I-70/I-71 Project Public Meeting Presented By

Similar documents
Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Welcome to the Cross County Trail Public Input Session!

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Innerbelt Bridge Contract Group 2 Tremont / Towpath Trail and Gateway January 8, 2013

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

ONONDAGA CREEKWALK PHASE II. Public Information Meeting Series 1

COTA Implements Service Changes for January 2010

Trails, steps, & P-Patch to be south of I- 5 Colonnade

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Alliant Energy Center Visioning Workshop Input Madison, WI July 20, 2017

Introduction. Project Overview

District Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

SR 934 Project Development And Environment (PD&E) Study

Ossington Station Easier Access Project - Construction & Public Art Concept Update

East Palomar Street Transit Station and Park & Ride Public Meeting Thursday, June 23, :00 to 8:00 p.m.

I-75 in Hamilton County Project Termini

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

Update on Route 1 Efforts

#1. Why is the City doing this project?

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Noise Abatement Decision Report

TBARTA: 2015 Master Plan and Tampa Bay Express Project

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

Public Open House. Chief Peguis Trail Project

Dufferin Jog Elimination Project

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer

I-579 Urban Open Space CAP Project. Final Land Development Plan (FLDP) Pittsburgh Department of City Planning

Route 29 Solutions Projects

Welcome! This open house provides an early look at: Garage layout and access Potential pedestrian, bicycle and transit improvements

Update: Manhattan Community Board 1 Land Use, Economic Development & Zoning committee February 12, 2018

Gulf Coast MPO Obligated Projects

CLAREMONT CLUB, SPA & RESIDENCES

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

CHAPTER FOUR RECOMMENDED NOISE COMPATIBILITY PROGRAM MEASURES

Madison Metro Transit System

Public Informational Meeting

25 th Avenue Grade Separation. September 13, 2017

State Route 8 Corridor. Northern Summit County s Path to Success

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

1.2 Corridor History and Current Characteristics

Vasona Light Rail Signal Design Challenges. Hugh D. MacGillivray, Hatch Mott MacDonald Dennis Mellon, Santa Clara County Transportation Authority

Overview of Boston Logan Operations and Noise from Overflights. Presentation to Massport Board March 19, 2015

25 th Avenue Grade Separation. December 13, 2017

TRAFFIC COMMISSION, VILLAGE OF LINCOLNWOOD 6900 N. Lincoln Avenue, Lincolnwood, IL 60712

Transportation Supporting Dulles Airport

Analysis and Feasibility Broward County Convention Center Master Plan Study Fort Lauderdale, FL HKS I Urban Design Studio

More than just express lanes

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Fairfax County Parkway Widening Fairfax County

Downtown Mobility Hub: Draft New Precinct Plan. Art Gallery of Burlington September 7, 2017

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

DIRECTOR S REPORT TRANSPORTATION BOARD AUGUST 14, 2017

2016 Regional Transportation Alternatives Program (TAP) Grant Application

SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

US 19 Sunset Point Rd to Countryside Blvd.

TRAIL ANNUAL REPORT

DOWNTOWN BRT ALTERNATIVE - 19th AVE

DEMOGRAPHICS AND EXISTING SERVICE

S i t e A n a ly s i s

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

Downtown to Defiance Trolley Key Messages Jan. 2017

Airport Planning Area

U.S. 33 Ravenswood Connector

Mohawk Hudson Bike Hike Trail Crossroad Connection Study

TRANSPORTATION ELEMENT

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Independence: overview

The Ohio State University Airport Master Plan Update Public Meeting 2

CHAPTER 6 NOISE EXPOSURE

October 18, Terry Hartwick Director, North Little Rock Parks and Recreation 2700 Willow Street North Little Rock, AR 72114

Item # 28. Chief Capital Management Officer Report. November 20, 2008

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

For Lease Retail Space LUXURY

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017

Pattullo Bridge Replacement Project

Area Surrounding Maplewood Manor

RECENT SCENARIO PLANNING FOR THE REGIONAL FREEWAY AND HIGHWAY PROGRAM MARICOPA ASSOCIATION OF GOVERNMENTS

RUSHMORE CONNECTOR TRAIL PROPOSAL

Lafourche Parish Government REQUEST FOR QUALIFICATIONS. Landscape Architectural Services

Building the transportation network we need for the future in Niagara Region

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

Key Center. Enjoy a close proximity to Downtown Bellevue s lively entertainment and shopping center, surrounded by a wide variety of dining options.

