwick Airport Limited Summary Gatwick Airport is performing well for passengers and airlines, and in many aspects is ahead of the performance

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

Performance monitoring report 2017/18

Performance monitoring report 2017/18 Performance monitoring report /18 Gatwick Airport Limited 1. Introduction Date of issue: 20 July 2018 This report provides an update on performance at Gatwick in the financial year /18, ending 31 March

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

Pre-Coordination Runway Scheduling Limits Winter 2014

Pre-Coordination Runway Scheduling Limits Winter 2014 Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional

More information

Performance monitoring report for first half of 2016

Performance monitoring report for first half of 2016 Performance monitoring report for first half of 2016 Gatwick Airport Limited 1. Introduction Date of issue: 5 December 2016 This report provides an update on performance at Gatwick in the first half of

More information

Heathrow Airport. Airport Charges for 2013/14. Consultation Document

Heathrow Airport. Airport Charges for 2013/14. Consultation Document Heathrow Airport Airport Charges for 2013/14 Consultation Document Date: 26 th October 2012 Prepared by: Heathrow Airport Limited [Page Intentionally Blank] Table of Contents EXECUTIVE SUMMARY... 2 CHAPTER

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

BAA (SP) Limited Results for six months ended 30 June July 2011

BAA (SP) Limited Results for six months ended 30 June July 2011 BAA (SP) Limited Results for six months ended 30 June 2011 July 2011 Record Q2 Heathrow traffic Good overall service standards Strong financial results Successful dollar and sterling financings H1 2011

More information

Runway Scheduling Limits Summer 2015

Runway Scheduling Limits Summer 2015 Appendix 1 Runway Scheduling Limits Summer 2015 Arrivals Hour (UTC) 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 Average Total Summer 2014 38 39 37 40 40 41 40 43 43 41 41 44 44 43 38 44 20 39.8

More information

Heathrow (SP) Limited

Heathrow (SP) Limited 28 April 2014 Heathrow (SP) Limited Results for three months ended 31 March 2014 Strong operational and financial performance at the outset of the new regulatory period Highest ever passenger satisfaction

More information

Ronan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX

Ronan Delaney.   DELANEY_RONAN_AVIATION_JUN_2018.DOCX Ronan Delaney Profession Structural Engineer Current Position Associate Principal Global Aviation Skills Leader Joined Arup 1988 Years of Experience 25+ Nationality Irish Qualifications Bsc (Eng), Dip

More information

Performance monitoring report for first half of 2015

Performance monitoring report for first half of 2015 Performance monitoring report for first half of 2015 Gatwick Airport Limited 1. Introduction Date of issue: 11 November 2015 This report provides an update on performance at Gatwick in the first half of

More information

Gatwick Airport Limited. Results for six months ended 30 September 2012

Gatwick Airport Limited. Results for six months ended 30 September 2012 Gatwick Airport Limited Results for six months ended 30 September 2012 28 November 2012 Operational and financial performance Highlights Traffic growth + 1.2% EBITDA + 4.8% Capital expenditure 119.1m Despite

More information

Network Manager Adding value to the Network 29 September 2011

Network Manager Adding value to the Network 29 September 2011 Network Manager Adding value to the Network 29 September 2011 Alain FOURNIE Head of Operational Monitoring & Reporting Directorate Network Management EUROCONTROL The European Organisation for the Safety

More information

Analysts and Investors conference call. Q results. 15 May 2013

Analysts and Investors conference call. Q results. 15 May 2013 Analysts and Investors conference call Q1 2013 results 15 May 2013 Management summary Key messages of Q1 2013 +6% +9% +3.3%p. Q1 2013 operational KPIs are in line with 109.7 116.2 6.5 7.1 82.3 85.6 expectations,

More information

Strategic Transport Forum

Strategic Transport Forum Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH

More information

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018 Subject: M Arrangements for the establishment of a West Yorkshire Urban Traffic Management Control

More information

GATWICK AIRPORT LIMITED

GATWICK AIRPORT LIMITED GATWICK AIRPORT LIMITED Investor briefing CAA Q6 Final Proposals 7 October 2013 AGENDA Introduction Airport Commitments o Price o Service o Other terms CAA licence & monitoring, underpinning the Airport

More information

STANSTED AIRPORT LIMITED REGULATORY ACCOUNTS PERFORMANCE REPORT FOR THE YEAR ENDED 31 MARCH Financial Review...1. Performance Report...

