Pavement Management Study

Similar documents
PAVEMENT CONDITION REPORT

Aloha Township Local Road Ratings Report for 2018

BOARD OF ADJUSTMENT OF THE CITY OF SUNSET HILLS, MISSOURI THURSDAY, MARCH 22, 2018

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Recommendation: That the Committee of the Whole agenda dated December 6, 2016 be adopted as printed.

SOUTH CAROLINA AERONAUTICS COMMISSION

City of Grand Island Tuesday, December 12, 2017 Council Session

AGENDA. WEDNESDAY, SEPTEMBER 23, :00 PM or immediately after the ICTC meeting

Pavement Management Report 2012 Status Report

Runway Roughness Evaluation- Boeing Bump Methodology

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Lanie Fleischer Chester Creek Trail Improvements Public Meeting #2. February 4, 2014

This is an electronic copy. Format and font may vary from the official version. Attachments may not appear. BEFORE THE PUBLIC UTILITY COMMISSION

Statewide Airfield Pavement Management Program. District 5 Report

4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat)

ROAD SURFACE ASSET MANAGEMENT

WELCOME! TSPE DFW MID-CITIES. January Chapter Meeting

Statewide Airfield Pavement Management Program. District 7 Report

Statewide Airfield Pavement Management Program. District 1 Report

General Relativity of Pavement Condition Rating and Its Global Impact

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

MIAMI-DADE AVIATION DEPARTMENT. Civil Environmental Engineering Division

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

2018 Investment in Infrastructure Expo February 27, 2018 Jason Jonas, P.E. Public Works Director

FULL DEPTH RECLAMATION (FDR)

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31

AVIATION AND SPACEPORT OFFICE DISTRICT 3 REPORT J UNE 2015 STATEWIDE. Airfield. Pavement Management

June 2007 Annual Update. 18 Communities - Naugatuck Valley Corridor Comprehensive Economic Development Strategy (CEDS)

CITY OF IMPERIAL TOTAL BID PROPOSAL. 1. Mobilization / Bonds / Insurances LS 1 $ $ 2. Preparation/Implementation Traffic Control Plan LS 1 $ $

Street, Sidewalk, Curb, and Alley Assessment

TRANSPORTATION COMMITTEE SEPTEMBER 24, :30 P.M. COUNCIL CHAMBERS

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT

Runway Length Analysis Prescott Municipal Airport

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Community Development Committee

Trail # NW Tuesday, June DESIGN. Provide an Review the Provide an. Project Goals: System system. wayfinding

Recommendation: THAT the Council of the Township of Centre Wellington award the following two tenders:

Pavement maintenance management systems

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Runway Roughness Evaluation- Boeing Bump Methodology

FY TIP Fiscal Constraint 2017 Total Commitments. agencies (the Michigan Department of programmed in the Kalamazoo Area

Runway Roughness Evaluation- Boeing Bump Methodology

Dallas Love Field General Aviation Landing Fee

MADERA COUNTY. Measure T & SB-1 Projects

A Message from the Director

CAPITAL IMPROVEMENT PLAN

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

Most people notice when ODOT builds something

METROBUS SERVICE GUIDELINES

Tuscarora Township Local Road Ratings Report for 2018

Project Planning, Compliance, and Funding

GREATER ORLANDO AVIATION AUTHORITY

Benton Township Local Road Ratings Report for 2018

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

1.2 Corridor History and Current Characteristics

Our Focus: Your Future AWARD OF TENDER FOR ROAD RESURFACING HOT MIX ASPHALT CONTRACT IS.07RSRF (H)

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Longitudinal Joint Construction. Mike Robinson, PE

CHAPTER 37 AN ACT TO AMEND THE LABRADOR INUIT LAND CLAIMS AGREEMENT ACT NO. 2. Analysis

Appendix B PAVEMENT CONDITION AND HISTORY

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

AVIATION AND SPACEPORT OFFICE DISTRICT 6 REPORT JU NE STATEWIDE. Airfield. Pavement Management

Woodside Plantation Property Owners' Association ROAD CONDITION SURVEY And IMPROVEMENT PLAN

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

OFFICE OF THE AUDITOR

Other Principle Arterials Minor Arterial Major Collector Minor Collector Local

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

Field Investigation: Evaluation of Non-Destructive Density Testing Devices on Hot Mix Asphalt. December 14, By:

