Safety measures for the Wolfsgruben tunnel

Size: px
Start display at page:

Download "Safety measures for the Wolfsgruben tunnel"

Transcription

1 Hans Wehr / Karl Schmid / Peter Ablinger Safety measures for the Integrated track design in tunnels with special reference to safety considerations In the wake of recent disasters due to fires in tunnels, safety in tunnels is a highly topical issue.the new in St. Anton am Arlberg has been designed so as to allow existing local firefighting vehicles direct access along the railway tunnel. In this context, the article describes the safety and civil engineering measures in the. The 60 km long, single-track mountain railway over the Arlberg range was opened to traffic in Only the 10 km Arlberg tunnnel between St. Anton and Langen am Arlberg was constructed as a double-track section from the beginning. Due to the increasing volume of traffic, it was finally decided about 15 years ago to increase the The authors Dipl.-Ing. Dr. Hans Wehr, Austrian Federal Railways, Planning/Engineering department, Arlberg line upgrade Project Manager, Dipl.-Ing. Karl Schmid, Austrian Federal Railways, Arlberg line upgrade assistant Project Manager, Dipl.-Ing. Peter Ablinger, ibt Bahntechnik - Innovation Beratung Technologie (Railway Technology Consultancy) Abb.1: Betonzug im Arbeitseinsatz für das zweite Gleis capacity of the Arlberg line. This was to be achieved mainly by extending the doubletrack section on both sides of the Arlberg range, in the Stanzer and Kloster valley sections. Thanks to the double-track upgrade between Langen and Klösterle on the Vorarlberg side, as well as the relocation of St. Anton station and an adjacent section of line totalling 4 km, and in conjunction with already upgraded sections in the Stanzer valley, a 23 km double-track section has now been created, representing more than one third of the total length of the Arlberg line. Both upgraded sections mentioned include the construction of new double-track tunnnels: the 1800 m on the Tyrol side and the 2400 m Blisadona tunnel on the Vorarlberg side. St. Anton and Langen am Arlberg stations respectively lie between these new tunnels and the Arlberg tunnel (see Figs. 1 and 2). The close juxtaposition of these tunnels, especially taken together with the recent fire disasters in the Mont Blanc and the Tauern road tunnels which have strongly influenced public opinion, and with the great public interest in the 2001 alpine skiing world cup competition which took place immediately after the opening of the, Fig. 1: Schematic map of the Arlberg line from Landeck to Bludenz Fig. 2: Overview of the Wolfsgruben - Arlberg - Blisadona chain of tunnels led the Austrian Federal Railways to give special attention to safety aspects of the. In this context, the following aspects were taken into account: Safety policies of railway companies and rescue services, Definition of a realistic accident scenario, Resulting planning in terms of safety measures, based on self-rescue by passengers as well as adequate access for rescue services, Evaluation of the planned measures in order to ensure their compatibility, taking into account the whole chain of tunnels. The safety philosophies of railway companies and fire services are fundamentally diffferent. It is the purpose of all railway safety installations to prevent unusual incidents. All safety installations operate in accordance with the "fail-safe" principle. The basic safety philosophy of railways is to take appropriate measures in order to avoid accidents. By contrast, fire brigades and rescue organisations set out from the assumption that an accident or a fire has occurred. They see themselves as lifesavers and rescuers and as controllers and extinguishers of fires. Their contribution to risk reduction is limited to minimising the effects of an incident. These differing perspectives complement each other very well. However, because the emergency services have no responsibility for the cost of an infrastructure project, there is a risk of excessive investment in safety and of insufficient compatibility between preventive measures and measures to reduce the effects of incidents. The basis of tunnel safety planning has thus always been the extremely unlikely scenario of a passenger train being stuck in the tunnnel and then catching fire. A comprehensive package of measures has been developed to deal with this scenario, with a view to their applicability also to other less spectacular accident scenarios. As indicated in reports on tunnel fires and confirmed by tunnel fire tests in Norway in 1992 in the course of the EUREKA project [1], [2], about 15 minutes elapse between the outbreak of a fire and the tunnel being entirely filled with smoke at the source of 1

2 the fire. The most effective action is therefore the rapid evacuation of the stranded train. Safety approach for the station to the tunnel mouth as well as rapid access within the tunnel. In addition, for the first time in Austria, the track in the has been designed to enable drive-in access for road vehicles, as shown in Fig. 4. The technical solutions for this slab track construction to enable access by road vehicles, together with the technical and organisational precautions taken in order to segregate the emergency operation of rescue teams on the track from normal track operations, are described in the The Zammer tunnel In 1992, in the course of the project approval procedure for the Zammer tunnel (Innsbruck - Landeck line), only walkable cesses with a minimum width of 1.20 m, emergency niches with a maximum spacing of 50 m as well as a continuous handrail were specified. Radiating cable equipment offered new opportunities for emergency radio applications. Fire services were expected to be equipped with road-rail vehicles. Because the operating licence was not Fig. 3: Emergency access at the western portal Fig. 4: Accessing the tunnel during a fire service exercise Construction details have therefore been designed so as to give passengers a good chance of escape from the dangerous part of the tunnel within 15 minutes, thus enabling their self-rescue in good time. Wide "cess" walkways, lighting for orientation purposes, hand rails, clear signs marking the escape route and an exit into the open air provided by a lateral gallery have been incorporated in the original construction, representing the most effective measures to facilitate self-rescue. Thanks to the lateral service tunnel, the distance between safe areas never exceeds 900 m, thus a maximum walking distance of 450 m is required for passengers to reach safety. Lighted rescue areas, which can be easily accessed by road vehicles, are situated at the tunnel mouths.assistance by the fire services is greatly facilitated by speedy alarm routines and good organisation. Fully equipped rescue teams are expected to be able to reach the tunnel portals within 10 minutes. In order to exploit this performance to the full, the aim of further planning was to ensure the most unobstructed possible access within the, and the incorporation of a permanent water supply to fire hydrants so as to allow effective fire brigade operations. Also taking into account the needs of the Arlberg tunnel, the St. Anton fire brigade is equipped with a combined road/rail fire engine for operation in tunnels, thus ensuring a quick approach from the fire following sections. Technical and organisational precautions In recent years, slab track has been increasingly adopted by Austrian Federal Railways, primarily to ensure stable track alignment and to minimise maintenance costs. On the Austrian Federal Railways, slab track is used mainly in new tunnels. However, the smooth concrete surfaces in the tunnel and the lack of sound deadening on the undersides of carriages led to increasing complaints from passengers. Sleeping car passengers have found this noise nuisance particularly disturbing. Extensive research has led to the development of acoustic panels to reduce noise reflection from the smooth concrete surface to the undersides of carriages.tunnels which had already been completed have been upgraded with these acoustic panels. Because of the construction of numerous tunnels on new lines and not least as a result of recent tunnel disasters, rail tunnel safety has also been subjected to intensive research, and solutions have been developed to increase the level of safety. issued with the legal construction permit required by railway regulations, joint measures have been established in coordination with local authorities and their experts and in close contact with the fire services, in order to upgrade the Zammer tunnel in terms of safety. In 2000 these measures finally led to the successful completion of the operating licensing procedure required by railway regulations. The additional measures include a fire hydrant duct mounted on the lower part of the right hand side wall of the tunnel as well as a reservoir with a volume of 108 m3 at the eastern portal, orientation lighting and escape route signs installed in the tunnel, rescue areas and communications facilities (emergency operations rooms) provided at the tunnel mouths, and finally a re-railing device for the road-rail fire engine as well as an electrically locked entry barrier. For the, all these measures were already incorporated during the project planning stage (see Fig. 5): Escape gallery (L = 180 m): Due to the time-critical construction schedule for its 2

