FY Candidate Sidewalk Projects. Sidewalk Advisory Committee

Similar documents
Lighting Evaluation Form

hauger bunch Town Center - Mixed Use Site 44+ Acres Outparcels/Major Retail US 98 South, Lakeland, Florida SITE

Site Location and Setting

US 19 Sunset Point Rd to Countryside Blvd.

4. Safety Concerns Potential Short and Medium-Term Improvements

Electric System Serving Pierce County Current system and future investments

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd


Culpeper District. Albemarle County Monthly Report. September 2012

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Grove Field Airport Environmental Assessment

Draft Year 2040 Cost Feasible Plan

FHWA Actions on Past Interstate Requests that were approved by the USRN were presented and conditions were lifted. FHWA Approval Date

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

Riverside County Transportation Department Summary of Bids

CITY COUNCIL AGENDA MEMORANDUM

Major Projects Overview

City of Madera Engineering Division. Citizen s Oversight Committee February 13, 2019

Memo. Orange City Trail Plan Becky Mendez, AICP Jamie Krzeminski, PE, PTOE Matt Wiesenfeld, PE, AICP. Development of the Existing and Proposed Network

APPENDIX G MULTI-USE TRAILS DOWNTOWN LAKELAND

GUIDE TO THE GREAT EASTERN TRAIL IN TENNESSEE

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

US 380 FEASIBILITY STUDY

Road widening from 2 lanes to 4 lanes. Bridge removal and piping of the canal. Lane closures are not expected.

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Order # 5131 FOR PUBLIC HEARING

Florida Department of Transportation MIKE DEW SECRETARY

Gulf Coast MPO Obligated Projects

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

MUSCATINE COUNTY BOARD OF SUPERVISORS

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

SAN RAFAEL City Council January 20, 2015

CHAPTER 4 -- THE LAND USE PLAN: DESCRIPTIONS AND POLICIES FOR THIRTEEN PLANNING AREAS

Construction Projects Report

September 30, 2016 PUBLIC HEARING RESULTS

Transportation TRANSPORTATION PROJECTS

See Yellow Highlighted for Major Closures

BONITA BEACH ROAD. May 18, Ian Lockwood, PE Cindy Zerger, AICP, ASLA Ken Ray, RLA. Greg Diserio, RLA. Tara Salmieri, AICP

Welcome to the Cross County Trail Public Input Session!

City of Madison, Buckeye Road Monona Drive to Stoughton Road County AB Dane County Public Involvement Meeting

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

2017 LIST OF PRIORITY PROJECTS

RESORT AREA STRATEGIC ACTION PLAN (RASAP) STEERING COMMITTEE MEETING - APRIL 3, 2019

FLORIDA DEPARTMENT OF TRANSPORTATION Bay County Citizen s Plan Tentative Work Program Fiscal Years

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

THE STATE OF GRAYSLAKE

SANTA FE. 82: p.108 POLLINATOR PRAIRIE PARK. 86: p : p : p.113. ARROWHEAD PARK 151st St. 41: p.102. Indian Creek Greenway PARK

Highways: State Highways

Special Committee on U.S. Route Numbering

Auburn Trail / Ontario Pathways Trail Connector Feasibility Study Public Information Meeting Wednesday, August 22, 2012

Pasco County Public Works. Maintained Sidewalk and Multi-Use Path Inventory (Updated 1/24/2018)

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Annual Listing of Federally Obligated Projects in Santa Barbara County Federal Fiscal Year (October 1, 2014 to September 30, 2015)

Capital Improvement Plan

Highways: Interstate. Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Fixed Capital Outlay: Facilities

Janitorial Service Needed

AGENDA. WEDNESDAY, SEPTEMBER 23, :00 PM or immediately after the ICTC meeting

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501

Public Workshop Preliminary Plans Review. Projects PW 1605, 1701, & 1702

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

SR 934 Project Development And Environment (PD&E) Study

Construction Update. Local Officials Briefing March 2016

New Jersey Department of Transportation

VISTA AZUL- APPROVED 20 LOT TENTATIVE MAP

Members: Guest(s): USRN DECISION CHANGE

The Joint Charlotte County - Punta Gorda and Lee MPO Meeting has changed from 10:00 a.m. to 9:30 a.m.

