According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

Airport Compatibility Brochure 737 MAX

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

PUBLIC NOTICE FOR PROPOSED COLLECTION OF PASSENGER FACILITY CHARGES AT COLORADO SPRINGS AIRPORT

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule

APPENDIX A. Condition Survey of Pavements Concrete Mixture Proportions Used in Pavements Deicer Usage on Pavements Core Locations and Core Catalog

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Hartsfield Jackson Update prepared for:

Construction of Pyongyang International Airport IP6

Phoenix Sky Harbor transit guideway bridge

Addendum - Airport Development Alternatives (Chapter 6)

AVIATION AND SPACEPORT OFFICE DISTRICT 3 REPORT J UNE 2015 STATEWIDE. Airfield. Pavement Management

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

Dallas Executive Airport Town Hall Meeting April 3, 2014

Welcome Sustainability Initiatives of. International Airport

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport

Boeing Aircraft and the Impact on Airports

Bremerton National Airport Airport Master Plan Project Update February 12, 2013

Runway Roughness Evaluation- Boeing Bump Methodology

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

BOARD OF AIRPORT COMMISSIONERS

Punta Gorda Airport Master Plan Update

Runway Roughness Evaluation- Boeing Bump Methodology

Runway Length Analysis Prescott Municipal Airport

What's your fleet mix for design?

Statewide Airfield Pavement Management Program. District 1 Report

7.1 General Information. 7.2 Landing Gear Footprint. 7.3 Maximum Pavement Loads. 7.4 Landing Gear Loading on Pavement

Passenger Facility Charge Application #1

Statewide Airfield Pavement Management Program. District 5 Report

AIRFIELD SAFETY IN THE UNITED STATES

Chapter 14. Design of Flexible Airport Pavements AC 150/5320-6D

For Airport Environmental Services. Date Released: August 27, 2018 Deadline for Submission: 5:00pm, September 17, 2018

Statewide Airfield Pavement Management Program. District 7 Report

FORECASTING FUTURE ACTIVITY

Runway Roughness Evaluation- Boeing Bump Methodology

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Vista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington

New PFC Application #13

GREATER ORLANDO AVIATION AUTHORITY

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

Table of Contents. Overview Objectives Key Issues Process...1-3

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter 9 Airport Financial Plan

Planning & Development Group

Boeing Airplane Overview

aircargo center Charlotte Charlotte Your Cargo Connection Connecting The Carolinas to the World

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

FULL DEPTH RECLAMATION (FDR)

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

City of Tallahassee, FL Department of Aviation

CHAPTER 4: ALTERNATIVES

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

7.1 General Information. 7.2 Landing Gear Footprint. 7.3 Maximum Pavement Loads. 7.4 Landing Gear Loading on Pavement

II. Purpose and Need. 2.1 Background

GENERAL INSTRUCTIONS REQUEST FOR STATEMENTS OF QUALIFICATIONS (RFQ) ON-CALL AVIATION ENGINEERING SERVICES

AVIATION. MichiganReportCard.com 5

DRONES + AIRPORTS: BUZZ AROUND HARTSFIELD-JACKSON

CHAPTER 1: INTRODUCTION

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

75 YEARS OF EXPERIENCE 350+ AIRPORT PROJECTS AIRPORT TERMINAL ENGINEER (BUILDING DESIGN+CONSTRUCTION) AIRPORTS (ENR 2016)

Implications of Construction Cost Escalation

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

aircargo center Charlotte Charlotte Your Cargo Connection Connecting The Carolinas to the World

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

7.1 General Information. 7.2 Landing Gear Footprint. 7.3 Maximum Pavement Loads. 7.4 Landing Gear Loading on Pavement

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

RESOLUTION NO

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

Yolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California

ATL SAFETY MANAGEMENT SYSTEMS. ACI Risk Management Conference January 12, 2017

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

Session Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

Chapter 8.0 Implementation Plan

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

AIRPORT MASTER PLAN UPDATE

Airfield Capacity Prof. Amedeo Odoni

Aviation Summit Design and Construction Services

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

Hartford-Brainard Airport Potential Runway Closure White Paper

SouthwestFloridaInternational Airport

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

Abstract. Introduction

Birmingham Airport 2033

Yakima Air Terminal/McAllister Field Airport Master Plan Update

AIRPORT WITH NO RUNWAYS IS A MALL

BELFAST MUNICIPAL AIRPORT OVERVIEW

Transcription:

TECHNICAL PAPER 2002-01 TITLE: Reconstruction of Runway 9R-27L at Hartsfield Atlanta International Airport. The 33-Day Wonder a Case History AUTHOR(S): Anu Saxena, D.S. Saxena, Subash Reddy Kuchikulla, Daniel Molloy, and Frank O. Hayes VENUE: Proceedings, International Congress, Challenges of Concrete Construction, University of Dundee, Scotland EVENT DATES: September 5-11, 2002

