University of Applied Sciences Amsterdam Department of Aviation Studies

Size: px
Start display at page:

Download "University of Applied Sciences Amsterdam Department of Aviation Studies"

Transcription

1

2 Table of contents Introduction... 3 Problem definition... 4 Objectives... 5 Demarcation... 6 List of appendixes February 13 th

3 Introduction The project Flight planning and operations combines several competences that were achieved in previous projects of the Aviation Engineering education. The flight planning project incorporates several subject, such as navigation, meteorology, manual usage and many regulations. Amsterdam Leeuwenburg Airlines (ALA) has given projectgroup 2A2L the assignment to plan flight VO-2011, code shared in the Sky team alliance with a short term wet leased KLM B ER, from Chili Arturo Merino Benitez Intl (SCEL/SCL) to Amsterdam Schiphol Airport (EHAM/AMS). This is an extreme long haul flight that lies beyond the designed operating range of a B ER. The project group has to investigate, plan and find solutions for malfunctions that occur during flight VO To compose a reliable and suitable flight plan for flight VO-2011 the start document is used to define the method of approach for the flight planning project. It is necessary to define and expose the problem that needs to be solved in this project. The flight should be planned to guarantee safe and profitable operations. Malfunctions that occur before and during the flight need to be solved and possible diversion airports must be processed in the flight plan (1). The main purpose of this project is to create a report that contains the flight plan for flight VO-2011, including the possible diversion airports, the solutions for the malfunctions and an alternate flight plan from the diversion airport to EHAM. This must be accomplished in a safe, accurate and economic way to minimize the operational costs for ALA (2). A delimitation is used to define the chapters an paragraphs that are included in the project report. When structuring the project, the needed information is used when planning the SCEL-EHAM flight and the use of unnecessary information could be prevented (3). The project report is written in US English, has a maximum pages of and meets the report lay-out requirements of the dictation Wentzel (2009). The deadline of the project report is on May 20 th at 13:30. The bibliography includes the functional sources, such as KLM manuals, flight planning handbooks and regulations (appendix 7). February 13 th

4 Problem definition What is the fastest and most efficient way to get from Santiago to Amsterdam, taking all conditions into account? Project group 2A2L must investigate and resolve several problems occurring during this flight, in order to perform a safe flight from Santiago (SCEL) to Amsterdam (EHAM). The following questions must be considered: What is the shortest route? What are the navigational principles? What are the meteorological principles? What are the weather conditions at all involved places? What are the geographical conditions en route? What are the specifications of the 777? What are the requirements for a diversion airport when needed? What is described in the mass and balance sheet and what does it means for flight planning? What are the fuel requirements and how does the pilot deals with it? What documentations are used in an everyday operation? What are the legal requirements for performing an ETOPS flight? How do the technical documentations and measurements of the Boeing ER look like before take-off? How do the operational flight plan (OFP) and an ICAO ATS flight plan (AFP) look like, which must be set up preliminary of the flight? Is the Boeing ER airworthy when these three malfunctions occur (sorted on time of appearance)? 1. APU fire detection system unserviceable (before take-off SCEL). 2. Engine overheat warning (after 10 hours of flight). 3. Left main tank fuel pumps unserviceable (during approach EHAM). Use must be made of the available documentations (manuals and legal documents) and weather reports to complete this investigation and to resolve the before mentioned problems. February 13 th

5 Objectives The result of this report will be a flight plan that is assigned by the Amsterdam Leeuwenburg Airlines. The flight plan will be created according to the Sky team timetable. The flight is scheduled at January 28, 2011 at 14:00 Zulu, with the leased B ER from KLM. Moreover, solutions for the possible malfunctions that will occur during the flight will be included in this report. Prior to composing the flight plan, research about the basics of navigations, meteorology, ATC and Operational flight plan, mass and balance will be done to obtain information for a proper flight plan. Also, information about the concerned airports will be gathered. This information includes meteorological conditions, standard instrument departure, airways, point of no return and ETOPS. Thereafter, the project group will be able to create an operational flight plan and an ATC flight plan. To compose a solution for the possible malfunction or failure that may occur during the flight, the project group must analyze what kind of procedures and decisions should be made during these situations. For this reason, several researches will be done to solve the failures and the malfunctions. The aircraft will be flying above different regions. Therefore the aircraft will be involved with various legislations, which the project group need consider about. The deadline of the project must also be taken into account. The final report must be handed out within 15 weeks on 20 th of May before 13:30 LT. Two hardcopies of the report and a digital file on a CD-Rom including the excel spreadsheet calculations will be presented. The report must meet the standards of Wentzel (2008) and will be written according to the method of 'Methodisch Ontwerpen' of author 'Van den Kroonenberg'. Moreover, the content of the report may not exceed 55 pages excluding the appendices. Finally, the conditions, regulations, and the group appointments are needed to be considered. This has a contributory effect on the final result, because every group member must follow the group agreements. Nevertheless, the improvements of the previous project experiences are also taken into account. The group appointments, conditions and regulations are added in the appendixes. February 13 th

6 Demarcation 1 Flight planning basics This chapter contains the flight planning basics. To create a flight plan from Santiago del Chili International Airport (SCEL/SCL) to Amsterdam International Airport (EHAM) a lot of procedures have to be taken in account. This chapter is divided into nine subparagraphs which are: Navigation, Meteorology, Manuals, OFP, ATC flight plan, Mass and Balance, Fuel, Regulations and B ER specifications. 1.1 Navigation The navigation basics need to be elaborated. Navigation will be divided into vertical navigation and horizontal navigation. In these sub chapters the basic navigation such as great circle navigation, positioning and distance calculations will be explained. Several navigation charts such as the Lambert- and Mercator charts. The navigation equipment that is used for positioning on earth will be considered. These include: VOR, DME, the magnetic compass and ILS. 1.2 Meteorology A limiting factor in the aviation world is the meteorology. Meteorological conditions around the airport may be inconvenient before take-off or approach. There are different kinds of weather reports that can be used to inform the cabin crew about the meteorological conditions. The different Charts and reports such as METAR, TAF, SWC, Upper Wind Chart, SIG- MET, AIRMET, VOLMET, NOTAM and ATIS will be explained. It is of importance to have knowledge about the reading method, to understand what the abbreviations in weather reports mean. 1.3 Manuals Each airplane has several types of manuals that are used to maintain an aircraft s airworthiness. This paragraph will mainly contain information about the manuals of the B ER, as this is the type of aircraft which will used to perform the operation from SCEL to EHAM. These manuals can be divided into Operation Manuals and Technical maintenance manuals. The operational manuals consider the AOM, BOM, ROM, the normal, non-normal and the emergency. The FRM, FIM AMM, MEL are the technical manuals that will also be described in this paragraph. 1.4 Operational flight plan It is important before a flight to have a plan to the destination. This plan is called the Operation Flight Plan (OFP). The OFP contains all information that is essential during the operation to the final destination. This paragraph will describe the information and codes that which can be found in the OFP. 1.5 ATC flight plan The ATC flight plan has to be made prior to departure. This flight plan contains information which is provided for Air Traffic Control authorities. This plan must be received by the ATC at least two hours prior to entry. The ATC flight plan serves as a check against permission to enter certain airspace and ensures effective ATC procedures once entering the airspace. This paragraph will explain such an ATC flight plan procedure and the structure of a flight plan form. 1.6 Mass and balance There are many factors that lead to efficient and safe operation of an aircraft. One of these factors is the mass and balance. The whole flight process from the ground to the destination, the mass and balance of the aircraft will continuously change. It is of importance for the pilot to take such changes in mass and balance into account during the flight. The principle of the centre of gravity and different categories of weight will be described in this paragraph. Also the mass and balance sheet will be discussed. 1.7 Fuel The required amount of fuel depends on the duration and distance of the flight. Before the flight, the fuel that is needed to reach the destination has to be calculated. Knowledge of the sort of fuel used, the SFC and the maximum amount that can be fuelled in the B ER is of importance before flight planning. 1.8 Regulations This paragraph contains the regulations concerning a flight planning procedure. Requirements with regard to the route and performance must be explained. ETOPS contains operational requirements and aircraft related requirements. The drift February 13 th

