AIRSPACE IMPACTS ON AIRPORT PLANNING

Similar documents
SITE ELEVATION AMSL...Ground Elevation in feet AMSL STRUCTURE HEIGHT...Height Above Ground Level OVERALL HEIGHT AMSL...Total Overall Height AMSL

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

** DETERMINATION OF NO HAZARD TO AIR NAVIGATION **

Windmills & Airspace Can We Work Together?

Part 77 and Construction

FAA Requirements for Engine-out Procedures and Obstacle Clearance

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

Ronald Reagan Washington National Airport. April 18, 2012

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

APPENDIX D FEDERAL AVIATION REGULATIONS, PART 77

EXPLANATION OF TPP TERMS AND SYMBOLS

Appendix E NextGen Appendix

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

AVIATION PLANNING AND DEVELOPMENT Oakland International Airport 530 Water Street Oakland, CA 94607

Navigation at the. Federal Aviation Administration Crossroads

Appendix C AIRPORT LAYOUT PLANS

RNP AR APCH Approvals: An Operator s Perspective

** DETERMINATION OF NO HAZARD TO AIR NAVIGATION **

AIRSPACE PROTECTION. Guidance and considerations for development in the vicinity of Ohio s airports and heliports

FLIGHT OPERATIONS PANEL

LONG BEACH, CALIFORNIA

New York Aviation Management Association Conference

Airport Obstruction Standards

APAC PBN UPDATE Slide 1 of xx

** DETERMINATION OF NO HAZARD TO AIR NAVIGATION **

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

Título ponencia: Introduction to the PBN concept

Preliminary Findings of Proposed Alternative

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

DSNA NAVIGATION STRATEGY

2008 FUture of Navigational Aids

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Implementation challenges for Flight Procedures

Updates to Procedures at St. John s International Airport

THE NATIONAL ACADEMIES PRESS

The following criteria shall be applied within the boundaries of the AO District:

Airplane Navigation Capabilities

RNP AR and Air Traffic Management

Status of PBN implementation in France

Agenda: SASP SAC Meeting 3

Performance Based Navigation (PBN) Implementation Plan. The Gambia

MetroAir Virtual Airlines

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

Consideration will be given to other methods of compliance which may be presented to the Authority.

(RN R A N V A V & & RN R P N

Approach Specifications

Proposed Provision of Navigation Services for the Next Generation Air. Transportation System (NextGen) Transition to Performance-Based Navigation

Airport 20 to 1 Approach Surface

Initiated By: AFS-400

Air Navigation Bureau ICAO Headquarters, Montreal

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

South Dakota Airports Conference

Yellowstone Regional Airport Operational Capability Assessment

SUBCHAPTER E AIRSPACE

Promoting EGNSS Operational Adoption in BLUEMED FAB CYPRUS

Required Navigation Performance (RNP) in the United States

Learning Objectives. By the end of this presentation you should understand:

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

Vertically-guided Instrument Approaches Using the Wide Area Augmentation System (WAAS)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Wide Area Augmentation System (WAAS) and Local Area Augmentation System (LAAS) Update

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

DRAFT MASTER PLAN UPDATE

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

SBAS as a solution for safe approaches in New Zealand and Australia

Overview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

UK Implementation of PBN

USE OF RADAR IN THE APPROACH CONTROL SERVICE

NATA 2018 AGM & CONFERENCE

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

Performance Based Navigation Operational End-State 2023

agis a brief overview

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

CONTROLLED AIRSPACE CONTAINMENT POLICY

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

Federal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

Name of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:

ENABLING GREENER FLIGHT TRAJECTORIES. David Bowen Chief of ATM SESAR JU

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

First LPV 200 approach in Europe. Paris Charles de Gaulle. Benoit Roturier DSNA ESSP Workshop Warsaw Direction Générale de l Aviation Civile

Flight Operations Inspector Manual

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

Safety Enhancement RNAV Safe Operating and Design Practices for STARs and RNAV Departures

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

TWELFTH AIR NAVIGATION CONFERENCE

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

Pro Line Fusion integrated avionics system. Pro Line Fusion on Embraer Legacy 450 and 500: Business-jet technology designed with tomorrow in mind.

