Each picture below has a brief explanation of the alignment. Please review and feel free to send any questions you might have.

Similar documents
This document is being shared by the Parks, Recreation and Musuem Advisory Board at the request of Golden citizens and in order to be transparent

OR MISSION TRAIL ELEMENTARY

MEETING MINUTES District 1 Trail Planning Meeting 1

NEW MEADOWS PARK PROPOSED MASTER PLAN

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Trail Phasing Plan. Note: Trails in the Clear Creek Canyon area (Segments will be finalized in the future to minimize wildlife impacts

Hudson Highlands Fjord Trail Draft Master Plan. April 29, 2015

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

CITY OF GOLDEN PARKS AND RECREATION ADVISORY BOARD REGULAR MEETING TUESDAY, JUNE 19, :00 P.M.

Regional Wayfinding Sign Strategy Thurston County Trails 2017

#1. Why is the City doing this project?

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

EP8.2 Presentation Exhibition GO Station Improvements

Northeast Quadrant Distinctive Features

Bonita to Bridgeport January 24, 2019

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

CITY COUNCIL AGENDA MEMORANDUM

Villages at Buffalo Run East

Chatsworth Branch Library Devonshire Street, Chatsworth, CA Thursday, November 16, :00-8:00 pm

Steps in the Management Planning Process

Stevenson Ranch Library The Old Road, Stevenson Ranch, CA Thursday, November 9, :00-8:00 pm

Committee. Presentation Outline

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Non-motorized Trail Plan & Proposal. August 8, 2014

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Raytown: overview. map. Santa Fe, Oregon, and California National Historic Trails KANSAS CITY KANSAS CITY. 38 Trail alignments: Raytown.

ST. CLOUD LAKE WOBEGON TRAIL OPEN HOUSE

The Vision for the San Juan Islands Scenic Byway

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

A VISION FOR EL MIRAGE

Attendance Presentation

Welcome to the Cross County Trail Public Input Session!

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

Paiute Trail Hatfield-McCoy Highwood Mountains

Dover Park Master Plan. Community Design Event Tuesday, May 22, 5 7 pm

BICYCLING WITH KIDS: LONG DISTANCE RIDES FROM BELOIT TO SUPERIOR

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018

Proposed Peninsula Bay Bike Track Development

6. How connected do you feel to the Sans Souci community?

Welcome to the Future Kingston Point Rail Trail!

Thank you for the opportunity to comment on the proposed action to add trails and trailheads to the Red Rock District trail system.

Public Comment. Comment To consider extending State Park lands above River Mile 7.0

Mohawk Hudson Bike Hike Trail Crossroad Connection Study

Port Gamble Shoreline Area Conceptual Trail Proposal

Rapid Transit From Arbutus Street to UBC. Policy and Strategic Priorities Council Meeting January 30, 2019

!" # $ % & % ' ( '' ) ) ) ) )

Conexus is committed to innovation and bringing financial services to market with speed. We have a long history of innovation, including:

PIONEER PARK. City of Des Peres Parks Master Plan. SWT Design 46 INTRODUCTION

ANCLOTE COASTAL TRAIL ALTERNATIVES ANALYSIS STUDY

Mendota Trail Newsletter

Community Advisory Committee Meeting #3 April 21, 2015

Growing up Boulder. Highlights from the Past Year

FEASIBILITY CRITERIA

Rivanna Trails Foundation

ADVENTURE PLAN EXPLORE PARK

This section provides the basic information about the park or trail and the organizations responsible for it. Funding Application F

Great Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17

STEP ALTERNATIVES RANKING TABLE

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

Adopt a Trail Blue Ridge Parkway

The Scoop. No Tax Increase for Residents; Rates and Fees to Remain the Same Budget 2019 at a Glance. December 20, 2018

EXECUTIVE SUMMARY FALL Introduction. Findings

KAWATHA TRANS CANADA TRAIL ADJACENT PRIVATE LAND OWNERSHIP SURVEY

SAN ANTONIO RIVER IMPROVEMENTS PROJECT. August 6, 2008

Building the transportation network we need for the future in Niagara Region

Blue River Trail Master Plan JSA to Town Hall June 2004

Greenville Rec Annual Trails Report

The Impact of Trails on Communities. Jim Wood Chief, Office of Greenways & Trails Division of Recreation and Parks

TRAFALGAR PARK. 78: p.140 W 99th St FLAT ROCK CREEK PARK. W 103rd St OVERLAND PARK. Quivira Rd. College Blvd. Shared use path. Mountain bike trail

Header i

Union Station Queens Quay Transit Link Study

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Southwest Quadrant Distinctive Features

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

A BOAT RAMP TO NOWHERE

Welcome and thank you for being here! Kick-Off Public Workshop November 19, 2014

GATEWAY PHASE 2. U.S. Forest Service and the Mount Shasta Trails Association


Waukee Trailhead Public Art and Amenities Project

City Council Workshop July 26, 2010

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Experience the environment

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

Why we re here: For educational purposes only

FINCH HYDRO CORRIDOR TRAIL PROJECT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

DRAFT - APRIL 13, 2007 ROUTING STUDY FOR TRAIL CONNECTIONS BETWEEN CALAIS AND AYERS JUNCTION

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501

Pilot Focus Group. March 31, :30 AM 10:00 AM. Meeting Minutes

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

September 14, Comments of the Colorado Trail Foundation On the USFS Scoping Notice of August 13, 2010 RE: the relocation of the CDNST/CT Page 1