3 implementation, the had to be driven via a lateral access galllery.today, this lateral gallery is available for use as an escape tunnel, joining the main tunnel at approximately mid-length. Thanks to the bigger cross section required by the construction process, it is posssible to provide emergency vehicle access to the main tunnel via the escape gallery. Fire door (25 m2): A smoke-proof door was constructed in the area of the intersection of the main tunnel and the escape gallery, enabling a safe stay of at least 90 minutes. Thus, passengers have to walk 450 m at the most in order to reach safety. The construction of fire doors is especially important in alpine regions, because the distance from the main tunnel into the open air can significantly lengthen the escape route, as shown, for example, by the Blisadona tunnel in Langen with its 420 m long escape gallery. Emergency exit doors: The emergency exits into the escape gallery and in the area of the fire door are equipped with "panic locks" allowing opening in the escape direction. Opening of track-side doors from outside is prevented by means of an electric lock and is only possible after consultation with and release by the emergency operation centre. Communications rooms: Communications rooms fitted out with telephone, Fig.: 5: Safety scheme for the Wolfsgruben tunnel Fig. 6: Eastern portal with emergency/rescue area and barriers to the track area fax and emergency radio are situated near each tunnel portal and emergency exit in order to enable optimum two-way communication with rescue teams. The emergency operations centre is co-located with the train operations control centre in St. Anton am Arlberg station. Rescue area (1500 m2): Paved rescue areas covering about 1500 m2, equipped with sufficient lighting as well as appropriate barriers to keep them permanently clear of obstructions, face each of the communications/control rooms. These rescue areas provide space for emergency vehicles and for tents for first aid to the injured. In the winter months, these areas must also be kept clear of snow. If at all posssible, helicopter landing facilities should be available in the immediate vicinity (see Fig. 6). Water duct for hydrants: Due to the delayed decision about the need for this, the firefighting water pipe has been installed at a height of about 4.2 m on the lower right wall of the tunnel, as shown in Fig. 7. The hydrant duct consists of insulated pipes which are additionally equipped with a heater band. Hydrants are placed in the emergency niches, with a maximum spacing of 150 m. Moreover, the hydrant system has been designed with shutoff units every 450 m. The hydrant duct is a wet pipe, i.e. it is permanently filled, with a pressure of at least 7 bar. In accordance with a joint decision, the pipe, which is fed from one direction only, must provide water at a rate of 20 litres/second for a period of 90 minutes. A reservoir with a volume of 108 m3 as well as an additional deep well have therefore been set up in the feeding area. In order to achieve maximum availability of the water supply with its electrically operated pumps, an emergency power supply with its own generators was designed. On future new tunnel projects, the water supply to fire hydrants will be incorporated beneath the cesses and water reservoirs will be provided at both tunnel portals. This should prevent any damage in case of future disasters. Emergency niches: Emergency niches have been incorporated on both sides throughout the tunnel, with a maximum spacing of 50 m. The niches with fire hydrants are also equipped with electric power outlets (Fig. 7). Orientation lighting: Orientation lighting has been fitted above every emergency niche. Thanks to illuminated push button switches, anybody in the tunnel can switch it on. However, lighting can only be switched off from the emergency control centre. Cesses:The cess walkway is 1.30 m wide, generally arranged at the same level as the top of the rails, and must be kept free from any further installation which may cause obstruction. Drivability: To enable road vehicles to Fig. 7: Emergency niche with fire hydrant and orientation lighting 3

