Mexico ATFM Development

Similar documents
SERVICIOS A LA NAVEGACIÓN EN EL ESPACIO AÉREO MEXICANO MEXICO ADS-B PROJECT PREVIEW

SEAT CAPACITY MEXICO MARKET ANALYSIS. June International Seats 51% Domestic Seats 49%

UBS Latin American New Opportunities Conference. June 11 th -12 th, 2007

ATLANTIC TRAVEL AGENCY

Continuous Descent? And RNAV Arrivals

Next Generation of Airline Alliances

Santander Conference Acapulco. January 2007

BEFORE THE U.S. DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C.

TVL DESK OF CONNECTICUT

Framework Brief. Edinburgh SIDs

Determining Airport Acceptance Rate (AAR) Mexico City Airport Case Study

First Quarter 2016 Results

CDA Continuous Descent Approach

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

Making the World A better place to live SFO

Flight Trials of CDA with Time-Based Metering at Atlanta International Airport

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Surveillance and Broadcast Services

Updates to Procedures at St. John s International Airport

PBN Airspace Concept. ATS requirements

ATM Collaboration & Data Sharing

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

KJFK Runway 13R-31L Rehabilitation ATFM Strategies

1. Background. 2. Summary and conclusion. 3. Flight efficiency parameters. Stockholm 04 May, 2011

Next Generation Airspace Developments: Key Operational Trends and Enablers

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

Honeywell.com PBN Concepts Krakow, Poland

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

Measurement of environmental benefits from the implementation of operational improvements

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

Considerations for Facility Consolidation

ATM processes automatization for Runway (Airport) Throughput Enhancement

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

NOISE ABATEMENT PROCEDURES

What is Flexible Use of Airspace (FUA)?

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Mexico City. Attractions. Where is it? (52) 55 Country Code/ Area Code

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren

Air Navigation Bureau ICAO Headquarters, Montreal

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Federal Aviation. Administration. FAA Overview. Federal Aviation. Administration

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

AIR TRAFFIC FLOW MANAGEMENT INDIA S PERSPECTIVE. Vineet Gulati GM(ATM-IPG), AAI

ATFM/CDM ICAO s Perspective

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

The Network Manager User Forum 2017

Defining and Managing capacities Brian Flynn, EUROCONTROL

THE AREA CONTROL CENTRE (CTR) POSITION

AIRAC AIP SUPPLEMENT A 16/17 08 June 2017

RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement

Required Navigation Performance at Alaska Airlines

LGAV LTAI Real Flights Event Partnership EUROPE. PILOT's BRIEFING. March 7 th 2009 Event time: 1200z 2200z. 1 Athens FIR Guide 2 LGAV Procedures

Environmental benefits of continuous descent approaches at Schiphol Airport compared with conventional approach procedures

Status of PBN implementation in France

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Efficiency and Automation

Ground movement safety systems and procedures - an overview

Colombian PBN implementation: El Dorado case study

Pi Aero Instrument Rating Syllabus

INVESTOR PRESENTATION FOURTH QUARTER 2017 RESULTS

B0 FRTO, B0-NOPS, B0-ASUR and B0-ACAS Implementation in the AFI and MID Regions

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Aviation in Kansas City. Mark VanLoh, A.A.E. Director of Aviation

FLIGHT STRIP MANAGEMENT - APPROACH LEVEL

Standard Operational Procedures

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

PJ25: AMAN Arrival Streaming

ATFM Procedure using the Bay of Bengal Cooperative ATFM System

LAX Community Noise Roundtable Work Program A1 Review of SoCal Metroplex Proposed Procedures and Suggestions for Comment Letter.