7 down, critical fuel scenario, entry point, equal time point and no-return point are explained. Knowledge about ETOPS is necessary to consider any route changes during the operation. The aircraft categories (II & III) need to be elaborated by the use of the aircraft regulations. The work and rest regulations for the crew of the aircraft need to be taken into account. 1.9 Boeing ER dimensions and specifications To create a flight plan it is necessary to know the specifications of the aircraft that is used during the flight. This paragraph contains information about number of passengers, cargo, maximum thrust, maximum take of weight, maximum range, dimensions of the airplane, fuel, etc. 2 Initial flight plan 2.1 SCEL airport A description and list of facilities and conveniences on SCEL, which are necessary to define the flight plan from here to EHAM Meteorological conditions The meteorological conditions are examined to ensure the wind is within the limits, the visibility, icing conditions etc. NO- TAMs are monitored for significant information SID The runway for takeoff is chosen. The departure route (SID) is chosen, with a fine description of the headings and altitudes. The navigational equipment that is available to ensure a safe instrumental departure is also elaborated Obstacles The surroundings of the airport are also examined; this is done to determine the minimal altitude to pass the mountains. The point where the airport SCEL cannot be reached during an engine failure is determined (point of no return). 2.2 En route The en route conditions are analyzed and several significant data are analyzed, such as the airways, point of no return and diversion airports Meteorological conditions The meteorological conditions are examined to ensure the wind is within the limits, the visibility, icing conditions, etc Airways A route will be chosen for an efficient and safe trip with multiple possibilities for diverting the aircraft. Mountain heights are also taken in consideration while choosing the airways Point of no return Also, the point at which the aircraft isn t able to return to the airport of original takeoff will be described (point of no return). This point is calculated due to the average fuel consumption of the aircraft (estimated) ETOPS This is done with the knowledge of remaining within the ETOPS limits. Airports that are suitable for diverting are chosen. The airports need to meet the requirements of the weather, the navigation equipment, air traffic control, runway distance available etc. The point of equal times (PET) is also determined. This is to create an overview at any time that shows which airport is closer. 2.3 EHAM airport A description and a list of facilities and conveniences on EHAM will be given. The only difference with SCEL is that the arrival routes are used (STAR) instead of the departure route Meteorological conditions The meteorological conditions are examined to ensure the wind is within the limits, the visibility, icing conditions, etc. NO- TAMs are monitored for significant information STAR The runway for the landing is chosen. The arrival route is chosen, with a fine description of the headings and altitudes. The navigational equipment that is available to ensure a safe instrumental landing are also elaborated. February 13 th

8 2.4 Performance The performance of the aircraft changes during the flight. The fuel is monitored and the mass and balance to. The operational flight plan and the air traffic service flight plan are elaborated Mass and balance A mass and balance sheet is made in order to calculate the center of gravity during flight (fuel distribution and passenger distribution) Fuel The actual fuel calculations during take-off, cruise and landing will be described. The non normal calculations will be elaborated in this sub-sub chapter as well. Non normal calculations include fuel calculations during one engine in operative situations. 2.5 Operational flight plan A summary concerning all of the above will be given in an operational flight plan. A representation of the route the aircraft is intended to fly. Charts during takeoff, cruise and landing will be presented as well. 2.6 ATC flight plan The endurance of the aircraft, the number of souls on board, aircraft color, the flight number and the intended destination are filled to the air traffic controllers. 3 Operation complications In this chapter the malfunctions are handled. These malfunctions are the flight malfunction and the ground malfunction. The flight malfunction is the malfunction during approach, on the route to EHAM. And the ground malfunction is the malfunction while on the ground on SCEL. 3.1 Ground malfunction The ground malfunction is the malfunction while on the ground at SCEL. The malfunction is the APU Fire Detection System u/s Description What is this kind of malfunction and what are the consequences on the aircraft or on the airworthiness? Procedures What is the procedure during an APU fire detecting system malfunction. Is there a possibility to fly or needs the aircraft maintenance Decisions Finally there need to be a decision. There two options; fly and repair the malfunction when the aircraft is at Amsterdam International Airport or the aircraft do not take-off and will need maintenance at the gate. 3.2 En route malfunction The route malfunction is the engine failure. This malfunction occurs after 10 hours after take-off during the flight to EHAM Description What is this kind of malfunction and what are the consequences on the aircraft or on the airworthiness. Is it still responsible to land and fly the aircraft safely? Procedures What is the procedure during an engine failure? Is it still possible to make it to the airport or need the aircraft to go to an alternate destination? Decisions What is this kind of malfunction and what are the consequences on the aircraft or on the airworthiness. Is it still responsible to land the aircraft safely? February 13 th

