TYPICAL SECTION OF IMPROVEMENT

Similar documents
I-94 at Grand Avenue Interchange: The Ride before the Roller Coaster

AWARD INTERSTATE. Bid Amount: Less Than 5 Million. Report created on : 4/20/18. Letting Date: 3/28/2018. Estimated Construction Cost.

4. Safety Concerns Potential Short and Medium-Term Improvements

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Ohio Department of Transportation Construction Update

Section 3-04 Cross Sectional Elements TABLE OF CONTENTS. INTRODUCTION...3 General...3 Exhibit 1-Cross-Sectional Elements...3

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

Important Lane Closures March 1 5, 2010

395 Express Lanes Major Closure Advisory

Add-A-Lane Contract V. along a Section of I-95 includes 6 Bridges

Pardon Our Dust Public Information Meeting

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

FLORIDA DEPARTMENT OF TRANSPORTATION

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

PROGRESS PARK CONNECTOR

77 McDonnell-Lindbergh - Monday thru Friday NORTHBOUND Effective: March 18, Shopping Center North County. Shopping Center Washington &

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

I-94 East Corridor Performance

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

Weekly construction update

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

Culpeper District. Albemarle County Monthly Report. September 2012

AGENDA ITEM I-6 Public Works

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Important Lane Closures, April 3 9, 2011

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

PRIORITIES COMMITTEE MEETING

FDOT Treasure Coast Traffic Report through

95 Express Monthly Operations Report May 2017

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

Constructor: Joseph B. Fay

95 Express Monthly Operations Report July 2017

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Guide to. Road Construction Projects

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects

A VISION FOR I-95. January 12, Delaware Department of Transportation

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

Wellington International Airport Runway Overlay

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007

Culpeper District. Albemarle County Monthly Report December 2011

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

November 21, 2012 Barbara Kelleher, (954)

FY 2018-FY 2021 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)

US 19 Sunset Point Rd to Countryside Blvd.

DISTRICT CONSTRUCTION PROGRAM OHIO DEPARTMENT OF TRANSPORTATION

Progress Report for Projects of Regional Significance

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

FDOT Treasure Coast Traffic Impact Report

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Palm Beach County Traffic Report July 13 through July 20, 2012

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

DHS Consolidation at St. Elizabeths Master Plan Amendment. Transportation Interstate 295 / Malcolm X Avenue Interchange

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

Hospital Link Project Project Update Winter 2018

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

Viaduct Demolition at Girard Interchange

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

Northeast Corridor Transportation Update

1.0 Purpose and Organization of the Community Impact Assessment Addendum

September 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

Steven Bauer, Policy Advisory Committee Chairperson, Presiding

Runway Roughness Evaluation- Boeing Bump Methodology

FDOT Treasure Coast Traffic Impact Report

Major Projects Overview

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County


TRAFFIC ALERT FOR SEPTEMBER 10-14, 2018 Highway Work Zones in the Staunton District

Maine Turnpike Authority Annual Report 2017

Transcription:

TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A NORTHBOUND I7 SOUTHBOUND I7 WHERE CLEARZONE IS UNATTAINABLE 8 8 OR END TREATMENT IS REQUIRED FOR BRIDGE APOACH, ADD.5 TO SHOULDER FOR GUARDRAIL AND : FORESLOPE. STANDARD DRAWING 805-70-00. 0 PLACE MILLED IN RUMBLE STRIPS IN ACCORDANCE WITH STANDARD DRAWINGS 0-05-0 AND 0-05-0 8 0 0 0 0.5.5 ADD.5 WHERE GUARDRAIL IS USED : CONST. CONST. VARIES : TO 0: VARIES : TO 0: : (>0 ) (<5 ) : (5-0 ) USE THIS SECTION ON MAINLINE 907+8.9 TO 8+8.9 CENTERLINE NOTE - Centerline of Parallel Frontage Road Shall Have a Minimum Distance of 58 From Centerline. 75 FROM 907+8.9 8+8.9 EXCEPTIONS TO APOVED BY REV. BY DESCRIPTION OF REVISION INTERSTATE 7 TYPICAL SECTION Y:\Roadways\Design\STATE\I7ROWS\SEGMENT -OCT-009 08: SCALE: " = 0

TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A A LOW SIDE SHOULDER WILL BE TRANSITIONED TO MATCH SLOPE RATE AND DIRECTION OF ADJACENT TRAVEL WHEN SLOPE RATE EXCEEDS NORMAL SHOULDER SLOPE. HIGH SIDE SHOULDER WILL BE TRANSITIONED TO MATCH SLOPE RATE AND DIRECTION OF NORTHBOUND I7 SOUTHBOUND I7 ADJACENT TRAVEL THROUGHOUT CURVE. 8 8 STANDARD DRAWING 805-70-00. 0 PLACE MILLED IN RUMBLE STRIPS IN ACCORDANCE WITH STANDARD DRAWINGS 0-05-0 AND 0-05-0 8 0 0 0 0.5.5 : SE SE SSAP SSAP CONST. VARIES : TO 0: CONST. VARIES : TO 0: SSAP SE SE SSAP ADD.5 WHERE GUARDRAIL IS USED (<5 ) : (>0 ) : (5-0 ) USE THIS SECTION ON MAINLINE IN SUPERELEVATED SECTIONS NOTE - Centerline of Parallel Frontage Road Shall Have a Minimum Distance of 58 From Centerline. FROM EXCEPTIONS TO APOVED BY REV. BY DESCRIPTION OF REVISION Y:\Roadways\Design\STATE\I7ROWS\SEGMENT -OCT-009 08: INTERSTATE 7 TYPICAL SECTION A SCALE: " = 0

TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A B STANDARD DRAWING 805-70-00. 0 ADD.5 WHERE GUARDRAIL IS USED : (<5 ) : (>0 ) : (5-0 ) USE THIS SECTION ON ROAD S-5 9+50.00 TO 9+50.00 CENTERLINE USE THIS SECTION ON ROAD S-6 7+00.00 TO +75.00 CENTERLINE 5+00.00 TO 69+00.00 CENTERLINE USE THIS SECTION ON ROAD S-6 09+50.00 TO 9+50.00 CENTERLINE USE THIS SECTION ON S.C. ROUTE 97 70+.87 TO +00.00 CENTERLINE USE THIS SECTION ON ROAD S-6 00+8.00 TO +98.8 CENTERLINE USE THIS SECTION ON ROAD S-56 0+9.0 TO 85+.87 CENTERLINE USE THIS SECTION ON S.C ROUTE 97 DETOUR (W/O PAVED SHOULDERS) 0+00.00 TO 9+.8 CENTERLINE ROAD FROM ROAD S-5 ROAD S-6 5 9+50.00 7+00.00 9+50.00 +75.00 ROAD S-6 5+00.00 69+00.00 ROAD S-6 5 09+50.00 9+50.00 S.C. ROUTE 97 70+.87 +00.00 ROAD S-6 ROAD S-56 5 5 00+8.00 +.50 +98.8 85+.87 APOVED BY SC ROUTE 97 DET. 5 0+00.00 9+.8 EXCEPTIONS TO FRONTAGE ROAD 5 0+9.0 +.50 REV. BY DESCRIPTION OF REVISION Y:\Roadways\Design\STATE\I7ROWS\SEGMENT -OCT-009 08: INTERSTATE 7 TYPICAL SECTION B SCALE: " = 0

TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A C STANDARD DRAWING 805-70-00. ADD.5 WHERE GUARDRAIL IS USED : 7 : (>0 ) : (5-0 ) (<5 ) USE THIS SECTION ON FRONTAGE ROAD 905+50.00 TO 980+.7 CENTERLINE USE THIS SECTION ON FRONTAGE ROAD 0+00.00 TO 6+5.86 CENTERLINE USE THIS SECTION ON FRONTAGE ROAD 8+.9 TO 99+89.00 CENTERLINE USE THIS SECTION ON FRONTAGE ROAD 5 7+7.7 TO 99+86.00 CENTERLINE USE THIS SECTION ON FRONTAGE ROAD 6 9+00.00 TO 99+86.00 CENTERLINE USE THIS SECTION ON FRONTAGE ROAD 7 75+77.07 TO 77+.8 CENTERLINE USE THIS SECTION ON BELIN COURT 88+0.8 TO 99+88. CENTERLINE USE THIS SECTION ON HIGH POCKETS ROAD 0+.6 TO +50.00 CENTERLINE USE THIS SECTION ON WATERSIDE DRIVE 98+00.00 TO 99+86.00 CENTERLINE USE THIS SECTION ON FRONTAGE ROAD 6 DRIVE 97+7.8 TO 99+89.00 CENTERLINE ROAD FROM FRONTAGE ROAD FRONTAGE ROAD 5 5 905+50.00 980+.7 0+00.00 6+5.86 FRONTAGE ROAD 5 8+.9 99+89.00 FRONTAGE ROAD 5 5 7+7.7 98+75.00 FRONTAGE ROAD 6 0 9+00.00 99+86.00 BELIN COURT HIGH POCKET ROAD 5 0 88+0.8 98+75.00 0+.6 +50.00 EXCEPTIONS TO FRONTAGE ROAD 5 5 98+75.00 99+86.00 FRONTAGE ROAD 7 0 75+77.07 77+.8 BELIN COURT 0 98+75.00 99+88. APOVED BY WATERSIDE DRIVE FRONTAGE ROAD 6 DRIVE 5 99+00.00 99+86.00 5 97+7.8 99+89.00 REV. BY DESCRIPTION OF REVISION INTERSTATE 7 TYPICAL SECTION Y:\Roadways\Design\STATE\I7ROWS\SEGMENT -OCT-009 08: C SCALE: " = 0

TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A D 5 DIRECTION OF TRAFFIC 0.5.5 STANDARD DRAWING 805-70-00. ADD.5 WHERE GUARDRAIL IS USED : (<5 ) 7 : (>0 ) : (5-0 ) RAMP, AND LOOP ARE STATIONED IN OPPOSITE DIRECTION OF TRAFFIC USE THIS SECTION ON INTERCHANGE RAMP 97+00.00 TO 009+.5 CENTERLINE USE THIS SECTION ON INTERCHANGE RAMP 970+00.00 TO 00+7.79 CENTERLINE USE THIS SECTION ON INTERCHANGE RAMP 99+57.07 TO 07+7. CENTERLINE USE THIS SECTION ON INTERCHANGE RAMP 988+05. TO 0+00.00 CENTERLINE USE THIS SECTION ON INTERCHANGE LOOP 69+50.58 TO 75+9. CENTERLINE USE THIS SECTION ON INTERCHANGE LOOP 7+5.66 TO 75+05.76 CENTERLINE ROUTE FROM RAMP 97+00.00 009+.5 RAMP 970+00.00 00+7.79 RAMP 99+57.07 07+7. RAMP 988+05. 0+00.00 APOVED BY LOOP 0 69+50.58 75+9. LOOP 0 7+5.66 75+05.76 EXCEPTIONS TO REV. BY DESCRIPTION OF REVISION Y:\Roadways\Design\STATE\I7ROWS\SEGMENT -OCT-009 08: INTERSTATE 7 TYPICAL SECTION D SCALE: " = 0

TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A E DIRECTION OF TRAFFIC 6 STANDARD DRAWING 805-70-00. 0 0.5.5 ADD.5 WHERE GUARDRAIL IS USED : (<5 ) 8 : (>0 ) : (5-0 ) USE THIS SECTION ON FLYOVER 96+5.5 TO 05+.0 CENTERLINE FLYOVER IS STATIONED IN OPPOSITE DIRECTION OF TRAFFIC USE THIS SECTION ON FLYOVER 9+00.00 TO 00+.90 CENTERLINE ROUTE FROM FLYOVER 96+5.5 05+0. FLYOVER 9+00.00 00+.90 EXCEPTIONS TO APOVED BY REV. BY DESCRIPTION OF REVISION Y:\Roadways\Design\STATE\I7ROWS\SEGMENT -OCT-009 08: INTERSTATE 7 TYPICAL SECTION E SCALE: " = 0

TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A F 7 NB/SB I-95 B/L LOOPS & 8 (TYP) 0 0-8 0 0 8 BARRIER OVERLAY ON N.B. I-95 OVERLAY ON S.B. I-95 MATCH SLOPE : RETAIN PAVEMENT USE THIS SECTION ON MAINLINE I-95 75+9. TO 70+77.6 79+77.6 TO 750+87.0 LOOP LOOP 689+58.5 TO 69+59.0 LOOP 70+59.0 TO 7+5.66 LOOP 8 NB/SB I-95 B/L LOOPS & 8 (TYP) 0 0-8 0 0-0 8 BARRIER OVERLAY ON N.B. I-95 OVERLAY ON S.B. I-95 MATCH SLOPE : RETAIN PAVEMENT USE THIS SECTION ON MAINLINE I-95 ROUTE LOOP FROM 75+9. 750+87.0 LOOP 689+58.5 7+5.66 70+77.6 TO 79+77.6 69+59.0 TO 70+59.0 LOOP LOOP EXCEPTIONS TO APOVED BY REV. BY DESCRIPTION OF REVISION INTERSTATE 7 TYPICAL SECTION Y:\Roadways\Design\STATE\I7ROWS\SEGMENT -OCT-009 08: F SCALE: " = 0

TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A G 9 NB/SB I-95 B/L LOOPS &.5 0 8 OVERLAY ON N.B. I-95 OVERLAY ON S.B. I-95 : RETAIN PAVEMENT REMOVE EXIST. SHOULDER USE THIS SECTION ON MAINLINE I-95 750+87.0 TO 76+57.0 LOOP 679+00.00 TO 689+58.5 LOOP ROUTE FROM LOOP LOOP 750+87.0 76+57.0 679+00.00 689+58.5 EXCEPTIONS TO APOVED BY REV. BY DESCRIPTION OF REVISION INTERSTATE 7 TYPICAL SECTION Y:\Roadways\Design\STATE\I7ROWS\SEGMENT -OCT-009 08: G SCALE: " = 0

: TYPICAL SECTION OF IMOVEMENT STATE COUNTY FILE OJECT ROUTE DIV. SC DILLON 7.0658A H 0 NORTHBOUND I95 SOUTHBOUND I95 8 0 0 ASPHALT OVERLAY ASPHALT OVERLAY.5.5.5 REMOVE RETAIN PAVEMENT RETAIN PAVEMENT PAVED SHOULDER REMOVE PAVED SHOULDER USE THIS SECTION ON MAINLINE I-95 670+00.00 TO 679+00.00 I-95 N.B. ACCEL 767+06.6 TO 79+00.00 658+7. TO 68+50.00 76+9. TO 77+9. I-95 N.B. DECEL I-95 S.B. DECEL I-95 S.B. ACCEL I-95 FROM N.B. 70 670+00.00 679+00.00 N.B. 70 767+06.6 79+00.00 S.B. 70 658+7. 68+50.00 S.B. 70 76+9. 77+9. APOVED BY REV. BY DESCRIPTION OF REVISION INTERSTATE 7 TYPICAL SECTION Y:\Roadways\Design\STATE\I7ROWS\SEGMENT -OCT-009 08: H SCALE: " = 0