MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

Similar documents
CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/5/2018 2:12:06 PM

PennDOT Interstate Work next week March 30-April 3:

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 10/11/2018 5:24:09 PM

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

PRIORITIES COMMITTEE MEETING

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/14/ :00:05 PM

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Northeast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015

Ohio Department of Transportation Construction Update

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

Street Affected Delayed/ Closed From To Time Closed Time Open. Quarry Ln 58th Ave Lake Cahuilla Pilot Car 6:30AM 58th Ave ( Closed) Van Buren

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

2 Construction Program

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURS., AUG. 25, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

Important Lane Closures, April 3 9, 2011

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

AGENDA ITEM I-6 Public Works

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

Road Construction Ahead January-April 2015 NORTHWEST REGION

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Springettsbury Township. Road Improvement Projects

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

El Dorado County / Tahoe Roadwork Schedule

2008 INDIAN BUSINESS RESOURCE GUIDE

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

Additional Economic Development Strategy submissions- Klickitat County

FDOT Treasure Coast Traffic Report through

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

Important Lane Closures March 1 5, 2010

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

DISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

State Route 8 Corridor. Northern Summit County s Path to Success

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

BID RESULTS. April 14, Award Date April 21, COMMISSION DISTRICT 1 Bob Ruwart - Commissioner

Weekly construction update

Florida Department of Transportation MIKE DEW SECRETARY

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

Hospital Link Project Project Update Winter 2018

TRAFFIC ALERT FOR APRIL 23-27, 2018 Highway Work Zones in the Staunton District

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

3529 Souris River Flood Plan (Phase MI-1)

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

State Project Reconstruction I-84

November 21, 2012 Barbara Kelleher, (954)

Montana Indian Business Alliance SMALL BUSINESS RESOURCE GUIDE

LOST HILLS ROAD INTERCHANGE PROJECT CONSTRUCTION UPDATE. CALABASAS CITY COUNCIL April 26, 2017

Riverside County Transportation Department Summary of Bids

FDOT Treasure Coast Traffic Impact Report

Major Projects Overview

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

TRAFFIC ALERT FOR JUNE 4-8, 2018 Highway Work Zones in the Staunton District

US 19 Sunset Point Rd to Countryside Blvd.

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

September 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10

Florida Department of Transportation ERIK FENNIMAN INTERIM SECRETARY

Route 29 Solutions Projects

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

Special Committee on U. S. Route Numbering

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

DISTRICT CONSTRUCTION PROGRAM OHIO DEPARTMENT OF TRANSPORTATION

TRAFFIC ALERT FOR JUNE 25-29, 2018 Highway Work Zones in the Staunton District

Pardon Our Dust Public Information Meeting

State of Texas. District: County: Condition: Roadway: Direction: Time: Limits:

Ocean Way at U.S. #1 (Town of Jupiter) Installation of a new traffic signal.

TEXAS BORDER DISTRICT TRADE TRANSPORTATION ACTIVITIES

Northern Rail Extension, Phase One

Transcription:

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016 ROAD INCIDENTS DUE TO FIRES AND FLOODING PLEASE CHECK OUR WEBSITE FOR MORE UP TO DATE CLOSURES AND INFORMATION http://www.mdt.mt.gov/travinfo/scripts/alerts.pl NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: WIDTH RESTRICTIONS LIFTED/COMPLETED: US-2 12 WIDTH US-2 - MILE MARKER 5.6 TO 5.8 5.6 MILES FROM THE MONTANA/IDAHO STATE LINE, NORTHWEST OF TROY. WORK WILL TAKE PLACE IN THE SOUTHBOUND LANE, MONDAY THRU THURSDAYS, WITH FRIDAYS AND HOLIDAYS OFF. THE PROJECT WILL LAST APPROXIMATLEY 3 WEEKS. TRAFFIC CONTROL IS PROVIDED BY GLACIER TRAFFIC PRODUCTS VIA PILOT CARS. EXPECT: MISCELLANEOUS ACTIVITIES; WIDTH RESTRICTION OF 12 FEET; PILOT CARS; SINGLE LANE TRAFFIC. S-314 14 WIDTH S-568 14 WIDTH S-287 10 WIDTH S-314 - Mile Marker 17.5 to 25.4 North of Decker & Wyoming Border. Crack sealing work to begin week of May 9, 2016. **WIDTH RESTRICTION OF 14 FEET. EXPECT: Crack sealing activities; width restriction of 14 feet; reduced speed of 35 MPH; pilot cars; single lane closures; flaggers. S-568 - MILE MARKER 27.8 TO 27.8 FLY CREEK BRIDGE IS LOCATED 0.5 MILES EAST OF THE TOWN OF POMPEY'S PILLAR AND 10 MILES WEST OF WACO.. PROJECT EARTHWORK WILL CONTINUE THIS WEEK. THE DETOUR IS OPEN WITH A REDUCED SPEED AND WIDTH RESTRICTION OF 14 FEET. EXPECT: BRIDGE ACTIVITIES; WIDTH RESTRICTION OF 14 FEET; DETOUR; REDUCED SPEED OF 35 MPH; ROAD CLOSURE. S-287 - MILE MARKER 0 TO 7.8 SOUTH OF THREE FORKS. STARTING MAY 13TH, 2016, RUMBLE STRIPS AND STRIPING WILL FEET; LOOSE GRAVEL; REDUCED SPEED OF 35 MPH; SINGLE LANE CLOSURES; TRAFFIC CONTROLLED BY SIGNAL LIGHTS.

CURRENT ROAD CONSTRUCTION AND RESTRICTIONS: I-15 18 WIDTH I-15 12 WIDTH I-15 12 WIDTH I-15 12 WIDTH I-15 - MILE MARKER 12.7 TO 12.9 3 MILES SOUTH OF LIMA. BRIDGE DEMOLITION UNDERWAY. **LOADS GREATER THAN 18 FEET WIDE WILL NEED TO FIND AN ALTERNATE ROUTE, OR CALL MOUNTAIN WEST TRAFFIC CONTROL AT 406-490-8390 MONDAY THRU FRIDAY, 8 A.M TO 5 P.M, 48 HOURS IN ADVANCE TO SET UP A TIME TO BE ESCORTED THROUGH THE PROJECT. THERE WILL BE STAGING AREAS JUST BEFORE THE PROJECT LIMITS IN BOTH NORTH AND SOUTH BOUND DIRECTIONS FOR LOADS REQUIRING AN ESCORT THROUGH THE PROJECT. EXPECT: BRIDGE ACTIVITIES; WIDTH RESTRICTION OF 18 FEET; REDUCED SPEED OF 65 MPH; SINGLE LANE TRAFFIC. I-15 - MILE MARKER 192.2 TO 193.1 HELENA - BETWEEN CAPITOL INTERCHANGE AND CEDAR INTERCHANGE. LOADS OVER 12 FEET WIDE WILL NEED TO BE PILOTED THROUGH THE PROJECT SITE (TRAFFIC CONTROL BY SUB-CONTRACTOR MWHC). PLEASE CALL 406-490-8390, 48 HOURS IN ADVANCE MONDAY THRU FRIDAY 8 A.M. TO 5 P.M. TO SCHEDULE PASSAGE OVER THE BRIDGE. WITH PROPER PERMITS CARRIERS MAY SEEK ALTERNATE ROUTES AROUND THE WIDTH RESTRICTION. ALL LOADS OVER 12 FEET WIDE ARE REQUIRED TO WAIT AT THE WIDE LOAD STAGING AREAS WHICH ARE LOCATED AT MP 195 FOR SB TRAFFIC AND MP 191.6 FOR NB TRAFFIC. ****WIDE LOAD TRAFFIC CONTROL OVER THE BRIDGE WILL BE BETWEEN 9 A.M. AND 11 A.M. MONDAY THRU THURSDAY. EXPECT: BRIDGE ACTIVITIES; WIDTH RESTRICTION OF 12 FEET; REDUCED SPEED OF 45 MPH; SINGLE LANE TRAFFIC; SINGLE LANE CLOSURES. I-15 - MILE MARKER 217 TO 219 1 MILE NORTH OF SIEBEN INTERCHANGE. LOADS OVER 12 FEET WIDE WILL NEED TO BE PILOTED THROUGH THE PROJECT SITE. NORTH BOUND LOADS WILL BE FROM 11:30 AM - 1:30 PM MONDAY THROUGH THURSDAY. SOUTH BOUND LOADS WILL BE PILOTED THROUGH 4:00 PM - 6:00 PM MONDAY THROUGH THURSDAY. THERE ARE WIDE LOAD STAGING AREAS. PROPER PERMIT CARRIERS MAY SEEK ALTERNATIVE ROUTES AROUND THE WIDTH RESTRICTIONS. MOUNTAIN WEST HOLDING CO. 406-490-8390 BETWEEN 8 AM AND 5 PM, AT LEAST 48 HOURS IN ADVANCE TO COORDINATE WIDE LOAD PASSAGE. EXPECT: ROCK ACTIVITIES; WIDTH RESTRICTION OF 12 FEET; REDUCED SPEED OF 45 MPH; PILOT CARS; SINGLE LANE TRAFFIC. I-15 - MILE MARKER 225 TO 245 1 MILE SOUTH OF WOLF CREEK INTERCHANGE TO 2 MILES SOUTH OF HARDY CREEK INTERCHANGE. ROCK REMOVAL PROJECT CONSISTS OF THREE LOCATIONS ALONG I-15; MP 225.4 (SB) 1 MILE SOUTH OF WOLF CREEK, MP 241.5 (NB), AND **CARS AND LIGHT TRUCKS WILL BE DETOURED