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

Managing Our Legacy Together

MUNICIPALITY OF ANCHORAGE

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

Brevard County Utility Services Department

By The Bahamas Department of Civil Aviation. Aerodrome Inspectors: Mr. Marcus A. Evans esq. and Ms. Charlestina Knowles

REPORT. Pavement Evaluation Summary Brookshire Way & Duluth Park Gwinnett County Duluth, Georgia. Project Number

Transportation System Preservation R & D Needs Statements

Dallas Executive Airport Town Hall Meeting April 3, 2014

One East First Street Reno, NV

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

REVIEW OF THE STATE EXECUTIVE AIRCRAFT POOL

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

Chapter 1 Introduction and Project Overview

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

An outdoor waterpark is a facility offering three or more waterslides and other aquatic facilities.

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

Daisy Dean Trail 628/619 ATV Trail Construction

S Central Coast Heritage Protection Act APRIL 21, 2016

2009 Muskoka Airport Economic Impact Study

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Pavement Strength Analysis Prepared by Molzen Corbin September 2016

AERODROME METEOROLOGICAL OBSERVATION AND FORECAST STUDY GROUP (AMOFSG)

You Have Been Assigned Responsibility for Unclaimed Property Compliance Now What?

US 380 FEASIBILITY STUDY

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Transcription:

Town of South Bethany, DE 2016 Pavement Management Study Prepared by: Kercher Engineering, Inc.

December 13, 2016 Mr. Melvin Cusick Town Manager Town of South Bethany 402 Evergreen Road South Bethany, DE 19930 RE: Y2016 Pavement Management Study KEI Project No. 16-1108M Dear Mr. Cusick: Kercher Engineering, Inc. (KEI) has completed an assessment of the pavement network of the Town of South Bethany. The following report documents the findings of the network level assessment including the establishment of a pavement network inventory, the Pavement Condition Survey (PCS) process followed, the pavement treatment definitions and costs, and the final results of the study. The main purpose of a pavement management program is to provide an intelligent, systematic approach to making maintenance decisions. It is a Network Level management tool that analyzes the entire road network of the Town. The results from this analysis are intended to be used to identify which general pavement maintenance strategies should be applied to individual roads in the road network to improve network condition and identify short and long term budgetary needs. Pavement management programs prioritize maintenance and preservation activities for the overall pavement network based on the realization that proper timing of maintenance is crucial. Research has shown that deterioration of a pavement accelerates dramatically as the pavement approaches the end of its design life. Delaying needed maintenance will allow the network to deteriorate unnecessarily, resulting in increasingly higher maintenance costs such as rehabilitation and reconstruction. Pavement management seeks to determine the proper timing and application of maintenance strategies to minimize the required annual cost of repairs while providing the traveling public with the highest level of service. While it can be appealing to address the worst roads in the network first, it is actually more fiscally responsible to maintain the good roads in a good state of repair first to keep them from deteriorating than it is to wait until roads fall into disrepair and then react. However, when a pavement network has roads that have already fallen into disrepair, there will need to be a funding avenue available to bring the roads back to a state of good structural and functional condition and then develop a long term plan to maintain the roads in the best condition possible. Therefore, it is most effective to develop a program that maintains a budget for Page 1

maintenance and preservation of the higher condition roads while simultaneously funding the rehabilitation of lower condition roads. A. Roadway Inventory Development KEI utilized the street inventory developed by KEI under a contract with the Delaware Technology Transfer Center. The data was obtained by reviewing DelDOT s Subdivision Streets Inventory Manual. Although dimensions may not be completely accurate, the data should be sufficient to development of a network level cost estimate. For each roadway segment managed by the Town, the inventory includes the street name, begin and end descriptions, length and width. When developing a network level pavement management assessment, these are minimum inventory elements required to estimate repair costs. The Street Inventory is provided in Appendix A. B. Pavement Condition Survey Process KEI performed a PCS of all asphalt pavement street segments within the Town. This involved driving each segment and observing and quantifying the severity and extent of each pavement distress using the methodology employed by KEI for municipalities in the mid-atlantic region. Below are the distresses, along with severity and extent levels. Structural (Alligator) Cracking 3 Severities and 6 Levels of Extents Environmental Cracking 3 Severities and 4 Levels of Extents Patching and Potholes 3 Severities and 6 Levels of Extents Longitudinal Cracking - 3 Severities and 3 Levels of Extents Surface Defects (Oxidation/Raveling) 3 Severities and 4 Levels of Extents Rutting and Roughness 3 Severities and 4 Levels of Extents The results of the condition survey are provided in Appendix B. C. Pavement Treatment Definitions KEI has incorporated Treatment recommendations for each street segment as part of the analysis results. The Treatment definitions and unit costs used in this report are consistent with costs of neighboring communities over the past few years. The following are the Unit Costs assigned to each treatment used in this assessment. Attached to this document is additional detail on the Treatment definitions and applicability to certain pavement conditions see Appendix D. Treatment Unit Cost (SY) Do Nothing $0.00 Micro-surfacing $3.50 Rehab Minor (Overlays) $14.00 Page 2