STANSTED AIRPORT LIMITED REGULATORY ACCOUNTS PERFORMANCE REPORT FOR THE YEAR ENDED 31 MARCH Financial Review...1. Performance Report... PERFORMANCE REPORT CONTENTS Page Financial Review...1 Performance Report...3 Notes to the Performance Report...4 Stansted Regulatory Accounts PERFORMANCE REPORT Financial Review General overview Stansted

More information

ACI EUROPE POSITION PAPER. Airport Slot Allocation

ACI EUROPE POSITION PAPER. Airport Slot Allocation ACI EUROPE POSITION PAPER Airport Slot Allocation June 2017 Cover / Photo: Madrid-Barajas Adolfo Suárez Airport (MAD) Introduction The European Union s regulatory framework for the allocation of slots

More information

ANGLIAN WATER GREEN BOND

ANGLIAN WATER GREEN BOND ANGLIAN WATER GREEN BOND DNV GL ELIGIBILITY ASSESSMENT Scope and Objectives Anglian Water Services Financing Plc is the financing subsidiary of Anglian Water Services Limited. References in this eligibility

More information

General Notice --------------------------------------------------------------------------------------------------------------------- Date: 25 th March 2009 GN: 03/09 Subject: TARIFFS WITH EFFECT FROM 1

More information

Terminal Transformation Project. Airline consultation document March 2013

Terminal Transformation Project. Airline consultation document March 2013 Project Airline consultation document FOREWORD by Andrew Harrison, Managing Director Stansted is a great airport with great people; and importantly great infrastructure. The acquisition of Stansted Airport

More information

BAGGAGE HANDLING SYSTEM MAKES FAST CONNECTIONS

BAGGAGE HANDLING SYSTEM MAKES FAST CONNECTIONS BAGGAGE HANDLING SYSTEM MAKES FAST CONNECTIONS Terminal 3 offers a swift, pleasant and modern airport experience reinforcing Changi s award-winning reputation for exceptional service. A major aviation

More information

Heathrow Airport Property Rents 2016/17 Consultation Document

Heathrow Airport Property Rents 2016/17 Consultation Document Heathrow Airport Property Rents 2016/17 Consultation Document Date: 17 th June 2016 Prepared by: Heathrow Airport Limited Status: Final Page 1 of 13 Contents 1.0 Introduction 2.0 Heathrow Property Rents

More information

Midfield Satellite Concourse (MSC)

Midfield Satellite Concourse (MSC) ock Los Angeles TM. r Midfield Satellite Concourse (MSC) ` JRPORîS elos Angeles DEVELOPMENT GROUP Agenda Topics Ongoing TBIT and MSC Baggage Screening /Processing Challenges Recommended Integrated Comprehensive

More information

JOB DESCRIPTION FBO Manager

JOB DESCRIPTION FBO Manager JOB DESCRIPTION FBO Manager RESPONSIBLE TO: LOCATION: Managing Director London Biggin Hill Airport Ltd WHAT IS THE JOB LIKE? The role holder will have an oversight of operational issues and teams to ensure

More information

Decision Strategic Plan Commission Paper 5/ th May 2017

Decision Strategic Plan Commission Paper 5/ th May 2017 Decision Strategic Plan 2017-2019 Commission Paper 5/2017 5 th May 2017 Commission for Aviation Regulation 3 rd Floor, Alexandra House Earlsfort Terrace Dublin 2 Ireland Tel: +353 1 6611700 Fax: +353 1