50 Ways to Improve Your Airport: Engaging Airport Management on Key Issues

Transcription:

2017 AIRPORT PLANNING & NEPA WORKSHOP AIRSPACE IMPACTS ON AIRPORT PLANNING Planning Session 3: Up in the Air: Flight Procedures, Part 77, TERPS, and Other Airspace Considerations in Planning Greg Albjerg VP, National Aviation Planning Leader, HNTB Fellow HNTB Corporation Galbjerg@hntb.com

Where are we going? Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Agenda What is Airspace How is Airspace evolving How does Airspace affect airport planning NextGen and how it all fits together Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

What is Airspace? FAR Part 77 surfaces Airport planning/design related surfaces (AC150/5300 13A) TERPS (US Standard for Terminal Instrument Procedures Order 8260.3C) Other FAR requirements (Example One Engine Inoperative Requirements (OEI)) Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

FAR Part 77 Surface dimensions vary based upon size/characteristics of airport Anything that penetrates one of these surfaces is an obstacle but not necessarily a hazard Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Runway Threshold Placement AC 150/5300 3A Surface for runway threshold placement Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Example of TERPS Surfaces Surfaces are very complex Surface dimensions vary on type of approach and type of aircraft This depicts a nonprecision RNAV approach Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

FAR Part 25 OEI Requirements Will be covered by Bill Yingling Very important but has not typically been a focus of airport planning Actual requirements are very complicated but representative simple surfaces can be used effectively (IE 62.5:1) Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

IAH 3D Airspace Surface Types Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

IAH 3D Composite Airspace Elevations Only (100' Intervals) Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

How Is Airspace Evolving? Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Legacy Approaches Used Ground NAVAIDs Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

NextGen Approaches Uses Area Navigation (RNAV) (Not Tied To Ground) Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

What is RNAV and RNP? How are they different from each other? Area Navigation (RNAV) has been around a long time Includes Inertial Navigation, GPS, Special VOR/DME and others Need to be designed to the lowest common denominator Required Navigation Performance (RNP) is fairly new (it is one type of RNAV) Can be provided by other than GPS, but multiple WAAS GPS receivers are an excellent way Can be designed for a specified tolerance i.e. RNP 0.1 Can design curved approach and departure paths Proven technology Note: RNP is one type of PBN (Performance Based Navigation). However, PBN can be applied to RNAV as well. Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

What About WAAS? Wide area augmentation system (for GPS) Provides enhanced precision for GPS WAAS GPS is one other subset of RNAV RNP is specified in terms of precision I.E. RNP 0.3 WAAS allows a lower (more precise) RNP value, assuming aircraft and crew can also be certified to lower value Most Legacy Airline Aircraft Are Not Equipped With WAAS Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

RNAV Versus RNP Traditional RNAV TERPS Surface Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

RNAV Versus RNP Image is approach chart for Palmer, Alaska Final approach leg is 4.3 nautical miles long This was shortest length possible with early GPS technology

Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Approach to Palmer, Alaska Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

RNAV Versus RNP TERPS RNP TERPS Surface Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

RNAV Versus RNP TERPS RNAV TERPS Surface Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

RNAV Versus RNP TERPS Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

How Does RNP Provide Advantages for an Airport or Pilot? Precision of RNP flight path advantages Better approach minimums at obstacle challenged airports Significant fuel savings and reduction in greenhouse gases Greater airspace capacity due to tight flight paths Potential noise mitigation enhancements Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

How Does Airspace Affect Airport Planning? Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Airspace Obstacle Environment Affects Runway Location and Capacity Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Airspace Affects Viability of Runways and Instrument Approaches Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Airspace Affects Viability of Runways and Instrument Approaches Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

How Can PBN/NextGen Help? PBN Provides for tighter navigation ADS B provides more accurate surveillance than RADAR Allows more routes to be fit in a chunk of airspace We need to protect those chunks Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

NextGen and how it all works Will walk through an RNP Approach to DCA from the pilot s perspective Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Thanks! Questions answered after the session Airport NEPA & Planning Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

FAA NAS PBN Strategy Relationship to airport planning and development Federal Aviation Administration <Audience>

Key Topics PBN basics, fleet equipage, and strategy FAA Navigation Services including published approach procedures Relationship to airport development Federal Aviation Administration 38

Alaska Airlines RNP Approach into Juneau Courtesy Alaska Airlines Federal Aviation Administration 39

PBN today and tomorrow PBN delivers benefits to users of the NAS every day: Airlines fly more efficient routes to get passengers faster to their destinations while burning less fuel and producing fewer aircraft exhaust emissions Safe, reliable access to GA airports with vertical guidance during poor weather is a regular operation Going Forward: Today, we can tell you with a good degree of accuracy where an aircraft is right now But when NextGen is fully implemented, we are going to be able to tell you with a great deal of accuracy where it will be at any point in time along the way to its destination This will have a tremendous impact on our ability to manage traffic efficiently, through transition to a time-based system of strategic management Federal Aviation Administration 40

PBN: RNAV and RNP RNAV: Area Navigation RNP: Required Navigation Performance Federal Aviation Administration 41