The unit prices are based on similar work being performed in nearby communities (Bethany Beach, Fenwick Island and Ocean View). Please note that actual construction costs can vary greatly depending upon many factors such the size and scope of work including composition of types of repairs (patching, crack sealing, rotomilling, utility adjustments, etc.), number of bidders, time of year, cost of raw materials, etc. Additionally, as stated in our Proposal, a detailed project-level investigation is not warranted at this time. Once a project-level investigation including field measures is performed, a more accurate scope-of-work can be developed which will help to improve the accuracy of the estimated costs. D. Pavement Network Level Analysis Process The analysis process followed by KEI includes utilizing a selection of treatments based on the distresses measured on each street segment. The selected treatments and estimated costs are provided in Appendix C. The list of streets is grouped by Treatment Type. E. Conclusions The total estimated cost of Treatments required to bring the network to a good state of repair would be approximately $552,614. The actual length of the network that was surveyed was 9.77 miles of Town maintained paved roads. Based on our experience of working with many agencies of different sizes across the United States, the Town of South Bethany s Pavement Network is in relatively good condition at this time. The good news is that a network-level preventive maintenance program utilizing microsurfacing will be able to cost-effectively extend pavement life by 8 to 10 years, possibly longer if applied in the next year or two. As an example, the Town of Ocean View s pavement network was in similar condition 10 years ago and utilizing a properly timed preventive maintenance program, their pavement network continues of be in good condition. The following table shows the breakdown of the network by required Treatment activity. Treatment Cost % of Total Cost Length (miles) % of Total Length Micro-Surfacing $248,104 44.90% 6.32 64.69% Micro-Surfacing - Defer $79,793 14.44% 2.01 20.57% Overlay $101,435 18.36% 0.65 6.65% Overlay - Defer $123,282 22.31% 0.79 8.09% Totals $552,614 9.77 Page 3

2016 - Cost of Repairs by Treatment Type $552,614 $248,104 $79,793 $101,435 Micro-Surfacing Micro-Surfacing - Defer Overlay Overlay - Defer Totals $123,282 2016 - Length of Repairs by Treatment Type (Mileage) 9.77 6.32 2.01 Micro-Surfacing Micro-Surfacing - Defer Overlay Overlay - Defer Totals 0.79 0.65 Page 4

This report will provide the Town of South Bethany with a viable starting point for planning purposes for determining short term budgetary needs for pavement maintenance. In addition to serving as a starting point for planning purposes, the total estimated cost will serve as a benchmark in the future to measure whether or not the Town is making headway in reducing the amount of required maintenance. Obviously, it is not expected that the Town can fix every street this year. However, it must be realized that in the years to come, other streets will continue to age and will also need repair. Therefore it is essential that a comprehensive, long-term maintenance plan be developed and adequate pavement maintenance funds be allocated to the network. Should you have any questions, please contact me. I may be reached at 302-894-1098, Ext. 301 or by email at ask@kercherei.com Sincerely, Kercher Engineering, Inc. Alan S. Kercher, P.E. President Page 5