RECONSTRUCTION OF RUNWAY 9R-27L AT HARTSFIELD ATLANTA INTERNATIONAL AIRPORT, THE 33 DAY WONDER A CASE HISTORY A. Saxena D.S. Saxena ASC geosciences, inc. USA S.R. Kuchikulla R&D Testing & Drilling, Inc. USA D. Molloy Hartsfield Atlanta International Airport USA Frank O. Hayes Aviation Consulting Engineers, Inc. USA ABSTRACT. The William B. Hartsfield Atlanta International Airport (ATL) is the world s busiest airport handling some 80 million passengers annually and serves major international and domestic markets around the globe. The airfield itself consists of roughly 4,200,000 sq m (5,000,000 sq yds) of pavement and includes 4 parallel runways measuring from 2,740 to 3,620 m (9,000 to 11,889 ft) long. Runway 9R-27L was initially constructed over 27 years ago and has been in service well beyond its design life. Due to pavement deterioration accelerated by alkali-silica reactivity (ASR) and other distress, the owner decided to remove Runway 9R-27L in late 1999 under a fast-track 36 day schedule. A joint venture of major contractors bid $ 52 million to complete the project under this fast track approach. A conventional approach was estimated to cost between $ 15 and $ 20 million without factoring the impact of a closed runway at some $ 475,000 per day over a normal 6 month construction timeframe. Keywords: aviation, runways, PCI, ASR, quality control testing, flexural strength Mr. Anupam Saxena, P.E., M. ASCE, is Technical Services Manager of ASC geosciences, inc., 2260 Godby Road, Atlanta, Georgia, 30349, USA Mr. D.S. Saxena, P.E., F. ASCE, is Senior Principal and President of ASC geosciences, inc., 3055 Drane Field Road, Lakeland, Florida, 33813, USA Mr. Subash Reddy Kuchikulla is Quality Assurance Engineer for ATL Geotechnical and Materials Programs at R&D Testing & Drilling, Inc., 2366 Sylvan Road SW, Atlanta, Georgia, 30344, USA Mr. Daniel Molloy, P.E., is Assistant Aviation General Manager of Facilities at Hartsfield Atlanta International Airport, Department of Aviation, P.O. Box 20509, Atlanta, Georgia, 30320, USA Mr. Frank O. Hayes is aviation pavement specialist with Aviation Consulting Engineers, Inc., 2400 Aviation Boulevard, Atlanta, Georgia, 30340, USA

BACKGROUND / FUTURE OF ATL The William B. Hartsfield Atlanta International Airport (ATL) is the world s busiest airport handling over 80 million passengers annually and serves major international and domestic markets around the globe. ATL, owned by the City of Atlanta, is located on 1,518 ha (3,750 ac) located some 16 km (10 mi) south of downtown Atlanta. ATL is home to the largest airline hubbing operations in the world, Delta Air Lines, and its Central Passenger Terminal Complex (CPTC) is situated on 53 ha (130 ac) with approximately 529,500 sq m (5.7 million sq ft) of facilities including 6 concourses with 168 gates served by a central, underground airport people mover system and pedestrian mall. Currently, some 34 passenger airlines and 23 all-cargo airlines serve HAIA. The airfield itself consists of roughly 4,200,000 sq m (5,000,000 sq yds) of pavement and includes 4 parallel runways measuring from 2,740 to 3,620 m (9,000 to 11,889 ft) long. These east/west runways handle over 2,000 daily takeoffs and landings. ATL has begun an intensive Capital Improvements Program totaling some $ 5.4 billion over the next 10 years. This CIP includes 4 major components: 1) a fifth runway; 2) an International Terminal; 3) a Consolidated Rental Car Facility; and, 4) a South Terminal. History of Runways ATL AIRFIELDS In anticipation of considerable growth during the 1970s and 1980s, Runway 8R-26L was reconstructed in 1969 utilizing a 24/7 schedule over 40 days and nights. Construction was expedited in this fashion to reopen the runway as soon as possible. In 1972, 9R-27L was constructed, and in 1974 9L-27R was reconstructed. Runway 8L- 26R was constructed in 1984, with east and west extensions added to 9L-27R. Throughout the 1980s and well into the 1990s, several pavement evaluation studies were conducted to look more closely at the performance of ATL airfield pavements and address concerns about their structural condition, pavement surface distress, concrete characteristic strengths, and age. Pavement Evaluation Programs 1997 Pavement Evaluation An exhaustive pavement evaluation program was performed in 1997 due to concerns about the relative age of some of the runways. The 1997 study employed several investigative techniques, including:

Falling Weight Deflectometer (FWD) Visual Survey Runway Ride Quality Measurement Field Delamination Testing including Impact Echo Testing and Ground Penetrating Radar Field Drilling and Sampling Laboratory Testing including Petrographic Examination Results of the 1997 study indicated the Pavement Condition Index (PCI) of the runways ranged from 53 to 97 with most values in excess of 70. The predominate distress observed was widespread map cracking in each of the runways. In Runway 9R-27L in particular, the joint distress was manifested into localized spall features which were increasing at an accelerating rate, as illustrated in Figure 1. It was noted that while the overall condition of Runway 8R-26L would appear lower than that of Runway 9R-27L, the results of PCI data indicate that 9R-27L was deteriorating at a faster rate than Runway 8R-26L, particularly with respect to the pavement keel or center section. Table 1 summarizes 1997 PCI Data for all ATL runways. Table 1 Pavement Condition Index for ATL Runways, 1997 Pavement Condition Scale Excellent 85-100 Very Good 70-84 Good 55-69 Fair 40-54 Poor 25-39 Very Poor 10-24 Failed 0-9 Runway PCI Rating Range of PCI Values Projected Year in Which PCI Becomes Critical (=50) 9R-27L Fair to very good 42 to 80 1999 8R-26L fair to good 42 to 79 2001 9L-27R Good to excellent 57 to 99 2003 8L-26R Very good to excellent 59 to 100 2010-2015 The 1997 pavement evaluation study concluded that a pavement exhibiting a PCI value below 70 would require significant maintenance and one below 50 would require major rehabilitation or replacement.

Figure 1 Typical Joint Distress 1999 PCI Survey Amongst growing concerns about the condition of Runway 9R-27L, a pavement evaluation study was again performed utilizing a heavy weight deflectometer (HWD) in lieu of the FWD. Results of the 1999 study indicated PCI values ranging from 25 to 79 with the center or keel portions of the runway again exhibiting significantly lower values. Table 2 Summary of 1999 PCI Data for 9R-27L Section Sample Unit Left (L) Center (C) Right (R) AB-Line CD-Line EF-Line 01 left section 02 keel section 03 right section 01 72 72 70 02 76 67 62 03 74 57 61 04 79 46 58 Average 75 61 63 05 79 32 74 06 76 45 74 07 76 50 48 Average 77 42 65 08 64 53 63 09 25 44 65 10 53 67 63 11 45 70 61 12 59 71 63 Average 49 61 63

Figure 2 illustrates chronological trends of PCI for center pavement sections of the ATL runways. Figure 2 Trend Comparisons for PCI Values of All Runways at ATL Deterioration from ASR During both the 1997 Pavement Evaluation and 1999 PCI Survey, evidence of alkalisilica reactivity (ASR) was observed in concrete cores from all 4 runways, as illustrated in Figure 3. The reactions appeared most severe in Runways 9R-27L and 8R-26L. Voids in the concrete matrix in these runways appeared nearly filled with the gel product of ASR. Furthermore, horizontal cracks within the top 15 cm (6 in.) were observed in cores from Runway 9R-27L. The spalling and surface cracks observed in Runway 9R-27L were load-associated and eth distress appeared to have been accelerated as a result of ASR. It was further noted that the ASR appeared worse in concrete pavement using Portland cement and less severe in concrete using slag cement. Together, these observations in Runway 9R-27L indicated ASR had in fact contributed to the deterioration of the concrete pavement to a point where replacement of the runway was considered necessary.

Figure 3 Indications of ASR Deterioration Overall Construction Approach RECONSTRUCTION OF RUNWAY 9R-27L While replacement of Runway 9R-27L was conceptualized in early 1998, a typical reconstruction schedule of some 6 to 7 months was not acceptable because the runway handled one-fourth of the daily flight operations and was also only one of two CATIIIB certified runways that provided pilots with the best landing capability in severe weather. The project designer, Aviation Consulting Engineers, Inc. (ACE) in association with the Department of Aviation is credited with the planning, design, and construction management of the Runway 9R-27L Reconstruction Program. An unprecedented planning effort began over 18 months in advance of construction and included close coordination and consultation with the City of Atlanta, major airlines, and FAA. A joint venture of major contractors included APAC Ballenger, C.W. Matthews Contracting, Swing Construction, and Mitchell Construction. Together, this team was selected to remove and replace the 2,740-m by 46-m (9,000-ft by 150-ft) wide Runway 9R-27L, over 167,000 sq m (200,000 sq yd) of 400- to 560-mm (16- to 22-in.) thick concrete pavement in only 36 days.

