Public Disclosure Copy

Similar documents
Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Thank you for participating in the financial results for fiscal 2014.

Foregone Economic Benefits from Airport Capacity Constraints in EU 28 in 2035

49 May-17. Jun-17. Travel is expected to grow over the coming 6 months; at a slower rate

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

2007/08 Full Year Results Investor Briefing

Performance monitoring report for 2014/15

Tourism Statistics

Analysts and Investors conference call. Q results. 15 May 2013

Oct-17 Nov-17. Sep-17. Travel is expected to grow over the coming 6 months; at a slightly faster rate

LEBANON: A DIVERSE ECOTOURISM DESTINATION IN THE EAST-MEDITERRANEAN. Prepared by: Dr. Jacques Samoury NGER National Expert

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Activity Concept Note:

Implementation of SESAR Pilot Common Project. - expected effects

UNWTO Regional Workshop for Africa Addis Ababa, Ethiopia, September, 2016

Implementation Status & Results Paraguay Road Maintenance (P082026)

26 October 2017 Icelandair Group Interim Report NET PROFIT USD 101 MILLION IN THIRD QUARTER

The results of the National Tourism Development Strategy Assessments

AN ECONOMIC PERSPECTIVE ON THE 5 YEARS AFTER ITS LAUNCH

Oct-17 Nov-17. Travel is expected to grow over the coming 6 months; at a slower rate

International Development Association

The Seychelles Sustainable Tourism Label (SSTL)

The Economic Impact of Tourism in North Carolina. Tourism Satellite Account Calendar Year 2015

Gold Coast: Modelled Future PIA Queensland Awards for Planning Excellence 2014 Nomination under Cutting Edge Research category

AFI AVIATION SECURITY MEETING. Dakar, Senegal, 28 May 2014 AN AFRICAN PLAN FOR ENHANCING AVIATION SECURITY AND FACILITATION. (Presented by Uganda)

Turistička zajednica grada Zagreba

Jan-18. Dec-17. Travel is expected to grow over the coming 6 months; at a slower rate

TURTLE SURVIVAL ALLIANCE EXECUTIVE DIRECTOR

Implementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965)

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

Implementation Status & Results Paraguay Road Maintenance (P082026)

Results of Tourism Activity Mexico, April 2017

THE CARICOM REGIONAL IMPLEMENTATION PLAN

APEC Tourism Working Group & PECC Agenda

5th NAMIBIA TOURISM SATELLITE ACCOUNT. Edition

Heathrow (SP) Limited

DESTIMED PROJECT CALL FOR EXPRESSION OF INTEREST FOR THE IMPLEMENTATION OF ECOTOURISM PILOT ACTIONS IN CROATIAN MPAS

Results of Tourism Activity. July, 2017

Singita Serengeti One Planet Annual Review 2017/18

Maximizing Sustainable Tourism impact for inclusive and low carbon growth Colombo, 7 October Zoritsa Urosevic World Tourism Organization

Results of Tourism Activity Mexico, May 2017

2017/ Q1 Performance Measures Report

BUSINESS BAROMETER December 2018

Talofa! Malo e lelei. Kia Orana. Hal o. Ia Orana. Maur i. Bula!

Rethink Vancouver. Tourism Industry Summit. March 31, 2011

Tulsa Airports Improvement Trust Strategic Plan Update

EXECUTIVE COUNCIL Twenty-Fifth Ordinary Session June 2014 Malabo, EQUATORIAL GUINEA EX.CL/862(XXV) Add.2 Original: English

An Integrated Investment Incentives and Cargo Hub Airports to Stimulate Air Cargo Demand. June,2017

Balearic Islands Good Practice

The Economic Impact of Tourism in North Carolina. Tourism Satellite Account Calendar Year 2013

Terms of Reference: Introduction

TUI GROUP INVESTOR PRESENTATION

SPOTLIGHT ON STUDENT ACCOMMODATION FABBY ERNESTA

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

AIRFIELD ACCESSIBILITY AND SAFETY INITIATIVE FAQs

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal

Tourism in South Africa A statistical overview

Business Plan INTRODUCTION AIRPORT ENTERPRISE FUND OVERVIEW. Master Plan Guiding Principles

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan

Implementation Status & Results Paraguay Road Maintenance (P082026)

PPIAF Assistance in Swaziland

48 Oct-15. Nov-15. Travel is expected to grow over the coming 6 months; at a slower rate

Manawatu District Economic Profile

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel:

Transcription:

Public Disclosure Authorized AFRICA Ethiopia Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 21-Dec-2015 ISR20896 Implementing Agencies: Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:30-Jun-2009 Planned Mid Term Review Date:23-Oct-2012 Original Closing Date:30-Dec-2014 Project Development Objectives Effectiveness Date:25-Feb-2010 Actual Mid-Term Review Date:23-Oct-2012 Revised Closing Date:30-Dec-2015 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The proposed project development objective is to contribute to enhancement of the quality and variety of tourism products andservices in targeted destinations so as to increase tourist visitation, foreign exchange earnings, and jobs. The implementation of the project will yield the following key outcomes, particularly in key destinations: (i) an increase ofannual international visitors; (ii) increased average spending by visitors translating into higher foreign exchange earnings; and(iii) an increased number of direct and indirect tourism-related jobs. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Public Disclosure Authorized Name Destination development:(cost $19.61 M) Market development:(cost $5.20 M) Institutional development and capacity building:(cost $4.36 M) Implementation support:(cost $4.89 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Satisfactory 12/21/2015 Page 1 of 11

Overall Risk Rating Substantial Moderate Implementation Status and Key Decisions The implementation of the project has progressed well particularly since the last implementation support mission conducted in June 2015. The remaining activities from the last implementation support mission, such as the walkways and plaza development, the construction of the visitor center and the refurbishing of the handcrafts center in Axum, have been completed and handed over to the local administration. The final key intervention in Lalibela for the landscaping and conservation of the heritage site is progressing well with remaining activities expected to be completed by December 23, 2015. The active engagement of key stakeholders at all levels and the hands-on support from the Steering Committee has facilitated the expedited implementation of the project in these final months. The Project interventions were targeted to address binding constraints to tourism development in Ethiopia noted during project design, in particular, (i) the low level of private sector investment in the tourism sector due to inadequate infrastructure at the tourism sites (such as access roads, water and sanitation, etc.);(ii) lack of access to finance for the private sector to expand investments; and (iii) weak capacity of the tourism institutions and lack of participation of local communities. The Project has addressed most of these contraints, including provision of access roads, water and sanitation systems, and improvements on tourist products and destinations. The Matching Grants Scheme and the Community Involvement interventions provided access to finance and technical assistance to the private sector and the community to introduce new tourism products, expand investments and improve services and standards. Many capacity building interventions were implemented to stregthen the institutions supporting the toursim sector such as the federal, regional and local touirsim bureaux, the Training instituions and key tourism sector stakeholders. The project also supported the estbalisment of the Tourism Transformation Council, the Toursim Board and the Ethiopian Tourism Organization, with high level policy making and strategic decision making power. Based on information available to date from the project unit, the project has achieved results on its outcome inedcators as follows: i) International annual visitation numbers on average achieved 8.5% and 11.5% growth in Axum and Lalibela respectively, based on 2012--2014 (the period after the restructuring and lifting of partial suspension and the last year for which we have full year actual data). Final growth rates are to be determined based upon actual 2015 data not yet available. International visitor arrivals for each of the destinations have fluctuated due to local factors (ie extended construction in destination centers and around attractions) and global developments (ie, perception of lack of security and safety by tourists). At the same time, domestic visitation has grown as overall economic conditions in the country improved and more Ethiopians have been able to travel to these sites treasured for their religious and historical significance; ii) The target for average exepnditure per person per day expenditure has been exceeded with $390 per day for Axum and $515 per day for Lalibela against the target of average expediture of $350/day. The final combined average rate is pending the most recent data from Addis Ababa; and iii) Job creation targets have been far exceeded with 5,553 jobs created from 2012-2015, versus the set target of 1,440. It is expected that the deeper impact of the project interventions will become more visible in the coming years as the investments to develop the tourism products and infrastructure, the support to the private sector to improve and expand services, and the capacity building interventions to public and private sector service providers will fuel a strengthened tourism value chain. These building blocks would enable the enhancement of the tourism experience in the supported destinations, attracting additional visitors, potentially higher expenditures and creation of more tourism sector related jobs going forward. To this end, the project has made significant contributions by addressing the critical constraints as indicated above, laying the ground for more investments and fostering opportunities for further sector development. Activities and results in the targeted destinations provide a demonstrable basis for the Government to further develop the country's many other destinations and realize the full economic potential of the tourism industry nationwide. 12/21/2015 Page 2 of 11

Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Substantial Moderate Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Moderate Moderate Institutional Capacity for Implementation and Sustainability -- Substantial Substantial Fiduciary -- Moderate Moderate Environment and Social -- Moderate Moderate Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Substantial Moderate Results Project Development Objective Indicators 12/21/2015 Page 3 of 11