PERIODICALLY. **TRUCKS WILL BE STAGED AT THE WIDE LOAD STAGING AREAS BEFORE THE PROJECT THEN LED BY PILOT CARS FROM 2:00 PM - 4:00 PM MONDAY THROUGH THURSDAY** PROPER PERMIT CARRIERS MAY SEEK ALTERNATIVE ROUTES AROUND THE WIDTH RESTRICTIONS. CONTACT MOUNTAIN WEST HOLDING CO. 406-490-8390 BETWEEN 8 AM AND 5 PM, 48 HOURS IN ADVANCE TO COORDINATE WIDE LOAD PASSAGE. EXPECT: ROCK ACTIVITIES; WIDTH RESTRICTION OF 12 FEET; DELAYS UP TO 20 MINUTES; REDUCED SPEED OF 35 MPH; SINGLE LANE TRAFFIC. I-90 12 WIDTH I-90 12 WIDTH I-90 - MILE MARKER 0 TO 1 IN IDAHO EXIT 69 (MULLAN) TO THE MONTANA STATE LINE. **THIS IS AN IDAHO DOT CONSTRUCTION PROJECT** *PROJECT IS IN IDAHO* MP 69 TO MP 73.6 BETWEEN EXIT 69 EAST MULLAN AND LOOKOUT PASS (NEAR MULLAN). LOOK OUT FOR LONG TERM ROAD CONSTRUCTION WORK. TRUCK SPEED LIMIT 45 MPH. LOADS UP TO 12 FEET WIDE WILL BE PERMITTED TO TRAVEL THRU THE PROJECT DURING DAY LIGHT HOURS. CONTACT FOR THE IDAHO DOT IS (208) 772-1200 OR VISIT THEIR WEBSITE. PROJECT WEB SITE: IDAHO TRANSPORTATION DEPARTMENT EXPECT: RECONSTRUCTION ACTIVITIES; WIDTH RESTRICTION OF 12 FEET; ROUGH ROADWAY SURFACE. I-90 - MILE MARKER 14.5 TO 29.6 DREXEL - EAST AND WEST. BEGINNING THURSDAY JUNE 9TH, AFTER WIDE LOADS ARE PILOTED THROUGH THE PROJECT, ALL LOADS OVER 12 FEET WIDE WILL BE REQUIRED TO FIND AN ALTERNATE ROUTE. LOADS 12 FEET WIDE AND UNDER ARE ALLOWED THROUGH THE PROJECT 24/7. LOCAL WIDE LOADS SUCH AS LOGGING EQUIPMENT AND MODULAR HOMES CAN CALL POTEET CONSTRUCTION 406-830-5076 IN ADVANCE TO SET UP AN ESCORT TIME AND DATE. EXPECT: PAVING ACTIVITIES; WIDTH RESTRICTION OF 12 FEET; REDUCED SPEED OF 55 MPH; SINGLE LANE TRAFFIC. I-90 12 WIDTH I-90 - MILE MARKER 357 TO 398 EAST AND WEST BOUND LANES BEGINNING WEST OF BIG TIMBER EXTENDING EAST.. MILLING OPERATIONS TO BEGIN IN THE WESTBOUND LANE AT MILEPOST 398. BRIDGE DIGOUTS TO BEGIN IN THE EASTBOUND LANE. WIDTH RESTRICTIONS AND SPECIAL CONDITIONS: EFFECTIVE APRIL 15, 2016, WIDTH WILL BE RESTRICTED TO 12 FEET. LOADS EXCEEDING 12 FEET UP TO 13 FEET 6 INCHES IN WIDTH MUST CALL NELCON BETWEEN 6 A.M. AND 8 P.M. AT 406-309-4031 TO CHECK CURRENT CONDITIONS WHICH MAY REQUIRE BEING ESCORTED THROUGH THE PROJECT. LOADS REQUIRING ESCORTS MAY STAGE AT COLUMBUS INTERCHANGE (WESTBOUND) AND SPRINGDALE INTERCHANGE (EASTBOUND). ESCORTING WILL OCCUR MONDAY- FRIDAY BETWEEN 8 A.M. AND 10 A.M., MST. LOADS EXCEEDING 13 FEET 6 INCHES WIDE MAY CONTACT NELCON BETWEEN 6 A.M. AND 8 P.M. AT 406-309-4031 TO MAKE SPECIAL ARRANGEMENTS TO BE ESCORTED ON A CASE BY CASE BASIS. DOCUMENTATION FROM NELCON MUST BE PROVIDED IN ORDER TO RECEIVE TRIP PERMITS