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

First rail. August 2011

2 Construction Program

Transcription:

I-70/I-71 Project Public Meeting Presented By Ohio Department of Transportation ms consultants, inc. engineers, architects, planners MSI Design June 9, 2010

W e l c o m e Thom Slack Planning Administrator, ODOT District 6

P r o j e c t P h a s i n g

P r o j e c t P h a s i n g Design-Build Contract Advertising for RFPs in late 2010 Phase 1 (North Interchange) Phase 1 - North Interchange Construction 2011

P r o j e c t P h a s i n g Final Design is underway Phase 1 (North Interchange) Phase 2 (East Interchange) Phase 1 - North Interchange Construction 2011 Phase 2 East Interchange Construction 2013

P r o j e c t P h a s i n g Final Design is Underway Phase 1 (North Interchange) Phase 3 (East Innerbelt) Phase 2 (East Interchange) Phase 1 - North Interchange Construction 2011 Phase 2 East Interchange Construction 2013 Phase 3 East Innerbelt Construction 2015

P u b l i c O u t r e a c h Complete Streets Initiative March - July 2010 Spring & Long Crossings June - July 2010 Main, Parsons, Grant & 18 th Crossings Starting July 2010 Broad, Oak, Town, Lester Crossings Starting August 2010

Standard Highway Bridge Long Street - today

Enhanced Bridge Project Starting Point Currently Proposed Design Features: Expanded Sidewalks Decorative Parapet Wall & Fence Upgraded Street Lights: black Esplanade tear-drop or Acorn post-top Upgraded Mast Arms: black Esplanade match Bridge Crossing Urban Urban Avenue Avenue

Standard Highway Bridge Pedestrian View Oak Street - today NORTH

Enhanced Bridge Pedestrian View NORTH

Bridge Crossing Enhancement Funding New Funding in 2010: ODOT, MORPC, and the City of Columbus now pledge $26 million for expanded bridge designs on East Corridor. Allows further improvement of bridges crossings. Includes Spring and Long Street Bridges in Phase 1.

Crossing Design Goals What we heard: Hide the Freeway Make the Bridge Crossings Inviting Use Complete Street Principles Reflect Neighborhood Character

Bridge Design Example Fort Washington Way Bridge Crossing NORTH

Spring & Long Street Area Today Columbus State King Art Complex CCAD Washington Ave Spring St. Long St. MLK Blvd. Blvd. Lincoln Theater Art Museum Jefferson Center Hamilton Park Broad St. NORTH

Spring & Long Street Area with Project Columbus State King Art Complex CCAD Washington Ave Spring St. Long St. MLK Blvd. Blvd. Lincoln Theater Art Museum Jefferson Center Hamilton Park Broad St. NORTH

Spring Street Existing Character

Long Street Existing Character

Gateway & Neighborhood Bridges

Spring & Long Street Bridge Area Existing and Urban Avenue Greenspace NORTH LESTER AVENUE LONG STREET SPRING STREET ELIJAH PIERCE AVENUE

Spring & Long Street Bridge Area Project Crossing Greenspace NORTH LESTER AVENUE LONG STREET SPRING STREET ELIJAH PIERCE AVENUE

Spring & Long Street Bridge Area New Bicycle Lanes & Circulation NORTH LESTER AVENUE LONG STREET SPRING STREET ELIJAH PIERCE AVENUE

Spring & Long Street Bridge Area Existing & Proposed Sidewalk Circulation NORTH LESTER AVENUE LONG STREET SPRING STREET ELIJAH PIERCE AVENUE

Spring & Long Street Bridge Area Complete Sidewalks & Bike Lane Circulation NORTH LESTER AVENUE LONG STREET SPRING STREET ELIJAH PIERCE AVENUE

