Urban Transport in Metropolitan Areas (P095485)

Similar documents
Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485)

Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Public Disclosure Copy

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Welcome. Green Line in Your Community

January 2018 Air Traffic Activity Summary

Manual vs. Automatic Operation and Operational Restrictions

Implementation of SESAR Pilot Common Project. - expected effects

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

United Nations Environment Programme

Congestion. Addressing urban congestion in SEQ. How do you define congestion? South East Queensland is growing. Sustained growth in motorised travel

Thursday, May 30, :00 to 3:30 PM Eastern Time. Preliminary Program

CARICOM Single ICT Space Digital Transformation is a Journey

Sub-regional Meeting on the Caribbean Action Plan for World Heritage November Havana, Cuba DRAFT CONCEPT PAPER

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)

Tourism Sector Development: JICA s Approach

ANGLIAN WATER GREEN BOND

BRAZIL - Activity Report 2012 ARGENTINA ACTIVITY REPORT 2014

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

Activity Report 2011 IIRSA. Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011

Tourism strategies for the renovation of mature coastal tourist destinations in Spain

PCN Annex: GEF Data Sheet

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

Sound Transit Operations August 2015 Service Performance Report. Ridership

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

Scoping Paper Belo Horizonte - Brazil

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

Results of Tourism Activity

IATA FUEL EFFICIENCY CAMPAIGN

Sound Transit Operations March 2018 Service Performance Report. Ridership

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

Network Manager Adding value to the Network 29 September 2011

UNWTO Commission for the Americas 64th meeting 16 May 2019 Provisional agenda item 5

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

Implementation Status & Results Bolivia BO Rural Alliances (P083051)

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Infrastructure: Networks to Sustain Development

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015

Sound Transit Operations January 2017 Service Performance Report. Ridership. Total Boardings by Mode

JAKARTA TRANSPORTATION

Sound Transit Operations December 2014 Service Performance Report. Ridership

BUENOS AIRES CITY TOURISM PERFORMANCE. Juan Carlos Belloso 26 September 2017, Buenos Aires

Assessing the Impacts of ENSO on South American Agriculture

PPIAF Assistance in Swaziland

Sound Transit Operations June 2016 Service Performance Report. Ridership

Driving Ridership Strategic Partnerships

METRO OPERATIONS COMMITTEE

P/01REV. Accountability and Performance Report of the ICAO NACC Regional Office to Member States. Nassau, Bahamas, May 2016

GAMA 2020 PUBLIC TRANSPORT VISION

Director, External Trade, CARICOM Secretariat. CARICOM Secretariat, Guyana

2014 STATEWIDE COMPREHENSIVE OUTDOOR RECREATION PLAN

Results of Tourism Activity

Evolution of Cultural Heritage Portfolio in MNA A Multi Faceted Approach

Implementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965)

Community Forum 17 August Resort Management Update

AN ECONOMIC PERSPECTIVE ON THE 5 YEARS AFTER ITS LAUNCH

Public transport strategy

Transcription:

Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 15 ARCHIVED on 26-Jan-2018 ISR31117 Implementing Agencies: Argentine Republic, Ministry of Finance, Ministry of Transport Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:20-Oct-2009 Planned Mid Term Review Date:04-Nov-2013 Original Closing Date:29-Feb-2016 Project Development Objectives Effectiveness Date:26-Nov-2010 Actual Mid-Term Review Date:16-Dec-2013 Revised Closing Date:30-Jun-2019 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The overall development objective of the program is to improve the quality and sustainability of urban transport systems in Argentine Metropolitan Areas, through the improvement of sectoral decision making frameworks and by giving priority to public transport modes in the urban transport sector. The project (APL1) development objectives contribute to the overall program development objective by: (i) supporting the design and creation of a multijurisdictional Metropolitan Transport Agency for the Buenos Aires Metropolitan Area (AMBA); (ii) strengthening the institutional capacity of the transport authorities in decision making, planning, priority setting, and resource allocation in urban transport; (iii) improving the quality and performance of urban transport infrastructure and/orservices in medium size Metropolitan Areas; and (iv) improving the physical integration and access to public transport networks in the Buenos Aires Metropolitan Area. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Components Public Disclosure Authorized Name Creation of the MTA:(Cost $10.83 M) Urban Transport Improvements in Medium Size Metropolitan Areas:(Cost $14.17 M) Public Transport Access and Modal Integration in AMBA:(Cost $161.10 M) Sectoral Training:(Cost $0.62 M) Project Management:(Cost $7.48 M) Front End Fee:(Cost $0.49 M) Overall Ratings 1/26/2018 Page 1 of 9

Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions The parent loan(ar-7794) of USD 149.68mll has been effective since November 2010 and as all financed activities have been complete by the end of 2017. An Additional Financing for USD45 million was approved on January 27, 2017, declared effective on June 07, 2017, and has a closing date in June 30, 2019. The AF covers a cost overrun related to the civil works of the La Matanza BRT system and will allow to complete the multimodal Saenz Transfer Station. The Project has been focused primarily on three public transport investments: 1. segregated lanes projects in the municipalities of Rosario and Santa Fe (completed); 2. a BRT project in La Matanza (bus lanes were inaugurated on May 5, 2017 and the civil work was finalized with the completion of the Transfer Station Center in Gonzales Catan by July 17, 2017); and 3. a multimodal Transfer Station in the Belgrano Sur suburban rail line in city of Buenos Aires (expected to be completed by January, 2019). The Project has also supported non-motorized transportation through the construction of bike paths in the cities of Tucuman and Salta. Technical assistance has also been financed to strengthen planning and data platforms for urban mobility planning and management in the Metropolitan Area of Buenos Aires and medium-sized Argentine cities, like Salta, La Rioja, and Corrientes. Currently, the Project is implementing two Trust Funds: - Greening urban growth in Metropolitan Buenos Aires financed by the Korean Green Growth Trust Fund. Transport Team is working together with the Urban Team to support the metropolitan agenda in the AMBA through activities that are focused in developing a Transit Oriented Development (TOD) strategy for the railroad project RER (Red de Expresos Regionales). The activities will include: (i) support to the design of the RER (ii) a note to define a TOD-RER concept (iii), a study on land use dynamics in AMBA including an economic evaluation, (iv) support to the development of a TOD pilot project. The first phase of these works is expected to finalized in June, 2018. - Improving public transport, walking and cycling in Argentina s Cities of the Interior: A look at Smart Mobility Solutions Trust Fund, supported by the Spanish Fund for Latin America & Caribbean (SFLAC). The task team has been working closely with the Secretary of Transport Planning to develop useful tools for data driven planning including: (i) Using cell phones & High-Resolution sensor data to Understand Individual Travel Patterns in Argentinian cities; ii) Supporting Data Analytics of Automatic Fare Collection Data; and (iii) Quantifying Housing and Transportation Affordability in Buenos Aires. These works are expected to finalized in March, 2018. A workshop to disseminate results of this technical collaboration is planned for the first semester of 2018. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Moderate Moderate Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Low Low Institutional Capacity for Implementation and Sustainability -- Moderate Moderate 1/26/2018 Page 2 of 9

Fiduciary -- Moderate Moderate Environment and Social -- Moderate Moderate Stakeholders -- Low Low Other -- -- -- Overall -- Moderate Moderate Results Project Development Objective Indicators Existence of a legal agreement for creating the AMT, signed inter-jurisdictionally. (Yes/No, Custom) Value N Y Y Y Produce transport planning instruments based on systematic data collection such as: Urban Transport Planning Model, Transportation Master Plan, and/or Urban Transport Center or Observatory. (Number, Custom) Value 0.00 3.00 3.00 3.00 1. "Modelo de Planificación de Transporte 2. "Plan de Fortalecimiento Institucional del Área de Movilidad y Transporte de la Ciudad de La Rioja" 3. Estudio integral de movilidad urbana para el área metropolitana de Salta Existence of a portfolio of projects with feasibility studies or detailed designs for the implementation of projects in Metropolitan Areas of Argentina. (Number, Custom) Value 0.00 6.00 6.00 6.00 1/26/2018 Page 3 of 9