9 3.3 Flight diversion Is it possible to land everywhere or are there any requirements to land, even with a malfunction? Also it is necessary to know what the facilities are on the alternate airport maybe maintenance is necessary Airport requirements What kinds of requirements are necessary for the aircraft? Is it possible for the pilot to land the aircraft wherever he wants? Or are there some laws and restrictions for alternate opportunities? Possible airports It is not possible to land at any airport? So what are the alternate airports where the aircraft can land? And is the airport in reach of the aircraft, how serious is the malfunction and how fast need the aircraft to land? Facilities The aircraft is quite big, are there any facilities for the aircraft and passengers? Is it possible to repair the malfunction, or can you refuel? Are there facilities for the passengers, can go out of the aircraft or need all passengers remain seated? 4 Flight plan from diversion airport to EHAM 4.1 Diversion airport The airport that is used to divert to, is analyzed for a save departure Meteorological conditions The meteorological conditions are examined to ensure the wind is within the limits, the visibility, icing conditions etc. NO- TAMs are monitored for significant information SID The runway for takeoff is chosen. The departure route is chosen, with a fine description of the headings and altitudes. The navigational equipment that is available to ensure a safe instrumental departure are also elaborated Obstacles The surroundings of the airport are also examined, this is done to determine the minimal altitude to pass the mountains. The point where the airport SCEL cannot be reached during an engine failure is determined (point of no return). 4.2 En route The en route conditions are analyzed and several significant data are analyzed, such as the airways and diversion airports Meteorological conditions The meteorological conditions are examined to ensure the wind is within the limits, the visibility, icing conditions etc (NO- TAMs ect) Airways A route will be chosen for an efficient and safe trip with multiple possibilities for diverting the aircraft. Mountain heights are also taken in consideration while choosing the airways. 4.3 EHAM airport The airport EHAM is analyzed in a similar way as SCEL, the only difference is that the arrival routes are used instead of the departure route and there are no mountains in Holland Meteorological conditions The meteorological conditions are examined to ensure the wind is within the limits, the visibility, icing conditions etc (NO- TAMs ect). NOTAMs are monitored for significant information STAR The runway for the landing is chosen. The arrival route is chosen, with a fine description of the headings and altitudes. The navigational equipment that is available to ensure a safe instrumental landing is also elaborated. During this landing a malfunction occurs which needs to be elaborated in such a way that all the procedures are known. February 13 th

10 4.4 Performance The performance of the aircraft changes during the flight. The fuel is monitored and the mass and balance to. The operational flight plan and the air traffic service flight plan are elaborated Mass and balance A mass and balance sheet is made in order to calculate the center of gravity during flight (fuel distribution and passenger distribution) Fuel The actual fuel calculations will be described during takeoff, cruise and landing. The non normal calculations will be elaborated in this sub-sub chapter as well. Non normal calculations include fuel calculations during one engine in operative situations. 4.5 Operational flight plan A summary concerning all of the above in a operational flight plan. A representation of the route the aircraft is intended to fly. Charts during takeoff, cruise and landing will be presented as well. 4.6 ATC flight plan The endurance of the aircraft, the number of souls on board, aircraft color, the flight number and the intended destination are filled to the air traffic controllers. February 13 th

11 List of appendixes Appendix 1 Project assignment... 1 Appendix 2 Pyramid model... 2 Appendix 3 Planning... 7 Appendix 4 Group agreements... 8 Appendix 5 Chairman and minutes secretary list... 9 Appendix 6 Contact list Appendix 7 Literature list February 13 th

12 Appendix 1 Project assignment February 13 th

13 Appendix 2 Pyramid model February 13 th

14 February 13 th

15 February 13 th

16 February 13 th

17 February 13 th

18 Appendix 3 Planning February 13 th

19 Appendix 4 Group agreements Official warnings have to be noted in the minute. Inform the chairman of the week as soon as possible if you will be later. You will get an official warning if you do not have a valid reason. After two officials warnings you will be kicked out of the group, in agreement of the project teacher. If you get caught for plagiarism, you are obliged to talk to the teacher. You will be kicked out of the group if the situation is seriously enough. The work is done means; that it is completely written, checked by your buddy and corrected by the writer in the valid layout before the actual deadline. The writer and his buddy can make appointments with each other when the work will be written and checked. Use the option wijzigingen bijhouden in Word when you check the work of your buddy. The deadlines can be moved if everyone agrees. This has to be marked up in de minutes. It is not allowed to complain afterwards about the amount of work and to use this as a reason for not finishing your work. This will result in an official warning. The day before the official meeting, before 10:00 p.m., the chairman sends the topics of the meeting by to all group members. The secretary publishes his written minutes on BSCW before 11:59 p.m. the very same day of the meeting. At least once a week there will be an official meeting beside the project lesson. Discussions are not allowed by . To improve the communication the problem will be handled at school, face to face. If the discussion is urgent then it is possible to contact each other over the phone. HvA- will be read by everyone at least once a day. The preset lay-out on BSCW will be used for this project. All written documents by the group members will be saved in docx format. Before an official meeting, the chairman should have mailed/discuss a date and time for that particular meeting at least 24hours in advance. After the majority of the group decides that a paragraphs content is not adequate enough, the writer has to re do its part. If a writer has to re do its part twice, he or she receives a official warning When being late, more than five minutes, without a good reason. When doubt if the reason is valid, the majority of the group decides if it is a valid reason or not. The decision can be made to give a official warning to that person Too late: Too late is later than the agreeing time of the meeting, or later than the time the Project meeting or Project-lesson is beginning within a margin of 5 minutes. Important: when a group member is too late he calls or sent the chairman a text message. In case this is not possible call or sent the minutes secretary a text message. When you can t reach each of these people, call one other person of the group. When a group member is more than once too late in the whole project time, without a valid reason: note the protocol. The buddies are divided as follows: Yorick Biersteker with Yalen Wong Shilan Damman with Jordi van Delft Steven van der Stelt with Victor Ravelli Joran Hoogenberg with Johnny Rama Hernandez February 13 th

20 Appendix 5 Chairman and minutes secretary list Chairman Minute 1 Yorick Biersteker Shilan Damman 2 Jordi van Delft Joran Hoogenberg 3 Joran Hoogenberg Shilan Damman 4 Shilan Damman Jordi van Delft 5 Johnny Rama Hernandez Victor Ravelli 6 Victor Ravelli Steven van der Stelt 7 Steven van der Stelt Yalen Wong 8 Yalen Wong Yorick Biersteker 9 Yorick Biersteker Johnny Rama Hernandez 10 Shilan Damman Jordi van Delft 11 Jordi van Delft Joran Hoogenberg 12 Joran Hoogenberg Johnny Rama Hernandez 13 Johnny Rama Hernandez Victor Ravelli 14 Victor Ravelli Steven van der Stelt 15 Steven van der Stelt Yalen Wong 16 Yalen Wong Yorick Biersteker 17 Yorick Biersteker Shilan Damman 18 Shilan Damman Jordi van Delft 19 Jordi van Delft Joran Hoogenberg 20 Joran Hoogenberg Johnny Rama Hernandez 21 Johnny Rama Hernandez Victor Ravelli 22 Victor Ravelli Steven van der Stelt 23 Steven van der Stelt Yalen Wong February 13 th

21 Appendix 6 Contact list Yorick Biersteker Mobiel: yorick_biersteker@hotmail.com Jordi van Delft Mobiel: jordiii_1992@hotmail.com Johnny Rama Hernandez Mobiel: Hernandezjr9@hotmail.com Steven van der Stelt Mobiel: svdstelt@hotmail.com Shilan Damman Mobiel: sweetyshilan@hotmail.com Joran Hoogenberg Mobiel: joranhoogenberg@hotmail.com Victor Ravelli Mobiel: victor_ravelli@hotmail.com Yalen Wong Mobiel: yalenwong@live.nl February 13 th

22 Appendix 7 Literature list February 13 th

Operational Procedures

Operational Procedures CHAPTER four OPERATIONAL PROCEDURES Contents ESTABLISHMENT OF PROCEDURES............................ 29 PERFORMANCE AND OPERATING LIMITATIONS................... 29 MASS LIMITATIONS......................................

