Urban Transport in Metropolitan Areas (P095485)

Similar documents
Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485)

Urban Transport in Metropolitan Areas (P095485)

Implementation Status & Results Argentina Urban Transport in Metropolitan Areas (P095485)

Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Argentina AR Road Safety (P116989)

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Argentina Essential Public Health Functions Programs II Project (P110599)

Implementation Status & Results Report Mozambique Conservation Areas for Biodiversity and Development Project (P131965)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Colombia CO Integrated Mass Transit Systems (P082466)

Implementation Status & Results Argentina Norte Grande Road Infrastructure (P120198)

Implementation Status & Results Peru Vilcanota Valley Rehabilitation and Management Project (P082625)

Implementation Status & Results Mexico MX Urban Transport Transformation Progr (P107159)

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

Public Disclosure Copy

Implementation Status & Results Argentina AR Cordoba Road Infrastructure (P099585)

Implementation Status & Results Mozambique Roads and Bridges Management and Maintenance Program - Phase II (P083325)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Indonesia Strategic Roads Infrastructure Project (P079906)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Moldova NATIONAL WATER SUPPLY & SANITATION PROGRAM (P107612)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Peru Sierra Irrigation Subsector (P104760)

Implementation Status & Results Egypt, Arab Republic of Railways Restructuring (P101103)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Peru PE Sierra Irrigation Subsector (P104760)

Implementation Status & Results Paraguay Road Maintenance (P082026)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

January 2018 Air Traffic Activity Summary

Argentina Control of unregistered work in the construction industry. An experience based on social dialogue and active involvement of stakeholders

Implementation Status & Results Paraguay Road Maintenance (P082026)

Successes and Failures of the Policies of Water Supply and Wastewater Services in Argentina

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

Implementation Status & Results Report Mozambique GEF Conservation Areas for Biodiversity and Development Project (P131965)

Infrastructure: Networks to Sustain Development

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

Implementation Status & Results Bolivia BO Rural Alliances (P083051)

ARGENTINA MODERNIZATION OF INFRASTRUCTURE AND AIRPORT SERVICES

Tourism Sector Development: JICA s Approach

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Driving Ridership Strategic Partnerships

With the completion of this project, we would like to follow-up on the projections as well as highlight a few other items:

Argentina is returning to the world markets. Leandro Pierbattisti, BA September 25th

Manual vs. Automatic Operation and Operational Restrictions

The Value of Investing in Local Economic Development and Sustainable Tourism

2007/08 Full Year Results Investor Briefing

Implementation Status & Results Africa GEF-Western Indian Ocean Marine Highway Development and Coastal and Marine Contamination Prevention (P078643)

IATA FUEL EFFICIENCY CAMPAIGN

Review of Airport Noise Issues East Airfield Development Area

Implementation Status & Results Bosnia and Herzegovina REAL ESTATE REGISTRATION PROJECT (P128950)

CBA Presentation XXIII Comité Mixto Empresario Argentino-Japonés

Thursday, May 30, :00 to 3:30 PM Eastern Time. Preliminary Program

Welcome. Green Line in Your Community

Implementation of SESAR Pilot Common Project. - expected effects

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2840. Date ISDS Prepared/Updated: 03/22/2007 I. BASIC INFORMATION. A. Basic Project Data

1. Key development issues and rationale for Bank involvement

Assessing the Impacts of ENSO on South American Agriculture

Results of Tourism Activity. July, 2017

Statistics of Air, Water, and Land Transport Statistics of Air, Water, and Land. Transport Released Date: August 2015

Activity Report 2011 IIRSA. Nineteenth Meeting of IIRSA National Coordinators Brasilia, November 29, 2011

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Landing in Latin America & Peering Landscape in Argentina

NATIONAL BACKGROUND REPORT ON TRANSPORT FOR KOSOVO *

The Effect of an Efficient Public Transport System on Poverty: Lessons for Johannesburg from Bogotá Eugenia Mpofu

MARKET REPORT. Argentina: Low-Cost Airlines - the New Protagonists

Sound Transit Operations December 2014 Service Performance Report. Ridership

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

Metropolitan Washington Airports Authority (MWAA)