Spring Street Bridge Today Looking West toward Downtown NORTH

Spring Street Bridge Concept Looking West toward Downtown NORTH

Spring Street Bridge Today Looking West on North Side of Bridge NORTH

Spring Street Bridge Concept Looking West on North Side of Bridge NORTH

Spring Street Bridge Today South Side Looking West NORTH

Spring Street Bridge Rendering South Side Looking West During the Day NORTH Elijah Elijah Pierce Pierce Avenue Avenue

Spring Street Bridge Rendering South Side Looking West at Night NORTH Elijah Elijah Pierce Pierce Avenue Avenue

Long Street Bridge Today Looking West toward Downtown NORTH

Long Street Bridge Concept Looking West toward Downtown NORTH

Long Street Bridge Today Aerial View NORTH

Long Street Bridge Concept Aerial View NORTH

Long Street Bridge Today Looking West on South Side of Bridge NORTH

Long Street Bridge Concept Looking West on South Side of Bridge NORTH

Long Street Bridge Today North Side View Looking West NORTH

Long Street Bridge Rendering North Side View Looking West During the Day Elijah Elijah Pierce Pierce Avenue Avenue NORTH

Long Street Bridge Rendering North Side View Looking West at Night NORTH Elijah Elijah Pierce Pierce Avenue Avenue

E a s t b o u n d I 6 7 0 N I-71 I-670 Cleveland Ave. Mt. Vernon Ave. Long St. Columbus State Broad St.

E a s t b o u n d I 6 7 0 N St. Clair Ave. I-670 Leonard Ave. I-71 Skyview Towers

E a s t b o u n d I 6 7 0 Leonard Ave. N St. Clair Ave. I-670 Relocation of eastbound Leonard Avenue Relocation of bike/pedestrian path

W h y d o a N o i s e S t u d y? Required by Federal Regulations (23 CFR 772) Federally funded project Project adds lanes to existing highway Project changes the location or elevation of the highway 44

H o w w a s t h e N o i s e S t u d y D o n e? ODOT Standard Procedure 417-00 FHWA Policy and Guidance Existing Noise Readings 45 Sites -- June 2009 Verify Computer Models Confirm Noise Sources

H o w w a s t h e N o i s e S t u d y D o n e? Computer Modeling (FHWA s TNM V2.5) Existing Sensitive Locations Outdoor Activity Areas Interiors of churches, hospitals, etc. New Highway Design Freeway Lanes Urban Avenues City Streets Bridges Year 2035 Predicted Traffic

N o i s e S t u d y R e s u l t s Existing Noise Levels currently exceed FHWA/ODOT Noise Abatement Criteria 67 db for residential areas (outdoor) Future Noise Levels will exceed FHWA/ODOT Noise Abatement Criteria Noise Impacts throughout project area

N o i s e S t u d y R e s u l t s Will this project increase current noise levels? About the same as the existing levels at most locations Already high enough to be an Impact and will continue to be an impact

N o i s e S t u d y R e s u l t s What mitigation did we consider? Impose vehicle and speed restrictions Move the alignment Create buffer zones Not appropriate for an urban interstate project

N o i s e S t u d y R e s u l t s Noise walls as mitigation Not effective in these locations East Corridor (I-71) South Corridor (I-70/71 overlap) Could be effective in these locations Near Shiloh Baptist Church not accepted East Split and I-70 east of 18 th Street pending public input

N o i s e S t u d y R e s u l t s Will the retaining walls reflect the noise? Just perceptible in South Corridor Not perceptible in East Corridor What about sound absorbing material on the retaining walls? Not effective at reducing perceptible noise

N e x t S t e p s Tonight - Open House Provide comments by June 25, 2010 Complete Environmental Documentation Follow-up for Spring & Long Details

O p e n H o u s e Spring & Long Crossings MORPC Shaping our Future Engineering & Traffic (I-670 Refinements) Complete Streets Noise Study Results

www.7071study.org Hotline: 877-381 381-7071 Leslie Montgomery, P.E. Project Manager ODOT District 6 400 E. William Street Delaware, OH 43015 Phone:740-833 833-82698269 Fax:614-877 877-4605 Email:Leslie.Montgomery@dot.state.oh.us