Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects 1 N 14 9 Chisago Interstate Highway 2011 Project Sites 8 12 6 Anoka 1 6 0 6 22 6 6 9 12 7 7 7 284 74 2 41 71 29 72 Carver 212 212 6 70 8 62 22 67 66 W 21 27 626 1 2 2 24 21 18 1 8 149 6 120 7 9 9 291 16 2 Dakota 0 0 0 96 19 2 E 1 9 6 77 1 28 77 17 79 2 4 6 2 41 16 62 4 Scott 2 96 244 40 42 1 282 9 E E 1 49 60 6 20 44 19 7 78 W 0 68 97 1 16 Ramsey 2 1 2 64 Hennepin 1 0 8 W 46 7 48 4 0 6 69 4 24 Washington 76 7 4 20 2 11 April 2011
2011 Twin Cities Metro Area Construction Projects 2011 Construction Program 1 Hwy Location: Hwy at 1 th St W in Empire Twp and Canadian RR Description: Replace culverts Dates: Dec 2011-June 2012 Cost: $260,000 2 Hwy 7 Location: At Baker Rd and Lake St Exit in Minnetonka system Cost: $12,000 Hwy 7 Location: West of CR 1 to I- in Minnetonka Cost: $1. million 4 Hwy 8 Location: I- to Karmel Ave (CR ) in Forest Lake, Wyoming, Chisago Dates: June-July 2011 Cost: $1.8 million ects/hwy8forestlakeu Hwy 8 Location: East of west jct with Hwy 9 in Taylors Falls Cost: $200,000 6 Hwy Location: At CR 7 (7 th Ave ramps) in Anoka Description: Rebuild ramp Cost: $400,000 7 Hwy Location: On WB Hwy exit loop to Foley Blvd (CR 11) in Coon Rapids Description: Add dual right turn lanes, revise, remove free right to SB Foley Blvd Cost: $708,00 8 Hwy 12 Location: At CR 6 and Wayzata Blvd interchanges in Orono Cost: $0,0 9 Hwy 1 Location: North of I- in Eagan, install guardrail, drainage work Cost: $290,000 Contacts: James Gillach Hwy 1 Location: Hwy 1 and Hwy 1 in Savage interchange to replace existing Hwy 1/1 at-grade intersection in Savage Dates: March 2011-June 2012 Total Cost: $19,07,000 2011 Cost: $1,07,000 11 Hwy 20 Location: From Hwy 0 to Hwy 19 (Main St) in Cannon Falls and Douglas Twp Dates: Oct-Nov 2011 Cost: $200,000 12 I- Location: From 0.8 miles north of Hwy 8 to Hwy 9 in North Branch, Wyoming, Stacy Description: Pavement preservation, misc drainage, safety improvements (remaining ARRA funds) Dates: April-July 2011 Cost: $9,,186 ects/inorthbranch/u 1 I- Location: At Chisago CR 17 interchange south of North Branch Description: Living snow fence landscaping Cost: $7,668 14 I- Location: At CR 2 and Hwy in Forest Lake Description: Interchange reconstruction and revision Dates: April-Aug 2011 Cost: $17 million 1 I-E Location: At CR 14 in Lino Lakes interchange and build new CR 14 bridge over I-E Dates: April 20-June 2011 Total Cost: $12. million 2011 Cost: $2,781,070 HUww2.anokacounty.us/v_highw ay/mainstreetati-e.aspxu 16 I-E Location: South of Ramsey CR 96 to north jct of I-W and I- E Description: Concrete overlay, drainage corrections, cable median barrier Dates: May-Oct 2011 Cost: $22 million ects/ieforestlake/u 17 I-E Location: From County Rd E to Edgerton Rd, I-6 from Hwy to Edgerton Rd (Unweave the weave) Dates: Aug 2011-July 2012 Cost: $7,00 18 I-E Location: Lone Oak Rd in Eagan to W 7th St in St. Paul Description: Overlay and concrete pavement repair Dates: July-Nov 2011 Cost: $7. million 19 I-W Location: I-W between 66th St and 42nd St, Hwy 62 between Penn Ave and Portland Ave in Mpls and Richfield Description: Construct HOV lanes for Bus Rapid Transit as part of Crosstown Commons project Dates: June 2007-June 2011 Total Cost: $286,748,220 2011 Cost: $00,000 Contact: Kevin Walker 20 I-W Location: From 42nd St to th St in Mpls Cost: $7,798 Contact: Kevin Walker 21 I-W Location: At County Rd D in Roseville Description: Rebuild Dates: Sept-Nov 2011 Cost: $40,000 1