More information

3) There have some basic terminology of a flight plan and it is the fuel calculations

3) There have some basic terminology of a flight plan and it is the fuel calculations QUESTION BANK FLIGHT PLANNING (CHAPTER 1) Introduction to Flight Planning 1) It is a duty of flight operation officer (FOO) to do a flight plan before the aircraft want to fly. a) i. Give the definition

More information

Airmen s Academic Examination

Airmen s Academic Examination Airmen s Academic Examination E4 ualification Airline Transport Pilot (Airplane, rotorcraft and airship) No. of questions; time allowed 20 questions; 40 minutes Subject Civil Aeronautics Law (subject code:

More information

Supplement No. 17 published with Gazette No. 22 dated 25 October, THE AIR NAVIGATION (OVERSEAS TERRITORIES) ORDER 2007, S.I No.

Supplement No. 17 published with Gazette No. 22 dated 25 October, THE AIR NAVIGATION (OVERSEAS TERRITORIES) ORDER 2007, S.I No. CAYMAN ISLANDS Supplement No. 17 published with Gazette No. 22 dated 25 October, 2010. THE AIR NAVIGATION (OVERSEAS TERRITORIES) ORDER 2007, S.I. 2007 No. 3468 THE AIR NAVIGATION (FEES) REGULATIONS, 2010

More information

Flight Operations Officer Recurrent Training Syllabus

Flight Operations Officer Recurrent Training Syllabus Page 1 Course Duration: 3 days per module 24 classroom hours Proficiency Requirements - Flight Dispatch Personnel (ICAO) Proficiency requirements for flight dispatch personnel, as well as acceptable methods

More information

Figure 3.1. Foreign Airport Assessment Aid

Figure 3.1. Foreign Airport Assessment Aid 01 oauu-t.d Foreign Airport Assessment Aid: Date of Assessment: Assessment Conducted by: Airport ICAO/IATA Identification: Hours of Operation: Figure 3.1. Foreign Airport Assessment Aid [ Airport Name:

More information

distance and time to descend from a given level or altitude. LO Find the frequency and/or identifiers of radio-navigation aids from charts.

distance and time to descend from a given level or altitude. LO Find the frequency and/or identifiers of radio-navigation aids from charts. Anne II to ED Decision 2016/008/R (1) For mass definitions, please refer to Chapter D. Syllabus 033 00 00 00 FLIGHT PLANNING AND MONITORING Aeroplane Helicopter / 033 01 00 00 FLIGHT PLANNING FOR VFR FLIGHTS

More information

CRUISE TABLE OF CONTENTS

CRUISE TABLE OF CONTENTS CRUISE FLIGHT 2-1 CRUISE TABLE OF CONTENTS SUBJECT PAGE CRUISE FLIGHT... 3 FUEL PLANNING SCHEMATIC 737-600... 5 FUEL PLANNING SCHEMATIC 737-700... 6 FUEL PLANNING SCHEMATIC 737-800... 7 FUEL PLANNING SCHEMATIC

More information

JAA Administrative & Guidance Material Section Five: Licensing, Part Two: Procedures

JAA Administrative & Guidance Material Section Five: Licensing, Part Two: Procedures INTRODUCTION Preliminary general remark: 1 To fully appreciate and understand subject 033, the applicant will benefit from background knowledge in subjects 010, 020, 031, 032/034, 050, 060, 070 and 080.

More information

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS

CHAPTER 5 AEROPLANE PERFORMANCE OPERATING LIMITATIONS CHAP 5-1 CHAPTER 5 PERFORMANCE OPERATING LIMITATIONS 5.1 GENERAL 5.1.1 Aeroplanes shall be operated in accordance with a comprehensive and detailed code of performance established by the Civil Aviation

More information

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT CHAP 7-1 CHAPTER 7 COMMUNICATION AND NAVIGATION EQUIPMENT 7.1 COMMUNICATION EQUIPMENT 7.1.1 An aeroplane shall be provided with radio communication equipment capable of: a) conducting two-way communication

More information

Learning Objectives 7.3 Flight Performance and Planning Flight Planning & Flight Monitoring

Learning Objectives 7.3 Flight Performance and Planning Flight Planning & Flight Monitoring 030 00 00 00 FLIGHT PERFORMANCE AND PLANNING 033 00 00 00 FLIGHT PLANNING AND FLIGHT MONITORING 033 01 00 00 FLIGHT PLANNING FOR VFR FLIGHTS Remark Using Training Route Manual VFR charts or CQB Annexes

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

SUBPART C Operator certification and supervision

SUBPART C Operator certification and supervision An AOC specifies the: SUBPART C Operator certification and supervision Appendix 1 to OPS 1.175 Contents and conditions of the Air Operator Certificate (a) Name and location (principal place of business)

More information

8.4.9 Fatigue Management. Republic of Korea

8.4.9 Fatigue Management. Republic of Korea 8.4.9 Fatigue Management Flight Safety Regulations for Aeroplanes (FSRA) Implementation 2017.6.12 Ministry of Land Transport and Maritime Affairs (Air Navigation Division), 044-201-4264 Republic of Korea

More information

EXTENDED-RANGE TWIN-ENGINE OPERATIONS

EXTENDED-RANGE TWIN-ENGINE OPERATIONS EXTENDED-RANGE TWIN-ENGINE OPERATIONS 1. Introduction Extended range operations by aircraft with two turbine power units (ETOPS or EROPS) are sometimes necessary to permit twin engine aircraft to operate

More information

Airmen s Academic Examination

Airmen s Academic Examination ualification Subject Airmen s Academic Examination Airline Transport Pilot (Airplane, rotorcraft and airship) Multi-crew Pilot (Airplane) Civil Aeronautics Law (subject code: 04) No. of questions; time

More information

Phases of a departure

Phases of a departure Phases of a departure Hours, days or even months prior, an airline will submit a flight plan to NATS requesting an air traffic routing to its destination. The filed route to be flown will include the designated

More information

CENTRAL TEXAS COLLEGE AIR AGENCY No. DU8S099Q SYLLABUS FOR AIRP 1451 INSTRUMENT GROUND SCHOOL Semester Hours Credit: 4_. Instructor: Office Hours:

CENTRAL TEXAS COLLEGE AIR AGENCY No. DU8S099Q SYLLABUS FOR AIRP 1451 INSTRUMENT GROUND SCHOOL Semester Hours Credit: 4_. Instructor: Office Hours: CENTRAL TEXAS COLLEGE AIR AGENCY No. DU8S099Q SYLLABUS FOR AIRP 1451 INSTRUMENT GROUND SCHOOL Semester Hours Credit: 4_ Instructor: Office Hours: I. INTRODUCTION A. The training course outline meets part

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

CHAPTER 6:VFR. Recite a prayer (15 seconds)

CHAPTER 6:VFR. Recite a prayer (15 seconds) CHAPTER 6:VFR Recite a prayer (15 seconds) ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL 4. APPROACH CONTROL --------------------------------------mid-term

More information

EROPS and Unscheduled Landings

EROPS and Unscheduled Landings EROPS and Unscheduled Landings Questions have arisen over the causes of unscheduled landings on long-range type aircraft. This study was undertaken to determine what the causes were for these unscheduled

More information

INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS

INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS INSTRUMENT RATING (SENIOR PRIVATE PILOT) UK FLIGHT TEST STANDARDS This document applies to Senior Private Pilot exams within UK airspace only, and should not be used elsewhere as some subjects are only

More information

GENERAL INFORMATION Aircraft #1 Aircraft #2

GENERAL INFORMATION Aircraft #1 Aircraft #2 GENERAL INFORMATION Identification number: 2007075 Classification: Serious incident Date and time 1 of the 2 August 2007, 10.12 hours occurrence: Location of occurrence: Maastricht control zone Aircraft

More information

Master Minimum Equipment Lists/Minimum Equipment Lists. Amendment Summary PART-MMEL/MEL. Amendment No. Effective Date Subpart Paragraph

Master Minimum Equipment Lists/Minimum Equipment Lists. Amendment Summary PART-MMEL/MEL. Amendment No. Effective Date Subpart Paragraph Amendment Summary PART-MMEL/MEL Master Minimum Equipment Lists/Minimum Equipment Lists Amendment No. Effective Date Subpart Paragraph Contents Section No. Subject SUBPART- A GENERAL MMEL/MEL.001 Applicability

More information

PPLAOG28 Maintain flight control operations and operating conditions

PPLAOG28 Maintain flight control operations and operating conditions Maintain flight control operations and operating conditions Overview This unit is about collecting, interpreting and assessing information on aircraft and operating conditions. You should be able to deal

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

AVIA 3133 INSTRUMENT PROCEDURES UNIVERSITY OF OKLAHOMA

AVIA 3133 INSTRUMENT PROCEDURES UNIVERSITY OF OKLAHOMA AVIA 3133 INSTRUMENT PROCEDURES UNIVERSITY OF OKLAHOMA, 20 I,, have acquired and have in my possession a copy of the training course outline, training syllabus, and safety procedures and practices for

More information

Airmen s Academic Examination

Airmen s Academic Examination Airmen s Academic Examination E4 Qualification Airline Transport Pilot (Airplane) (Rotorcraft) (Airship) No. of questions; time allowed 20 questions; 40 minutes Subject Civil Aeronautics Law (subject code:

More information

THE CIVIL AVIATION ACT (No. 21 of 2013 THE CIVIL AVIATION (OPERATION OF AIRCRAFT) (AMENDMENT) REGULATIONS, 2015

THE CIVIL AVIATION ACT (No. 21 of 2013 THE CIVIL AVIATION (OPERATION OF AIRCRAFT) (AMENDMENT) REGULATIONS, 2015 LEGAL NOTICE. THE CIVIL AVIATION ACT (No. 21 of 2013 THE CIVIL AVIATION (OPERATION OF AIRCRAFT) (AMENDMENT) REGULATIONS, 2015 Citation GN. No. of 20 Citation 1. These Regulations may be cited as the Civil

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

MetroAir Virtual Airlines

MetroAir Virtual Airlines MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC

More information

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding References The Convention on International Civil Aviation (Chicago Convention) ICAO SARPS Annex 14 Vol. I, 7 th Edition, July

More information

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports.

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports. Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports. surface analysis charts. radar summary charts. significant weather

More information

REGULATION No. 990/2017 on the operation of remotely piloted aircraft CHAPTER I. General provisions Article 1 Objective

REGULATION No. 990/2017 on the operation of remotely piloted aircraft CHAPTER I. General provisions Article 1 Objective REGULATION No. 990/2017 on the operation of remotely piloted aircraft CHAPTER I General provisions Article 1 Objective This Regulation sets out rules on the operation of remotely piloted aircraft with

More information

VFR GENERAL AVIATION FLIGHT OPERATION

VFR GENERAL AVIATION FLIGHT OPERATION 1. Introduction VFR GENERAL AVIATION FLIGHT OPERATION The general aviation flight operation is the operation of an aircraft other than a commercial air transport operation. The commercial air transport

More information

Sitting 2 3. Meteorology (20 Questions, Time allowed 1 hour) 4. Human Performance & Limitations (20 Questions, Time allowed 40 minutes)

Sitting 2 3. Meteorology (20 Questions, Time allowed 1 hour) 4. Human Performance & Limitations (20 Questions, Time allowed 40 minutes) EASA PART- FCL PPL and LAPL THEORETICAL KNOWLEDGE EXAMINATIONS There are 9 Theoretical Knowledge Examinations in the PPL/LAPL syllabus. At Compton Abbas we recommend that the exams are taken in the following

More information

AC-MMEL/MEL.060 (b) Contents. Subject. CARC Master Minimum Equipment List Preamble

AC-MMEL/MEL.060 (b) Contents. Subject. CARC Master Minimum Equipment List Preamble AC-MMEL/MEL Contents SUBPART A Number AC-MMEL/MEL.001 (a) AC-MMEL/MEL.003 Subject Limit of MEL Applicability Compliance SUBPART B Number AC-MMEL/MEL.010(c) AC-MMEL/MEL.025 AC-MMEL/MEL.030 AC-MMEL/MEL.040/080

More information

Policies for Certification, operation and maintenance of UAS Andres Eduardo Parra Catama Air Safety Inspector Civil Aviation Authority of Colombia

Policies for Certification, operation and maintenance of UAS Andres Eduardo Parra Catama Air Safety Inspector Civil Aviation Authority of Colombia Policies for Certification, operation and maintenance of UAS Andres Eduardo Parra Catama Air Safety Inspector Civil Aviation Authority of Colombia Abstract: Civil Aviation Authority of Colombia currently

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

JAA Administrative & Guidance Material Section Five: Licensing, Part Two: Procedures

JAA Administrative & Guidance Material Section Five: Licensing, Part Two: Procedures 090 00 00 00 COMMUNICATIONS 091 00 00 00 VFR COMMUNICATIONS 091 01 00 00 DEFINITIONS 091 01 01 00 Meanings and significance of associated terms x x x x x LO Stations LO Communication methods 091 01 02

More information

FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT

FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT FUEL MANAGEMENT FOR COMMERCIAL TRANSPORT 1. Introduction An aeroplane shall carry a sufficient amount of usable fuel to complete the planned flight safely and to allow for deviation from the planned operation.