1. Ciclovías del Área Metropolitana de Salta ; 2. Ciclovía Área Metropolitana de Tucumán ; 3. Carril exclusivo para transporte masivo de pasajeros Proyecto Av. Blas Parera. Articulación metropolitana Santa Fe Recreo Esperanza ; 4. Remodelación de la Avenida Alberdi para la implementación de Carriles Exclusivos de Transporte Urbano de Pasajeros (Tramo 1) Ciudad de Rosario ; 5. Barrio 11 de Marzo Tucumán. Cofinanced PTUMA BIRF N 7794 AR & GEF TF 093048. 6. "Proyecto Ejecutivo Sistema de Transporte Ciudad de Corrientes". Segregated corridor constructed in Argentina's medium size Metropolitan Areas that provides a 10% reduction in generalized cost of travel. (Percentage, Custom) Value 0.00-40.00-40.00-10.00 Date 20-Oct-2009 20-Jun-2017 20-Jun-2017 30-Jun-2019 Calculated for the Project "Carriles Exclusivos de Transporte Urbano de Pasajeros (Tramo 1) Ciudad de Rosario" (40% reduction). The BRT in Santa Fe, has provided preliminary results with a 15% improvement in the operating speed (the reduction in generalized cost of travel will be calculated soon). Improved mobility in the La Matanza BRT Juan Manuel de Rosas which provides at least a 10% reduction in generalized cost of travel. (Percentage, Custom) Value 0.00 0.00 0.00-10.00 The UEC has infromally reported significant beneficies of the La Matanza BRT, however they are waiting 6 months from the inaguaration to perfom the assesment of the impact of the civil work. 1/26/2018 Page 4 of 9

Reduction in travel time for at grade public transit users due to the removal of the Saenz Transfer Station level crossings (Percentage, Custom) Value 0.00 0.00 0.00-10.00 Date 03-Nov-2016 20-Jun-2017 26-Dec-2017 30-Jun-2019 Increase in number of public transit users in the La Matanza BRT (Percentage, Custom) Value 0.00 0.00 0.00 10.00 Date 07-Dec-2016 20-Jun-2017 26-Dec-2017 30-Jun-2019 The UEC has infromally reported significant beneficies of the La Matanza BRT, however they are waiting 6 months from the inaguaration to perfom the assesment of the impact of the civil work. Overall Intermediate Results Indicators Evidence of AMT performance, such as: creating a project with inter-jurisdictional participation and/or inter-jurisdictional agreements on specific transport issues. (Yes/No, Custom) Value N Y Y Y 1/26/2018 Page 5 of 9

Existence of a valid statute for the internal organization of the AMT and appointed representatives for each jurisdiction. (Yes/No, Custom) Value N Y Y Y Number of minutes of the AMT meetings per year. (Number, Custom) Value 0.00 2.00 3.00 3.00 Number of Metropolitan Areas with updated OD Home Mobility Surveys. (Number, Custom) Value 0.00 8.00 8.00 6.00 Kilometers of segregated bus lanes constructed in Metropolitan Areas of Argentina. (Kilometers, Custom) Value 0.00 8.20 8.20 7.80 1/26/2018 Page 6 of 9

Kilometers of segregated bus lanes constructed in the AMBA. (Kilometers, Custom) Value 0.00 11.30 12.30 10.00 Improvement of access conditions in trains stations in AMBA (Percentage, Custom) Value 0.00 100.00 100.00 100.00 Post-graduate course in urban transport is approved and created by Buenos Aires University (Yes/No, Custom) Value N Y Y Y Date 20-Oct-2009 20-Jun-2017 20-Jun-2017 30-Jun-2019 General progress of the Saenz Transfer Station civil works. (Percentage, Custom) Value 0.00 3.00 7.00 100.00 Date 03-Nov-2016 20-Jun-2017 30-Sep-2017 30-Jun-2019 Overall 1/26/2018 Page 7 of 9

Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P095485 IBRD-77940 Closed USD 150.00 149.68 0.32 149.57 0.11 100% P095485 IBRD-87000 Effective USD 45.00 45.00 0.00 26.46 18.54 59% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P095485 IBRD-77940 Closed 20-Oct-2009 11-Aug-2010 26-Nov-2010 29-Feb-2016 31-Dec-2017 P095485 IBRD-87000 Effective 27-Jan-2017 09-May-2017 07-Jun-2017 30-Jun-2019 30-Jun-2019 Cumulative Disbursements Restructuring History Level 2 Approved on 19-Aug-2014,Level 2 Approved on 29-Sep-2015 1/26/2018 Page 8 of 9

Related Project(s) P161393-Metropolitan Areas Urban Transport Project 1/26/2018 Page 9 of 9