US-87/US- 87/US- 191/MT- 200 US-87/US- 87/US- 191/MT- 200 US-87 US-2 US-212 MT-200 MT-200S 14 WIDTH 14 WIDTH 12 6 WIDTH 12 WIDTH 12 WIDTH 14 WIDTH 14 WIDTH OR CONSIDER USING AN ALTERNATE ROUTE.*** EXPECT: BRIDGE ACTIVITIES; WIDTH RESTRICTION OF 12 FEET; REDUCED SPEED VARYING FROM 45 TO 65 MPH; SINGLE LANE TRAFFIC. US-87/US 87 / US 191 / MT 200 - MILE MARKER 79 TO 81.1 LEWISTOWN WEST - OVERPASS. CONTRACTOR IS BEGINNING WORK, TRAVELERS SHOULD EXPECT A 14 FOOT WIDTH RESTRICTION. EXPECT: GRADING ACTIVITIES; WIDTH RESTRICTION OF 14 FEET; DELAYS UP TO 15 MINUTES; REDUCED SPEED OF 35 MPH; PILOT CARS; GRAVEL SURFACE; ROUGH ROADWAY SURFACE; SINGLE LANE TRAFFIC; SINGLE LANE CLOSURES; GROOVED SURFACE; INTERSECTION WORK; TRAFFIC CONTROLLED BY SIGNAL LIGHTS; FLAGGERS; MOTORCYCLES CONSIDER ANOTHER ROUTE. US-87/US 191 / MT 200 - MILE MARKER 81.5 TO 82.8 LEWISTOWN DOWNTOWN SIDEWALKS. EXPECT: SIDEWALK ACTIVITIES; WIDTH RESTRICTION OF 14 FEET; REDUCED SPEED OF 25 MPH; INTERSECTION WORK. BETWEEN BELT AND RAYNESFORD (EB AND WB): THERE IS A WIDTH RESTRICTION OF 12 FEET 6 INCHES WIDE. THE DETOURES FOR EB AND WB ARE: 1) WB: RAYNESFORD, MT (WB DETOURED) TO GREAT FALLS, MT: U-87, S-427, US-89, US-87. 2) EB: GREAT FALLS, MT (EB DETOURED) TO RAYNESFORD, MT: US-87, US-89, S-427, US-87 (THIS IS A PERMANENT RESTRICTION) US-2 - MILE MARKER 471.7 TO 514.9 FROM MALTA TO 2 MILES EAST OF HINSDALE. THERE WILL BE A 12 FOOT WIDTH RESTRICTION FROM MP 490 TO MP 515. STARTING MONDAY MAY 2 THERE WILL BE A 10 FOOT WIDTH RESTRICTION AT MP 471.7. EXPECT: BRIDGE ACTIVITIES; WIDTH RESTRICTION OF 12 FEET; DELAYS UP TO 15 MINUTES; REDUCED SPEED OF 35 MPH; SINGLE LANE TRAFFIC; TRAFFIC CONTROLLED BY SIGNAL LIGHTS. US-212 - MILE MARKER 119.5 TO 130.3 APPROXIMATELY 39.4 MILES SOUTH OF BROADUS. CHIP SEAL BEGINNING JUNE 13, 2016 THROUGH JUNE 17, 2016. EXPECT: CHIP SEALING ACTIVITIES; WIDTH RESTRICTION OF 12 FEET; DELAYS UP TO 15 MINUTES; DETOUR; FRESH OIL; LOOSE GRAVEL; REDUCED SPEED OF 35 MPH; PILOT CARS; GRAVEL SURFACE; SINGLE LANE TRAFFIC. MT-200 - MILE MARKER 220.5 TO 230.2 7 MILES EAST OF JORDAN CONTINUING 10 MILES EAST. STARTING JUNE 22, 2016 A 14 FOOT WIDTH RESTRICTION WILL BE IN PLACE. EXPECT: RECONSTRUCTION ACTIVITIES; WIDTH RESTRICTION OF 14 FEET; REDUCED SPEED OF 35 MPH.. MT-200S - MILE MARKER 306.4 TO 316.7 10 MILES WEST OF GLENDIVE ON MT-200S. CHIP SEAL FROM JUNE 13, 2016 THROUGH