4 Fig. 10: GRP grid at a switch Fig. 8: Drivability with concrete to top-of-sleeper level Fig. 9: Drivability with concrete to top-of-rail level 4 access the tunnel the acoustic panels have been strengthened in accordance with static requirements. Thanks to the rail height of 19 cm, this did not cause any problem. However the design of the sound-absorbing surfaces is critical; while damage cannot be excluded in a disaster situation, during emergency service training care should be taken to protect them. Between the rails (the four-foot way), the rolling surface for road vehicles is provided by means of drivable absorption panels, while in the six-foot way (between tracks), drivability has been ensured by filling with filtering concrete up to sleeper-top level. In the tunnel portal areas as well as in the area of the intersection with the escape gallery, the six-foot way has been filled further, up to top-of-rail level, to enable those escaping to reach safety without obstacles. This also makes it easier for emergency vehicles to get onto the tracks or to turn round at specific places in the tunnel.training exercises have shown that filling with concrete up to top-of-rail level offers significant advantages to emergency vehicles needing to pass each other in the tunnel. In the next tunnel, in Langen am Arlberg (the Blisadona tunnel), filling will be to top-of-rail level throughout its length. As a result of having the same level over the whole cross section of the tunnel, the possibility of emergency vehicles driving on the cess walkways cannot be excluded, so the cable ducts situated in this area must also be equipped with drivable covers (Figs. 8 and 9). In the vicinity of switches, because of the continuously varying distance between the individual running rails, special constructions in the form of gratings had to be used. Up to 170 different components per switch had to be produced for this purpose. Moreover, for safety reasons, these components could not exceed 30 kg in weight, in order to enable one person to handle them in case of failure. For switch diagnostic systems, which are particularly sensitive to magnetic disturbance, the grids had to be made of glassfibre-reinforced plastic (GRP) (Fig. 10). Wherever escape routes cross the track, the remaining 18 cm gaps between the running rail and the drivable acoustic panel on the one hand, and the cess walkway on the other hand, have been filled with plastic gap fillers (Fig. 11). In the future, this gap will be reduced to 13 cm, thus enabling these plastic components to be dispensed with. Thanks to the drivability of the whole tunnnel area, after intensive negotiations the local fire services agreed that the railway authority could rely on their existing infrastructure. Thus, in contrast with the purchase and maintenance of a dedicated train for tunnel emergencies, including provision of the necessary staff, only small adaptations have been necessary to the equipment of the local fire services. Construction design Drivability on prefabricated slab track The track design in the tunnel, enabling both drivability and noise absorption, is a special feature. Backed-up by comprehensive tests and research, this system, which is based on the BAFS drivable sound-absorbing guard rail system, approved in Germany for operational testing and already used on the new Hanover - Berlin line, and on sound-absorbing track covers, has now been practically implemented in the in cooperation with the Rieder and the Rhomberg Bau companies. Figs. 12 and 13 show two cases of loading of the sound-absorbing track covers with a wheel load of 85 kn. Even with the loading shown in Fig. 13, which rarely occurs in practice, no damage has been observed. Only steering movements under full wheel load produce some damage to the edges. In the access ramp areas, these edges have therefore been additionally protected by means of steel angles. The sound-absorbing track covers are manufactured in two separate Fig. 11: Access area with plastic gap fillers Fig. 12: Loading of the track cover with 85 kn Fig. 13: Atypical loading of 85 kn during the test Fig. 14: Design and placement of the soundabsorbing drivable track cover

5 Fig. 15: Longitudinal section of the drivable cover panel (decoupled from the sleepers) Fig. 16: Transition from elastically supported individual sleepers to slab track with prefabricated components layers with supporting steel-reinforced concrete plus absorbent porous concrete, and are then laid elastically on the prefabricated track slabs using strips at the outer side of the plate, as shown in Fig. 14. These plates are bolted onto the substructure in order to prevent them from shifting due to vibrations caused by the passage of trains. Drivability on elastically supported monobloc sleepers In the sections with the six drivable switches as well as in the intermediate tracks, a slab track design with monobloc sleepers elastically supported in rubber shoes has been chosen and implemented. In order not to alter the elastic properties of track and switches, all drivable parts of the construction design had to be decoupled from the sleepers. Fig. 15 shows the longitudinal section of this design. In the spaces between sleepers, mouldings are placed on iron pins previously set out in lean-mix concrete, are then adjusted and grouted with concrete. The sound-absorbing panels are the laid on these mouldings and bolted in place at their joints with the substructure. External track covers Areas outside the track are covered with prefabricated components up to a distance of 18 cm from the outer edge of the rail, thus ensuring that the elastically supported sleepers are entirely decoupled. Summary In spite of the extremely short construction schedule, numerous details used for the first time in this project were developed and efficiently implemented in the course of construction, thanks to the close cooperation between the ÖBB project management, the project design engineers and the railway construction contractors under the technical direction of Rhomberg Bau GmbH. The integrated approach of all those involved to meeting the very wide variety of requirements, together with their comprehensive technical and organisational solutions, enabled timely completion ready for the skiing world cup in St. Anton in Tunnelsicherheitsmaßnahmen für den Wolfsgrubentunnel Auf Grund der letzten Katastrophen bei Tunnelbränden ist das Thema Tunnelsicherheit hoch aktuell. In St.Anton am Arlberg wurde der neue Wolfgrubentunnel derart ausgerüstet, dass er als Bahntunnel mit den vorhandenen Einsatzfahrzeugen der örtlichen Feuerwehren direkt befahren werden kann. In diesem Zusammenhang beschreibt der vorliegende Artikel die sicherheits- und bautechnischen Maßnahmen im Wolfsgrubentunnel. Mesures de sécurité pour le tunnel du Wolfsgruben Compte tenu des dernières catastrophes dues à des incendies dans des tunnels, le thème de la sécurité est à l ordre du jour. A St. Anton am Arlberg, le nouveau tunnel du Wolfsgruben a été équipé de facon à pouvoir être emprunté directement par les véhicles actuels du service local des pompiers. 5

Mountain Peak Platform Top of Tyrol

Mountain Peak Platform Top of Tyrol Project Mountain Peak Platform Top of Tyrol Site Mount Isidor Stubai glacier in Tirol, Austria. 3200m. Accessible by cable car [8h 16h] Client Wintersport Tirol AG & Co, Stubaier Bergbahnen KG CEO Reinhard

More information

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions Therme storage water heater Table of contents Symbols used... 8 Installation instructions Water supply... 9 Choice of location... 9 Installation of the Therme... 9 Fitting the draining and venting valve...

