RNP AR Experience. Phil Rakena PBN Project Manager February 2015

Similar documents
PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

APAC PBN UPDATE Slide 1 of xx

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Status of PBN implementation in France

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Learning Objectives. By the end of this presentation you should understand:

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Título ponencia: Introduction to the PBN concept

Open Questions & Collecting Lessons Learned

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

Approach Specifications

DSNA NAVIGATION STRATEGY

Air Navigation Bureau ICAO Headquarters, Montreal

EASA RNP (AR) Workshop The Landscape Working Together

ICAO framework for LPV

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

Review of the designation of Class C controlled airspace in the Mount Cook area - Consultation November 2013

PBN and Procedure Design training

Honeywell.com PBN Concepts Krakow, Poland

(RN R A N V A V & & RN R P N

PBN Operational Approval Continental En Route Navigation Specifications

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

CONTROLLED AIRSPACE CONTAINMENT POLICY

Performance Based Navigation Implementation of Procedures

TWELFTH AIR NAVIGATION CONFERENCE

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

RNP AR APCH Approvals: An Operator s Perspective

PBN and airspace concept

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

What is an Airspace Concept? Module 5

Regulations & Obligations

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

Final Approach Operations Symposium

AERONAUTICAL INFORMATION CIRCULAR 18/18

Performance Based Navigation Operational End-State 2023

European Aviation Safety Agency

Performance Based Navigation (PBN) Implementation Plan. The Gambia

PBN Implementation in the UK

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

PBN Airspace Concept. ATS requirements

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

Think the solution, experience the change

Validation & Implementation Considerations Module 14 Activities 11 to 17

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Required Navigation Performance (RNP) in the United States

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

Next Generation Airspace Developments: Key Operational Trends and Enablers

Services Charter. 2014/15 to 2015/16

Russian Federation ATM modernization program

NEW FPL Transition Phase & Implementation Stages

RNP AR and Air Traffic Management

Framework Brief. Edinburgh SIDs

34 th Airline/ATS Safety Forum

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

DEPARTURE, HOLDING, AND APPROACH PROCEDURES

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Performance Based Navigation Implementation Plan Revised 2017 New Zealand

NATA 2018 AGM & CONFERENCE

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Airplane Navigation Capabilities

EUROMED GNSS II Achievements and expectations. Presented By: M. Akram HYDRI Head of Air Traffic Studies and Planning Division OACA

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

Performance-based Navigation (PBN) Operations Plan VERSION 1.1

TABLE OF CONTENTS 1.0 INTRODUCTION...

Advisory Circular. Radius to Fix (RF) Path Terminator

SDM Workshop on PBN Airborne Perspective. Michael Hopp, Lufthansa Group Brussels,

UK Implementation of PBN

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.

Asia Pacific Initiative to Reduce Emission. Brian Bagstad Senior ATO Representative, FAA

RNP AR RWY 16 in Vienna Schwechat (LOWW) PBN based Noise Abatement

Colombian PBN implementation: El Dorado case study

ATM 4 Airspace & Procedure Design

Performance Based Navigation Implementation Plan SINGAPORE. December Published by Civil Aviation Authority of Singapore

Flight Operations Inspector Manual

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

UK Performance-based Navigation (PBN) Implementation Status

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

Bits to Blocks Aviation System Block Upgrades (ASBU)

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

This advisory circular provides the syllabus for training and assessment for applicants for an approach control procedural rating.

TERMS OF REFERENCE FREDERICTON AIRSPACE REVIEW

PBN IMPLEMENTATION IN INDONESIA

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene

AIR TRAFFIC FLOW MANAGEMENT

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

NextGen and ASPIRE Environmental Initiatives

Updates to Procedures at St. John s International Airport

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

Transcription:

RNP AR Experience Phil Rakena PBN Project Manager February 2015 1

What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from sensor-based, to performance-based navigation e.g. RNAV 2 = TSE +/- 2nm 95% time 2 Airways PBN

PBN Nav-Specs Area Navigation Old RNP Specs: B-RNAV P-RNAV AUSEP RNP / RNAV US RNAV RNP 10 RNP 4 unsafe, inefficient costly & confusing 3 Airways PBN

Policy ICAO Guidance SARPs and PANS AN37/11; Doc 9613, 4444, 8168, 9905; Cir 336, ASBU etc. Global Air Navigation Plan (GANP) Asia-Pacific Regional PBN Implementation Plan PBN Implementation Plan NZ National Airspace and Air Navigation Plan New Southern Skies 4 Airways PBN

Regulations Civil Aviation Act 1990 (Amended 11Apr08) Rule Part 19 Subpart D IFR Operations: GNSS Rule Part 91.246 Operations in RNP designated airspace Rule Part 91.501 General requirements Rule Part 91.519 IFR Communication and Navigation Equipment Advisory Circular AC91-21 Op. Approvals Aeronautical Information Circular (AIC) AIP Supplement (Effective 18 Oct 12) PBN Implementation Queenstown, Invercargill and Wanaka AIP (Effective 15 Nov 12) STARs at CH; SIDs/STARs at QN and NV Enroute Charts (ERCs) Visual Nav Charts (VNCs) 5 Airways PBN