I-70/I-71 Project Public Meeting Presented By

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

Palm Beach County Traffic Report July 13 through July 20, 2012

Independence: overview

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

City of North Liberty

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FDOT Treasure Coast Traffic Impact Report

Florida Department of TRANSPORTATION. First Coast Expressway

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

Montgomery Citizens Advisory Committee Meeting Minutes

Public Works Department. Fiscal Year 2019 Projects

Community Development Department Council Chambers, 7:30 PM, December 20, 2012

Route 29 Solutions Projects

Lee County Board of County Commissioners January 24, 2017 Workshop Meeting

Legoland Area Commercial Development Site Directly Across From Legoland Main Entrance Winter Haven, FL

Public Open House. Chief Peguis Trail Project

Ponte Vedra High School

June 17, 2016 PUBLIC HEARING RESULTS

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Culpeper District. Albemarle County Monthly Report December 2011

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

DRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Chapter 4. Development Alternatives

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY

November 21, 2012 Barbara Kelleher, (954)

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Northaven Trail Phase 2 Initial Project Overview

02/21/2013 OKLAHOMA DEPARTMENT OF TRANSPORTATION PAGE: 2 09:04:10 FINAL MAY 2013 BID OPENING JBPRC068 JOB PIECE CD HIGHWAY MILES ADV.

Transcription:

FY 18-19 Candidate Sidewalk Projects Sidewalk Advisory Committee

Sidewalk Advisory Committee December 2017 FY 18-19 Candidate Sidewalk Projects Old Berkley Road C. Fred Jones Blvd. (CR 559A) to Gapway Road Auburndale Gapway Road Old Berkley Road to Berkley Road Auburndale Old Polk City Road Odoniel Drive to Hammock Shade Drive N. N. Lakeland Hooker Street Old Hwy. 37 to DEE Bradley

C. Fred Jones Blvd./CR 559A Old Berkley Road 11,334 LF (MOL) Existing Sidewalk Berkley Accelerated Middle School and Berkley Charter School Gapway Road Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

Old Berkley Road at Gapway Road Looking northerly to Old Berkley Road from intersection Old Berkley Road Gapway Road Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

Looking northerly Old Berkley Road Undeveloped Frontage Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

Drainage Outfall/Endwall East side of road at Fish Haven Road Older Developed Frontage Along Lake Juliana/East-side Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

Looking northerly Newer Developed Frontage Existing Sidewalk Existing Sidewalk Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

School-Zone Beacon Looking north at Berkley Knights Drive Existing Sidewalk Sidewalk to Schools from Berkley Road ½ mile to ¾ mile walk along Berkley Knights Drive Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

Looking northerly to C. Fred Jones Blvd./CR 559A Swale Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

Looking northerly to C. Fred Jones Blvd./CR 559A Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

Existing Sidewalk Existing Sidewalk Looking southerly to Old Berkley Road from C. Fred Jones Blvd./CR 559A Sidewalk extends to SR 559 and Berkley Road Old Berkley Road C. Fred Jones Blvd./CR 559A to Gapway Road (Auburndale)

Old Berkley Road Total Score: 95 Limits: C. Fred Jones Blvd./CR 559A to Gapway Road Length: 11,334 LF (MOL) Requester: Resident via Comm. Dantzler Comments: Speed limit is 40 MPH. R/W = 35'-70' (MOL). No pedestrian crash history. Low potential for use. Some lengthy easements or R/W likely needed. Existing cross drains at Fish Haven Road will need extending or a pedestrian bridge may be required. Swale, some utility and mailbox relocations needed. Potential sidewalk damage from grove operations. Potential for extensive clearing along some frontages. Design and construction costs could exceed $1 M.

1,604 LF (MOL) Gapway Road Old Berkley Road to Berkley Road (Auburndale)

Gapway Road at Berkley Road Looking easterly to Gapway Road from intersection Gapway Road Existing Sidewalk Existing Sidewalk Berkley Road Gapway Road Old Berkley Road to Berkley Road (Auburndale)

Gapway Road Looking easterly from intersection at Berkley Road Gapway Road Existing Sidewalk Gapway Road Old Berkley Road to Berkley Road (Auburndale)

Gapway Road Looking easterly to intersection at Old Berkley Road Old Berkley Road Gapway Road Gapway Road Old Berkley Road to Berkley Road (Auburndale)

Gapway Road at Old Berkley Road Looking northerly to Old Berkley Road from intersection Old Berkley Road Gapway Road Gapway Road Old Berkley Road to Berkley Road (Auburndale)

Gapway Road Total Score: 75 Limits: Length: Old Berkley Road to Berkley Road 1,604 LF (MOL) Requester: Resident via Comm. Dantzler Comments: Speed limit is 40 MPH. with no road shoulder. No pedestrian crash history. Low potential for use. No developed frontage or homes accessing segment. Approximately 70% of the project limits have existing Type F curb and gutter. An easement or two may be needed west of Old Berkley Road.