South Canon City Center

Staff Report Sign Design

January 14, Orange County Transportation Authority Attn: M2 NCCP/HCP 550 South Main Street P.O. Box Orange, CA

Coast to Coast Connector Summit

Transcription:

TO: Golden Parks, Recreation and Museums Advisory Board FR: Al Head & Ben Davis, Golden Giddyup Tim Waters & Jerry Harcek, Golden Community Members RE: Singletrack Sidewalks Pilot Proposal 3.0, January, 2018 update Thank you again for your interest in working with community members to build singletrack sidewalks in Golden. We are very grateful for your support in taking this process to the next steps. As requested, we have gone out on site and are providing much more specific alignments. We walked all of the terrain in question with an inclinometer and in all instances strive to keep the trail at no more than a 5-6% grade, meeting the goals to have a green level trail that would be accessible and fun for beginners on up. While investigating the terrain, we made several adjustments to the alignments we had originally proposed. These changes were typically due to a combination of factors, including already existing social trails in the area, identifying the best, most interesting terrain with the lowest impact, and, of course, safety. Each picture below has a brief explanation of the alignment. Please review and feel free to send any questions you might have. We would be excited to take a group out to walk the alignment in person so you can see what an amazing, and relatively low-cost amenity this would be to our community. The terrain is spectacular. We welcome your input and are anxious to move towards next steps as soon as possible. (For review) Project: Starting with a community trail at the Apex trailhead and running the length of the bike path to Heritage Dells Park, passing Shelton Elementary School, and then reconnecting at the bottom of Tripp Ranch Road before continuing past the first tunnel beneath Eagle Ridge Drive and down towards the tunnel under 6th Ave. At the request of Mayor Marjorie Sloan, we have also included a feeder trail that would connect the communities east of Heritage Rd, including the Golden Terrace, Zeta St, and Golden Ridge communities, all of which have high populations of youth attending Shelton Elementary. Design Notes: In this proposal phase we sketched trail alignments that we believed would bring added value to community activities, meet local desires for green, beginner-level trails and connect existing trail systems. We fully expect these proposed alignments will need to be assessed for their impacts on the environment and put out for public comment from local residents. In our vision, these trails are multi-use, packed-dirt trails with alternate lines for simple, beginner features made of rock and wood. They are built to offer all riders an opportunity to try their bike

on a natural surface trail, regardless of age or skill. And, most importantly, they are fun. Fun to ride. Fun to experience with other family members. And fun to maintain. We encourage and can arrange a trip to Valmont for anyone curious to see examples in person. Valmont s Skills Loop and Dirt 101 trails are great examples of fun, beginner level trails built for all ages. Volunteer Resources: As we ve mentioned before, the Golden Giddyup has attracted hundreds of volunteers from the community in the last several years, logging thousands of volunteer hours to build and improve local trails. In the last nine months alone, over 300 volunteers have logged over 3,200 hours on nearly 120 project days (doubling the 2017 numbers from our initial proposal submitted in July of this year). We believe the people of Golden will continue to come out in support of this project to improve their neighborhood amenities, and we will put our resources (and backs) to work to ensure that the project has local support for assistance in building and maintenance. Financial Support: The Golden Giddyup is prepared to partner with the City of Golden financially in funding the construction of these trails and trail features. It is important to note that this commitment is made possible by the 500 annual Giddyup participants, REI-Coop of Denver, Yeti Cycles, and additional Golden Giddyup sponsors. Timeline : The Golden Giddyup Trail Team is prepared to dedicate resources to this endeavor as soon as approval is granted by the City of Golden.

Update on Trail Alignments (January, 2018): 1. From Apex Parking lot, North towards Heritage Dells Park. There is an existing social trail on the east side of the Kinney Run bike path that follows the rock outcropping and is used by many local residents and kids. For this reason, we moved the alignment to the east side of the path throughout. 2. For the trail connecting Zeta St and surrounding communities, there are also social trails through the land between the Bachman property and the condo developments. Connecting into the roundabout at Kimball and following Heritage on the east side also provides the most access as well as the safest routes for crossing Heritage (including the pedestrian bridge just north of 4th ave).

Aspect 1: 2. From Kimball, through Heritage Dells Park/ Shelton Elementary towards Crawford/ Tripp Ranch Rd.

Aspect 2: 3. From Tripp Ranch Rd to Eagle Ridge Dr. Again, there is existing social trail along much of this corridor. The terrain is spectacular, but we would need to re-join the bike path before the brick oven historical site.:

4. From Eagle Ridge Rd to 6th Ave. This stretch has no neighbors/ residents adjacent.:

Example of STS in Breckenridge and Arkansas:

Examples of Alternate lines with Skills features (from Valmont Bike Park in Boulder):

Engaging the community in the process creates buy-in, ownership, and a sense of pride and accomplishment.

Other resources on Singletrack Sidewalk initiatives and their positive impact on local communities: https://www.grindtv.com/bike/singletrack-sidewalks-trails-program-makes-getting-school -fun-eagle-colo/ https://www.outsideonline.com/1930586/connecting-town-singletrack-sidewalks http://dirtragmag.com/singletrack-to-school-how-one-arkansas-town-is-securing-its-cycli ng-future/