Construction Staging Adelaide Street West

Similar documents
Construction Staging Area 197 Redpath Avenue

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

Construction Staging Area Blue Jays Way (357 King Street West)

Construction Staging Area 19 Western Battery Road

As the Toronto Transit Commission (TTC) operates a transit service on Dundas Street West, City Council approval of this report is required.

Pedestrian Safety Review Spadina Avenue

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council

St. Dennis Drive Conversion of Traffic Lanes to On- Street Parking and Bicycle Lanes

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

5.1 Traffic and Transportation

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO.

Sheraton Centre Toronto Hotel Motor Court - Relocation of Taxi Facilities

Spadina Avenue Built Form Study Preliminary Report

A. CONCLUSIONS OF THE FGEIS

Toronto and East York Community Council. Director, Toronto Building, Toronto and East York District

KING STREET TRANSIT PILOT

This report recommends two new TTC transit services in southwest Toronto.

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

KING STREET TRANSIT PILOT

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

Toronto and East York Community Council

Lake Erie Commerce Center Traffic Analysis

Sky Temporary Car Park Transport Statement

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

Second Street Improvements Project Project Update Archive

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Glasgow Street Traffic Review

TORONTO TRANSIT COMMISSION REPORT NO.

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

Report to the Strategic Development Committee

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Request to Improve Transit along the Dufferin Street Corridor

AGENDA ITEM I-6 Public Works

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

Appendix B Connecting Track Options Evaluation Criteria

Hospital Link Project Project Update Winter 2018

Toronto and East York Community Council. Director, Community Planning, Toronto and East York District

2433 Dufferin Street Zoning By-law Amendment Application - Preliminary Report

25 th Avenue Grade Separation. September 13, 2017

Toronto and East York Community Council. Acting Director, Community Planning, Toronto and East York District

Noise Mitigation Program

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

TORONTO TRANSIT COMMISSION REPORT NO.

McLean Citizens Association Transportation Committee Project Briefing

Movement Strategy. November On behalf of Barton Oxford LLP

Design Meeting Presentation

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses

STAFF REPORT FOR ACTION

Wellesley Station Second Exit and Automatic Entrance Public Open House. Tuesday, September 23, 2014 Central YMCA 20 Grosvenor Street

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

Madison Metro Transit System

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

4 YORK REGION TRANSIT DON MILLS SUBWAY STATION ACCESS AGREEMENT

Finchley and Golders Green Area Committee 27 April 2017

Major Projects Overview

Update Report - Etobicoke Creek and South Mimico Creek Trails

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

York Street Pedestrian Promenade Plan, Front Street West to Queens Quay West

Project Deliverable 4.1.3d Individual City Report - City of La Verne

TORONTO TRANSIT COMMISSION REPORT NO.

LESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #6 January 30, 2014

401, and 415 King Street West - Zoning Amendment Application - Preliminary Report

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

Director, Community Planning, Toronto and East York District

Transportation TRANSPORTATION PROJECTS

EX28.6 REPORT FOR ACTION. Advancing Fare Integration SUMMARY. Date: October 16, 2017 To: Executive Committee From: City Manager Wards: All

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

PennDOT Interstate Work next week March 30-April 3:

KING STREET PILOT STUDY PUBLIC MEETING

Arlington County Board Meeting Project Briefing. October 20, 2015

US 19 Sunset Point Rd to Countryside Blvd.

Ossington Station Easier Access Project - Construction & Public Art Concept Update

Keele Street Draft Plan of Standard Condominium Application Status Report

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Ridership Growth Strategy (RGS) Status Update

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

FNORTHWEST ARKANSAS WESTERN BELTWAY FEASIBILITY STUDY

Improving Transit Service to Major Music Festivals

Our ref: FRC/REC/Nov Steve Farrell Clerk to the Rural Economy and Connectivity Committee The Scottish Parliament.

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

Site Location and Setting

Minutes May 14, 2018 Monday, 4:30 p.m. Chairman Donald Bowman called the meeting to order at 4:30 p.m.