During this period, normal operations would be transferred to Taxiway R, just south of Runway 9R-27L, that was readied to serve as a temporary runway during this period. This fast-track alternative approach was bid at $ 52 million. A conventional approach was estimated to cost between $ 15 to $ 20 million, without factoring the impact of a closed runway at some $ 475,000 per day over a normal 6 month construction time frame. So actually, the fast-track bid was significantly less expensive to the owner. Because time was so critical, penalties for not meeting the construction schedule ran as high as $ 200 per minute. Removal of Existing Pavements A critical phase of the construction project was the removal of some 21,150 concrete panels, each measuring 2.3 m by 3.7 m (7.5 ft by 12 ft) by 406 mm to 559 mm (16 to 22 in.) thick. A specialty contractor, Penhall Company, was chosen for this task based on their experience in California with removal of earthquake-damaged bridges and interstates following major California earthquakes. Penhall mobilized multiple teams of operators and equipment from across the country to complete the task. Once the existing concrete slabs were cut, unique pavement removal buckets were utilized to carry away a maximum of three 9,150-kg (20,150-lb) panels onto each flat bed truck for transport to a 5.7-ha (14-ac) stockpile yard accommodating some 1,900,000 kn (213,000 tons) of panels stacked on top of one another, sometimes as high as 13 panels (refer to Figure 4). Figure 4 Removal of Existing Pavements Concrete Mix Design and Construction Operations A total of 13 trial concrete mix design were formulated. Flexural strength data from this mix design phase indicated that a target 7-day strength of 4,130 kpa (600 psi) as well as a target 28-day strength of 4,480 kpa (650 psi) could easily be achieved. The newly-constructed runway was designed to have an average thickness of 46 cm (18 in.) and a design life cycle of well over 20 years.

The resource needs for this project were significant, including: I) 1,200+ workers working 24 hours per day, 7 days per week at the height of construction ; 2) 200 to 300 truck loads of materials per day; iii) three on-site concrete batch plants (refer to Figure 5), plus an existing off-site commercial batch plant as backup, each capable of producing as much as 7.7 cu m (10 cu yds) per min. Phase I operations for the project focused on a temporary modification of an adjacent taxiway which would serve as a replacement runway during construction. This phase lasted 70 days and included procurement and mobilization. Phase II comprised the actual runway reconstruction for a planned 36 day timeframe. Phase III was scheduled for 30 days to convert the temporary runway back to a taxiway, to remove runway lighting and install taxiway lighting, convert runway striping to taxiway markings, and remove temporary exits. Figure 5 Batching and Placement of Concrete QUALITY CONTROL TESTING Quality Assurance testing for the owner and Quality Control testing for the contractor were performed during several key phases of construction, including subgrade preparation, installation of a soil-cement base, bituminous pavement placement and, of course, concrete pavement placement. In accordance with FAA P-501 specifications, testing during construction included casting beams for flexural strength. Between QA and QC functions, over 2,000 beams were cast. Target design flexural strengths were 4,130 kpa (600 psi) at 7 days and 4,480 kpa (650 psi) at 28 days when tested in accordance with ASTM C 78. Tables 3 and 4 summarize QC strength data.

Table 3 Summary of Quality Control Flexural Strength Data Test at Days N, sample size Range kpa / psi 1 166 1,930 4,892 280 710 3 166 2,825 5,994 410 870 7 318 3,514 6,201 510 900 28 349 4,823 7,648 700 1,110 Average kpa / psi 3,197 464 611 4,210 665 4,582 811 5,588 S.D. kpa / psi 544 79 599 87 482 70 530 77 Table 4 Summary of Quality Control Splitting Tensile Strength Data N, Range sample size kpa / psi 56 25,011 41,340 3,630 6,000 Average kpa / psi 31,350 4,550 S.D. kpa / psi 3,569 518 Results of the strength testing for flexural strength on beams indicated that the ultimate 28-day target compressive strength of 4,480 kpa (650 psi) was generally achieved between 3 days and 7 days. ACKNOWLEDGEMENTS The authors acknowledge the cooperation of the entire design and construction team which was essential to the success of the 9R-27L Reconstruction project. Planning, design, and construction management were performed by Aviation Consulting Engineers, Inc. (ACE) in association with the Department of Aviation on behalf of the owner, City of Atlanta. A plaque was placed on the completed runway project to recognize and honor Mr. Frank Hayes with ACE for over 25 years of engineering service at ATL. The construction team was led by a joint venture of 4 firms, including APAC Ballenger, C.W. Matthews Contracting, Swing Construction, and Mitchell Construction, all from Georgia, USA.