More information

HOME OWNER PRE- DELIVERY INSTRUCTIONS

HOME OWNER PRE- DELIVERY INSTRUCTIONS Congratulations on your decision to enjoy the finest spas available Welcome to the growing family of Sundance Spa owners HOME OWNER PRE- DELIVERY INSTRUCTIONS Please take the time to read these instructions

More information

4 Storage cupboards SCALA

4 Storage cupboards SCALA Our SCALA laboratory furniture system provides a vast selection of storage variants for fast access and safe storage. All storage cupboards can be variably equipped and provide optimum space utilisation

More information

NORMACLAMP COBRA. One-piece hose clips. Advantages at a glance. Applications

NORMACLAMP COBRA. One-piece hose clips. Advantages at a glance. Applications One-piece hose clips products are bolt-free, one-piece hose clips. Their low overall height enables precise installation in even the tightest of spaces. clamps are quick and easy to install. Self-adjusting

More information

The text of the amendment is arranged to show deleted, new or amended text, as shown below:

The text of the amendment is arranged to show deleted, new or amended text, as shown below: Annex to Decision 2016/009/R Acceptable Means of Compliance (AMC) and Guidance Material (GM) to Authority, Organisation and Operations Requirements for Aerodromes Amendment 1 The Annex to Decision 2014/012/R

More information

UPGRADING EXISTING TERN ROAD TUNNELS TO CURRENT NEEDS, TAKING THE ARLBERGTUNNEL AS AN EXAMPLE

UPGRADING EXISTING TERN ROAD TUNNELS TO CURRENT NEEDS, TAKING THE ARLBERGTUNNEL AS AN EXAMPLE - 28 - UPGRADING EXISTING TERN ROAD TUNNELS TO CURRENT NEEDS, TAKING THE ARLBERGTUNNEL AS AN EXAMPLE M. Bacher, P.J. Sturm Graz University of Technology, Austria ABSTRACT The operation and safety facilities

More information

Installation instruction

Installation instruction Installation instruction Ci51 116 FACTS Technical specifications Model i51 Log box (option) Output 6-11 kw Nominal output 8 kw Efficiency 80 % Weight (kg) 215 50 Powerstone (option): + 100 kg Width (mm)

More information

MODEL SDB BELT DRIVE CENTRIFUGAL DOWNBLAST ROOF EXHAUSTERS MODEL SDB - BELT DRIVE CENTRIFUGAL ROOF EXHAUSTER MODEL FEATURES

MODEL SDB BELT DRIVE CENTRIFUGAL DOWNBLAST ROOF EXHAUSTERS MODEL SDB - BELT DRIVE CENTRIFUGAL ROOF EXHAUSTER MODEL FEATURES BELT DRIVE CENTRIFUGAL DOWNBLAST ROOF EXHAUSTERS - BELT DRIVE CENTRIFUGAL ROOF EXHAUSTER MODEL FEATURES Exhaust air up to 8,098 CFM in high static pressure applications up to 1-3/4 w.g. Attractive spun

More information

Hazardous Cattle Crossing: Use of Flashing Amber Lamps

Hazardous Cattle Crossing: Use of Flashing Amber Lamps THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Hazardous Cattle Crossing: Use of Flashing Amber

More information

IB 15/120. Nozzle case holder. Automatic residual ice discharge. Glass-fibre reinforced plastic dry ice container. Outstanding mobility

IB 15/120. Nozzle case holder. Automatic residual ice discharge. Glass-fibre reinforced plastic dry ice container. Outstanding mobility IB 15/120 The Ice Blaster IB 15/120 is one of the most powerful dry ice blasting machines on the market. It impresses with its robustness, highly reliable technology and the best results in dry ice cleaning.

More information

APPENDIX TO THE INSTALLATION AND OPERATING MANUAL OF STOVEMAN SAUNA STOVE

APPENDIX TO THE INSTALLATION AND OPERATING MANUAL OF STOVEMAN SAUNA STOVE APPENDIX TO THE INSTALLATION AND OPERATING MANUAL OF STOVEMAN SAUNA STOVE Technical data of the sauna stove Sauna stove type Stoveman 16 Model Stoveman 16 Nominal heat capacity, i.e. ability to 17 kw heat

More information

icleanzone A Clean Environment is A Safe Environment With icleanzone Cleaning System keeps your Workplace Clean and Safe

icleanzone A Clean Environment is A Safe Environment With icleanzone Cleaning System keeps your Workplace Clean and Safe Made in USA icleanzone.com A Clean Environment is A Safe Environment With Cleaning System keeps your Workplace Clean and Safe icleanzone.com icleanzone Removes and Contains Dirt in its Place Off your Floors!

More information

Guidelines for NOTAM Workflow and Allocation of Responsibilities

Guidelines for NOTAM Workflow and Allocation of Responsibilities Guidelines for NOTAM Workflow and Allocation of Responsibilities May 19 2011 INDEX 1- MAIN OBJECTIVES 1 2- ORIGINATION OF NOTAM 1 3- VALUE OF A NOTAM 3 4- DURATION OF NOTAM 4 5- THE AERONAUTICAL DATA CHAIN

More information

Tents & Membrane Structures Information Packet

Tents & Membrane Structures Information Packet Tents & Membrane Structures Information Packet South Metro Fire Rescue Authority Community Safety Services Division Life Safety Bureau 9195 E. Mineral Ave. Centennial, Colorado 80112 Tel: (720) 989-2230

More information

SECTIONAL OVERHEAD DOORS

SECTIONAL OVERHEAD DOORS SECTIONAL OVERHEAD DOORS Why choose Insulated Sectional Overhead Doors? 25mm approx. 40mm This leaflet is offered as a guide for the Trade when presenting the arguments in favour of specification and selection

More information

Avalanche Agencies in the Tyrol

Avalanche Agencies in the Tyrol Avalanche Agencies in the Tyrol Prevention in highly frequented public Spaces 38 Victims Galtür/Valzur 1999 Harald Riedl und Walter Wuertl, Zivil- und Katastrophenschutz, Lawinenkommissionen Land Tirol

More information

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN Background to BARNZ BARNZ is an incorporated society comprising 19 member airlines

More information

MODEL SDB BELT DRIVE CENTRIFUGAL DOWNBLAST ROOF EXHAUSTERS MODEL SDB - BELT DRIVE CENTRIFUGAL ROOF EXHAUSTER MODEL FEATURES

MODEL SDB BELT DRIVE CENTRIFUGAL DOWNBLAST ROOF EXHAUSTERS MODEL SDB - BELT DRIVE CENTRIFUGAL ROOF EXHAUSTER MODEL FEATURES BELT DIVE CENTIFUGAL DOWNBLAST OOF EXHAUSTES - BELT DIVE CENTIFUGAL OOF EXHAUSTE MODEL FEATUES Exhaust air up to 31,563 CFM in high static pressure applications up to 1-3/4 w.g. Attractive spun aluminum

More information

Level Crossings Configuration Standards

Level Crossings Configuration Standards Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Fire safety in camping sites. CFPA-E Guideline No 20:2012 F