More information

Update on the Thameslink programme

Update on the Thameslink programme A picture of the National Audit Office logo Report by the Comptroller and Auditor General Department for Transport Update on the Thameslink programme HC 413 SESSION 2017 2019 23 NOVEMBER 2017 4 Key facts

More information

Air Berlin PLC AGM 06 June 2013 London

Air Berlin PLC AGM 06 June 2013 London Air Berlin PLC AGM 06 June 2013 London airberlin a strong European carrier Market position as of 31 December 2012 No. 2 in core market: Germany / Austria / Switzerland No. 7 in Europe with 33.3 m guests

More information

Heathrow (SP) Limited

Heathrow (SP) Limited Draft v2.0 10 Feb Heathrow (SP) Limited Results for year ended 31 December 2013 24 February 2014 Strong operational and financial performance in 2013 Passenger satisfaction at record high and over 72 million

More information

Official Journal of the European Union L 186/27

Official Journal of the European Union L 186/27 7.7.2006 Official Journal of the European Union L 186/27 COMMISSION REGULATION (EC) No 1032/2006 of 6 July 2006 laying down requirements for automatic systems for the exchange of flight data for the purpose

More information

Citi Industrials Conference

Citi Industrials Conference Citi Industrials Conference June 13, 2017 Andrew Levy Executive Vice President and Chief Financial Officer Safe Harbor Statement Certain statements included in this presentation are forward-looking and

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

Performance monitoring report for the second half of 2015/16

Performance monitoring report for the second half of 2015/16 Performance monitoring report for the second half of 2015/16 Gatwick Airport Limited 1. Introduction DATE OF ISSUE: 7 JUNE 2016 This report provides an update on performance at Gatwick in the second half

More information

In-Service Data Program Helps Boeing Design, Build, and Support Airplanes

In-Service Data Program Helps Boeing Design, Build, and Support Airplanes In-Service Data Program Helps Boeing Design, Build, and Support Airplanes By John Kneuer Team Leader, In-Service Data Program The Boeing In-Service Data Program (ISDP) allows airlines and suppliers to

More information

LAMP 2 - FASI(S) Network

LAMP 2 - FASI(S) Network Future Airspace Strategy Implementation South: ATS Route Network managed by NERL under London Airspace Management Programme 2 LAMP 2 - FASI(S) Network Stage 1 Assessment Meeting Friday 23 rd February 2018

More information

DANUBE FAB real-time simulation 7 November - 2 December 2011

DANUBE FAB real-time simulation 7 November - 2 December 2011 EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

Air China Limited 2014 Annual Results Under IFRS

Air China Limited 2014 Annual Results Under IFRS Air China Limited 2014 Annual Results Under IFRS March 2015 Agenda Part 1 Results Highlights Part 2 Business Overview Part 3 Financial Overview Part 4 Outlook Part 1 Results Highlights Gradual Global Economic

More information

Measure 67: Intermodality for people First page:

Measure 67: Intermodality for people First page: Measure 67: Intermodality for people First page: Policy package: 5: Intermodal package Measure 69: Intermodality for people: the principle of subsidiarity notwithstanding, priority should be given in the

More information

SAN JOSÉ INTERNATIONAL AIRPORT

SAN JOSÉ INTERNATIONAL AIRPORT SAN JOSÉ INTERNATIONAL AIRPORT NEAR-TERM TERMINAL CAPACITY ANALYSIS AIRPORT COMMISSION AUGUST 14, 2017 August 14, 2017 AGENDA 1. Forecast Review (with 14 MAP High Case) 2. Gate Requirements and Aircraft

More information

Transport Delivery Committee

Transport Delivery Committee Agenda Item No. 11 Transport Delivery Committee Date 6 th March 2016 Report title Accountable Director Accountable Employee Virgin Trains Partnership Agreement Update Pete Bond, Director of Transport Services

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

Bartlett Square Welcome. Investment Framework. London Airport Ltd

Bartlett Square Welcome. Investment Framework. London Airport Ltd 1 Welcome Welcome to Luton s public exhibition on proposals for the (formerly known as Stirling Place) project which will comprise 2.5 acres of commercial development, providing up to 2,000 jobs for local