More information

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE

July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE ADVISORY CIRCULAR CAA-AC-OPS009A July 2008 COMPANY INDOCTRINATION TRAINING 1.0 PURPOSE This Advisory Circular (AC) specifies the objectives and content of company indoctrination curriculum segments applicable

More information

Insert new Standards, including Appendix 6, applicable from 20 November 2008, and Attachment F as follows:

Insert new Standards, including Appendix 6, applicable from 20 November 2008, and Attachment F as follows: Insert new Standards, including Appendix 6, applicable from 20 November 2008, and Attachment F as follows: 4.2.1.6 The air operator certificate shall contain at least the following information and, from

More information

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. The text of the amendment is arranged to show deleted text, new or amended

More information

5/4/2016 ht.ttlms.com

5/4/2016 ht.ttlms.com Order Template Screen 1 Free Form Lesson Overview 2 Free Form OpSpecs for Each SAO 3 Free Form Issuing OpSpecs for SAO 4 Single Answer Knowledge Check 5 Free Form Key Components of the OpSpec(s) for each

More information

THAT REGULATES THE USE AND OPERATION OF THE SYSTEMS OF PILOTED AIRCRAFT AT DISTANCE (RPA) or DRONES IN THE NATIONAL TERRITORY.

THAT REGULATES THE USE AND OPERATION OF THE SYSTEMS OF PILOTED AIRCRAFT AT DISTANCE (RPA) or DRONES IN THE NATIONAL TERRITORY. THAT REGULATES THE USE AND OPERATION OF THE SYSTEMS OF PILOTED AIRCRAFT AT DISTANCE (RPA) or DRONES IN THE NATIONAL TERRITORY. RNC: National Registry of Taxpayers. VLO: Visual line of sight. VMC: Visual

More information

AIP KUWAIT FIR AMENDMENT 28 IMPLEMENTATION AIRAC DATE 25 NOVEMBER 2004

AIP KUWAIT FIR AMENDMENT 28 IMPLEMENTATION AIRAC DATE 25 NOVEMBER 2004 Phone: +965 476 25 31 FAX: +965 476 55 12 AFTN: OKNOYNYX Email :ais1@kuwait-airport.com.kw www.kuwait-airport.com.kw STATE OF DIRECTORATE GENERAL OF CIVIL AVIATION AERONAUTICAL INFORMATION SERVICE (AIS)

More information

Analysis of en-route vertical flight efficiency

Analysis of en-route vertical flight efficiency Analysis of en-route vertical flight efficiency Technical report on the analysis of en-route vertical flight efficiency Edition Number: 00-04 Edition Date: 19/01/2017 Status: Submitted for consultation

More information

ONE-ENGINE INOPERATIVE FLIGHT

ONE-ENGINE INOPERATIVE FLIGHT ONE-ENGINE INOPERATIVE FLIGHT 1. Introduction When an engine fails in flight in a turbojet, there are many things the pilots need to be aware of to fly the airplane safely and get it on the ground. This

More information

This Section 1 contains the requirements for the approval of Master Minimum Equipment Lists and Minimum Equipment Lists.

This Section 1 contains the requirements for the approval of Master Minimum Equipment Lists and Minimum Equipment Lists. SECTION 1 JAR-MMEL/MEL SECTION 1 - REQUIREMENTS 1 GENERAL This Section 1 contains the requirements for the approval of Master Minimum Equipment Lists and Minimum Equipment Lists. 2 PRESENTATION 2.1 The

More information

Learning Objectives 090 Communications

Learning Objectives 090 Communications Learning Objectives 090 Communications Syllabus 090 00 00 00 COMMUNICATIONS 091 00 00 00 VFR COMMUNICATIONS (understood as basic information for IFR-procedures) 091 01 00 00 DEFINITIONS 091 01 01 00 Meanings

More information

APPENDIX X: RUNWAY LENGTH ANALYSIS

APPENDIX X: RUNWAY LENGTH ANALYSIS APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for

More information

Appendix B. Comparative Risk Assessment Form

Appendix B. Comparative Risk Assessment Form Appendix B Comparative Risk Assessment Form B-1 SEC TRACKING No: This is the number assigned CRA Title: Title as assigned by the FAA SEC to the CRA by the FAA System Engineering Council (SEC) SYSTEM: This

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

Appendix 1(a) to JCAR-FCL 1.055

Appendix 1(a) to JCAR-FCL 1.055 Flying Training Organizations for Pilot licenses and Ratings This guide gives the requirements for the issue, revalidation and variation of the approval of FTOs Introduction 1. A Flying Training Organization

More information

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94

INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS. Agenda Item: B.5.12 IFATCA 09 WP No. 94 INTERNATIONAL FEDERATION OF AIR TRAFFIC CONTROLLERS ASSOCIATIONS 48 th ANNUAL CONFERENCE - Dubrovnik, 20 th to 24 th April 2009 Agenda Item: B.5.12 IFATCA 09 WP No. 94 Study Go Around Procedures When on

More information

NZQA registered unit standard version 2 Page 1 of 8. Demonstrate flying skills for a commercial pilot licence (aeroplane)

NZQA registered unit standard version 2 Page 1 of 8. Demonstrate flying skills for a commercial pilot licence (aeroplane) Page 1 of 8 Title Demonstrate flying skills for a commercial pilot licence (aeroplane) Level 5 Credits 10 Purpose People credited with this unit standard are able, for a commercial pilot licence (aeroplane),

More information

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION AIM SG/5 (Egypt, Cairo, 22 24 January 2019) AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION Presentation contents : 1. NG Aviation company overview 2. New documentation

More information

Chapter 3 GV Performance and Flight Planning Guidelines

Chapter 3 GV Performance and Flight Planning Guidelines Chapter 3 GV Performance and Flight Planning Guidelines 3.1 Runway Requirements 7,000 feet of runway is generally required for G-V operations to allow for adequate safety margins in case of emergency aborts

More information

Pre-Solo Written Exam

Pre-Solo Written Exam Pre-Solo Written Exam Introduction 14 CFR Part 61.87(b) requires student pilots to demonstrate aeronautical knowledge by completing a knowledge test prior to soloing an aircraft. The test must address

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

Part 135 Recurrency (B)

Part 135 Recurrency (B) King Schools Online Internet Learning Programs Part 135 Recurrency (B) Pilot Training Course SYLLABUS King Schools, Inc. 3840 Calle Fortunada San Diego, CA 92123 800-854-1001 (USA) 858-541-2200 (Worldwide)

More information

Syllabus details and associated Learning Objectives ATPL CPL ATPL/ IR COMMUNICATIONS

Syllabus details and associated Learning Objectives ATPL CPL ATPL/ IR COMMUNICATIONS P. SUBJECT 092 IFR COMMUNICATIONS Syllabus ATPL CPL 090 00 00 00 COMMUNICATIONS 092 00 00 00 IFR COMMUNICATIONS 092 01 00 00 DEFINITIONS 092 01 01 00 Meanings and significance of associated terms LO Stations.