Fire safety in camping sites. CFPA-E Guideline No 20:2012 F Fire safety in camping sites CFPA-E Guideline No 20:2012 F FOREWORD The European fire protection associations have decided to produce common guidelines in order to achieve similar interpretation in the

More information

LIGHT AIRCRAFT ASSOCIATION

LIGHT AIRCRAFT ASSOCIATION LIGHT AIRCRAFT ASSOCIATION STRUT SAFETY GUIDELINES These notes provide general guidelines to Strut Safety Officers in respect of safety enhancement at Strut events Struts should create their own specific

More information

INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE YSEN

INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE YSEN INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE YSEN READ THE INSTRUCTION BOOKLET AND THESE SUPPLEMENTARY INSTRUCTIONS CAREFULLY BEFORE INSTALLATION These instructions together with those in the instruction

More information

CODE SUMMARY TENTS AND OTHER MEMBRANE STRUCTURES

CODE SUMMARY TENTS AND OTHER MEMBRANE STRUCTURES CODE SUMMARY TENTS AND OTHER MEMBRANE STRUCTURES A code summary is a compilation of code sections related to a specific topic and does not contain any interpretations or District standards. This code summary

More information

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012 ICAO Aerodrome s Manual AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO 11-15 June 2012 Objectives - Identify the requirements listed in Annex 14 regarding the development and maintenance of an aerodrome

More information

4-wheeled container systems. The LARGE family

4-wheeled container systems. The LARGE family 4-wheeled container systems The LARGE family 4-wheeled container systems For LARGE demands MGB 660 MGB 770 MGB 1100 MGB 660 MGB 770 MGB 1100 flat lid MGB 1100 domed lid MGB 1100 lid in lid MGB 1100 automatic

More information

Code of Practice for filming in East Lothian

Code of Practice for filming in East Lothian Code of Practice for filming in East Lothian Film Edinburgh Part of Marketing Edinburgh Ltd Tel +44 (0)131 622 7337 Email: info@filmedinburgh.org Web: www.filmedinburgh.org filmedinburgh.org In order to

More information

Forcible Entry Notebook

Forcible Entry Notebook Forcible Entry Notebook by Captain Robert Morris, L-28 Doors that Swing Toward You (Outward)--Part II Additional security may be installed on these doors by bolting a metal shield to protect the space

More information

Session Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions

Session Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions Session Best Practices Amendments From Annex14, Volume I Annex 15 Runway Incursions Runway Excursions Annex 15 AIP - Member States Report: Installation of ARRESTOR SYSTEMS Location - Runway End Industry

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

We set new standards! Laparoscopy

We set new standards! Laparoscopy We set new standards! Laparoscopy We set new standards! As a manufacturer of highly complex systems in medical technology our responsibility every day is to provide you as a surgeon with a dependable and

More information

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8 Contents Introduction 1 Duct & Fitting Range 2 Duct Sizes 3 Fittings 5 Round Duct Connector 7 Installation 8 Celmec International Pty Ltd ACN 005 850 546 Melbourne Tel: +61 3 8552 8200 Fax: +61 3 9555

More information

Harrie Leenders Fuga el - Instructions for Installation, Use and Maintenance INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE

Harrie Leenders Fuga el - Instructions for Installation, Use and Maintenance INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE INSTRUCTIONS FOR INSTALLATION, USE AND MAINTENANCE FUGA el 1 2 1. Flue 2. Case 3. Ceramic glass 4. Aeration slide 5. Convection fins 6. Door handle 7. Base 3 4 READ THE INSTRUCTION BOOKLET AND THESE SUPPLEMENTARY

More information

INTERNATIONAL FIRE TRAINING CENTRE

INTERNATIONAL FIRE TRAINING CENTRE INTERNATIONAL FIRE TRAINING CENTRE RFFS SUPERVISOR INITIAL LICENSING OF AERODROMES CHAPTER 8 THE MINIMUM REQUIREMENTS TO BE MET IN THE PROVISION OF RESCUE AND FIRE FIGHTING SERVICES AT UK LICENSED AERODROMES

More information

Striving for Excellence in Aviation Ground Safety

Striving for Excellence in Aviation Ground Safety AAGSC RECOMMENDED INDUSTRY PRACTICE PASSENGER SAFETY ON THE APRON AAGSC : RIP No. 7 Issue 3 Issued : 12 May 2006 Review Date : May 2008 Background There are few standards that provide guidance to airport

More information

Technical data. Patio awnings

Technical data. Patio awnings Technical data Patio awnings Valid from 01.03.2017 WAREMA patio awnings for individual sun protection WAREMA awnings are an eye-catching feature for any building. The large choice of designs, colours and

More information

Sprint 100. transport stretcher

Sprint 100. transport stretcher Sprint 100 transport stretcher 5 features for safety and IV&Drive FlexiDrive EasyBrake 2 comfort CardiacChair SoftDrop 3 IV&Drive World s first IV poles with integrated push handles 4 LINET Sprint 100

More information

Etac Relieve ergonomic knives

Etac Relieve ergonomic knives Etac Relieve ergonomic knives Relieve knives have an angled handle and sharp blade which make cutting easier. The handle: The angle keeps the wrist straight and the grip friendly oval shape ensures a stable

More information

Report from Marcel Meier Dog-handler sub-commission regarding the dog-handler gathering that be held by Marcel last winter.

Report from Marcel Meier Dog-handler sub-commission regarding the dog-handler gathering that be held by Marcel last winter. Avalanche commission report Killarney Ireland 2015 Oct. Practical day : Presence of the President of the avalanche commission. Assembly of Delegates of the Avalanche Rescue Commission: Welcome / Meeting

More information

Industrial Fluid Systems

Industrial Fluid Systems Industrial Fluid Systems Whatever your production and maintenance requirements, we offer the most competitive solutions. Trelleborg Industrial Hose, with its experience and know-how, gives you the most

More information

Contents. Introduction Technical description Adjusting your Goya The alternative methods of emergency parachute connection ...

