S i t e A n a ly s i s

Similar documents
10810 SAN PABLO AVENUE, EL CERRITO CA

A VISION FOR EL MIRAGE

SCHOOL CAMPUS FOR SALE

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

OR MISSION TRAIL ELEMENTARY

SOUTH PARK AT FRESHKILLS PARK ANCHOR PARKS PROGRAM COMMUNITY VISIONING. JCC of Staten Island February 1, 2017

Multifamily Transit-Oriented Development Projects

SOUTH INTERCHANGE AREA

Masterplan Accepted June MGA Partners Planners and Architects Lager Raabe Skafte Landscape Architects

Park to Playa Trail. June 17, 2014


Welcome to the Cross County Trail Public Input Session!

IL 390 Station. Wood Dale Open House Summary 5/18/17

CANNING CITY CENTRE. the new energy of the southeast

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

2.1 Site Location. Site Location. Harbouside Waterfront Rezoning Submission - November 2012

Great Wolf Lodge Fact Sheet & Frequently Asked Questions Potential Location in Gilroy, California 8/30/17

SEVAN BARSEGHIAN'S PORTFOLIO GLENDALE COMMUNITY COLLEGE

COASTAL CONSERVANCY. Staff Recommendation November 6, 2008 SAN FRANCISCO BAY TRAIL: CANAL BOULEVARD CONSTRUCTION

SR 934 Project Development And Environment (PD&E) Study

1505 WESTLAKE AVENUE NORTH :: SEATTLE, WASHINGTON

Wilds. Headwaters. Lakes. Oxbows. Falls

Washington Township MASTER PLAN. Addendum: Washington Township Master Plan

1505 WESTLAKE AVENUE NORTH :: SEATTLE, WASHINGTON

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

Ground Lease W LINCOLN AVE DRIVE-THRU OPPORTUNITY ANAHEIM, CA Newport Center Drive, Newport Beach, CA 92660

For Lease Retail Space LUXURY

Home of Southbank Partners. Riverfront Commons. Southbank Partners. Covington Newport Bellevue Ft. Thomas Dayton Ludlow

MAPLEWOOD VILLAGE CENTRE AND INNOVATION DISTRICT IMPLEMENTATION PLAN & DESIGN GUIDELINES. November 6, 2017 Regular Meeting of Council

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#

COMMENT PERIOD INTRODUCTION

CHAPTER 5. Chapter 5 Recreation Element

NOTE: YOU MAY COMPLETE THIS SURVEY ONLINE (USING THIS DOCUMENT TO VIEW MAPS AND GRAPHICS) AT:

Post Oak Blvd & San Felipe St

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

Bay-Friendly Rated Landscapes PROJECT SUMMARY

LAND USE GUIDELINES NEW TOWN

Dogpatch Project Descriptions Summary DRAFT UNDER REVIEW January 11, 2017

Is Scarborough City Centre A Transit Village?

The Digital Divide in Assembly District 15: Broadband Wireline Service

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

Site Analysis. Context Plan ANALYSIS

Appendix B Connecting Track Options Evaluation Criteria

FOR LEASE MARINA LANDING SHOPPING CENTER PHASE II WALMART ANCHORED PADS AVAILABLE

I-70/I-71 Project Public Meeting Presented By

CHULA VISTA DEVELOPMENT OPPORTUNITY. For Additional Information: Sean Bascom Lic#

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

Key Center. Enjoy a close proximity to Downtown Bellevue s lively entertainment and shopping center, surrounded by a wide variety of dining options.

230 CHURCH AVENUE CHULA VISTA, CA 91910

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

Everett Riverwalk Life style explore

October 23, 2017 Council Workshop

South Bay Light Rail Extension Summer/Fall 2017 Project Briefing

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Waukee Trailhead Public Art and Amenities Project

The Vision for the San Juan Islands Scenic Byway

TRAIL ANNUAL REPORT

Tropicana Public Workshop August 22, Image: City of St. Petersburg

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Introduction. Project Overview

7393 EL CAJON BLVD. LA MESA, CALIFORNIA 7393 El Cajon Blvd, La Mesa, CA 91942

GATEWAY TO THE WHARF. 800 Maine Jones Lang LaSalle. All rights reserved.

Citrus Heights Creek Corridor Trail Project Trail Advisory Group Field Trip #2 September 11, :00 11:00 am Trellis Hall, Citrus Heights

COLLEGE STREET STUDY Community Consultation Meeting. December 2015

CHURCH AVENUE CHULA VISTA, CA 91910

Site Location and Setting

SCOPING INFORMATION PACKET

Available Land - Bay Area

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

Key Center. Enjoy a close proximity to Downtown Bellevue s lively entertainment and shopping center, surrounded by a wide variety of dining options.