More information

PRIVATE PILOT STUDENT RECORD

PRIVATE PILOT STUDENT RECORD PRIVATE PILOT STUDENT RECORD CHECK-IN AND ORIENTATION REQUIRED BEFORE FIRST FLIGHT!! TSA Documentation: Must keep photocopies of ALL in student s folder for 5 years. Student Name: US Citizen: Unexpired

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE CIVIL AVIATION AUTHORITY OF SLOVENIA (Ljubljana, 7 to 8 March 2002) International Civil Aviation

More information

Air Law. Iain Darby NAPC/PH-NSIL IAEA. International Atomic Energy Agency

Air Law. Iain Darby NAPC/PH-NSIL IAEA. International Atomic Energy Agency Air Law Iain Darby NAPC/PH-NSIL International Atomic Energy Agency Aviation Regulations International Civil Aviation Organisation (ICAO) Convention on International Civil Aviation also known as the Chicago

More information

Course Outline 10/29/ Santa Teresa Blvd Gilroy, CA COURSE: AFT 134 DIVISION: 50 ALSO LISTED AS: SHORT TITLE: AVIATION FLIGHT TECH

Course Outline 10/29/ Santa Teresa Blvd Gilroy, CA COURSE: AFT 134 DIVISION: 50 ALSO LISTED AS: SHORT TITLE: AVIATION FLIGHT TECH 5055 Santa Teresa Blvd Gilroy, CA 95023 Course Outline COURSE: AFT 134 DIVISION: 50 ALSO LISTED AS: TERM EFFECTIVE: Spring 2014 Inactive Course SHORT TITLE: AVIATION FLIGHT TECH LONG TITLE: Aviation Flight

More information

DGCA Indonesia CASR Part Amendment 8 Flight Time, Duty Time and Rest Requirements

DGCA Indonesia CASR Part Amendment 8 Flight Time, Duty Time and Rest Requirements DGCA Indonesia CASR Part 121 - Amendment 8 Flight Time, Duty Time and Requirements September-2012 Contents Contents... 2 Forward... 3 SUBPART A... 3 121.0 Regulatory Reference... 3 121.1 Definitions and

More information

AIRSPACE CLASSES. All flights are provided with air traffic control service and are separated from each other. limit Communication clearance

AIRSPACE CLASSES. All flights are provided with air traffic control service and are separated from each other. limit Communication clearance AIRSPACE CLASSES 1. Introduction Even if the sky may appear always the same, air traffic management requires the airspace to be divided in some classes, named with the first 7 alphabetic letters (A to

More information

Insert new Standards in Section II, including Appendix 3, applicable from 20 November 2008, and Attachment F as follows:

Insert new Standards in Section II, including Appendix 3, applicable from 20 November 2008, and Attachment F as follows: Insert new Standards in Section II, including Appendix 3, applicable from 20 November 2008, and Attachment F as follows: 2.2.1.5 The air operator certificate shall contain at least the following information

More information

AREA NAVIGATION RNAV- MANAGEMENT

AREA NAVIGATION RNAV- MANAGEMENT 1. Introduction AREA NAVIGATION RNAV- MANAGEMENT RNAV is an instrument-based navigation method that leads to fly from a fix (geographic point inside an airspace) to another fix directly. Contrary to conventional

More information

Part 121, Amendment 26. Air Operations Large Aeroplanes. Docket 14/CAR/3

Part 121, Amendment 26. Air Operations Large Aeroplanes. Docket 14/CAR/3 Docket 14/CAR/3 Contents Rule objective... 3 Extent of consultation... 3 Summary of submissions... 3 Examination of submissions... 3 Insertion of Amendments... 3 Effective date of rule... 4 Availability

More information

DO NOT BEGIN THIS WORK UNTIL YOU HAVE COMPLETED ALL REQUIRED ASSIGNED READING AND EXERCISES.

DO NOT BEGIN THIS WORK UNTIL YOU HAVE COMPLETED ALL REQUIRED ASSIGNED READING AND EXERCISES. DO NOT BEGIN THIS WORK UNTIL YOU HAVE COMPLETED ALL REQUIRED ASSIGNED READING AND EXERCISES. Gardner Textbook Review Questions to prepare for Class #12 Answer these on notebook paper (or a text file) then

More information

The pilot and airline operator s perspective on runway excursion hazards and mitigation options. Session 2 Presentation 1

The pilot and airline operator s perspective on runway excursion hazards and mitigation options. Session 2 Presentation 1 The pilot and airline operator s perspective on runway excursion hazards and mitigation options Session 2 Presentation 1 Communications Communication hazards and mitigation The failure to provide timely,

More information

Gleim Private Pilot Syllabus Fifth Edition, 3rd Printing Updates March 2016

Gleim Private Pilot Syllabus Fifth Edition, 3rd Printing Updates March 2016 Page of Gleim Private Pilot Syllabus Fifth Edition, rd Printing Updates March 0 NOTE: Text that should be deleted is displayed with a line through it. New text is shown with a blue background. If you see

More information

CAPR June 2004 is supplemented as follows:

CAPR June 2004 is supplemented as follows: Headquarters Utah Wing Civil Air Patrol Utah Wing Supplement 1 640 North 2360 West CAPR 60-1 (E) Salt Lake City, Utah 84116 19 October 2005 Operations CAP FLIGHT MANAGEMENT CAPR 60-1 10 June 2004 is supplemented

More information

Airport Obstruction Standards

Airport Obstruction Standards Airport Obstruction Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Outline of this Presentation Obstructions to navigation around airports Discussion of Federal

More information

NZQA registered unit standard version 2 Page 1 of 9. Demonstrate flying skills for an airline transport pilot licence (aeroplane)

NZQA registered unit standard version 2 Page 1 of 9. Demonstrate flying skills for an airline transport pilot licence (aeroplane) Page 1 of 9 Title Demonstrate flying skills for an airline transport pilot licence (aeroplane) Level 6 Credits 35 Purpose People credited with this unit standard are able, for an airline transport pilot

More information

Efficiency and Automation

Efficiency and Automation Efficiency and Automation Towards higher levels of automation in Air Traffic Management HALA! Summer School Cursos de Verano Politécnica de Madrid La Granja, July 2011 Guest Lecturer: Rosa Arnaldo Universidad

More information

It is essential that planning take full account of air safety and efficiency of operations.