Contents. Introduction Technical description Adjusting your Goya The alternative methods of emergency parachute connection ... GOYA Contents Introduction... 3 Technical description... 3 Adjusting your Goya... 4 The alternative methods of emergency parachute connection... 6 Speed systém... 10 Towing... 10 Tandem flying... 10 Harness

More information

S E L E C T I O N. Abdominal Crunch. User manual

S E L E C T I O N. Abdominal Crunch. User manual and S E L E C T I O N T H E S T R E N G T H E V O L U T I O N User manual and and The identification plate of the and manufacturer, affixed along side the seat on the frame of the weight stack, gives the

More information

17500 VRANJE, SRBIJA Radnička 1, Tel.: 017/ INSTRUCTIONS FOR INSTALLATION, ADJUSTMENT AND USE

17500 VRANJE, SRBIJA Radnička 1, Tel.: 017/ INSTRUCTIONS FOR INSTALLATION, ADJUSTMENT AND USE 17500 VRANJE, SRBIJA Radnička 1, Tel.: 017/421-121 STOVE OF THICK METAL SHEETS PREMIJER PREMIJER K INSTRUCTIONS FOR INSTALLATION, ADJUSTMENT AND USE 1.Technical data about continuously burning stove of

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M

STAFF REPORT. Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta. MEETING DATE: June 18, 2015 AGENDA ITEM: 5M STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Old Town Village Mixed Use Project City of Goleta MEETING DATE: AGENDA ITEM: 5M STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION:

More information

Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular

Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular Subject: TECHNICAL GUIDANCE MATERIAL FOR RESCUE & FIRE FIGHTING SERVICES Date: 27 JULY 2011 APPLICABILITY: 1.

More information

MACO RAIL SYSTEMS SLIDING HARDWARE

MACO RAIL SYSTEMS SLIDING HARDWARE TECHNOLOGY IN MOTION MACO SLIDING HARDWARE For a harmonic confluence inside and out LIFT&SLIDE HARDWARE PVC Re-define non-enclosed area as floor space in harmony with nature: to take a breath, let in light

More information

Part 26 CAA Consolidation 25 March 2010 Additional Airworthiness Requirements

Part 26 CAA Consolidation 25 March 2010 Additional Airworthiness Requirements Part 26 CAA Consolidation 25 March 2010 Additional Airworthiness Requirements Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 26 prescribes rules for airworthiness requirements

More information

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN 1 INTRODUCTION New Zealand was awarded the Rugby World Cup 2011 hosting rights in November 2005. A condition of the winning bid was the provision of a 60,000 seat stadium for the finals. New Zealand s

More information

Measure 67: Intermodality for people First page:

Measure 67: Intermodality for people First page: Measure 67: Intermodality for people First page: Policy package: 5: Intermodal package Measure 69: Intermodality for people: the principle of subsidiarity notwithstanding, priority should be given in the

More information

Thule security solutions

Thule security solutions 76 Security Thule security solutions Know you re safe Enjoy activities far from your recreational vehicle, safe the knowledge your belongings are protected with robust, high quality locks the bests on

More information

Strapping Lines in Module Structure Universal Range of Machines.

Strapping Lines in Module Structure Universal Range of Machines. Strapping Lines in Module Structure Universal Range of Machines. Strapping machines consumables Expert advice Customer service Cyklop System Guarantee for perfect holding POWER All from one source Perfectly

More information

Let us help you with your manure handling, few know m

Let us help you with your manure handling, few know m Manure handling Svea Agri manure handling systems are designed to provide many solutions and still be easy to work with. They are cow-friendly, durable and reliable. Scraper system Press system Cow safety

More information

Assembling A Pennine Awning: A Pictorial Guide Below is a step by step pictorial guide to setting up a Pennine awning. This guide is based on the older, heavy duty awning poles, and the smaller awning

More information

Sow Management. Modern housing and feeding systems

Sow Management. Modern housing and feeding systems Sow Management Modern housing and feeding systems Successful sow management but how? To achieve an increase of sow perfor mance to more than 25 weaners per year is not easy but it is possible. By supplying

More information

Select Barn Equipment

Select Barn Equipment Gates Kow Kisser Freestalls Rubber Matting & much more!!! TABLE OF CONTENTS Galvanized Gates...3 Fiberglass Gates...4 Flex-Tip Gates...4 Gate Options...5 Freestalls...6 Infra-rail System...7 Feedrail...10

More information

Installation Instructions

Installation Instructions Installation Instructions C 556 www.contura.eu 50 CERTIFICATE PERFORMANCE DECLARATION No. C556-CPR-130601-SE-2 PRODUCT Product type Stove lit with solid biofuels Type designation Contura 556 Manufacturing

More information

Dräger Bodyguard II Warning Device

Dräger Bodyguard II Warning Device Dräger Bodyguard II Warning Device The Dräger Bodyguard II is a fully electronic signal and warning unit for use with compressed air breathing apparatus and closedcircuit breathing apparatus. Combining

More information

Terms of Reference for a rulemaking task. Implementation of Evidence-Based Training within the European regulatory framework RMT.0696 ISSUE

Terms of Reference for a rulemaking task. Implementation of Evidence-Based Training within the European regulatory framework RMT.0696 ISSUE Terms of Reference for a rulemaking task Implementation of Evidence-Based Training within the European regulatory framework ISSUE 1 3.9.2015 Applicability Process map Affected regulations and decisions:

More information

HARD. Preventing. Nosegear Touchdowns

HARD. Preventing. Nosegear Touchdowns Preventing HARD Nosegear Touchdowns In recent years, there has been an increase in the incidence of significant structural damage to commercial airplanes from hard nosegear touchdowns. In most cases, the

More information

LIVEX Exercise 09. Introduction and summary. 16 May 2009

LIVEX Exercise 09. Introduction and summary. 16 May 2009 LIVEX Exercise 09 Introduction and summary 16 May 2009 1. Introduction Background for LIVEX 09 The North Sea is one of the world s busiest seas in terms of shipping traffic. Approximately 250,000 ship

More information

INSTALLATION GUIDE INTRODUCTION

INSTALLATION GUIDE INTRODUCTION INSTALLATION GUIDE for for HotEdge Rail Rail INTRODUCTION HotEdge Rail is a patent pending one-piece roof edge ice melt systems engineered to easily install on standing seam, pro panel, and corrugated

More information

Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master

Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master Assembly instructions for Eurotramp trampolines Series: Ultimate, Grand Master Exclusiv, Grand Master, Master 1. Assembly instructions 2. Attaching the plastic coated steel cables on the Ultimate frame

More information

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10 The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

Industry best 5 year fan housing warranty, 1 year motor warranty

Industry best 5 year fan housing warranty, 1 year motor warranty MEL DB MEL FEATURES Exhaust air up to 28,000 CFM in high static pressure applications up to 1-1/4 w.g. Attractive spun aluminum exterior Belt drives permit easy performance adjustments when needed Non-overloading

More information

AVALANCHES; CONTROLLED TRIGGERING OFF BY RADIO BEAMS.