Burlington ATCT Standard Operating Procedures

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

Cooperative traffic management

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

Safety and Airspace Regulation Group

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

ATC BRIEFING March 7th 2009 Event time: 1200z-2200z

INVESTOR PRESENTATION THIRD QUARTER 2017 RESULTS

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

System Oriented Runway Management: A Research Update

Operational Demonstration of a Performance-Based Separation Standard at The Hartsfield-Jackson Atlanta International Airport

LFBO / Toulouse-Blagnac / TLS

Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator

INVESTOR PRESENTATION SECOND QUARTER 2017 RESULTS

Los Angeles Basin Terminal Airspace Redesign

LAMP 2 - FASI(S) Network

Airport Community Roundtable

SECTION 4 - APPROACH CONTROL PROCEDURES

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

MANUAL FOR CONTINUOUS DESCENT OPERATIONS V4-4 1 APRIL 2009

Transcription:

NAM/CAR AIR TRAFFIC FLOW MANAGEMENT SEMINAR ATFM Tegucigalpa, Honduras 27 31 March 2006 Presented by: Rodolfo Olivares Mexico ATFM Development Background. Where we are. What we have. How we use that Tools. Airport Capacity. Regulations. The future. 2 1

Mexico ATFM Development Background. Where we are. What we have. How we use that Tools. Airport Capacity. Regulations. The future. 3 Background SENEAM. ATS provider in Mexico. Government Company. Part of the Communications and Transport Minister. Facilities. 4 2

3 5 TIJ REX NLD CUU HMO CJS MXL MAM LTO LAP SJD GYM CEN LMM TRC SLW ADN MTY CVM TAM VER MTT VSA CME CPE MID CUN CZM CTM TAP HUX TGZ PXM OAX ACA ZIH UPN MLM BJX SLP ZCL DGO CUL MZT ZLO PVR GDL AGU COL TNY PBC MEX TLC 6 TIJ HMO LAP NLD CJS MTY MZT CUL SJD TAM MAM REX GDL BJX SLP ZLO MLM PVR VER ACA MEX ZIH TGZ VSA CUN CZM MID CONTROL RADAR CONTROL MANUAL PBC CUU

1 2 3 3 2 1 4 3 ACC MEX ACC MZT 4 5 7 5 6 1 2 ACC MTY 4 ACC MID 2 1 3 7 Background Cont.. Growing traffic. 4% per year in the Country (average). Cancun and Toluca 6.5%. Los Cabos 13%. Delays, Holding patterns, High Workload, High incident level. Mexico City, Cancun and Los Cabos. Monterrey and Guadalajara some times. 8 4

Background Cont.. 2000. Strategy Change in the air space layout in MEX. Airway System Review. Pre-Tactic. We commence to Define Flow Control procedures. Software developed by a group of Air Traffic Controllers Flow Control (PROSAT). 9 Background Cont.. Coordination with Airport Service provider AICM-, to establish Airport Capacity. Communication process with Customers. Flow Control training (Supervisors). 10 5

Background Cont.. 2001. Flow Control to MEX Commence 11 Mexico ATFM Development Background. Where we are. What we have. How we use that Tools. Airport Capacity. Regulations. The future. 12 6

Where we are Los Cabos Situation. Since 2005 Flow Control To SJD is in effect. Airport Capacity. Cancun Situation. Flow Control will be establish by april 1st. Toluca Situation. Satellite Airport located 25 NM west 13 Where we are Toluca Situation. Mexico City Satellite Airport located 25 NM west. 1994 Business Aviation moves from Mexico City International to TLC. New Airlines and General Aviation increasing. Flow Control will be establish by the end of june. Guadalajara and Monterrey Intl. 14 7

What we have. Flow Control Unit located in MEX ACC. PROSAT. ETMS. Sat - Com system with the whole Country. AFTN. Flow Control Manual. 15 How we use that Tools PROSAT. Pronostico de Saturacion. Saturation Forecast. 16 8

PROSAT RPL Manual AFTN CPL/ACT AFTN FLU AFTN 17 Prioridad de Mensajes 4th. 3th. FLU CPL/ACT 2nd. Manual 1st. RPL/Slot 18 9

Time Line FP LIST Saturation Warning Entry Pole to TMA MEX Number of Arrivals per 15 min. Saturation Warning 19 PROSAT Una vez llenos los datos del plan de vuelo PROSAT calcula la capacidad del aeropuerto y del fijo de entrada. En este caso el ETD no afecta la capacidad En este caso el ETD SI afecta la capacidad y nos sugiere un ETD 20 10