MT-89 / 91 MT-1 MT-41 MT-43 MT-48 10 WIDTH 10 WIDTH 10 WIDTH 10 WIDTH 10 WIDTH JUNE 16, 2016. EXPECT: CHIP SEALING ACTIVITIES; WIDTH RESTRICTION OF 14 FEET; DELAYS UP TO 10 MINUTES; FRESH OIL; LOOSE GRAVEL; PILOT CARS; SINGLE LANE TRAFFIC. MONTANA STREET/HWY 91 - MILE MARKER 2.5 TO 2.9 DILLON - INTERSECTION OF MONTANA STREET AND HIGHWAY 91. PROJECT BEGINS ON MONDAY, MAY 16, 2016 AT THE INTERSECTION OF MONTANA STREET AND HIGHWAY 91, MM 2.9 AND EXTENDS WEST TO THE NORTH DILLON INTERCHANGE RAMP MM 2.5. NORTH DILLON INTERCHANGE CLOSED TO LOADS OVER 10 FEET WIDE. DETOUR TO SOUTH DILLON INTERCHANGE EXPECT: MILLING ACTIVITIES; WIDTH RESTRICTION OF 10 FEET; DETOUR; ROUGH ROADWAY SURFACE; MOTORCYCLES CONSIDER ANOTHER ROUTE. MT-1 - MILE MARKER 10.6 TO 27.1 WEST OF ANACONDA. STARTING MAY 31ST, 2016, RUMBLE STRIPS AND STRIPING WILL MT-41 - MILE MARKER 57.2 TO 65.6 MT-41/MT-2, BUTTE TO JCT MT- 55, EXTENDS FROM MILE POST 65.6 TO MILE POST 83.4 ON MT-2. STARTING MAY 24TH, 2016, RUMBLE STRIPS AND STRIPING WILL CLOSURES; TRAFFIC CONTROLLED BY SIGNAL LIGHTs. MT-43 - MILE MARKER 54.4 TO 77.8 DIVIDE (WISE RIVER) TO JCT S- 569. STARTING MAY 25TH, 2016, RUMBLE STRIPS AND STRIPING WILL MT-48 - MILE MARKER 0 TO 6.8 EAST OF ANACONDA. STARTING JUNE 1ST, 2016, RUMBLE STRIPS AND STRIPING WILL S-238 13 WIDTH S-238 - MILE MARKER.4 TO 7.2 LEWISTOWN SOUTHEAST (UPPER SPRINGCREEK ROAD) SECONDARY 238. BECAUSE OF SLIDES IN THE AREA, TRAFFIC WILL BE SINGLE LANES FROM ASH STREET TO STENDAL ROAD DAY AND NIGHT UNTIL FURTHER NOTICE WITH LOAD LIMITS OF 8 TONS PER SINGLE AXLE AND 16 TONS PER TANDEM AXLE. EXPECT: RECONSTRUCTION ACTIVITIES; WIDTH RESTRICTION OF 13 FEET; WEIGHT RESTRICTION; DELAYS UP TO 15 MINUTES; LOOSE GRAVEL; REDUCED SPEED OF 35 MPH; PILOT CARS; GRAVEL SURFACE; ROUGH ROADWAY SURFACE; SINGLE LANE TRAFFIC;