Scoping Paper Belo Horizonte - Brazil

SHAPING A SUSTAINABLE FUTURE

Annual Transit Ridership Monitoring Report Fiscal Year

Landing in South America & Peering Landscape in Argentina

TOURISM PERFORMANCE 2017

ANGLIAN WATER GREEN BOND

Noise Oversight Committee

Clean and Inclusive Cities in Argentina. November Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Implementation Status & Results Andean Countries Adaptation to the Impact of Rapid Glacier Retreat in the Tropical Andes (P098248)

From: OECD Tourism Trends and Policies Access the complete publication at: Italy

Slum Situation Analysis

Significant increase in accommodation activity but slightly less than in the previous month

Analysts and Investors conference call. Q results. 15 May 2013

CARICOM Single ICT Space Digital Transformation is a Journey

Jefatura de Gabinete de Ministros. Unidad Plan Belgrano

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

AGENDA. MENA Region Economic Context/Challenges. Importance of Cultural Heritage. Responding to Countries Needs and Demands

Sound Transit Operations January 2017 Service Performance Report. Ridership. Total Boardings by Mode

Transcription:

Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Argentina Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2010 Seq No: 12 ARCHIVED on 09-May-2016 ISR22958 Implementing Agencies: Public Disclosure Authorized Key Dates Key Project Dates Bank Approval Date:20-Oct-2009 Planned Mid Term Review Date:04-Nov-2013 Original Closing Date:29-Feb-2016 Project Development Objectives Effectiveness Date:26-Nov-2010 Actual Mid-Term Review Date:16-Dec-2013 Revised Closing Date:31-Jan-2017 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) The overall development objective of the program is to improve the quality and sustainability of urban transport systems in Argentine Metropolitan Areas, through the improvement of sectoral decision making frameworks and by giving priority to public transport modes in the urban transport sector. The project (APL1) development objectives contribute to the overall program development objective by: (i) supporting the design and creation of a multijurisdictional Metropolitan Transport Agency for the Buenos Aires Metropolitan Area (AMBA); (ii) strengthening the institutional capacity of the transport authorities in decision making, planning, priority setting, and resource allocation in urban transport; (iii) improving the quality and performance of urban transport infrastructure and/orservices in medium size Metropolitan Areas; and (iv) improving the physical integration and access to public transport networks in the Buenos Aires Metropolitan Area. Has the Project Development Objective been changed since Board Approval of the Project Objective? No PHRPDODEL Public Disclosure Authorized Components Name Creation of the MTA:(Cost $17.61 M) Urban Transport Improvements in Medium Size Metropolitan Areas:(Cost $24.46 M) Public Transport Access and Modal Integration in AMBA:(Cost $99.28 M) Sectoral Training:(Cost $2.50 M) Project Management:(Cost $5.77 M) Overall Ratings Name Previous Rating Current Rating 5/9/2016 Page 1 of 12

Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The loan has been effective since November 2010 and has disbursed USD67 million or 47% as of April 2016. The project was restructured in August 2014. The level 2 restructuring of the project resulted in: (i) a reallocation of funds within the components to allow the execution of selected high priority investments for urban transport in the metropolitan areas; (ii) a formal transfer of the implementing unit to the Ministry of the Interior and Transport; (iii) modification of the key indicators for the Project; and (iv) modification of certain Project activities. The restructured project is now focused primarily on three public transport investments under preparation: a BRT project in greater Buenos Aires with proposed works in the municipalities of La Matanza and the city of Buenos Aires; segregated lanes projects in the municipalities of Santa Fe and Rosario. The project is also financing technical assistance to strengthen planning and data platforms for urban mobility planning and management in medium-sized Argentine cities. The project is expected to achieve its development objectives. No key issues to raise. 5/9/2016 Page 2 of 12