APPENDIX A STREET INVENTORY

STREET INVENTORY NAME FROMSTREET TOSTREET Width LENGTH ANCHORAGE AVE. W. 12TH ST. JEFFERSON CREEK 19 0.330 ANCHORAGE DRIVE OCEAN HIGHWAY PETERSON DRIVE 19 0.310 BAY SHORE DR.-1 OCEAN HWY BAYSHORE E-W 19 0.330 BAY SHORE DR.-2 BAYSHORE N-S JEFFERSON CREEK 19 0.220 BLACK GUM DR. ROAD 361 CUL-DE-SAC 22 0.250 BOONE ROAD YORK ROAD LAGOON 19 0.050 BRANDYWINE DR. OCEAN HWY. JEFFERSON CREEK 19 0.310 BRISTOL ROAD YORK ROAD CUL-DE-SAC 19 0.140 CANAL DRIVE RUSSEL ROAD JEFFERSON CREEK 19 0.440 CARLISLE RD. YORK ROAD CUL-DE-SAC 19 0.280 CATTAIL ROAD TAMARACK DRIVE BLACK GUM DRIVE 19 0.100 CLEVELAND DR. ANCHORAGE DRIVE EVERGREEN ROAD 19 0.130 DIVISION ST. NORTH OCEAN HWY. OCEAN DRIVE 19 0.070 EIGHTH ST. SOUTH OCEAN HWY. OCEAN DRIVE 19 0.070 EIGHTH ST. WEST CANAL DRIVE JEFFERSON CREEK 19 0.050 ELEVENTH ST. WEST PETERSON DRIVE JEFERSON CREEL 19 0.060 ELIZABETHS COURT ELIZABETHS WAY CUL-DE-SAC 19 0.090 ELIZABETHS WAY MAYS WAY CLEVELAND DRIVE 19 0.220 EVERGREEN ROAD-1 OCEAN HWY. PETERSON DRIVE 19 0.300 EVERGREEN ROAD-2 PETERSON DRIVE TOWN HALL 19 0.160 FIFTH ST. NORTH OCEAN HWY. OCEAN DRIVE 19 0.070 FIFTH ST. SOUTH SOUTH OCEAN HWY. OCEAN DRIVE 19 0.070 FIFTH ST. WEST CANAL DRIVE JEFFERSON CREEK 19 0.050 FIRST ST. NORTH OCEAN HWY. OCEAN DRIVE 19 0.070 FIRST ST. SOUTH OCEAN HWY. OCEAN DRIVE 19 0.070 FIRST ST. WEST CANAL DRIVE JEFFERSON CREEK 19 0.050 FOURTH ST. NORTH OCEAN HWY. OCEAN DRIVE 19 0.070 FOURTH ST. WEST CANAL DRIVE JEFFERSON DRIVE 19 0.050 FOURTH ST. SOUTH OCEAN HWY. OCEAN DRIVE 19 0.070 GODWIN PLACE OCEAN HWY. JEFFERSON CREEK 19 0.040 HENLOPEN DRIVE OCEAN HWY. JEFFERSON CREEK 19 0.310 INDIAN STREET OCEAN HWY. OCEAN DRIVE 19 0.070 JAMAICA ST. OCEAN HWY. OCEAN DRIVE 19 0.070 KENT PLACE OCEAN HWY. JEFFERSON CREEK 19 0.040 KEWANEE ST. OCEAN HWY. OCEAN DRIVE 19 0.070 KIMBERLY RD. YORK RD. CUL-DE-SAC 19 0.130 LAYTON DRIVE OCEAN HWY. JEFFERSON CREEK 19 0.310 LOGAN ST. OCEAN HWY. OCEAN DRIVE 19 0.070 MAYS WAY ANCHORAGE DRIVE EVERGREEN ROAD 19 0.060 NEW CASTLE DR. OCEAN HWY. JEFFERSON CREEK 19 0.310