Access: Relative IAP minima Most PBN approaches will have multiple lines of minima published RNP AR LNAV VNAV Cat I Cat II/III LNAV: Lateral Navigation VNAV: Vertical Navigation LPV: Localizer Performance Vertical LP: charted where LPV is N/A RNP: Required Navigation Performance AR: Authorization Required WAAS: Wide Area Augmentation System GBAS: Ground-Based Augmentation System GLS: GBAS Landing System EFVS: Enhanced Flight Vision System ILS, EFVS, or future GBAS ILS, GLS, and LPV Federal Aviation Administration 42

Avionics Fleet Equipage: Who can fly what procedure? Majority of the fleet has some type of PBN equipage, but the type of equipage varies For GA, focus is on IFR fleet that makes regular use of IFR system, rather than VFR fleet does not fly IFR ~92% IFR GA fleet is WAAS/LPV equipped General trends:** General aviation favors WAAS/LPV equipage for IFR Air carriers favor RNP **trend; ~90% not Air absolute Carrier rule fleet is RNP 0.3 equipped PBN avionics equipage in the fleet is a necessary consideration when evaluating navigation services (i.e., access) Federal Aviation Administration 43

Air Carrier 121 Fleet has diverse and increasingly capable equipage LNAV Further resources: https://www.faa.gov/nextgen/delivering/oiaa/investments/pbn/ Federal Aviation Administration 44

Strategic Goals for Transitioning to a PBN-Centric NAS Daily operation with PBN throughout the NAS, using the right procedure to meet the need Identification of the key navigation capabilities that will be available in the NAS over the next 15 years Aligned to NPIAS Shift to time and speed-based air traffic management (TBFM) Deliver and use resilient navigation services (GPS backup) Enable lower visibility access Expectations for evolution of aircraft operator fleet capabilities Federal Aviation Administration 45

Navigation Services Overview 1) All qualified instrument runway ends in the NAS: LPV (or LP), LNAV, VNAV as an essential level of navigation service Hybrid: RNP>ILS Top 10+ and nearby L/M Hubs S/N Hubs GA-Nat/Reg GA-Loc/Bsc All Instrument runway ends 2) RNP is charted where beneficial: right procedure to meet the need 3) ILS network is mature and is not the focus for new development All Instrument runway ends All Instrument runway ends Order 7100.41 governs process; RNP procedures require ATO benefit analysis right procedure to meet the need Merging and spacing pause No change Federal Aviation Administration 46

EoR: Established on RNP at DEN Federal Aviation Administration 47

What happens during a GPS outage? Navigation Strategy: VOR and ILS Minimum Operating Networks During GPS outage: Pilots fly above 5000 AGL to receive VOR coverage ILS available at safe landing airports within 100 miles Or in a few remote areas, a VOR approach Minimum Operating Network (MON) Intent is to right-size the ground-based NAVAID networks to provide an alternate means of navigation in case of GPS outage VOR drawdown effort is ongoing per 2016 FRN and Order 7400.2 process WAAS reliability is 99.7%+ but outages can happen (e.g., military testing) Future phase: DME/DME as additional backup for RNAV Federal Aviation Administration 48

PBN benefits at Airports Today, RNAV approaches provide the most common mechanism for precise, safe, vertically guided approaches at thousands of airports 1,550 ILS 2,300+ Airports with LPV/LP and no ILS 3,200+ Runway Ends with LPV/LP and no ILS LPV Yes, criteria but what are about equivalent the unequipped to ILS in TERPS aircraft today that fly IFR? Because The strategy RNAV can here be is implemented that we re at costeffectively the tipping at point; an airport, there we are can broad establish and IFPs maturing at many more FAA/industry airports discussions than could ever on be afforded future equipage with more of costly air carrier ILS fleet But in the interim, this is also why the existing ILS network will remain and we re not yet pursuing a systemic pulldown 92% GA fleet that flies IFR is WAAS/LPV equipped AIP favors RNAV first rather than ILS Federal Aviation Administration 49

What does this mean for airport planning and development? ALP considerations: Navigation strategy is for vertically guided LPV approach to all qualified instrument runway ends (agreed to by ATO/ARP/sponsor) and charting LNAV/VNAV; but not visual runways Notional ILS on ALP for future development: not supportable at other than large/medium hub airport Is the on-airport VOR on the discontinuance list published in FRN, thus freeing up potential real estate? GBAS (non-fed) plans at large/medium hub airport? Additional considerations: Access: do users need RNP or is LNAV/VNAV/LPV adequate? Normal requirements for approach lights (BCA) and alignment with airport design standards apply to get lower minima Establishing safe and reliable approach access is the goal; not per se all improvements need for the best possible minima Federal Aviation Administration 50