STAFF REPORT INFORMATION ONLY

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

COMMITTEE OF THE WHOLE (WORKING SESSION) APRIL 19, 2011 YORK REGION RAPID TRANSIT HIGHWAY 7 BUS RAPID TRANSIT- VMC STATION WARD 4.

Transcription:

REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 20, Trinity-Spadina SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Adelaide Street West, City Council approval of this report is required. Transportation Services is requesting approval to close the south sidewalk, cycle track and curb lane on Adelaide Street West and to establish a temporary cycle track and pedestrian walkway in the south curb lane on Adelaide Street West for a period of 12 months. EllisDon Corporation is building a mixed-use development that will consist of a 16- storey residential apartment building and a 15-storey commercial building at 602-620 King Street West. The site is located on the north side of King Street West, west of Portland Street and extends to the south side Adelaide Street West. In order to construct the development, the applicant requires the aforementioned closures. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District recommends that: 1. City Council approve the closure of the south sidewalk, cycle track and curb lane on the south side of Adelaide Street West, between Adelaide Place and a point 55.0 metres east, from February 6, 2017 to January 28, 2018. 2. City Council rescind the existing "Pay & Display" parking regulation on the north side of Adelaide Street West, between Adelaide Place and a point 55.0 metres east. 3. City Council prohibit stopping at all times on the north side of Adelaide Street West, between Adelaide Place and a point 55.0 metres east. Construction Staging - Adelaide St W Page 1 of 7

4. City Council direct the applicant to post a 24-hour monitored construction hotline number on the hoarding board, which must be prominently placed and legible from 20 metres and on all elevations from the construction site. 5. City Council direct the applicant to provide and install public art, including mural artwork, onto every elevation of the hoarding board with adequate spotlighting for nighttime illumination, at their sole cost, to the satisfaction of the Ward Councillor. 6. City Council direct that Adelaide Street West be returned to its pre-construction traffic regulations when the project is completed. FINANCIAL IMPACT There is no financial impact on the City. EllisDon Corporation is responsible for all costs, including payment of fees to the City for the occupancy of the right-of-way. Based on the area enclosed and projected term of the closure, these fees will be approximately $86,000. DECISION HISTORY City Council, at its meeting on November 19, 2013, adopted Item TE28.36 of the Toronto and East York Community Council to amend Zoning By-law No. 438-86 for the lands at 602-622 King Street West. COMMENTS EllisDon Corporation is building a mixed-use development that will consist of a 16- storey residential apartment building on the north portion of the development and a 15- storey commercial building, on the south portion of the development there will also be three levels of underground parking at 602-620 King Street West. The site is bounded by Adelaide Street West to the north, King Street West to the south and the east and west side consist of existing commercial buildings, private and public lanes. Developing this property means excavating the entire site to a depth of 14.0 metres (approximately 4-storeys). The applicant requires a constructing staging area within the road allowance on the south side of Adelaide Street West to enable construction. Adelaide Street West, between Portland Street and Adelaide Place is a major arterial road and operates three lanes eastbound on a pavement width of 12.8 metres. An eastbound cycle track exists on the south side of the street. On the north side of the street, Pay and Display parking is in effect outside of the "No Parking, 7:00 a.m. to 9:00 a.m. Mon. to Fri. except public holidays" regulation. TTC service on Adelaide Street West is provided by the '145 Humber Bay Express' bus. The applicant has explored staging off the public lanes and private lanes adjacent to the site. Specifically, the private lane south of Adelaide Street West, east of Adelaide Place and the private lane, south of Adelaide Street West, west of Portland Street. Construction Staging - Adelaide St W Page 2 of 7