STREET INVENTORY - CONTINUED NAME FROMSTREET TOSTREET Width LENGTH NINTH ST. SOUTH OCEAN HWY. OCEAN DRIVE 19 0.070 NINTH ST. WEST CANAL DRIVE JEFFERSON CREEK 19 0.050 OCEAN DRIVE N. 6TH ST. LOGAN ST. 20 0.670 PERIWINKLE RD. CUL-DE-SAC CUL-DE-SAC 19 0.150 PETERSON DRIVE ANCHORAGE DRIVE EVERGREEN ROAD 19 0.150 PLYMOUTH ROAD YORK ROAD CUL-DE-SAC 19 0.050 REBECCA ROAD YORK ROAD CUL-DE-SAC 19 0.120 RUSSELL ROAD CANAL DRIVE EVERGREEN ROAD 19 0.130 RUSSELL ROAD - 2 CUL-DE-SAC CANAL DRIVE 19 0.080 SEASIDE DRIVE OCEAN HWY. SEASIDE DRIVE 19 0.210 SECOND ST. NORTH OCEAN HWY. OCEAN DRIVE 19 0.070 SECOND ST. SOUTH OCEAN HWY. OCEAN DRIVE 19 0.070 SECOND ST. WEST CANAL END 19 0.060 SEVENTH ST. SOUTH OCEAN HWY. OCEAN DRIVE 19 0.070 SEVENTH ST. WEST CANAL DRIVE JEFFERSON CREEK 19 0.050 SIXTH ST. NORTH OCEAN HWY. OCEAN DRIVE 19 0.070 SIXTH ST. SOUTH OCEAN HWY. OCEAN DRIVE 19 0.070 SIXTH ST. WEST CANAL DRIVE JEFFERSON CREEK 19 0.050 SURFSIDE STREET NINTH ST. SOUTH DEAD END 19 0.040 SUSSEX PLACE OCEAN HWY. JEFFERSON CREEK 19 0.040 TAMARACK COURT TAMARACK DRIVE CUL-DE-SAC 19 0.020 TAMARACK DRIVE CANAL ROAD CATTAIL RD. 19 0.200 TENTH ST. WEST PETERSON DRIVE JEFFERSON CREEK 19 0.060 TERN DRIVE OCEAN HWY. CUL-DE-SAC 19 0.080 THIRD ST. NORTH OCEAN HWY. OCEAN DRIVE 19 0.070 THIRD ST. WEST CANAL DRIVE JEFFERSON CREEK 19 0.050 THIRD ST. SOUTH OCEAN HWY. OCEAN DRIVE 19 0.070 TOWN ROAD RUSSELL ROAD EVERGREEN RD. 19 0.040 TWELFTH ST. WEST PETERSON DRIVE JEFFERSON CREEK 19 0.070 VICTORIA RD. YORK RD. CUL-DE-SAC 19 0.120 YORK ROAD OCEAN HWY. PLYMOUTH RD. 19 0.200 YORK ROAD - 1 PLYMOUTH RD. REBECCA RD. 19 0.250 PETHERTON DRIVE OCEAN HWY. JEFFERSON CREEK 19 0.310

APPENDIX B CONDITION SURVEY DATA

CONDITION SURVEY DATA Alig. Crack Trans. Crack Long. Patch Rough Ravel Name From To Sev Ext Sev Ext Sev Ext Sev. Sev. ANCHORAGE AVE. W. 12TH ST. JEFFERSON CREEK L 1 M 1 M/L H/1 M ANCHORAGE DRIVE OCEAN HIGHWAY PETERSON DRIVE L 5 M 3 M/L M BAY SHORE DR.-1 OCEAN HWY BAYSHORE E-W L 3 M 1 M/L M BAY SHORE DR.-2 BAYSHORE N-S JEFFERSON CREEK L 1 M 1 M BLACK GUM DR. ROAD 361 CUL-DE-SAC M 1 M/L L BOONE ROAD YORK ROAD LAGOON L 1 M/L M BRANDYWINE DR. OCEAN HWY. JEFFERSON CREEK M 1 M/L M BRISTOL ROAD YORK ROAD CUL-DE-SAC M 3 M 1 M/M M CANAL DRIVE RUSSEL ROAD JEFFERSON CREEK M 1 M/L M/1 L CARLISLE RD. YORK ROAD CUL-DE-SAC L 2 M 1 M/L M CATTAIL ROAD TAMARACK DRIVE BLACK GUM DRIVE L CLEVELAND DR. ANCHORAGE DRIVE EVERGREEN ROAD L 1 M 1 M/L M/1 M DIVISION ST. NORTH OCEAN HWY. OCEAN DRIVE M/L L EIGHTH ST. SOUTH OCEAN HWY. OCEAN DRIVE M/L L EIGHTH ST. WEST CANAL DRIVE JEFFERSON CREEK L 1 M/L M ELEVENTH ST. WEST PETERSON DRIVE JEFERSON CREEL L 1 M ELIZABETHS COURT ELIZABETHS WAY CUL-DE-SAC L 1 M 1 M ELIZABETHS WAY MAYS WAY CLEVELAND DRIVE L 1 M 1 M/L L/1 M EVERGREEN ROAD-1 OCEAN HWY. PETERSON DRIVE L 3 M 1 M/1 L EVERGREEN ROAD-2 PETERSON DRIVE TOWN HALL L 1 L/L L FIFTH ST. NORTH OCEAN HWY. OCEAN DRIVE M/L L FIFTH ST. SOUTH OCEAN HWY. OCEAN DRIVE L 1 M/L L