Fabulous Residential Development Site on the Peninsula

CRANE LAKE TRAILS NETWORK AND SPACES

Key Center. Enjoy a close proximity to Downtown Bellevue s lively entertainment and shopping center, surrounded by a wide variety of dining options.

RETAIL/RESTAURANT OPPORTUNITY MISSION BAY DRIVE FOR LEASE. LUKE HOLLER

HOTEL SITE Centennial Olympic Park

FALSE CREEK AND ROBSON SQUARE VANCOUVER

Stuart Thain. Elizabeth Leader Cameron Simonsen

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

CHAPTER 3 PLANNING GOALS

STATION TYPOLOGIES. Typology Matrix 35

6. How connected do you feel to the Sans Souci community?

Airport Planning Area

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Cabarrus County line. Overland Connector. to Newell Park. Overland Connector

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

FINCH HYDRO CORRIDOR TRAIL PROJECT

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

MEETING MINUTES District 1 Trail Planning Meeting 1

COMMUNITY PROFILE Uptown, Minneapolis

IN-SHAPE PLAZA 6 S. EL DORADO STREET STOCKTON, CALIFORNIA. Visit the property web site at:

201 E LAS OLAS BLVD DOWNTOWN FORT LAUDERDALE S NEWEST LUXURY OFFICE TOWER

Well situated. Centrally located between downtown Burlingame, Millbrae Intermodal & the SFO Airport.

Alliant Energy Center Visioning Workshop Input Madison, WI July 20, 2017

Sustainable Urban Development. Presentation to WVCC 1 December 2010

OFFICE PROPERTIES FOR LEASE

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Transcription:

S i t e A n a ly s i s 11

SECTION B SITE ANALYSIS Existing Conditions TRANSPORTATION CONTEXT: The Ohlone Greenway site, paralleling San Pablo Avenue to the west, is centrally located within the City of El Cerrito, and therefore has a social and geographical relevance to a wide range of locations. Its importance as not only a major transportation corridor but also a continuous open space is obvious. Less obvious, but no less significant, is the Greenway s role in creating connections within the community, as its close proximity to many retail, residential, civic, and community sites creates dynamic lines between places that would otherwise remain undrawn. BART Stations -El Cerrito Plaza Station -El Cerrito Del Norte Station San Pablo Avenue -Major automobile thoroughfare -AC Transit Rapid Bus Corridor Hwy 80 Bayshore Freeway Rapid Bus stop on San Pablo Ave. TO SAN FRANCISCO BAY FUTURE DEVELOPMENT CREEKSIDE AT EL CERRITO PLAZA SAN PABLO AVENUE FAIRMONT ELEMENTARY SCHOOL EL CERRITO SENIOR CENTER EL CERRITO PLAZA RETAIL AREA ALBANY MIDDLE SCHOOL PORTOLA DRIVE MOESER LANE WALDO AVENUE STOCKTON AVENUE EUREKA UE N AVEN LINCOL CENTRA L AVENUE UE FAIRMOU NT AVEN O H L O N E G R E E N WA Y M A S T E R P L A N E L C E R R I T O, C A L I F O R N I A AVENUE EL CERRITO PLAZA BART STATION COUGAR FIELD OHLONE GREENWAY EL CERRITO LIBRARY FAIRMONT PARK EL CERRITO COMMUNITY CENTER 12

SITE ANALYSIS RECREATIONAL CONTEXT: Community Gathering Sites -El Cerrito Library -El Cerrito Senior Center -El Cerrito Community Center Connection to Baxter Creek Gateway Park Schools -Fairmont Elementary -St. John the Baptist SECTION B LOCAL CONNECTIONS: Parks and Open Spaces -Cougar Field -Fairmont Park -Baxter Creek Gateway Park -Canyon Trail Park Civic Sites -City Hall and Civic Center Complex Retail Sites El Cerrito Plaza retail center -El Cerrito Plaza -San Pablo Avenue -Stockton Avenue Residential Sites -Creekside at El Cerrito Plaza (future development) -Cerrito Royale Senior Residence -Del Norte Place Apartments NOT TO SCALE I - 80 NO RT H DEL NORTE PLACE APARTMENTS EL CERRITO CITY HALL BAXTER CREEK GATEWAY PARK SAN PABLO AVENUE ST. JOHN THE BAPTIST SCHOOL EL CERRITO DEL NORTE BART STATION NUE CONLON AV E KNOTT AVENUE CUTTING BOULEVARD HILL STREET BLAKE STREET POTRERO AVENUE GLADYS AVENUE DONAL AVENUE MANILA AVENUE SCHMIDT LANE CERRITO ROYALE SENIOR RESIDENCE CANYON TRAIL PARK Existing Conditions 13 O H L O N E G R E E N WA Y M A S T E R P L A N E L C E R R I T O, C A L I F O R N I A