5/9/2016 Page 3 of 12

5/9/2016 Page 4 of 12

5/9/2016 Page 5 of 12

Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Substantial Moderate Macroeconomic -- Substantial Substantial Sector Strategies and Policies -- Substantial Substantial Technical Design of Project or Program -- Moderate Substantial Institutional Capacity for Implementation and Sustainability -- Substantial Moderate Fiduciary -- Substantial Substantial Environment and Social -- Moderate Moderate Stakeholders -- Moderate Moderate Other -- -- -- Overall -- Substantial Substantial Results Project Development Objective Indicators PHINDPDOTBL Existence of a legal agreement for creating the AMT, signed inter-jurisdictionally. (Yes/No, Custom) Value N Y Y Y Date 20-Oct-2009 04-Sep-2015 16-Mar-2016 31-Jan-2017 In August 2014 the Ministry of Interior and Transportation, approved the tripartite agreement between the National Government, the Province of Buenos Aires and the Autonomous City of Buenos Aires, which was originally signed on October 2012, creating the Metropolitan Transportation Agency (MTA). 5/9/2016 Page 6 of 12

PHINDPDOTBL Produce transport planning instruments based on systematic data collection such as: Urban Transport Planning Model, Transportation Master Plan, and/or Urban Transport Center or Observatory. (Number, Custom) Value 0.00 2.00 2.00 3.00 Date 20-Oct-2009 04-Sep-2015 16-Mar-2016 31-Jan-2017 The full four step urban transport planning model for the AMBA was finalzied by LOGIT. The technical assistance projects to create a Urban Mobility Plan in La Rioja has finalized; and the Integral Mobility Plan for the metropolitan area of Salta is is underway, and expected to finish in 3 months. PHINDPDOTBL Existence of a portfolio of projects with feasibility studies or detailed designs for the implementation of projects in Metropolitan Areas of Argentina. (Number, Custom) Value 0.00 5.00 5.00 6.00 Date 20-Oct-2009 04-Sep-2015 16-Mar-2016 31-Jan-2017 Among the Transport Projects that have been prepared are: 1. Rosario: Segregated Bus Lane - North Corridor 2. Santa Fe: Segregated Bus Lane - Av. Bias Parera 3. Salta: Bicycle Segregated Lanes 4. Tucuman: Bicycle Segregated Lanes 5. AMBA: RN3 corridor BRT R3 Juan Manuel de Rosas 6. Corrientes--Segregated Lanes to be completed. The detail design proyect for the first phase of the Urbann Trnsport Integrated System for the city of Corrientes is under progress. PHINDPDOTBL Segregated corridor constructed in Argentina s medium size Metropolitan Areas that provides a 10% reduction in generalized cost of travel. (Percentage, Custom) Value 0.00 0.00 0.00-10.00 Date 20-Oct-2009 04-Sep-2015 16-Mar-2016 31-Jan-2017 The civil works for construction of segregated bus lanes in Santa Fe (5.7km & US$13 million) and Rosario (2.5km & US$4.5 million) are under construction. Since last supervision mission, significant progress can be reported. The civil work in Rosario has a progress of 76% and is expected to be completed by mid-year; the one in Santa Fe has a progress of 40% and is expetected to be finished by the end of the 5/9/2016 Page 7 of 12

PHINDIRITBL year. Progress on these infrastructure investments will lead to attainment of this results indicator. PHINDPDOTBL Improved mobility in the RN3 corridor BRT R3 Juan Manuel de Rosas which provides at least a 10% reduction in generalized cost of travel. (Percentage, Custom) Value 0.00 0.00 0.00-10.00 Date 20-Oct-2009 15-Aug-2014 16-Mar-2016 28-Feb-2017 On October 21, 2015, the contract was signed for the construction of a BRT system of 14 Km in the Municipality of La Matanza. The works started on January 4, 2016, and the proyect is currently under construction, with a 6% progress by April 2016. The completion of the BRT will lead to attainment of this results indicator. Overall Intermediate Results Indicators Evidence of AMT performance, such as: creating a project with inter-jurisdictional participation and/or inter-jurisdictional agreements on specific transport issues. (Yes/No, Custom) Value N Y Y Y Date 20-Oct-2009 04-Sep-2015 29-Apr-2016 31-Jan-2017 The Bus Rapid Transit system connecting the Municpality of La Matanza and the dowtown of the City of Buenos Aires will be the first multijurisdictional transport project in the Metropolitan Area of Buenos Aires (AMBA). The implentation of this project under the new political alignment between the National Government, the Province of Buenos Aires and the City of Buenos Aires is expected to strengthen the metropolitan governance agenda. 5/9/2016 Page 8 of 12