CONDITION SURVEY DATA CONTINUED Name From To Sev Ext Sev Ext Sev Ext Sev. Sev. FIFTH ST. WEST CANAL DRIVE JEFFERSON CREEK M 1 H/1 FIRST ST. NORTH OCEAN HWY. OCEAN DRIVE M/L L FIRST ST. SOUTH OCEAN HWY. OCEAN DRIVE M/L L FIRST ST. WEST CANAL DRIVE JEFFERSON CREEK L/1 M FOURTH ST. NORTH OCEAN HWY. OCEAN DRIVE M/L L/2 L FOURTH ST. WEST CANAL DRIVE JEFFERSON DRIVE L/1 M FOURTH ST. SOUTH OCEAN HWY. OCEAN DRIVE M/L L GODWIN PLACE OCEAN HWY. JEFFERSON CREEK L 1 M/L M HENLOPEN DRIVE OCEAN HWY. JEFFERSON CREEK L 1 M 1 M/L M INDIAN STREET OCEAN HWY. OCEAN DRIVE M/L L JAMAICA ST. OCEAN HWY. OCEAN DRIVE M/L L KENT PLACE OCEAN HWY. JEFFERSON CREEK M/L M KEWANEE ST. OCEAN HWY. OCEAN DRIVE M/L L KIMBERLY RD. YORK RD. CUL-DE-SAC L 1 M 1 M/L M/1 M LAYTON DRIVE OCEAN HWY. JEFFERSON CREEK M 1 M 1 M/L M/1 M LOGAN ST. OCEAN HWY. OCEAN DRIVE M/L L MAYS WAY ANCHORAGE DRIVE EVERGREEN ROAD L 1 M 1 M/L M NEW CASTLE DR. OCEAN HWY. JEFFERSON CREEK L 1 M 1 M/L M/1 M NINTH ST. SOUTH OCEAN HWY. OCEAN DRIVE NINTH ST. WEST CANAL DRIVE JEFFERSON CREEK L 1 L OCEAN DRIVE N. 6TH ST. LOGAN ST. L 1 L 1 M/L L PERIWINKLE RD. CUL-DE-SAC CUL-DE-SAC L 1 M/L L PETERSON DRIVE ANCHORAGE DRIVE EVERGREEN ROAD M 1 M/L L PLYMOUTH ROAD YORK ROAD CUL-DE-SAC M 1 M/L M REBECCA ROAD YORK ROAD CUL-DE-SAC L 4 M 1 M/L H/1 M