It is essential that planning take full account of air safety and efficiency of operations. Airspace Protection Airspace Protection It is essential that planning take full account of air safety and efficiency of operations. 7.1 INTRODUCTION Obstacles near an airport, whether they are natural

More information

Air Operations - Medium Aeroplanes

Air Operations - Medium Aeroplanes PURSUANT to Sections 28, 29 and 30 of the Civil Aviation Act 1990 I, HARRY JAMES DUYNHOVEN, Minister for Transport Safety, HEREBY MAKE the following ordinary rules. SIGNED AT Wellington This day of 2007

More information

Civil Aviation Administration of Taiwan Civil Aviation Regulations (CAR)-07-02A Aircraft Flight Operation Regulations (AFOR) 23-Dec-2016 Flight, Duty

Civil Aviation Administration of Taiwan Civil Aviation Regulations (CAR)-07-02A Aircraft Flight Operation Regulations (AFOR) 23-Dec-2016 Flight, Duty Civil Aviation Administration of Taiwan Civil Aviation Regulations (CAR)-07-02A Aircraft Flight Operation Regulations (AFOR) Flight, Duty Time and Rest Requirements (FDTR) Contents Chapter 1 General...

More information

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA FEDERATED STATES OF MICRONESIA 2001 [THIS PAGE INTENTIONALLY LEFT BLANK] 10-ii

More information

Appendix A REQUEST FOR AUTHORIZATION FORM

Appendix A REQUEST FOR AUTHORIZATION FORM Appendix A REQUEST FOR AUTHORIZATION FORM Note. For details on completing this form, and for definitions of acronyms and abbreviations, see section on Information Required for the Assessment of Authorization

More information

General Information Applicant Name and Address: Tel./Fax/ Contact Person Name/Tel./Fax/

General Information Applicant Name and Address: Tel./Fax/  Contact Person Name/Tel./Fax/ Application for steep approach approval Completion of form: Each relevant box should be completed with a tick ( ) or a (X). Form must be completed by referring to a document of applicant's documentation

More information

Index to Paragraph Numbers - OTAR Parts 91, 125, 135, 121 Issue 10-0

Index to Paragraph Numbers - OTAR Parts 91, 125, 135, 121 Issue 10-0 Index to Paragraph umbers - TAR Parts 91, 125, 135, 121 Issue 10-0 Part 91 Part 125 Part 135 Part 121 Subpart A General 1 91.1 Applicability 125.1 Applicability 135.1 Applicability 121.1 Applicability

More information

Research on Controlled Flight Into Terrain Risk Analysis Based on Bow-tie Model and WQAR Data

Research on Controlled Flight Into Terrain Risk Analysis Based on Bow-tie Model and WQAR Data 2017 Asia-Pacific Engineering and Technology Conference (APETC 2017) ISBN: 978-1-60595-443-1 Research on Controlled Flight Into Terrain Risk Analysis Based on Bow-tie Model and WQAR Data Haofeng Wang,

More information

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION

AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION VOLUME I AERODROME DESIGN AND OPERATIONS The amendment to Annex 14, Volume I contained

More information

FLIGHT DISPATCH MANUAL

FLIGHT DISPATCH MANUAL PAGE: 1 Table of Contents CHAPTER 3.-... 2 3.1 NOTAM... 2 3.2 ORIGINAL DISPATCH (FLIGHT RELEASE), RE-DISPATCH, AMENDMENT... 2 3.3 WEATHER REQUIREMENTS... 3 3.3.1 DEFINITION OF WEATHER CONDITIONS... 3 3.3.2

More information

In-Service Data Program Helps Boeing Design, Build, and Support Airplanes

In-Service Data Program Helps Boeing Design, Build, and Support Airplanes In-Service Data Program Helps Boeing Design, Build, and Support Airplanes By John Kneuer Team Leader, In-Service Data Program The Boeing In-Service Data Program (ISDP) allows airlines and suppliers to

More information

Appendix A COMMUNICATION BEST PRACTICES

Appendix A COMMUNICATION BEST PRACTICES Appendix A COMMUNICATION BEST PRACTICES 1. GENERAL 1.1 It is apparent from investigation reports and surveys regarding runway safety occurrences that communication issues are frequently a causal or contributory

More information

PRIVATE PILOT GROUND SCHOOL SYLLABUS. Part 61. Revision 1 03/01/2017. Steffen Franz ADVANCED GROUND INSTRUCTOR BELMONT, CA, 94002,

PRIVATE PILOT GROUND SCHOOL SYLLABUS. Part 61. Revision 1 03/01/2017. Steffen Franz ADVANCED GROUND INSTRUCTOR BELMONT, CA, 94002, Part 61 PRIVATE PILOT GROUND SCHOOL SYLLABUS Revision 1 03/01/2017 Steffen Franz ADVANCED GROUND INSTRUCTOR BELMONT, CA, 94002, 650.255.1290 Private Pilot Ground School Part 61 Training Course Outline

More information

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division

More information

SECURITY OVERSIGHT AGENCY May 2017 EXTENDED DIVERSION TIME OPERATIONS (EDTO)

SECURITY OVERSIGHT AGENCY May 2017 EXTENDED DIVERSION TIME OPERATIONS (EDTO) ADVISORY CIRCULAR CIVIL AVIATION SAFETY AND CAA-AC-OPS031A SECURITY OVERSIGHT AGENCY May 2017 1.0 PURPOSE EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1.1 This advisory circular (AC) provides guidance to

More information

DUTCH SAFETY BOARD. Runway incursion Amsterdam Airport Schiphol

DUTCH SAFETY BOARD. Runway incursion Amsterdam Airport Schiphol DUTCH SAFETY BOARD Runway incursion Amsterdam Airport Schiphol Runway incursion Amsterdam Airport Schiphol 18 April 2012 The Hague, December 2013 The reports issued by the Dutch Safety Board are open to

More information

Summary of Public Submissions Received on

Summary of Public Submissions Received on Summary of Public Submissions Received on NPRM 15-01 Omnibus 2014 Prepared by DENISE RATIETA and PAUL ELTON 17 August 2015 Table of Contents General... 1 Summary of Submissions... 1 Definition of controlled

More information

Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink

Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators Fred Abbink Content Development of Air transport cockpits, avionics, automation and safety Pre World War 2 Post World

More information

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS

REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS REPUBLIC OF BULGARIA MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY AND COMMUNICATIONS TO ALL INTERESTED PERSONS IN THE PROCEDURE FOR GRANTING A CONCESSION FOR SERVICE FOR THE OBJECT CIVIL AIRPORT FOR PUBLIC

More information