SECTION B SITE ANALYSIS Opportunities and Constraints A site as far-ranging and diverse as the Ohlone Greenway brings with it a multitude of opportunities. There are many possibilities for improving the way this site interacts with the surrounding city and neighborhoods, many existing elements that are wonderful and need to be protected, or are in need of improvement to bring them to their fullest potential. The other side of this valuable coin is that the site holds many constraints and challenges that must be addressed. The prevailing conditions on the site, both good and bad, manmade or natural, are the very first limitations to which the design must ultimately respond. According to the Metropolitan Transportation Commission and the San Pablo Avenue Specific Plan (see Bibliography Sec. G, pg 83), planned future densities along San Pablo Avenue will be much higher than they are today. OPPORTUNITIES Connection to Fairmont Elementary School Daylighted creek south of Fairmount Avenue Backyard fences directly on the Greenway TO SAN FRANCISCO BAY Improve mid-block connections access for bicycles and pedestrians Connect to adjacent open space areas Relate to adjacent uses community, retail, residential, new development SAN PABLO AVENUE Celebrate BART station entries and trail entries at street crossings improve visibility and presence from surrounding areas O H L O N E G R E E N WA Y M A S T E R P L A N E L C E R R I T O, C A L I F O R N I A PORTOLA DRIVE MOESER LANE WALDO AVENUE STOCKTON AVENUE AVENUE EUREKA UE N AVEN LINCOL BART constraints: Columns impede visibility Train noise AVENUE Long blocks with limited access points and visibility CENTRA L Rear yard fences residential properties have their backs to the site FAIRMOU CONSTRAINTS NT AVEN UE Restore or improve daylighted or culverted streams and creek areas 14

SITE ANALYSIS OPPORTUNITIES: Ped and Bike Connections -Eureka Avenue -Donal Avenue -Gladys Avenue -Conlon Avenue Open Space Connections -Fairmont Park -Baxter Creek Gateway Park Pedestrian and bike access at Eureka Ave. Adjacent Uses -El Cerrito Plaza -Fairmont School -Cerrito Royale Senior Residence -St. John School -Del Norte Place Apartments Civic Connections -El Cerrito City Hall -Senior Center / Library SECTION B CONSTRAINTS: Crossings and Entries -BART: El Cerrito Plaza and Long Blocks -Lincoln Ave. to Stockton Ave. -Manila Ave. to Potrero Ave El Cerrito Del Norte Stations -14 Street Trail intersections BART Streams and Creeks -4 daylighted stream crossings -Fluvius Innominatus Creek -Constraints run the length of the site (between Portola and Schmidt) BART noise, columns and equipment NOT TO SCALE I - 80 NO RT H NUE CONLON AV E OHLONE GREENWAY O ppo rt u n i t i e s 15 KNOTT AVENUE CUTTING BOULEVARD HILL STREET BLAKE STREET POTRERO AVENUE GLADYS AVENUE DONAL AVENUE MANILA AVENUE SCHMIDT LANE SAN PABLO AVENUE and Constraints O H L O N E G R E E N WA Y M A S T E R P L A N E L C E R R I T O, C A L I F O R N I A

16

Master Plan Design Vision 17

SECTION C MASTER PLAN DESIGN VISION Vision The Greenway s primary use is as a non-vehicular transportation route. Use nodes sited along the way provide areas for pausing, meeting, and engaging in a variety of solitary and group recreation activities. Connections through the site from commercial and civic areas to the residential zone are highlighted and enhanced. Master Site Plan Goals Goals for the site addressed by the Master Plan: Improved circulation and infrastructure Improved safety and security A more maintainable site Modern amenities Increased stewardship and community involvement Enhancements integrated into future and adjacent development V i s i o n a n d Go a l s OHLONE GREENWAY MASTER PLAN EL CERRITO, CALIFORNIA 18

MASTER PLAN DESIGN VISION S E C T I O N C Site Character The Master Plan provides for a variety of uses united by a consistent character. Rustic, natural spaces will be designed to withstand time and use by the selection of durable practical furnishings and finishes. The site will invite the community in with simplicity and practicality. Image The site will provide the community with an open space to identify with and call their own. As a unique El Cerrito amenity, the Greenway should bring to mind a connection that brings the community together, physically and socially, providing a safe, clean pathway upon which to journey again and again. C h a r a c t e r a n d Im a g e 19 OHLONE GREENWAY MASTER PLAN EL CERRITO, CALIFORNIA

20