PBN Summary for Airport Planning FAA goal is to have vertically guided PBN approaches to all qualified instrument runways in the NAS PBN access to GA airports is real and growing, with more ~2.5x more access via LPV than ILS GA fleet that regularly flies IFR is highly equipped for RNAV procedures; Air carrier fleet equipage is more complex but is increasingly highly capable Planned VOR and ILS minimum operating network, and DME/DME, provides for backup navigation in case of GPS outage FAA PBN Strategy provides framework for PBN-centric NAS, with alignment to NPIAS airport categories Federal Aviation Administration 51

Airport Planning and NEPA Workshop Federal Aviation Administration Obstruction Evaluation Process Planning Session 3: Up in the Air: Flight Procedures, Part 77, TERPS, and Other Airspace Considerations in Planning Presented to: By: Date: Multiple Industries Kerryaine Yarber-Hiller, Specialist, Obstruction Evaluation Group November 30, 2017

Overview FAA Form 7460-1, Notice of Proposed Construction or Alteration Who has to file and why Verification Responders Responder s responsibilities Code of Federal Regulations (CFR) 14 Part 77 Evaluation Visual Flight Rules (VFR) or Traffic Pattern Airspace (TPA) Evaluation Negotiations, mitigation, public notice Determinations Petitions Federal Aviation Administration 53

7460-1 Notice of Construction or Alteration Who must file for Aeronautical Study? CFR 14, Part 77 vs Notice Criteria Tool Federal Aviation Administration 54

Part 77.9 Construction or Alteration Notice If requested by the FAA or if you propose any of the following types of construction or alteration, you must file notice with the FAA if: (a) Any construction or alteration that is more than 200 feet above ground level (AGL) at its site. (b) Any construction or alteration that exceeds an imaginary surface extending outward and upward at any of the following slopes for all public use airports/heliports: (1) 100-to-1 for a horizontal distance of 20,000 feet from the nearest point of the nearest runway of an airport with its longest runway more than 3,200 feet in actual length. (2) 50-to-1 for a horizontal distance of 10,000 feet from the nearest point of the nearest runway of an airport with its longest runway no more than 3,200 feet in actual length. (3) 25-to-1 for a horizontal distance of 5,000 ft. from the nearest point of the nearest landing and takeoff area of each heliport. (c) Any highway, railroad, or other traverse way for mobile objects of a height which if adjusted upward by the following, would exceed a standard of paragraph (a) or (b) of this section: (1) 17 feet for an Interstate Highway part of the National System of Military and Interstate Highways where overcrossings are designed for a minimum of 17 feet vertical distance, (2) 15 feet for any other public roadway, (3) 10 feet or the height of the highest mobile object that would normally traverse the road, whichever is greater, for a private road, (4) 23 feet for a railroad, (5) An amount equal to the height of the highest mobile object that would normally traverse it for a waterway or any other traverse way not previously mentioned. (d) Any construction or alteration on all public use airports and heliports. Federal Aviation Administration 55

OE/AAA Website (oeaaa.faa.gov) Federal Aviation Administration 56

Notice Criteria Tool Screening tool using Notice Criteria based on Part 77.9 and the business rules of each office. Must use coordinates in degrees, minutes, seconds, format NAD83. If it is traverse way, select appropriate option for upward adjustment. Much more stringent by incorporating responders business rules. Federal Aviation Administration 57

Part 77 Penetrations Part 77 obstruction standards are used to screen the many proposals submitted in order to identify those which warrant further aeronautical study. Studies are conducted in order to determine if the proposal would have a significant adverse effect on protected aeronautical operations and airspace. While part 77 obstruction standards trigger formal aeronautical study, including public circularization, these obstruction standards do not constitute absolute or arbitrary criteria for identification of hazards to air navigation. Accordingly, the fact that a proposed structure exceeds certain obstruction standards of part 77 is in itself not sufficient grounds for issuance of a determination of hazard to air navigation. Federal Aviation Administration 58

OEG Process - Verification Verify coordinates / site elevation Compare survey data If existing, compare digital obstacle file and add FCC number Ensure frequencies and effective radiated power are included When errors, discrepancies, or lack of information is discovered, coordinates with sponsor using electronic Request for Additional Information letters. Ensure marking and/or lighting preferences are included Verify submission includes sufficient information to allow each division or service area office to accomplish its specialized portion of the obstruction evaluation as subject matter experts When the submission passes verification and there are no unresolved issues, evaluation by other divisions is initiated. Federal Aviation Administration 59