22 I-W Location: From Blackdog Rd to 90th St in Bloomington Description: Rehabilitate/replace drainage structures Dates: Sept-Nov 2011 Cost: $29,000 2 I-W Location: MnPass and Smart Lanes extension project, NB only from the I-E/I-W split to Burnsville Pkwy Description: Construct MnPASS Smart Lane in median, convert rural median to urban, construct median barrier Dates: July-Oct 2011 Cost: $12,664,000 24 I-W Location: SB from Burnsville Pkwy to Hwy 1 in Burnsville (part of MnPass Extension project) Dates: April-Oct 2011 Cost: $6,000 2 I-W Location: From Burnsville Pkwy to I- in Burnsville and Richfield Dates: Oct-Nov 2011 Cost: $40,000 26 Hwy 6 Location: At Rice St in Roseville, Little Canada Description: Replace Rice St bridge, reconstruct interchange Dates: July 20-Nov 2011 Total Cost: $16.6 million 2011 Cost: $6,6,864 27 Hwy 6 Location: At Commerce St and Hamline Ave in Roseville Description: Rebuild traffic Dates: Spring 2011 Cost: $20,000 28 Hwy 6 Location: From White Bear Ave to Hwy 120 in Maplewood, North St. Paul Dates: Sept 2011-July 2012 Cost: $7,000 29 Hwy 41 Location: At 4th St in Chaska Description: Rebuild traffic Cost: $20,000 0 Hwy 0 Location: From Hwy to Hwy in Farmington, Empire Twp, Castle Rock Twp, Vermillion Twp, Hampton Twp, New Trier Twp, Douglas Twp Description: Micro-surface Cost: $1.1 million 1 Hwy 1 Location: From Pierce Butler Route to Como Ave in St. Paul Description: Repair concrete pavement and drainage Dates: Sept-Oct 2011 Cost: $70,000 2 I-, Hwy 2 Location: From I- in Inver Grove Heights to Belvedere St in St. Paul Description: Repair deck on nine bridges Dates: April-July 2011 Cost: $1,,20, Kent Barnard Hwy 2 Location: Along Southview Blvd (CR 14) in South St. Paul Description: Install pedestrian walkway Dates: Aug 2011-Feb 2012 Cost: $4,200 4 Hwy 2 Location: Eaton St, Plato Blvd, Concord St bridges Description: Re-deck Eaton St, Plato Blvd and repair deck on Concord St Dates: Summer 2011 Cost: Included in Project (Lafayette Bridge replacement) Website: ects/hwy2-stpaul/u Hwy 2 Location: St. Paul Description: Replace the Lafayette Bridge and roadway approaches Dates: Jan 2011-Nov 2014 Total Cost: $,81,000 2011 Cost: $9,79,6 ects/hwy2-stpaul/u 6 Hwy 2 Location: At Wentworth Ave and Thompson Ave in West St. Paul, South St. Paul Cost: $4,06 7 Hwy 2 Location: Near CR 46 in Coates Dates: Sept 20-Nov 2012 Cost: $,20 8 Hwy Location: North jct of Hwy 149 (Dodd Rd) Description: Replace Dates: Dec 2011-June 2012 Cost: $20,000 9 Hwy Location: Hwy bridge and approaches spanning the Mississippi River in Hastings bridge, approaches, access roads, connecting trails Dates: Oct 20-June 201 Total Cost: $120 million 2011 Cost: $46,669,6 HUwww.dot.state.mn.us/hastingsbr idge/u 40 Hwy Location: Hwy in Gem Lake Description: Replace BNSF railroad bridge spanning