AVALANCHES; CONTROLLED TRIGGERING OFF BY RADIO BEAMS. AVALANCHES; CONTROLLED TRGGERNG OFF BY RADO BEAMS. Magne Strand Norwegian Public Road Administration 5840 Hermansverk, Norway ABSTRACT This paper presents a brief introduction of the instruments, the organising

More information

INTERNATIONAL FIRE TRAINING CENTRE

INTERNATIONAL FIRE TRAINING CENTRE INTERNATIONAL FIRE TRAINING CENTRE LOW CATEGORY AERODROME SUPERVISOR INITIAL AERODROME CATEGORISATION Throughout this note he means he/she and his means his/hers. It is considered that all of the document

More information

Technical data. Patio awnings. 550 Cassette Folding Arm Awning

Technical data. Patio awnings. 550 Cassette Folding Arm Awning Technical data Patio awnings 550 Cassette Folding Arm Awning Valid from 01.03.2017 WAREMA patio awnings for individual sun protection WAREMA awnings are an eye-catching feature for any building. The large

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

HARTWIG MEDICAL FOUNDATION - GUIDING PRINCIPLES 2017

HARTWIG MEDICAL FOUNDATION - GUIDING PRINCIPLES 2017 HARTWIG MEDICAL FOUNDATION - GUIDING PRINCIPLES 2017 These Guiding Principles 2017 apply as of 1 January 2017 until 31 December 2017. Hartwig Medical Foundation may amend these Guiding Principles 2017

More information

Wooden Koi/Octagonal Pond Instruction Manual

Wooden Koi/Octagonal Pond Instruction Manual www.gardenparadise.net Wooden Koi/Octagonal Pond Instruction Manual Introduction Please take time to read these instructions prior to installing your pond. This will help you understand the product and

More information

VS SILVANO VIDORI. VS SILVANO VIDORI Via Roma 103/A I San Vito di Cadore (BL) Tel Fax Mobile

VS SILVANO VIDORI. VS SILVANO VIDORI Via Roma 103/A I San Vito di Cadore (BL) Tel Fax Mobile VS SILVANO VIDORI VS SILVANO VIDORI Via Roma 103/A I 32046 San Vito di Cadore (BL) Tel. 0039 0436 890160 Fax 0039 0436 898322 Mobile 0039 347 9316259 WHO I AM? Vs Silvano Vidori s company works to put

More information

Level Crossings Design and Installation

Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Design and Installation ETD-16-02 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 02 Document

More information

ADVICE ON Cattle Grids

ADVICE ON Cattle Grids ADVICE ON 2 Definition A cattle grid, for highway purposes, is a device designed to prevent the passage of animals, or animals of any particular description, but to allow the passage of all or some other

More information

City of Sydney Convenience Store Development Control Plan 2004

City of Sydney Convenience Store Development Control Plan 2004 City of Sydney Convenience Store Development Control Plan 2004 Table of Contents 1 Introduction 1 1.1 Citation 1 1.2 Area to which the plan applies 2 1.3 Commencement 1 1.4 Relationship to other environmental

More information

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content Gold Coast Rapid Transit Chapter twelve Social impact Chapter content Social impact assessment process...235 Existing community profile...237 Consultation...238 Social impacts and mitigation strategies...239

More information

REVIEW OF PERTH AIRPORT Noise Abatement Procedures

REVIEW OF PERTH AIRPORT Noise Abatement Procedures REVIEW OF PERTH AIRPORT Noise Abatement Procedures Contents SUMMARY... 3 Summary of Review Findings... 3 BACKGROUND... 4 Noise Abatement Procedures... 4 Perth Airport Noise Abatement Procedures... 4 Noise

More information

Leica CE/ Leica CN. Knife holder

Leica CE/ Leica CN. Knife holder Leica CE/ Leica CN Knife holder Instruction Manual Leica knife holder CE/ knife holder CN V2.2 English 08/2005 Always keep this manual near the instrument. Read carefully prior to operating the knife holders.

More information

Saw Blade Lube Systems

Saw Blade Lube Systems Environmentally Friendly Lubrication Saw Blade Lube Systems Cutting Edge Technology Saw Blade Lube Systems Cutting Edge Technology Cutting Edge Technology Unist saw blade lubrication systems deliver all

More information

K 24. Cutter knife system

K 24. Cutter knife system K 24 Cutter knife system K 24 Cutter knife system The K 24 cutter knife system simplifies the cutting system of the bowl cutter as never before. Thanks to the innovative design and state-of-the-art production

More information

75mm High Road Humps. Traffic Advisory Leaflet 2/96 April 1996

75mm High Road Humps. Traffic Advisory Leaflet 2/96 April 1996 Traffic Advisory Leaflet 2/96 April 1996 75mm High Road Humps Introduction The Highway (Road Humps) Regulations 1990 and the Road Humps (Scotland) Regulations 1991 allowed considerable flexibility in the

More information

TUCSON PATIO AWNING INSTALLATION MANUAL

TUCSON PATIO AWNING INSTALLATION MANUAL TUCSON PATIO AWNING INSTALLATION MANUAL Toll Free 877-792-1775 Fax 877-792-0031 swsuncontrolpro.com sales@swsuncontrol.com 1 INTRODUCTION...3 1.1 Symbols used in this manual... 3 1.2 Personnel requirements...

More information

HEINE GAMMA Series Shockproof and Latex-free Sphygmomanometers and Stethoscopes

HEINE GAMMA Series Shockproof and Latex-free Sphygmomanometers and Stethoscopes HEINE GAMMA Series Shockproof and Latex-free Sphygmomanometers and Stethoscopes Best in Class. Those who expect the highest diagnostic precision, choose the best quality. Shockproof. Double-walled housing.