More information

FACILITATION (FAL) DIVISION TWELFTH SESSION. Cairo, Egypt, 22 March to 2 April 2004

FACILITATION (FAL) DIVISION TWELFTH SESSION. Cairo, Egypt, 22 March to 2 April 2004 19/2/04 English only FACILITATION (FAL) DIVISION TWELFTH SESSION Cairo, Egypt, 22 March to 2 April 2004 Agenda Item 2: Facilitation and security of travel documents and border control formalities 2.5:

More information

Information Paper 2 SUMMARY

Information Paper 2 SUMMARY COSCAP North Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme 14th STEERING COMMITTEE MEETING Performance Based Navigation (PBN) Update on ICAO Asia and Pacific Regional

More information

GATWICK AIRPORT LIMITED RESULTS FOR THE YEAR ENDED 31 MARCH 2014

GATWICK AIRPORT LIMITED RESULTS FOR THE YEAR ENDED 31 MARCH 2014 GATWICK AIRPORT LIMITED RESULTS FOR THE YEAR ENDED 31 MARCH 2014 OPERATIONAL AND FINANCIAL PERFORMANCE HIGHLIGHTS TRAFFIC GROWTH EBITDA GROWTH PROFIT FOR THE YEAR CAPITAL EXPENDITURE RAB* SENIOR NET DEBT*

More information

Update of the Airport Master Plan. Initial Runway & Land Use Alternatives

Update of the Airport Master Plan. Initial Runway & Land Use Alternatives Johannesburg International Airport Update of the Airport Master Plan Initial Runway & Land Use Alternatives 15 February 2006 BACKGROUND JNB current Master Plan Approved by ACSA Board in 1999 20-22 mppa?

More information

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development To: Chair Tom Galloway and Members of the Planning and Works Committee

More information

South East Queensland Stabling Site Selection Report January 2014

South East Queensland Stabling Site Selection Report January 2014 South East Queensland Stabling Site Selection Report January 2014 1 Contents Page 1. Introduction... 3 2. Project Background... 3 2.1 Stabling Options... 3 3. Site Selection Process... 4 4. Site Assessment

More information

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment

Ryeish Green and Grays Fruit Farm Sports Hub Projects. Shinfield South and Wokingham Without. Heather Thwaites, Director of Environment TITLE Ryeish Green and Grays Fruit Farm Sports Hub Projects FOR CONSIDERATION BY The Executive on 30 July 2015 WARD DIRECTOR LEAD MEMBER Shinfield South and Wokingham Without Heather Thwaites, Director

More information

FirstGroup plc South Western

FirstGroup plc South Western FirstGroup plc South Western Rail franchise award Monday 27 March 2017 Overview Delighted to be selected by the Department for Transport (DfT) to operate the South Western franchise for at least seven

More information

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018 s An Overview of GMR Megawide Consortium s Unsolicited Proposal March 2018 1 Metro Manila requires a multi-airport system and NAIA shall continue to play an anchor role in this system. Multi-Airport system

More information

Special edition paper Development of a Crew Schedule Data Transfer System

Special edition paper Development of a Crew Schedule Data Transfer System Development of a Crew Schedule Data Transfer System Hideto Murakami* Takashi Matsumoto* Kazuya Yumikura* Akira Nomura* We developed a crew schedule data transfer system where crew schedule data is transferred

More information

Changi Airport A-CDM Handbook

Changi Airport A-CDM Handbook Changi Airport A-CDM Handbook Intentionally left blank Contents 1. Introduction... 3 2. What is Airport Collaborative Decision Making?... 3 3. Operating concept at Changi... 3 a) Target off Block Time

More information

Keflavik International Airport Passenger forecast 2018

Keflavik International Airport Passenger forecast 2018 Keflavik International Airport Passenger forecast 2018 2 Keflavik International Airport Passenger forecast Keflavik International Airport 2018 3 Passenger Forecast 2018 Forecast 2018 6,409,312 3,971,969