However, utilization of the private lanes was not deemed feasible as the turning radius is too narrow to manoeuvre and the pavement width is too narrow to accommodate construction vehicles. As for Adelaide Place, occupation is not feasible as it would close off access/egress to adjacent properties. To reduce the overall amount of road occupation, the applicant has an agreement with an adjacent property owner on King Street West to have a partial occupation on Waterloo Terrace, a private laneway. This will allow for the construction staging operation on King Street West to take place within the site. Site access/egress will be provided on the north side of King Street West with a 1.50 metre wide covered pedestrian walkway to maintain pedestrian operations as per the existing condition. The original application requested staging on Adelaide Street West for a period of 14 months. In order to minimize the impact to all road users, the applicant has revised the duration of their construction schedule. Specifically, Phase 1 of construction will be lengthened by two months to allow for site clearing, excavation and related activities. In this phase, construction activities will be carried out during the off peak periods (9:00 a.m. to 3:00 p.m.) which will result in the temporary closure of the cycle track and south curb lane on Adelaide Street West. The applicant will set-up and remove their equipment daily. The remaining width will accommodate one 3.5 metre wide eastbound lane, one 2.8 metre temporary walkway and one 3.2 metre parking lane. This will result in a two month reduction in Phase 2, in which the closures outlined below are required. Phase 2 of construction will require a lane occupation on the roadway. If the construction staging area is approved, the south sidewalk, cycle track and curb lane on Adelaide Street West will be closed and a temporary cycle track and protected covered pedestrian walkway will be established within the closed south curb lane. Traffic on Adelaide Street West will be reduced from three eastbound lanes to two eastbound lanes. The remaining width will maintain one 3.3 metre eastbound lane, one 3.1 metre parking lane, one 1.50 metre pedestrian walkway and one 2.0 metre wide cycle track at all times. In summary, the applicant will decrease the duration of the original street occupation request from 14 months to 12 months. Signal Operation Analysis A signal operation analysis was undertaken at the intersection of Bathurst Street and Adelaide Street West and at Portland Street and Adelaide Street West to examine the impact to traffic as a result of the proposed lane closures. Bathurst Street and Adelaide Street West: The signal analysis indicates that this intersection operates acceptably under existing traffic conditions. All movements operate well within existing capacity with the exception of the southbound through / left-turn movement during the weekday morning peak hour. Under the lane closure on Adelaide Street West, between Bathurst Street and Portland Street, the signal analysis indicates that this intersection will continue to operate similar to existing conditions. Relative to the existing conditions, the southbound through / leftturn movement is anticipated to operate with an average increase in delay of approximately 1 second or less during the weekday morning and weekday afternoon peak hours. Construction Staging - Adelaide St W Page 3 of 7

Portland Street and Adelaide Street West: The traffic operations analysis indicates that this intersection operates acceptably under existing traffic conditions. All movements operate well within existing capacity limitations. Under the future temporary lane reduction on Adelaide Street West, between Bathurst Street and Portland Street, the signal analysis indicates that this intersection will continue to operate acceptably. Relative to the existing conditions, the eastbound through movement is anticipated to operate with an average increase in delay of approximately 2 seconds or less during the weekday morning and afternoon peak hours. In view of the above, the subject lane closure is anticipated to have negligible impacts on other traffic movements at the above noted intersections. Generally, an increase of approximately 3 seconds (sum of intersection delays) would be anticipated along this segment of the corridor, over the course of weekday peak hours. To enhance traffic flow around the construction site, stopping will be prohibited at all times on north side of Adelaide Street West, between Adelaide Place and a point 55.0 metres east. EllisDon Cooperation will be responsible for the lost revenue of four "Pay and Display" parking spaces on the north side of Adelaide Street West. Transportation Services is satisfied that EllisDon Cooperation has looked at all options to alleviate congestion at this location. Construction Staging - Adelaide St W Page 4 of 7

Councillor Joe Cressy has been advised of the recommendations of this staff report. CONTACT Ann S. Khan, P. Eng. Manager, Traffic Operations Toronto and East York District Transportation Services Telephone: (416) 397-5021 Fax: (416) 392-1920 E-mail: Ann.Khan@toronto.ca SIGNATURE Dave Twaddle, C.E.T. Acting Director, Transportation Services Toronto and East York District ATTACHMENTS Drawing No. 421G-2346, dated October 2016 Drawing No. 421G-2347, dated October 2016 p:\2016\cluster B\TRA\ts2016232.te.top.doc - nb Construction Staging - Adelaide St W Page 5 of 7

Proposed Construction Staging Area on Adelaide Street West Construction Staging - Adelaide St W Page 6 of 7

Proposed Construction Staging Area on King Street West Construction Staging - Adelaide St W Page 7 of 7