Williamsburg Town Hall Meeting DEVELOPMENT UPDATE ORANGE COUNTY PLANNING DIVISION November 30, 2017 1
AREA CONTEXT
FUTURE LAND USE MAP MEADOW WOODS MEADOW WOODS GINN PROPERTY
ZONING MEADOW WOODS MEADOW WOODS GINN PROPERTY
PD ZONINGS MEADOW WOODS GINN PROPERTY MEADOW WOODS
AD1 Aloft & Element Hotel DP 280 room hotel 7 stories Not yet approved by DRC 6
RC Residences DP 37 short-term rental villas Access through Ritz-Carlton DRC on December 6th
IAAPA HEADQUARTERS International Association of Amusement Park and Attractions Moving from Alexandria, VA Up to 150K SF DP forthcoming
I-Drive Update
HELICOPTERS BCC engaged consultant (AVCON, Inc.) to study helitour operations in the I-Drive area BCC work session pending
November 30, 2017
Opening Remarks and Introductions Commissioner VanderLey Turnpike Authority Update Christine Girardin Infrastructure Improvements Renzo Nastasi (OC Transportation Planning) Traffic Frank Yokiel (OC Traffic Engineering) Area Growth & Development Eric Raasch (OC Planning) Fire Rescue Chief Drozd (OC Fire Rescue) Orange County Sheriff s Office Captain Carpenter (OCSO) Q&A
UPDATE Beachline West Expressway Widening (406090-5) November 2017 Project Highlights Construction Update 6 Beachline West Toll Plaza 406090-5 Add 2 express lanes in each direction 437156-1 Add 1 express lane in each direction Eastbound and westbound Beachline Expressway widening and new ramp construction continues After widening and new ramps are complete, traffic will shift onto newly constructed roadway so median reconstruction can begin Bridge construction complete at Orangewood/Universal Boulevard The final phase of Shingle Creek bridge reconstruction began in October 2017 New LED roadway lighting and sign installation continues Anticipated project completion is late 2018 Landscape project to follow in 2020 How Will Turnpike Express Lanes Work? Widen roadway from 4 to 8 lanes by adding 2 express lanes in each direction Add noise walls along residential communities Widen six bridges Reconstruct and raise bridges over Shingle Creek Minor interchange improvements Physically separate commuter traffic from local / airport traffic During congested hours, pricing will vary to manage congestion Not available to commercial trucks Local commuter and school buses allowed Must have transponder SunPass or other interoperable device Properly mounted in vehicle What Will Turnpike Express Lanes Do? By providing users a choice to bypass congestion they will: Increase mobility Minimize travel delays Improve travel time reliability Maximize construction dollars
Williamsburg Town Hall Meeting Roadway Infrastructure Improvements November 30, 2017
Williamsburg Road Projects Williamsburg
Williamsburg Road Projects International Drive Williamsburg
Williamsburg Road Projects International Drive TOLL 528 South Westwood Boulevard to North Westwood Boulevard 6-Lane Widening into the Median 2.2 Miles 4 Central Florida Parkway Construction Schedule Began September 2015 82% Complete Completion in January 2018
Williamsburg Road Projects International Drive and Universal Boulevard Williamsburg
Williamsburg Road Projects International Transit Lanes Sand Lake Road Destination Parkway to Sand Lake Road Additional Lane in Each Direction Relieves Congestion and Accommodates I-Ride Trolley and Buses 2.5 Miles 4 Project Schedule Design Complete in June 2018 Construction Funding 2019-2021 Destination Parkway TOLL 528
Williamsburg Road Projects International Drive Transit Feasibility and Alternative Technology Assessment Sand Lake Road Present South of SR 528 to Sand Lake Road 4.3 Miles Includes Project Advisory Group Data Collection/Analysis Vehicle and Route Identification Federal Funding Eligibility 4 Future Study Schedule Issue Study RFP January 2018 Complete Study Summer 2019 TOLL 528 Destination Parkway
Williamsburg Road Projects Destination Parkway Williamsburg
Williamsburg Road Projects 4 Destination Parkway Tradeshow Boulevard to East of Lake Cay New 4-Lane Road 0.6 Miles Completes Link Between John Young Parkway and International Drive TOLL 528 Construction Schedule Began January 2017 Completion in August 2018
Williamsburg Road Projects Daryl Carter Parkway Extension Williamsburg
Daryl Carter Parkway Extension Apopka-Vineland Road to Palm Parkway New 4-Lane Road Public Private Partnership 1.1 Miles Williamsburg Road Projects Construction Schedule Begin in June 2018 Completion in June 2020 Hilton Grand Vacation Club at Ruby Lake 4
Williamsburg Road Projects Williamsburg Shingle Creek Trail
Trail Projects Shingle Creek Trail Osceola County to Sand Lake Road (8.5 Miles) Trail Recognized by US Department of Interior (Listed in Top 100 Trails, 2 From Each State) Federal Design and Construction Funds Construction Schedule Design Complete in September 2016 Phase 1 Segment 1 Seg. 1 Construction Dec. 2017 Nov. 2018 Seg. 2 Construction Oct. 2018 Apr. 2019 Seg. 3 Construction May 2019 Apr. 2020 Phase 2 & Phase 3 TBD - Requesting Federal Funding 4 Sand Lake Road Phase 1 Segment 1 Destination Parkway Phase 1 Segment 2 BeachLine Expwy Phase 1 Segment 3 Taft Vineland Road Phase 2 Town Loop Bv. Phase 3 Osceola County Line
Williamsburg Road Projects Sand Lake Road Williamsburg
Williamsburg Road Projects Sand Lake Road Orange County and FDOT Projects FDOT Portion Cost: $74.5M 3.2 Miles Includes $13M Orange County Contribution for New JYP Interchange Orange County Study Completed Design Funding 2018 Construction Schedule (FDOT) Construction Began October 2016 Construction Complete in Fall 2020 407143-4 International Dr to Universal Bv 407143-5 Universal Bv to West of John Young Py 407143-6 John Young Py to West of Presidents Dr *Future Turnpike Interchange East of John Young Py New Interchanges FLORIDA S TURNPIKE 4 FDOT Construction 4 5 6
Williamsburg Road Projects I-4 at Sand Lake Road Williamsburg
I-4/Sand Lake Road Interchange Divergent Diamond Interchange TOLL 528 Design/Build Contract May Become Part of Sand Lake Road Project 4 Year Construction Term Relieves Turkey Lake Road Intersection Central Florida Parkway Construction Schedule Ongoing Design Begin Construction 2020 Completion Complete 2024
Williamsburg Road Projects I-4 at Daryl Carter Parkway Williamsburg
I-4/Daryl Carter Parkway Interchange Divergent Diamond Interchange Elevated Interchange Build Ultimate Interchange Configuration 4 Year Construction Term TOLL 528 Construction Schedule Design Underway Design Complete March 2019 Began Construction 2020 Completion Complete 2024
Williamsburg Road Projects Intersection: Orangewood Boulevard at Gateway Avenue Williamsburg
Intersection Project Orangewood Boulevard at Gateway Avenue Roundabout Conversion No Additional ROW Anticipated Estimated Cost $800,000 Project Schedule Design Start in 2018 Design Completed End of 2018 Begin Construction in Mid 2019 End Construction in Mid 2020
Williamsburg Road Projects Williamsburg
Pedestrian Safety Project Universal Boulevard Pedestrian Safety Action Plan Sand Lake Road SR 528 to Sand Lake Road Study Underway Data Collection Funded by CRA Study Schedule Study Complete March 2018 Future Funding TBD TOLL 528