PHINDPDOTBL Average annual increase of the number of international visitors in targeted destination of Axum. (Percentage, Custom) Value 19.00 13.70 8.50 23.00 The end target for Axum of 23% refers to an annual target for the 3-year period (post restructuring) developed during the mid-term review and prior to the project's extension. This was an ambitious target based on the baseline review which utilized projections as well as historical figures. Based on the results to date, the average annual increase is 8.5% for Axum and 11.5% for Lalibela for 2012-2014. Final rates of growth will be calculated with 2015 data to be provided after they year ends and full data becomes available. These growth rates are impactful despite being under the ambitious target. Growth was achieved despite extensive works activities in the core zone of each of these destinations and significant external factors such as security and safety concerns negatively affecting traveler motivation. The previous actual figure (13.7%) refers to actual growth in number of visitors as of June 2015 based on preliminary survey results; this ISR is not able to include 2015 figures since the data is not yet complete or finalized. This indicator will be confirmed once 2015 figures are integrated, allowing average annual growth to be recalculated. An on-going terminal evaluation summary will further supplement or update these numbers by project closing. PHINDPDOTBL Average annual increase of international visitors to Lalibela (Percentage, Custom Breakdown) Value 27.00 23.60 11.50 33.00 PHINDPDOTBL Increase of average foreign currency spending per international tourist per day in all the three targeted destinations of Addis/ environs, Axum and Lalibela (Percentage, Custom) Value 310.00 438.00 393.00 350.00 The Actual (current) figure is determined by a November 2015 Survey, averaging the daily expenditures in 3 destinations: US$390 in Axum, US$515 in Lalibela. Addis Ababa figures are yet to be finalized, however, by utilizing the previous conservative estimate of US$274 in Addis, the average per day spend of US $393 still exceeds the target of US$350. This indicator is considered to be met, and the final combined level will be confirmed once the most recent Addis Ababa figures are made available by the end of December 2015. The Actual (Previous) figures (and those in the Aide Memoire) were based on incomplete estimates calculated utilizing secondary data, and have been revised as the more comprehensive primary survey results are submitted. An ongoing terminal evaluation in-depth survey will supplement and update these figures by project closing. 12/21/2015 Page 4 of 11

PHINDPDOTBL Number of jobs created in tourism related industries in the targeted destinations of Axum and Lalibela (Number, Custom) Value 440.00 4600.00 5553.00 1440.00 Date 31-Oct-2012 30-Sep-2014 30-Oct-2015 30-Dec-2015 This indicator reflects the number of new jobs created in the four tourism-related industries of accommodation/catering, tourist transportation, and tourist guides, in line with the baseline categories. It shows clear attribution links to project activities, such as the Matching Grants and Community Involvement investments directly creating almost 2,000 jobs. This indicator has been met and exceeded. Proxy indicators confirm this, as in Axum, tourism-related jobs increased by 725% between 2010 and 2015; During the target period (2012-July 2015): Youth accounted for 42% of new jobs created; Women accounted for 55% of new jobs created; 59% of enterprises hire workers only from Axum. A total of 88% of recorded jobs created are Full-Time Equivalent jobs. In Lalibela, tourism-related jobs increased by 1,566% between 2010 and 2015; During the target period (2012-July 2015): Youth accounted for 27% of new jobs created; Women accounted for 50% of new jobs created; 79% of enterprises hire workers only from Lalibela. A total of 88% of recorded jobs in this area created are Full-Time Equivalent jobs. PHINDPDOTBL Number of jobs created in Lalibela (Number, Custom Breakdown) Value 650.00 1635.00 3229.00 860.00 Date 30-Oct-2012 30-May-2015 30-Oct-2015 30-Dec-2015 Overall This indicator reflects the number of new jobs created in the four tourism-related industries of accommodation/catering, tourist transportation, and tourist guides, in line with the baseline categories for Lalibela, Ethiopia's most popular destination after Addis Ababa.. Intermediate Results Indicators 12/21/2015 Page 5 of 11

Number of historic monuments/ sites rehabilitated in all the three targeted destinations (Number, Custom) Value 0.00 1.00 3.00 6.00 Completion of works on additional sites, such as the Addis Ababa Museum, are anticipated by project end. In addition, 3,614 people have been employed during construction of access roads and those rehabilitated, including 1,061 women. These temporary jobs are in additon to the number of jobs reported under PDO indiactor 2. Kilometers of access/town roads rehabilitated (Kilometers, Custom Supplement) Value 0.00 20.10 21.10 4.00 Number of visitor service centers established and staffed in all the three targeted destinations (Number, Custom) Value 0.00 0.00 0.00 3.00 Only goods procurement remains for the visitor service centers, and these are aiming to be completed by project closing. These will serve as sites for further capacity building, fostering on-going tourism product diversification and as focal point for visitors. 12/21/2015 Page 6 of 11