Hwy, reconstruct roadway Dates: May 20-May 2011 Total Cost: $,64, 2011 Cost: $,000 41 Hwy Location: Hwy from 20th St to Carver Ave; I- from Maxwell to Lake Rd; I-/Hwy interchange (Wakota project) in Newport, St. Paul, Maplewood, Woodbury Dates: April 20-Nov 2012 Cost: $1,276 42 Hwy Location: Jct of Hwy and Minnehaha Ave in St. Paul traffic control Dates: April-Oct 2011 Cost: $224, 4 Hwy Location: Jct of Hwy and Hwy 9 in Cottage Grove intersection, reconstruct / lengthen west frontage road Dates: May-Nov 2011 Cost: $1.2 million 44 Hwy 62 Location: At Hwy 62 / Hwy 77 interchange in Mpls Dates: Nov 20-May 2011 Cost: $4,000 4 Hwy 6 Location: Near CR 14 in Blaine Dates: Sept 2011-June 2012 Cost: $12,000 46 Hwy 6 Location: At th Ave in Ham Lake Description: Convert median openings, add U-turn access in downstream directions Dates: Aug-Nov 2011 Cost: $1,00,000 2
Hwy 6 Location: From I-6 to CR 24/27th Ave NE in Fridley, Spring Lake Park, Blaine, East Bethel Description: Signal timing, install fiber optics and cameras at various ized intersections Dates: Aug-Nov 2011 Cost: $1.4 million 48 Hwy 6 Location: East side of Hwy 6 between 1rd Ave and 19th Ave in Ham Lake Description: Restrict and close access points to Hwy 6 this is a 20 access management set-aside project Dates: Aug 2011-Feb 2012 Total Cost: $1. million 2011 Cost: $0,000 49 Hwy 77 Location: Under Old Shakopee Rd (CR 1) in Bloomington Description: Repair bridge deck, complete water resource work and pedestrian ramp Dates: July-Nov 2011 Cost: $640,000 0 I- Location: From just east of Hwy 1 in Rogers to Maple Grove Description: Resurface, rehabilitate interstate Dates: April 20-July 2011 Total Cost: $16,79,02 2011 Cost: $1,,17 ects/hwy1/index.htmlu 1 I- Location: Between 49th Ave and Shingle Creek Pkwy from Mpls to Brooklyn Center Description: Paint 1 bridges Cost: $2,,000 2 I- Location: EB from NB Hwy to White Bear Ave in St. Paul Description: Auxiliary lane EB I-, ramp metering Dates: July-Oct 2011 Cost: $2. million I- Location: From Nicollet Ave in Mpls to Cretin//Vandalia in St. Paul, repair concrete pavement, work on bridge piers, install noise wall and traffic management device Dates: April-Sept 2011 Cost: $2,66,000 ects/iresurfacing/phase2.htmlu 4 I- Location: From jct of I- in Maple Grove to CR 12 (Brooklyn Blvd) in Brooklyn Park Cost: $197,72 Contacts: Breanna Magee I- Location: From the Lowry Ave bridge to the 1st Ave bridge in Mpls Description: Resurface frontage road Dates: Aug-Sept 2011 Cost: $00,000 6 I- Location: At Shingle Creek Pkwy in Brooklyn Park Description: Rebuild Cost: $6,9 7 Hwy 9 Location: Hwy 8 in Franconia Twp to Hwy 97 in New Scandia Twp, repair drainage and guardrail, add WB right turn lane on Hwy 24 to NB Hwy 9 Cost: $4,4,000 ects/hwy9taylorsfallsu 8 Hwy 0 Location: From west 0th St/Vernon Ave to Hwy in St. Louis Park, Edina and Golden Valley Dates: June-Oct 2011 Cost: $40,000 9 Hwy 0 Location: From Brooklyn Blvd (CR 12) to over I- EB in Brooklyn Center Cost: $00,000 60 Hwy 1 Location: From Bramble Dr to Pioneer Trail in Chanhassen road Dates: July-Aug 2011 Cost: $1,000 Hwy 120 Location: At Century College entrance in White Bear