Hammock Shade 4,121 LF (MOL) Odoniel Drive Existing Sidewalk Old Polk City Road Odoniel Drive to Hammock Shade Drive (NE Lakeland)

Existing Sidewalk Looking southerly from Odoniel Drive to existing sidewalk Existing Sidewalk Old Polk City Road Odoniel Drive to Hammock Shade Drive (NE Lakeland)

Looking northerly to Odoniel Drive from existing sidewalk 300 LF south Pipeline marker, O/H poles, at-grade telecom and shrubbery Existing Sidewalk Old Polk City Road Odoniel Drive to Hammock Shade Drive (NE Lakeland)

Looking northerly along typical frontage (w/ ROW constraints) Swale O/H poles, mailboxes and at-grade utilities Old Polk City Road Odoniel Drive to Hammock Shade Drive (NE Lakeland)

Established entry landscaping. Looking south from Hammock Shade Drive Old Polk City Road Odoniel Drive to Hammock Shade Drive (NE Lakeland)

Old Polk City Road Total Score: 115 Limits: Length: Odoniel Drive to Hammock Shade Drive 4,121 LF (MOL) Requester: Jennifer Melton/Resident Comments: Speed limit is 45 MPH. R/W = 50'-60' (MOL). Pedestrian crash history, incl. one fatality in 5-years. Medium potential for use. An easement or two may be needed. Landscaping at The Oaks of Lakeland (Hammock Shade Drive) subject to removal. Could site behind utility poles on the east side to match existing 300' south of Odoniel Drive. Some utility relocation likely. Landscaping and shrubbery removal needed.

Transit Stop and Food Store ¼-⅓ mile west of Old Hwy. 37/Hooker Street Intersection 1,738 LF (MOL) Hooker Street Old Hwy. 37 to DEE (Bradley)

Hooker Street Looking easterly from Old Hwy. 37 to Nero Drive/Hooker Street Hooker Street Old Hwy. 37 to DEE (Bradley)

Old Hwy. 37 Swale Looking northerly from Hooker Street to Old Hwy. 37 Hooker Street Old Hwy. 37 to DEE (Bradley)

Looking westerly along Hooker Street at Community Center frontage/driveway Utilities (telecom and shut-off valves) Hooker Street Old Hwy. 37 to DEE (Bradley)

Swale Utility poles and signs within swale Looking westerly along Hooker Street at Wilson Ave. across from Community Center Swale Hooker Street Old Hwy. 37 to DEE (Bradley)

Swale Poles and valves in swale Looking west along Hooker Street from Central Ave. to Community Center Hooker Street Swale Central Avenue Hooker Street Old Hwy. 37 to DEE (Bradley)

Swale Swale Looking westerly along Hooker Street at Dead End East (typical frontage) Hooker Street Old Hwy. 37 to DEE (Bradley)

Hooker Street Total Score: 70 Limits: Length: Old Hwy. 37 to DEE 1,738 LF (MOL) Requester: Betty Stancil/Resident Comments: No observed speed limit. R/W = 40' (MOL). No pedestrian crash history. High potential for use. Swales close to the EOP on both sides of roadway. Drainage modifications (w/ handrail?) likely. Utility poles, traffic signs and water valves in southside swale(s). New sidewalk would act as a community spine path accessing six connecting residential streets. Site sidewalk at EOP at back of curb?

December 2017 SAC Sidewalk Projects Update SAC 15-16 Project List Limits Status Schedule Old Dixie Hwy. E. Carroll Road to US Hwy. 92 COMPLETE Southern Avenue Wabash Community Center to Ariana Street COMPLETE Berkley Road SR 33 to Park COMPLETE Walt Williams Road South Chippendale Road to Watson Elem. School Preparing bid documents. Bids January 2018 Lake Ned Road Lakeside Townhomes to Park COMPLETE Walt Williams Road North Wendell Watson Elem. to Ashbury Drive COMPLETE

December 2017 SAC Sidewalk Projects Update SAC 16-17 Project List Limits Status Schedule Cypress Gardens Road 7-11 store to Lake Fox Road South COMPLETE Odom Road Socrum Loop Road N. to Corona del Mar COMPLETE Swindell Rd East CR 542 to Swindell Road COMPLETE Palmetto Street Marigold Avenue to Audubon Road COMPLETE Cypress Gardens Road Lakeside Townhomes to Osprey Point Trees removal complete. Project being re-bid. Bids December 8. Construction starting January 2018. South Blvd. Orchid Drive to US Hwy. 27 COMPLETE Campbell Road North Banana Road to D.R. Bryant Road In Design. Awaiting survey at south tie-in point to existing sidewalk. Design to be completed by January 2018. Construction starting February 2018. Eloise Loop Road 1,000 LF gap west of West Lake Ruby Drive Dollar General Store COMPLETE CR630 (Frostproof) Palm Avenue to Lake Avenue Contacted new City of Frostproof staff, who are uncertain about participating in project. Initially, Frostproof would secure needed ROW/easements. Insufficient ROW available for construction. TBD Swindell Road West Ponderosa Drive to N. Galloway Road COMPLETE Allegheny Road Lake Hatchineha Road to Bayberry Street COMPLETE Washington Avenue US Hwy. 27 to Community In Design. Pending easement. Construction TBD