Number of tourism product development plans prepared in secondary destinations (Number, Custom) Value 0.00 2.00 3.00 3.00 Product development plans for the Southern, Western and Eastern routes have been prepared with extensive consultation. This target is met. The preparation of these has enabled identification and planning for the sector to continue to expand beyond the targeted sites in this project. Number of marketing and promotion strategies adopted with at least 3 international tourism market segments (Number, Custom) Value 0.00 0.00 3.00 3.00 Date 31-Dec-2009 30-May-2015 30-Oct-2015 30-Dec-2015 As of December 15, 2015 (based on progress report from PIU), the marketing development strategy and the branding strategy have been finalized. This target has been met.the development of the promotional materials is underway is and is expected to be completed before project closing. Number of beneficiary firms utilized the matching grants financing (Number, Custom) Value 0.00 65.00 79.00 50.00 Date 14-Dec-2009 30-May-2015 15-Dec-2015 30-Dec-2015 The Matching Grant scheme implementation has been well-received with strong implementation in Lalibela, Axum and Addis and benefitting entities across the tourism value chain. It has far exceeded its target. The reported result of 79 Matching Grant beneficiaries is based on the progress update from PIU on December 15, 2015 reflecting the latest information on this intervention which has benefitted a variety of enterprises contributing to a stronger tourism value chain. 12/21/2015 Page 7 of 11

Number of community based and tourism related business ventures established (Number, Custom) Value 0.00 46.00 56.00 45.00 Date 31-Dec-2009 30-May-2015 15-Dec-2015 30-Dec-2015 The Community Intervention support established 56 Business Ventures as of end of October 2015, based on the project progress update from the PIU on December 15, 2015. This intervention has enabled the communities in the three destinations to directly benefit from tourism industry activity. This target is met. A strategy with a detailed 3-5 year action plan to support the implementation of the national tourism strategy developed (Number, Custom) Value 0.00 1.00 1.00 1.00 Date 30-Oct-2012 30-May-2015 30-Oct-2015 30-Dec-2015 The national strategy was developed through extensive consultations and has guided Government (national, state and local level) in tourism development decision making. A lodging grading regime compatible to international standards developed and pilot tested (Number, Custom) Value 0.00 0.00 1.00 1.00 Date 31-Oct-2012 30-May-2015 15-Dec-2015 16-Dec-2015 At the time of the mission from Nov 2 to 10, 2015, the regime has been developed, 52 grading experts have been trained, and 337 Hotels in 7 regions have been assessed/graded. Two additional regions are finalizing the assessments, and some properties in Addis require reassessments. Based on the progress update received from PIU on December 15, this activity has been fully completed and the final workshop has been conducted. Accordingly, the result has been updated to reflect this progress as of December 15, 2015. 12/21/2015 Page 8 of 11

An upgraded national tourism statistics system that is capable of capturing basic tourism indicators (Number, Custom) Value 0.00 0.00 1.00 1.00 Date 31-Dec-2009 30-May-2015 30-Oct-2015 30-Dec-2015 The system is operational: it has been designed, users are trained and software has been migrated to the GoE s systems. This is a crucial intervention benefitting all areas in the country to better track and monitor tourism sector performance. The target has been met. Number of instructors/ trainers trained on training curricula developed under the project at vocational schools (Number, Custom) Value 0.00 0.00 44.00 40.00 The project supported beneficiaries to partake in training in overseas programs which demonstrate good practices and international standards which is much needed in Ethiopia. Also, those trained were required to share the learned content with colleagues upon return to their training institutions. Number of people in the tourism industry trained in Addis/ environs, Axum and Lalibela (Number, Custom) Value 0.00 1379.00 1661.00 200.00 Date 31-Dec-2009 30-May-2015 30-Oct-2015 30-Dec-2015 Training enabled improved understanding of the sector and standards necessary for achieving a competitive product. Of those trained 834 are women. This target has been fully met. 12/21/2015 Page 9 of 11

Direct project beneficiaries (Number, Core) Value 0.00 1899.00 3837.00 500.00 An additional 26,738 have benefitted from improved access to water and sanitation in Lalibela which has suffered in the past from water shortages. Additionally, 8,316 workers have been employed as inputs to the project (mainly in construction). Female beneficiaries (Percentage, Core Supplement) Value 0.00 760.00 1704.00 100.00 Overall The Project has hired a consultancy service to carry out a comprehensive terminal survey and evaluation which is expected to be completed by end of December 2015. The results reported here are expected to be validated by this survey and the results of some of the ongoing interventions will be provided once the survey is completed. Even though some of the indicators are reported as zero, all the interventions that contributed to the indicators are ongoing and are expected to be completed before December 30, 2015. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P098132 IDA-46240 Effective XDR 23.60 23.60 0.00 21.76 1.84 92% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P098132 IDA-46240 Effective 30-Jun-2009 16-Sep-2009 25-Feb-2010 30-Dec-2014 30-Dec-2015 Cumulative Disbursements 12/21/2015 Page 10 of 11

Restructuring History Level Approved on 13-Mar-2013,Level 2 Approved on 27-Jun-2014 Related Project(s) There are no related projects. 12/21/2015 Page 11 of 11