Collaboration Close Partnership Approach Airlines Airport Company Airways (Project controller) GEAD CAA GA GE NAVERUS 6 Airways PBN

Terminology o Required Navigation Performance with Authorisation Required (RNP AR). o Total System Error (TSE) may be as low as 0.10 nm, with Radius to Fix (RF) turns o Lower minima in mountainous terrain o Short approach with precision ground path set to minimise noise impact Fly-by Buffer Leg Buffer RF Turn 7 Airways PBN

Separated SIDs and STARs 8 Airways PBN

Access & Capacity Reduced Track Miles / Flight Time / Fuel Burn / CO2 Emissions RNP AR Tailored Arrival RNAV Arrival Radar Vectors 9 Airways PBN

Queenstown Rwy23 Traffic 10 Airways PBN

Queenstown Rwy05 Traffic 11 Airways PBN

Queenstown PBN results MONTH CAM Ground Delay In-flight Delay Number of Aircraft AVG Delay per Aircraft AVG PRIOR NOV 2012 550mins 2,400mins 360 6:15mins NOV2014 56mins 435mins 468 :56secs Additional Track miles for separated SIDs/STARs, but Most arrivals ever recorded for November. Ground Delay down 90% Inflight Delay down 80% Jet payloads up 5-15 pax Fewer diversions Network more predictable Available capacity up 200% ATC workload reduced 12 Airways PBN

Movements / Congestion Effective Runway Hour Flow Management 35.0 World Airport Runway Demand/Capacity Balance 30.0 25.0 20.0 15.0 10.0 5.0 0.0 0 1 2 3 4 5 6 7 8 Number of Runways World Airports NZAA - Auckland International Airport, New Zealand YMML - Melbourne International Airport, Australia YPPH - Perth International Airport, Australia YBBN - Brisbane International Airport, Australia YSSY - Sydney Airport, Australia YBCS - Cairns International Airport, Australia YPAD - Adelaide International Airport, Australia 16 Airways PBN

Minutes of delay Enable 4D-ATM 30,000 In-flight delay/month: Auckland-Wellington city pair 25,000 20,000 THE CFM EFFECT - Combined delays on Auckland - Wellington city pair averaged 28,000 minutes per month. From January 2009 delay averages below 5,000 minutes per month, and since May 2013 delay average is less than 3,000 minutes per month with less than 1,000 minutes of that at Auckland. 15,000 10,000 5,000 0 17 Airways PBN

Expedition/Noise Reduced Track Miles / Flight Time / Fuel Burn / CO2 Emissions RNP AR Tailored Arrival RNAV Arrival Radar Vectors 18 Airways PBN

Noise Auckland Smart Trial RNP AR APCH Short Efficient Noisy Withdrawn 19 Airways PBN

Iterative 20 Airways PBN

Iterative 21 Airways PBN

Modified RNP AR APCHs Auckland Smart Trial RNP AR APCH Higher (6,000ft) CA Wider/faster (190 IAS) Revised groundpath Efficient Less noise impact 10/day per APCH Discussion: Consultation, CA, Speeds, Noise, LIP, Coding, Testing 22 Airways PBN

23 Airways PBN

24 Airways PBN

25 Airways PBN

Normalising PBN Knowledge - Management, PMs, Pilots and ATC, Trainers, Supporters o CAA, ANSP, GEAD, Airports, Operators, GA, Military, Community Resource - Budget (Metrics/BCI); Time (complex); People: Skilled Technology Avionics, Navaids, Surveillance, ATM RNP AR, GBAS, SBAS ICAO - Separations, RTF Phraseologies, RNAV Vis, WPT Names CAA equipage/approvals (AC91-21); airspace containment; RAIM <0.3; contingency; sole-means; SBAS Airways Consultation; ATMS auto-allocation; sequencing tools (AMAN); ICAO 2012; scope; schedule; VNAV; Radar vs Procedural ATC; ATC/FIS Operators - Fleet equipage; Coding for different types/operators GA/Helo s/vfrs - RNP 0.3 (H), CTR fit for VFRs, Airports/Community Consultation, service, QN night ops 26 Airways PBN

27 Questions?

Links Performance Based Navigation NZCAA http://www.caa.govt.nz/pbn/pbn.htm https://www.caa.govt.nz/naanp/naanp_home.htm http://www.nss.govt.nz/ Auckland RNP AR ApproachTrial http://aucklandflightpathtrial.co.nz/ ICAO PBN ikit http://www.icao.int/safety/pbn/sitepages/pbn%20ikit.aspx Global Air Navigation Plan http://www.icao.int/sustainability/pages/ganp.aspx ASBU Framework http://www.icao.int/sustainability/pages/asbu-framework.aspx CANSO PBN Best Practice Guide (pending!) https://www.canso.org/publications Eurocontrol - PBN Training Module http://pbnwbt.ecacnav.com/pbn_package_site/ 28 AirNZ PBN & MLat