PHINDIRITBL PHINDIRITBL PHINDIRITBL Existence of a valid statute for the internal organization of the AMT and appointed representatives for each jurisdiction. (Yes/No, Custom) Value N Y Y Y Date 20-Oct-2009 04-Sep-2015 29-Apr-2016 31-Jan-2017 The decree to create the AMT was approved by the city of Buenos Aires (Decree No. 513 of October 23, 2012) and the Province of Buenos Aires (Decree No. 490 of July 26, 2013) and the State (Decree 1359 of August 14, 2014). Each jurisdiction appointed a representative to constitute the board of directors of the Agency. Number of minutes of the AMT meetings per year. (Number, Custom) Value 0.00 2.00 2.00 3.00 Date 20-Oct-2009 04-Sep-2015 29-Apr-2016 31-Jan-2017 It was recently infromed that the number of meetings held since the cretation of the AMT in 2012 were fifteen; including two of them wich took place during the last year. Number of Metropolitan Areas with updated OD Home Mobility Surveys. (Number, Custom) Value 0.00 8.00 8.00 6.00 Date 20-Oct-2009 04-Sep-2015 29-Apr-2016 31-Jan-2017 The Household Mobility Survey have been updated, processed and published for: Resistencia-Corrientes 2013 Neuquén-Cipolletti 2012 Santa Fe y Paraná 2012 Salta Metropolitan Area 2012 Tucumán Metropolitan Area 2011** Mendoza Metropolitan Area 2010** Posadas Metropolitan Area 2010** Buenos Aires Metropolitan Area 2009-2010** **These surveys were started with financing from PTUBA 5/9/2016 Page 9 of 12

PHINDIRITBL PHINDIRITBL Kilometers of segregated bus lanes constructed in Metropolitan Areas of Argentina. (Kilometers, Custom) Value 0.00 0.00 4.18 7.80 Date 20-Oct-2009 04-Sep-2015 29-Apr-2016 31-Jan-2017 The construction of segregated bus lanes in Santa Fe (2.3kmprogress) and Rosario (1.9km progress ) are currently under construction. The civil work in Rosario is expected to be completed by mid-year and the one in Santa Fe to be finished by the end of the year. Kilometers of segregated bus lanes constructed in the AMBA. (Kilometers, Custom) Value 0.00 0.00 0.60 10.00 Date 20-Oct-2009 04-Sep-2015 29-Apr-2016 31-Jan-2017 On October 21, 2015, the contract was signed for the construction of a BRT system of 14 Km in the Municipality of La Matanza. The works started on January 4, 2016, and the proyect is currently under construction w 0.6km constructed. The completion of the BRT will lead to attainment of this results indicator. 5/9/2016 Page 10 of 12

PHINDIRITBL PHINDIRITBL Improvement of access conditions in trains stations in AMBA (Percentage, Custom) Value 0.00 100.00 100.00 100.00 Date 20-Oct-2009 04-Sep-2015 04-Sep-2015 31-Jan-2017 Post-graduate course in urban transport is approved and created by Buenos Aires University (Yes/No, Custom) Value N Y Y Y Date 20-Oct-2009 04-Sep-2015 04-Sep-2015 31-Jan-2017 The Graduate Studies of a "Maestria de Planification de Transporte Urbano" started with its first cohort of student in March 2014 and continued with the second cohort in 2015. The Bank recently granted a NO to finance the third cohort in 2016. Overall Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P095485 IBRD-77940 Effective USD 150.00 149.68 0.32 70.05 79.63 47% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P095485 IBRD-77940 Effective 20-Oct-2009 11-Aug-2010 26-Nov-2010 29-Feb-2016 31-Jan-2017 Cumulative Disbursements 5/9/2016 Page 11 of 12

Restructuring History Level 2 Approved on 19-Aug-2014,Level 2 Approved on 29-Sep-2015 Related Project(s) There are no related projects. 5/9/2016 Page 12 of 12