Lake Description: Rebuild Dates: July-Aug 2011 Cost: $184,91 62 Hwy 149 Location: From north of Mendota Heights Rd to Smith Ave in Mendota Heights, West St. Paul Description: Seal road Dates: Sept-Oct 2011 Cost: $400,000 6 Hwy Location: At I- north and south ramps and at Highwood Drive Description: Remove s, reconstruct interchange Dates: Nov 20-Nov 2012 Total Cost: $12,27,000 2011 Cost: $42,26,14 ects//u 64 Hwy Location: From Rockford Rd to 6th Ave N in New Hope Description: Install noise wall Dates: June-Dec 2011 Cost: $1.4 million 6 Hwy Location: At CR 81 and CR 9 in Brooklyn Park (Triangle Project) Dates: Sept 2011-June 2012 Cost: $,000 66 Hwy Location: At CR 64 in Belle Plaine Dates: Oct 20-June 201 Cost: $,664 67 Hwy Location: At 17rd St in Sandcreek Twp Description: Revise intersection, close access, reconstruct backage road Cost: $,000 68 Hwy Location: At Bren Rd in Minnetonka, Edina interchange, replace bridge Dates: April-Nov 2011 Cost: $7,60,000 (Mn/DOT share) HUwww.eminnetonka.com/Bre n.cfmu 69 Hwy Location: Hwy, CR 81 and 8th Ave in Brooklyn Park, Osseo interchange bridges Dates: July 2008-July 2011 Total Cost: $49,98,77 2011 Cost: $1,829,669 ects/hwytriangle/u 70 Hwy 212 Location: Hennepin CR 4 and Dell Rd in Eden Prairie Cost: $189,440
71 Hwy 212 Location: Hwy 1 and Carver CR 17 (Powers Blvd) interchanges in Chanhassen Cost: $222,286 72 Hwy 212 Location: Hwy 41, Carver CR (Engler Blvd) and Carver CR 11 interchanges in Chaska Cost: $,62 7 Hwy 284 Location: th St to Hwy in Waconia Description: Add medians and replace Dates: June-Dec 2011 Cost: $1,08,000 74 I- Location: Hwy in Eden Prairie to I- in Minnetonka Cost: $7,1 7 I- Location: Nicollet Ave bridge and 2nd Ave pedestrian bridge in Richfield, Bloomington Description: Resurface and update bridges Dates: July 2011 Cost: $1.2 million 76 Hwy 0 Location: From Hwy in Brooklyn Park to CR 81 in Maple Grove Description: Construct three new miles of Hwy 0 Dates: Sept 2009-July 2011 Total Cost: $,827, 2011 Cost: $4,,868 ects/0/u 77 I-6 Location: 40th St to Hwy in Oakdale, Vadnais Heights, White Bear Lake, Maplewood Description: Concrete overlay Dates: Oct 2011-Oct 2012 Total Cost: $18 million 2011 Cost: $ million ects/i6oakdaleu 78 I-6 Location: Hwy SB to EB left lane entrance to I-6 and merge to Snelling Ave and SB Hamline Ave to EB I-6 interchange Dates: Aug 2011-Sept 201 Total Cost: $4 million 2011 Cost: $ million ects/6expand/u 79 I-6 Location: At CR in Oakdale system Dates: Aug-Sept 2011 Cost: $19,0 I-, Hwy, Hwy 7 Location: I- from Park Place/Xenia Ave to Central Ave/CR 1; Hwy 7 from Ottawa Ave S to Hazeltine Blvd/Hwy 41; Hwy from Theodore Wirth Pkwy to Arrowhead Dr Description: Signal timing, install fiber optics and cameras at various intersections in Hennepin County Dates: March-Oct 2011 Cost: $2,70,98 ------------------------------------------- ULegend: CR County Road Jct Junction HOV High occupancy vehicle, or carpool lanes ARRA American Recovery and Reinvestment Act SB Southbound NB Northbound WB Westbound EB Eastbound UContact Info: Kent Barnard -24-704 James Gillach -24-70 Breanna Magee -24-702 Beth Petrowske -24-708 Kevin Walker -24-709 4