More information

The tried-and-tested complete range

The tried-and-tested complete range The tried-and-tested complete range S 2000 Classic by C+P offers more than you have come to expect. Why? Because it is our ambition as the market leader in steel lockers to always stay ahead of the competition.

More information

TfL Planning. 1. Question 1

TfL Planning. 1. Question 1 TfL Planning TfL response to questions from Zac Goldsmith MP, Chair of the All Party Parliamentary Group on Heathrow and the Wider Economy Heathrow airport expansion proposal - surface access February

More information

Foam Systems Engineering Design Manual

Foam Systems Engineering Design Manual Foam Systems Engineering Design Manual CONTENTS Foam Systems Engineering Design Manual Haardous Chemical & Product Data 1 Foam Concentrate Induction Systems 2 Protection of Fuel Storage Tanks 3 Foam Base

More information

Grade Crossing Regulations

Grade Crossing Regulations Grade Crossing Regulations An Overview of Municipal Roles and Responsibilities at Federally Legislated Grade Crossings March 21, 2017 presentation to Alberta Municipal Supervisor Association, Edmonton,

More information

Development and implementation of a marketing strategy for the European ecolabel on textiles and shoes in Denmark

Development and implementation of a marketing strategy for the European ecolabel on textiles and shoes in Denmark Final Report Development and implementation of a marketing strategy for the European ecolabel on textiles and shoes in Denmark ENV.D.3/SER/2001/0039r Valør & Tinge Ltd Copenhagen 27 September 2002 TABLE

More information

DANUBE FAB real-time simulation 7 November - 2 December 2011

DANUBE FAB real-time simulation 7 November - 2 December 2011 EUROCONTROL DANUBE FAB real-time simulation 7 November - 2 December 2011 Visitor Information DANUBE FAB in context The framework for the creation and operation of a Functional Airspace Block (FAB) is laid

More information

Plan B When the Show Simply Can t Go on

Plan B When the Show Simply Can t Go on Plan B When the Show Simply Can t Go on CASE STUDY: City of Perth Australia Day Skyworks Cancellation 2017 Erica Mueller, City of Perth Today s Presentation Event Overview The Incident The Resources The

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Train Order Working Rule Number: 5017 Version 1.0, 31 March 2016 Train Order Working Rule Number: 5017 Document Control Identification Document title Number Version

More information

Case No COMP/M GENERAL ELECTRIC / THOMSON CSF / JV. REGULATION (EEC) No 4064/89 MERGER PROCEDURE

Case No COMP/M GENERAL ELECTRIC / THOMSON CSF / JV. REGULATION (EEC) No 4064/89 MERGER PROCEDURE EN Case No COMP/M.1786 - GENERAL ELECTRIC / THOMSON CSF / JV Only the English text is available and authentic. REGULATION (EEC) No 4064/89 MERGER PROCEDURE Article 6(1)(b) NON-OPPOSITION Date: 02/02/2000

More information

TECHNICAL BULLETIN TRI-FUNCTIONAL BUSH INSPECTION

TECHNICAL BULLETIN TRI-FUNCTIONAL BUSH INSPECTION TECHNICAL BULLETIN TRI-FUNCTIONAL BUSH INSPECTION LIT NO: 97117-135 DATE: June 2018 REVISION: E 6 Inch Bush 3 Inch Bush The TRI-FUNCTIONAL Bush (TFB ) is a key factor in both ride quality and roll stability

More information

Off-Site Solutions. CPM Headwalls. Concrete for Life

Off-Site Solutions. CPM Headwalls. Concrete for Life Off-Site Solutions CPM Headwalls Concrete for Life Welcome to CPM CPM is a market leading manufacturer of concrete products with production facilities across the UK. This combined with a network of specialist

More information

1. WHO OWNS THE STANDARD OPERATING PROCEDURE? FEATURES OF THE GATE LINE... 5

1. WHO OWNS THE STANDARD OPERATING PROCEDURE? FEATURES OF THE GATE LINE... 5 Contents Page DISTRIBUTION... 4 CHANGE HISTORY... 4 1. WHO OWNS THE STANDARD OPERATING PROCEDURE?... 5 1.2 CONTENT OF THE STANDARD OPERATING PROCEDURE... 5 1.3 PURPOSE... 5 2. FEATURES OF THE GATE LINE...

More information

Outdoor Furniture Catalogue

Outdoor Furniture Catalogue INNOVATION ENGINEERING PTY. LTD. Outdoor Furniture Catalogue INNOVATION ENGINEERING PTY. LTD. ABN: 50 143 512 976 56 PARINGA AVENUE, SOMERTON PARK, SOUTH AUSTRALIA, 5044 Email: info@innovationengineering.com.au

More information

1224 Splitter and CTO combo, setup instructions using the Panelview HMI

1224 Splitter and CTO combo, setup instructions using the Panelview HMI Knowledge Base Article Type: Instructions 1224 Splitter and CTO combo, setup instructions using the Panelview 1000+ HMI Description: Instructions on How to properly setup the 1224 Splitter and CTO/Clamp

More information

(HELICOPTER FORCE LANDED AND BURNT OUT AFTER ENGINE FIRE WARNINGS)

(HELICOPTER FORCE LANDED AND BURNT OUT AFTER ENGINE FIRE WARNINGS) Follow-up Action on Occurrence Report ACCIDENT TO SIKORSKY S61N, G-BBHM, AT POOLE, DORSET ON 15 JULY 2002 (HELICOPTER FORCE LANDED AND BURNT OUT AFTER ENGINE FIRE WARNINGS) CAA FACTOR NUMBER : F21/2004

More information

FACILITATION (FAL) DIVISION TWELFTH SESSION. Cairo, Egypt, 22 March to 2 April 2004

FACILITATION (FAL) DIVISION TWELFTH SESSION. Cairo, Egypt, 22 March to 2 April 2004 19/2/04 English only FACILITATION (FAL) DIVISION TWELFTH SESSION Cairo, Egypt, 22 March to 2 April 2004 Agenda Item 2: Facilitation and security of travel documents and border control formalities 2.5:

More information