CONDITION SURVEY DATA CONTINUED Alig. Crack Trans. Crack Long. Patch Rough Ravel Name From To Sev Ext Sev Ext Sev Ext Sev. Sev. RUSSELL ROAD -1 CANAL DRIVE EVERGREEN ROAD L 1 M/L L RUSSELL ROAD - 2 CUL-DE-SAC CANAL DRIVE M 2 M/L L SEASIDE DRIVE OCEAN HWY. SEASIDE DRIVE L 2 M 1 L SECOND ST. NORTH OCEAN HWY. OCEAN DRIVE M/L L SECOND ST. WEST CANAL END M 1 M SECOND ST. SOUTH OCEAN HWY. OCEAN DRIVE M/L L SEVENTH ST. SOUTH OCEAN HWY. OCEAN DRIVE M/L L SEVENTH ST. WEST CANAL DRIVE JEFFERSON CREEK M SIXTH ST. NORTH OCEAN HWY. OCEAN DRIVE M/L L SIXTH ST. SOUTH OCEAN HWY. OCEAN DRIVE M/L L SIXTH ST. WEST CANAL DRIVE JEFFERSON CREEK L 1 M/L M SURFSIDE STREET NINTH ST. SOUTH DEAD END L SUSSEX PLACE OCEAN HWY. JEFFERSON CREEK M/L M TAMARACK COURT TAMARACK DRIVE CUL-DE-SAC M TAMARACK DRIVE CANAL ROAD CATTAIL RD. M/L L TENTH ST. WEST PETERSON DRIVE JEFFERSON CREEK L 1 M/L M/1 M TERN DRIVE OCEAN HWY. CUL-DE-SAC L 1 M/L M THIRD ST. NORTH OCEAN HWY. OCEAN DRIVE M/L L THIRD ST. WEST CANAL DRIVE JEFFERSON CREEK M 1 H/1 M THIRD ST. SOUTH OCEAN HWY. OCEAN DRIVE M/L L TOWN ROAD RUSSELL ROAD EVERGREEN RD. M 5 M/L L TWELFTH ST. WEST PETERSON DRIVE JEFFERSON CREEK L 1 L/1 M VICTORIA RD. YORK RD. CUL-DE-SAC L 3 M/L L/1 M YORK ROAD OCEAN HWY. PLYMOUTH RD. L 4 M 1 M/L M YORK ROAD - 1 PLYMOUTH RD. REBECCA RD. L 1 M 1 M/L M PETHERTON DRIVE OCEAN HWY. JEFFERSON CREEK M 1 M 1 M/L L/1 M

APPENDIX C SUMMARY OF REPAIRS AND COSTS (GROUPED BY TREATMENT TYPE)

REPAIRS GROUPED BY TREATMENT TYPE Micro-Surfacing NAME FROMSTREET TOSTREET Cost ANCHORAGE AVE. W. 12TH ST. JEFFERSON CREEK $12,874 BAY SHORE DR.-2 BAYSHORE N-S JEFFERSON CREEK $8,583 BLACK GUM DR. ROAD 361 CUL-DE-SAC $11,293 BOONE ROAD YORK ROAD LAGOON $1,951 BRANDYWINE DR. OCEAN HWY. JEFFERSON CREEK $12,094 CANAL DRIVE RUSSEL ROAD JEFFERSON CREEK $17,166 CARLISLE RD. YORK ROAD CUL-DE-SAC $10,924 CATTAIL ROAD TAMARACK DRIVE BLACK GUM DRIVE $3,901 CLEVELAND DR. ANCHORAGE DRIVE EVERGREEN ROAD $5,072 EIGHTH ST. SOUTH OCEAN HWY. OCEAN DRIVE $2,731 EIGHTH ST. WEST CANAL DRIVE JEFFERSON CREEK $1,951 ELEVENTH ST. WEST PETERSON DRIVE JEFERSON CREEL $2,341 ELIZABETHS COURT ELIZABETHS WAY CUL-DE-SAC $3,511 ELIZABETHS WAY MAYS WAY CLEVELAND DRIVE $8,583 EVERGREEN ROAD-2 PETERSON DRIVE TOWN HALL $6,242 FIFTH ST. WEST CANAL DRIVE JEFFERSON CREEK $1,951 FIRST ST. WEST CANAL DRIVE JEFFERSON CREEK $1,951 FOURTH ST. WEST CANAL DRIVE JEFFERSON DRIVE $1,951 GODWIN PLACE OCEAN HWY. JEFFERSON CREEK $1,561 HENLOPEN DRIVE OCEAN HWY. JEFFERSON CREEK $12,094 KENT PLACE OCEAN HWY. JEFFERSON CREEK $1,561 KIMBERLY RD. YORK RD. CUL-DE-SAC $5,072 LAYTON DRIVE OCEAN HWY. JEFFERSON CREEK $12,094 MAYS WAY ANCHORAGE DRIVE EVERGREEN ROAD $2,341 NEW CASTLE DR. OCEAN HWY. JEFFERSON CREEK $12,094 NINTH ST. SOUTH OCEAN HWY. OCEAN DRIVE $2,731 PERIWINKLE RD. CUL-DE-SAC CUL-DE-SAC $5,852 PETERSON DRIVE ANCHORAGE DRIVE EVERGREEN ROAD $5,852 PETHERTON DRIVE OCEAN HWY. JEFFERSON CREEK $12,094 PLYMOUTH ROAD YORK ROAD CUL-DE-SAC $1,951 RUSSELL ROAD CANAL DRIVE EVERGREEN ROAD $5,072 RUSSELL ROAD - 2 CUL-DE-SAC CANAL DRIVE $3,121 SEASIDE DRIVE OCEAN HWY. SEASIDE DRIVE $8,193 SECOND ST. SOUTH OCEAN HWY. OCEAN DRIVE $2,731 SEVENTH ST. WEST CANAL DRIVE JEFFERSON CREEK $1,951 SUSSEX PLACE OCEAN HWY. JEFFERSON CREEK $1,561 TAMARACK COURT TAMARACK DRIVE CUL-DE-SAC $780 TAMARACK DRIVE CANAL ROAD CATTAIL RD. $7,803