SINGLE LANE CLOSURES; GROOVED SURFACE; INTERSECTION WORK; TRAFFIC CONTROLLED BY SIGNAL LIGHTS; FLAGGERS; MOTORCYCLES CONSIDER ANOTHER ROUTE. S-273 10 WIDTH S-288 10 WIDTH S-569 10 WIDTH S-569 10 WIDTH S-273 - MILE MARKER 0 TO 12.1 ANACONDA TO JCT I-90. STARTING JUNE 1ST, 2016, RUMBLE STRIPS AND STRIPING WILL S-288/CHURCHILL ROAD - MILE MARKER 0 TO 15.6 CHURCHILL ROAD. STARTING MAY 16TH, 2016, RUMBLE STRIPS AND STRIPING WILL S-569 - MILE MARKER 0 TO 3 SOUTH OF ANANCONDA. STARTING MAY 27TH, 2016, RUMBLE STRIPS AND STRIPING WILL S-569 - MILE MARKER 19 TO 22 SOUTH OF ANACONDA. STARTING MAY 27TH, 2016, RUMBLE STRIPS AND STRIPING WILL EXPECT: RECONSTRUCTION ACTIVITIES; WIDTH RESTRICTION OF 10 FEET; LOOSE GRAVEL; REDUCED SPEED OF 35 MPH; SINGLE LANE CLOSURES; TRAFFIC CONTROLLED BY SIGNAL LIGHTS. MT-35 S-261 S-201 9 WIDTH WEIGHT RESTRICTED / WEIGHT RESTRICTED / ALL LOADS OVER 9 FEET WIDE TRAVELING BETWEEN POLSON AND BIGFORK WITH THE EXCEPTION OF LOADS THAT ARE ORIGINATING OR ARE BEING DELIVERED BETWEEN POLSON AND BIGFORKS. EFFICTIVE MARCH 26, 2012 S-261: COUNTY GRAVEL PORTION OF S-261 MP 13.4 TO MP 27.6. THE WEIGHT RESTRICTION HAS BEEN LIFTED ON THE PAVED PORTION OF S-261. THE RESTRICTION IS STILL IN EFFECT ON THE GRAVEL PORTION OF S-261 MP 13.4 TO 27.6 (MP 13.4 TO 25.8) EFFECTIVE MARCH 16, 2015 S-201 - MILE POST 27.6 TO 57.7 END OF RICHLAND COUNTY GRAVEL ROAD TO JUNCTION MT-16 NORTH OF SIDNEY