Responders & Responsibility Each agency, office or organizations protect their piece of the aviation pie. Federal Aviation Administration 60

FAA JO 7400.2L, 6-3-6 Responsibility Air Traffic personnel must FPT personnel must Regional Flight Standards personnel must Technical Operations Services must Military personnel are responsible for evaluating Participation by all responding offices is key in accomplishing the FAA s prime objective, which is to conduct obstruction evaluation studies to ensure the safety of air navigation, and the efficient utilization of navigable airspace by aircraft. Other applicable FAA offices or services may be requested to provide an evaluation of the structure on a case-by-case basis. Federal Aviation Administration 61

Once in EVAL Status Federal Aviation Administration 62

CFR 14, Part 77 Evaluation Federal Aviation Administration 63

Traffic Pattern Airspace Federal Aviation Administration 64

Notice of Presumed Hazard A Notice of Presumed Hazard is issued if the structure exceeds obstruction standards and/or has an adverse effect upon navigable airspace or air navigation facilities and resolution or further study is necessary to fully determine the extent of the adverse effect. -The NPH facilitates negotiation airspace -Informs sponsor of the initial findings If negotiation is successful, and resolution is achieved, or further study is completed, an appropriate subsequent determination should be issued. Federal Aviation Administration 65

Air Traffic Obstruction Evaluation Group Identifies when negotiations are necessary Conduct negotiations with the sponsor - May be done with assistance from other division/service area office personnel when their subject expertise is required (i.e., cases of electromagnetic interference) Identifies when circularization is necessary Conducts circularization when required Evaluates all valid aeronautical comments received as a result of circularization Issues determinations Types of determinations Does Not Exceed (DNE) Exceeds But Okay (EBO) Determination of No Hazard (DNH) Structure exceeds obstruction standards, but does not result in a substantial adverse effect Must include standards exceeded, effects, cumulative impact, and information/comments received from circularization Determination of Hazard (DOH) If the structure would have or has a substantial adverse effect Negotiations have been unsuccessful eliminating the effect Determinations may require Advisory statements submitted to OEG for inclusion in the determination from a division responder to notify sponsors of potential issues Federal Aviation Administration 66

Petitions Determinations are Subject to Petition Determination of No Hazard (DNH) Determination of Hazard (DOH) The determination is subject to review if an interested party files a petition that is received by the FAA 30 days from issued date. In the event a petition for review is filed, it must contain a full statement of the basis upon which it is made and be submitted to the Manager, Airspace Regulations and ATC Procedures Group, Federal Aviation Administration, 800 Independence Ave, SW., Room 423, Washington, DC, 20591. The determination becomes final 40 days from issued date unless a petition is timely filed. In which case, the determination will not become final pending disposition of the petition. Interested parties will be notified of the grant of any review. For any questions regarding a petition, please contact Airspace Regulations and ATC Procedures Group via telephone, 202-267-8783 - or facsimile, 202-267-9328. Federal Aviation Administration 67

Recap 7460-1 Notice of Proposed Construction or Alteration Who has to file and why Verification Responders Responder s Responsibilities CFR 14 Part 77 Evaluation VFR or TPA Evaluation Negotiations, Mitigation, Public Notice Determinations Petitions Federal Aviation Administration 68

QUESTIONS Federal Aviation Administration 69

2017 AIRPORT PLANNING & NEPA WORKSHOP OEI Airline Challenges Planning Session 3 William (Bill) Yingling Sr. Engineer JetBlue Operations Research & Engineering william.yingling@jetblue.com

Overview Why is OEI obstacle analysis needed and what is it? Why do airlines need obstacle data from airports? Why aren t TERPS departure surfaces good enough? What can airports do to help airlines with OEI obstacle data? Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Why is OEI obstacle analysis needed? Airlines are required to restrict takeoff weights to allow for an engine failure with every departure. (CFR Title 14 Part 121.189, 135 379, EASA OPS 1.495) Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

What is OEI obstacle analysis? AC120 91 describes obstacle accountability areas for OEI takeoff analysis. Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Why aren t TERPS departure surfaces good enough? AC150 5300 13 defines departure obstacle splays. Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

What can airports do to help airlines with obstacle data? Open a dialog with the Operations Engineering departments of the airlines serving your airport! We can help you protect your airspace! Airlines can help to define departure corridors for OEI obstacle accountability areas. There can be a large financial impact to obstacles that do not penetrate TERPS surfaces. Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA

Questions or Comments? My Contact info william.yingling@jetblue.com Thank You!!! Airport Planning & NEPA Workshop Nov. 29 Dec. 01, 2017 Arlington, VA