REPAIRS GROUPED BY TREATMENT TYPE - CONTINUED Micro-surfacing - Continued NAME FROMSTREET TOSTREET Cost TENTH ST. WEST PETERSON DRIVE JEFFERSON CREEK $2,341 TERN DRIVE OCEAN HWY. CUL-DE-SAC $3,121 THIRD ST. WEST CANAL DRIVE JEFFERSON CREEK $1,951 TWELFTH ST. WEST PETERSON DRIVE JEFFERSON CREEK $2,731 VICTORIA RD. YORK RD. CUL-DE-SAC $4,682 YORK ROAD - 1 PLYMOUTH RD. REBECCA RD. $9,753 SIXTH ST. WEST CANAL DRIVE JEFFERSON CREEK $1,951 Cost $248,104 Micro-Surfacing Deferred NAME FROMSTREET TOSTREET Cost DIVISION ST. NORTH OCEAN HWY. OCEAN DRIVE $2,731 FIFTH ST. NORTH OCEAN HWY. OCEAN DRIVE $2,731 FIFTH ST. SOUTH SOUTH OCEAN HWY. OCEAN DRIVE $2,731 FIRST ST. NORTH OCEAN HWY. OCEAN DRIVE $2,731 FIRST ST. SOUTH OCEAN HWY. OCEAN DRIVE $2,731 FOURTH ST. NORTH OCEAN HWY. OCEAN DRIVE $2,731 FOURTH ST. SOUTH OCEAN HWY. OCEAN DRIVE $2,731 INDIAN STREET OCEAN HWY. OCEAN DRIVE $2,731 JAMAICA ST. OCEAN HWY. OCEAN DRIVE $2,731 KEWANEE ST. OCEAN HWY. OCEAN DRIVE $2,731 LOGAN ST. OCEAN HWY. OCEAN DRIVE $2,731 NINTH ST. WEST CANAL DRIVE JEFFERSON CREEK $1,951 OCEAN DRIVE N. 6TH ST. LOGAN ST. $27,515 SECOND ST. NORTH OCEAN HWY. OCEAN DRIVE $2,731 SECOND ST. WEST CANAL END $2,341 SEVENTH ST. SOUTH OCEAN HWY. OCEAN DRIVE $2,731 SIXTH ST. NORTH OCEAN HWY. OCEAN DRIVE $2,731 SIXTH ST. SOUTH OCEAN HWY. OCEAN DRIVE $2,731 SURFSIDE STREET NINTH ST. SOUTH DEAD END $1,561 THIRD ST. NORTH OCEAN HWY. OCEAN DRIVE $2,731 THIRD ST. SOUTH OCEAN HWY. OCEAN DRIVE $2,731 Cost $79,793

REPAIRS GROUPED BY TREATMENT TYPE CONTINUED HMA Overlays NAME FROMSTREET TOSTREET Cost ANCHORAGE DRIVE OCEAN HIGHWAY PETERSON DRIVE $48,377 EVERGREEN ROAD-1 OCEAN HWY. PETERSON DRIVE $46,816 TOWN ROAD RUSSELL ROAD EVERGREEN RD. $6,242 Cost $101,435 HMA Overlays - Deferred NAME FROMSTREET TOSTREET Cost BRISTOL ROAD YORK ROAD CUL-DE-SAC $21,847 BAY SHORE DR.-1 OCEAN HWY BAYSHORE E-W $51,498 REBECCA ROAD YORK ROAD CUL-DE-SAC $18,726 YORK ROAD OCEAN HWY. PLYMOUTH RD. $31,211 Cost $123,282 Total Cost $552,614