More information

Commissioned by: Economic Impact of Tourism. Stevenage Results. Produced by: Destination Research

Commissioned by: Economic Impact of Tourism. Stevenage Results. Produced by: Destination Research Commissioned by: Produced by: Destination Research www.destinationresearch.co.uk December 2016 Contents Page Introduction and Contextual Analysis 3 Headline Figures 5 Volume of Tourism 7 Staying Visitors

More information

Economic Impact of Tourism. Hertfordshire Results. Commissioned by: Visit Herts. Produced by:

Economic Impact of Tourism. Hertfordshire Results. Commissioned by: Visit Herts. Produced by: Commissioned by: Visit Herts Produced by: Destination Research www.destinationresearch.co.uk December 2016 Contents Page Introduction and Contextual Analysis 3 Headline Figures 5 Volume of Tourism 7 Staying

More information

Toronto Pearson: Toronto Pearson:

Toronto Pearson: Toronto Pearson: Case Studies Toronto Pearson: Optimization study Check-in and baggage outbound (December 2014 March 2015) Toronto Pearson: Baggage operation improvement (March 2015 - ) OPTIMIZATION STUDY CHECK-IN AND

More information

Update on the development of the Regional Real Time Passenger Information (RTPI) System

Update on the development of the Regional Real Time Passenger Information (RTPI) System Agenda Item 11 Update on the development of the Regional Real Time Passenger Information (RTPI) System Committee Strategy and Programmes Date of meeting 23 November 2018 Date of report 30 October 2018

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

Heathrow Airport Property Rents Consultation Document

Heathrow Airport Property Rents Consultation Document Heathrow Airport Property Rents Consultation Document Date: 26 th May 2011 Prepared By: Heathrow Airport Limited Status: Final Page 2 of 12 Heathrow Airport Property Rents Consultation Heathrow Property

More information

GATWICK AIRPORT LIMITED RESULTS FOR THE SIX MONTHS ENDED 30 SEPTEMBER 2013

GATWICK AIRPORT LIMITED RESULTS FOR THE SIX MONTHS ENDED 30 SEPTEMBER 2013 GATWICK AIRPORT LIMITED RESULTS FOR THE SIX MONTHS ENDED 30 SEPTEMBER 2013 OPERATIONAL AND FINANCIAL PERFORMANCE HIGHLIGHTS UNDERLYING TRAFFIC GROWTH * EBITDA GROWTH CAPITAL EXPENDITURE RAB** SENIOR NET

More information

Enhanced Engagement Terms of Reference:

Enhanced Engagement Terms of Reference: Official Enhanced Engagement Terms of Reference: Assessment of how well HAL is engaging with and responding to the airline community on its plans for capacity expansion at Heathrow and whether this engagement

More information

MONTHLY PERFORMANCE REPORT MAY gatwickairport.com/performance

MONTHLY PERFORMANCE REPORT MAY gatwickairport.com/performance MONTHLY PERFORMANCE REPORT gatwickairport.com/performance DOCUMENT HISTORY Monthly Performance Report Published Republished Page Reference Metric Reason for Change May 01/05/2017 01/06/2017 12 Pier Service

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 23/05/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

Investor & analyst day. London, 28 September 2011

Investor & analyst day. London, 28 September 2011 Investor & analyst day London, 28 September 2011 2 years ago Andrew Macfarlane Fundamentally attractive airline But Assets Robust balance sheet Modern Airbus fleet; 50% owned Valuable route network & strategic

More information

Quarter 3 Interim management Statement

Quarter 3 Interim management Statement Quarter 3 Interim management Statement 3 months to 30 th June 2012 25 th July 2012 1 1 Strong Q3 performance - in a difficult market Revenue growth in line with expectations Constant currency RPS growth

More information

Prospect ATCOs Branch & ATSS Branch response to CAP Terminal Air Navigation Services (TANS) contestability in the UK: Call for evidence