ETMS 21 Mexico ATFM Development Background. Where we are. What we have. How we use that Tools. Airport Capacity. Regulations. The future. 22 11

Airport Capacity. Mexico City. AAR 54. 36 Arrivals. On Trail Separation. 23 Airport Capacity On Trail Separation Capacity per hour 4 M.N. 40 Arrivals 5 M.N. 6 M.N. 7 M.N. 36 Arrivals 28 Arrivals 26 Arrivals 8 M.N. 24 Arrivals 9 M.N. 22 Arrivals 10 M.N. 20 Arrivals 24 12

Airport Capacity Cancun. Single Runway. Los Cabos. Single Runway. No Approach Radar. No Taxiways to Clear the Runway. Toluca. ILS CATIII. 25 Mexico ATFM Development Background. Where we are. What we have. How we use that Tools. Airport Capacity. Regulations. The future. 26 13

Regulations. MEX International. Controlled Airport. Slot Distribution Program. Congress Legislation and Rules ready. 7 Hour Saturation Declaration. Next Cancun. 27 Mexico ATFM Development Background. Where we are. What we have. How we use that Tools. Airport Capacity. Regulations. The future. 28 14

The future. National Flow Control Command Center. Located in Mexico City. 29 The future. System Update EUROCAT X. Already installed in MID ACC and CUN APP. Next MTY ACC. Traffic Management tool. Processes Finish by the end of 2008. 30 15

The future. Airspace layout review. MEX - CDA STAR s and SID s with no altitude restriction (primary), review in effect. Arrivals in just one Flow with Continuous Descend Approach profile. Airspace with Risk assessment. No Crossing Trajectories during descend. Reduces ATCO s workload. Designed to maintain the Airport capacity. 31 CDA Concept description FL240 FL220 FL200 280 Kts 250 Kts 220 Kts 190 Kts 32 16

CDA Concept description 4000 ft target 12 mn 33 CDA Concept description Concept description lower power settings from higher altitude no level-off segment 34 17

CDA Concept description. CDA Conventional approach 35 B747 Radar Vector to ILS Corrected net Thrust [lbs,all engines] Altitude [ft] 8000 8000 6000 4000 2000 0-2000 7000 6000 5000 4000 3000 2000 1000 0-5 0 5 10 15 20 25 30 35 40 45 50 55 60 Track distance KM Altitude profile Thrust profile 36 18

B747 Approach CDA - RNAV procedures Corrected net Thrust [lbs,all engines] Altitude [ft] 8000 8000 6000 4000 2000 0-2000 7000 6000 5000 4000 3000 2000 1000 0-5 0 5 10 15 20 25 30 35 40 45 50 55 Track distance [km] Altitude profile Thrust profile ~ 30% fuel saving Reduced noise impact 60 37 Noise Reduction Benefits using RNAV CDAs 10 65.0 db(a): Decrease of 25 km² 5 0 Y (km) 75.0 db(a): Decrease of 0.3 km² 55.0 db(a): Decrease of 24 km² -5 0 5 10 15 20 X (km) 25 30 35 40-10 45 38 19

39 40 20

41 42 21

43 44 22

TRAFICO SOLO ATERRIZANDO EN VER 45 46 23

MMR 103 47 48 24

MMR 103 49 OVERFLIGHTS NORTH - SOUTH WEST - EAST 50 25

TLC TRAFICO SOLO ATERRIZANDO EN VER 51 FINAL OVERVIEW TRAFICO SOLO ATERRIZANDO EN VER 52 26

FLOW CONTROL GOAL 53 MEXICO ATFM DEVELOPMENTS THANK YOU QUESTIONS, COMMENTS.. AT 13:30 ON THE DEBATE SESSION. frolivaresc@yahoo.com.mx 54 27

NAM/CAR AIR TRAFFIC FLOW MANAGEMENT SEMINAR ATFM Tegucigalpa, Honduras 27 31 March 2006 Presented by: Rodolfo Olivares 28