Prospect ATCOs Branch & ATSS Branch response to CAP Terminal Air Navigation Services (TANS) contestability in the UK: Call for evidence Prospect ATCOs Branch & ATSS Branch response to CAP 1605 Terminal Air Navigation Services (TANS) contestability in the UK: Call for evidence Introduction This document sets out the views of Prospect s

More information

SSP progress in Latvia. Overview

SSP progress in Latvia. Overview SSP progress in Latvia CAA of Latvia: Ms. Ērika Neimane, Head of the ATM Section, ANS Division LGS: Mr. Jānis Lapiņš, Head of Safety, Quality, Security and Audit Management airbaltic: Mr. Lauris Miķelsons,

More information

LINCOLNSHIRE PARKING POLICY DRAFT

LINCOLNSHIRE PARKING POLICY DRAFT LINCOLNSHIRE PARKING POLICY DRAFT Draft 17/11/11 1 of 7 1. Introduction This document sets out and explains the County Councils Parking Policy. The County Council is planning to apply for powers to take

More information

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES

EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES EXHIBIT K TERMINAL PROJECT PROCEDURES PHASE I - DEVELOPMENT OF TERMINAL PROGRAM & ALTERNATIVES Over the term of the Master Amendment to the Airline Use and Lease Agreement, the Kansas City Aviation Department

More information

General Notice Tariffs with effect from 1 January 2017

General Notice Tariffs with effect from 1 January 2017 General Notice Tariffs with effect from 1 January 2017 Date: 30 September 2016 Reference: 01/16 Tariffs affected From 1 January 2017 Airside licences Baggage Check-in desks and Common use self-service

More information

GATWICK AIRPORT JOINS VINCI AIRPORTS December 2018

GATWICK AIRPORT JOINS VINCI AIRPORTS December 2018 GATWICK AIRPORT JOINS VINCI AIRPORTS December 2018 Asset presentation Gatwick is the 2 nd largest airport in the UK and the 8 th busiest in Europe with 46 mpax Key features 46 mpaxin FY18, in the wealthiest

More information

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018 NOISE MANAGEMENT BOARD - GATWICK AIRPORT Review of NMB/10 11 th April 2018 Synopsis This paper provides a brief review of the issues discussed at the NMB/10 meeting, which was held on 11 th April. Introduction

More information

Produced by: Destination Research Sergi Jarques, Director

Produced by: Destination Research Sergi Jarques, Director Produced by: Destination Research Sergi Jarques, Director Economic Impact of Tourism Oxfordshire - 2015 Economic Impact of Tourism Headline Figures Oxfordshire - 2015 Total number of trips (day & staying)

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015 Statistics of Air, Water, and Land Transport 2014 2013 1 Released Date: August 2015 Table of Contents Introduction... 4 Key Points... 5 1. Air Transport... 6 1.1 Aircraft movements... 6 1.2 Number of passengers...

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010 COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, XXX Draft COMMISSION REGULATION (EU) No /2010 of [ ] on safety oversight in air traffic management and air navigation services (Text with EEA relevance)

More information

Ground Handling Social Dialogue Support. The limitation of ramp handling licenses at Rome Fiumicino Airport

Ground Handling Social Dialogue Support. The limitation of ramp handling licenses at Rome Fiumicino Airport Ground Handling Social Dialogue Support The limitation of ramp handling licenses at Rome Fiumicino Airport Final conference Copenhagen 27-2 April 2017 2 A quick look at history at Rome Fiumicino After

More information

THE GLOBAL PERSPECTIVE ON GASP/GANP/GASOS

THE GLOBAL PERSPECTIVE ON GASP/GANP/GASOS THE GLOBAL PERSPECTIVE ON GASP/GANP/GASOS Capt. Denis Guindon Deputy Director, Monitoring and Oversight, Air Navigation Bureau International Civil Aviation Organization (ICAO) AFI Aviation Safety Symposium

More information

Enhancing customer service Offering the right services Improving integrated journeys Facilitating local

Enhancing customer service Offering the right services Improving integrated journeys Facilitating local London City Airport London City Airport: Background London City Airport (LCY) is the only airport so close to the centre of London. It is also London s fastest growing airport, having grown twice as fast

More information

Heathrow Consultation January March 2018

Heathrow Consultation January March 2018 A briefing from HACAN Heathrow Consultation January March 2018 Heathrow launched its biggest ever consultation on 17 th January. It closes on 28 th March. In reality, it is two consultations running in

More information

TfL Planning. 1. Question 1

TfL Planning. 1. Question 1 TfL Planning TfL response to questions from Zac Goldsmith MP, Chair of the All Party Parliamentary Group on Heathrow and the Wider Economy Heathrow airport expansion proposal - surface access February

More information

E-RECORDS. Heading towards a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT

E-RECORDS. Heading towards a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT Heading towards a SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT something about us Ambition > What we do: We are low-cost European point-to-point short-haul airline. > Where we do it: Intra-European

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

GATWICK AIRPORT LIMITED REGULATORY ACCOUNTS FOR THE YEAR ENDED 31 MARCH 2010

GATWICK AIRPORT LIMITED REGULATORY ACCOUNTS FOR THE YEAR ENDED 31 MARCH 2010 CONTENTS Page Financial review 1 Performance Report 5 Notes to the Performance Report 6 Financial review General overview During the year ended 31 March 2010, Airport Limited ( the Company ) underwent

More information

2. Our response follows the structure of the consultation document and covers the following issues in turn:

2. Our response follows the structure of the consultation document and covers the following issues in turn: Virgin Atlantic Airways response to the CAA s consultation on Economic regulation of capacity expansion at Heathrow: policy update and consultation (CAP 1658) Introduction 1. Virgin Atlantic Airways (VAA)

More information

Message from the Managing Director... r...

Message from the Managing Director... r... Message from the Managing Director... r... Our first full trading year has been a challenging and rewarding period for the team during the early life of the Company, a year during which we have gained

More information

E-RECORDS. Our Innovation journey - a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT

E-RECORDS. Our Innovation journey - a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT Our Innovation journey - a Paperless operation SWARAN SIDHU - HEAD OF FLEET TECHNICAL MANAGEMENT something about us > What we do: We are low-cost European point-to-point short-haul airline. > Where we

More information

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region

Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Performance Criteria for Assessing Airport Expansion Alternatives for the London Region Jagoda Egeland International Transport Forum at the OECD TRB Annual Meeting 836 - Measuring Aviation System Performance:

More information

Aeronautical pricing. July 2017 June Adrian Littlewood Chief Executive. Philip Neutze Chief Financial Officer

Aeronautical pricing. July 2017 June Adrian Littlewood Chief Executive. Philip Neutze Chief Financial Officer Aeronautical pricing July 2017 June 2022 Adrian Littlewood Chief Executive Philip Neutze Chief Financial Officer New pricing summary Reasonable price path and strong infrastructure investment 30-year Master

More information

Sawasdee Krup. Applications of RFID in Aviation. Symbol RFID Ecosystem Summit. Bangkok May Louis Kirk

Sawasdee Krup. Applications of RFID in Aviation. Symbol RFID Ecosystem Summit. Bangkok May Louis Kirk Sawasdee Krup Applications of RFID in Aviation Symbol RFID Ecosystem Summit Bangkok 10-11 May 2006 Louis Kirk Topics Symbol Products in Airports 2 Common Questions About RFID IATA Initiatives Standards

More information

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Agenda Brisbane Metro project update Packaging and procurement overview Panel discussion Audience Q&A The journey so far Planning

More information

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014. RESOLUTION NO. R2013-24 Establish a Fare Structure and Fare Level for Tacoma Link MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: PHONE: Board 09/26/2013 Final Action Ric Ilgenfritz, Executive Director,

More information

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project Item 1 To: Leadership Board On: 3 June 2015 Report by: Director of Development and Housing Services Heading: City Deal Strategic Business Cases 1. Summary 1.1 This report seeks approval from the Board

More information